CONTENTS
īļ    1. INTRODUCTION ABOUT KOTA SUPER THERMAL POWER STATION
īļ    2. ENERGY GENERATED IN KSTPS
īļ    3. ELECTRICITY GENERATION AT KSTPS
īļ    4. COAL HANDING PLANT
īļ    5. PULVERISING PLANT
īļ    6. BOILER
īļ    7. TURBINE
īļ    8. DC SYSTEM
īļ    9. ECONOMISER
īļ   10. GENARATOR
īļ   11. TRANSFORMER
īļ   12. CHIMNEY
īļ   13. COOLING TOWER
īļ   14. D.M. WATER PLANT
īļ   15. WATER TREATMENT PLANT
īļ   16. CONTROL ROOM
īļ   17. PROTECTION
īļ   18. CONCLUSION
Introduction
  LOCATION           SAKATPURA,KOTA

  K.T.P.S is designed in four stages

      STAGE    l      2 x 110MW
      STAGE    ll     2 x 210MW
      STAGE    lll    1 x 210MW
      STAGE    lV     1 x 195MW
       TOTAL                1045MW
ENERGY GENERATED IN KSTPS
īļ TOTAL CAPACITY                            =1045MW
īļ TOTAL GENERATED ELECTRICITY PER HOUR      =1045*HR.
                                            =10.45 LACS UNITS
īļ   AMOUNT OF ENERGY GENERATED DAILY        =10.45*24
                                            =250.8 LACS UNITS
īļ   COAL REQUIRED OF ONE UNIT               =0.5 KG.
īļ   SO AMOUNT OF COAL(PER DAY)              =0.5*250.8*100000 KG.
                                             =125.4 MILLION KG.
īļ   5 TRAINS OF COAL SUPPLY THIS AMOUNT OF COAL DAILY
ELECTRICITY GNERATION AT KSTPS
THERMAL POWER STATION BURNS
THE FUEL AND USE THE RESULTENT
HEAT TO RAISE THE STEAM WHICH
DRIVES THE TURBO GENERATOR
EXHAUT
                        COAL STORAGE

                                             FORCED DRAFT FAN

                         COAL                                       C
                         HANDLING                                   H
                                                                    I
                                                                    M
                                       AIR                          N
ASH                                            AIR
STORAGE
              ASH
              HANDING
                        BOILER                 PREHEATER
                                                                    E
                                                                    Y


                        FURNANCE

                                             SUPER HEATER
      RAW
      WATER
      TANK


              FWH       CONDESER             TURBINE




                                                      CKT BREAKER
COAL HANDLING PLANT
īļ THE COAL FOR RECEIVED FROM BHARAT COKING COAL
  LTD. DHANBAD & SOUTH EASTERN COAL FIELD LTD.
  BILAS PUR(M.P.) BY TRAIN.FOLLOWING PERMUTATION AND
  COMBINATION OF OPERATION ARE POSSIBLE WITH INSTALLED
  SYS.
īļ 1. TO TRANSFER ALL CRUSHED COAL RECIVED FROM CRUSHER
  HOUSE TO LIVE STORAGE PIPE.
īļ 2. TO TRANSFER PART OF RECEIVED CRUSHED COAL TO PLANT
  & TO BALANCE TO STROAGE YARD.
īļ 3. TO DELIVER THE RAW COAL BUNKERS PAR & RECEIVED
  CRUSHED COAL MIXED WITH BALANCE COAL FROM THE LIVE
  STROAGE PIPE.
īļ 4.TO TRANSFER THE PLANT CRUSHED COAL AT 750T/HR.FROM
  THE RECLAIM LIVE PIPE AND SIMULTANEOUSLY STOCK AND
  S/RAD.
COAL HANDLING PLANT
  Raw coal from           To KSTPS               Wagon
  Bharat coking           from Gudla             Tripler
  coal ltd (MP)           via a single
                          line track
          Coal mills
                                                 Vibrators

Boilers
            Raw Coal
             Feeder
                                               Crusher house
               Junction                       (20mm x 20mm)
Bunkers          tower           Stock yard
PULVERISING PLANT
īļ IN MODERN THERMAL POWER PLANTS COAL IS
  PULVERISED I.E. GROUND TO DUST LIKE SIZE AND
  CARRIED TO THE FURNACE IN A STREAM OF A HOT
  AIR.
īļ ADVANTAGES:-

īƒ˜ THE RATE OF COMBUSTION CAN BE CONTROLLED AND CHANGED
  QUICKLY TO MEET THE VARYING LOAD.
īƒ˜ THE PERCENTAGE OF EXCESS AIR REQUIRED IS LOW.
īƒ˜ AUTOMATIC COMBUSTION CONTROL CAN BE USED.
īƒ˜ A WIDE VARIETY OF EVEN LOW GRADE COALS CAN BE USED.
BOILER
 īļBOILER IS A PLACE THE WATER IS BEING
  CONVERTED INTO STEAM WITH BURNING
  OF COAL.

 īļWATER TUBE BOILER USED IN KSTPS.
TURBINE
 Turbine is a machine in which a shaft is
 rotated steadily by impact or reaction of
 current or stream of working   substance
 (steam,air,water,gases etc.).

 It convert the PE or KE of the working
 substance into     mechanical power by
 virtue of dynamic action of working
 substance
Cont..
  Steam turbine is used at KTPS




  PIC 1: Closer look of steam turbine at KTPS.
DC SYSTEM
īļDC POWER CAN BE STORED IN A BETTERY
AND USE IN EMERGENCY.
īļEMERGENCY LIGHTNING,CONTROL & RELAY
EQIPMENT,COMMUNICATION ETC.
īļMETHOD OF OBTAINING DC
īƒ¨RECTIFIER
    * WHICH CONVERT AC INTO DC
    * BASIC COMPONENTS ARE DIODE
īƒ¨ CLASSIFICATION
    *HALF WAVE RECTIFIER
    *FULL WAVE RECTIFIER
ECONOMISER
                        FLUE GASES




  FEED WATER OUTLET




                                     FEED WATER INLET




                       FLUE GASES


FLUE GASAE COMING OUT OF THE BOILER CARRY LOT
OF HEAT. AN ECONOMISER EXTRACTS A PART OF
THESE HEAT FROM THE FLUE GASES AND USES FOR HEATING
FEED WATER AND IMPROVERS EFFICIENCY OF PLANT.
Cont..
Efficiency increased by the Economiser



        33
      32.5
        32
      31.5
                                   Without
        31                         Economiser
      30.5                         With
        30                         Economiser
      29.5
        29
      28.5
                  1st Qtr
GENERATOR
īļGENERATOR IS A M/C WHICH CONVERT
 MECHANICAL ENERGY INTO ELECTRICAL
 ENERGY.THE GENERATOR HAS STATOR IN
 GAS COLINGTH CONSTRUCTION
 ENCLOSING THE STATOR WINDING
 ,CORE,&HYDROGEN COOLERS.
TRANSFORMER
īļ X-MER IS A STATIC DEVICE WHICH STEP UP OR
  DOWN THE VOLTAGE WITHOUT ANY CHANGE IN
  FREQUENCY.

īļ THERE ARE VARIOUS X-MER IS USED FOR
  VARIOUS PURPOSES.

  1.GENERATING X-MER
  2.UNIT AUXILARY X-MER
  3.INSTRUMENT X-MER
  (a) CURRENT X-MER      (b) POTENTIOL X-MER
  4.CAPACITOR VOLTAGE X-MER
CHIMNEY

A SINGLE CHIMNEY OF 180M HEIGHT WITH TWO
SEPRATE
FLUES FOR THE TWO UNIT EACH OF 110MW IS
PROVIDED.
 SIMILARLY ANOTHER CHIMNEY WITH THREE SEPARATE
FLUES IS ALSO PROVIDED FOR ANOTHER THREE UNITS
OF 210 MW EACH AND ONE CHIMNEY FOR THE SIXTH
UNIT OF 195MW IS ALSO CONSTRUCTED IN 2003.
COOLING TOWER
īļA COOLING TOWER IS A STEEL OR COCRETE
 HYPERBOLIC STRUCTURE HAVING A
 RESERVOIR AT THE BOTTOM FOR STORAGE
 OF COOLED WATER. WARM WATER IS LED TO
 THE TOP. AIR FLOWS FROM THE BOTTOM TO
 THE TOP. THE WATER DROPS FALLING FROM
 THE TOP COME IN CONTACT WITH AIR, LOSE
 HEAT TO THE AIR AND GET COOLED.
D.M. WATER PLANT
īļIN D.M. WATER PLANT THE DE-
 MINERIALIZATION OF WATER USED IN
 STEAM GENERATION IN BOILER IS
 DONE, SO THAT THE IMPURITIES AND
 UNWANTED MINERALS IN THAT WATER
 MAY NOT CAUSE ANY HARM TO BOILER
 AND TURBINE.
WATER TREATMENT PLANT
īļTHE PRINCIPLE PROBLEM IN HIGH PRESSURE
BOILER ARE CORROSION AND STEAM
IMPURITIES.THESE IMPURITIES FORM
DEPOSITE OVER TURBINE BLADES AND
NOZZELES.
īļCORROSION COSTS POWER STATION CRORES
RUPEES IN REPAIR.
SPACIFICATION OF SCREEN
   WATER PUMPS
īļPUMP TYPE   HORIZONTAL,CENTRIFUGAL,SINGLE STAGE
īļCAPACITY    275 FT.
īļPOWER       110 H.P.
īļSPEED       2900 RPM
īļMOTOR       25 H.P.,159 AMP.,VOLTAGE 415 V.
īļLUBRICATION GREASE
CONTROL ROOM
īļIN CONTROL ROOM VARIOUS
CONTROLS ARE PROVIDED.
SIMULTANEOUELY VARIOUS ARE
MADE.VARIOUS RELAYS ARE
PROVIDED HERE.
īļTHE CONTROL ROOM HAS A SET OF
PARAMETERS PANEL FOR INDICATING
AND RECORDING VARIOUS DATAS.
CONTROL ROOM
CONTROL ROOM PANELS
CP-I
(1)FAN CONTROL DESK
a- I D FAN
b-F D FAN
c- P AFAN
(2)PRESSURE CONTROL DESK
a FURNACE PRESSURE
b PRIMARY HEADER PRESSURE
CP-II
FUEL CONTROL DESK
(a) COAL OIL FLOW
(b) OIL PRESSURE
(c) TEMPERATURE OF MILL
(d) FLOW OF AIR
(e) DIFFERENTIAL PRESSURE OF MILL
CP-III
(a) DRUM LEVEL CONTROL
(b) FLOW OF STEAM &WATER
(c) PRESSURE OF STEAM&WATER
(d) TEMPERATURE OF STEAM &WATER
CP-IV
TURBINE DESK
( a) PRESSURE CONTREOL,LOAD MADE CONTROL
(b) SPEED CONTROL
(C)EJECTORS,CONTROL VALVES,STOP VALVES &DEVITORS
CP-V
GENERATOR CONTROL PANEL
PROTECTION
īļ   DIFERENT TYPES OF PROTECTION CAN BE LISTED AS
īļ   (1)CURRENT OPERATED PROTECTION
īļ   (2)DIFFERENTIAL PROTECTION
īļ   (3)VOLTAGE OPERATED PROTECTION
īļ   (4)IMPEDANCE TYPE PROTECTION
īļ   (5)FREQENCY TYPE PROTECTION
CONCLUSION
īļIt was a knowledgeable experience while
 taking practical training at KOTA SUPER
 POWER THERMAL STATION .

 It proved an opportunity for encounter
  with such huge machines like tippler
  ,turbine and generator. But there are few
  factors that require special mention.
  training proved quite faithful.
THANK YOU

More Related Content

What's hot

Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC RamagunadamAbhinay Angari
 
Thermal power plant Khedr, Hisar, Haryana
Thermal power plant Khedr, Hisar, HaryanaThermal power plant Khedr, Hisar, Haryana
Thermal power plant Khedr, Hisar, HaryanaEesha Gupta
 
kota Super Thermal Power Station training ppt
kota Super Thermal Power Station training pptkota Super Thermal Power Station training ppt
kota Super Thermal Power Station training pptEr. Aman Agrawal
 
Kota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurKota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurAbhishek Mathur
 
kota super thermal power plant (kstps)
kota super thermal power plant (kstps)kota super thermal power plant (kstps)
kota super thermal power plant (kstps)vaibyfrndz
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plantsagar20jain
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Shubham Thakur
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Abhijeet Thakur
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant FamiliarizationAanand Kumar
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantAbhishek Kumar
 
01 regenerative feed heating
01 regenerative feed heating01 regenerative feed heating
01 regenerative feed heatingAnil Palamwar
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantAshvani Shukla
 
Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation ReportManish Kumar
 
Thermal power station
Thermal power stationThermal power station
Thermal power stationvishal gupta
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantRabi Kumar
 

What's hot (20)

Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
Thermal power plant Khedr, Hisar, Haryana
Thermal power plant Khedr, Hisar, HaryanaThermal power plant Khedr, Hisar, Haryana
Thermal power plant Khedr, Hisar, Haryana
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
 
kota Super Thermal Power Station training ppt
kota Super Thermal Power Station training pptkota Super Thermal Power Station training ppt
kota Super Thermal Power Station training ppt
 
Kota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathurKota Thermal Training report by Abhishk mathur
Kota Thermal Training report by Abhishk mathur
 
kota super thermal power plant (kstps)
kota super thermal power plant (kstps)kota super thermal power plant (kstps)
kota super thermal power plant (kstps)
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
 
Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant Familiarization
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
 
01 regenerative feed heating
01 regenerative feed heating01 regenerative feed heating
01 regenerative feed heating
 
Training Report, Thermal Power Plant Report, KSTPS Report
Training Report, Thermal Power Plant Report, KSTPS ReportTraining Report, Thermal Power Plant Report, KSTPS Report
Training Report, Thermal Power Plant Report, KSTPS Report
 
Ntpc report harsh
Ntpc report  harshNtpc report  harsh
Ntpc report harsh
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation Report
 
Thermal power station
Thermal power stationThermal power station
Thermal power station
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 

Similar to kstps summer training 36 slides

K.s.t.p.s. ppt
K.s.t.p.s.  pptK.s.t.p.s.  ppt
K.s.t.p.s. pptKamlesh Sahu
 
Pintu raj
Pintu rajPintu raj
Pintu rajritchaubey
 
ppt on kstps 2016
ppt on kstps 2016ppt on kstps 2016
ppt on kstps 2016Apoorva Sharma
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plantR G Sanjay Prakash
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminarCentury Rayon
 
THERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALITHERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALIMahendra Magre
 
Presentation on kstps
Presentation on kstps Presentation on kstps
Presentation on kstps bhanu meena
 
Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Stationpukhraj palariya
 
Chandrapura thermal power station (CTPS)--DVC_Industrial Training
Chandrapura thermal power station (CTPS)--DVC_Industrial TrainingChandrapura thermal power station (CTPS)--DVC_Industrial Training
Chandrapura thermal power station (CTPS)--DVC_Industrial TrainingPragya wan
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesVaibhav Paydelwar
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingRadhe Shyam
 
Lovely Amit
Lovely AmitLovely Amit
Lovely AmitAmit Kumar
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant pptPrakash Jarotia
 
Powerplant 150830061520-lva1-app6892
Powerplant 150830061520-lva1-app6892Powerplant 150830061520-lva1-app6892
Powerplant 150830061520-lva1-app6892cit-cit
 
Power plant Engineering ppt
Power plant Engineering ppt Power plant Engineering ppt
Power plant Engineering ppt Prabhat Kumar
 
kota super thermal power station
kota super thermal power station kota super thermal power station
kota super thermal power station aryanmewara2
 

Similar to kstps summer training 36 slides (20)

K.s.t.p.s. ppt
K.s.t.p.s.  pptK.s.t.p.s.  ppt
K.s.t.p.s. ppt
 
Pintu raj
Pintu rajPintu raj
Pintu raj
 
ppt on kstps 2016
ppt on kstps 2016ppt on kstps 2016
ppt on kstps 2016
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminar
 
THERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALITHERMAL POWER PLANT PARALI
THERMAL POWER PLANT PARALI
 
Presentation on kstps
Presentation on kstps Presentation on kstps
Presentation on kstps
 
Mukesh 53
Mukesh 53Mukesh 53
Mukesh 53
 
Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Station
 
Chandrapura thermal power station (CTPS)--DVC_Industrial Training
Chandrapura thermal power station (CTPS)--DVC_Industrial TrainingChandrapura thermal power station (CTPS)--DVC_Industrial Training
Chandrapura thermal power station (CTPS)--DVC_Industrial Training
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial training
 
Attachment.doc
Attachment.docAttachment.doc
Attachment.doc
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
Niket
NiketNiket
Niket
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Powerplant 150830061520-lva1-app6892
Powerplant 150830061520-lva1-app6892Powerplant 150830061520-lva1-app6892
Powerplant 150830061520-lva1-app6892
 
Power plant Engineering ppt
Power plant Engineering ppt Power plant Engineering ppt
Power plant Engineering ppt
 
ppt.pptx
ppt.pptxppt.pptx
ppt.pptx
 
kota super thermal power station
kota super thermal power station kota super thermal power station
kota super thermal power station
 

Recently uploaded

How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Táģ”NG ÔN TáēŦP THI VÀO LáģšP 10 MÔN TIáēžNG ANH NĂM HáģŒC 2023 - 2024 CÓ ĐÁP ÁN (NGáģŽ Â...
Táģ”NG ÔN TáēŦP THI VÀO LáģšP 10 MÔN TIáēžNG ANH NĂM HáģŒC 2023 - 2024 CÓ ĐÁP ÁN (NGáģŽ Â...Táģ”NG ÔN TáēŦP THI VÀO LáģšP 10 MÔN TIáēžNG ANH NĂM HáģŒC 2023 - 2024 CÓ ĐÁP ÁN (NGáģŽ Â...
Táģ”NG ÔN TáēŦP THI VÀO LáģšP 10 MÔN TIáēžNG ANH NĂM HáģŒC 2023 - 2024 CÓ ĐÁP ÁN (NGáģŽ Â...Nguyen Thanh Tu Collection
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 

Recently uploaded (20)

How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Táģ”NG ÔN TáēŦP THI VÀO LáģšP 10 MÔN TIáēžNG ANH NĂM HáģŒC 2023 - 2024 CÓ ĐÁP ÁN (NGáģŽ Â...
Táģ”NG ÔN TáēŦP THI VÀO LáģšP 10 MÔN TIáēžNG ANH NĂM HáģŒC 2023 - 2024 CÓ ĐÁP ÁN (NGáģŽ Â...Táģ”NG ÔN TáēŦP THI VÀO LáģšP 10 MÔN TIáēžNG ANH NĂM HáģŒC 2023 - 2024 CÓ ĐÁP ÁN (NGáģŽ Â...
Táģ”NG ÔN TáēŦP THI VÀO LáģšP 10 MÔN TIáēžNG ANH NĂM HáģŒC 2023 - 2024 CÓ ĐÁP ÁN (NGáģŽ Â...
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 

kstps summer training 36 slides

  • 1. A Seminar on Practical Training Taken at KOTA SUPER THERMAL POWER STATION During 21th July 2008 to 4th Augest 2008 By DIVESH KACOLIA IV B.E. VII Sem. Electrical Engg. in the partial fulfillment for award the degree of Bachelor of Engineering From University of Rajasthan, Jaipur Submitted to Department of Electrical Engineering Jaipur Engineering College & Research Center Session 2008-2009
  • 2. CONTENTS īļ 1. INTRODUCTION ABOUT KOTA SUPER THERMAL POWER STATION īļ 2. ENERGY GENERATED IN KSTPS īļ 3. ELECTRICITY GENERATION AT KSTPS īļ 4. COAL HANDING PLANT īļ 5. PULVERISING PLANT īļ 6. BOILER īļ 7. TURBINE īļ 8. DC SYSTEM īļ 9. ECONOMISER īļ 10. GENARATOR īļ 11. TRANSFORMER īļ 12. CHIMNEY īļ 13. COOLING TOWER īļ 14. D.M. WATER PLANT īļ 15. WATER TREATMENT PLANT īļ 16. CONTROL ROOM īļ 17. PROTECTION īļ 18. CONCLUSION
  • 3. Introduction LOCATION SAKATPURA,KOTA K.T.P.S is designed in four stages STAGE l 2 x 110MW STAGE ll 2 x 210MW STAGE lll 1 x 210MW STAGE lV 1 x 195MW TOTAL 1045MW
  • 4. ENERGY GENERATED IN KSTPS īļ TOTAL CAPACITY =1045MW īļ TOTAL GENERATED ELECTRICITY PER HOUR =1045*HR. =10.45 LACS UNITS īļ AMOUNT OF ENERGY GENERATED DAILY =10.45*24 =250.8 LACS UNITS īļ COAL REQUIRED OF ONE UNIT =0.5 KG. īļ SO AMOUNT OF COAL(PER DAY) =0.5*250.8*100000 KG. =125.4 MILLION KG. īļ 5 TRAINS OF COAL SUPPLY THIS AMOUNT OF COAL DAILY
  • 5.
  • 6. ELECTRICITY GNERATION AT KSTPS THERMAL POWER STATION BURNS THE FUEL AND USE THE RESULTENT HEAT TO RAISE THE STEAM WHICH DRIVES THE TURBO GENERATOR
  • 7.
  • 8. EXHAUT COAL STORAGE FORCED DRAFT FAN COAL C HANDLING H I M AIR N ASH AIR STORAGE ASH HANDING BOILER PREHEATER E Y FURNANCE SUPER HEATER RAW WATER TANK FWH CONDESER TURBINE CKT BREAKER
  • 9. COAL HANDLING PLANT īļ THE COAL FOR RECEIVED FROM BHARAT COKING COAL LTD. DHANBAD & SOUTH EASTERN COAL FIELD LTD. BILAS PUR(M.P.) BY TRAIN.FOLLOWING PERMUTATION AND COMBINATION OF OPERATION ARE POSSIBLE WITH INSTALLED SYS. īļ 1. TO TRANSFER ALL CRUSHED COAL RECIVED FROM CRUSHER HOUSE TO LIVE STORAGE PIPE. īļ 2. TO TRANSFER PART OF RECEIVED CRUSHED COAL TO PLANT & TO BALANCE TO STROAGE YARD. īļ 3. TO DELIVER THE RAW COAL BUNKERS PAR & RECEIVED CRUSHED COAL MIXED WITH BALANCE COAL FROM THE LIVE STROAGE PIPE. īļ 4.TO TRANSFER THE PLANT CRUSHED COAL AT 750T/HR.FROM THE RECLAIM LIVE PIPE AND SIMULTANEOUSLY STOCK AND S/RAD.
  • 10. COAL HANDLING PLANT Raw coal from To KSTPS Wagon Bharat coking from Gudla Tripler coal ltd (MP) via a single line track Coal mills Vibrators Boilers Raw Coal Feeder Crusher house Junction (20mm x 20mm) Bunkers tower Stock yard
  • 11.
  • 12. PULVERISING PLANT īļ IN MODERN THERMAL POWER PLANTS COAL IS PULVERISED I.E. GROUND TO DUST LIKE SIZE AND CARRIED TO THE FURNACE IN A STREAM OF A HOT AIR. īļ ADVANTAGES:- īƒ˜ THE RATE OF COMBUSTION CAN BE CONTROLLED AND CHANGED QUICKLY TO MEET THE VARYING LOAD. īƒ˜ THE PERCENTAGE OF EXCESS AIR REQUIRED IS LOW. īƒ˜ AUTOMATIC COMBUSTION CONTROL CAN BE USED. īƒ˜ A WIDE VARIETY OF EVEN LOW GRADE COALS CAN BE USED.
  • 13. BOILER īļBOILER IS A PLACE THE WATER IS BEING CONVERTED INTO STEAM WITH BURNING OF COAL. īļWATER TUBE BOILER USED IN KSTPS.
  • 14.
  • 15. TURBINE Turbine is a machine in which a shaft is rotated steadily by impact or reaction of current or stream of working substance (steam,air,water,gases etc.). It convert the PE or KE of the working substance into mechanical power by virtue of dynamic action of working substance
  • 16. Cont.. Steam turbine is used at KTPS PIC 1: Closer look of steam turbine at KTPS.
  • 17. DC SYSTEM īļDC POWER CAN BE STORED IN A BETTERY AND USE IN EMERGENCY. īļEMERGENCY LIGHTNING,CONTROL & RELAY EQIPMENT,COMMUNICATION ETC. īļMETHOD OF OBTAINING DC īƒ¨RECTIFIER * WHICH CONVERT AC INTO DC * BASIC COMPONENTS ARE DIODE īƒ¨ CLASSIFICATION *HALF WAVE RECTIFIER *FULL WAVE RECTIFIER
  • 18. ECONOMISER FLUE GASES FEED WATER OUTLET FEED WATER INLET FLUE GASES FLUE GASAE COMING OUT OF THE BOILER CARRY LOT OF HEAT. AN ECONOMISER EXTRACTS A PART OF THESE HEAT FROM THE FLUE GASES AND USES FOR HEATING FEED WATER AND IMPROVERS EFFICIENCY OF PLANT.
  • 19. Cont.. Efficiency increased by the Economiser 33 32.5 32 31.5 Without 31 Economiser 30.5 With 30 Economiser 29.5 29 28.5 1st Qtr
  • 20. GENERATOR īļGENERATOR IS A M/C WHICH CONVERT MECHANICAL ENERGY INTO ELECTRICAL ENERGY.THE GENERATOR HAS STATOR IN GAS COLINGTH CONSTRUCTION ENCLOSING THE STATOR WINDING ,CORE,&HYDROGEN COOLERS.
  • 21. TRANSFORMER īļ X-MER IS A STATIC DEVICE WHICH STEP UP OR DOWN THE VOLTAGE WITHOUT ANY CHANGE IN FREQUENCY. īļ THERE ARE VARIOUS X-MER IS USED FOR VARIOUS PURPOSES. 1.GENERATING X-MER 2.UNIT AUXILARY X-MER 3.INSTRUMENT X-MER (a) CURRENT X-MER (b) POTENTIOL X-MER 4.CAPACITOR VOLTAGE X-MER
  • 22.
  • 23. CHIMNEY A SINGLE CHIMNEY OF 180M HEIGHT WITH TWO SEPRATE FLUES FOR THE TWO UNIT EACH OF 110MW IS PROVIDED. SIMILARLY ANOTHER CHIMNEY WITH THREE SEPARATE FLUES IS ALSO PROVIDED FOR ANOTHER THREE UNITS OF 210 MW EACH AND ONE CHIMNEY FOR THE SIXTH UNIT OF 195MW IS ALSO CONSTRUCTED IN 2003.
  • 24.
  • 25. COOLING TOWER īļA COOLING TOWER IS A STEEL OR COCRETE HYPERBOLIC STRUCTURE HAVING A RESERVOIR AT THE BOTTOM FOR STORAGE OF COOLED WATER. WARM WATER IS LED TO THE TOP. AIR FLOWS FROM THE BOTTOM TO THE TOP. THE WATER DROPS FALLING FROM THE TOP COME IN CONTACT WITH AIR, LOSE HEAT TO THE AIR AND GET COOLED.
  • 26.
  • 27. D.M. WATER PLANT īļIN D.M. WATER PLANT THE DE- MINERIALIZATION OF WATER USED IN STEAM GENERATION IN BOILER IS DONE, SO THAT THE IMPURITIES AND UNWANTED MINERALS IN THAT WATER MAY NOT CAUSE ANY HARM TO BOILER AND TURBINE.
  • 28. WATER TREATMENT PLANT īļTHE PRINCIPLE PROBLEM IN HIGH PRESSURE BOILER ARE CORROSION AND STEAM IMPURITIES.THESE IMPURITIES FORM DEPOSITE OVER TURBINE BLADES AND NOZZELES. īļCORROSION COSTS POWER STATION CRORES RUPEES IN REPAIR.
  • 29. SPACIFICATION OF SCREEN WATER PUMPS īļPUMP TYPE HORIZONTAL,CENTRIFUGAL,SINGLE STAGE īļCAPACITY 275 FT. īļPOWER 110 H.P. īļSPEED 2900 RPM īļMOTOR 25 H.P.,159 AMP.,VOLTAGE 415 V. īļLUBRICATION GREASE
  • 30.
  • 31. CONTROL ROOM īļIN CONTROL ROOM VARIOUS CONTROLS ARE PROVIDED. SIMULTANEOUELY VARIOUS ARE MADE.VARIOUS RELAYS ARE PROVIDED HERE. īļTHE CONTROL ROOM HAS A SET OF PARAMETERS PANEL FOR INDICATING AND RECORDING VARIOUS DATAS.
  • 32. CONTROL ROOM CONTROL ROOM PANELS CP-I (1)FAN CONTROL DESK a- I D FAN b-F D FAN c- P AFAN (2)PRESSURE CONTROL DESK a FURNACE PRESSURE b PRIMARY HEADER PRESSURE CP-II FUEL CONTROL DESK (a) COAL OIL FLOW (b) OIL PRESSURE (c) TEMPERATURE OF MILL (d) FLOW OF AIR (e) DIFFERENTIAL PRESSURE OF MILL CP-III (a) DRUM LEVEL CONTROL (b) FLOW OF STEAM &WATER (c) PRESSURE OF STEAM&WATER (d) TEMPERATURE OF STEAM &WATER CP-IV TURBINE DESK ( a) PRESSURE CONTREOL,LOAD MADE CONTROL (b) SPEED CONTROL (C)EJECTORS,CONTROL VALVES,STOP VALVES &DEVITORS CP-V GENERATOR CONTROL PANEL
  • 33.
  • 34. PROTECTION īļ DIFERENT TYPES OF PROTECTION CAN BE LISTED AS īļ (1)CURRENT OPERATED PROTECTION īļ (2)DIFFERENTIAL PROTECTION īļ (3)VOLTAGE OPERATED PROTECTION īļ (4)IMPEDANCE TYPE PROTECTION īļ (5)FREQENCY TYPE PROTECTION
  • 35. CONCLUSION īļIt was a knowledgeable experience while taking practical training at KOTA SUPER POWER THERMAL STATION . It proved an opportunity for encounter with such huge machines like tippler ,turbine and generator. But there are few factors that require special mention. training proved quite faithful.