SlideShare a Scribd company logo
1 of 5
WORK EXPERIENCE Fugro – Svitzer


All the projects listed are done from start to end, meaning mobilisation, data collection, interpretation,
charting and reporting.


2002 May      Function: Partyleader
              Project: Rig entrance Inspection, ROV
              Client: Maersk Oil and Gas
              Equipment: DGPS navigation, single beam echo sounder
              and ROV with: Manipulators video and sonar.
2002 Apr      Function: Party leader
              Project: ROV Cable survey
              Client: SWEPOL
              Equipment: Scorpio ROV with: Dual head scanner, bathy
              pressure sensor, altimeter and Video.
2002 Jan      Function: Party leader
              Project: Multibeam survey, sail route south of Samsø
              Client: Fredericia Havn
              Equipment: RTK GPS, multibeam. single beam echosounder, motion sensor, gyros
2001 Oct      Function: Surveyor
              Project: Cable layering 6 Links in Thailand
              Client: NKT Cable
              Equipment: Single beam echo sounder, gyros and DGPS navigation.
2001 Sep      Function: Surveyor
              Project: Rig move Mærsk Exerter
              Client: Maersk Olie and Gas
              Equipment: RTK GPS, Gyros, laser and totalstation
2001 Aug      Function: Surveyor
              Project: Rig move Mærsk Giant from Dan field to Norway
              Client: Maersk Olie and Gas
              Equipment: RTK GPS, Gyros, laser and totalstation
2001 July     Function: Party leader
              Project: Shallow land seismik at Brande, Denmark
              Client: Ringkøbing amt
2001 June     Function: Party leader
              Project: Shallow land seismik at Lindknud, Denmark
              Client: Ribe amt
2001 Apr      Function: Surveyor
              Project: Rig move Ensco 71 from Dan to Gorm
              Client: Maersk Olie and Gas
              Equipment: RTK GPS, Gyros, laser and totalstation
2001 Mar      Function: Party leader
              Project: Multibeam survey Fredericia-Middelfart-Nyborg habour
              Client: Fredericia Havn
              Equipment: RTK GPS, multibeam. single beam echosounder,
              motion sensor, gyros
2001 Feb      Function: Party leader
              Project: Shallow land seismik at Lemvig, Denmark
              Client: Ringkøbing amt
2001 Feb      Function: Partyleader
              Project: Shallow land seismik at Vorbasse, Denmark
2001 Jan      Function: Partyleader
              Project: Pipeline Inspection after Rig move
              Client: Maersk Oil and Gas
              Equipment: DGPS navigation, single beam echo sounder and Side Scan


_______________________________________________________________________________________________
John Løndal                                   CV                                       Side 1 af 5
WORK EXPERIENCE Fugro – Svitzer

2000 Nov     Function: Partyleader
             Project: ROV conductor cleaning
             Client: Maersk Oil and Gas
             Equipment: Scorpio ROV with: Dual head scanner, bathy
             pressure sensor, altimeter, Water jet cleaner
2000 Nov     Function: Party leader
             Project: Multibeam survey Middelgrunden.
             Client: Krangården
             Equipment: RTK GPS, multibeam. single beam
             echosounder, motion sensor, gyros
2000 Aug     Function: Surveyor
             Project: Rig move Mærsk Endevaur from wildcat to new
             Halfdan installation
             Client: Maersk Olie and Gas
             Equipment: RTK GPS, Gyros, laser and totalstation
2000 Aug     Function: Surveyor
             Project: Position of Halfdan
             Client: Maersk Olie and Gas
             Equipment: Static RTK GPS and totalstation
2000 Aug     Function: Surveyor
             Project: Rig move Mærsk Endevaur from Halfdan to
             wildcat. Position of anchors and rig
             Client: Maersk Olie and Gas
             Equipment: RTK GPS, Gyros, laser and totalstation
2000 July    Function: Party leader
             Project: Multibeam survey Samsø.
             Client: TeleDenmark cable
             Equipment: RTK GPS, multibeam. single beam echosounder, side scan sonar
2000 July    Function: Party leader
             Project: Multibeam survey Lillebælt.
             Client: Fredericia Havn
             Equipment: RTK GPS, multibeam. single beam echosounder, side scan sonar
2000 May     Function: Client rep
             Project: Cable route survey 8 Links in Thailand
             Client: NKT Project
             Equipment: Side scan sonar, sub bottom profiler, single
             beam echo sounder, grab samples and DGPS navigation.
2000 Apr     Function: Party leader
             Project: Cable route survey Denmark-Germany
             Client: TeleDenmark Marine
             Equipment: Side scan sonar, sub bottom profiler, single
             beam echo sounder, magnetometer, grab samples and DGPS
             navigation.
2000 Mar     Function: Party leader
             Project: Multibeam survey of stone protection on the
             Storebelt bridge.
             Client: A/S Storebelt
             Equipment: 2 RTK GPS systems, doppler log, multibeam.
             Total station.
2000 Feb     Function: Party leader
             Project: Cable route survey Denmark-Laesoe
             Client: TeleDenmark Marine
             Equipment: Side scan sonar, sub bottom profiler, single beam echo sounder, multibeam echo
             sounder, magnetometer, grab samples, diver swim and DGPS navigation.
2000 Jan     Function: Party leader
             Project: Cable route survey Denmark-Germany

_______________________________________________________________________________________________
John Løndal                                   CV                                       Side 2 af 5
WORK EXPERIENCE Fugro – Svitzer

             Client: TeleDenmark Marine
             Equipment: Side scan sonar, sub bottom profiler, single beam echo sounder, multibeam echo
             sounder, magnetometer, grab samples, diver swim and DGPS navigation.
1999 Dec     Function: Party leader
             Project: Cable route survey, Helsinki-Tallin-Sweden,
             landfall
             Client: Alcatel – Pangea project
             Equipment: Side scan sonar, pinger seismic, proton
             magnetometer, 2 divers with camera, single beam echo
             sounder, total station, levelling, grab samples and DGPS
             navigation.
1999 Nov     Function: Engineer
             Project: Multibeam survey of stone protection on the Storebelt bridge.
             Client: A/S Storebelt
             Equipment: 2 RTK GPS systems, doppler log, multibeam. Total station.
1999 Nov     Function: Surveyor
             Project: Cable repairs Copenhagen harbour.
             Client: NKT Cables
             Equipment: Cable ship H.P Lading, single beam echo sounder, 2 DGPS navigation’s systems,
             measurement of wind, current, tension and cable length.
1999 Sep     Function: Party leader
             Project: 2 Cable route surveys in Lillebaelt Denmark
             Client: DONG
             Equipment: Side scan sonar, pinger seismic, multibeam echo sounder, single beam echo sounder, grab
             samples and DGPS navigation. 1000 km. surveyed.
1999 Aug     Function: Party leader
             Project: Position and bathymetric survey in 2 harbours between Fyn and Als Denmark.
             Client: Havnecon Consulting
             Equipment: RTKGPS navigation, single beam echo sounder and Aga totalstation.
1999 July    Function: Partyleader
             Project: Annual Infield Pipeline Inspection, ROV
             Client: Maersk Oil and Gas
             Equipment: DGPS navigation, single beam echo sounder
             and ROV with: Dual head scanner, bathy pressure sensor,
             altimeter, 5 VCR's and pipe tracker. 200 km. Pipe surveyed.
1999 May     Function: Surveyor
             Project: 6 Landfall surveys in Nederland (2), Belgium (2)
             and UK (2)
             Client: TeleDenmark Marine and Flute
             Equipment: Side scan sonar, pinger seismic, magnetometer,
             multibeam echo sounder, single beam echo sounder, grab
             samples and DGPS navigation. 160 km. surveyed.
1999 April   Function: Online Processor/Geophysicist
             Project: Cable route survey Nederland-Belgium-UK
             Client: TeleDenmark Marine and Flute
             Equipment: Side scan sonar, pinger seismic, Magnetometer,
             Multibeam echo sounder, single beam echo sounder, grab
             samples and DGPS navigation. 1600 km. surveyed.
1999 Marts   Function: Geophysicist
             Project: Cable route survey AArhus-Kaluendborg, Denmark
             Client: TeleDenmark Marine
             Equipment: Side scan sonar, pinger seismic, Proton Magnetometer, single beam echo
             sounder, grab/drop core samples and DGPS navigation. 210 km. surveyed.
1999 Feb     Function: Party leader
             Project: Cable route survey near Patra, Greece
             Client: NKT Cables

_______________________________________________________________________________________________
John Løndal                                   CV                                       Side 3 af 5
WORK EXPERIENCE Fugro – Svitzer

            Equipment: Side scan sonar, Sub bottom profiler, single beam echo sounder, drop cores and
            DGPS navigation.
1999 Jan    Function: Surveyor
            Project: Cable layering Aktio-Preveza and Achladi-Eiva,
            Greece
            Client: NKT Cables
            Equipment: Cable ship H.P Lading, single beam echo
            sounder, 2 DGPS navigation systems, measurement of wind,
            current, tension and cable length.
1998 Nov    Function: Party leader/Geophysicist
            Project: Cable route survey Rion-AntiRion, Greece
            Client: NKT Cables
            Equipment: Side scan sonar, Sub bottom profiler, single
            beam echo sounder and DGPS navigation.
1998 Oct    Function: Party leader/Geophysicist
            Project: Cable route survey Denmark-Sweden
            Client: TeleDenmark Marine
            Equipment: Side scan sonar, sub bottom profiler, single
            beam echo sounder and DGPS navigation.
1998 Sep    Function: Party leader/Geophysicist
            Project: Debris survey in Storbaelt Workareas
            Client: A/S Storebaeltsforbindelsen
            Equipment: Side scan sonar, DGPS navigation and single beam echo sounder.
1998 Sep    Function: Party leader/Surveyor
            Project: Position and bathymetric survey of gas pipes in Svendborgsund
            Client: Naturgas Fyn
1998 Aug.   Function: Surveyor
            Project: Bathymetric landfall survey
            Client: DONG
1998 July   Function: Party leader/Geophysicist
            Project: Cable route survey Langeland-Fyn
            Client: Telecom Denmark
            Equipment: Side scan sonar, Sub bottom profiler, single beam echo sounder and DGPS
            navigation.
1998 July   Function: Party leader/Geophysicist
            Project: Debris survey Odense harbour
            Client: Odense Amt
            Equipment: Side scan sonar, DGPS navigation and single
            beam echo sounder.
1998 June   Function: Party leader/Geophysicist
            Project: Outsurvey Storbaelt east bridge
            Client: Gec Alsthom
            Equipment: Side scan sonar, DGPS navigation and single
            beam echo sounder.
1998 May    Party leader/Surveyor
            Project: Position and bathymetric survey in Sundsoere harbour
            Client: Havnecon Consulting
            Equipment: DGPS navigation, single beam echo sounder and Aga totalstation.
1998 April  Function: Geophysicist
            Project: Annual Infield Pipeline Inspection
            Client: Maersk Olie and Gas
            Equipment: Side scan sonar, DGPS navigation and single beam echo sounder.
 1998 Marts Function: Geophysicist
            Project: Cable route survey Storebaelt
            Client: Telecom Denmark


_______________________________________________________________________________________________
John Løndal                                   CV                                       Side 4 af 5
WORK EXPERIENCE Fugro – Svitzer

             Equipment: Side scan sonar, Sub bottom profiler, single beam echo sounder and DGPS
             navigation.
1998 Feb     Function: Surveyor
             Project: Rig move Shelf Explore from ADDA-4 to Dan. Position of anchors and rig
             Client: Maersk Olie and Gas
             Equipment: Gyros, laser and totalstation
1998 Jan/Feb Function: Surveyor
             Project: Rig move Maersk Explore from Dan FF to Kraka. Position and penetration
             measurement
             Client: Maersk Olie and Gas.
1998 Jan     Function: Surveyor
             Project: Position of Voresaa harbour
             Client: Havnecon Consulting.
1997 Dec.    Function: Surveyor
             Project: Bathymetric survey in Voresaa harbour
             Client: Havnecon Consulting.
1997 Nov.    Function: Surveyor
             Project: Video inspection Odense harbour
             Client: Odense Amt.
1995         Function: Geophysicist
             Project: Magnetic Dating of 2 sediment profiles from Lithuania.
1994         Function: Geophysicist
             Project: Localisation and sample taking of a waste product from an old Iron production.
             Equipment: Proton-magnetometer, SQUID-magneto-meter, fluxgate-magnetometer and
             Spinner magnetometer.
1994         Function: Geophysicis
             Project: Testing and programming SQUID-magnetometer and Spinner magnetometer
1994         Function: Geophysicist
             Project: Geophysical groundwater investigation North Beder town, Aarhus
             Equipment: DC-cable Geo-electric, AC Geo-electric, Electric Log, Drag Geo-electric,
             Transient distinction.
1993         Function: Geophysicist
             Project: Localisation of a rubbish heap
             Equipment: use of Proton-magnetometer.
1993         Function: Geophysicist
             Project: Evaluation of saltwater invading on a peninsula
             Equipment: Seismic, AC and DC-Geo-electric and bore hole logging




_______________________________________________________________________________________________
John Løndal                                   CV                                       Side 5 af 5

More Related Content

Viewers also liked

Dhwani09 Lonewolf - Stamps
Dhwani09 Lonewolf - StampsDhwani09 Lonewolf - Stamps
Dhwani09 Lonewolf - StampsJithin Jacob
 
Botanicgardensslides
BotanicgardensslidesBotanicgardensslides
Botanicgardensslideslhansen99
 
Bluesign Innovation For Extremes 06.05.2009
Bluesign Innovation For Extremes 06.05.2009Bluesign Innovation For Extremes 06.05.2009
Bluesign Innovation For Extremes 06.05.2009Mary Rose
 
Gearing Up Google Glass Development - August 2013
Gearing Up Google Glass Development - August 2013Gearing Up Google Glass Development - August 2013
Gearing Up Google Glass Development - August 2013Maximiliano Firtman
 
Ultimate Hq Wallpapers
Ultimate Hq WallpapersUltimate Hq Wallpapers
Ultimate Hq Wallpapersfondas vakalis
 
Alberti.innovex pp
Alberti.innovex ppAlberti.innovex pp
Alberti.innovex ppMary Rose
 
Work Life Home Care
Work Life Home CareWork Life Home Care
Work Life Home Carensachs
 
Saturn - Tcacenco Alina
Saturn - Tcacenco AlinaSaturn - Tcacenco Alina
Saturn - Tcacenco Alinaalexcurbet
 
CET Quiz Club Set #3
CET Quiz Club Set #3CET Quiz Club Set #3
CET Quiz Club Set #3Jithin Jacob
 
Social Media In The Classroom
Social Media In The ClassroomSocial Media In The Classroom
Social Media In The Classroombkestner
 
Progressbar promo - english version
Progressbar promo - english versionProgressbar promo - english version
Progressbar promo - english versionJuraj Bednar
 
The Adventures of Our Toys!
The Adventures of Our Toys!The Adventures of Our Toys!
The Adventures of Our Toys!Serkan Solmaz
 
Ploieşti The City Of The Black Gold
Ploieşti   The City Of The Black GoldPloieşti   The City Of The Black Gold
Ploieşti The City Of The Black GoldAlex Dragomirescu
 
Lisa Alberti.Proposed Linked Design Project 1
Lisa Alberti.Proposed Linked Design Project 1Lisa Alberti.Proposed Linked Design Project 1
Lisa Alberti.Proposed Linked Design Project 1Mary Rose
 
Atjaunojamā EnerģIja
Atjaunojamā  EnerģIjaAtjaunojamā  EnerģIja
Atjaunojamā EnerģIjaUldis Pavuls
 

Viewers also liked (20)

Dhwani09 Lonewolf - Stamps
Dhwani09 Lonewolf - StampsDhwani09 Lonewolf - Stamps
Dhwani09 Lonewolf - Stamps
 
Wensen
WensenWensen
Wensen
 
激 勵 Motivation
激 勵 Motivation激 勵 Motivation
激 勵 Motivation
 
Mercur
MercurMercur
Mercur
 
Botanicgardensslides
BotanicgardensslidesBotanicgardensslides
Botanicgardensslides
 
Bluesign Innovation For Extremes 06.05.2009
Bluesign Innovation For Extremes 06.05.2009Bluesign Innovation For Extremes 06.05.2009
Bluesign Innovation For Extremes 06.05.2009
 
Gearing Up Google Glass Development - August 2013
Gearing Up Google Glass Development - August 2013Gearing Up Google Glass Development - August 2013
Gearing Up Google Glass Development - August 2013
 
Ultimate Hq Wallpapers
Ultimate Hq WallpapersUltimate Hq Wallpapers
Ultimate Hq Wallpapers
 
Alberti.innovex pp
Alberti.innovex ppAlberti.innovex pp
Alberti.innovex pp
 
Work Life Home Care
Work Life Home CareWork Life Home Care
Work Life Home Care
 
Saturn - Tcacenco Alina
Saturn - Tcacenco AlinaSaturn - Tcacenco Alina
Saturn - Tcacenco Alina
 
CET Quiz Club Set #3
CET Quiz Club Set #3CET Quiz Club Set #3
CET Quiz Club Set #3
 
Social Media In The Classroom
Social Media In The ClassroomSocial Media In The Classroom
Social Media In The Classroom
 
Progressbar promo - english version
Progressbar promo - english versionProgressbar promo - english version
Progressbar promo - english version
 
The Adventures of Our Toys!
The Adventures of Our Toys!The Adventures of Our Toys!
The Adventures of Our Toys!
 
Ploieşti The City Of The Black Gold
Ploieşti   The City Of The Black GoldPloieşti   The City Of The Black Gold
Ploieşti The City Of The Black Gold
 
Lisa Alberti.Proposed Linked Design Project 1
Lisa Alberti.Proposed Linked Design Project 1Lisa Alberti.Proposed Linked Design Project 1
Lisa Alberti.Proposed Linked Design Project 1
 
The Web is Human
The Web is HumanThe Web is Human
The Web is Human
 
Atjaunojamā EnerģIja
Atjaunojamā  EnerģIjaAtjaunojamā  EnerģIja
Atjaunojamā EnerģIja
 
Paradise Bay Grand
Paradise Bay GrandParadise Bay Grand
Paradise Bay Grand
 

Similar to Work Experience from Fugro and Svitzer

High Resolution Multibeam Survey and Mobile Laser Scanning
High Resolution Multibeam Survey and Mobile Laser ScanningHigh Resolution Multibeam Survey and Mobile Laser Scanning
High Resolution Multibeam Survey and Mobile Laser ScanningHavnetekniskgruppe
 
Tim Bailey CV updated July 2015
Tim Bailey CV updated July 2015Tim Bailey CV updated July 2015
Tim Bailey CV updated July 2015Tim Bailey
 
C.V - Walid Abdelbaky
C.V - Walid AbdelbakyC.V - Walid Abdelbaky
C.V - Walid AbdelbakyWalid Said
 
Karen Edelvang-list of projects
Karen Edelvang-list of projectsKaren Edelvang-list of projects
Karen Edelvang-list of projectsKaren Edelvang
 
Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017Philip Harrison
 
Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Alistair Lamont
 
DSM IN NORWAY'S EEZ - EMERGING INDUSTRY BASED ON REGIONAL TECHNOLOGICAL EXPER...
DSM IN NORWAY'S EEZ - EMERGING INDUSTRY BASED ON REGIONAL TECHNOLOGICAL EXPER...DSM IN NORWAY'S EEZ - EMERGING INDUSTRY BASED ON REGIONAL TECHNOLOGICAL EXPER...
DSM IN NORWAY'S EEZ - EMERGING INDUSTRY BASED ON REGIONAL TECHNOLOGICAL EXPER...iQHub
 
CV Bajic Updated 2016[7971]
CV Bajic Updated 2016[7971]CV Bajic Updated 2016[7971]
CV Bajic Updated 2016[7971]Petar Bajic
 
TUGI PETR CV_2015
TUGI PETR CV_2015TUGI PETR CV_2015
TUGI PETR CV_2015Peter Tugi
 
Gemini – Wind farm positioning beyond the horizon
Gemini – Wind farm positioning beyond the horizonGemini – Wind farm positioning beyond the horizon
Gemini – Wind farm positioning beyond the horizonHydrographic Society Benelux
 
TH2.L10.5: OVERVIEW ON CALIBRATION AND VALIDATION ACTIVITIES FOR ESA’S SOIL M...
TH2.L10.5: OVERVIEW ON CALIBRATION AND VALIDATION ACTIVITIES FOR ESA’S SOIL M...TH2.L10.5: OVERVIEW ON CALIBRATION AND VALIDATION ACTIVITIES FOR ESA’S SOIL M...
TH2.L10.5: OVERVIEW ON CALIBRATION AND VALIDATION ACTIVITIES FOR ESA’S SOIL M...grssieee
 
Well logging summary and Interpretation
Well logging summary and InterpretationWell logging summary and Interpretation
Well logging summary and InterpretationPE Mahmoud Jad
 
GWT 2014: Emergency Conference - 08 I servizi satellitari in near real-time a...
GWT 2014: Emergency Conference - 08 I servizi satellitari in near real-time a...GWT 2014: Emergency Conference - 08 I servizi satellitari in near real-time a...
GWT 2014: Emergency Conference - 08 I servizi satellitari in near real-time a...Planetek Italia Srl
 
Earth Observation Systems Evolution- Thales Alenia Space at Paris Air Show 2013
Earth Observation Systems Evolution- Thales Alenia Space at Paris Air Show 2013Earth Observation Systems Evolution- Thales Alenia Space at Paris Air Show 2013
Earth Observation Systems Evolution- Thales Alenia Space at Paris Air Show 2013Leonardo
 
Vincent_Droulez_CV latest
Vincent_Droulez_CV latestVincent_Droulez_CV latest
Vincent_Droulez_CV latestvincent Droulez
 
GM-casestudy-uninett
GM-casestudy-uninettGM-casestudy-uninett
GM-casestudy-uninettScott Miller
 

Similar to Work Experience from Fugro and Svitzer (20)

High Resolution Multibeam Survey and Mobile Laser Scanning
High Resolution Multibeam Survey and Mobile Laser ScanningHigh Resolution Multibeam Survey and Mobile Laser Scanning
High Resolution Multibeam Survey and Mobile Laser Scanning
 
Tim Bailey CV updated July 2015
Tim Bailey CV updated July 2015Tim Bailey CV updated July 2015
Tim Bailey CV updated July 2015
 
cv in word fromat
cv in word fromatcv in word fromat
cv in word fromat
 
C.V - Walid Abdelbaky
C.V - Walid AbdelbakyC.V - Walid Abdelbaky
C.V - Walid Abdelbaky
 
Karen Edelvang-list of projects
Karen Edelvang-list of projectsKaren Edelvang-list of projects
Karen Edelvang-list of projects
 
Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017
 
Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015Ali Lamont 2.8MB CV&Certs 2015
Ali Lamont 2.8MB CV&Certs 2015
 
DSM IN NORWAY'S EEZ - EMERGING INDUSTRY BASED ON REGIONAL TECHNOLOGICAL EXPER...
DSM IN NORWAY'S EEZ - EMERGING INDUSTRY BASED ON REGIONAL TECHNOLOGICAL EXPER...DSM IN NORWAY'S EEZ - EMERGING INDUSTRY BASED ON REGIONAL TECHNOLOGICAL EXPER...
DSM IN NORWAY'S EEZ - EMERGING INDUSTRY BASED ON REGIONAL TECHNOLOGICAL EXPER...
 
CV Bajic Updated 2016[7971]
CV Bajic Updated 2016[7971]CV Bajic Updated 2016[7971]
CV Bajic Updated 2016[7971]
 
Ali Lamont CV 2013
Ali Lamont CV 2013Ali Lamont CV 2013
Ali Lamont CV 2013
 
TUGI PETR CV_2015
TUGI PETR CV_2015TUGI PETR CV_2015
TUGI PETR CV_2015
 
GRUJIC_ZORAN_2015
GRUJIC_ZORAN_2015GRUJIC_ZORAN_2015
GRUJIC_ZORAN_2015
 
Gemini – Wind farm positioning beyond the horizon
Gemini – Wind farm positioning beyond the horizonGemini – Wind farm positioning beyond the horizon
Gemini – Wind farm positioning beyond the horizon
 
TH2.L10.5: OVERVIEW ON CALIBRATION AND VALIDATION ACTIVITIES FOR ESA’S SOIL M...
TH2.L10.5: OVERVIEW ON CALIBRATION AND VALIDATION ACTIVITIES FOR ESA’S SOIL M...TH2.L10.5: OVERVIEW ON CALIBRATION AND VALIDATION ACTIVITIES FOR ESA’S SOIL M...
TH2.L10.5: OVERVIEW ON CALIBRATION AND VALIDATION ACTIVITIES FOR ESA’S SOIL M...
 
Well logging summary and Interpretation
Well logging summary and InterpretationWell logging summary and Interpretation
Well logging summary and Interpretation
 
GWT 2014: Emergency Conference - 08 I servizi satellitari in near real-time a...
GWT 2014: Emergency Conference - 08 I servizi satellitari in near real-time a...GWT 2014: Emergency Conference - 08 I servizi satellitari in near real-time a...
GWT 2014: Emergency Conference - 08 I servizi satellitari in near real-time a...
 
CV 2017 QC
CV 2017 QCCV 2017 QC
CV 2017 QC
 
Earth Observation Systems Evolution- Thales Alenia Space at Paris Air Show 2013
Earth Observation Systems Evolution- Thales Alenia Space at Paris Air Show 2013Earth Observation Systems Evolution- Thales Alenia Space at Paris Air Show 2013
Earth Observation Systems Evolution- Thales Alenia Space at Paris Air Show 2013
 
Vincent_Droulez_CV latest
Vincent_Droulez_CV latestVincent_Droulez_CV latest
Vincent_Droulez_CV latest
 
GM-casestudy-uninett
GM-casestudy-uninettGM-casestudy-uninett
GM-casestudy-uninett
 

Recently uploaded

Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 

Recently uploaded (20)

Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 

Work Experience from Fugro and Svitzer

  • 1. WORK EXPERIENCE Fugro – Svitzer All the projects listed are done from start to end, meaning mobilisation, data collection, interpretation, charting and reporting. 2002 May Function: Partyleader Project: Rig entrance Inspection, ROV Client: Maersk Oil and Gas Equipment: DGPS navigation, single beam echo sounder and ROV with: Manipulators video and sonar. 2002 Apr Function: Party leader Project: ROV Cable survey Client: SWEPOL Equipment: Scorpio ROV with: Dual head scanner, bathy pressure sensor, altimeter and Video. 2002 Jan Function: Party leader Project: Multibeam survey, sail route south of Samsø Client: Fredericia Havn Equipment: RTK GPS, multibeam. single beam echosounder, motion sensor, gyros 2001 Oct Function: Surveyor Project: Cable layering 6 Links in Thailand Client: NKT Cable Equipment: Single beam echo sounder, gyros and DGPS navigation. 2001 Sep Function: Surveyor Project: Rig move Mærsk Exerter Client: Maersk Olie and Gas Equipment: RTK GPS, Gyros, laser and totalstation 2001 Aug Function: Surveyor Project: Rig move Mærsk Giant from Dan field to Norway Client: Maersk Olie and Gas Equipment: RTK GPS, Gyros, laser and totalstation 2001 July Function: Party leader Project: Shallow land seismik at Brande, Denmark Client: Ringkøbing amt 2001 June Function: Party leader Project: Shallow land seismik at Lindknud, Denmark Client: Ribe amt 2001 Apr Function: Surveyor Project: Rig move Ensco 71 from Dan to Gorm Client: Maersk Olie and Gas Equipment: RTK GPS, Gyros, laser and totalstation 2001 Mar Function: Party leader Project: Multibeam survey Fredericia-Middelfart-Nyborg habour Client: Fredericia Havn Equipment: RTK GPS, multibeam. single beam echosounder, motion sensor, gyros 2001 Feb Function: Party leader Project: Shallow land seismik at Lemvig, Denmark Client: Ringkøbing amt 2001 Feb Function: Partyleader Project: Shallow land seismik at Vorbasse, Denmark 2001 Jan Function: Partyleader Project: Pipeline Inspection after Rig move Client: Maersk Oil and Gas Equipment: DGPS navigation, single beam echo sounder and Side Scan _______________________________________________________________________________________________ John Løndal CV Side 1 af 5
  • 2. WORK EXPERIENCE Fugro – Svitzer 2000 Nov Function: Partyleader Project: ROV conductor cleaning Client: Maersk Oil and Gas Equipment: Scorpio ROV with: Dual head scanner, bathy pressure sensor, altimeter, Water jet cleaner 2000 Nov Function: Party leader Project: Multibeam survey Middelgrunden. Client: Krangården Equipment: RTK GPS, multibeam. single beam echosounder, motion sensor, gyros 2000 Aug Function: Surveyor Project: Rig move Mærsk Endevaur from wildcat to new Halfdan installation Client: Maersk Olie and Gas Equipment: RTK GPS, Gyros, laser and totalstation 2000 Aug Function: Surveyor Project: Position of Halfdan Client: Maersk Olie and Gas Equipment: Static RTK GPS and totalstation 2000 Aug Function: Surveyor Project: Rig move Mærsk Endevaur from Halfdan to wildcat. Position of anchors and rig Client: Maersk Olie and Gas Equipment: RTK GPS, Gyros, laser and totalstation 2000 July Function: Party leader Project: Multibeam survey Samsø. Client: TeleDenmark cable Equipment: RTK GPS, multibeam. single beam echosounder, side scan sonar 2000 July Function: Party leader Project: Multibeam survey Lillebælt. Client: Fredericia Havn Equipment: RTK GPS, multibeam. single beam echosounder, side scan sonar 2000 May Function: Client rep Project: Cable route survey 8 Links in Thailand Client: NKT Project Equipment: Side scan sonar, sub bottom profiler, single beam echo sounder, grab samples and DGPS navigation. 2000 Apr Function: Party leader Project: Cable route survey Denmark-Germany Client: TeleDenmark Marine Equipment: Side scan sonar, sub bottom profiler, single beam echo sounder, magnetometer, grab samples and DGPS navigation. 2000 Mar Function: Party leader Project: Multibeam survey of stone protection on the Storebelt bridge. Client: A/S Storebelt Equipment: 2 RTK GPS systems, doppler log, multibeam. Total station. 2000 Feb Function: Party leader Project: Cable route survey Denmark-Laesoe Client: TeleDenmark Marine Equipment: Side scan sonar, sub bottom profiler, single beam echo sounder, multibeam echo sounder, magnetometer, grab samples, diver swim and DGPS navigation. 2000 Jan Function: Party leader Project: Cable route survey Denmark-Germany _______________________________________________________________________________________________ John Løndal CV Side 2 af 5
  • 3. WORK EXPERIENCE Fugro – Svitzer Client: TeleDenmark Marine Equipment: Side scan sonar, sub bottom profiler, single beam echo sounder, multibeam echo sounder, magnetometer, grab samples, diver swim and DGPS navigation. 1999 Dec Function: Party leader Project: Cable route survey, Helsinki-Tallin-Sweden, landfall Client: Alcatel – Pangea project Equipment: Side scan sonar, pinger seismic, proton magnetometer, 2 divers with camera, single beam echo sounder, total station, levelling, grab samples and DGPS navigation. 1999 Nov Function: Engineer Project: Multibeam survey of stone protection on the Storebelt bridge. Client: A/S Storebelt Equipment: 2 RTK GPS systems, doppler log, multibeam. Total station. 1999 Nov Function: Surveyor Project: Cable repairs Copenhagen harbour. Client: NKT Cables Equipment: Cable ship H.P Lading, single beam echo sounder, 2 DGPS navigation’s systems, measurement of wind, current, tension and cable length. 1999 Sep Function: Party leader Project: 2 Cable route surveys in Lillebaelt Denmark Client: DONG Equipment: Side scan sonar, pinger seismic, multibeam echo sounder, single beam echo sounder, grab samples and DGPS navigation. 1000 km. surveyed. 1999 Aug Function: Party leader Project: Position and bathymetric survey in 2 harbours between Fyn and Als Denmark. Client: Havnecon Consulting Equipment: RTKGPS navigation, single beam echo sounder and Aga totalstation. 1999 July Function: Partyleader Project: Annual Infield Pipeline Inspection, ROV Client: Maersk Oil and Gas Equipment: DGPS navigation, single beam echo sounder and ROV with: Dual head scanner, bathy pressure sensor, altimeter, 5 VCR's and pipe tracker. 200 km. Pipe surveyed. 1999 May Function: Surveyor Project: 6 Landfall surveys in Nederland (2), Belgium (2) and UK (2) Client: TeleDenmark Marine and Flute Equipment: Side scan sonar, pinger seismic, magnetometer, multibeam echo sounder, single beam echo sounder, grab samples and DGPS navigation. 160 km. surveyed. 1999 April Function: Online Processor/Geophysicist Project: Cable route survey Nederland-Belgium-UK Client: TeleDenmark Marine and Flute Equipment: Side scan sonar, pinger seismic, Magnetometer, Multibeam echo sounder, single beam echo sounder, grab samples and DGPS navigation. 1600 km. surveyed. 1999 Marts Function: Geophysicist Project: Cable route survey AArhus-Kaluendborg, Denmark Client: TeleDenmark Marine Equipment: Side scan sonar, pinger seismic, Proton Magnetometer, single beam echo sounder, grab/drop core samples and DGPS navigation. 210 km. surveyed. 1999 Feb Function: Party leader Project: Cable route survey near Patra, Greece Client: NKT Cables _______________________________________________________________________________________________ John Løndal CV Side 3 af 5
  • 4. WORK EXPERIENCE Fugro – Svitzer Equipment: Side scan sonar, Sub bottom profiler, single beam echo sounder, drop cores and DGPS navigation. 1999 Jan Function: Surveyor Project: Cable layering Aktio-Preveza and Achladi-Eiva, Greece Client: NKT Cables Equipment: Cable ship H.P Lading, single beam echo sounder, 2 DGPS navigation systems, measurement of wind, current, tension and cable length. 1998 Nov Function: Party leader/Geophysicist Project: Cable route survey Rion-AntiRion, Greece Client: NKT Cables Equipment: Side scan sonar, Sub bottom profiler, single beam echo sounder and DGPS navigation. 1998 Oct Function: Party leader/Geophysicist Project: Cable route survey Denmark-Sweden Client: TeleDenmark Marine Equipment: Side scan sonar, sub bottom profiler, single beam echo sounder and DGPS navigation. 1998 Sep Function: Party leader/Geophysicist Project: Debris survey in Storbaelt Workareas Client: A/S Storebaeltsforbindelsen Equipment: Side scan sonar, DGPS navigation and single beam echo sounder. 1998 Sep Function: Party leader/Surveyor Project: Position and bathymetric survey of gas pipes in Svendborgsund Client: Naturgas Fyn 1998 Aug. Function: Surveyor Project: Bathymetric landfall survey Client: DONG 1998 July Function: Party leader/Geophysicist Project: Cable route survey Langeland-Fyn Client: Telecom Denmark Equipment: Side scan sonar, Sub bottom profiler, single beam echo sounder and DGPS navigation. 1998 July Function: Party leader/Geophysicist Project: Debris survey Odense harbour Client: Odense Amt Equipment: Side scan sonar, DGPS navigation and single beam echo sounder. 1998 June Function: Party leader/Geophysicist Project: Outsurvey Storbaelt east bridge Client: Gec Alsthom Equipment: Side scan sonar, DGPS navigation and single beam echo sounder. 1998 May Party leader/Surveyor Project: Position and bathymetric survey in Sundsoere harbour Client: Havnecon Consulting Equipment: DGPS navigation, single beam echo sounder and Aga totalstation. 1998 April Function: Geophysicist Project: Annual Infield Pipeline Inspection Client: Maersk Olie and Gas Equipment: Side scan sonar, DGPS navigation and single beam echo sounder. 1998 Marts Function: Geophysicist Project: Cable route survey Storebaelt Client: Telecom Denmark _______________________________________________________________________________________________ John Løndal CV Side 4 af 5
  • 5. WORK EXPERIENCE Fugro – Svitzer Equipment: Side scan sonar, Sub bottom profiler, single beam echo sounder and DGPS navigation. 1998 Feb Function: Surveyor Project: Rig move Shelf Explore from ADDA-4 to Dan. Position of anchors and rig Client: Maersk Olie and Gas Equipment: Gyros, laser and totalstation 1998 Jan/Feb Function: Surveyor Project: Rig move Maersk Explore from Dan FF to Kraka. Position and penetration measurement Client: Maersk Olie and Gas. 1998 Jan Function: Surveyor Project: Position of Voresaa harbour Client: Havnecon Consulting. 1997 Dec. Function: Surveyor Project: Bathymetric survey in Voresaa harbour Client: Havnecon Consulting. 1997 Nov. Function: Surveyor Project: Video inspection Odense harbour Client: Odense Amt. 1995 Function: Geophysicist Project: Magnetic Dating of 2 sediment profiles from Lithuania. 1994 Function: Geophysicist Project: Localisation and sample taking of a waste product from an old Iron production. Equipment: Proton-magnetometer, SQUID-magneto-meter, fluxgate-magnetometer and Spinner magnetometer. 1994 Function: Geophysicis Project: Testing and programming SQUID-magnetometer and Spinner magnetometer 1994 Function: Geophysicist Project: Geophysical groundwater investigation North Beder town, Aarhus Equipment: DC-cable Geo-electric, AC Geo-electric, Electric Log, Drag Geo-electric, Transient distinction. 1993 Function: Geophysicist Project: Localisation of a rubbish heap Equipment: use of Proton-magnetometer. 1993 Function: Geophysicist Project: Evaluation of saltwater invading on a peninsula Equipment: Seismic, AC and DC-Geo-electric and bore hole logging _______________________________________________________________________________________________ John Løndal CV Side 5 af 5