PRESENTATION
ON

AUTOBILE MANUFACTRING
(IMPLANT TRAINING)
INTERNSHIP
AT

RENAULT NISSAN AUTOMOTIVE INDIA
PRIVATE LIMITED (RNAIPL)
PRESENTED BY

AVINISH KUMAR JAIN
06-02-2014
Objectives of Internship
General objective
• As partial fulfillment of the requirements of the B.Tech. program at XXX
University

Specific Objectives
• To get exposed to functions, structures and operational activities of the organization.
• To learn about various manufacturing & managerial concepts, tools and techniques
that are theoretically and applied in an industry.
• To learn the manufacturing and assembly process of an automobile.
• To experience the working process of an industry.
• To contribute my effort to industry.
About RNAIPL
The first dedicated Alliance facility in which Nissans and Renaults are made side-by-side – is a modern and
highly efficient plant producing top quality cars. But there’s more. It’s now officially one of India’s safest and
most environmentally-friendly factories, too. That’s according to the Confederation of Indian Industry (CII),
which has given the plant its top award for excellence in Environmental Health and Safety.
In February 2008, the Renault-Nissan Alliance signed a MOU with Government of Tamil Nadu to set up a
manufacturing plant at Oragadam, near Chennai with a minimum investment of Rs. 4500 Crore over a period
of 7 years. On March 17, 2010, the Renault-Nissan alliance plant was inaugurated in a record time of 21
months since its groundbreaking ceremony in June 2008.
RNAIPL thus achieved the unique milestone of starting operations in record time of 21 months from the date
of signing of MOU. The Plant has an initial capacity of 2, 00,000 units per year and planned to reach
4, 00,000 units per year in full capacity. Nissan’s first locally manufactured global compact hatchback –The
Nissan Micra is manufactured at the plant and commercial production for the same began in May 2010.It
represents 1500 employs.
Vision –Enriching People’s Lives
Mission – It provide unique and innovative automotive product
and services that deliver superior measurable values to all stack
holders.
Products manufactured at
RNAIPL

Renault
•
•
•
•
•

Renault Fluence (Launched 2011)
Renault Koleos (Launched 2011)
Renault Pulse (Launched 2012)
Renault Duster (Launched July-2012)
Renault Scala (Launched 2012)
Cont.

Nissan
• Nissan X-Trail (Launched 2005)
• Nissan Teana (Launched 2007)
• Nissan 370Z
(Launched 2010)

• Nissan Micra (Launched 2010)
• Nissan Sunny (Launched 2011)
Basic Ideology in Manufacturing
Preference-1

Safety

Preference-2

Quality

Preference-3

Cost
Hydraulics
All the shops of RNAIPL are automated. In each shop hydraulic and pneumatic machines
are installed. Most of the manufacturing work are done by robots. So for operating, and
maintaining these machines and robots with accuracy, good knowledge of hydraulic,
pneumatics and robotics is necessary.

Principle (Pascal Law)
Pressure applied to a confined fluid at any point is transmitted undiminished and
equally throughout the fluid in all directions and acts upon every part of the
confining vessel at right angles to its interior surfaces.
Pumps

Cont.

A pump is a mechanical device that moves fluids (liquids and gases) or
sometimes slurries, by mechanical action.

Pumps
Positive Displacement Pump
Gear Pump
Vane
Piston

External

Non Positive Displacement Pump
Centrifugal

Internal
Axial
Axial Piston
Radial
Control Valves
A mechanical device that is used to control the flow of a fluid.

Valves

Direction Control
Valve (DCV)

Flow Control
Valve (FCV)

Pressure Control
Valve (PCV)
Mechanical Utility System
There are five components of mechanical utility system.

1.
2.
3.
4.
5.

Compressors
Driers
Heat Exchangers
Pumps
Cooling Towers
Compressed air and drier flow process chart
Schematic diagram for compressors
Schematic Diagram of plate heat exchanger
BMS (Building Management system)
In BMS all the mechanical utilities are controlled and monitored. All the information about utilities
(driers, compressors etc.) like operating status, present conditions (pressure, temperature, and flow rate)
is transmitted through sensors to BMS. In BMS five displays are using that display the operating status
of the all utilities. One main display is used for main control. All the utilities can be controlled from the
BMS. For safety automatic alarm system is there. If any problem occurs in any utility system then
alarm rings and displays show the place where problem occurs. It also display that what is the problem.
Alarm rings in all the areas. It is very fast and time saving system because where is the problem, it is
already known so only specific person go there and solve the problem so checking of all utilities is not
required.
In design of plant every system is designed according to specific industrial standards.
In firefighting system the circular distance between each fire extinguisher should be 30 meters. But here
at every 15 meters fire extinguisher is placed for more safety. For every danger and safety sign photo
luminescent material is used.
PROJECT STRUCTURE (PHASE – I)
PROCESS TEAM

INPUT

TECHNICAL
ALIGNMENT MEETING

PROJECT
ENGINEERING TEAM

NO

YES

FINAL BOQ
(Technically aligned
BOQ)

VALIDATE & CHECK

YES

RNPO

DESIGN OF SYSTEMS

NO

YES

TENDER FLOATING

VALIDATE & CHECK &
PREPARE BOQ

PURCHASE TEAM

TENDER FLOATING TO
CONTRACTORS

TECHNICAL
ALIGNMENT MEETING

RESEND QUOTATION

NEGOTIATION BY
RNPO

SUPPLIER FINALISATION
PROJECT STRUCTURE PHASE-2





SCHEDULE
MODE OF WORKING
WORK METHOD
RULES &
REGULATIONS

KICK OF
MEETING

START OF
PROJECT

PROJECT
COMPLETION

QC
&

PREPARING
SNAG LIST

SAFETY AUDIT
(PRIMARY &
SECONDARY)

PREPARE
REPORT

CLOSING OF
SNAG LIST

HAND OVER TO
MAINTANENCE






DRAWING APPROVAL
DESIGN APPROVAL
PROGRESS REVIEW MEET
SCHEDULE MONITORING
Vehicle Chain
Stamping Shop

Trim and
Chassis shop

Body Shop

Paint Shop
Stamping Shop
In stamping shop body parts of car are manufactured using steel
plate.

1. Blanking
2. Pressing and Piercing
3. Quality checking
Blanking Process
1.

2.
3.
4.

5.
6.
7.

8.

Coil-Car: Coil of steel plate is pick up by crane and transferred to coil-car that transfer the coil to
uncoiler.
Uncoiler and advance correction machine: It sets the inner diameter of coil to the center of the line
by holding device that remove rolling habit of the tip of the coil.
Washing: The device that removes the foreign material that has adhered to the coil.
Leveler: Device that corrects the shape of the steel plate and makes it smooth. It consist a
combination of rollers that level the plate.
Looping: In this process steel plate is stretched into the pit and all the bends are removed..
Feeder: Device that adjusts the coil material to press cycle and set the cutting length and sends it to
piler.
Press: It press the steel plate and cut the steel. Press can be rotated at required angle to cut the steel
plate at any angle.
Piler: The device that piles the cut material with accuracy. From here cut material are transferred to
pressing line. There are Two Piler zone here.
Pressing and piercing Line
Here are three pressing lines.
Pressing Lines
XL-Line (5400 ton)

For pressing of larger parts

L-Line (2400 ton)

For pressing of small parts

Line-3 (5400 ton)

For pressing of larger parts
Pressing and piercing Line
Cont.
Each line have 4 presses.
 PB: By this press shape is given to steel plate by using specific die
according to drawing.
 PC: By this press side or extra material is removed.
 PD: By this press Piercing is done.
 PE: By this press specific holes is made.

L-LINE

XL LINE AND LINE-3
PB

2400 ton

1200 ton

PB

PC
PD

1000 ton
1000 ton
1000 ton

400 ton

PC

400 ton

PD

400 ton

PE

PE
Stamping Shop
In stamping shop body parts of car are manufactured using steel
plate.

1. Blanking
2. Pressing and Piercing
3. Quality checking
After the pressing quality inspection is manually done. If there is no fault then
part is transferred to body shop.
Body Shop
Stamped parts are transferred using fork lifter from stamping shop to body shop. Here various stamped
parts are welded to make various components of main body like doors, engine compartments and
mounting points, chassis, hood, front cabin, rare cabin etc.

• Spot welding and MAG welding is done for making the components.
• Manually some parts are welded and by robot some other parts are welded.
• Almost all the doors are made by robots like ABB, FANUC using various
mechanical operations (bending, compression) at the edges of parts.
• There are two main lines and six sub lines (three each). Both are same lines. At
present time at Line -1 Sunny and Duster are being manufactured and at Line-2
Micra is being manufactured. Production rate of the body shop is 40JPH (jobs per
hour).
Welding car’s doors at body shop by robots

Cont.
Welding car’s roof at body shop by robots
Cont.
• In the first sub line the engine compartment, the front cabin and the rear cabin are
assembled using spot welding manually.
• In the second sub line nearby parts of engine, doors, hoods are assembled using
welding and nuts.
• In main assembly line side doors, back doors, hood is assembled using automatic
nut runner machine. Finally quality checking is done of car body.
• Each car is given with the serial number which corresponds to the paint colour.
• The car body is sent to the metal line, where bumps or the dent or spots are
inspected. If any defect is found the body is sent to the sideways where it is tested
for the faults and solutions.
• Finally car body is transferred to paint shop.
Paint shop
• In paint shop there are two lines i.e. Line: 1 and Line: 2. both lines are
same.
• Car body comes here from body shop.
• At Line: 1 bodies of sunny and duster are painted and at line: 2 Micra
body is painted.
In paint shop car body passes through following lines:
1. Pre-treatment line (PT-line)
2. Electro Deposit Line (ED-Line)
3. ED-Oven
4. Sealer Zone
5. ED sanding zone
6. Body arranging zone
7. Dust off zone
8. TOPCOAT zone
From the paint shop car body is transferred to Trim & Chassis shop.
Pre-Treatment Line.
Cont.

It has 8 stages.

1. Pre-Degreaser-Washing using chemicals and safely removal of oils, greases, fats and carbon deposited on the
car body.
2. Degreaser-2 (D/P).- Final washing with chemicals of car’s body.
3. Pre-Raw water Rinse. -Here, car body is washed using raw water of specific ph.
4. Raw water Rinse (D/P).- Again washed with raw water of specific ph. (final raw water washing).
5. Conditioner- It is used to make the car body surface rough. Because at rough surfaces coating more adheres.
6. Phosphate treatment zone- car body is coated with phosphate for providing metal cleanliness and corrosion
protection to the surface of the car body.
7. Pre-DI (Deionized) water Rinse zone- DI water bath is given to car body. For DI Water rinse Fresh deionized water is used that is cleaner than drinking water. If any contamination remains on the surface before
the ED coating, it will cause the application issue and raise the potential for product failure.
8. DI water Rinse (D/P). -Final DI water bath is given to car body.

Here Pre-Treatment line ends.
Electro Deposit Line (ED-Line)
Cont.

It has 3 stages.

1. ED-Bath-At this stage car body is covered with ED Paint. ED (Electro-deposition)
paint (cationic) is used as a primer for car bodies. It imparts rust resistance and
chipping resistance to the car body.
2. UF-(Ultra Filtrate)-1-The paint bath can be contaminated with pre-treatment
chemicals like e.g. phosphates, chlorides, and chromates. So, a part of ultra-filtrate
has to be leaded out to avoid contamination of the paint bath with these chemicals.
3. Fresh water and Tilting stage-After UF stage car body is washed with fresh water.
After washing the car body is tilted to remove all the water and waste paint from the
car body. Then car is tilted back to its initial position.
Here ED Line ends.
ED-OVEN
Cont.

Car body passes through the ED Oven for drying the ED paint. First, air is
heated and passed through oven chamber then car body passes through the
chamber. Thus ED paint is dried by hot air.
Sealer-Zone
Sealant is applied at every exterior edge of the car. Sealant is used to resist
the leakage through the car body. Then car body passes through the Sealer
Oven for drying the sealant.
ED sanding zone
Then car body passes through the ED Sanding Zone. Here, extra paint is removed to make
ED paint layer uniform. This process is completely manual. First workers check the ED
paint layer and then remove extra paint using Sanding paper.
Body arranging zone
Cont.

•
•
•

It has 3 lines.
Side line
Main Line
Repair Line
When car body enters at storage are then barcode of car body is scanned and data sent to the CCR
(central control room) panel. Bodies of the same color are arranged in the main line. In main line
bodies are arranged on the basis of color such that same color bodies are together. If any car body
of different color comes in that line then it will be shifted to side line till it groups with another
bodies of same color. It is fully automated process according to the color car bodies are arranged
automatically in their respective line.
If after the ED Sanding stage body paint is not uniform or if some other faults are found in ED
paint then car body is transferred to repair line. From here body is sent to repair zone for repairing.
Dust Off zone
Dust from the body is removed before painting. So that dust doesn’t
contaminate the paint. Feathers of Emu bird are used as dust remover

Cont.

TOPCOAT Zone
In this zone car is painted through following zone.
•
•
•
•
•
•
•

ACC (Anti corrosion Coating)
Primer coat (Sprayed by robots)
Primer Paint (Manually for more accuracy)
Primer flash off zone (Drying of primer paint)
Base Zone (For main paint, first sprayed by robots ,then manually)
Base flash off zone (Drying of base paint)
Clear Zone (For clearing car surface for shining, First by robots then manually for
more shining purpose.)
Car body is transferred to Trim & Chassis shop
Plastic Shop
• In this shop bumpers are manufactured by Injection Molding Process.
• Small pieces of Poly Propylene are used as raw material.
• Two Mechanical Injection Molding machine (MIMM) and one Electrical Injection Molding machine
(EIMM) are here.
• Mechanical Injection Molding Machine is controlled by hydraulic cylinders and Electrical Injection
Molding machine is controlled by Servo motors.
• Electrical molding machine is preferable because it requires less maintenance and works with good
accuracy. In both types of machines hydraulic forces are applied.
• For changing the mold for different units QMC (Quick Mold Change) System is used. It is completely
automated.
• QMC system is controlled by PLC. For changing a one mold it takes 8.2 minutes.
• PLC has all the specification about all the molds. For each mold a number is given. So for changing a
mold, corresponding number is given to PLC.
• Then according to the size and shape of mold, QMC automatically adjusts its process for change the die
• Die also has heater for maintaining the die temperature. It takes 45 minutes for heating the die. So die is
pre heated before the installation for saving the time.
• For both mechanical molding machines there is common QMC unit and electrical molding machine has its
own QMC unit
• Weight of a die is about 28-30 ton. From here bumpers are forward to bumper paint shop for painting and
piercing
Bumper Paint Shop
In this process Rare and Front bumpers, and finishers are painted. Finishing process of bumpers
and finishers is also done in this shop. Here, punching and drilling operation are done for
generating holes in bumpers
In this zone bumper is painted through following zone.

• Heating Zone (Low speed conveyor) (bumper is heated. For heating fire is applied by the two
robots. Fire flame length is 250 mm)
• Dust off zone (air is applied to bumper surface for clean the dust.)
• Primer coat (Sprayed by robots)
• Primer Paint (Manually for more accuracy)
• Primer flash off zone (Drying of primer paint)
• Base Zone (For main paint, first sprayed by robots ,then manually)
• Base flash off zone (Drying of base paint)
• Clear Zone (For clearing car surface for shining, First by robots then manually for more
shining purpose.)
• Backing Zone 1 & 2- (High Speed Conveyor) Both backing zones are maintained at 120
degree Celsius temperature. By passing hot air in banking chamber paint is dried. Then bumper
is shifted from high speed conveyor to low speed conveyor
Bumper Paint Shop
Cont.

• Quality checking-Here, quality inspection is done. If any fault found in
bumper then it is sent for repair. If no fault is found then bumper is
unloaded from low speed conveyor and sent to vehicle chain.

For finisher painting same process is followed but at dust off zone there is no
need of finisher heating.

After final painting process piercing robot is used to generate holes in
bumper
Robots generate small holes in bumper by drilling operation. Holes are used for placing small sensors in
bumper.
Rare punching machine: It is used to generate big holes in bumper. These holes are used for placing little
big sensors, lights and other components.
Front punching machine: It is used for generate big holes in rare bumper and Front punching machine is
used for generate big holes in front bumper
Trim and Chassis shop
• Here all the components of car are assembled
• There are two main lines Line-1 and Line-2. Both lines
are same
• At each line total 31 stations are there.
• At each station 3-4 parts are assembled in car body.
• There are six sub lines in each main line:
Primary line
Trim Line
Chassis Trim line
Engine assembly
Pre final
Tester Line
Cont.
 Primary line- Car body comes from paint shop. Doors are separated.
 Trim Line- Interior components are assembled manually. Ex. Seat belt, floor cover ,Front and
rear glass ,CMM (Speedometer, Tachometer etc.). CCR controls the assembly.
 Chassis and Engine Assembly line – Exterior parts are assembled. Ex. engine, suspension
system, exhaust system, fuel tank, exhaust heat observer, brake system
 Chassis and Trim line- All assembled components are checked. front and rear wheels.
 Pre-final line- pre final line brake oil, fuel and coolant are filled using combo filling machine.
 Final Line- Doors are assembled.
 Tester Line- wheel alignment, Speed, braking system, Leakage are tested.

Test Drive and Sale
Internal component assembly
Engine fitting in car at Trim and Chassis shop
Wheels fitting in car at Trim and Chassis shop
Tester Line
Car’s final stretch inspection
Power Train Line
Three Lines are here

• JXX gear box assembly line
• Engine Line:1
• Engine Line:2
Gear box assembly Line Process
Cont.

1.
2.
3.
4.
5.

6.
7.
8.

Gear box Scanning
Assembly of gears.
Gear shifter (for 1st and 2nd gear) attached to secondary shaft
Primary shaft, secondary shaft with gear shifter and differential are
assembled in clutch housing
Gear shifters for 3rd, 4th and reverse gear are assembled with both
shafts.
Differential housing is assembled with clutch housing
By using mechanical housing tire side of the gear box is closed
In gear box a magnet is placed
Gear box assembly Line Process
Cont.

9. Primary shaft thickness measurement
10. Sealant Deposition
11. Then mechanical and clutch gear boxes are fixed and closed using
nut
12. Gear Box leakage testing by pressurized air.
13. Final Testing of gear box by assemble it with engine.
14. First gear box is scanned.
15. All tests are control by a PC.
16. maximum speed at different gears, Noise level (Manually) Speed at
different torques, power required at different slops at different
speed are tested. It is a one time process.
17. unloaded at gearbox area.
18. Testing of machine by blue and red gear box.
19. All blocks for gear box are imported from Renault France
Engine Shop Line
Cont.

• At line-1 K9K (Diesel) engine is manufactured.

• At line-2 XH (petrol) engine is manufactured Gear
Box leakage testing by pressurized air.
Process
Cont.

1. Cylinder block scanning.
2. Oil jet is fixed in cylinder by Oil jet press (2 Hydraulic and 4
Pneumatic)
3. Marking of engine code on cylinder block.
4. Oil level indicator assembly.
5. metal pieces are assembled in cylinder block support the crank
shaft. These metal pieces work as a bearing.
6. Then D dimension machine measure the height between bottom
dead center and top dead center for selecting the proper piston.
7. then crankshaft, piston, connecting rod are assembled in cylinder
block
8. oil filter, oil pump and oil pan is fixed
9. In H dimension machine piston is inspected that the piston is
perfect or not for the corresponding bore.
Process
Cont.

10.
11.
12.
13.

cylinder head is fixed on the cylinder block using nut bolt.
Then Cam shaft is fixed. Then fuel injector and high pressure fuel pump is fixed.
Timing Pulley and Timing belt is fixed.
Timing belt and gear transfer the power or motion from crank shaft to other engine accessories like cam
shaft, high pressure fuel pump. Fuel pump, cam shaft and other accessories are synchronized with crank
shaft.
14. Flywheel, vacuum pump ,Fuel pipe line, EGI harness cable, Intake manifold, exhaust manifold , Then
EGR (exhaust gas recycle) unit stabilizer, exhaust air intake ,exhaust air filter, Clutch kit (clutch plate
and disk), friction plate are assembled.
15. Engine Testing
16. Then quality of engine is checked and visual inspection of engine is done. If any fault is found then
engine is sent for repair. Then finally engine is sent to the SCM (supply chain management).
Casting Shop
In casting shop cylinder head and cylinder blocks are manufactured by casting
process.
In this shop two casting machines are here.

1 HPDC (High Pressure Die casting): Cylinder blocks are
manufactured by High Pressure Die Casting because they are heavy in
weight.
2 LPDC (Low Pressure Die Casting): Cylinder heads are
manufactured by Low Pressure Die Casting Process.

HDPC process is same as LDPC. Only difference is that pressure and die
moving velocity is higher in HDPC i.e. 60-70 Mpa and 308 m/s.
LPDC (Low Pressure Die Casting)
Cont.

•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•

Total 16 machines (3 LPDC) are here.
Raw material (ACD 12 Al alloy Rectangular rods)is poured into Melting Furnace where it melts.
Then molten material is transferred to holding zone to maintain the molten material temperature.
Temperature of Holding Zone is maintained at 700 degree Celsius.
Melting rate is 1.5 ton/hr.
LPG (fuel for combustion) furnace is used for melting where burner melt the raw material.
LPG is supplied at 1bar and air is supplied by blower.
Melting and Holding zone individual air blower is used.
At degreasing zone unwanted trapped gasses are removed from the molten material.
Then molten material is poured into LPDC machine
Using LPG die is pre heated before install in LPDC machine
Then casting is done in LPDC.
The temperature of molten material is maintained by electrical heaters in LPDC machine.
Removing the sand from casting surface.
Finishing operation of casting.
Hardening of casting.
Quality checking for cracks.
Visual inspection.
Air leakage checking
Conclusion

On the whole, this internship was a very useful experience. I have gained new knowledge, skills
and met many new people. I achieved several of my learning goals, however for some the
conditions did not permit. I got insight into professional practice. I learned the different facets of
working. I experienced that work management, is an important factor for the progress of projects.
Related to my study I learned more about the casting, stamping, machining, and welding. The
safety arrangements are very effective. I really very impressed with safety arrangements. I have
seen that all the employees are very aware of safety.
It is a very important aspect of the conservation of energy. Energy saving arrangements is also
very effective. The internship was also good to find out what my strengths and weaknesses are.
This helped me to define what skills and knowledge I have to improve in the coming time. At last
this internship has given me new insights and motivation to pursue a career in automotive field.
References

RNAIPL DATA
http://automotivehorizon.sulekha.com/
http://businesstoday.intoday.in/
http://www.dmcnicholl-technology.com/
http://www.theautochannel.com/news/2010/10/05/499926.html
RENAULT NISSAN AUTOMOTIVE INDIA PRIVATE LIMITED

More Related Content

What's hot

Manufacturing process & assembly of automobile
Manufacturing process & assembly of automobileManufacturing process & assembly of automobile
Manufacturing process & assembly of automobileYashraj Patil
 
Global Automobile Industry
Global Automobile IndustryGlobal Automobile Industry
Global Automobile IndustryYashmin Revawala
 
Vehicle Design construction
Vehicle Design constructionVehicle Design construction
Vehicle Design constructionRajat Seth
 
Summer trainning iproject hyundai ii
Summer trainning iproject hyundai iiSummer trainning iproject hyundai ii
Summer trainning iproject hyundai iiAnand pratap
 
Swot analysis of automobile industry in India
Swot analysis of automobile industry in IndiaSwot analysis of automobile industry in India
Swot analysis of automobile industry in IndiaShri Theja
 
Bus body fabrication- Design & Analysis
Bus body fabrication-  Design & AnalysisBus body fabrication-  Design & Analysis
Bus body fabrication- Design & AnalysisVIKAS SINGH
 
Jk tyre and industry ltd Final Report
 Jk tyre and industry ltd Final Report Jk tyre and industry ltd Final Report
Jk tyre and industry ltd Final ReportBhavyaruna Chittajallu
 
Internship Project for Automobile sector
Internship Project for Automobile sector Internship Project for Automobile sector
Internship Project for Automobile sector Kirtan Pandya
 
Automobile industry project report
Automobile industry project reportAutomobile industry project report
Automobile industry project reportPrasoon Agarwal
 
Industrial Internship Presentation
Industrial Internship PresentationIndustrial Internship Presentation
Industrial Internship PresentationPankaj Dogra
 
PERFORMANCE EVALUATION OF LEANING REVERSE TRIKE
PERFORMANCE EVALUATION OF LEANING REVERSE TRIKEPERFORMANCE EVALUATION OF LEANING REVERSE TRIKE
PERFORMANCE EVALUATION OF LEANING REVERSE TRIKEJournal For Research
 
JOSHUA SEMINAR FINAL (ADAS) (4) (2).pptx
JOSHUA SEMINAR FINAL (ADAS) (4) (2).pptxJOSHUA SEMINAR FINAL (ADAS) (4) (2).pptx
JOSHUA SEMINAR FINAL (ADAS) (4) (2).pptxFREDYJoy2
 
Feasibility analysis of electric vehicles in India
Feasibility analysis of electric vehicles in IndiaFeasibility analysis of electric vehicles in India
Feasibility analysis of electric vehicles in IndiaSushovan Bej
 
AUTOMOTIVE INDUSTRY STANDARD Requirements for School Buses in India
AUTOMOTIVE INDUSTRY STANDARD Requirements for School Buses in IndiaAUTOMOTIVE INDUSTRY STANDARD Requirements for School Buses in India
AUTOMOTIVE INDUSTRY STANDARD Requirements for School Buses in IndiaKunal Ashar
 
Internship at HONDA MOTOR CYCLE SCOOTER INDIA LIMITED
Internship at HONDA MOTOR CYCLE SCOOTER INDIA LIMITEDInternship at HONDA MOTOR CYCLE SCOOTER INDIA LIMITED
Internship at HONDA MOTOR CYCLE SCOOTER INDIA LIMITEDsgrsoni45
 
Introduction to Automotive materials
Introduction to Automotive materialsIntroduction to Automotive materials
Introduction to Automotive materialsPadmanabhan Krishnan
 

What's hot (20)

Manufacturing process & assembly of automobile
Manufacturing process & assembly of automobileManufacturing process & assembly of automobile
Manufacturing process & assembly of automobile
 
Global Automobile Industry
Global Automobile IndustryGlobal Automobile Industry
Global Automobile Industry
 
Hyundai
HyundaiHyundai
Hyundai
 
Vehicle Design construction
Vehicle Design constructionVehicle Design construction
Vehicle Design construction
 
Honda Intern Report
Honda Intern ReportHonda Intern Report
Honda Intern Report
 
Summer trainning iproject hyundai ii
Summer trainning iproject hyundai iiSummer trainning iproject hyundai ii
Summer trainning iproject hyundai ii
 
Swot analysis of automobile industry in India
Swot analysis of automobile industry in IndiaSwot analysis of automobile industry in India
Swot analysis of automobile industry in India
 
Bus body fabrication- Design & Analysis
Bus body fabrication-  Design & AnalysisBus body fabrication-  Design & Analysis
Bus body fabrication- Design & Analysis
 
Auto industry Ppt
Auto industry PptAuto industry Ppt
Auto industry Ppt
 
Jk tyre and industry ltd Final Report
 Jk tyre and industry ltd Final Report Jk tyre and industry ltd Final Report
Jk tyre and industry ltd Final Report
 
Internship Project for Automobile sector
Internship Project for Automobile sector Internship Project for Automobile sector
Internship Project for Automobile sector
 
Automobile industry project report
Automobile industry project reportAutomobile industry project report
Automobile industry project report
 
Automobile Sector
Automobile SectorAutomobile Sector
Automobile Sector
 
Industrial Internship Presentation
Industrial Internship PresentationIndustrial Internship Presentation
Industrial Internship Presentation
 
PERFORMANCE EVALUATION OF LEANING REVERSE TRIKE
PERFORMANCE EVALUATION OF LEANING REVERSE TRIKEPERFORMANCE EVALUATION OF LEANING REVERSE TRIKE
PERFORMANCE EVALUATION OF LEANING REVERSE TRIKE
 
JOSHUA SEMINAR FINAL (ADAS) (4) (2).pptx
JOSHUA SEMINAR FINAL (ADAS) (4) (2).pptxJOSHUA SEMINAR FINAL (ADAS) (4) (2).pptx
JOSHUA SEMINAR FINAL (ADAS) (4) (2).pptx
 
Feasibility analysis of electric vehicles in India
Feasibility analysis of electric vehicles in IndiaFeasibility analysis of electric vehicles in India
Feasibility analysis of electric vehicles in India
 
AUTOMOTIVE INDUSTRY STANDARD Requirements for School Buses in India
AUTOMOTIVE INDUSTRY STANDARD Requirements for School Buses in IndiaAUTOMOTIVE INDUSTRY STANDARD Requirements for School Buses in India
AUTOMOTIVE INDUSTRY STANDARD Requirements for School Buses in India
 
Internship at HONDA MOTOR CYCLE SCOOTER INDIA LIMITED
Internship at HONDA MOTOR CYCLE SCOOTER INDIA LIMITEDInternship at HONDA MOTOR CYCLE SCOOTER INDIA LIMITED
Internship at HONDA MOTOR CYCLE SCOOTER INDIA LIMITED
 
Introduction to Automotive materials
Introduction to Automotive materialsIntroduction to Automotive materials
Introduction to Automotive materials
 

Viewers also liked

A project report on orgnoziation study of tata motors
A project report on  orgnoziation study of tata motorsA project report on  orgnoziation study of tata motors
A project report on orgnoziation study of tata motorsBabasab Patil
 
Organizational Design for Effective Software Development
Organizational Design for Effective Software DevelopmentOrganizational Design for Effective Software Development
Organizational Design for Effective Software DevelopmentDev9Com
 
Federal mogul Bearing India limited
Federal mogul Bearing India limitedFederal mogul Bearing India limited
Federal mogul Bearing India limitedDeepak kango
 
Project report on navjivan automobiles (hero motocorp)
Project report on navjivan automobiles (hero motocorp)Project report on navjivan automobiles (hero motocorp)
Project report on navjivan automobiles (hero motocorp)Govind14
 
Project summary report on tata motors by bharat goyal
Project summary report on tata motors by bharat goyalProject summary report on tata motors by bharat goyal
Project summary report on tata motors by bharat goyalbharatgoyal44
 
Renault nissan case study
Renault nissan case studyRenault nissan case study
Renault nissan case studyUlusyar Tareen
 
The automotive industry presentation
The automotive industry presentationThe automotive industry presentation
The automotive industry presentationSuhaib Tariq
 
Project on-tata-motors
Project on-tata-motorsProject on-tata-motors
Project on-tata-motorsSanchit Jasuja
 

Viewers also liked (10)

A project report on orgnoziation study of tata motors
A project report on  orgnoziation study of tata motorsA project report on  orgnoziation study of tata motors
A project report on orgnoziation study of tata motors
 
Organizational Design for Effective Software Development
Organizational Design for Effective Software DevelopmentOrganizational Design for Effective Software Development
Organizational Design for Effective Software Development
 
Gaurav
GauravGaurav
Gaurav
 
Federal mogul Bearing India limited
Federal mogul Bearing India limitedFederal mogul Bearing India limited
Federal mogul Bearing India limited
 
Project report on navjivan automobiles (hero motocorp)
Project report on navjivan automobiles (hero motocorp)Project report on navjivan automobiles (hero motocorp)
Project report on navjivan automobiles (hero motocorp)
 
Project summary report on tata motors by bharat goyal
Project summary report on tata motors by bharat goyalProject summary report on tata motors by bharat goyal
Project summary report on tata motors by bharat goyal
 
Renault nissan case study
Renault nissan case studyRenault nissan case study
Renault nissan case study
 
The automotive industry presentation
The automotive industry presentationThe automotive industry presentation
The automotive industry presentation
 
sheet metal
sheet metalsheet metal
sheet metal
 
Project on-tata-motors
Project on-tata-motorsProject on-tata-motors
Project on-tata-motors
 

Similar to RENAULT NISSAN AUTOMOTIVE INDIA PRIVATE LIMITED

Allison training report
Allison training reportAllison training report
Allison training reportInfosys
 
Mid term presentation kartikey kr gupta
Mid term presentation kartikey kr guptaMid term presentation kartikey kr gupta
Mid term presentation kartikey kr guptakartik dogra
 
Atlas Internship report
Atlas Internship reportAtlas Internship report
Atlas Internship reportM Nadeem
 
Internship111111111111111111111111111111
Internship111111111111111111111111111111Internship111111111111111111111111111111
Internship111111111111111111111111111111rkishone4444
 
Industrial training at general motors by VIVEK NIRWAL
 Industrial training at general motors by VIVEK NIRWAL Industrial training at general motors by VIVEK NIRWAL
Industrial training at general motors by VIVEK NIRWALvivek nirwal
 
Bluestar profile 2013
Bluestar profile 2013Bluestar profile 2013
Bluestar profile 2013Huy Dickens
 
intro to conclusion
intro to conclusionintro to conclusion
intro to conclusionvicky mech
 
Prince Industries Inc
Prince Industries IncPrince Industries Inc
Prince Industries IncRick
 
MANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNC
MANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNCMANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNC
MANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNCBhaumik Sheth
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee incrementVinoth Axus
 
Summer Training Report - Gaurab Pant(1)
Summer Training Report - Gaurab Pant(1)Summer Training Report - Gaurab Pant(1)
Summer Training Report - Gaurab Pant(1)Gaurab Pant
 
Varroc Corporate Presentation - Forging Division
Varroc Corporate Presentation - Forging DivisionVarroc Corporate Presentation - Forging Division
Varroc Corporate Presentation - Forging DivisionChetan Mangaonkar
 
company profile (1) (1).pdf
company profile (1) (1).pdfcompany profile (1) (1).pdf
company profile (1) (1).pdfvameegroup
 
Twin Engineers Pvt. Ltd.
Twin Engineers Pvt. Ltd.Twin Engineers Pvt. Ltd.
Twin Engineers Pvt. Ltd.MayankRohatgi
 
ANALYSIS OF GRINDING WHEEL.docx
ANALYSIS OF GRINDING WHEEL.docxANALYSIS OF GRINDING WHEEL.docx
ANALYSIS OF GRINDING WHEEL.docxGVivekanandaChary
 

Similar to RENAULT NISSAN AUTOMOTIVE INDIA PRIVATE LIMITED (20)

Allison training report
Allison training reportAllison training report
Allison training report
 
Mid term presentation kartikey kr gupta
Mid term presentation kartikey kr guptaMid term presentation kartikey kr gupta
Mid term presentation kartikey kr gupta
 
AKS
AKSAKS
AKS
 
Production scheduling
Production schedulingProduction scheduling
Production scheduling
 
Atlas Internship report
Atlas Internship reportAtlas Internship report
Atlas Internship report
 
Internship111111111111111111111111111111
Internship111111111111111111111111111111Internship111111111111111111111111111111
Internship111111111111111111111111111111
 
Industrial training at general motors by VIVEK NIRWAL
 Industrial training at general motors by VIVEK NIRWAL Industrial training at general motors by VIVEK NIRWAL
Industrial training at general motors by VIVEK NIRWAL
 
Bluestar profile 2013
Bluestar profile 2013Bluestar profile 2013
Bluestar profile 2013
 
honda
honda honda
honda
 
intro to conclusion
intro to conclusionintro to conclusion
intro to conclusion
 
Resume
ResumeResume
Resume
 
Prince Industries Inc
Prince Industries IncPrince Industries Inc
Prince Industries Inc
 
MANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNC
MANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNCMANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNC
MANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNC
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee increment
 
Summer Training Report - Gaurab Pant(1)
Summer Training Report - Gaurab Pant(1)Summer Training Report - Gaurab Pant(1)
Summer Training Report - Gaurab Pant(1)
 
Varroc Corporate Presentation - Forging Division
Varroc Corporate Presentation - Forging DivisionVarroc Corporate Presentation - Forging Division
Varroc Corporate Presentation - Forging Division
 
company profile (1) (1).pdf
company profile (1) (1).pdfcompany profile (1) (1).pdf
company profile (1) (1).pdf
 
Twin Engineers Pvt. Ltd.
Twin Engineers Pvt. Ltd.Twin Engineers Pvt. Ltd.
Twin Engineers Pvt. Ltd.
 
ANALYSIS OF GRINDING WHEEL.docx
ANALYSIS OF GRINDING WHEEL.docxANALYSIS OF GRINDING WHEEL.docx
ANALYSIS OF GRINDING WHEEL.docx
 
my report
my reportmy report
my report
 

Recently uploaded

-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hhmhamadhawlery16
 
907MTAMount Coventry University Bachelor's Diploma in Engineering
907MTAMount Coventry University Bachelor's Diploma in Engineering907MTAMount Coventry University Bachelor's Diploma in Engineering
907MTAMount Coventry University Bachelor's Diploma in EngineeringFi sss
 
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...Forth
 
办理昆士兰科技大学毕业证QUT毕业证留信学历认证
办理昆士兰科技大学毕业证QUT毕业证留信学历认证办理昆士兰科技大学毕业证QUT毕业证留信学历认证
办理昆士兰科技大学毕业证QUT毕业证留信学历认证jdkhjh
 
Pros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptxPros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptxjennifermiller8137
 
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdfkushkruthik555
 
Trent engineer.pptx presentation reports
Trent engineer.pptx presentation reportsTrent engineer.pptx presentation reports
Trent engineer.pptx presentation reportsbasant11731
 
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样gfghbihg
 
EPA Funding Opportunities for Equitable Electric Transportation by Mike Moltzen
EPA Funding Opportunities for Equitable Electric Transportationby Mike MoltzenEPA Funding Opportunities for Equitable Electric Transportationby Mike Moltzen
EPA Funding Opportunities for Equitable Electric Transportation by Mike MoltzenForth
 
原版定制copy澳洲查尔斯顿大学毕业证UC毕业证成绩单留信学历认证保障质量
原版定制copy澳洲查尔斯顿大学毕业证UC毕业证成绩单留信学历认证保障质量原版定制copy澳洲查尔斯顿大学毕业证UC毕业证成绩单留信学历认证保障质量
原版定制copy澳洲查尔斯顿大学毕业证UC毕业证成绩单留信学历认证保障质量sehgh15heh
 
办理阿德莱德大学毕业证Adelaide毕业证留信学历认证
办理阿德莱德大学毕业证Adelaide毕业证留信学历认证办理阿德莱德大学毕业证Adelaide毕业证留信学历认证
办理阿德莱德大学毕业证Adelaide毕业证留信学历认证jdkhjh
 
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书zdzoqco
 
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Forth
 
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书zdzoqco
 
办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一F La
 
原版1:1复刻俄亥俄州立大学毕业证OSU毕业证留信学历认证
原版1:1复刻俄亥俄州立大学毕业证OSU毕业证留信学历认证原版1:1复刻俄亥俄州立大学毕业证OSU毕业证留信学历认证
原版1:1复刻俄亥俄州立大学毕业证OSU毕业证留信学历认证jdkhjh
 
原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
办理克莱姆森大学毕业证成绩单|购买美国文凭证书
办理克莱姆森大学毕业证成绩单|购买美国文凭证书办理克莱姆森大学毕业证成绩单|购买美国文凭证书
办理克莱姆森大学毕业证成绩单|购买美国文凭证书zdzoqco
 
Mastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
Mastering Mercedes Engine Care Top Tips for Rowlett, TX ResidentsMastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
Mastering Mercedes Engine Care Top Tips for Rowlett, TX ResidentsRowlett Motorwerks
 
Program Design by Prateek Suri and Christian Williss
Program Design by Prateek Suri and Christian WillissProgram Design by Prateek Suri and Christian Williss
Program Design by Prateek Suri and Christian WillissForth
 

Recently uploaded (20)

-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh
 
907MTAMount Coventry University Bachelor's Diploma in Engineering
907MTAMount Coventry University Bachelor's Diploma in Engineering907MTAMount Coventry University Bachelor's Diploma in Engineering
907MTAMount Coventry University Bachelor's Diploma in Engineering
 
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
Electric Nation Upper Midwest Inter-Tribal Electric Vehicle (EV) Charging Com...
 
办理昆士兰科技大学毕业证QUT毕业证留信学历认证
办理昆士兰科技大学毕业证QUT毕业证留信学历认证办理昆士兰科技大学毕业证QUT毕业证留信学历认证
办理昆士兰科技大学毕业证QUT毕业证留信学历认证
 
Pros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptxPros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptx
 
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
 
Trent engineer.pptx presentation reports
Trent engineer.pptx presentation reportsTrent engineer.pptx presentation reports
Trent engineer.pptx presentation reports
 
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
 
EPA Funding Opportunities for Equitable Electric Transportation by Mike Moltzen
EPA Funding Opportunities for Equitable Electric Transportationby Mike MoltzenEPA Funding Opportunities for Equitable Electric Transportationby Mike Moltzen
EPA Funding Opportunities for Equitable Electric Transportation by Mike Moltzen
 
原版定制copy澳洲查尔斯顿大学毕业证UC毕业证成绩单留信学历认证保障质量
原版定制copy澳洲查尔斯顿大学毕业证UC毕业证成绩单留信学历认证保障质量原版定制copy澳洲查尔斯顿大学毕业证UC毕业证成绩单留信学历认证保障质量
原版定制copy澳洲查尔斯顿大学毕业证UC毕业证成绩单留信学历认证保障质量
 
办理阿德莱德大学毕业证Adelaide毕业证留信学历认证
办理阿德莱德大学毕业证Adelaide毕业证留信学历认证办理阿德莱德大学毕业证Adelaide毕业证留信学历认证
办理阿德莱德大学毕业证Adelaide毕业证留信学历认证
 
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
 
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
 
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
 
办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一
 
原版1:1复刻俄亥俄州立大学毕业证OSU毕业证留信学历认证
原版1:1复刻俄亥俄州立大学毕业证OSU毕业证留信学历认证原版1:1复刻俄亥俄州立大学毕业证OSU毕业证留信学历认证
原版1:1复刻俄亥俄州立大学毕业证OSU毕业证留信学历认证
 
原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制中央昆士兰大学毕业证(CQU毕业证)#文凭成绩单#真实留信学历认证永久存档
 
办理克莱姆森大学毕业证成绩单|购买美国文凭证书
办理克莱姆森大学毕业证成绩单|购买美国文凭证书办理克莱姆森大学毕业证成绩单|购买美国文凭证书
办理克莱姆森大学毕业证成绩单|购买美国文凭证书
 
Mastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
Mastering Mercedes Engine Care Top Tips for Rowlett, TX ResidentsMastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
Mastering Mercedes Engine Care Top Tips for Rowlett, TX Residents
 
Program Design by Prateek Suri and Christian Williss
Program Design by Prateek Suri and Christian WillissProgram Design by Prateek Suri and Christian Williss
Program Design by Prateek Suri and Christian Williss
 

RENAULT NISSAN AUTOMOTIVE INDIA PRIVATE LIMITED

  • 1. PRESENTATION ON AUTOBILE MANUFACTRING (IMPLANT TRAINING) INTERNSHIP AT RENAULT NISSAN AUTOMOTIVE INDIA PRIVATE LIMITED (RNAIPL) PRESENTED BY AVINISH KUMAR JAIN 06-02-2014
  • 2. Objectives of Internship General objective • As partial fulfillment of the requirements of the B.Tech. program at XXX University Specific Objectives • To get exposed to functions, structures and operational activities of the organization. • To learn about various manufacturing & managerial concepts, tools and techniques that are theoretically and applied in an industry. • To learn the manufacturing and assembly process of an automobile. • To experience the working process of an industry. • To contribute my effort to industry.
  • 3. About RNAIPL The first dedicated Alliance facility in which Nissans and Renaults are made side-by-side – is a modern and highly efficient plant producing top quality cars. But there’s more. It’s now officially one of India’s safest and most environmentally-friendly factories, too. That’s according to the Confederation of Indian Industry (CII), which has given the plant its top award for excellence in Environmental Health and Safety. In February 2008, the Renault-Nissan Alliance signed a MOU with Government of Tamil Nadu to set up a manufacturing plant at Oragadam, near Chennai with a minimum investment of Rs. 4500 Crore over a period of 7 years. On March 17, 2010, the Renault-Nissan alliance plant was inaugurated in a record time of 21 months since its groundbreaking ceremony in June 2008. RNAIPL thus achieved the unique milestone of starting operations in record time of 21 months from the date of signing of MOU. The Plant has an initial capacity of 2, 00,000 units per year and planned to reach 4, 00,000 units per year in full capacity. Nissan’s first locally manufactured global compact hatchback –The Nissan Micra is manufactured at the plant and commercial production for the same began in May 2010.It represents 1500 employs.
  • 4. Vision –Enriching People’s Lives Mission – It provide unique and innovative automotive product and services that deliver superior measurable values to all stack holders.
  • 5. Products manufactured at RNAIPL Renault • • • • • Renault Fluence (Launched 2011) Renault Koleos (Launched 2011) Renault Pulse (Launched 2012) Renault Duster (Launched July-2012) Renault Scala (Launched 2012)
  • 6. Cont. Nissan • Nissan X-Trail (Launched 2005) • Nissan Teana (Launched 2007) • Nissan 370Z (Launched 2010) • Nissan Micra (Launched 2010) • Nissan Sunny (Launched 2011)
  • 7. Basic Ideology in Manufacturing Preference-1 Safety Preference-2 Quality Preference-3 Cost
  • 8. Hydraulics All the shops of RNAIPL are automated. In each shop hydraulic and pneumatic machines are installed. Most of the manufacturing work are done by robots. So for operating, and maintaining these machines and robots with accuracy, good knowledge of hydraulic, pneumatics and robotics is necessary. Principle (Pascal Law) Pressure applied to a confined fluid at any point is transmitted undiminished and equally throughout the fluid in all directions and acts upon every part of the confining vessel at right angles to its interior surfaces.
  • 9. Pumps Cont. A pump is a mechanical device that moves fluids (liquids and gases) or sometimes slurries, by mechanical action. Pumps Positive Displacement Pump Gear Pump Vane Piston External Non Positive Displacement Pump Centrifugal Internal Axial Axial Piston Radial
  • 10. Control Valves A mechanical device that is used to control the flow of a fluid. Valves Direction Control Valve (DCV) Flow Control Valve (FCV) Pressure Control Valve (PCV)
  • 11. Mechanical Utility System There are five components of mechanical utility system. 1. 2. 3. 4. 5. Compressors Driers Heat Exchangers Pumps Cooling Towers
  • 12. Compressed air and drier flow process chart
  • 13. Schematic diagram for compressors
  • 14. Schematic Diagram of plate heat exchanger
  • 15. BMS (Building Management system) In BMS all the mechanical utilities are controlled and monitored. All the information about utilities (driers, compressors etc.) like operating status, present conditions (pressure, temperature, and flow rate) is transmitted through sensors to BMS. In BMS five displays are using that display the operating status of the all utilities. One main display is used for main control. All the utilities can be controlled from the BMS. For safety automatic alarm system is there. If any problem occurs in any utility system then alarm rings and displays show the place where problem occurs. It also display that what is the problem. Alarm rings in all the areas. It is very fast and time saving system because where is the problem, it is already known so only specific person go there and solve the problem so checking of all utilities is not required. In design of plant every system is designed according to specific industrial standards. In firefighting system the circular distance between each fire extinguisher should be 30 meters. But here at every 15 meters fire extinguisher is placed for more safety. For every danger and safety sign photo luminescent material is used.
  • 16. PROJECT STRUCTURE (PHASE – I) PROCESS TEAM INPUT TECHNICAL ALIGNMENT MEETING PROJECT ENGINEERING TEAM NO YES FINAL BOQ (Technically aligned BOQ) VALIDATE & CHECK YES RNPO DESIGN OF SYSTEMS NO YES TENDER FLOATING VALIDATE & CHECK & PREPARE BOQ PURCHASE TEAM TENDER FLOATING TO CONTRACTORS TECHNICAL ALIGNMENT MEETING RESEND QUOTATION NEGOTIATION BY RNPO SUPPLIER FINALISATION
  • 17. PROJECT STRUCTURE PHASE-2     SCHEDULE MODE OF WORKING WORK METHOD RULES & REGULATIONS KICK OF MEETING START OF PROJECT PROJECT COMPLETION QC & PREPARING SNAG LIST SAFETY AUDIT (PRIMARY & SECONDARY) PREPARE REPORT CLOSING OF SNAG LIST HAND OVER TO MAINTANENCE     DRAWING APPROVAL DESIGN APPROVAL PROGRESS REVIEW MEET SCHEDULE MONITORING
  • 18. Vehicle Chain Stamping Shop Trim and Chassis shop Body Shop Paint Shop
  • 19. Stamping Shop In stamping shop body parts of car are manufactured using steel plate. 1. Blanking 2. Pressing and Piercing 3. Quality checking
  • 20. Blanking Process 1. 2. 3. 4. 5. 6. 7. 8. Coil-Car: Coil of steel plate is pick up by crane and transferred to coil-car that transfer the coil to uncoiler. Uncoiler and advance correction machine: It sets the inner diameter of coil to the center of the line by holding device that remove rolling habit of the tip of the coil. Washing: The device that removes the foreign material that has adhered to the coil. Leveler: Device that corrects the shape of the steel plate and makes it smooth. It consist a combination of rollers that level the plate. Looping: In this process steel plate is stretched into the pit and all the bends are removed.. Feeder: Device that adjusts the coil material to press cycle and set the cutting length and sends it to piler. Press: It press the steel plate and cut the steel. Press can be rotated at required angle to cut the steel plate at any angle. Piler: The device that piles the cut material with accuracy. From here cut material are transferred to pressing line. There are Two Piler zone here.
  • 21. Pressing and piercing Line Here are three pressing lines. Pressing Lines XL-Line (5400 ton) For pressing of larger parts L-Line (2400 ton) For pressing of small parts Line-3 (5400 ton) For pressing of larger parts
  • 22. Pressing and piercing Line Cont. Each line have 4 presses.  PB: By this press shape is given to steel plate by using specific die according to drawing.  PC: By this press side or extra material is removed.  PD: By this press Piercing is done.  PE: By this press specific holes is made. L-LINE XL LINE AND LINE-3 PB 2400 ton 1200 ton PB PC PD 1000 ton 1000 ton 1000 ton 400 ton PC 400 ton PD 400 ton PE PE
  • 23. Stamping Shop In stamping shop body parts of car are manufactured using steel plate. 1. Blanking 2. Pressing and Piercing 3. Quality checking After the pressing quality inspection is manually done. If there is no fault then part is transferred to body shop.
  • 24. Body Shop Stamped parts are transferred using fork lifter from stamping shop to body shop. Here various stamped parts are welded to make various components of main body like doors, engine compartments and mounting points, chassis, hood, front cabin, rare cabin etc. • Spot welding and MAG welding is done for making the components. • Manually some parts are welded and by robot some other parts are welded. • Almost all the doors are made by robots like ABB, FANUC using various mechanical operations (bending, compression) at the edges of parts. • There are two main lines and six sub lines (three each). Both are same lines. At present time at Line -1 Sunny and Duster are being manufactured and at Line-2 Micra is being manufactured. Production rate of the body shop is 40JPH (jobs per hour).
  • 25. Welding car’s doors at body shop by robots Cont.
  • 26. Welding car’s roof at body shop by robots
  • 27. Cont. • In the first sub line the engine compartment, the front cabin and the rear cabin are assembled using spot welding manually. • In the second sub line nearby parts of engine, doors, hoods are assembled using welding and nuts. • In main assembly line side doors, back doors, hood is assembled using automatic nut runner machine. Finally quality checking is done of car body. • Each car is given with the serial number which corresponds to the paint colour. • The car body is sent to the metal line, where bumps or the dent or spots are inspected. If any defect is found the body is sent to the sideways where it is tested for the faults and solutions. • Finally car body is transferred to paint shop.
  • 28. Paint shop • In paint shop there are two lines i.e. Line: 1 and Line: 2. both lines are same. • Car body comes here from body shop. • At Line: 1 bodies of sunny and duster are painted and at line: 2 Micra body is painted. In paint shop car body passes through following lines: 1. Pre-treatment line (PT-line) 2. Electro Deposit Line (ED-Line) 3. ED-Oven 4. Sealer Zone 5. ED sanding zone 6. Body arranging zone 7. Dust off zone 8. TOPCOAT zone From the paint shop car body is transferred to Trim & Chassis shop.
  • 29. Pre-Treatment Line. Cont. It has 8 stages. 1. Pre-Degreaser-Washing using chemicals and safely removal of oils, greases, fats and carbon deposited on the car body. 2. Degreaser-2 (D/P).- Final washing with chemicals of car’s body. 3. Pre-Raw water Rinse. -Here, car body is washed using raw water of specific ph. 4. Raw water Rinse (D/P).- Again washed with raw water of specific ph. (final raw water washing). 5. Conditioner- It is used to make the car body surface rough. Because at rough surfaces coating more adheres. 6. Phosphate treatment zone- car body is coated with phosphate for providing metal cleanliness and corrosion protection to the surface of the car body. 7. Pre-DI (Deionized) water Rinse zone- DI water bath is given to car body. For DI Water rinse Fresh deionized water is used that is cleaner than drinking water. If any contamination remains on the surface before the ED coating, it will cause the application issue and raise the potential for product failure. 8. DI water Rinse (D/P). -Final DI water bath is given to car body. Here Pre-Treatment line ends.
  • 30. Electro Deposit Line (ED-Line) Cont. It has 3 stages. 1. ED-Bath-At this stage car body is covered with ED Paint. ED (Electro-deposition) paint (cationic) is used as a primer for car bodies. It imparts rust resistance and chipping resistance to the car body. 2. UF-(Ultra Filtrate)-1-The paint bath can be contaminated with pre-treatment chemicals like e.g. phosphates, chlorides, and chromates. So, a part of ultra-filtrate has to be leaded out to avoid contamination of the paint bath with these chemicals. 3. Fresh water and Tilting stage-After UF stage car body is washed with fresh water. After washing the car body is tilted to remove all the water and waste paint from the car body. Then car is tilted back to its initial position. Here ED Line ends.
  • 31. ED-OVEN Cont. Car body passes through the ED Oven for drying the ED paint. First, air is heated and passed through oven chamber then car body passes through the chamber. Thus ED paint is dried by hot air. Sealer-Zone Sealant is applied at every exterior edge of the car. Sealant is used to resist the leakage through the car body. Then car body passes through the Sealer Oven for drying the sealant. ED sanding zone Then car body passes through the ED Sanding Zone. Here, extra paint is removed to make ED paint layer uniform. This process is completely manual. First workers check the ED paint layer and then remove extra paint using Sanding paper.
  • 32. Body arranging zone Cont. • • • It has 3 lines. Side line Main Line Repair Line When car body enters at storage are then barcode of car body is scanned and data sent to the CCR (central control room) panel. Bodies of the same color are arranged in the main line. In main line bodies are arranged on the basis of color such that same color bodies are together. If any car body of different color comes in that line then it will be shifted to side line till it groups with another bodies of same color. It is fully automated process according to the color car bodies are arranged automatically in their respective line. If after the ED Sanding stage body paint is not uniform or if some other faults are found in ED paint then car body is transferred to repair line. From here body is sent to repair zone for repairing.
  • 33. Dust Off zone Dust from the body is removed before painting. So that dust doesn’t contaminate the paint. Feathers of Emu bird are used as dust remover Cont. TOPCOAT Zone In this zone car is painted through following zone. • • • • • • • ACC (Anti corrosion Coating) Primer coat (Sprayed by robots) Primer Paint (Manually for more accuracy) Primer flash off zone (Drying of primer paint) Base Zone (For main paint, first sprayed by robots ,then manually) Base flash off zone (Drying of base paint) Clear Zone (For clearing car surface for shining, First by robots then manually for more shining purpose.) Car body is transferred to Trim & Chassis shop
  • 34. Plastic Shop • In this shop bumpers are manufactured by Injection Molding Process. • Small pieces of Poly Propylene are used as raw material. • Two Mechanical Injection Molding machine (MIMM) and one Electrical Injection Molding machine (EIMM) are here. • Mechanical Injection Molding Machine is controlled by hydraulic cylinders and Electrical Injection Molding machine is controlled by Servo motors. • Electrical molding machine is preferable because it requires less maintenance and works with good accuracy. In both types of machines hydraulic forces are applied. • For changing the mold for different units QMC (Quick Mold Change) System is used. It is completely automated. • QMC system is controlled by PLC. For changing a one mold it takes 8.2 minutes. • PLC has all the specification about all the molds. For each mold a number is given. So for changing a mold, corresponding number is given to PLC. • Then according to the size and shape of mold, QMC automatically adjusts its process for change the die • Die also has heater for maintaining the die temperature. It takes 45 minutes for heating the die. So die is pre heated before the installation for saving the time. • For both mechanical molding machines there is common QMC unit and electrical molding machine has its own QMC unit • Weight of a die is about 28-30 ton. From here bumpers are forward to bumper paint shop for painting and piercing
  • 35. Bumper Paint Shop In this process Rare and Front bumpers, and finishers are painted. Finishing process of bumpers and finishers is also done in this shop. Here, punching and drilling operation are done for generating holes in bumpers In this zone bumper is painted through following zone. • Heating Zone (Low speed conveyor) (bumper is heated. For heating fire is applied by the two robots. Fire flame length is 250 mm) • Dust off zone (air is applied to bumper surface for clean the dust.) • Primer coat (Sprayed by robots) • Primer Paint (Manually for more accuracy) • Primer flash off zone (Drying of primer paint) • Base Zone (For main paint, first sprayed by robots ,then manually) • Base flash off zone (Drying of base paint) • Clear Zone (For clearing car surface for shining, First by robots then manually for more shining purpose.) • Backing Zone 1 & 2- (High Speed Conveyor) Both backing zones are maintained at 120 degree Celsius temperature. By passing hot air in banking chamber paint is dried. Then bumper is shifted from high speed conveyor to low speed conveyor
  • 36. Bumper Paint Shop Cont. • Quality checking-Here, quality inspection is done. If any fault found in bumper then it is sent for repair. If no fault is found then bumper is unloaded from low speed conveyor and sent to vehicle chain. For finisher painting same process is followed but at dust off zone there is no need of finisher heating. After final painting process piercing robot is used to generate holes in bumper Robots generate small holes in bumper by drilling operation. Holes are used for placing small sensors in bumper. Rare punching machine: It is used to generate big holes in bumper. These holes are used for placing little big sensors, lights and other components. Front punching machine: It is used for generate big holes in rare bumper and Front punching machine is used for generate big holes in front bumper
  • 37. Trim and Chassis shop • Here all the components of car are assembled • There are two main lines Line-1 and Line-2. Both lines are same • At each line total 31 stations are there. • At each station 3-4 parts are assembled in car body. • There are six sub lines in each main line: Primary line Trim Line Chassis Trim line Engine assembly Pre final Tester Line
  • 38. Cont.  Primary line- Car body comes from paint shop. Doors are separated.  Trim Line- Interior components are assembled manually. Ex. Seat belt, floor cover ,Front and rear glass ,CMM (Speedometer, Tachometer etc.). CCR controls the assembly.  Chassis and Engine Assembly line – Exterior parts are assembled. Ex. engine, suspension system, exhaust system, fuel tank, exhaust heat observer, brake system  Chassis and Trim line- All assembled components are checked. front and rear wheels.  Pre-final line- pre final line brake oil, fuel and coolant are filled using combo filling machine.  Final Line- Doors are assembled.  Tester Line- wheel alignment, Speed, braking system, Leakage are tested. Test Drive and Sale
  • 40. Engine fitting in car at Trim and Chassis shop
  • 41. Wheels fitting in car at Trim and Chassis shop
  • 43. Car’s final stretch inspection
  • 44. Power Train Line Three Lines are here • JXX gear box assembly line • Engine Line:1 • Engine Line:2
  • 45. Gear box assembly Line Process Cont. 1. 2. 3. 4. 5. 6. 7. 8. Gear box Scanning Assembly of gears. Gear shifter (for 1st and 2nd gear) attached to secondary shaft Primary shaft, secondary shaft with gear shifter and differential are assembled in clutch housing Gear shifters for 3rd, 4th and reverse gear are assembled with both shafts. Differential housing is assembled with clutch housing By using mechanical housing tire side of the gear box is closed In gear box a magnet is placed
  • 46. Gear box assembly Line Process Cont. 9. Primary shaft thickness measurement 10. Sealant Deposition 11. Then mechanical and clutch gear boxes are fixed and closed using nut 12. Gear Box leakage testing by pressurized air. 13. Final Testing of gear box by assemble it with engine. 14. First gear box is scanned. 15. All tests are control by a PC. 16. maximum speed at different gears, Noise level (Manually) Speed at different torques, power required at different slops at different speed are tested. It is a one time process. 17. unloaded at gearbox area. 18. Testing of machine by blue and red gear box. 19. All blocks for gear box are imported from Renault France
  • 47. Engine Shop Line Cont. • At line-1 K9K (Diesel) engine is manufactured. • At line-2 XH (petrol) engine is manufactured Gear Box leakage testing by pressurized air.
  • 48. Process Cont. 1. Cylinder block scanning. 2. Oil jet is fixed in cylinder by Oil jet press (2 Hydraulic and 4 Pneumatic) 3. Marking of engine code on cylinder block. 4. Oil level indicator assembly. 5. metal pieces are assembled in cylinder block support the crank shaft. These metal pieces work as a bearing. 6. Then D dimension machine measure the height between bottom dead center and top dead center for selecting the proper piston. 7. then crankshaft, piston, connecting rod are assembled in cylinder block 8. oil filter, oil pump and oil pan is fixed 9. In H dimension machine piston is inspected that the piston is perfect or not for the corresponding bore.
  • 49. Process Cont. 10. 11. 12. 13. cylinder head is fixed on the cylinder block using nut bolt. Then Cam shaft is fixed. Then fuel injector and high pressure fuel pump is fixed. Timing Pulley and Timing belt is fixed. Timing belt and gear transfer the power or motion from crank shaft to other engine accessories like cam shaft, high pressure fuel pump. Fuel pump, cam shaft and other accessories are synchronized with crank shaft. 14. Flywheel, vacuum pump ,Fuel pipe line, EGI harness cable, Intake manifold, exhaust manifold , Then EGR (exhaust gas recycle) unit stabilizer, exhaust air intake ,exhaust air filter, Clutch kit (clutch plate and disk), friction plate are assembled. 15. Engine Testing 16. Then quality of engine is checked and visual inspection of engine is done. If any fault is found then engine is sent for repair. Then finally engine is sent to the SCM (supply chain management).
  • 50. Casting Shop In casting shop cylinder head and cylinder blocks are manufactured by casting process. In this shop two casting machines are here. 1 HPDC (High Pressure Die casting): Cylinder blocks are manufactured by High Pressure Die Casting because they are heavy in weight. 2 LPDC (Low Pressure Die Casting): Cylinder heads are manufactured by Low Pressure Die Casting Process. HDPC process is same as LDPC. Only difference is that pressure and die moving velocity is higher in HDPC i.e. 60-70 Mpa and 308 m/s.
  • 51. LPDC (Low Pressure Die Casting) Cont. • • • • • • • • • • • • • • • • • • • Total 16 machines (3 LPDC) are here. Raw material (ACD 12 Al alloy Rectangular rods)is poured into Melting Furnace where it melts. Then molten material is transferred to holding zone to maintain the molten material temperature. Temperature of Holding Zone is maintained at 700 degree Celsius. Melting rate is 1.5 ton/hr. LPG (fuel for combustion) furnace is used for melting where burner melt the raw material. LPG is supplied at 1bar and air is supplied by blower. Melting and Holding zone individual air blower is used. At degreasing zone unwanted trapped gasses are removed from the molten material. Then molten material is poured into LPDC machine Using LPG die is pre heated before install in LPDC machine Then casting is done in LPDC. The temperature of molten material is maintained by electrical heaters in LPDC machine. Removing the sand from casting surface. Finishing operation of casting. Hardening of casting. Quality checking for cracks. Visual inspection. Air leakage checking
  • 52. Conclusion On the whole, this internship was a very useful experience. I have gained new knowledge, skills and met many new people. I achieved several of my learning goals, however for some the conditions did not permit. I got insight into professional practice. I learned the different facets of working. I experienced that work management, is an important factor for the progress of projects. Related to my study I learned more about the casting, stamping, machining, and welding. The safety arrangements are very effective. I really very impressed with safety arrangements. I have seen that all the employees are very aware of safety. It is a very important aspect of the conservation of energy. Energy saving arrangements is also very effective. The internship was also good to find out what my strengths and weaknesses are. This helped me to define what skills and knowledge I have to improve in the coming time. At last this internship has given me new insights and motivation to pursue a career in automotive field.