What Tetra Pak is doing to make the operator works
more interesting?
10 key elements
Everyone contribution counts!
JD/2019/12/12 / 1
/ 2
What makes the difference
How to mobilize the organization at every level
Only WCM! From performance to excellence. Build to last.
Synopsis
Introduction
JD/2019/12/12
Introduction
The company challenges
Overall spending, Quality, flexibility and productivity
► Increase commoditization of the base business
triggered a rapid growth of competition offering
low price at acceptable quality.
► Price pressure will necessitate revision of
current business model.
► System Quality – Machine Material Interaction
► Low service level – OT - IF
► High manufacturing costs – TW ECTC
JD/2019/12/12 / 3
Strategic Choices at Company level
► Reduce cost by improving asset utilisation while
mitigating risk to service level
► Standardise high capacity converting platform
► Take long term perspective on supplier relations in
order to optimise benefits
► Give priority to suppliers that support all four strategic
priorities
► Drive WCM as the methodology for performance
improvement
► Ensure that Make/buy decisions are the best for each
industrial base strategic priorities
JD/2019/12/12 / 4
Our Objectives
► Reduce costs
► Excel in customer service
Easy to do business with
On time, in full and
Flexibility
► Drive innovation
3
Our enablers
► Drive a deep rooted change through WCM -
Accomplish JiPm Advanced SpecialAward
► Drive and comply with Corporate Social Responsibility
► Drive indirect cost reduction with Supplier Mgt
Our values
► Safety
► Quality
► Engagement
3
3
3 main goals to be taken by the plants
We want to be better, faster, cheaper
JD/2019/12/12 / 5
What makes the difference
How to mobilize the organization at every level
Only WCM! From performance to excellence. Build to last.
Synopsis
Introduction
JD/2019/12/12 / 6
How to mobilize the organization at every level
Change management: Kotter’s model
Drive an effective change
JD/2019/12/12 / 7
Tetra Pak Rubiera
Hai detto piattaforma che brucia?
JD/2019/12/12 / 8
Burning Platform
Turning challenges to opportunities
§ We must reduce our production costs
§ We have to facilitate innovation deployment
§ We need to improve our service level
§ Safety first - SAM program
§ Comply to CSR – sustainability – Sedex
§ Regain Quality leadership – MMI
/ 9JD/2019/12/12
July 09, 2015
Agenda
► Where are we?
► Our current bottlenecks
► Workshop
JD/2019/12/12 / 10
..with different capabilities, but all targeting our business
Aggressively targeting volume markets
GA Pack new factory in Germany
NSS
Continuously improving competitiveness
Krones with low cost/ low CSC offer
PET
Selectively focusing on growth markets
New factory in Brazil
SIG
Expanding ambient portfolio & capacity
Struggling with profitability
Elopak
We are facing several competitors
JD/2019/12/12 / 11
Packaging
Material
Filling
Equipment
Distribution
Equipment
Spare partsProcessing
Equipment
Straws StripsClosures
Quality Mgt
Services
Financial
Services
Local Presence
e-business
Services
Trusted Brand
Package
Portfolio
Package Design
Services
Single Source
Responsibility
Family Owned
Partnership
Environmental
Image
Technical
Competence
Innovation
Leader
Certified
Suppliers
Business
Continuity
Performance
Guarantees
Maintenance
Services
Improvement
Services
Consumer
Intelligence
Services
Category
Management
Services
Co-packing
Arrangement
Services
Long Term
Perspective
Strong Parts
Supply Chain
Product
Formulation
Services
Training
Services
Food Quality
Competence
Consultancy
Competence
…to avoid price war with NSS
Success will be to secure value offering...
JD/2019/12/12 / 12
The way forward
• Efficiency on top of our agenda
• Cleaning the pipeline
• Remove current bottlenecks. Ultimately, coating line should be Rubiera
bottleneck. (4.5 Bio std packs)
• Quality is still an area of opportunity
• Without swapability, perceived quality is not achieved
• Competitiveness requires us to look at ALL expenses. Indirect costs in
Rubiera to be attacked
• This will require new ways of organizing ourselves
JD/2019/12/12 / 13
JD/2019/12/12 / 14
What makes the difference
How to mobilize the organization at every level
Only WCM! From performance to excellence. Build to last.
Synopsis
Introduction
JD/2019/12/12 / 15
Only WCM! From performance to excellence. Build to last.
In Rubiera, we have a vision
To become the best factory in Western Europe
JD/2019/12/12 / 16
Safety first!
Driving SaM program Cracking
the Full Supply Chain
cost structure
Improving
Supply Chain Service
Index
Strive for Sustainability
Quality first!
“Clean the pipe line”
Improve
EE Coating
“85”
and Finishing
output
Increase
Pay-load
Improve Perfect Delivery
Comply to Corporate Social
Responsibility
Deploy SPC
Reduce
Extended CTC
“9”
Eradicate
Air freight
Write-Off
“Perfect Order Concept”
Reduce CO2 emission
Manage Recycled & Not Recycled
waste
Driving Innovation
Developing an High Performing Organization toward World Class Level:
capable employees, role model leaders and fair recognition system
WCM Assessment Score
OCRwithTSandCustomers
WCMAssessmentLogisticPillar
Driving with WCM
Effective Strategy cascading – Clear and simple
Rubiera’s key actions 2015-2019
3
3
3
85.9
Rubiera
EE Coating 85% Extended CTC 9
EE coating: 85% Extended CTC: 9
JD/2019/12/12 / 17
Futuro
Ambiente
Sicurezza
Cliente
Crescita
Leadership
Innovazione
Responsabilità
Sociale
Effective Strategy cascading
9 messages on laser guided vehicles
JD/2019/12/12 / 18
WCM in Rubiera
Our mission: build to last
“ We drive a deep rooted change to achieve zero
loss by involving all employees to ensure our future
through customers’ trust
JD/2019/12/12 / 19
LF/2018-05-15
WCM Development
Supply Chain
InnovationChain
Customers
and
Consumers
Suppliers Source Make Deliver
Plan
Technology Development
Product Development
TPM Level 1
Reducing Manufacturing Costs
• AOV & CFC deployment per process
• TW deployment per process
• Loss tree definition
TPM Level 2
Reducing Product Costs
• Focus on Total Production Costs
• Cost Driver identification
• Define Target Cost to survive in the market
TPM Level 3
Extended SC World Class Business
Reducing Supply Chain Costs
• Focus on extended Supply Chain Costs
• Loss-Cost Matrix for extended Supply Chain Costs
• Inventories optimization (J-cost theory)
• Define Target Cost to win and stay in the market
TPM Excellence
Award
2008
TPM Consistency
Award
2010
TPM Special Award
2014
TPM Special
Advanced Award
2016
TPM World Class
Award
2019
Supply Chain Integration
Extended SC World Class Business
JD/2019/12/12 / 20
Management System
Quality Management System
(ISO 9001)
OHSAS certification
(18001)
Environmental
Management System
(ISO 14001)
GMP
BRC/IOP
W
ORLD CLASS M
ANUFACTURING
Method & tools
Improve & Maintain
JD/2019/12/12 / 21
11 Pillars
WCM Pillars in TP organization
JD/2019/12/12 / 22
Effective Strategy cascading
“What does it mean for me?”
Effective Structure
Skilled People
Engaged people
Valuable Teamwork
WCM principles
Four successful elements – PDCA ensuring sustainability
P
D
C
A
Ensuring sustainable
results
JD/2019/12/12 / 23
LF/2018-05-15
Deep rooted change of mindset
Effective structure
WCM team (Office + Pillars)
Process
Cells
Focused Teams
(All)
Steering Team
Focus on specific losses (chronic & sporadic)
Seek sporadic losses + Short Term Vision
Spread the Strategy; attack chronic losses + Middle Term Vision
Develop and drive an effective strategy + Long Term Vision
JD/2019/12/12 / 24
Tetra Pak Process Cell organization
JD/2019/12/12 / 25
SLITTING &
DOCTORING
COATING
PRINTING
PRE - PRESS
Factory
Targets
Pre-press
Targets
Printing
Targets
Coating
Targets
Slitting-Finishing
Targets
CDI Exp Proc Dry M15 M16 T2 Ink M1 M2 M3 M4M26 Chil Sil M4
Teams Teams Teams Teams Teams Teams Teams TeamsTeams Teams Teams Teams Teams TeamsTeams Teams
Results Results Results ResultsResults Results Results Results ResultsResultsResults Results Results Results Results Results
WCM
Everyone contribution counts
JD/2019/12/12 / 26
TPM - Way to Factory Success
Based on:
1. Intelligence
2. Eradication
3. Prevention
Basic Principles:
• 100% Involvement
• Cross functional Teams
• Hands-On, Shop Floor Approach
• Eradication-Zero Philosophy
• Prevention Philosophy
• Standard Work (OPLs,SOPs, ..)
• Visual Management
•People
•Processes
•Organization
Losses
Develop
JD/2019/12/12 / 27
Translate strategy into actions
LF/2018-05-15
Roadmap & Contribution Matrix
JD/2019/12/12 / 28
Simplification and Focus
LF/2018-05-15
Management & Steering Teams
JD/2019/12/12 / 29
Pre Production
•Design Management 09:00
•Order Handling 09:15
•Planning 09:30
Production
•Prepress 09:00
•Printing 09:00
•Coating 09:00
•Slitting 09:00
Post Production
•Maintenance 08:45
•Quality 09:15
•Logistic 09:00
•Warehouse 09:00
Production meeting 10:00
LF/2018-05-15
Regular decision meeting in each area
Daily Management System
2003 2010 2011 2012 2013 YTD 2014 TG 2014 TG 2015 TG 2016
a Full SC Cost
index vs
2013
unit cost
100,00 96,38 99,70 98,10 97,50
a CTC (€/Kspk)
Index vs
2010
100,00 98,95 95,99 95,32 94,44 95,64 94,70 93,94
a Total Waste % 6,57 5,51 5,23 4,84 4,54 3,93 4,08 3,80 3,65
a Process Waste % 4,04 4,31 3,71 3,52 2,89 3,19 3,12 TBD
a Dummy rolls used % 90 99 100 100 100
a EE Printing % 56,6 58,2 59,3 59,3 61,1 TBD
a EE Slitting % 17,6 19,0 18,5 19,0 TBD TBD
a Other material cost*
Index vs
2010
100 106 92 100 97,8 101,9 99,9 98,9
a Productivity spk / FTE 1.062 1.114 1.141 1.189 1.206 1.189 TBD TBD
a TEE Coating % 52,3 53,5 53,3 51,7 60,7 TBD
a EE Laminator M26 % 68,9 71,8 74,5 73,6 80,4 82,1
a Flying Setup % 28,0 55,0 50,0 75,0 100,0
a Climate efficiency Kg / msp 6.882 5.972 5.504 5.214 4.734 5.036 4.885 TBD
a Recycled waste reduction Kg / msp 2.146 2.098 1.910 1.688 1.702 1.427 1.550 1.500 TBD
a World Class Level Level
Start
up
GL
Special
GL
Special
Special
JiPm
GL spc
advc
spc
advc
JiPm
a FI Pillar Score % 54,5 60,90 66,40 66,4 TBD TBD
History
Yearly
trend Target
COST
SCO Cluster
Strategy
KMI KPI KAI
FI Pillar
Indicators
Unit
ENVIRONMENT
PEOPLE
Consistency Award
Different score criteria
TPM PHASE 3
TPM PHASE 2
TPM PHASE 1
Order
Management
Design
Handle
Planning &
Replenish.
Pre-
Press
Print Coating Slitting LogisticSuppliers Customer
JD/2019/12/12 / 30
What makes the difference
How to mobilize the organization at every level
Only WCM! From performance to excellence. Build to last.
Synopsis
Introduction
JD/2019/12/12 / 31
What makes the difference
What Tetra is doing to make the operator works more interesting?
10 key elements – Everyone has a brain and two arms!
1. Build the local strategy: “our story, our future” – Bring the sense of urgency - Increase the speed of “change”
2. Communicate this strategy in a comprehensive manner to be understood by all. “What does it mean for me?”.
3. Strengthen the feeling we belong to a great Company: “Tetra Pak un gran posto in cui lavorare” campaign.
4. Drive and develop the Autonomous Maintenance program toward step 7. Involving all operators is key.
5. Promote multiskilled employee concept and reward.
6. Revamp the “non financial” rewarding system for WCM activities i.e. successful teams & improvement tags
7. Pay the incentive based on yearly factory performance. Local contract signed with unions
8. Establish a simple structure for Cells and Pillars with clear roles and responsibilities.
9. Empower this structure including the Shift Supervisors.
10. Ensure the training program is executed and contributes to loss eradication through people development.
JD/2019/12/12 / 32
Management
1. Change
2. Collaborate
3. Develop others
4. Develop self
5. Engage
6. Perform
Trainings
• PKEs (QM, AM, PM, FI)
• WCM basic
• WCM advanced
Run for Europe by Central Team for
Pillar Member and Managers
• Effective feedback
• Develop others (mandatory)
• Stress & Care of collaborators
Operational & Management development
Leadership programs
JD/2019/12/12 / 33
8 8 10
23
40
101
110
108
112
116
0
20
40
60
80
100
120
140
2010 2011 2012 2013 2014 2015 2016 TG16 TG 17 TG 18
No.
No. of Multi-skilled Operators
FI - AM - E&T
Skilled people
85,2% of shopfloor operators are multiskilled
2018
JD/2019/12/12 / 34
Engaged workforce
Celebrating results
min 6.8 12.1 17.4 22.7 28
max 12 17.3 22.6 27.9 28.9
36 Teams awarded & 174
colleagues
2018
JD/2019/12/12 / 35
Reward & Recognition System
• Recognitions through communication channels – boards, meetings, TV Info
• Team presentations in front of StC and Top management
• Publishing teams through network -– (f.e. i – cast - Nex Flex set up Team)
• Visit to other factories (Tetra Pak or local WCM – FIAT, Carlsberg, Tarket)
• Reward at year end – non monetary
JD/2019/12/12 / 36
Common mistakes
1. Put process or pillar responsibility on one person
2. Focus on method and tools is not the purpose
3. Unclear strategy/vision/direction
4. Rush to results with no solid foundations
5. Set too ambitious scope for teams and pillars
6. Lack of guiding coalition to drive change
7. Beware of the messages conveyed by managers
8. Disregard HR role into change
JD/2019/12/12 / 37
Hurdles to overcome
1. Firefighting culture
2. See WCM as additional work
3. Middle management mindset
4. Mismatch between employee interest and strategy
5. Tendence to jump to conclusions
6. Cinema perception (form overcome substance)
JD/2019/12/12 / 38
Key success factors
1. TOP management committment
2. Shop-floor presence – Lead by example
3. Middle Management involvement – from boss to coach
4. Empower people to take decisions and contribute
5. Focus on «MAN» and communication
6. We never lose, either we win or we learn (Resilience)
Jacques Deschamps master-class (TETRA PAK) — LeanForum 2019 (11/12/2019)

More Related Content

Similar to Jacques Deschamps master-class (TETRA PAK) — LeanForum 2019 (11/12/2019)

Laying the foundations for a financially sound industry - OECD.pdf
Laying the foundations for a financially sound industry - OECD.pdfLaying the foundations for a financially sound industry - OECD.pdf
Laying the foundations for a financially sound industry - OECD.pdfIlhamHatmawan1
 
Prepaid OCS Convergence Model
Prepaid OCS Convergence ModelPrepaid OCS Convergence Model
Prepaid OCS Convergence ModelKarthik Ethirajan
 
Presentation juin15daimlerproduction
Presentation juin15daimlerproductionPresentation juin15daimlerproduction
Presentation juin15daimlerproductionBertrand Gay
 
Process and operational excellence synergies
Process and operational excellence synergiesProcess and operational excellence synergies
Process and operational excellence synergiesMarcelo Costa
 
Con1169 office depot scm cloud mbx session
Con1169 office depot scm cloud mbx sessionCon1169 office depot scm cloud mbx session
Con1169 office depot scm cloud mbx sessionBharti Tiwary, PMP
 
Prospering & Profiting in the Low Carbon Economy
Prospering & Profiting in the Low Carbon EconomyProspering & Profiting in the Low Carbon Economy
Prospering & Profiting in the Low Carbon EconomyRobert Nicholls
 
Building A Winning Maintenance Strategy
Building A Winning Maintenance StrategyBuilding A Winning Maintenance Strategy
Building A Winning Maintenance StrategyeMaint Enterprises
 
7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costsICV_eV
 
7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costsICV_eV
 
ABB Key Note Gartner Supply Chain Conference London 2018
ABB Key Note Gartner Supply Chain Conference London 2018ABB Key Note Gartner Supply Chain Conference London 2018
ABB Key Note Gartner Supply Chain Conference London 2018Eva Bouchoux
 
Valmet general presentation
Valmet general presentationValmet general presentation
Valmet general presentationValmet Oyj
 
Customer site visit to Manchester
Customer site visit to ManchesterCustomer site visit to Manchester
Customer site visit to ManchesterValmet Oyj
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsScottMadden, Inc.
 
SWJ TECHNOLOGY Talent Acquisition
SWJ TECHNOLOGY Talent AcquisitionSWJ TECHNOLOGY Talent Acquisition
SWJ TECHNOLOGY Talent AcquisitionAmber Skinner
 
Business Performance Management - Process Approach
Business Performance Management - Process ApproachBusiness Performance Management - Process Approach
Business Performance Management - Process ApproachAjay Koul
 
Cost Reduction Toolkit
Cost Reduction ToolkitCost Reduction Toolkit
Cost Reduction ToolkitDavid Tracy
 

Similar to Jacques Deschamps master-class (TETRA PAK) — LeanForum 2019 (11/12/2019) (20)

Laying the foundations for a financially sound industry - OECD.pdf
Laying the foundations for a financially sound industry - OECD.pdfLaying the foundations for a financially sound industry - OECD.pdf
Laying the foundations for a financially sound industry - OECD.pdf
 
Prepaid OCS Convergence Model
Prepaid OCS Convergence ModelPrepaid OCS Convergence Model
Prepaid OCS Convergence Model
 
Driving uncertainty from your supply chain final
Driving uncertainty from your supply chain finalDriving uncertainty from your supply chain final
Driving uncertainty from your supply chain final
 
Quality management
Quality managementQuality management
Quality management
 
Presentation juin15daimlerproduction
Presentation juin15daimlerproductionPresentation juin15daimlerproduction
Presentation juin15daimlerproduction
 
Process and operational excellence synergies
Process and operational excellence synergiesProcess and operational excellence synergies
Process and operational excellence synergies
 
Con1169 office depot scm cloud mbx session
Con1169 office depot scm cloud mbx sessionCon1169 office depot scm cloud mbx session
Con1169 office depot scm cloud mbx session
 
Prospering & Profiting in the Low Carbon Economy
Prospering & Profiting in the Low Carbon EconomyProspering & Profiting in the Low Carbon Economy
Prospering & Profiting in the Low Carbon Economy
 
Simple sustainablesap 2014
Simple sustainablesap 2014Simple sustainablesap 2014
Simple sustainablesap 2014
 
Building A Winning Maintenance Strategy
Building A Winning Maintenance StrategyBuilding A Winning Maintenance Strategy
Building A Winning Maintenance Strategy
 
7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs
 
7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs7. 21.10.11-t. zielinski-processes or costs
7. 21.10.11-t. zielinski-processes or costs
 
ABB Key Note Gartner Supply Chain Conference London 2018
ABB Key Note Gartner Supply Chain Conference London 2018ABB Key Note Gartner Supply Chain Conference London 2018
ABB Key Note Gartner Supply Chain Conference London 2018
 
Valmet general presentation
Valmet general presentationValmet general presentation
Valmet general presentation
 
Customer site visit to Manchester
Customer site visit to ManchesterCustomer site visit to Manchester
Customer site visit to Manchester
 
Benchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCsBenchmarking for Natural Gas LDCs
Benchmarking for Natural Gas LDCs
 
Begg
BeggBegg
Begg
 
SWJ TECHNOLOGY Talent Acquisition
SWJ TECHNOLOGY Talent AcquisitionSWJ TECHNOLOGY Talent Acquisition
SWJ TECHNOLOGY Talent Acquisition
 
Business Performance Management - Process Approach
Business Performance Management - Process ApproachBusiness Performance Management - Process Approach
Business Performance Management - Process Approach
 
Cost Reduction Toolkit
Cost Reduction ToolkitCost Reduction Toolkit
Cost Reduction Toolkit
 

More from Всеукраинский Форум "Развитие производственных систем"

More from Всеукраинский Форум "Развитие производственных систем" (20)

LeanForum 2021 - P&G
LeanForum 2021 - P&GLeanForum 2021 - P&G
LeanForum 2021 - P&G
 
LeanForum 2021 - ELOPAK
LeanForum 2021 - ELOPAKLeanForum 2021 - ELOPAK
LeanForum 2021 - ELOPAK
 
LeanForum 2021 - JABIL
LeanForum 2021 - JABILLeanForum 2021 - JABIL
LeanForum 2021 - JABIL
 
LeanForum 2021 - Imperial Tobacco
LeanForum 2021 - Imperial TobaccoLeanForum 2021 - Imperial Tobacco
LeanForum 2021 - Imperial Tobacco
 
LeanForum 2021 - GEBERIT
LeanForum 2021 - GEBERITLeanForum 2021 - GEBERIT
LeanForum 2021 - GEBERIT
 
Michael Wader keynote — LeanForum 2019
Michael Wader keynote — LeanForum 2019Michael Wader keynote — LeanForum 2019
Michael Wader keynote — LeanForum 2019
 
Ruslana Korzh master-class — LeanForum 2019
Ruslana Korzh master-class — LeanForum 2019Ruslana Korzh master-class — LeanForum 2019
Ruslana Korzh master-class — LeanForum 2019
 
Robert Saunders keynote (CDI Global / CDI Cape) — LeanForum 2019 (12/12/2019)
Robert Saunders keynote (CDI Global / CDI Cape) — LeanForum 2019 (12/12/2019)Robert Saunders keynote (CDI Global / CDI Cape) — LeanForum 2019 (12/12/2019)
Robert Saunders keynote (CDI Global / CDI Cape) — LeanForum 2019 (12/12/2019)
 
Lazslo Matra & Artem Dudka (Procter & Gamble) keynote — LeanForum 2019 (12/12...
Lazslo Matra & Artem Dudka (Procter & Gamble) keynote — LeanForum 2019 (12/12...Lazslo Matra & Artem Dudka (Procter & Gamble) keynote — LeanForum 2019 (12/12...
Lazslo Matra & Artem Dudka (Procter & Gamble) keynote — LeanForum 2019 (12/12...
 
Mikhail Shelemba (Datagroup) keynote — LeanForum 2019 (12/12/2019)
Mikhail Shelemba (Datagroup) keynote — LeanForum 2019 (12/12/2019)Mikhail Shelemba (Datagroup) keynote — LeanForum 2019 (12/12/2019)
Mikhail Shelemba (Datagroup) keynote — LeanForum 2019 (12/12/2019)
 
Ken Snyder keynote (Shingo Institute) — LeanForum 2019 (12/12/2019)
Ken Snyder keynote (Shingo Institute) — LeanForum 2019 (12/12/2019)Ken Snyder keynote (Shingo Institute) — LeanForum 2019 (12/12/2019)
Ken Snyder keynote (Shingo Institute) — LeanForum 2019 (12/12/2019)
 
Alfredo Moscardini keynote — LeanForum 2019 (12/12/2019)
Alfredo Moscardini keynote — LeanForum 2019 (12/12/2019)Alfredo Moscardini keynote — LeanForum 2019 (12/12/2019)
Alfredo Moscardini keynote — LeanForum 2019 (12/12/2019)
 
Giedrius Balnis (TOCPA) master-class — LeanForum 2019 (11/12/2019)
Giedrius Balnis (TOCPA) master-class — LeanForum 2019 (11/12/2019)Giedrius Balnis (TOCPA) master-class — LeanForum 2019 (11/12/2019)
Giedrius Balnis (TOCPA) master-class — LeanForum 2019 (11/12/2019)
 
Yasmin Maier & Markus Esch (Barry-Wehmiller) master-class — LeanForum 2019 (1...
Yasmin Maier & Markus Esch (Barry-Wehmiller) master-class — LeanForum 2019 (1...Yasmin Maier & Markus Esch (Barry-Wehmiller) master-class — LeanForum 2019 (1...
Yasmin Maier & Markus Esch (Barry-Wehmiller) master-class — LeanForum 2019 (1...
 
Bogdan Mazurkevich master-class — LeanForum 2019 (11/12/2019)
Bogdan Mazurkevich master-class — LeanForum 2019 (11/12/2019)Bogdan Mazurkevich master-class — LeanForum 2019 (11/12/2019)
Bogdan Mazurkevich master-class — LeanForum 2019 (11/12/2019)
 
Alfredo Moscardini master-class — LeanForum 2019 (11/12/2019)
Alfredo Moscardini master-class — LeanForum 2019 (11/12/2019)Alfredo Moscardini master-class — LeanForum 2019 (11/12/2019)
Alfredo Moscardini master-class — LeanForum 2019 (11/12/2019)
 
ACMP Ukraine master-class — LeanForum 2019 (11/12/2019)
ACMP Ukraine master-class — LeanForum 2019 (11/12/2019)ACMP Ukraine master-class — LeanForum 2019 (11/12/2019)
ACMP Ukraine master-class — LeanForum 2019 (11/12/2019)
 
Shingo Institute workshop - LeanForum 2019 (9/12/2019-10/12/2019)
Shingo Institute workshop - LeanForum 2019 (9/12/2019-10/12/2019)Shingo Institute workshop - LeanForum 2019 (9/12/2019-10/12/2019)
Shingo Institute workshop - LeanForum 2019 (9/12/2019-10/12/2019)
 
Laszlo Marta&Olesia Burak. P&G. Base IWS principles to build operational exce...
Laszlo Marta&Olesia Burak. P&G. Base IWS principles to build operational exce...Laszlo Marta&Olesia Burak. P&G. Base IWS principles to build operational exce...
Laszlo Marta&Olesia Burak. P&G. Base IWS principles to build operational exce...
 
Попенов Артем. Сoca-Сola Helenic Botling Company. - Развитие производственной...
Попенов Артем. Сoca-Сola Helenic Botling Company. - Развитие производственной...Попенов Артем. Сoca-Сola Helenic Botling Company. - Развитие производственной...
Попенов Артем. Сoca-Сola Helenic Botling Company. - Развитие производственной...
 

Recently uploaded

Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Alex Marques
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningCIToolkit
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 

Recently uploaded (20)

Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 

Jacques Deschamps master-class (TETRA PAK) — LeanForum 2019 (11/12/2019)

  • 1. What Tetra Pak is doing to make the operator works more interesting? 10 key elements Everyone contribution counts! JD/2019/12/12 / 1
  • 2. / 2 What makes the difference How to mobilize the organization at every level Only WCM! From performance to excellence. Build to last. Synopsis Introduction JD/2019/12/12 Introduction
  • 3. The company challenges Overall spending, Quality, flexibility and productivity ► Increase commoditization of the base business triggered a rapid growth of competition offering low price at acceptable quality. ► Price pressure will necessitate revision of current business model. ► System Quality – Machine Material Interaction ► Low service level – OT - IF ► High manufacturing costs – TW ECTC JD/2019/12/12 / 3
  • 4. Strategic Choices at Company level ► Reduce cost by improving asset utilisation while mitigating risk to service level ► Standardise high capacity converting platform ► Take long term perspective on supplier relations in order to optimise benefits ► Give priority to suppliers that support all four strategic priorities ► Drive WCM as the methodology for performance improvement ► Ensure that Make/buy decisions are the best for each industrial base strategic priorities JD/2019/12/12 / 4
  • 5. Our Objectives ► Reduce costs ► Excel in customer service Easy to do business with On time, in full and Flexibility ► Drive innovation 3 Our enablers ► Drive a deep rooted change through WCM - Accomplish JiPm Advanced SpecialAward ► Drive and comply with Corporate Social Responsibility ► Drive indirect cost reduction with Supplier Mgt Our values ► Safety ► Quality ► Engagement 3 3 3 main goals to be taken by the plants We want to be better, faster, cheaper JD/2019/12/12 / 5
  • 6. What makes the difference How to mobilize the organization at every level Only WCM! From performance to excellence. Build to last. Synopsis Introduction JD/2019/12/12 / 6 How to mobilize the organization at every level
  • 7. Change management: Kotter’s model Drive an effective change JD/2019/12/12 / 7
  • 8. Tetra Pak Rubiera Hai detto piattaforma che brucia? JD/2019/12/12 / 8
  • 9. Burning Platform Turning challenges to opportunities § We must reduce our production costs § We have to facilitate innovation deployment § We need to improve our service level § Safety first - SAM program § Comply to CSR – sustainability – Sedex § Regain Quality leadership – MMI / 9JD/2019/12/12
  • 10. July 09, 2015 Agenda ► Where are we? ► Our current bottlenecks ► Workshop JD/2019/12/12 / 10
  • 11. ..with different capabilities, but all targeting our business Aggressively targeting volume markets GA Pack new factory in Germany NSS Continuously improving competitiveness Krones with low cost/ low CSC offer PET Selectively focusing on growth markets New factory in Brazil SIG Expanding ambient portfolio & capacity Struggling with profitability Elopak We are facing several competitors JD/2019/12/12 / 11
  • 12. Packaging Material Filling Equipment Distribution Equipment Spare partsProcessing Equipment Straws StripsClosures Quality Mgt Services Financial Services Local Presence e-business Services Trusted Brand Package Portfolio Package Design Services Single Source Responsibility Family Owned Partnership Environmental Image Technical Competence Innovation Leader Certified Suppliers Business Continuity Performance Guarantees Maintenance Services Improvement Services Consumer Intelligence Services Category Management Services Co-packing Arrangement Services Long Term Perspective Strong Parts Supply Chain Product Formulation Services Training Services Food Quality Competence Consultancy Competence …to avoid price war with NSS Success will be to secure value offering... JD/2019/12/12 / 12
  • 13. The way forward • Efficiency on top of our agenda • Cleaning the pipeline • Remove current bottlenecks. Ultimately, coating line should be Rubiera bottleneck. (4.5 Bio std packs) • Quality is still an area of opportunity • Without swapability, perceived quality is not achieved • Competitiveness requires us to look at ALL expenses. Indirect costs in Rubiera to be attacked • This will require new ways of organizing ourselves JD/2019/12/12 / 13
  • 15. What makes the difference How to mobilize the organization at every level Only WCM! From performance to excellence. Build to last. Synopsis Introduction JD/2019/12/12 / 15 Only WCM! From performance to excellence. Build to last.
  • 16. In Rubiera, we have a vision To become the best factory in Western Europe JD/2019/12/12 / 16
  • 17. Safety first! Driving SaM program Cracking the Full Supply Chain cost structure Improving Supply Chain Service Index Strive for Sustainability Quality first! “Clean the pipe line” Improve EE Coating “85” and Finishing output Increase Pay-load Improve Perfect Delivery Comply to Corporate Social Responsibility Deploy SPC Reduce Extended CTC “9” Eradicate Air freight Write-Off “Perfect Order Concept” Reduce CO2 emission Manage Recycled & Not Recycled waste Driving Innovation Developing an High Performing Organization toward World Class Level: capable employees, role model leaders and fair recognition system WCM Assessment Score OCRwithTSandCustomers WCMAssessmentLogisticPillar Driving with WCM Effective Strategy cascading – Clear and simple Rubiera’s key actions 2015-2019 3 3 3 85.9 Rubiera EE Coating 85% Extended CTC 9 EE coating: 85% Extended CTC: 9 JD/2019/12/12 / 17
  • 19. WCM in Rubiera Our mission: build to last “ We drive a deep rooted change to achieve zero loss by involving all employees to ensure our future through customers’ trust JD/2019/12/12 / 19
  • 20. LF/2018-05-15 WCM Development Supply Chain InnovationChain Customers and Consumers Suppliers Source Make Deliver Plan Technology Development Product Development TPM Level 1 Reducing Manufacturing Costs • AOV & CFC deployment per process • TW deployment per process • Loss tree definition TPM Level 2 Reducing Product Costs • Focus on Total Production Costs • Cost Driver identification • Define Target Cost to survive in the market TPM Level 3 Extended SC World Class Business Reducing Supply Chain Costs • Focus on extended Supply Chain Costs • Loss-Cost Matrix for extended Supply Chain Costs • Inventories optimization (J-cost theory) • Define Target Cost to win and stay in the market TPM Excellence Award 2008 TPM Consistency Award 2010 TPM Special Award 2014 TPM Special Advanced Award 2016 TPM World Class Award 2019 Supply Chain Integration Extended SC World Class Business JD/2019/12/12 / 20
  • 21. Management System Quality Management System (ISO 9001) OHSAS certification (18001) Environmental Management System (ISO 14001) GMP BRC/IOP W ORLD CLASS M ANUFACTURING Method & tools Improve & Maintain JD/2019/12/12 / 21
  • 22. 11 Pillars WCM Pillars in TP organization JD/2019/12/12 / 22
  • 23. Effective Strategy cascading “What does it mean for me?” Effective Structure Skilled People Engaged people Valuable Teamwork WCM principles Four successful elements – PDCA ensuring sustainability P D C A Ensuring sustainable results JD/2019/12/12 / 23
  • 24. LF/2018-05-15 Deep rooted change of mindset Effective structure WCM team (Office + Pillars) Process Cells Focused Teams (All) Steering Team Focus on specific losses (chronic & sporadic) Seek sporadic losses + Short Term Vision Spread the Strategy; attack chronic losses + Middle Term Vision Develop and drive an effective strategy + Long Term Vision JD/2019/12/12 / 24
  • 25. Tetra Pak Process Cell organization JD/2019/12/12 / 25
  • 26. SLITTING & DOCTORING COATING PRINTING PRE - PRESS Factory Targets Pre-press Targets Printing Targets Coating Targets Slitting-Finishing Targets CDI Exp Proc Dry M15 M16 T2 Ink M1 M2 M3 M4M26 Chil Sil M4 Teams Teams Teams Teams Teams Teams Teams TeamsTeams Teams Teams Teams Teams TeamsTeams Teams Results Results Results ResultsResults Results Results Results ResultsResultsResults Results Results Results Results Results WCM Everyone contribution counts JD/2019/12/12 / 26
  • 27. TPM - Way to Factory Success Based on: 1. Intelligence 2. Eradication 3. Prevention Basic Principles: • 100% Involvement • Cross functional Teams • Hands-On, Shop Floor Approach • Eradication-Zero Philosophy • Prevention Philosophy • Standard Work (OPLs,SOPs, ..) • Visual Management •People •Processes •Organization Losses Develop JD/2019/12/12 / 27
  • 28. Translate strategy into actions LF/2018-05-15 Roadmap & Contribution Matrix JD/2019/12/12 / 28
  • 29. Simplification and Focus LF/2018-05-15 Management & Steering Teams JD/2019/12/12 / 29
  • 30. Pre Production •Design Management 09:00 •Order Handling 09:15 •Planning 09:30 Production •Prepress 09:00 •Printing 09:00 •Coating 09:00 •Slitting 09:00 Post Production •Maintenance 08:45 •Quality 09:15 •Logistic 09:00 •Warehouse 09:00 Production meeting 10:00 LF/2018-05-15 Regular decision meeting in each area Daily Management System 2003 2010 2011 2012 2013 YTD 2014 TG 2014 TG 2015 TG 2016 a Full SC Cost index vs 2013 unit cost 100,00 96,38 99,70 98,10 97,50 a CTC (€/Kspk) Index vs 2010 100,00 98,95 95,99 95,32 94,44 95,64 94,70 93,94 a Total Waste % 6,57 5,51 5,23 4,84 4,54 3,93 4,08 3,80 3,65 a Process Waste % 4,04 4,31 3,71 3,52 2,89 3,19 3,12 TBD a Dummy rolls used % 90 99 100 100 100 a EE Printing % 56,6 58,2 59,3 59,3 61,1 TBD a EE Slitting % 17,6 19,0 18,5 19,0 TBD TBD a Other material cost* Index vs 2010 100 106 92 100 97,8 101,9 99,9 98,9 a Productivity spk / FTE 1.062 1.114 1.141 1.189 1.206 1.189 TBD TBD a TEE Coating % 52,3 53,5 53,3 51,7 60,7 TBD a EE Laminator M26 % 68,9 71,8 74,5 73,6 80,4 82,1 a Flying Setup % 28,0 55,0 50,0 75,0 100,0 a Climate efficiency Kg / msp 6.882 5.972 5.504 5.214 4.734 5.036 4.885 TBD a Recycled waste reduction Kg / msp 2.146 2.098 1.910 1.688 1.702 1.427 1.550 1.500 TBD a World Class Level Level Start up GL Special GL Special Special JiPm GL spc advc spc advc JiPm a FI Pillar Score % 54,5 60,90 66,40 66,4 TBD TBD History Yearly trend Target COST SCO Cluster Strategy KMI KPI KAI FI Pillar Indicators Unit ENVIRONMENT PEOPLE Consistency Award Different score criteria TPM PHASE 3 TPM PHASE 2 TPM PHASE 1 Order Management Design Handle Planning & Replenish. Pre- Press Print Coating Slitting LogisticSuppliers Customer JD/2019/12/12 / 30
  • 31. What makes the difference How to mobilize the organization at every level Only WCM! From performance to excellence. Build to last. Synopsis Introduction JD/2019/12/12 / 31 What makes the difference
  • 32. What Tetra is doing to make the operator works more interesting? 10 key elements – Everyone has a brain and two arms! 1. Build the local strategy: “our story, our future” – Bring the sense of urgency - Increase the speed of “change” 2. Communicate this strategy in a comprehensive manner to be understood by all. “What does it mean for me?”. 3. Strengthen the feeling we belong to a great Company: “Tetra Pak un gran posto in cui lavorare” campaign. 4. Drive and develop the Autonomous Maintenance program toward step 7. Involving all operators is key. 5. Promote multiskilled employee concept and reward. 6. Revamp the “non financial” rewarding system for WCM activities i.e. successful teams & improvement tags 7. Pay the incentive based on yearly factory performance. Local contract signed with unions 8. Establish a simple structure for Cells and Pillars with clear roles and responsibilities. 9. Empower this structure including the Shift Supervisors. 10. Ensure the training program is executed and contributes to loss eradication through people development. JD/2019/12/12 / 32
  • 33. Management 1. Change 2. Collaborate 3. Develop others 4. Develop self 5. Engage 6. Perform Trainings • PKEs (QM, AM, PM, FI) • WCM basic • WCM advanced Run for Europe by Central Team for Pillar Member and Managers • Effective feedback • Develop others (mandatory) • Stress & Care of collaborators Operational & Management development Leadership programs JD/2019/12/12 / 33
  • 34. 8 8 10 23 40 101 110 108 112 116 0 20 40 60 80 100 120 140 2010 2011 2012 2013 2014 2015 2016 TG16 TG 17 TG 18 No. No. of Multi-skilled Operators FI - AM - E&T Skilled people 85,2% of shopfloor operators are multiskilled 2018 JD/2019/12/12 / 34
  • 35. Engaged workforce Celebrating results min 6.8 12.1 17.4 22.7 28 max 12 17.3 22.6 27.9 28.9 36 Teams awarded & 174 colleagues 2018 JD/2019/12/12 / 35
  • 36. Reward & Recognition System • Recognitions through communication channels – boards, meetings, TV Info • Team presentations in front of StC and Top management • Publishing teams through network -– (f.e. i – cast - Nex Flex set up Team) • Visit to other factories (Tetra Pak or local WCM – FIAT, Carlsberg, Tarket) • Reward at year end – non monetary JD/2019/12/12 / 36
  • 37. Common mistakes 1. Put process or pillar responsibility on one person 2. Focus on method and tools is not the purpose 3. Unclear strategy/vision/direction 4. Rush to results with no solid foundations 5. Set too ambitious scope for teams and pillars 6. Lack of guiding coalition to drive change 7. Beware of the messages conveyed by managers 8. Disregard HR role into change JD/2019/12/12 / 37
  • 38. Hurdles to overcome 1. Firefighting culture 2. See WCM as additional work 3. Middle management mindset 4. Mismatch between employee interest and strategy 5. Tendence to jump to conclusions 6. Cinema perception (form overcome substance) JD/2019/12/12 / 38
  • 39. Key success factors 1. TOP management committment 2. Shop-floor presence – Lead by example 3. Middle Management involvement – from boss to coach 4. Empower people to take decisions and contribute 5. Focus on «MAN» and communication 6. We never lose, either we win or we learn (Resilience)