SlideShare a Scribd company logo
1 of 83
Legacy Lawsuit School
        R.S. 30:29
         ACT 312
Oil and Gas Operations

 The last operator of record is responsible for
 bringing the location into compliance with
 state standards - 29-B (regulatory damages)
 LSA R.S. 30:82(9)


 The last operator is also responsible for
 full-filling any contractual obligation that he
 has to the landowner (private claims)
Operations Cont...
Only the current operator of record has a
right to access the site without the consent
of the landowner

The standard by which the operator
remediates is 29-B

The operator may use the standards that are
in place at DEQ / EPA called RECAP

RECAP may only be used with landowner
consent

Outside of lawsuits, consent to use RECAP is
normally easily attainable
Why RECAP or 29-B
RECAP is the standard used by DEQ for
hazardous waste

There are instances when RECAP is a better
standard to apply for the environment

EXAMPLE
  29B has a limit on oil and grease concentration in soil

  29B does not have any limits on individual hydrocarbon fractions
  (the individual carbon chains that make up hydrocarbons) like
  benzene

  A site could therefore pass 29B standards for oil and grease
  (and require no remediation) but fail the standards for benzene
  under RECAP
Why RECAP or 29-B
EXAMPLE

  29B has limits on salt concentrations in soil that are based on
  agriculture standards and are not health risk based

  A given salt concentration could exceed 29B but have no risk to
  human health

  If the location has no present or future utility as farmland,
  RECAP would suggest that the most environmentally responsible
  course of action is to leave the salt in place

  To dig and haul the salt impacted soil would cause a negative
  impact by taking up limited space at a disposal facility when
  the salt in place has no health risk

  If land has utility as farmland, treatment of the salt in place is
  the environmentally preferred course of action.
SERP

In 2010 the Office of Conservation
introduced SERP as an alternative to 29-B

SERP was largely based off the RECAP
program at DEQ / EPA

SERP never became law as it was pulled the
night before it went into the register for
unknown reasons
Landowner
          Courses of Action
Landowner has 3 different courses of action if they feel there land is
contaminated

   Contact the current operator of record and ask them to remediate
   (bills filed by T.Burns and Cortez would make this mandatory)

   File an environmental complaint with the Department of Natural
   Resources / Office of Conservation - which may result in compliance
   order

       7 of these filed in 2011

           2 required no action by operator

           1 operator and landowner were directed to meet and resolved
           the issues

           4 resulted in one or more compliance orders for evaluation
           and/or remediation which are currently being carried out

   File a lawsuit under ACT 312
DNR Report on Legacy
HCR 167 by Rep. Karen St. Germain

   Directed DNR to report on Legacy Lawsuits

Excerpts

   271 Lawsuits

   210 with no environmental data

   64 Settlements

       3 Remediated

       35 no remediation required

       29 -being evaluated, remediated and assessed
DNR Report Cont...
Issues Impacting Evaluation or Remediation Timelines

1.   Allowing all parties access to the property for evaluation is often disputed

2. Discovery and sampling time-lines have to be agreed upon by parties or ordered by the
   court

3. Limitations on the ability of parties to admit regulatory responsibility without admitting
   liability for other claims

4. Proving responsibility through trial and the delays inherent in all litigation

5. Remedial work requires time to complete in accordance with regulatory standards

6. OOC role under ACT 312 in submitting to the Court its most feasible evaluation or
   remediation plan to meet applicable State Regulatory standards generally occurs after the
   completion of the trial on the merits in its entirety

7. ACT 312 provides no way to enforce requirement in R.S> 30:29.1 that all environmental
   sample data associated with E & P activity be submitted to OOC within 10 days of receipt
   by all parties

8. For various reasons recent oil & gas operators without any specific causal connection to
   environmental damage are subject to ACT 312 litigation

9. Reimbursement for ACT 312 expenses by Conservation and the AGs office only occurs after
   a responsible party has been determined

10. The complexity of the legal issues addressed in ACT 312 cases
Where are the suits
Problems with ACT 312
Courts have interpreted the ACT 312 process
incorrectly and inconsistently
  Many Courts awarding damages for private claims and regulatory
  claims before hearing from DNR

Slowness in execution leads to higher attorneys
fees
Compromises of 2006 have reared their head
  Most importantly, inability to admit responsibility for the regulatory
  damages only

Landowners not giving consent to defendants to
evaluate or remediate
  Have even blocked compliance orders from the Office of
  Conservation (Sweet Lake Land)
What we would like to fix in ACT 312
Timelines and Schedules
   This would establish timeframes for each step to happen holding
   everyone accountable

Delay
  Cannot move to trial on the merits until DNR submits plan


Jury Instructions
  Juries are not being told what the ACT 312 process is
Access
  Landowner cannot deny defendant access to evaluate if notice is given


Admission of Liability
  Allow the admission to be limited to regulatory damages
Timelines and Schedules
   This would establish timeframes for each step to happen holding
   everyone accountable

Delay
  Cannot move to trial on the merits until DNR submits plan


Jury Instructions
  Juries are not being told what the ACT 312 process is
Access
  Landowner cannot deny defendant access to evaluate if notice is given


Admission of Liability
  Allow the admission to be limited to regulatory damages
Delay
  Cannot move to trial on the merits until DNR submits plan


Jury Instructions
  Juries are not being told what the ACT 312 process is
Access
  Landowner cannot deny defendant access to evaluate if notice is given


Admission of Liability
  Allow the admission to be limited to regulatory damages
Jury Instructions
  Juries are not being told what the ACT 312 process is
Access
  Landowner cannot deny defendant access to evaluate if notice is given


Admission of Liability
  Allow the admission to be limited to regulatory damages
Access
  Landowner cannot deny defendant access to evaluate if notice is given


Admission of Liability
  Allow the admission to be limited to regulatory damages
Admission of Liability
  Allow the admission to be limited to regulatory damages
Admission of Liability
  Allow the admission to be limited to regulatory damages
What are we proposing to fix




Admission of Liability
  Allow the admission to be limited to regulatory damages
Why can’t a compromise be reached


What we want that they will not agree to?
  DNR public hearing to develop plan (which is
  currently part of ACT 312)
Why is that so important?
  2 reasons
    Validates the plan by being an open and
    transparent process
    Only mechanism to consider RECAP as
    alternative to 29-B besides landowner consent
Why can’t a compromise be reached

What are they saying is wrong with what we want
  Costs - This will be an unfair burden on plaintiff to try the
  case 2 times - very expensive
     ANSWER - all plaintiff costs are covered by the party
     admitting responsibility currently under ACT 312 - so
     there is no additional costs. Also, ACT 312 currently
     requires a public hearing as part of the determination of
     the plan
  Primary Jurisdiction - Another way to get around to
  primary jurisdiction

     ANSWER - There is no change in the jurisdiction of the
     trial, nor is there any change in authority of the district
     court in approval of the plan or their standard of review
     of the plan
How ACT 312 was intended to work
   Responsible Party                  Regulatory                   “Other” Damages
    Determination                     Remediation                    Determination
                                     Determination




 Jury           Party              DNR Approval of              Private        “Extra”
Decides         Admits             Regulatory Plans            Damages       Remediation




                         How ACT 312 has worked
                                       Damages                        Regulatory
   Responsible Party                 Determination                    Remediation
    Determination
                                                                     Determination
                                         Regulatory
                                          Damages

 Jury           Party                                              DNR Approval of
                               Private             “Extra”         Regulatory Plans
Decides         Admits
                              Damages            Remediation
THE PROCESS
  LANDOWNER
 FILES LAWSUIT
      FOR
CONTAMINATION
THE PROCESS
  LANDOWNER
 FILES LAWSUIT
      FOR
CONTAMINATION
THE PROCESS
  LANDOWNER       NOTIFICATION
 FILES LAWSUIT    THAT SUIT HAS
      FOR         BEEN FILED IS
CONTAMINATION      SENT TO OOC
                     AND AG



                 R.S. 30:29 B(1)
THE PROCESS
                                       OPERATORS
                                        ADMITS
                                     LIABILITY FOR
                                     ALL DAMAGES
  LANDOWNER       NOTIFICATION
 FILES LAWSUIT    THAT SUIT HAS
      FOR         BEEN FILED IS    R.S. 30:29 C(1)
CONTAMINATION      SENT TO OOC
                     AND AG

                                         COURT
                                      DETERMINES
                 R.S. 30:29 B(1)      RESPONSIBLE
                                         PARTY
THE PROCESS
                                       OPERATORS       R.S. 30:29 C(1)
                                        ADMITS
                                     LIABILITY FOR
                                     ALL DAMAGES
  LANDOWNER       NOTIFICATION                           RESPONSIBLE
 FILES LAWSUIT    THAT SUIT HAS                      PARTY SUBMITS PLAN
      FOR         BEEN FILED IS    R.S. 30:29 C(1)   TO OOC ALONG WITH
CONTAMINATION      SENT TO OOC                         ESTIMATED COSTS
                     AND AG

                                         COURT
                                      DETERMINES
                 R.S. 30:29 B(1)      RESPONSIBLE
                                         PARTY
THE PROCESS
                                       OPERATORS       R.S. 30:29 C(1)
                                        ADMITS
                                     LIABILITY FOR
                                     ALL DAMAGES
  LANDOWNER       NOTIFICATION                           RESPONSIBLE
 FILES LAWSUIT    THAT SUIT HAS                      PARTY SUBMITS PLAN
      FOR         BEEN FILED IS    R.S. 30:29 C(1)   TO OOC ALONG WITH
CONTAMINATION      SENT TO OOC                         ESTIMATED COSTS
                     AND AG

                                         COURT
                                      DETERMINES
                 R.S. 30:29 B(1)      RESPONSIBLE
                                         PARTY




                                                           PLANS
                                                        RECEIVED BY
                                                         COURT AND
                                                            OOC




                                                     R.S. 30:29 C(1)
THE PROCESS
                                       OPERATORS       R.S. 30:29 C(1)
                                        ADMITS
                                     LIABILITY FOR
                                     ALL DAMAGES
  LANDOWNER       NOTIFICATION                           RESPONSIBLE
 FILES LAWSUIT    THAT SUIT HAS                      PARTY SUBMITS PLAN
      FOR         BEEN FILED IS    R.S. 30:29 C(1)   TO OOC ALONG WITH
CONTAMINATION      SENT TO OOC                         ESTIMATED COSTS
                     AND AG

                                         COURT
                                      DETERMINES
                 R.S. 30:29 B(1)      RESPONSIBLE
                                         PARTY




                                                                            LANDOWNER
                                                                             OR OTHER
                                                           PLANS              PARTIES
                                                        RECEIVED BY        SUMBIT PLAN(S)
                                                         COURT AND         TO OOC/COURT
                                                            OOC             ALONG WITH
                                                                             ESTIMATED
                                                                               COSTS

                                                     R.S. 30:29 C(1)
                                                                          R.S. 30:29 C(1)
THE PROCESS
                                       OPERATORS                         R.S. 30:29 C(1)
                                        ADMITS
                                     LIABILITY FOR
                                     ALL DAMAGES
  LANDOWNER       NOTIFICATION                                             RESPONSIBLE
 FILES LAWSUIT    THAT SUIT HAS                                        PARTY SUBMITS PLAN
      FOR         BEEN FILED IS    R.S. 30:29 C(1)                     TO OOC ALONG WITH
CONTAMINATION      SENT TO OOC                                           ESTIMATED COSTS
                     AND AG

                                         COURT
                                      DETERMINES
                 R.S. 30:29 B(1)      RESPONSIBLE
                                         PARTY




                                                                                              LANDOWNER
                                                                                               OR OTHER
                                                       OOC REVIEWS
                                                                             PLANS              PARTIES
                                                      PLAN AND GIVES
                                                                          RECEIVED BY        SUMBIT PLAN(S)
                                                       ESTIMATE OF
                                                                           COURT AND         TO OOC/COURT
                                                        REVIEW AND
                                                                              OOC             ALONG WITH
                                                         COSTS TO
                                                                                               ESTIMATED
                                                          COURT
                                                                                                 COSTS

                                                     R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                            R.S. 30:29 C(1)
THE PROCESS
                                                    OPERATORS                         R.S. 30:29 C(1)
                                                     ADMITS
                                                  LIABILITY FOR
                                                  ALL DAMAGES
  LANDOWNER       NOTIFICATION                                                          RESPONSIBLE
 FILES LAWSUIT    THAT SUIT HAS                                                     PARTY SUBMITS PLAN
      FOR         BEEN FILED IS               R.S. 30:29 C(1)                       TO OOC ALONG WITH
CONTAMINATION      SENT TO OOC                                                        ESTIMATED COSTS
                     AND AG

                                                     COURT
                                                  DETERMINES
                 R.S. 30:29 B(1)                  RESPONSIBLE
                                                     PARTY




                                                                                                           LANDOWNER
                                                                                                            OR OTHER
                                                                    OOC REVIEWS
                                                                                          PLANS              PARTIES
                                    OOC CONDUCTS                   PLAN AND GIVES
                                                                                       RECEIVED BY        SUMBIT PLAN(S)
                                    PUBLIC HEARING                  ESTIMATE OF
                                                                                        COURT AND         TO OOC/COURT
                                     ON THE PLAN(S)                  REVIEW AND
                                                                                           OOC             ALONG WITH
                                                                      COSTS TO
                                                                                                            ESTIMATED
                                                                       COURT
                                                                                                              COSTS
                                   R.S. 30:29 C(2)
                                                                  R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                                         R.S. 30:29 C(1)
THE PROCESS
                                                    OPERATORS                         R.S. 30:29 C(1)
                                                     ADMITS
                                                  LIABILITY FOR
                                                  ALL DAMAGES
  LANDOWNER        NOTIFICATION                                                         RESPONSIBLE
 FILES LAWSUIT     THAT SUIT HAS                                                    PARTY SUBMITS PLAN
      FOR          BEEN FILED IS              R.S. 30:29 C(1)                       TO OOC ALONG WITH
CONTAMINATION       SENT TO OOC                                                       ESTIMATED COSTS
                      AND AG

                                                     COURT
                                                  DETERMINES
                 R.S. 30:29 B(1)                  RESPONSIBLE
                                                     PARTY




                                                                                                           LANDOWNER
                                                                                                            OR OTHER
                                                                    OOC REVIEWS
                    OOC SELECTS                                                           PLANS              PARTIES
                                    OOC CONDUCTS                   PLAN AND GIVES
                     PLAN AND                                                          RECEIVED BY        SUMBIT PLAN(S)
                                    PUBLIC HEARING                  ESTIMATE OF
                    SUBMITS TO                                                          COURT AND         TO OOC/COURT
                                     ON THE PLAN(S)                  REVIEW AND
                      COURT                                                                OOC             ALONG WITH
                                                                      COSTS TO
                                                                                                            ESTIMATED
                                                                       COURT
                                                                                                              COSTS
                 R.S. 30:29 C(2)   R.S. 30:29 C(2)
                                                                  R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                                         R.S. 30:29 C(1)
THE PROCESS
                                                        OPERATORS                         R.S. 30:29 C(1)
                                                         ADMITS
                                                      LIABILITY FOR
                                                      ALL DAMAGES
   LANDOWNER           NOTIFICATION                                                         RESPONSIBLE
  FILES LAWSUIT        THAT SUIT HAS                                                    PARTY SUBMITS PLAN
       FOR             BEEN FILED IS              R.S. 30:29 C(1)                       TO OOC ALONG WITH
 CONTAMINATION          SENT TO OOC                                                       ESTIMATED COSTS
                          AND AG

                                                         COURT
                                                      DETERMINES
                     R.S. 30:29 B(1)                  RESPONSIBLE
                                                         PARTY
R.S. 30:29 C(5)

      COURT
                                                                                                               LANDOWNER
      SHALL
                                                                                                                OR OTHER
    ADOPT PLAN                                                          OOC REVIEWS
                        OOC SELECTS                                                           PLANS              PARTIES
   SENT BY OOC                          OOC CONDUCTS                   PLAN AND GIVES
                         PLAN AND                                                          RECEIVED BY        SUMBIT PLAN(S)
 UNLESS THERE IS A                      PUBLIC HEARING                  ESTIMATE OF
                        SUBMITS TO                                                          COURT AND         TO OOC/COURT
  PREPONDERANCE                          ON THE PLAN(S)                  REVIEW AND
                          COURT                                                                OOC             ALONG WITH
   OF EVIDENCE                                                            COSTS TO
                                                                                                                ESTIMATED
     AGAINST                                                               COURT
                                                                                                                  COSTS
        IT
                     R.S. 30:29 C(2)   R.S. 30:29 C(2)
                                                                      R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                                             R.S. 30:29 C(1)
THE PROCESS
                                                        OPERATORS                         R.S. 30:29 C(1)
                                                         ADMITS
                                                      LIABILITY FOR
                                                      ALL DAMAGES
   LANDOWNER           NOTIFICATION                                                         RESPONSIBLE
  FILES LAWSUIT        THAT SUIT HAS                                                    PARTY SUBMITS PLAN
       FOR             BEEN FILED IS              R.S. 30:29 C(1)                       TO OOC ALONG WITH
 CONTAMINATION          SENT TO OOC                                                       ESTIMATED COSTS
                          AND AG

                                                         COURT
                                                      DETERMINES
                     R.S. 30:29 B(1)                  RESPONSIBLE
                                                         PARTY
R.S. 30:29 C(5)

      COURT
                                                                                                               LANDOWNER
      SHALL
                                                                                                                OR OTHER
    ADOPT PLAN                                                          OOC REVIEWS
                        OOC SELECTS                                                           PLANS              PARTIES
   SENT BY OOC                          OOC CONDUCTS                   PLAN AND GIVES
                         PLAN AND                                                          RECEIVED BY        SUMBIT PLAN(S)
 UNLESS THERE IS A                      PUBLIC HEARING                  ESTIMATE OF
                        SUBMITS TO                                                          COURT AND         TO OOC/COURT
  PREPONDERANCE                          ON THE PLAN(S)                  REVIEW AND
                          COURT                                                                OOC             ALONG WITH
   OF EVIDENCE                                                            COSTS TO
                                                                                                                ESTIMATED
     AGAINST                                                               COURT
                                                                                                                  COSTS
        IT
                     R.S. 30:29 C(2)   R.S. 30:29 C(2)
                                                                      R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                                             R.S. 30:29 C(1)



      COURT
      ORDERS
   RESPONSIBLE
    PARTY TO
     FUND THE
       PLAN


R.S. 30:29 C(5)
THE PROCESS
                                                          OPERATORS                         R.S. 30:29 C(1)
                                                           ADMITS
                                                        LIABILITY FOR
                                                        ALL DAMAGES
   LANDOWNER           NOTIFICATION                                                           RESPONSIBLE
  FILES LAWSUIT        THAT SUIT HAS                                                      PARTY SUBMITS PLAN
       FOR             BEEN FILED IS                R.S. 30:29 C(1)                       TO OOC ALONG WITH
 CONTAMINATION          SENT TO OOC                                                         ESTIMATED COSTS
                          AND AG

                                                           COURT
                                                        DETERMINES
                     R.S. 30:29 B(1)                    RESPONSIBLE
                                                           PARTY
R.S. 30:29 C(5)

      COURT
                                                                                                                 LANDOWNER
      SHALL
                                                                                                                  OR OTHER
    ADOPT PLAN                                                            OOC REVIEWS
                        OOC SELECTS                                                             PLANS              PARTIES
   SENT BY OOC                            OOC CONDUCTS                   PLAN AND GIVES
                         PLAN AND                                                            RECEIVED BY        SUMBIT PLAN(S)
 UNLESS THERE IS A                        PUBLIC HEARING                  ESTIMATE OF
                        SUBMITS TO                                                            COURT AND         TO OOC/COURT
  PREPONDERANCE                            ON THE PLAN(S)                  REVIEW AND
                          COURT                                                                  OOC             ALONG WITH
   OF EVIDENCE                                                              COSTS TO
                                                                                                                  ESTIMATED
     AGAINST                                                                 COURT
                                                                                                                    COSTS
        IT
                     R.S. 30:29 C(2)     R.S. 30:29 C(2)
                                                                        R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                                               R.S. 30:29 C(1)



      COURT
                         RESPONSIBLE
      ORDERS
                       PARTY DEPOSITS
   RESPONSIBLE
                       MONEY INTO THE
    PARTY TO
                       REGISTRY OF THE
     FUND THE
                            COURT
       PLAN


R.S. 30:29 C(5)      R.S. 30:29 C(6)a
THE PROCESS
                                                          OPERATORS                         R.S. 30:29 C(1)
                                                           ADMITS
                                                        LIABILITY FOR
                                                        ALL DAMAGES
   LANDOWNER           NOTIFICATION                                                           RESPONSIBLE
  FILES LAWSUIT        THAT SUIT HAS                                                      PARTY SUBMITS PLAN
       FOR             BEEN FILED IS                R.S. 30:29 C(1)                       TO OOC ALONG WITH
 CONTAMINATION          SENT TO OOC                                                         ESTIMATED COSTS
                          AND AG

                                                           COURT
                                                        DETERMINES
                     R.S. 30:29 B(1)                    RESPONSIBLE
                                                           PARTY
R.S. 30:29 C(5)

      COURT
                                                                                                                 LANDOWNER
      SHALL
                                                                                                                  OR OTHER
    ADOPT PLAN                                                            OOC REVIEWS
                        OOC SELECTS                                                             PLANS              PARTIES
   SENT BY OOC                            OOC CONDUCTS                   PLAN AND GIVES
                         PLAN AND                                                            RECEIVED BY        SUMBIT PLAN(S)
 UNLESS THERE IS A                        PUBLIC HEARING                  ESTIMATE OF
                        SUBMITS TO                                                            COURT AND         TO OOC/COURT
  PREPONDERANCE                            ON THE PLAN(S)                  REVIEW AND
                          COURT                                                                  OOC             ALONG WITH
   OF EVIDENCE                                                              COSTS TO
                                                                                                                  ESTIMATED
     AGAINST                                                                 COURT
                                                                                                                    COSTS
        IT
                     R.S. 30:29 C(2)     R.S. 30:29 C(2)
                                                                        R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                                               R.S. 30:29 C(1)



      COURT
                         RESPONSIBLE
      ORDERS
                       PARTY DEPOSITS        COURT
   RESPONSIBLE
                       MONEY INTO THE      DETERMINES
    PARTY TO
                       REGISTRY OF THE      DAMAGES
     FUND THE
                            COURT
       PLAN


R.S. 30:29 C(5)      R.S. 30:29 C(6)a
THE PROCESS
                                                          OPERATORS                         R.S. 30:29 C(1)
                                                           ADMITS
                                                        LIABILITY FOR
                                                        ALL DAMAGES
   LANDOWNER           NOTIFICATION                                                           RESPONSIBLE
  FILES LAWSUIT        THAT SUIT HAS                                                      PARTY SUBMITS PLAN
       FOR             BEEN FILED IS                R.S. 30:29 C(1)                       TO OOC ALONG WITH
 CONTAMINATION          SENT TO OOC                                                         ESTIMATED COSTS
                          AND AG

                                                           COURT
                                                        DETERMINES
                     R.S. 30:29 B(1)                    RESPONSIBLE
                                                           PARTY
R.S. 30:29 C(5)

      COURT
                                                                                                                 LANDOWNER
      SHALL
                                                                                                                  OR OTHER
    ADOPT PLAN                                                            OOC REVIEWS
                        OOC SELECTS                                                             PLANS              PARTIES
   SENT BY OOC                            OOC CONDUCTS                   PLAN AND GIVES
                         PLAN AND                                                            RECEIVED BY        SUMBIT PLAN(S)
 UNLESS THERE IS A                        PUBLIC HEARING                  ESTIMATE OF
                        SUBMITS TO                                                            COURT AND         TO OOC/COURT
  PREPONDERANCE                            ON THE PLAN(S)                  REVIEW AND
                          COURT                                                                  OOC             ALONG WITH
   OF EVIDENCE                                                              COSTS TO
                                                                                                                  ESTIMATED
     AGAINST                                                                 COURT
                                                                                                                    COSTS
        IT
                     R.S. 30:29 C(2)     R.S. 30:29 C(2)
                                                                        R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                                               R.S. 30:29 C(1)



      COURT
                         RESPONSIBLE
      ORDERS
                       PARTY DEPOSITS        COURT
   RESPONSIBLE                                                           REMEDIATION
                       MONEY INTO THE      DETERMINES
    PARTY TO                                                             TAKES PLACE
                       REGISTRY OF THE      DAMAGES
     FUND THE
                            COURT
       PLAN


R.S. 30:29 C(5)      R.S. 30:29 C(6)a
THE PROCESS
                                                          OPERATORS                         R.S. 30:29 C(1)
                                                           ADMITS
                                                        LIABILITY FOR
                                                        ALL DAMAGES
   LANDOWNER           NOTIFICATION                                                           RESPONSIBLE
  FILES LAWSUIT        THAT SUIT HAS                                                      PARTY SUBMITS PLAN
       FOR             BEEN FILED IS                R.S. 30:29 C(1)                       TO OOC ALONG WITH
 CONTAMINATION          SENT TO OOC                                                         ESTIMATED COSTS
                          AND AG

                                                           COURT
                                                        DETERMINES
                     R.S. 30:29 B(1)                    RESPONSIBLE
                                                           PARTY
R.S. 30:29 C(5)

      COURT
                                                                                                                 LANDOWNER
      SHALL
                                                                                                                  OR OTHER
    ADOPT PLAN                                                            OOC REVIEWS
                        OOC SELECTS                                                             PLANS              PARTIES
   SENT BY OOC                            OOC CONDUCTS                   PLAN AND GIVES
                         PLAN AND                                                            RECEIVED BY        SUMBIT PLAN(S)
 UNLESS THERE IS A                        PUBLIC HEARING                  ESTIMATE OF
                        SUBMITS TO                                                            COURT AND         TO OOC/COURT
  PREPONDERANCE                            ON THE PLAN(S)                  REVIEW AND
                          COURT                                                                  OOC             ALONG WITH
   OF EVIDENCE                                                              COSTS TO
                                                                                                                  ESTIMATED
     AGAINST                                                                 COURT
                                                                                                                    COSTS
        IT
                     R.S. 30:29 C(2)     R.S. 30:29 C(2)
                                                                        R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                                               R.S. 30:29 C(1)



      COURT                                                                                      EXCESS
                         RESPONSIBLE
      ORDERS                                                                                  REMEDIATION
                       PARTY DEPOSITS        COURT
   RESPONSIBLE                                                           REMEDIATION           FUNDS ARE
                       MONEY INTO THE      DETERMINES
    PARTY TO                                                             TAKES PLACE          RETURNED TO
                       REGISTRY OF THE      DAMAGES
     FUND THE                                                                                 RESPONSIBLE
                            COURT
       PLAN                                                                                      PARTY


R.S. 30:29 C(5)      R.S. 30:29 C(6)a                                                      R.S. 30:29 D(4)
Reality

  LANDOWNER
 FILES LAWSUIT
      FOR
CONTAMINATION
Reality

  LANDOWNER
 FILES LAWSUIT
      FOR
CONTAMINATION
Reality

  LANDOWNER       NOTIFICATION
 FILES LAWSUIT    THAT SUIT HAS
      FOR         BEEN FILED IS
CONTAMINATION      SENT TO OOC
                     AND AG



                 R.S. 30:29 B(1)
Reality
                                      LANDOWNER
                                     SETTLES SUIT
                                   GIVES CONSENT TO
                                     OPERATOR TO
                                       REMEDIATE
                                     ACCORDING TO
                                    OPERATORS PLAN

  LANDOWNER       NOTIFICATION
 FILES LAWSUIT    THAT SUIT HAS
                                   R.S. 30:29 J(1)
      FOR         BEEN FILED IS
CONTAMINATION      SENT TO OOC
                     AND AG

                                    TRIAL ON
                                     MERITS
                 R.S. 30:29 B(1)
Reality
                                      LANDOWNER
                                     SETTLES SUIT
                                   GIVES CONSENT TO
                                                        REMEDIATION
                                     OPERATOR TO
                                                        TAKES PLACE
                                       REMEDIATE
                                     ACCORDING TO
                                    OPERATORS PLAN

  LANDOWNER       NOTIFICATION
 FILES LAWSUIT    THAT SUIT HAS
                                   R.S. 30:29 J(1)
      FOR         BEEN FILED IS
CONTAMINATION      SENT TO OOC
                     AND AG                              COURT
                                                      DETERMINES
                                    TRIAL ON           DAMAGES -
                                     MERITS           PRIVATE AND
                 R.S. 30:29 B(1)                      REGULATORY
Reality
                                      LANDOWNER
                                     SETTLES SUIT
                                   GIVES CONSENT TO
                                                        REMEDIATION
                                     OPERATOR TO
                                                        TAKES PLACE
                                       REMEDIATE
                                     ACCORDING TO
                                    OPERATORS PLAN

  LANDOWNER       NOTIFICATION
 FILES LAWSUIT    THAT SUIT HAS
                                   R.S. 30:29 J(1)                     COURT REFERS
      FOR         BEEN FILED IS                                        THE MATTER TO
CONTAMINATION      SENT TO OOC                                        THE DEPARTMENT
                     AND AG                              COURT
                                                      DETERMINES
                                    TRIAL ON           DAMAGES -
                                     MERITS           PRIVATE AND
                 R.S. 30:29 B(1)                      REGULATORY
Reality
                                      LANDOWNER
                                     SETTLES SUIT
                                   GIVES CONSENT TO
                                                        REMEDIATION
                                     OPERATOR TO
                                                        TAKES PLACE
                                       REMEDIATE
                                     ACCORDING TO
                                    OPERATORS PLAN

  LANDOWNER       NOTIFICATION
 FILES LAWSUIT    THAT SUIT HAS
                                   R.S. 30:29 J(1)                      COURT REFERS
      FOR         BEEN FILED IS                                         THE MATTER TO
CONTAMINATION      SENT TO OOC                                         THE DEPARTMENT
                     AND AG                              COURT
                                                      DETERMINES
                                    TRIAL ON           DAMAGES -
                                     MERITS           PRIVATE AND
                 R.S. 30:29 B(1)                                                            RESPONSIBLE
                                                      REGULATORY
                                                                                        PARTY SUBMITS PLAN
                                                                                        TO OOC ALONG WITH
                                                                                          ESTIMATED COSTS




                                                                            PLANS        R.S. 30:29 C(1)
                                                                         RECEIVED BY
                                                                          COURT AND
                                                                             OOC


                                                                                            LANDOWNER
                                                                                             OR OTHER
                                                                      R.S. 30:29 C(1)         PARTIES
                                                                                           SUMBIT PLAN(S)
                                                                                           TO OOC/COURT
                                                                                            ALONG WITH
                                                                                             ESTIMATED
                                                                                               COSTS


                                                                                         R.S. 30:29 C(1)
Reality
                                      LANDOWNER
                                     SETTLES SUIT
                                   GIVES CONSENT TO
                                                         REMEDIATION
                                     OPERATOR TO
                                                         TAKES PLACE
                                       REMEDIATE
                                     ACCORDING TO
                                    OPERATORS PLAN

  LANDOWNER       NOTIFICATION
 FILES LAWSUIT    THAT SUIT HAS
                                   R.S. 30:29 J(1)                        COURT REFERS
      FOR         BEEN FILED IS                                           THE MATTER TO
CONTAMINATION      SENT TO OOC                                           THE DEPARTMENT
                     AND AG                              COURT
                                                      DETERMINES
                                    TRIAL ON           DAMAGES -
                                     MERITS           PRIVATE AND
                 R.S. 30:29 B(1)                                                              RESPONSIBLE
                                                      REGULATORY
                                                                                          PARTY SUBMITS PLAN
                                                                                          TO OOC ALONG WITH
                                                                                            ESTIMATED COSTS




                                                        OOC REVIEWS
                                                                              PLANS        R.S. 30:29 C(1)
                                                       PLAN AND GIVES
                                                                           RECEIVED BY
                                                        ESTIMATE OF
                                                                            COURT AND
                                                         REVIEW AND
                                                                               OOC
                                                          COSTS TO
                                                           COURT
                                                                                              LANDOWNER
                                                                                               OR OTHER
                                                      R.S. 30:29 C(1)   R.S. 30:29 C(1)         PARTIES
                                                                                             SUMBIT PLAN(S)
                                                                                             TO OOC/COURT
                                                                                              ALONG WITH
                                                                                               ESTIMATED
                                                                                                 COSTS


                                                                                           R.S. 30:29 C(1)
Reality
                                         LANDOWNER
                                        SETTLES SUIT
                                      GIVES CONSENT TO
                                                            REMEDIATION
                                        OPERATOR TO
                                                            TAKES PLACE
                                          REMEDIATE
                                        ACCORDING TO
                                       OPERATORS PLAN

  LANDOWNER       NOTIFICATION
 FILES LAWSUIT    THAT SUIT HAS
                                      R.S. 30:29 J(1)                        COURT REFERS
      FOR         BEEN FILED IS                                              THE MATTER TO
CONTAMINATION      SENT TO OOC                                              THE DEPARTMENT
                     AND AG                                 COURT
                                                         DETERMINES
                                       TRIAL ON           DAMAGES -
                                        MERITS           PRIVATE AND
                 R.S. 30:29 B(1)                                                                 RESPONSIBLE
                                                         REGULATORY
                                                                                             PARTY SUBMITS PLAN
                                                                                             TO OOC ALONG WITH
                                                                                               ESTIMATED COSTS




                                                           OOC REVIEWS
                                                                                 PLANS        R.S. 30:29 C(1)
                                    OOC CONDUCTS          PLAN AND GIVES
                                                                              RECEIVED BY
                                    PUBLIC HEARING         ESTIMATE OF
                                                                               COURT AND
                                     ON THE PLAN(S)         REVIEW AND
                                                                                  OOC
                                                             COSTS TO
                                                              COURT
                                                                                                 LANDOWNER
                                   R.S. 30:29 C(2)                                                OR OTHER
                                                         R.S. 30:29 C(1)   R.S. 30:29 C(1)         PARTIES
                                                                                                SUMBIT PLAN(S)
                                                                                                TO OOC/COURT
                                                                                                 ALONG WITH
                                                                                                  ESTIMATED
                                                                                                    COSTS


                                                                                              R.S. 30:29 C(1)
Reality
                                         LANDOWNER
                                        SETTLES SUIT
                                      GIVES CONSENT TO
                                                            REMEDIATION
                                        OPERATOR TO
                                                            TAKES PLACE
                                          REMEDIATE
                                        ACCORDING TO
                                       OPERATORS PLAN

  LANDOWNER        NOTIFICATION
 FILES LAWSUIT     THAT SUIT HAS
                                      R.S. 30:29 J(1)                        COURT REFERS
      FOR          BEEN FILED IS                                             THE MATTER TO
CONTAMINATION       SENT TO OOC                                             THE DEPARTMENT
                      AND AG                                COURT
                                                         DETERMINES
                                       TRIAL ON           DAMAGES -
                                        MERITS           PRIVATE AND
                 R.S. 30:29 B(1)                                                                 RESPONSIBLE
                                                         REGULATORY
                                                                                             PARTY SUBMITS PLAN
                                                                                             TO OOC ALONG WITH
                                                                                               ESTIMATED COSTS




                    OOC SELECTS
                                                           OOC REVIEWS
                                                                                 PLANS        R.S. 30:29 C(1)
                                    OOC CONDUCTS          PLAN AND GIVES
                     PLAN AND                                                 RECEIVED BY
                                    PUBLIC HEARING         ESTIMATE OF
                    SUBMITS TO                                                 COURT AND
                                     ON THE PLAN(S)         REVIEW AND
                      COURT                                                       OOC
                                                             COSTS TO
                                                              COURT
                                                                                                 LANDOWNER
                 R.S. 30:29 C(2)   R.S. 30:29 C(2)                                                OR OTHER
                                                         R.S. 30:29 C(1)   R.S. 30:29 C(1)         PARTIES
                                                                                                SUMBIT PLAN(S)
                                                                                                TO OOC/COURT
                                                                                                 ALONG WITH
                                                                                                  ESTIMATED
                                                                                                    COSTS


                                                                                              R.S. 30:29 C(1)
Reality
                                             LANDOWNER
                                            SETTLES SUIT
                                          GIVES CONSENT TO
                                                                REMEDIATION
                                            OPERATOR TO
                                                                TAKES PLACE
                                              REMEDIATE
                                            ACCORDING TO
                                           OPERATORS PLAN

   LANDOWNER           NOTIFICATION
  FILES LAWSUIT        THAT SUIT HAS
                                          R.S. 30:29 J(1)                        COURT REFERS
       FOR             BEEN FILED IS                                             THE MATTER TO
 CONTAMINATION          SENT TO OOC                                             THE DEPARTMENT
                          AND AG                                COURT
                                                             DETERMINES
                                           TRIAL ON           DAMAGES -
                                            MERITS           PRIVATE AND
                     R.S. 30:29 B(1)                                                                 RESPONSIBLE
                                                             REGULATORY
                                                                                                 PARTY SUBMITS PLAN
R.S. 30:29 C(5)                                                                                  TO OOC ALONG WITH
                                                                                                   ESTIMATED COSTS


      COURT
      SHALL
    ADOPT PLAN
                        OOC SELECTS
                                                               OOC REVIEWS
                                                                                     PLANS        R.S. 30:29 C(1)
   SENT BY OOC                          OOC CONDUCTS          PLAN AND GIVES
                         PLAN AND                                                 RECEIVED BY
 UNLESS THERE IS A                      PUBLIC HEARING         ESTIMATE OF
                        SUBMITS TO                                                 COURT AND
  PREPONDERANCE                          ON THE PLAN(S)         REVIEW AND
                          COURT                                                       OOC
   OF EVIDENCE                                                   COSTS TO
     AGAINST                                                      COURT
        IT                                                                                           LANDOWNER
                     R.S. 30:29 C(2)   R.S. 30:29 C(2)                                                OR OTHER
                                                             R.S. 30:29 C(1)   R.S. 30:29 C(1)         PARTIES
                                                                                                    SUMBIT PLAN(S)
                                                                                                    TO OOC/COURT
                                                                                                     ALONG WITH
                                                                                                      ESTIMATED
                                                                                                        COSTS


                                                                                                  R.S. 30:29 C(1)
Reality
                                             LANDOWNER
                                            SETTLES SUIT
                                          GIVES CONSENT TO
                                                                REMEDIATION
                                            OPERATOR TO
                                                                TAKES PLACE
                                              REMEDIATE
                                            ACCORDING TO
                                           OPERATORS PLAN

   LANDOWNER           NOTIFICATION
  FILES LAWSUIT        THAT SUIT HAS
                                          R.S. 30:29 J(1)                        COURT REFERS
       FOR             BEEN FILED IS                                             THE MATTER TO
 CONTAMINATION          SENT TO OOC                                             THE DEPARTMENT
                          AND AG                                COURT
                                                             DETERMINES
                                           TRIAL ON           DAMAGES -
                                            MERITS           PRIVATE AND
                     R.S. 30:29 B(1)                                                                 RESPONSIBLE
                                                             REGULATORY
                                                                                                 PARTY SUBMITS PLAN
R.S. 30:29 C(5)                                                                                  TO OOC ALONG WITH
                                                                                                   ESTIMATED COSTS


      COURT
      SHALL
    ADOPT PLAN
                        OOC SELECTS
                                                               OOC REVIEWS
                                                                                     PLANS        R.S. 30:29 C(1)
   SENT BY OOC                          OOC CONDUCTS          PLAN AND GIVES
                         PLAN AND                                                 RECEIVED BY
 UNLESS THERE IS A                      PUBLIC HEARING         ESTIMATE OF
                        SUBMITS TO                                                 COURT AND
  PREPONDERANCE                          ON THE PLAN(S)         REVIEW AND
                          COURT                                                       OOC
   OF EVIDENCE                                                   COSTS TO
     AGAINST                                                      COURT
        IT                                                                                           LANDOWNER
                     R.S. 30:29 C(2)   R.S. 30:29 C(2)                                                OR OTHER
                                                             R.S. 30:29 C(1)   R.S. 30:29 C(1)         PARTIES
                                                                                                    SUMBIT PLAN(S)
                                                                                                    TO OOC/COURT
                                                                                                     ALONG WITH
                                                                                                      ESTIMATED
      COURT                                                                                             COSTS
      ORDERS
   RESPONSIBLE                                                                                    R.S. 30:29 C(1)
    PARTY TO
     FUND THE
       PLAN


R.S. 30:29 C(5)
Reality
                                              LANDOWNER
                                             SETTLES SUIT
                                           GIVES CONSENT TO
                                                                 REMEDIATION
                                             OPERATOR TO
                                                                 TAKES PLACE
                                               REMEDIATE
                                             ACCORDING TO
                                            OPERATORS PLAN

   LANDOWNER           NOTIFICATION
  FILES LAWSUIT        THAT SUIT HAS
                                           R.S. 30:29 J(1)                        COURT REFERS
       FOR             BEEN FILED IS                                              THE MATTER TO
 CONTAMINATION          SENT TO OOC                                              THE DEPARTMENT
                          AND AG                                 COURT
                                                              DETERMINES
                                            TRIAL ON           DAMAGES -
                                             MERITS           PRIVATE AND
                     R.S. 30:29 B(1)                                                                  RESPONSIBLE
                                                              REGULATORY
                                                                                                  PARTY SUBMITS PLAN
R.S. 30:29 C(5)                                                                                   TO OOC ALONG WITH
                                                                                                    ESTIMATED COSTS


      COURT
      SHALL
    ADOPT PLAN
                        OOC SELECTS
                                                                OOC REVIEWS
                                                                                      PLANS        R.S. 30:29 C(1)
   SENT BY OOC                           OOC CONDUCTS          PLAN AND GIVES
                         PLAN AND                                                  RECEIVED BY
 UNLESS THERE IS A                       PUBLIC HEARING         ESTIMATE OF
                        SUBMITS TO                                                  COURT AND
  PREPONDERANCE                           ON THE PLAN(S)         REVIEW AND
                          COURT                                                        OOC
   OF EVIDENCE                                                    COSTS TO
     AGAINST                                                       COURT
        IT                                                                                            LANDOWNER
                     R.S. 30:29 C(2)    R.S. 30:29 C(2)                                                OR OTHER
                                                              R.S. 30:29 C(1)   R.S. 30:29 C(1)         PARTIES
                                                                                                     SUMBIT PLAN(S)
                                                                                                     TO OOC/COURT
                                                                                                      ALONG WITH
                                                                                                       ESTIMATED
      COURT                                                                                              COSTS
                        RESPONSIBLE
      ORDERS          PARTY DEPOSITS
   RESPONSIBLE        MONEY INTO THE                                                               R.S. 30:29 C(1)
    PARTY TO          REGISTRY OF THE
     FUND THE              COURT
       PLAN


R.S. 30:29 C(5)      R.S. 30:29 C(6)a
Reality
                                              LANDOWNER
                                             SETTLES SUIT
                                           GIVES CONSENT TO
                                                                 REMEDIATION
                                             OPERATOR TO
                                                                 TAKES PLACE
                                               REMEDIATE
                                             ACCORDING TO
                                            OPERATORS PLAN

   LANDOWNER           NOTIFICATION
  FILES LAWSUIT        THAT SUIT HAS
                                           R.S. 30:29 J(1)                        COURT REFERS
       FOR             BEEN FILED IS                                              THE MATTER TO
 CONTAMINATION          SENT TO OOC                                              THE DEPARTMENT
                          AND AG                                 COURT
                                                              DETERMINES
                                            TRIAL ON           DAMAGES -
                                             MERITS           PRIVATE AND
                     R.S. 30:29 B(1)                                                                  RESPONSIBLE
                                                              REGULATORY
                                                                                                  PARTY SUBMITS PLAN
R.S. 30:29 C(5)                                                                                   TO OOC ALONG WITH
                                                                                                    ESTIMATED COSTS


      COURT
      SHALL
    ADOPT PLAN
                        OOC SELECTS
                                                                OOC REVIEWS
                                                                                      PLANS        R.S. 30:29 C(1)
   SENT BY OOC                           OOC CONDUCTS          PLAN AND GIVES
                         PLAN AND                                                  RECEIVED BY
 UNLESS THERE IS A                       PUBLIC HEARING         ESTIMATE OF
                        SUBMITS TO                                                  COURT AND
  PREPONDERANCE                           ON THE PLAN(S)         REVIEW AND
                          COURT                                                        OOC
   OF EVIDENCE                                                    COSTS TO
     AGAINST                                                       COURT
        IT                                                                                            LANDOWNER
                     R.S. 30:29 C(2)    R.S. 30:29 C(2)                                                OR OTHER
                                                              R.S. 30:29 C(1)   R.S. 30:29 C(1)         PARTIES
                                                                                                     SUMBIT PLAN(S)
                                                                                                     TO OOC/COURT
                                                                                                      ALONG WITH
                                                                                                       ESTIMATED
      COURT                                                                                              COSTS
                        RESPONSIBLE
      ORDERS          PARTY DEPOSITS
                                          REMEDIATION
   RESPONSIBLE        MONEY INTO THE
                                          TAKES PLACE                                              R.S. 30:29 C(1)
    PARTY TO          REGISTRY OF THE
     FUND THE              COURT
       PLAN


R.S. 30:29 C(5)      R.S. 30:29 C(6)a
Reality
                                              LANDOWNER
                                             SETTLES SUIT
                                           GIVES CONSENT TO
                                                                    REMEDIATION
                                             OPERATOR TO
                                                                    TAKES PLACE
                                               REMEDIATE
                                             ACCORDING TO
                                            OPERATORS PLAN

   LANDOWNER           NOTIFICATION
  FILES LAWSUIT        THAT SUIT HAS
                                           R.S. 30:29 J(1)                           COURT REFERS
       FOR             BEEN FILED IS                                                 THE MATTER TO
 CONTAMINATION          SENT TO OOC                                                 THE DEPARTMENT
                          AND AG                                     COURT
                                                                  DETERMINES
                                            TRIAL ON               DAMAGES -
                                             MERITS               PRIVATE AND
                     R.S. 30:29 B(1)                                                                     RESPONSIBLE
                                                                  REGULATORY
                                                                                                     PARTY SUBMITS PLAN
R.S. 30:29 C(5)                                                                                      TO OOC ALONG WITH
                                                                                                       ESTIMATED COSTS


      COURT
      SHALL
    ADOPT PLAN
                        OOC SELECTS
                                                                   OOC REVIEWS
                                                                                         PLANS        R.S. 30:29 C(1)
   SENT BY OOC                           OOC CONDUCTS             PLAN AND GIVES
                         PLAN AND                                                     RECEIVED BY
 UNLESS THERE IS A                       PUBLIC HEARING            ESTIMATE OF
                        SUBMITS TO                                                     COURT AND
  PREPONDERANCE                           ON THE PLAN(S)            REVIEW AND
                          COURT                                                           OOC
   OF EVIDENCE                                                       COSTS TO
     AGAINST                                                          COURT
        IT                                                                                               LANDOWNER
                     R.S. 30:29 C(2)    R.S. 30:29 C(2)                                                   OR OTHER
                                                                 R.S. 30:29 C(1)   R.S. 30:29 C(1)         PARTIES
                                                                                                        SUMBIT PLAN(S)
                                                                                                        TO OOC/COURT
                                                                                                         ALONG WITH
                                                                                                          ESTIMATED
      COURT                                                        EXCESS                                   COSTS
                        RESPONSIBLE
      ORDERS          PARTY DEPOSITS                            REMEDIATION
                                          REMEDIATION
   RESPONSIBLE        MONEY INTO THE
                                          TAKES PLACE
                                                                 FUNDS ARE                            R.S. 30:29 C(1)
    PARTY TO          REGISTRY OF THE                           RETURNED TO
     FUND THE              COURT                                RESPONSIBLE
       PLAN                                                        PARTY


R.S. 30:29 C(5)      R.S. 30:29 C(6)a                         R.S. 30:29 D(4)
Proposed Solution to ACT 312

                              Regulatory                   “Other” Damages
                              Remediation                    Determination
                             Determination



    Party                  DNR Approval of              Private        “Extra”
    Admits                 Regulatory Plans            Damages       Remediation


Responsible Party
 Determination



     Jury
    Decides                    Damages                        Regulatory
                             Determination                    Remediation
                                                             Determination
                                 Regulatory
                                  Damages

                                                           DNR Approval of
                       Private             “Extra”         Regulatory Plans
                      Damages            Remediation
The Solution
  LANDOWNER
 FILES LAWSUIT
      FOR
CONTAMINATION
The Solution
  LANDOWNER
 FILES LAWSUIT
      FOR
CONTAMINATION
The Solution
  LANDOWNER       NOTIFICATION
 FILES LAWSUIT    THAT SUIT HAS
      FOR         BEEN FILED IS
CONTAMINATION      SENT TO OOC
                     AND AG



                 R.S. 30:29 B(1)
The Solution
  LANDOWNER       NOTIFICATION
 FILES LAWSUIT    THAT SUIT HAS       OPERATORS
      FOR         BEEN FILED IS        ADMITS
CONTAMINATION      SENT TO OOC      LIABILITY FOR
                     AND AG         ALL DAMAGES


                                   R.S. 30:29 C(1)
                 R.S. 30:29 B(1)
                                       COURT
                                    DETERMINES
                                    RESPONSIBLE
                                       PARTY
R.S. 30:29.2
The Solution                           Defendant
                                   limits admission
                                     to regulatory
                                        damages




  LANDOWNER       NOTIFICATION
 FILES LAWSUIT    THAT SUIT HAS       OPERATORS
      FOR         BEEN FILED IS        ADMITS
CONTAMINATION      SENT TO OOC      LIABILITY FOR
                     AND AG         ALL DAMAGES


                                   R.S. 30:29 C(1)
                 R.S. 30:29 B(1)
                                       COURT
                                    DETERMINES
                                    RESPONSIBLE
                                       PARTY
R.S. 30:29.2
The Solution                           Defendant
                                   limits admission
                                     to regulatory
                                        damages
                                                          R.S. 30:29 C(1)


  LANDOWNER       NOTIFICATION                              RESPONSIBLE
 FILES LAWSUIT    THAT SUIT HAS       OPERATORS         PARTY SUBMITS PLAN
      FOR         BEEN FILED IS        ADMITS           TO OOC ALONG WITH
CONTAMINATION      SENT TO OOC      LIABILITY FOR         ESTIMATED COSTS
                     AND AG         ALL DAMAGES


                                   R.S. 30:29 C(1)
                 R.S. 30:29 B(1)
                                       COURT
                                    DETERMINES
                                    RESPONSIBLE
                                       PARTY
R.S. 30:29.2
The Solution                           Defendant
                                   limits admission
                                     to regulatory
                                        damages
                                                          R.S. 30:29 C(1)


  LANDOWNER       NOTIFICATION                              RESPONSIBLE
 FILES LAWSUIT    THAT SUIT HAS       OPERATORS         PARTY SUBMITS PLAN
      FOR         BEEN FILED IS        ADMITS           TO OOC ALONG WITH
CONTAMINATION      SENT TO OOC      LIABILITY FOR         ESTIMATED COSTS
                     AND AG         ALL DAMAGES


                                   R.S. 30:29 C(1)
                 R.S. 30:29 B(1)
                                       COURT
                                    DETERMINES
                                    RESPONSIBLE
                                       PARTY



                                                              PLANS
                                                           RECEIVED BY
                                                            COURT AND
                                                               OOC




                                                        R.S. 30:29 C(1)
R.S. 30:29.2
The Solution                           Defendant
                                   limits admission
                                     to regulatory
                                        damages
                                                          R.S. 30:29 C(1)


  LANDOWNER       NOTIFICATION                              RESPONSIBLE
 FILES LAWSUIT    THAT SUIT HAS       OPERATORS         PARTY SUBMITS PLAN
      FOR         BEEN FILED IS        ADMITS           TO OOC ALONG WITH
CONTAMINATION      SENT TO OOC      LIABILITY FOR         ESTIMATED COSTS
                     AND AG         ALL DAMAGES


                                   R.S. 30:29 C(1)
                 R.S. 30:29 B(1)
                                       COURT
                                    DETERMINES
                                    RESPONSIBLE
                                       PARTY
                                                                               LANDOWNER
                                                                                OR OTHER
                                                              PLANS              PARTIES
                                                           RECEIVED BY        SUMBIT PLAN(S)
                                                            COURT AND         TO OOC/COURT
                                                               OOC             ALONG WITH
                                                                                ESTIMATED
                                                                                  COSTS

                                                        R.S. 30:29 C(1)
                                                                             R.S. 30:29 C(1)
R.S. 30:29.2
The Solution                           Defendant
                                   limits admission
                                     to regulatory
                                        damages
                                                                          R.S. 30:29 C(1)


  LANDOWNER       NOTIFICATION                                              RESPONSIBLE
 FILES LAWSUIT    THAT SUIT HAS       OPERATORS                         PARTY SUBMITS PLAN
      FOR         BEEN FILED IS        ADMITS                           TO OOC ALONG WITH
CONTAMINATION      SENT TO OOC      LIABILITY FOR                         ESTIMATED COSTS
                     AND AG         ALL DAMAGES


                                   R.S. 30:29 C(1)
                 R.S. 30:29 B(1)
                                       COURT
                                    DETERMINES
                                    RESPONSIBLE
                                       PARTY
                                                                                               LANDOWNER
                                                                                                OR OTHER
                                                        OOC REVIEWS
                                                                              PLANS              PARTIES
                                                       PLAN AND GIVES
                                                                           RECEIVED BY        SUMBIT PLAN(S)
                                                        ESTIMATE OF
                                                                            COURT AND         TO OOC/COURT
                                                         REVIEW AND
                                                                               OOC             ALONG WITH
                                                          COSTS TO
                                                                                                ESTIMATED
                                                           COURT
                                                                                                  COSTS

                                                      R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                             R.S. 30:29 C(1)
R.S. 30:29.2
The Solution                                        Defendant
                                                limits admission
                                                  to regulatory
                                                     damages
                                                                                       R.S. 30:29 C(1)


  LANDOWNER       NOTIFICATION                                                           RESPONSIBLE
 FILES LAWSUIT    THAT SUIT HAS                    OPERATORS                         PARTY SUBMITS PLAN
      FOR         BEEN FILED IS                     ADMITS                           TO OOC ALONG WITH
CONTAMINATION      SENT TO OOC                   LIABILITY FOR                         ESTIMATED COSTS
                     AND AG                      ALL DAMAGES


                                                R.S. 30:29 C(1)
                 R.S. 30:29 B(1)
                                                     COURT
                                                  DETERMINES
                                                  RESPONSIBLE
                                                     PARTY
                                                                                                            LANDOWNER
                                                                                                             OR OTHER
                                                                     OOC REVIEWS
                                                                                           PLANS              PARTIES
                                    OOC CONDUCTS                    PLAN AND GIVES
                                                                                        RECEIVED BY        SUMBIT PLAN(S)
                                    PUBLIC HEARING                   ESTIMATE OF
                                                                                         COURT AND         TO OOC/COURT
                                     ON THE PLAN(S)                   REVIEW AND
                                                                                            OOC             ALONG WITH
                                                                       COSTS TO
                                                                                                             ESTIMATED
                                                                        COURT
                                                                                                               COSTS
                                   R.S. 30:29 C(2)
                                                                   R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                                          R.S. 30:29 C(1)
R.S. 30:29.2
The Solution                                        Defendant
                                                limits admission
                                                  to regulatory
                                                     damages
                                                                                       R.S. 30:29 C(1)


  LANDOWNER        NOTIFICATION                                                          RESPONSIBLE
 FILES LAWSUIT     THAT SUIT HAS                   OPERATORS                         PARTY SUBMITS PLAN
      FOR          BEEN FILED IS                    ADMITS                           TO OOC ALONG WITH
CONTAMINATION       SENT TO OOC                  LIABILITY FOR                         ESTIMATED COSTS
                      AND AG                     ALL DAMAGES


                                                R.S. 30:29 C(1)
                 R.S. 30:29 B(1)
                                                     COURT
                                                  DETERMINES
                                                  RESPONSIBLE
                                                     PARTY
                                                                                                            LANDOWNER
                                                                                                             OR OTHER
                                                                     OOC REVIEWS
                    OOC SELECTS                                                            PLANS              PARTIES
                                    OOC CONDUCTS                    PLAN AND GIVES
                     PLAN AND                                                           RECEIVED BY        SUMBIT PLAN(S)
                                    PUBLIC HEARING                   ESTIMATE OF
                    SUBMITS TO                                                           COURT AND         TO OOC/COURT
                                     ON THE PLAN(S)                   REVIEW AND
                      COURT                                                                 OOC             ALONG WITH
                                                                       COSTS TO
                                                                                                             ESTIMATED
                                                                        COURT
                                                                                                               COSTS
                 R.S. 30:29 C(2)   R.S. 30:29 C(2)
                                                                   R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                                          R.S. 30:29 C(1)
R.S. 30:29.2
The Solution                                            Defendant
                                                    limits admission
                                                      to regulatory
                                                         damages
                                                                                           R.S. 30:29 C(1)


   LANDOWNER           NOTIFICATION                                                          RESPONSIBLE
  FILES LAWSUIT        THAT SUIT HAS                   OPERATORS                         PARTY SUBMITS PLAN
       FOR             BEEN FILED IS                    ADMITS                           TO OOC ALONG WITH
 CONTAMINATION          SENT TO OOC                  LIABILITY FOR                         ESTIMATED COSTS
                          AND AG                     ALL DAMAGES


                                                    R.S. 30:29 C(1)
                     R.S. 30:29 B(1)
                                                         COURT
R.S. 30:29 C(5)                                       DETERMINES
                                                      RESPONSIBLE
                                                         PARTY
      COURT
                                                                                                                LANDOWNER
      SHALL
                                                                                                                 OR OTHER
    ADOPT PLAN                                                           OOC REVIEWS
                        OOC SELECTS                                                            PLANS              PARTIES
   SENT BY OOC                          OOC CONDUCTS                    PLAN AND GIVES
                         PLAN AND                                                           RECEIVED BY        SUMBIT PLAN(S)
 UNLESS THERE IS A                      PUBLIC HEARING                   ESTIMATE OF
                        SUBMITS TO                                                           COURT AND         TO OOC/COURT
  PREPONDERANCE                          ON THE PLAN(S)                   REVIEW AND
                          COURT                                                                 OOC             ALONG WITH
   OF EVIDENCE                                                             COSTS TO
                                                                                                                 ESTIMATED
     AGAINST                                                                COURT
                                                                                                                   COSTS
        IT
                     R.S. 30:29 C(2)   R.S. 30:29 C(2)
                                                                       R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                                              R.S. 30:29 C(1)
R.S. 30:29.2
The Solution                                            Defendant
                                                    limits admission
                                                      to regulatory
                                                         damages
                                                                                           R.S. 30:29 C(1)


   LANDOWNER           NOTIFICATION                                                          RESPONSIBLE
  FILES LAWSUIT        THAT SUIT HAS                   OPERATORS                         PARTY SUBMITS PLAN
       FOR             BEEN FILED IS                    ADMITS                           TO OOC ALONG WITH
 CONTAMINATION          SENT TO OOC                  LIABILITY FOR                         ESTIMATED COSTS
                          AND AG                     ALL DAMAGES


                                                    R.S. 30:29 C(1)
                     R.S. 30:29 B(1)
                                                         COURT
R.S. 30:29 C(5)                                       DETERMINES
                                                      RESPONSIBLE
                                                         PARTY
      COURT
                                                                                                                LANDOWNER
      SHALL
                                                                                                                 OR OTHER
    ADOPT PLAN                                                           OOC REVIEWS
                        OOC SELECTS                                                            PLANS              PARTIES
   SENT BY OOC                          OOC CONDUCTS                    PLAN AND GIVES
                         PLAN AND                                                           RECEIVED BY        SUMBIT PLAN(S)
 UNLESS THERE IS A                      PUBLIC HEARING                   ESTIMATE OF
                        SUBMITS TO                                                           COURT AND         TO OOC/COURT
  PREPONDERANCE                          ON THE PLAN(S)                   REVIEW AND
                          COURT                                                                 OOC             ALONG WITH
   OF EVIDENCE                                                             COSTS TO
                                                                                                                 ESTIMATED
     AGAINST                                                                COURT
                                                                                                                   COSTS
        IT
                     R.S. 30:29 C(2)   R.S. 30:29 C(2)
                                                                       R.S. 30:29 C(1)   R.S. 30:29 C(1)
                                                                                                              R.S. 30:29 C(1)



      COURT
      ORDERS
   RESPONSIBLE
    PARTY TO
     FUND THE
       PLAN


R.S. 30:29 C(5)
Legacy School
Legacy School
Legacy School
Legacy School
Legacy School
Legacy School
Legacy School
Legacy School
Legacy School
Legacy School
Legacy School
Legacy School
Legacy School
Legacy School
Legacy School

More Related Content

Viewers also liked

Planability ETI short exhibition contractorss
Planability ETI short exhibition contractorssPlanability ETI short exhibition contractorss
Planability ETI short exhibition contractorssPlanabilityETI
 
Lallaa its the poem in pictures
Lallaa its the poem in picturesLallaa its the poem in pictures
Lallaa its the poem in picturesinskee
 
Making your fantasy job a reality
Making your fantasy job a realityMaking your fantasy job a reality
Making your fantasy job a realitypvwright1000
 
Psalm1 – A picture of Godly happiness
Psalm1 – A picture of Godly happinessPsalm1 – A picture of Godly happiness
Psalm1 – A picture of Godly happinessJon Juane
 
Lallaa its the poem in pictures
Lallaa its the poem in picturesLallaa its the poem in pictures
Lallaa its the poem in picturesinskee
 
STC-PMC November 2016 Presentation - Mobile First Content
STC-PMC November 2016 Presentation - Mobile First ContentSTC-PMC November 2016 Presentation - Mobile First Content
STC-PMC November 2016 Presentation - Mobile First ContentSTC-Philadelphia Metro Chapter
 
22. вымпелком анатолий сморгонский
22. вымпелком анатолий сморгонский22. вымпелком анатолий сморгонский
22. вымпелком анатолий сморгонскийAleksey Naumkin
 
What is Intelligence?
What is Intelligence?What is Intelligence?
What is Intelligence?benstory
 
Core Java Training in Noida
Core Java Training in NoidaCore Java Training in Noida
Core Java Training in NoidaTech Mentro
 
Useful Shareware / Freeware for Technical Communicators
Useful Shareware / Freeware for Technical CommunicatorsUseful Shareware / Freeware for Technical Communicators
Useful Shareware / Freeware for Technical CommunicatorsSTC-Philadelphia Metro Chapter
 
презентация1
презентация1презентация1
презентация1xxxnmxxx
 
Work Samples
Work SamplesWork Samples
Work SamplesEggersP
 

Viewers also liked (18)

Planability ETI short exhibition contractorss
Planability ETI short exhibition contractorssPlanability ETI short exhibition contractorss
Planability ETI short exhibition contractorss
 
Lallaa its the poem in pictures
Lallaa its the poem in picturesLallaa its the poem in pictures
Lallaa its the poem in pictures
 
Making your fantasy job a reality
Making your fantasy job a realityMaking your fantasy job a reality
Making your fantasy job a reality
 
Boh
BohBoh
Boh
 
Tameer 3rd issue
Tameer   3rd issueTameer   3rd issue
Tameer 3rd issue
 
Psalm1 – A picture of Godly happiness
Psalm1 – A picture of Godly happinessPsalm1 – A picture of Godly happiness
Psalm1 – A picture of Godly happiness
 
Jordi 16 7
Jordi 16 7Jordi 16 7
Jordi 16 7
 
Lallaa its the poem in pictures
Lallaa its the poem in picturesLallaa its the poem in pictures
Lallaa its the poem in pictures
 
STC-PMC November 2016 Presentation - Mobile First Content
STC-PMC November 2016 Presentation - Mobile First ContentSTC-PMC November 2016 Presentation - Mobile First Content
STC-PMC November 2016 Presentation - Mobile First Content
 
22. вымпелком анатолий сморгонский
22. вымпелком анатолий сморгонский22. вымпелком анатолий сморгонский
22. вымпелком анатолий сморгонский
 
FITOXY2003
FITOXY2003FITOXY2003
FITOXY2003
 
Powerrománico
PowerrománicoPowerrománico
Powerrománico
 
What is Intelligence?
What is Intelligence?What is Intelligence?
What is Intelligence?
 
Core Java Training in Noida
Core Java Training in NoidaCore Java Training in Noida
Core Java Training in Noida
 
Useful Shareware / Freeware for Technical Communicators
Useful Shareware / Freeware for Technical CommunicatorsUseful Shareware / Freeware for Technical Communicators
Useful Shareware / Freeware for Technical Communicators
 
презентация1
презентация1презентация1
презентация1
 
Work Samples
Work SamplesWork Samples
Work Samples
 
UniMAP Vice Chancellor 2015 Presentation
UniMAP Vice Chancellor 2015 PresentationUniMAP Vice Chancellor 2015 Presentation
UniMAP Vice Chancellor 2015 Presentation
 

Similar to Legacy School

Hydraulic Fracturing: Where Are We Now?
Hydraulic Fracturing: Where Are We Now?Hydraulic Fracturing: Where Are We Now?
Hydraulic Fracturing: Where Are We Now?RAFI-USA
 
January 10th Lecture
January 10th  LectureJanuary 10th  Lecture
January 10th LectureCEQAplanner
 
Our inspection agreement
Our inspection agreementOur inspection agreement
Our inspection agreementstoneybrook
 
Ceca adjudication the process - january 2013
Ceca   adjudication  the process - january 2013Ceca   adjudication  the process - january 2013
Ceca adjudication the process - january 2013watsonburton
 
Maryland Register - Nov 14, 2016 - New Fracking Rules
Maryland Register - Nov 14, 2016 - New Fracking RulesMaryland Register - Nov 14, 2016 - New Fracking Rules
Maryland Register - Nov 14, 2016 - New Fracking RulesMarcellus Drilling News
 
EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...
EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...
EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...EMLI Indonesia
 
J.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitrators
J.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitratorsJ.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitrators
J.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitratorsJ.S. Daniel
 
Fxc euci brc 061612
Fxc euci brc 061612Fxc euci brc 061612
Fxc euci brc 061612barkinbob
 
Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...StopHermosaBeachOil
 
Public sector planning club - October 2017, Nottingham
Public sector planning club - October 2017, NottinghamPublic sector planning club - October 2017, Nottingham
Public sector planning club - October 2017, NottinghamBrowne Jacobson LLP
 
NEPA and the Mining Law
NEPA and the Mining LawNEPA and the Mining Law
NEPA and the Mining LawRob Shull
 
PA Executive Order: Permit Decision Guarantee for the DEP
PA Executive Order: Permit Decision Guarantee for the DEPPA Executive Order: Permit Decision Guarantee for the DEP
PA Executive Order: Permit Decision Guarantee for the DEPMarcellus Drilling News
 
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...Amanda James
 
Land court and adr procedures final
Land court and adr procedures   finalLand court and adr procedures   final
Land court and adr procedures finalResolution Institute
 

Similar to Legacy School (20)

Hydraulic Fracturing: Where Are We Now?
Hydraulic Fracturing: Where Are We Now?Hydraulic Fracturing: Where Are We Now?
Hydraulic Fracturing: Where Are We Now?
 
January 10th Lecture
January 10th  LectureJanuary 10th  Lecture
January 10th Lecture
 
Our inspection agreement
Our inspection agreementOur inspection agreement
Our inspection agreement
 
Ceca adjudication the process - january 2013
Ceca   adjudication  the process - january 2013Ceca   adjudication  the process - january 2013
Ceca adjudication the process - january 2013
 
APPLICATION OF ZONING VARIANCE
APPLICATION OF ZONING VARIANCEAPPLICATION OF ZONING VARIANCE
APPLICATION OF ZONING VARIANCE
 
Environmental case law update
Environmental case law updateEnvironmental case law update
Environmental case law update
 
Maryland Register - Nov 14, 2016 - New Fracking Rules
Maryland Register - Nov 14, 2016 - New Fracking RulesMaryland Register - Nov 14, 2016 - New Fracking Rules
Maryland Register - Nov 14, 2016 - New Fracking Rules
 
EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...
EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...
EMLI Training-Legal Due Diligence for Acquisition Deal in Indonesian Mining P...
 
Fxc euci brc 061612
Fxc euci brc 061612Fxc euci brc 061612
Fxc euci brc 061612
 
J.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitrators
J.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitratorsJ.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitrators
J.S. Daniel paper on Arbitrated cases in lebanon and decisions of arbitrators
 
Fxc euci brc 061612
Fxc euci brc 061612Fxc euci brc 061612
Fxc euci brc 061612
 
Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
Rick Pruetz - Draft Environmental Impact Report Comments - Hermosa Beach Oil ...
 
Public sector planning club - October 2017, Nottingham
Public sector planning club - October 2017, NottinghamPublic sector planning club - October 2017, Nottingham
Public sector planning club - October 2017, Nottingham
 
NEPA and the Mining Law
NEPA and the Mining LawNEPA and the Mining Law
NEPA and the Mining Law
 
ADR
ADRADR
ADR
 
Lawyers, Water & Money, Jim Bradbury
Lawyers, Water & Money, Jim BradburyLawyers, Water & Money, Jim Bradbury
Lawyers, Water & Money, Jim Bradbury
 
EPA CAA Email 2.26.03
EPA CAA Email 2.26.03EPA CAA Email 2.26.03
EPA CAA Email 2.26.03
 
PA Executive Order: Permit Decision Guarantee for the DEP
PA Executive Order: Permit Decision Guarantee for the DEPPA Executive Order: Permit Decision Guarantee for the DEP
PA Executive Order: Permit Decision Guarantee for the DEP
 
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
Wind_Energy_Law_2014_Amanda James _Avoiding Regulatory Missteps for Developer...
 
Land court and adr procedures final
Land court and adr procedures   finalLand court and adr procedures   final
Land court and adr procedures final
 

More from Louisiana Oil & Gas Association

8 Years in Louisiana's Oil & Gas Industry - Ben Broussard, LOGA
8 Years in Louisiana's Oil & Gas Industry - Ben Broussard, LOGA8 Years in Louisiana's Oil & Gas Industry - Ben Broussard, LOGA
8 Years in Louisiana's Oil & Gas Industry - Ben Broussard, LOGALouisiana Oil & Gas Association
 

More from Louisiana Oil & Gas Association (20)

2017 State of the Industry - Gifford Briggs
2017 State of the Industry - Gifford Briggs2017 State of the Industry - Gifford Briggs
2017 State of the Industry - Gifford Briggs
 
LOGA | AADE Lafayette | 1.16.17
LOGA | AADE Lafayette | 1.16.17LOGA | AADE Lafayette | 1.16.17
LOGA | AADE Lafayette | 1.16.17
 
Ben Broussard, LOGA - State of the Industry
Ben Broussard, LOGA - State of the IndustryBen Broussard, LOGA - State of the Industry
Ben Broussard, LOGA - State of the Industry
 
8 Years in Louisiana's Oil & Gas Industry - Ben Broussard, LOGA
8 Years in Louisiana's Oil & Gas Industry - Ben Broussard, LOGA8 Years in Louisiana's Oil & Gas Industry - Ben Broussard, LOGA
8 Years in Louisiana's Oil & Gas Industry - Ben Broussard, LOGA
 
2015 State of the Industry - LOGA Don Briggs
2015 State of the Industry - LOGA Don Briggs2015 State of the Industry - LOGA Don Briggs
2015 State of the Industry - LOGA Don Briggs
 
AFMS April 2014 - Louisiana Resources & Issues
AFMS April 2014 - Louisiana Resources & IssuesAFMS April 2014 - Louisiana Resources & Issues
AFMS April 2014 - Louisiana Resources & Issues
 
Louisiana Resources: American Eurocopter
Louisiana Resources: American EurocopterLouisiana Resources: American Eurocopter
Louisiana Resources: American Eurocopter
 
GSRMS Ben Broussard
GSRMS Ben BroussardGSRMS Ben Broussard
GSRMS Ben Broussard
 
LMTA
LMTALMTA
LMTA
 
Legacy lawsuit seminar
Legacy lawsuit seminarLegacy lawsuit seminar
Legacy lawsuit seminar
 
GBRIA
GBRIAGBRIA
GBRIA
 
TIPRO: Legacy Lawsuit Update
TIPRO: Legacy Lawsuit UpdateTIPRO: Legacy Lawsuit Update
TIPRO: Legacy Lawsuit Update
 
Future of Natural Gas Markets: LNG & CNG
Future of Natural Gas Markets: LNG & CNGFuture of Natural Gas Markets: LNG & CNG
Future of Natural Gas Markets: LNG & CNG
 
Legislative breakout session
Legislative breakout sessionLegislative breakout session
Legislative breakout session
 
Police Jury Association
Police Jury AssociationPolice Jury Association
Police Jury Association
 
SOI2012
SOI2012SOI2012
SOI2012
 
New Legislator Oil & Gas Orientation
New Legislator Oil & Gas OrientationNew Legislator Oil & Gas Orientation
New Legislator Oil & Gas Orientation
 
LOGA CNG Fleet Seminar & Workshop
LOGA CNG Fleet Seminar & WorkshopLOGA CNG Fleet Seminar & Workshop
LOGA CNG Fleet Seminar & Workshop
 
LOGA State of the Industry: Houston, TX
LOGA State of the Industry: Houston, TXLOGA State of the Industry: Houston, TX
LOGA State of the Industry: Houston, TX
 
Lafayette Rotary
Lafayette RotaryLafayette Rotary
Lafayette Rotary
 

Recently uploaded

57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdfGerald Furnkranz
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.NaveedKhaskheli1
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest2
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsnaxymaxyy
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendFabwelt
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeAbdulGhani778830
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkbhavenpr
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012ankitnayak356677
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkbhavenpr
 

Recently uploaded (10)

57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf57 Bidens Annihilation Nation Policy.pdf
57 Bidens Annihilation Nation Policy.pdf
 
Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.Global Terrorism and its types and prevention ppt.
Global Terrorism and its types and prevention ppt.
 
IndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global NewsIndiaWest: Your Trusted Source for Today's Global News
IndiaWest: Your Trusted Source for Today's Global News
 
Quiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the roundsQuiz for Heritage Indian including all the rounds
Quiz for Heritage Indian including all the rounds
 
Experience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming TrendExperience the Future of the Web3 Gaming Trend
Experience the Future of the Web3 Gaming Trend
 
Rohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for JusticeRohan Jaitley: Central Gov't Standing Counsel for Justice
Rohan Jaitley: Central Gov't Standing Counsel for Justice
 
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfkcomplaint-ECI-PM-media-1-Chandru.pdfra;;prfk
complaint-ECI-PM-media-1-Chandru.pdfra;;prfk
 
VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012VIP Girls Available Call or WhatsApp 9711199012
VIP Girls Available Call or WhatsApp 9711199012
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
Manipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpkManipur-Book-Final-2-compressed.pdfsal'rpk
Manipur-Book-Final-2-compressed.pdfsal'rpk
 

Legacy School

  • 1. Legacy Lawsuit School R.S. 30:29 ACT 312
  • 2. Oil and Gas Operations The last operator of record is responsible for bringing the location into compliance with state standards - 29-B (regulatory damages) LSA R.S. 30:82(9) The last operator is also responsible for full-filling any contractual obligation that he has to the landowner (private claims)
  • 3. Operations Cont... Only the current operator of record has a right to access the site without the consent of the landowner The standard by which the operator remediates is 29-B The operator may use the standards that are in place at DEQ / EPA called RECAP RECAP may only be used with landowner consent Outside of lawsuits, consent to use RECAP is normally easily attainable
  • 4. Why RECAP or 29-B RECAP is the standard used by DEQ for hazardous waste There are instances when RECAP is a better standard to apply for the environment EXAMPLE 29B has a limit on oil and grease concentration in soil 29B does not have any limits on individual hydrocarbon fractions (the individual carbon chains that make up hydrocarbons) like benzene A site could therefore pass 29B standards for oil and grease (and require no remediation) but fail the standards for benzene under RECAP
  • 5. Why RECAP or 29-B EXAMPLE 29B has limits on salt concentrations in soil that are based on agriculture standards and are not health risk based A given salt concentration could exceed 29B but have no risk to human health If the location has no present or future utility as farmland, RECAP would suggest that the most environmentally responsible course of action is to leave the salt in place To dig and haul the salt impacted soil would cause a negative impact by taking up limited space at a disposal facility when the salt in place has no health risk If land has utility as farmland, treatment of the salt in place is the environmentally preferred course of action.
  • 6. SERP In 2010 the Office of Conservation introduced SERP as an alternative to 29-B SERP was largely based off the RECAP program at DEQ / EPA SERP never became law as it was pulled the night before it went into the register for unknown reasons
  • 7. Landowner Courses of Action Landowner has 3 different courses of action if they feel there land is contaminated Contact the current operator of record and ask them to remediate (bills filed by T.Burns and Cortez would make this mandatory) File an environmental complaint with the Department of Natural Resources / Office of Conservation - which may result in compliance order 7 of these filed in 2011 2 required no action by operator 1 operator and landowner were directed to meet and resolved the issues 4 resulted in one or more compliance orders for evaluation and/or remediation which are currently being carried out File a lawsuit under ACT 312
  • 8. DNR Report on Legacy HCR 167 by Rep. Karen St. Germain Directed DNR to report on Legacy Lawsuits Excerpts 271 Lawsuits 210 with no environmental data 64 Settlements 3 Remediated 35 no remediation required 29 -being evaluated, remediated and assessed
  • 9. DNR Report Cont... Issues Impacting Evaluation or Remediation Timelines 1. Allowing all parties access to the property for evaluation is often disputed 2. Discovery and sampling time-lines have to be agreed upon by parties or ordered by the court 3. Limitations on the ability of parties to admit regulatory responsibility without admitting liability for other claims 4. Proving responsibility through trial and the delays inherent in all litigation 5. Remedial work requires time to complete in accordance with regulatory standards 6. OOC role under ACT 312 in submitting to the Court its most feasible evaluation or remediation plan to meet applicable State Regulatory standards generally occurs after the completion of the trial on the merits in its entirety 7. ACT 312 provides no way to enforce requirement in R.S> 30:29.1 that all environmental sample data associated with E & P activity be submitted to OOC within 10 days of receipt by all parties 8. For various reasons recent oil & gas operators without any specific causal connection to environmental damage are subject to ACT 312 litigation 9. Reimbursement for ACT 312 expenses by Conservation and the AGs office only occurs after a responsible party has been determined 10. The complexity of the legal issues addressed in ACT 312 cases
  • 10. Where are the suits
  • 11.
  • 12. Problems with ACT 312 Courts have interpreted the ACT 312 process incorrectly and inconsistently Many Courts awarding damages for private claims and regulatory claims before hearing from DNR Slowness in execution leads to higher attorneys fees Compromises of 2006 have reared their head Most importantly, inability to admit responsibility for the regulatory damages only Landowners not giving consent to defendants to evaluate or remediate Have even blocked compliance orders from the Office of Conservation (Sweet Lake Land)
  • 13. What we would like to fix in ACT 312 Timelines and Schedules This would establish timeframes for each step to happen holding everyone accountable Delay Cannot move to trial on the merits until DNR submits plan Jury Instructions Juries are not being told what the ACT 312 process is Access Landowner cannot deny defendant access to evaluate if notice is given Admission of Liability Allow the admission to be limited to regulatory damages
  • 14. Timelines and Schedules This would establish timeframes for each step to happen holding everyone accountable Delay Cannot move to trial on the merits until DNR submits plan Jury Instructions Juries are not being told what the ACT 312 process is Access Landowner cannot deny defendant access to evaluate if notice is given Admission of Liability Allow the admission to be limited to regulatory damages
  • 15. Delay Cannot move to trial on the merits until DNR submits plan Jury Instructions Juries are not being told what the ACT 312 process is Access Landowner cannot deny defendant access to evaluate if notice is given Admission of Liability Allow the admission to be limited to regulatory damages
  • 16. Jury Instructions Juries are not being told what the ACT 312 process is Access Landowner cannot deny defendant access to evaluate if notice is given Admission of Liability Allow the admission to be limited to regulatory damages
  • 17. Access Landowner cannot deny defendant access to evaluate if notice is given Admission of Liability Allow the admission to be limited to regulatory damages
  • 18. Admission of Liability Allow the admission to be limited to regulatory damages
  • 19. Admission of Liability Allow the admission to be limited to regulatory damages
  • 20. What are we proposing to fix Admission of Liability Allow the admission to be limited to regulatory damages
  • 21. Why can’t a compromise be reached What we want that they will not agree to? DNR public hearing to develop plan (which is currently part of ACT 312) Why is that so important? 2 reasons Validates the plan by being an open and transparent process Only mechanism to consider RECAP as alternative to 29-B besides landowner consent
  • 22. Why can’t a compromise be reached What are they saying is wrong with what we want Costs - This will be an unfair burden on plaintiff to try the case 2 times - very expensive ANSWER - all plaintiff costs are covered by the party admitting responsibility currently under ACT 312 - so there is no additional costs. Also, ACT 312 currently requires a public hearing as part of the determination of the plan Primary Jurisdiction - Another way to get around to primary jurisdiction ANSWER - There is no change in the jurisdiction of the trial, nor is there any change in authority of the district court in approval of the plan or their standard of review of the plan
  • 23. How ACT 312 was intended to work Responsible Party Regulatory “Other” Damages Determination Remediation Determination Determination Jury Party DNR Approval of Private “Extra” Decides Admits Regulatory Plans Damages Remediation How ACT 312 has worked Damages Regulatory Responsible Party Determination Remediation Determination Determination Regulatory Damages Jury Party DNR Approval of Private “Extra” Regulatory Plans Decides Admits Damages Remediation
  • 24. THE PROCESS LANDOWNER FILES LAWSUIT FOR CONTAMINATION
  • 25. THE PROCESS LANDOWNER FILES LAWSUIT FOR CONTAMINATION
  • 26. THE PROCESS LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS FOR BEEN FILED IS CONTAMINATION SENT TO OOC AND AG R.S. 30:29 B(1)
  • 27. THE PROCESS OPERATORS ADMITS LIABILITY FOR ALL DAMAGES LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS FOR BEEN FILED IS R.S. 30:29 C(1) CONTAMINATION SENT TO OOC AND AG COURT DETERMINES R.S. 30:29 B(1) RESPONSIBLE PARTY
  • 28. THE PROCESS OPERATORS R.S. 30:29 C(1) ADMITS LIABILITY FOR ALL DAMAGES LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS PARTY SUBMITS PLAN FOR BEEN FILED IS R.S. 30:29 C(1) TO OOC ALONG WITH CONTAMINATION SENT TO OOC ESTIMATED COSTS AND AG COURT DETERMINES R.S. 30:29 B(1) RESPONSIBLE PARTY
  • 29. THE PROCESS OPERATORS R.S. 30:29 C(1) ADMITS LIABILITY FOR ALL DAMAGES LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS PARTY SUBMITS PLAN FOR BEEN FILED IS R.S. 30:29 C(1) TO OOC ALONG WITH CONTAMINATION SENT TO OOC ESTIMATED COSTS AND AG COURT DETERMINES R.S. 30:29 B(1) RESPONSIBLE PARTY PLANS RECEIVED BY COURT AND OOC R.S. 30:29 C(1)
  • 30. THE PROCESS OPERATORS R.S. 30:29 C(1) ADMITS LIABILITY FOR ALL DAMAGES LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS PARTY SUBMITS PLAN FOR BEEN FILED IS R.S. 30:29 C(1) TO OOC ALONG WITH CONTAMINATION SENT TO OOC ESTIMATED COSTS AND AG COURT DETERMINES R.S. 30:29 B(1) RESPONSIBLE PARTY LANDOWNER OR OTHER PLANS PARTIES RECEIVED BY SUMBIT PLAN(S) COURT AND TO OOC/COURT OOC ALONG WITH ESTIMATED COSTS R.S. 30:29 C(1) R.S. 30:29 C(1)
  • 31. THE PROCESS OPERATORS R.S. 30:29 C(1) ADMITS LIABILITY FOR ALL DAMAGES LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS PARTY SUBMITS PLAN FOR BEEN FILED IS R.S. 30:29 C(1) TO OOC ALONG WITH CONTAMINATION SENT TO OOC ESTIMATED COSTS AND AG COURT DETERMINES R.S. 30:29 B(1) RESPONSIBLE PARTY LANDOWNER OR OTHER OOC REVIEWS PLANS PARTIES PLAN AND GIVES RECEIVED BY SUMBIT PLAN(S) ESTIMATE OF COURT AND TO OOC/COURT REVIEW AND OOC ALONG WITH COSTS TO ESTIMATED COURT COSTS R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1)
  • 32. THE PROCESS OPERATORS R.S. 30:29 C(1) ADMITS LIABILITY FOR ALL DAMAGES LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS PARTY SUBMITS PLAN FOR BEEN FILED IS R.S. 30:29 C(1) TO OOC ALONG WITH CONTAMINATION SENT TO OOC ESTIMATED COSTS AND AG COURT DETERMINES R.S. 30:29 B(1) RESPONSIBLE PARTY LANDOWNER OR OTHER OOC REVIEWS PLANS PARTIES OOC CONDUCTS PLAN AND GIVES RECEIVED BY SUMBIT PLAN(S) PUBLIC HEARING ESTIMATE OF COURT AND TO OOC/COURT ON THE PLAN(S) REVIEW AND OOC ALONG WITH COSTS TO ESTIMATED COURT COSTS R.S. 30:29 C(2) R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1)
  • 33. THE PROCESS OPERATORS R.S. 30:29 C(1) ADMITS LIABILITY FOR ALL DAMAGES LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS PARTY SUBMITS PLAN FOR BEEN FILED IS R.S. 30:29 C(1) TO OOC ALONG WITH CONTAMINATION SENT TO OOC ESTIMATED COSTS AND AG COURT DETERMINES R.S. 30:29 B(1) RESPONSIBLE PARTY LANDOWNER OR OTHER OOC REVIEWS OOC SELECTS PLANS PARTIES OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY SUMBIT PLAN(S) PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND TO OOC/COURT ON THE PLAN(S) REVIEW AND COURT OOC ALONG WITH COSTS TO ESTIMATED COURT COSTS R.S. 30:29 C(2) R.S. 30:29 C(2) R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1)
  • 34. THE PROCESS OPERATORS R.S. 30:29 C(1) ADMITS LIABILITY FOR ALL DAMAGES LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS PARTY SUBMITS PLAN FOR BEEN FILED IS R.S. 30:29 C(1) TO OOC ALONG WITH CONTAMINATION SENT TO OOC ESTIMATED COSTS AND AG COURT DETERMINES R.S. 30:29 B(1) RESPONSIBLE PARTY R.S. 30:29 C(5) COURT LANDOWNER SHALL OR OTHER ADOPT PLAN OOC REVIEWS OOC SELECTS PLANS PARTIES SENT BY OOC OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY SUMBIT PLAN(S) UNLESS THERE IS A PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND TO OOC/COURT PREPONDERANCE ON THE PLAN(S) REVIEW AND COURT OOC ALONG WITH OF EVIDENCE COSTS TO ESTIMATED AGAINST COURT COSTS IT R.S. 30:29 C(2) R.S. 30:29 C(2) R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1)
  • 35. THE PROCESS OPERATORS R.S. 30:29 C(1) ADMITS LIABILITY FOR ALL DAMAGES LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS PARTY SUBMITS PLAN FOR BEEN FILED IS R.S. 30:29 C(1) TO OOC ALONG WITH CONTAMINATION SENT TO OOC ESTIMATED COSTS AND AG COURT DETERMINES R.S. 30:29 B(1) RESPONSIBLE PARTY R.S. 30:29 C(5) COURT LANDOWNER SHALL OR OTHER ADOPT PLAN OOC REVIEWS OOC SELECTS PLANS PARTIES SENT BY OOC OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY SUMBIT PLAN(S) UNLESS THERE IS A PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND TO OOC/COURT PREPONDERANCE ON THE PLAN(S) REVIEW AND COURT OOC ALONG WITH OF EVIDENCE COSTS TO ESTIMATED AGAINST COURT COSTS IT R.S. 30:29 C(2) R.S. 30:29 C(2) R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1) COURT ORDERS RESPONSIBLE PARTY TO FUND THE PLAN R.S. 30:29 C(5)
  • 36. THE PROCESS OPERATORS R.S. 30:29 C(1) ADMITS LIABILITY FOR ALL DAMAGES LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS PARTY SUBMITS PLAN FOR BEEN FILED IS R.S. 30:29 C(1) TO OOC ALONG WITH CONTAMINATION SENT TO OOC ESTIMATED COSTS AND AG COURT DETERMINES R.S. 30:29 B(1) RESPONSIBLE PARTY R.S. 30:29 C(5) COURT LANDOWNER SHALL OR OTHER ADOPT PLAN OOC REVIEWS OOC SELECTS PLANS PARTIES SENT BY OOC OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY SUMBIT PLAN(S) UNLESS THERE IS A PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND TO OOC/COURT PREPONDERANCE ON THE PLAN(S) REVIEW AND COURT OOC ALONG WITH OF EVIDENCE COSTS TO ESTIMATED AGAINST COURT COSTS IT R.S. 30:29 C(2) R.S. 30:29 C(2) R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1) COURT RESPONSIBLE ORDERS PARTY DEPOSITS RESPONSIBLE MONEY INTO THE PARTY TO REGISTRY OF THE FUND THE COURT PLAN R.S. 30:29 C(5) R.S. 30:29 C(6)a
  • 37. THE PROCESS OPERATORS R.S. 30:29 C(1) ADMITS LIABILITY FOR ALL DAMAGES LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS PARTY SUBMITS PLAN FOR BEEN FILED IS R.S. 30:29 C(1) TO OOC ALONG WITH CONTAMINATION SENT TO OOC ESTIMATED COSTS AND AG COURT DETERMINES R.S. 30:29 B(1) RESPONSIBLE PARTY R.S. 30:29 C(5) COURT LANDOWNER SHALL OR OTHER ADOPT PLAN OOC REVIEWS OOC SELECTS PLANS PARTIES SENT BY OOC OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY SUMBIT PLAN(S) UNLESS THERE IS A PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND TO OOC/COURT PREPONDERANCE ON THE PLAN(S) REVIEW AND COURT OOC ALONG WITH OF EVIDENCE COSTS TO ESTIMATED AGAINST COURT COSTS IT R.S. 30:29 C(2) R.S. 30:29 C(2) R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1) COURT RESPONSIBLE ORDERS PARTY DEPOSITS COURT RESPONSIBLE MONEY INTO THE DETERMINES PARTY TO REGISTRY OF THE DAMAGES FUND THE COURT PLAN R.S. 30:29 C(5) R.S. 30:29 C(6)a
  • 38. THE PROCESS OPERATORS R.S. 30:29 C(1) ADMITS LIABILITY FOR ALL DAMAGES LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS PARTY SUBMITS PLAN FOR BEEN FILED IS R.S. 30:29 C(1) TO OOC ALONG WITH CONTAMINATION SENT TO OOC ESTIMATED COSTS AND AG COURT DETERMINES R.S. 30:29 B(1) RESPONSIBLE PARTY R.S. 30:29 C(5) COURT LANDOWNER SHALL OR OTHER ADOPT PLAN OOC REVIEWS OOC SELECTS PLANS PARTIES SENT BY OOC OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY SUMBIT PLAN(S) UNLESS THERE IS A PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND TO OOC/COURT PREPONDERANCE ON THE PLAN(S) REVIEW AND COURT OOC ALONG WITH OF EVIDENCE COSTS TO ESTIMATED AGAINST COURT COSTS IT R.S. 30:29 C(2) R.S. 30:29 C(2) R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1) COURT RESPONSIBLE ORDERS PARTY DEPOSITS COURT RESPONSIBLE REMEDIATION MONEY INTO THE DETERMINES PARTY TO TAKES PLACE REGISTRY OF THE DAMAGES FUND THE COURT PLAN R.S. 30:29 C(5) R.S. 30:29 C(6)a
  • 39. THE PROCESS OPERATORS R.S. 30:29 C(1) ADMITS LIABILITY FOR ALL DAMAGES LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS PARTY SUBMITS PLAN FOR BEEN FILED IS R.S. 30:29 C(1) TO OOC ALONG WITH CONTAMINATION SENT TO OOC ESTIMATED COSTS AND AG COURT DETERMINES R.S. 30:29 B(1) RESPONSIBLE PARTY R.S. 30:29 C(5) COURT LANDOWNER SHALL OR OTHER ADOPT PLAN OOC REVIEWS OOC SELECTS PLANS PARTIES SENT BY OOC OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY SUMBIT PLAN(S) UNLESS THERE IS A PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND TO OOC/COURT PREPONDERANCE ON THE PLAN(S) REVIEW AND COURT OOC ALONG WITH OF EVIDENCE COSTS TO ESTIMATED AGAINST COURT COSTS IT R.S. 30:29 C(2) R.S. 30:29 C(2) R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1) COURT EXCESS RESPONSIBLE ORDERS REMEDIATION PARTY DEPOSITS COURT RESPONSIBLE REMEDIATION FUNDS ARE MONEY INTO THE DETERMINES PARTY TO TAKES PLACE RETURNED TO REGISTRY OF THE DAMAGES FUND THE RESPONSIBLE COURT PLAN PARTY R.S. 30:29 C(5) R.S. 30:29 C(6)a R.S. 30:29 D(4)
  • 40. Reality LANDOWNER FILES LAWSUIT FOR CONTAMINATION
  • 41. Reality LANDOWNER FILES LAWSUIT FOR CONTAMINATION
  • 42. Reality LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS FOR BEEN FILED IS CONTAMINATION SENT TO OOC AND AG R.S. 30:29 B(1)
  • 43. Reality LANDOWNER SETTLES SUIT GIVES CONSENT TO OPERATOR TO REMEDIATE ACCORDING TO OPERATORS PLAN LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS R.S. 30:29 J(1) FOR BEEN FILED IS CONTAMINATION SENT TO OOC AND AG TRIAL ON MERITS R.S. 30:29 B(1)
  • 44. Reality LANDOWNER SETTLES SUIT GIVES CONSENT TO REMEDIATION OPERATOR TO TAKES PLACE REMEDIATE ACCORDING TO OPERATORS PLAN LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS R.S. 30:29 J(1) FOR BEEN FILED IS CONTAMINATION SENT TO OOC AND AG COURT DETERMINES TRIAL ON DAMAGES - MERITS PRIVATE AND R.S. 30:29 B(1) REGULATORY
  • 45. Reality LANDOWNER SETTLES SUIT GIVES CONSENT TO REMEDIATION OPERATOR TO TAKES PLACE REMEDIATE ACCORDING TO OPERATORS PLAN LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS R.S. 30:29 J(1) COURT REFERS FOR BEEN FILED IS THE MATTER TO CONTAMINATION SENT TO OOC THE DEPARTMENT AND AG COURT DETERMINES TRIAL ON DAMAGES - MERITS PRIVATE AND R.S. 30:29 B(1) REGULATORY
  • 46. Reality LANDOWNER SETTLES SUIT GIVES CONSENT TO REMEDIATION OPERATOR TO TAKES PLACE REMEDIATE ACCORDING TO OPERATORS PLAN LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS R.S. 30:29 J(1) COURT REFERS FOR BEEN FILED IS THE MATTER TO CONTAMINATION SENT TO OOC THE DEPARTMENT AND AG COURT DETERMINES TRIAL ON DAMAGES - MERITS PRIVATE AND R.S. 30:29 B(1) RESPONSIBLE REGULATORY PARTY SUBMITS PLAN TO OOC ALONG WITH ESTIMATED COSTS PLANS R.S. 30:29 C(1) RECEIVED BY COURT AND OOC LANDOWNER OR OTHER R.S. 30:29 C(1) PARTIES SUMBIT PLAN(S) TO OOC/COURT ALONG WITH ESTIMATED COSTS R.S. 30:29 C(1)
  • 47. Reality LANDOWNER SETTLES SUIT GIVES CONSENT TO REMEDIATION OPERATOR TO TAKES PLACE REMEDIATE ACCORDING TO OPERATORS PLAN LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS R.S. 30:29 J(1) COURT REFERS FOR BEEN FILED IS THE MATTER TO CONTAMINATION SENT TO OOC THE DEPARTMENT AND AG COURT DETERMINES TRIAL ON DAMAGES - MERITS PRIVATE AND R.S. 30:29 B(1) RESPONSIBLE REGULATORY PARTY SUBMITS PLAN TO OOC ALONG WITH ESTIMATED COSTS OOC REVIEWS PLANS R.S. 30:29 C(1) PLAN AND GIVES RECEIVED BY ESTIMATE OF COURT AND REVIEW AND OOC COSTS TO COURT LANDOWNER OR OTHER R.S. 30:29 C(1) R.S. 30:29 C(1) PARTIES SUMBIT PLAN(S) TO OOC/COURT ALONG WITH ESTIMATED COSTS R.S. 30:29 C(1)
  • 48. Reality LANDOWNER SETTLES SUIT GIVES CONSENT TO REMEDIATION OPERATOR TO TAKES PLACE REMEDIATE ACCORDING TO OPERATORS PLAN LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS R.S. 30:29 J(1) COURT REFERS FOR BEEN FILED IS THE MATTER TO CONTAMINATION SENT TO OOC THE DEPARTMENT AND AG COURT DETERMINES TRIAL ON DAMAGES - MERITS PRIVATE AND R.S. 30:29 B(1) RESPONSIBLE REGULATORY PARTY SUBMITS PLAN TO OOC ALONG WITH ESTIMATED COSTS OOC REVIEWS PLANS R.S. 30:29 C(1) OOC CONDUCTS PLAN AND GIVES RECEIVED BY PUBLIC HEARING ESTIMATE OF COURT AND ON THE PLAN(S) REVIEW AND OOC COSTS TO COURT LANDOWNER R.S. 30:29 C(2) OR OTHER R.S. 30:29 C(1) R.S. 30:29 C(1) PARTIES SUMBIT PLAN(S) TO OOC/COURT ALONG WITH ESTIMATED COSTS R.S. 30:29 C(1)
  • 49. Reality LANDOWNER SETTLES SUIT GIVES CONSENT TO REMEDIATION OPERATOR TO TAKES PLACE REMEDIATE ACCORDING TO OPERATORS PLAN LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS R.S. 30:29 J(1) COURT REFERS FOR BEEN FILED IS THE MATTER TO CONTAMINATION SENT TO OOC THE DEPARTMENT AND AG COURT DETERMINES TRIAL ON DAMAGES - MERITS PRIVATE AND R.S. 30:29 B(1) RESPONSIBLE REGULATORY PARTY SUBMITS PLAN TO OOC ALONG WITH ESTIMATED COSTS OOC SELECTS OOC REVIEWS PLANS R.S. 30:29 C(1) OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND ON THE PLAN(S) REVIEW AND COURT OOC COSTS TO COURT LANDOWNER R.S. 30:29 C(2) R.S. 30:29 C(2) OR OTHER R.S. 30:29 C(1) R.S. 30:29 C(1) PARTIES SUMBIT PLAN(S) TO OOC/COURT ALONG WITH ESTIMATED COSTS R.S. 30:29 C(1)
  • 50. Reality LANDOWNER SETTLES SUIT GIVES CONSENT TO REMEDIATION OPERATOR TO TAKES PLACE REMEDIATE ACCORDING TO OPERATORS PLAN LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS R.S. 30:29 J(1) COURT REFERS FOR BEEN FILED IS THE MATTER TO CONTAMINATION SENT TO OOC THE DEPARTMENT AND AG COURT DETERMINES TRIAL ON DAMAGES - MERITS PRIVATE AND R.S. 30:29 B(1) RESPONSIBLE REGULATORY PARTY SUBMITS PLAN R.S. 30:29 C(5) TO OOC ALONG WITH ESTIMATED COSTS COURT SHALL ADOPT PLAN OOC SELECTS OOC REVIEWS PLANS R.S. 30:29 C(1) SENT BY OOC OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY UNLESS THERE IS A PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND PREPONDERANCE ON THE PLAN(S) REVIEW AND COURT OOC OF EVIDENCE COSTS TO AGAINST COURT IT LANDOWNER R.S. 30:29 C(2) R.S. 30:29 C(2) OR OTHER R.S. 30:29 C(1) R.S. 30:29 C(1) PARTIES SUMBIT PLAN(S) TO OOC/COURT ALONG WITH ESTIMATED COSTS R.S. 30:29 C(1)
  • 51. Reality LANDOWNER SETTLES SUIT GIVES CONSENT TO REMEDIATION OPERATOR TO TAKES PLACE REMEDIATE ACCORDING TO OPERATORS PLAN LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS R.S. 30:29 J(1) COURT REFERS FOR BEEN FILED IS THE MATTER TO CONTAMINATION SENT TO OOC THE DEPARTMENT AND AG COURT DETERMINES TRIAL ON DAMAGES - MERITS PRIVATE AND R.S. 30:29 B(1) RESPONSIBLE REGULATORY PARTY SUBMITS PLAN R.S. 30:29 C(5) TO OOC ALONG WITH ESTIMATED COSTS COURT SHALL ADOPT PLAN OOC SELECTS OOC REVIEWS PLANS R.S. 30:29 C(1) SENT BY OOC OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY UNLESS THERE IS A PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND PREPONDERANCE ON THE PLAN(S) REVIEW AND COURT OOC OF EVIDENCE COSTS TO AGAINST COURT IT LANDOWNER R.S. 30:29 C(2) R.S. 30:29 C(2) OR OTHER R.S. 30:29 C(1) R.S. 30:29 C(1) PARTIES SUMBIT PLAN(S) TO OOC/COURT ALONG WITH ESTIMATED COURT COSTS ORDERS RESPONSIBLE R.S. 30:29 C(1) PARTY TO FUND THE PLAN R.S. 30:29 C(5)
  • 52. Reality LANDOWNER SETTLES SUIT GIVES CONSENT TO REMEDIATION OPERATOR TO TAKES PLACE REMEDIATE ACCORDING TO OPERATORS PLAN LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS R.S. 30:29 J(1) COURT REFERS FOR BEEN FILED IS THE MATTER TO CONTAMINATION SENT TO OOC THE DEPARTMENT AND AG COURT DETERMINES TRIAL ON DAMAGES - MERITS PRIVATE AND R.S. 30:29 B(1) RESPONSIBLE REGULATORY PARTY SUBMITS PLAN R.S. 30:29 C(5) TO OOC ALONG WITH ESTIMATED COSTS COURT SHALL ADOPT PLAN OOC SELECTS OOC REVIEWS PLANS R.S. 30:29 C(1) SENT BY OOC OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY UNLESS THERE IS A PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND PREPONDERANCE ON THE PLAN(S) REVIEW AND COURT OOC OF EVIDENCE COSTS TO AGAINST COURT IT LANDOWNER R.S. 30:29 C(2) R.S. 30:29 C(2) OR OTHER R.S. 30:29 C(1) R.S. 30:29 C(1) PARTIES SUMBIT PLAN(S) TO OOC/COURT ALONG WITH ESTIMATED COURT COSTS RESPONSIBLE ORDERS PARTY DEPOSITS RESPONSIBLE MONEY INTO THE R.S. 30:29 C(1) PARTY TO REGISTRY OF THE FUND THE COURT PLAN R.S. 30:29 C(5) R.S. 30:29 C(6)a
  • 53. Reality LANDOWNER SETTLES SUIT GIVES CONSENT TO REMEDIATION OPERATOR TO TAKES PLACE REMEDIATE ACCORDING TO OPERATORS PLAN LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS R.S. 30:29 J(1) COURT REFERS FOR BEEN FILED IS THE MATTER TO CONTAMINATION SENT TO OOC THE DEPARTMENT AND AG COURT DETERMINES TRIAL ON DAMAGES - MERITS PRIVATE AND R.S. 30:29 B(1) RESPONSIBLE REGULATORY PARTY SUBMITS PLAN R.S. 30:29 C(5) TO OOC ALONG WITH ESTIMATED COSTS COURT SHALL ADOPT PLAN OOC SELECTS OOC REVIEWS PLANS R.S. 30:29 C(1) SENT BY OOC OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY UNLESS THERE IS A PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND PREPONDERANCE ON THE PLAN(S) REVIEW AND COURT OOC OF EVIDENCE COSTS TO AGAINST COURT IT LANDOWNER R.S. 30:29 C(2) R.S. 30:29 C(2) OR OTHER R.S. 30:29 C(1) R.S. 30:29 C(1) PARTIES SUMBIT PLAN(S) TO OOC/COURT ALONG WITH ESTIMATED COURT COSTS RESPONSIBLE ORDERS PARTY DEPOSITS REMEDIATION RESPONSIBLE MONEY INTO THE TAKES PLACE R.S. 30:29 C(1) PARTY TO REGISTRY OF THE FUND THE COURT PLAN R.S. 30:29 C(5) R.S. 30:29 C(6)a
  • 54. Reality LANDOWNER SETTLES SUIT GIVES CONSENT TO REMEDIATION OPERATOR TO TAKES PLACE REMEDIATE ACCORDING TO OPERATORS PLAN LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS R.S. 30:29 J(1) COURT REFERS FOR BEEN FILED IS THE MATTER TO CONTAMINATION SENT TO OOC THE DEPARTMENT AND AG COURT DETERMINES TRIAL ON DAMAGES - MERITS PRIVATE AND R.S. 30:29 B(1) RESPONSIBLE REGULATORY PARTY SUBMITS PLAN R.S. 30:29 C(5) TO OOC ALONG WITH ESTIMATED COSTS COURT SHALL ADOPT PLAN OOC SELECTS OOC REVIEWS PLANS R.S. 30:29 C(1) SENT BY OOC OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY UNLESS THERE IS A PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND PREPONDERANCE ON THE PLAN(S) REVIEW AND COURT OOC OF EVIDENCE COSTS TO AGAINST COURT IT LANDOWNER R.S. 30:29 C(2) R.S. 30:29 C(2) OR OTHER R.S. 30:29 C(1) R.S. 30:29 C(1) PARTIES SUMBIT PLAN(S) TO OOC/COURT ALONG WITH ESTIMATED COURT EXCESS COSTS RESPONSIBLE ORDERS PARTY DEPOSITS REMEDIATION REMEDIATION RESPONSIBLE MONEY INTO THE TAKES PLACE FUNDS ARE R.S. 30:29 C(1) PARTY TO REGISTRY OF THE RETURNED TO FUND THE COURT RESPONSIBLE PLAN PARTY R.S. 30:29 C(5) R.S. 30:29 C(6)a R.S. 30:29 D(4)
  • 55. Proposed Solution to ACT 312 Regulatory “Other” Damages Remediation Determination Determination Party DNR Approval of Private “Extra” Admits Regulatory Plans Damages Remediation Responsible Party Determination Jury Decides Damages Regulatory Determination Remediation Determination Regulatory Damages DNR Approval of Private “Extra” Regulatory Plans Damages Remediation
  • 56. The Solution LANDOWNER FILES LAWSUIT FOR CONTAMINATION
  • 57. The Solution LANDOWNER FILES LAWSUIT FOR CONTAMINATION
  • 58. The Solution LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS FOR BEEN FILED IS CONTAMINATION SENT TO OOC AND AG R.S. 30:29 B(1)
  • 59. The Solution LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS OPERATORS FOR BEEN FILED IS ADMITS CONTAMINATION SENT TO OOC LIABILITY FOR AND AG ALL DAMAGES R.S. 30:29 C(1) R.S. 30:29 B(1) COURT DETERMINES RESPONSIBLE PARTY
  • 60. R.S. 30:29.2 The Solution Defendant limits admission to regulatory damages LANDOWNER NOTIFICATION FILES LAWSUIT THAT SUIT HAS OPERATORS FOR BEEN FILED IS ADMITS CONTAMINATION SENT TO OOC LIABILITY FOR AND AG ALL DAMAGES R.S. 30:29 C(1) R.S. 30:29 B(1) COURT DETERMINES RESPONSIBLE PARTY
  • 61. R.S. 30:29.2 The Solution Defendant limits admission to regulatory damages R.S. 30:29 C(1) LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS OPERATORS PARTY SUBMITS PLAN FOR BEEN FILED IS ADMITS TO OOC ALONG WITH CONTAMINATION SENT TO OOC LIABILITY FOR ESTIMATED COSTS AND AG ALL DAMAGES R.S. 30:29 C(1) R.S. 30:29 B(1) COURT DETERMINES RESPONSIBLE PARTY
  • 62. R.S. 30:29.2 The Solution Defendant limits admission to regulatory damages R.S. 30:29 C(1) LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS OPERATORS PARTY SUBMITS PLAN FOR BEEN FILED IS ADMITS TO OOC ALONG WITH CONTAMINATION SENT TO OOC LIABILITY FOR ESTIMATED COSTS AND AG ALL DAMAGES R.S. 30:29 C(1) R.S. 30:29 B(1) COURT DETERMINES RESPONSIBLE PARTY PLANS RECEIVED BY COURT AND OOC R.S. 30:29 C(1)
  • 63. R.S. 30:29.2 The Solution Defendant limits admission to regulatory damages R.S. 30:29 C(1) LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS OPERATORS PARTY SUBMITS PLAN FOR BEEN FILED IS ADMITS TO OOC ALONG WITH CONTAMINATION SENT TO OOC LIABILITY FOR ESTIMATED COSTS AND AG ALL DAMAGES R.S. 30:29 C(1) R.S. 30:29 B(1) COURT DETERMINES RESPONSIBLE PARTY LANDOWNER OR OTHER PLANS PARTIES RECEIVED BY SUMBIT PLAN(S) COURT AND TO OOC/COURT OOC ALONG WITH ESTIMATED COSTS R.S. 30:29 C(1) R.S. 30:29 C(1)
  • 64. R.S. 30:29.2 The Solution Defendant limits admission to regulatory damages R.S. 30:29 C(1) LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS OPERATORS PARTY SUBMITS PLAN FOR BEEN FILED IS ADMITS TO OOC ALONG WITH CONTAMINATION SENT TO OOC LIABILITY FOR ESTIMATED COSTS AND AG ALL DAMAGES R.S. 30:29 C(1) R.S. 30:29 B(1) COURT DETERMINES RESPONSIBLE PARTY LANDOWNER OR OTHER OOC REVIEWS PLANS PARTIES PLAN AND GIVES RECEIVED BY SUMBIT PLAN(S) ESTIMATE OF COURT AND TO OOC/COURT REVIEW AND OOC ALONG WITH COSTS TO ESTIMATED COURT COSTS R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1)
  • 65. R.S. 30:29.2 The Solution Defendant limits admission to regulatory damages R.S. 30:29 C(1) LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS OPERATORS PARTY SUBMITS PLAN FOR BEEN FILED IS ADMITS TO OOC ALONG WITH CONTAMINATION SENT TO OOC LIABILITY FOR ESTIMATED COSTS AND AG ALL DAMAGES R.S. 30:29 C(1) R.S. 30:29 B(1) COURT DETERMINES RESPONSIBLE PARTY LANDOWNER OR OTHER OOC REVIEWS PLANS PARTIES OOC CONDUCTS PLAN AND GIVES RECEIVED BY SUMBIT PLAN(S) PUBLIC HEARING ESTIMATE OF COURT AND TO OOC/COURT ON THE PLAN(S) REVIEW AND OOC ALONG WITH COSTS TO ESTIMATED COURT COSTS R.S. 30:29 C(2) R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1)
  • 66. R.S. 30:29.2 The Solution Defendant limits admission to regulatory damages R.S. 30:29 C(1) LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS OPERATORS PARTY SUBMITS PLAN FOR BEEN FILED IS ADMITS TO OOC ALONG WITH CONTAMINATION SENT TO OOC LIABILITY FOR ESTIMATED COSTS AND AG ALL DAMAGES R.S. 30:29 C(1) R.S. 30:29 B(1) COURT DETERMINES RESPONSIBLE PARTY LANDOWNER OR OTHER OOC REVIEWS OOC SELECTS PLANS PARTIES OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY SUMBIT PLAN(S) PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND TO OOC/COURT ON THE PLAN(S) REVIEW AND COURT OOC ALONG WITH COSTS TO ESTIMATED COURT COSTS R.S. 30:29 C(2) R.S. 30:29 C(2) R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1)
  • 67. R.S. 30:29.2 The Solution Defendant limits admission to regulatory damages R.S. 30:29 C(1) LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS OPERATORS PARTY SUBMITS PLAN FOR BEEN FILED IS ADMITS TO OOC ALONG WITH CONTAMINATION SENT TO OOC LIABILITY FOR ESTIMATED COSTS AND AG ALL DAMAGES R.S. 30:29 C(1) R.S. 30:29 B(1) COURT R.S. 30:29 C(5) DETERMINES RESPONSIBLE PARTY COURT LANDOWNER SHALL OR OTHER ADOPT PLAN OOC REVIEWS OOC SELECTS PLANS PARTIES SENT BY OOC OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY SUMBIT PLAN(S) UNLESS THERE IS A PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND TO OOC/COURT PREPONDERANCE ON THE PLAN(S) REVIEW AND COURT OOC ALONG WITH OF EVIDENCE COSTS TO ESTIMATED AGAINST COURT COSTS IT R.S. 30:29 C(2) R.S. 30:29 C(2) R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1)
  • 68. R.S. 30:29.2 The Solution Defendant limits admission to regulatory damages R.S. 30:29 C(1) LANDOWNER NOTIFICATION RESPONSIBLE FILES LAWSUIT THAT SUIT HAS OPERATORS PARTY SUBMITS PLAN FOR BEEN FILED IS ADMITS TO OOC ALONG WITH CONTAMINATION SENT TO OOC LIABILITY FOR ESTIMATED COSTS AND AG ALL DAMAGES R.S. 30:29 C(1) R.S. 30:29 B(1) COURT R.S. 30:29 C(5) DETERMINES RESPONSIBLE PARTY COURT LANDOWNER SHALL OR OTHER ADOPT PLAN OOC REVIEWS OOC SELECTS PLANS PARTIES SENT BY OOC OOC CONDUCTS PLAN AND GIVES PLAN AND RECEIVED BY SUMBIT PLAN(S) UNLESS THERE IS A PUBLIC HEARING ESTIMATE OF SUBMITS TO COURT AND TO OOC/COURT PREPONDERANCE ON THE PLAN(S) REVIEW AND COURT OOC ALONG WITH OF EVIDENCE COSTS TO ESTIMATED AGAINST COURT COSTS IT R.S. 30:29 C(2) R.S. 30:29 C(2) R.S. 30:29 C(1) R.S. 30:29 C(1) R.S. 30:29 C(1) COURT ORDERS RESPONSIBLE PARTY TO FUND THE PLAN R.S. 30:29 C(5)

Editor's Notes

  1. \n
  2. \n
  3. \n
  4. \n
  5. \n
  6. \n
  7. \n
  8. \n
  9. \n
  10. \n
  11. \n
  12. \n
  13. \n
  14. \n
  15. \n
  16. \n
  17. \n
  18. \n
  19. \n
  20. \n
  21. \n
  22. \n
  23. \n
  24. \n
  25. \n
  26. \n
  27. \n
  28. \n
  29. \n
  30. \n
  31. \n
  32. \n
  33. \n
  34. \n
  35. \n
  36. \n
  37. \n
  38. \n
  39. \n
  40. \n
  41. \n
  42. \n
  43. \n
  44. \n
  45. \n
  46. \n
  47. \n
  48. \n
  49. \n
  50. \n
  51. \n
  52. \n
  53. \n
  54. \n
  55. \n
  56. \n
  57. \n
  58. \n
  59. \n
  60. \n
  61. \n
  62. \n
  63. \n
  64. \n
  65. \n
  66. \n
  67. \n
  68. \n
  69. \n
  70. \n
  71. \n
  72. \n
  73. \n
  74. \n
  75. \n
  76. \n
  77. \n
  78. \n
  79. \n
  80. \n
  81. \n
  82. \n
  83. \n
  84. \n
  85. \n
  86. \n
  87. \n
  88. \n
  89. \n
  90. \n
  91. \n
  92. \n
  93. \n
  94. \n
  95. \n
  96. \n
  97. \n
  98. \n
  99. \n
  100. \n
  101. \n
  102. \n
  103. \n
  104. \n
  105. \n
  106. \n
  107. \n
  108. \n
  109. \n
  110. \n
  111. \n
  112. \n
  113. \n
  114. \n
  115. \n
  116. \n
  117. \n
  118. \n
  119. \n
  120. \n
  121. \n
  122. \n
  123. \n
  124. \n
  125. \n
  126. \n
  127. \n
  128. \n
  129. \n
  130. \n
  131. \n
  132. \n
  133. \n
  134. \n
  135. \n
  136. \n
  137. \n
  138. \n
  139. \n
  140. \n
  141. \n
  142. \n
  143. \n
  144. \n
  145. \n
  146. \n
  147. \n
  148. \n
  149. \n
  150. \n
  151. \n
  152. \n
  153. \n
  154. \n
  155. \n
  156. \n
  157. \n
  158. \n
  159. \n
  160. \n
  161. \n
  162. \n
  163. \n
  164. \n
  165. \n
  166. \n
  167. \n
  168. \n
  169. \n