About
▪ Situated at Andal, Durgapur,W B
(co-ordinates 23°34'48"N, 87°12'19"E)
▪ Installed Capacity : 2x500 MW
▪ Running Capacity :350 MW
(1x140 + 1x210 MW)
Overview
Chemical
Energy (Fuel)
Heat Energy
(Steam)
Mechanical
Energy
(Rotation of
Turbine)
Electrical
Energy
Fuel
Water
Air
Combustion Steam Generation Treatment
Conditioning
Coal
Oil
Heat
DM Plant
Power Generation
Turbine Generator
Flue
Gas
Cooling System
Wastewater
Water Packaging
Source of RawWater : Damodar River
Water Requirement:
 To provide make-up water to the water/steam cycle.
 For cooling of the steam for re-use as condensate.
 For general domestic use.
RESERVOIR AERATOR
DM PLANT
BOILER MAKE-UP
CW MAKE-UP DMF
POTABLE WATER
GRAVITY FILTERCLARIFLOCCULATOR
Water Packaging : De-Mineralization Plant
Activated
Carbon Filter
Strong Acidic
Cation
Exchanger
Degasser
Tower
Strong Basic
Anion Exchanger
Mixed
Bed
Ultra Filtration
SKID
DM Water
Storage Tank
Coal Handling Plant (CHP)
▪ Track Hopper
▪ WagonTippler
▪ Crusher House
▪ Stacker-cum-Reclaimer
▪ Conveyor Belts
▪ Raw Coal Bunker
Coal Mill (Pulverizer)
▪ Supplies pulverized coal as per
steam generation requirement
▪ Facilitates combustion by pre-
combustion drying up.
▪ Separates incombustibles.
DSTPS has 10 Bowl Mills for each
boiler
Name : 803XRP
Boiler
▪ Steam is generated from DM water by heat addition to DM water at
constant pressure & temperature.
Boiler Description at DSTPS, Andal
▪ Top supported, fusion welded
▪ Vertical water-tube boiler
▪ Controlled Circulation
▪ 4-corner tilting tangential firing
Boiler Mountings
▪ Pressure Gauges
– For measuring pressures at various points
▪ Valves
– For safety, and to maintain unidirectional flow
▪ Water Level Indicator
– For optimum running of boiler
▪ LRSB (Long Retractable Soot Blower)
– For cleaning soot from boiler’s inner surfaces
▪ Tapping and Manholes
– Maintenance Purpose
Boiler Accessories
▪ Air Preheater
– Air is pre-heated by flue gases to ensure complete combustion of even low-grade fuel,
like Lignite.
▪ Economizer
– Feed-water is heated by the outgoing flue gases before entering boiler drum.
▪ Superheaters
– Steam is heated to higher temperature to ensure dryness fraction remains above 0.8
▪ Reheaters
– Steam is reheated between HPT and IPT, and again between IPT and LPT
Turbines
▪ 3 turbines : HP, IP, and LP
▪ High PressureTurbine (HPT)
– 17 stages
▪ Intermediate PressureTurbine (IPT)
– 12 x 2 stages
▪ Low PressureTurbine (LPT)
– 6x2 stages
▪ 3000 RPM
▪ Heat Rate : 1944.4 kcal/kWh
Generator and Exciter
▪ Generates electrical power by the interaction of the
rotating magnetic fields of the stator and rotor
kW: 500000 Speed: 3000 RPM
kVA: 588000 Frequency: 50 Hz
P.F.: 0.85 Lag Coolant: H2 and H2O
Made at BHEL, Haridwar
▪ Brushless excitation system
Auxiliaries
▪ Regenerators
– HP Heaters (3 nos)
– LP Heaters (3 nos)
▪ Boiler Feed Pump
– Pressurizes feed water from De-aerator before
entering into boiler
– Turbine Driven Boiler Feed Pump
▪ works with steam extracted from IP turbine
exhaust.
– Motor Driven Boiler Feed Pump
▪ works with a motor. HP Heater
Condenser
▪ A shell and tube type surface
heat exchanger.
▪ Cooling water flows twice
through the tubes.
▪ Steam condenses by giving
up heat and is collected at the
hot well below.
▪ Maintained at 45˚C and little
below atmospheric pressure.
Cooling Towers
▪ The heated cooling water
after passing through the
condenser, is brought to the
cooling towers.
▪ Heat is given out in the
atmostphere.
▪ The water is recirculated back
as cooling water.
Ash Handling Plant
▪ Ash is categorised into :
– Bottom Ash
▪ collected at the bottom of the boiler
– Fly Ash
▪ collected at the Electro-Static Precipitator
▪ It is transported in the form of slurry
▪ Ash is either given away to cement
factories, or is stored in Ash dykes.
Control and Automation
▪ Highly Automated by use of PLC
controllers
▪ Control Rooms :
– Boiler Control Room
– CHP Control Room
– Switchyard Control Room
Conclusion
▪ The practical experience I have gathered during the overview training
of this thermal power plant in two weeks will be very useful as a
stepping stone in building bright professional career in future life.
▪ It gave me large spectrum to utilize the theoretical knowledge and to
put it into practice.
▪ The trouble shooting activities in operation and decision making in
case of crisis made me more confident to work in the industrial
atmosphere.
Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal

More Related Content

What's hot

Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
STEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANTSTEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANTS.Vijaya Bhaskar
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plantsagar20jain
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training ReportUtsav Yagnik
 
Vocational training report
Vocational training reportVocational training report
Vocational training reportATUL RAJ
 
DPL Vocational Training Report
DPL Vocational Training ReportDPL Vocational Training Report
DPL Vocational Training ReportShivendra Bhushan
 
Chandrapura thermal power station
Chandrapura thermal power stationChandrapura thermal power station
Chandrapura thermal power stationdlinkdir
 
Project report on THDC Hydrop Power Plant Summer Training
Project report on THDC Hydrop Power Plant Summer TrainingProject report on THDC Hydrop Power Plant Summer Training
Project report on THDC Hydrop Power Plant Summer TrainingCharu Kandpal
 
Bhel Haridwar training ppt
Bhel Haridwar training pptBhel Haridwar training ppt
Bhel Haridwar training pptAditya Sharma
 
Modern thermal power plant
Modern thermal power plantModern thermal power plant
Modern thermal power plantTaral Soliya
 
Training report on DVC
Training report on DVCTraining report on DVC
Training report on DVCLinkon Khan
 
BK T. P. P. Vocational Training Report
BK T. P. P. Vocational Training ReportBK T. P. P. Vocational Training Report
BK T. P. P. Vocational Training Reportavijit1996
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCADITYA ARYAN
 
training report on steam turbine manufacturing
 training report on steam turbine manufacturing training report on steam turbine manufacturing
training report on steam turbine manufacturingaryannigam
 
Bhel vocational training report_1301
Bhel vocational training report_1301Bhel vocational training report_1301
Bhel vocational training report_1301Shubham Yadav
 
2X500 MW Steel Thermal Power Station
2X500 MW Steel Thermal Power Station2X500 MW Steel Thermal Power Station
2X500 MW Steel Thermal Power Stationshreyansh sahu
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...Sagar Mehta
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training reportsanjeevps12345
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipatpratikguptateddy
 

What's hot (20)

Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
STEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANTSTEAM POWER PLANT / THERMAL POWER PLANT
STEAM POWER PLANT / THERMAL POWER PLANT
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
 
DPL Vocational Training Report
DPL Vocational Training ReportDPL Vocational Training Report
DPL Vocational Training Report
 
Chandrapura thermal power station
Chandrapura thermal power stationChandrapura thermal power station
Chandrapura thermal power station
 
Project report on THDC Hydrop Power Plant Summer Training
Project report on THDC Hydrop Power Plant Summer TrainingProject report on THDC Hydrop Power Plant Summer Training
Project report on THDC Hydrop Power Plant Summer Training
 
Bhel Haridwar training ppt
Bhel Haridwar training pptBhel Haridwar training ppt
Bhel Haridwar training ppt
 
Modern thermal power plant
Modern thermal power plantModern thermal power plant
Modern thermal power plant
 
Training report on DVC
Training report on DVCTraining report on DVC
Training report on DVC
 
BK T. P. P. Vocational Training Report
BK T. P. P. Vocational Training ReportBK T. P. P. Vocational Training Report
BK T. P. P. Vocational Training Report
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 
training report on steam turbine manufacturing
 training report on steam turbine manufacturing training report on steam turbine manufacturing
training report on steam turbine manufacturing
 
Bhel vocational training report_1301
Bhel vocational training report_1301Bhel vocational training report_1301
Bhel vocational training report_1301
 
2X500 MW Steel Thermal Power Station
2X500 MW Steel Thermal Power Station2X500 MW Steel Thermal Power Station
2X500 MW Steel Thermal Power Station
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 

Viewers also liked

DVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPTDVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPTSohail Akhtar
 
training report on Mejia Thermal Power Station
training report on Mejia Thermal Power Stationtraining report on Mejia Thermal Power Station
training report on Mejia Thermal Power Stationsagnikchoudhury
 
Training Report
Training Report Training Report
Training Report Pintu Khan
 
A report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyA report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyShobhan Biswas
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Stationsagnikchoudhury
 
Summer training project on DVC power plant
Summer training project on DVC power plantSummer training project on DVC power plant
Summer training project on DVC power plantAnkita Shrestha
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentationrajkumar_sm
 
Industrial training at durgapur steel plant (instrumentation)
Industrial training at durgapur steel plant (instrumentation)Industrial training at durgapur steel plant (instrumentation)
Industrial training at durgapur steel plant (instrumentation)Chayan Sen
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)Baibhav Saha
 
Best ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plantBest ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plantRonak Thakare
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station workingRonak Thakare
 
25635 320-gpp-ghx-00023 s jha pets base
25635 320-gpp-ghx-00023 s jha pets base25635 320-gpp-ghx-00023 s jha pets base
25635 320-gpp-ghx-00023 s jha pets baseJuan Carlos Mamani
 
Class 10 physical science question answer
Class 10 physical science question answerClass 10 physical science question answer
Class 10 physical science question answersagnikchoudhury
 
Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship PresentationAayush Kumar
 

Viewers also liked (20)

DVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPTDVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPT
 
training report on Mejia Thermal Power Station
training report on Mejia Thermal Power Stationtraining report on Mejia Thermal Power Station
training report on Mejia Thermal Power Station
 
Training Report
Training Report Training Report
Training Report
 
Project report
Project reportProject report
Project report
 
A report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyA report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical only
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
Summer training project on DVC power plant
Summer training project on DVC power plantSummer training project on DVC power plant
Summer training project on DVC power plant
 
Chp in presentation
Chp in presentationChp in presentation
Chp in presentation
 
Industrial training at durgapur steel plant (instrumentation)
Industrial training at durgapur steel plant (instrumentation)Industrial training at durgapur steel plant (instrumentation)
Industrial training at durgapur steel plant (instrumentation)
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
DVC seminar on industrial training by Udit Narayan Das
DVC seminar on industrial training by Udit Narayan DasDVC seminar on industrial training by Udit Narayan Das
DVC seminar on industrial training by Udit Narayan Das
 
Best ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plantBest ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plant
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station working
 
25635 320-gpp-ghx-00023 s jha pets base
25635 320-gpp-ghx-00023 s jha pets base25635 320-gpp-ghx-00023 s jha pets base
25635 320-gpp-ghx-00023 s jha pets base
 
Class 10 physical science question answer
Class 10 physical science question answerClass 10 physical science question answer
Class 10 physical science question answer
 
mukesh Resume (1)
mukesh Resume (1)mukesh Resume (1)
mukesh Resume (1)
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
Resume - Mahipal Singh Bisht
Resume - Mahipal Singh BishtResume - Mahipal Singh Bisht
Resume - Mahipal Singh Bisht
 
Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship Presentation
 
Project report1
Project report1Project report1
Project report1
 

Similar to Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal

Similar to Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal (20)

coal based power plants
coal based power plantscoal based power plants
coal based power plants
 
KOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPTKOTA SUPER THERMAL POWER STATION PPT
KOTA SUPER THERMAL POWER STATION PPT
 
training report
training reporttraining report
training report
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
Attachment.doc
Attachment.docAttachment.doc
Attachment.doc
 
Applied Thermal Engineering
Applied Thermal EngineeringApplied Thermal Engineering
Applied Thermal Engineering
 
kstps training report
kstps training reportkstps training report
kstps training report
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal Power Plant PPT
Thermal Power Plant PPTThermal Power Plant PPT
Thermal Power Plant PPT
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
ntpc dadri
ntpc dadri ntpc dadri
ntpc dadri
 
Kota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUKota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTU
 
steam turbine[1] (3).pptxshshshhhshshshh
steam turbine[1] (3).pptxshshshhhshshshhsteam turbine[1] (3).pptxshshshhhshshshh
steam turbine[1] (3).pptxshshshhhshshshh
 
Powerengineering
PowerengineeringPowerengineering
Powerengineering
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
Emam training
Emam training Emam training
Emam training
 
ppt of ntpc dadri by emam raza khan
ppt of ntpc dadri by emam raza khan  ppt of ntpc dadri by emam raza khan
ppt of ntpc dadri by emam raza khan
 
Unit 4 cogeneration
Unit 4 cogenerationUnit 4 cogeneration
Unit 4 cogeneration
 
Ppt aman
Ppt amanPpt aman
Ppt aman
 
EMERSON Power plant applications
EMERSON Power plant applicationsEMERSON Power plant applications
EMERSON Power plant applications
 

Recently uploaded

CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptssuser319dad
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Delhi Call girls
 
Motivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfMotivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfakankshagupta7348026
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Krijn Poppe
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxNikitaBankoti2
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxmohammadalnahdi22
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...NETWAYS
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyPooja Nehwal
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfhenrik385807
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝soniya singh
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Hasting Chen
 

Recently uploaded (20)

CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.ppt
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
 
Motivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfMotivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdf
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
Presentation for the Strategic Dialogue on the Future of Agriculture, Brussel...
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docxANCHORING SCRIPT FOR A CULTURAL EVENT.docx
ANCHORING SCRIPT FOR A CULTURAL EVENT.docx
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 

Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal

  • 1. Durgapur Steel Thermal Power Station DVC, Andal Abhishek Gorai Roll – 12/ME/13 Mechanical Engineering National Institute ofTechnology Durgapur
  • 2. About ▪ Situated at Andal, Durgapur,W B (co-ordinates 23°34'48"N, 87°12'19"E) ▪ Installed Capacity : 2x500 MW ▪ Running Capacity :350 MW (1x140 + 1x210 MW)
  • 3. Overview Chemical Energy (Fuel) Heat Energy (Steam) Mechanical Energy (Rotation of Turbine) Electrical Energy Fuel Water Air Combustion Steam Generation Treatment Conditioning Coal Oil Heat DM Plant Power Generation Turbine Generator Flue Gas Cooling System Wastewater
  • 4. Water Packaging Source of RawWater : Damodar River Water Requirement:  To provide make-up water to the water/steam cycle.  For cooling of the steam for re-use as condensate.  For general domestic use. RESERVOIR AERATOR DM PLANT BOILER MAKE-UP CW MAKE-UP DMF POTABLE WATER GRAVITY FILTERCLARIFLOCCULATOR
  • 5. Water Packaging : De-Mineralization Plant Activated Carbon Filter Strong Acidic Cation Exchanger Degasser Tower Strong Basic Anion Exchanger Mixed Bed Ultra Filtration SKID DM Water Storage Tank
  • 6. Coal Handling Plant (CHP) ▪ Track Hopper ▪ WagonTippler ▪ Crusher House ▪ Stacker-cum-Reclaimer ▪ Conveyor Belts ▪ Raw Coal Bunker
  • 7. Coal Mill (Pulverizer) ▪ Supplies pulverized coal as per steam generation requirement ▪ Facilitates combustion by pre- combustion drying up. ▪ Separates incombustibles. DSTPS has 10 Bowl Mills for each boiler Name : 803XRP
  • 8. Boiler ▪ Steam is generated from DM water by heat addition to DM water at constant pressure & temperature. Boiler Description at DSTPS, Andal ▪ Top supported, fusion welded ▪ Vertical water-tube boiler ▪ Controlled Circulation ▪ 4-corner tilting tangential firing
  • 9. Boiler Mountings ▪ Pressure Gauges – For measuring pressures at various points ▪ Valves – For safety, and to maintain unidirectional flow ▪ Water Level Indicator – For optimum running of boiler ▪ LRSB (Long Retractable Soot Blower) – For cleaning soot from boiler’s inner surfaces ▪ Tapping and Manholes – Maintenance Purpose
  • 10. Boiler Accessories ▪ Air Preheater – Air is pre-heated by flue gases to ensure complete combustion of even low-grade fuel, like Lignite. ▪ Economizer – Feed-water is heated by the outgoing flue gases before entering boiler drum. ▪ Superheaters – Steam is heated to higher temperature to ensure dryness fraction remains above 0.8 ▪ Reheaters – Steam is reheated between HPT and IPT, and again between IPT and LPT
  • 11. Turbines ▪ 3 turbines : HP, IP, and LP ▪ High PressureTurbine (HPT) – 17 stages ▪ Intermediate PressureTurbine (IPT) – 12 x 2 stages ▪ Low PressureTurbine (LPT) – 6x2 stages ▪ 3000 RPM ▪ Heat Rate : 1944.4 kcal/kWh
  • 12. Generator and Exciter ▪ Generates electrical power by the interaction of the rotating magnetic fields of the stator and rotor kW: 500000 Speed: 3000 RPM kVA: 588000 Frequency: 50 Hz P.F.: 0.85 Lag Coolant: H2 and H2O Made at BHEL, Haridwar ▪ Brushless excitation system
  • 13. Auxiliaries ▪ Regenerators – HP Heaters (3 nos) – LP Heaters (3 nos) ▪ Boiler Feed Pump – Pressurizes feed water from De-aerator before entering into boiler – Turbine Driven Boiler Feed Pump ▪ works with steam extracted from IP turbine exhaust. – Motor Driven Boiler Feed Pump ▪ works with a motor. HP Heater
  • 14. Condenser ▪ A shell and tube type surface heat exchanger. ▪ Cooling water flows twice through the tubes. ▪ Steam condenses by giving up heat and is collected at the hot well below. ▪ Maintained at 45˚C and little below atmospheric pressure.
  • 15. Cooling Towers ▪ The heated cooling water after passing through the condenser, is brought to the cooling towers. ▪ Heat is given out in the atmostphere. ▪ The water is recirculated back as cooling water.
  • 16. Ash Handling Plant ▪ Ash is categorised into : – Bottom Ash ▪ collected at the bottom of the boiler – Fly Ash ▪ collected at the Electro-Static Precipitator ▪ It is transported in the form of slurry ▪ Ash is either given away to cement factories, or is stored in Ash dykes.
  • 17. Control and Automation ▪ Highly Automated by use of PLC controllers ▪ Control Rooms : – Boiler Control Room – CHP Control Room – Switchyard Control Room
  • 18. Conclusion ▪ The practical experience I have gathered during the overview training of this thermal power plant in two weeks will be very useful as a stepping stone in building bright professional career in future life. ▪ It gave me large spectrum to utilize the theoretical knowledge and to put it into practice. ▪ The trouble shooting activities in operation and decision making in case of crisis made me more confident to work in the industrial atmosphere.

Editor's Notes

  1. Good Afternoon, esteemed professor and my beloved friends. Thank you for this opportunity to talk about Durgapur Steel Thermal Power Station or DSTPS, based on my two week vocational training..
  2. DSTPS is a 2x500 MW power station, one of the eight power stations under Damodar Valley Corporation, situated at Andal. It is a pioneer in technological advancement of Thermal Power Generation, currently running at 35 % of its maximum capacity.
  3. Thermal Power Generation involves 3 stages of energy transformations. Chemical Energy stored in fuel is converted to heat energy, that is further converted to rotational energy of the turbine, which in turn produces electrical energy. A power plant has 3 major raw materials. Water is used for steam generation, cooling and other domestic purposes after conditioning. The fuels, coal and oil, participate in combustion with the help of air, to produce the necessary heat, and then is carried out of the chimney as flue gas.
  4. For every 1MW produced, water is consumed at 4 m3/hr. DSPTS requires 4000 m3/hr at its maximum capacity. This water is pumped from the Damodar River 13 kms away and is used for various purposes like water-steam cycle, cooling cycles, drinking etc. The water is first stored in a reservoir for sedimentation, following which it undergoes aeration to remove dissolved organic gases and fouling, chlorination to kill germs, and clarification to reduce turbidity by adding alum solution. The only impurities at this point are the dissolved ions and colloidal silica, which are removed at DM Plant. The clarified water itself is used for cooling water and domestic purposes.
  5. DM Plant, or the de-mineralization plant has several stages. The ACF removes excess chlorine and organic matters to prevent fouling of the resins in SAC. SAC exchanges all the cations with H+ ion, while SBA exchanges all anions with hydroxide. The mixed bed takes care of any leftover ions. After this stage, only colloidal silica remains in the water, which is removed by passing pressurized water through a membrane. The DM Water is then stored in tanks and supplied as required.
  6. The next major raw material, Coal, arrives in rail wagons, which are emptied by track hoppers and wagon tipplers. Coal is sized to less than 20 mm, and then stored or sent to the bunkers using conveyor belts. These are fed to the coal burners of the boiler after pulverizing as per requirement.
  7. Coal received from the bunker via a gravimetric feeder enters the mill through the central feed tube into the rotating bowl. The coal particles move out due to centrifugal action and gets crushed under the rollers and is carried upwards by the air, through the classifier. Coal dust of 175 mesh size is allowed to discharge, while the rest falls back in the inner cone. The air, called primary air, is preheated by the flue gas to get rid of any moisture.
  8. The boiler, called the mother plant, is a hanging type, vertical, water-tube boiler, with 4-corner tangential firing. That is, fuel is fired from 4 corners of the boiler, tangential to the fireball. Water from BFP passes through the economizer to the boiler drum, from where, it circulates through the water walls, divisional panels, and finally superheater before moving out to the HP Turbine. There is also Hot Reheat and Cold Reheat panels for reheating.
  9. Both primary air and secondary air are heated by the outgoing flue gases, which increases the thermal efficiency of the plant. The feedwater is also heated by the flue gases in the economizer. Superheaters are placed nearest to the heat source within the boiler to increase work output. The reheaters heat steam once between HP and IP turbine, ie, hot reheat, and again between IP and LP turbines, called cold reheat.
  10. There are three turbines, one high pressure turbine with 17 stages, another intermediate pressure turbine which is a double flow turbine with 12 stages in each flow. The third, Low pressure turbine, is also a double flow turbine with 6 stages per flow.
  11. The turbine-generator along with various auxiliaries are stationed at 17 m height. The primary coolant used in the exciter is hydrogen gas, which is further cooled by water. The generator uses a brushless excitation system.
  12. The first HP heater is the de-aerator itself, for which steam is extracted from IP turbine’s 12th stage. For the next 2 HP heaters, steam is extracted from IP Turbine’s 7th stage and from cold reheater’s exit. The LP heaters extract steam from the LP turbine’s 5th, 3rd and 2nd stages. There are two boiler feed pumps, one that is driven by a turbine of its own, and one driven by electricity, ie, motor. The motor-driven pump comes to play during startup of the plant when there is no steam available.
  13. Condenser is basically a heat exchanger. There are numerous tubes. Cooling water is made to flow once through the bottom tubes and then again back through the upper tubes. The exhaust steam enters through the top, exchanges heat, changes phase and settles as condensate in the bottom, called the hotwell. In case of a leakage, the leaking tube is sealed in both ends.
  14. The cooling water from various equipments are are collected and the heat is rejected to the atmosphere. The hot water is sprayed from the top, The venturi shaped cooling towers create a natural draft for air, that absorbs the heat and water vapours and takes them along. Clarified water is added to make-up for the lost water.
  15. The residue from the boiler, ie, ash must be cleaned periodically and effectively for proper functioning of the power station. The ash deposited at the bottom of the boiler is collected by two PLC-operated bottom ash hoppers that are emptied every 4 hours. The ash is carried away in the form of slurry after grinding. Fly ash is collected by electrostatic precipitation and is collected using vacuum pumps in dry mode, or as slurry in wet mode. These are given away to local cement factories, stored in ash ponds.
  16. DSTPS flaunts a highly automated Power Generation System consisting of various sensors, automatic control mechanisms, PLC controllers, etc. All activities are constantly monitored by Scada systems in control rooms, supervised by technical personnel.
  17. In conclusion, the vocational training was an enlightening experience. Connecting the gap between college books and control room screens. I’ve seen and known a lot of things about the working of a full-fledged power station, the various cycles, and auxiliary systems to keep it running smoothly.