POWER LINE CARRIER 
COMMUNICATION 
PRESENTED BY 
MOHIT AGARWAL 
CGI/ECE/ 7TH SEM/15
INDEX 
• TRAINING OVERVIEW 
• INTRODUCTION 
• BASIC PRINCIPAL OF PLCC 
• SIGNALS FOR PLCC 
• COMPONENTS 
• PLCC STATION 
• BLOCK DIAGRAM OF 
CIRCUIT 
• BASIC COUPLING 
ARRANGEMENT 
• MAINTAINENCE AND 
FAULT TRACKING 
• ADVANTAGE 
• LIMITATIONS 
• CONCLUSION
TRAINING OVERVIEW 
 Name Of Industry : Rajasthan Rajya Vidyut Prasaran Nigam 
Limited 
 Location: 220KV GSS PREMISES, RIICO INDUSTRIAL 
AREA, BHARATPUR 
 Reporting Officer: A. K. MITTAL 
 Duration of training : 3rd June to 18th July, 2014 
 Department of training :Electronics & Communication
INTRODUCTION 
 PLCC is the method of transmitting information 
using power network. 
 Its equipment are used for point-to-point 
communication over high voltage power lines 
 It’s equipments are used to send/receive 
speech/data/teleprotection signals. 
 It’s the most economical and reliable method of 
communication for medium or long distance.
BASIC PRINCIPAL OF PLCC 
 The telephone communication system cannot be 
directly connected to the high voltage lines so, 
we use suitably designed coupling devices for 
communication. 
 These usually consist of high voltage capacitor 
used in conjunction with suitable line matching 
unit (LMU) for matching the impedance of line 
to that of the coaxial cable connecting the unit 
to the PLC transmiter-receiver equipment.
SIGNALS FOR PLCC 
The signal that can be transmitted over the PLCC 
include 
 Speech signal (300-2000Hz ) 
 Data signal (2000-3000Hz)
Components 
• PLCC station 
• Line matching Unit 
• CVT/CC 
• Earth Switch 
• Lightening Arrestor 
• Wave Trap 
• Co axial Cable 
7 
EPAX 
RF carrier 
(40-500kHz) 
Power Line 
(50Hz) 
C.C 
RTU 
L.T 
PLCC TERMINAL
PLCC station 
• It is the station where (modulation)Transmission , 
Receiving (Demodulation ) , Amplification and 
Filtration are performed. 
• Transmitter : 
8
Receiver :
CVT/CC 
• It is Control Voltage transformer/ Coupling capacitor. 
• This is used for blocking the high voltage entering 
to the PLCC equipment. 
Earth Switch 
• This is used at the time of maintenance of LMU.
Lightening Arrestor 
• Used to protect the system from the 
damaging effect of lightening. 
• It works as an insulator between light 
and the power line. 
Co axial Cable 
• This is used for inter connection 
between PLCC & L.M.U for carrying the 
high frequency signal.
Line Matching Unit 
The out-put of PLCC is connected to the matching unit 
before the power lines to achieve the proper impedance 
matching and protection in between PLCC Equipments 
and power line. 
Module Cabinet
Wave Trap 
• Consists of a number choke 
coils connected in series. 
• It is connected in series with the 
power line and prevents carrier 
current from 
entering to the power 
equipment. 
• Offer negligible impedance to 
power frequency & high 
impedance to carrier frequency. 
PLC signal 
Blocking 
HV Line 
Substation 
Power 
energy 
PLC 
Signal
Block diagram 0f Circuit
BASIC COUPLING ARRANGEMENT 
 The power frequency and radio frequency currents are 
sorted by this arrangement . 
 Carrier currents are prevented to enter station bus by 
wave trap & power frequency current is blocked by 
coupling capacitor, from the PLC equipment. 
 Hence we get power current at the bus & carrier current 
at PLC equipment.
BATTERY CHARGER 
• PLCC work on rectified AC or main supply, when supply 
goes off, we make use of a device for proper functioning 
of PLCC called battery charger. 
• This is the device that provide supply to the PLCC 
equipment for uninterrupted working. 
• It provide DC to the panel by battery. 
16
Maintenance & Fault Tracking 
• FAULT ANALYSIS 
In fault analysis the faulty devices are checked in 
this serial or manner:- 
1. Telephone or tale operation signal 
2. Cabling low frequency circuit or DC power supply 
3. PLC equipment 
4. HF transmission path
MAINTAINANCE AND FAULT TRACING 
PROCEDURE 
1. The control circuit boards should be inserted far 
firmly. 
2. The charger should be switch off once in every 
month. 
3. The battery terminal should be connected first and 
the AC input after that. 
4. All mounting bolts should be checked before 
energizing.
Advantages 
 No separate wires are needed for 
communication purpose. 
 Both communication and power transfer can 
be possible on same circuit. 
 Power lines provides the shortest route 
between the power station. 
 Increased reliability. 
 Lower attenuation over long distance. 
 Implementation cost is reduced.
Limitations 
 Reflection are produced on spur lines connected 
to high voltage line. This increased attenuation 
and create other problem. 
 High voltage lines have transformer connections, 
which attenuate carrier currents. 
 Noise introduced by power lines is far more than 
in case of telephone lines.
Key learning 
• PLCC is mainly used for telecommunication, tele-protection 
and tele-monitoring between electrical 
substations through power lines. 
• In a PLCC system the communication is established 
through the power line. 
• The carrier frequency range is allocated to include 
the audio signal, protection and the pilot frequency.
CONCLUSION 
The Training was based on communication over 
existing power line.
ANY QUERIES ?

More Related Content

What's hot

power line carrier communication
power line carrier communicationpower line carrier communication
power line carrier communicationLAVANYA d
 
Plcc presentation
Plcc presentationPlcc presentation
Plcc presentationMAHESH SONI
 
Electricity theft control
Electricity theft controlElectricity theft control
Electricity theft controlAffable Mee
 
substation ppt at gail by ratnesh singh
substation ppt at gail by ratnesh singhsubstation ppt at gail by ratnesh singh
substation ppt at gail by ratnesh singhRatnesh Singh
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier CommunicationBiswajit Pratihari
 
Power line carrier communication,ETL41/42
Power line carrier communication,ETL41/42Power line carrier communication,ETL41/42
Power line carrier communication,ETL41/42Sreenivas Gundu
 
Reactive power management and voltage control by using statcom
Reactive power management and voltage control by using statcomReactive power management and voltage control by using statcom
Reactive power management and voltage control by using statcomHussain Ali
 
Loading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission LinesLoading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission LinesRaja Adapa
 
Power Line Communication
Power Line CommunicationPower Line Communication
Power Line CommunicationPiyush Chand
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training pptShubham Patel
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptAshutosh Srivastava
 
Differential Protection Relay
DifferentialProtection RelayDifferentialProtection Relay
Differential Protection Relaykishore kish
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationRrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationDushyant Singh Chouhan
 

What's hot (20)

power line carrier communication
power line carrier communicationpower line carrier communication
power line carrier communication
 
Plcc presentation
Plcc presentationPlcc presentation
Plcc presentation
 
Plcc ppt1
Plcc ppt1Plcc ppt1
Plcc ppt1
 
Electricity theft control
Electricity theft controlElectricity theft control
Electricity theft control
 
substation ppt at gail by ratnesh singh
substation ppt at gail by ratnesh singhsubstation ppt at gail by ratnesh singh
substation ppt at gail by ratnesh singh
 
Power Line Carrier Communication
Power Line Carrier CommunicationPower Line Carrier Communication
Power Line Carrier Communication
 
Substation
SubstationSubstation
Substation
 
Power line carrier communication,ETL41/42
Power line carrier communication,ETL41/42Power line carrier communication,ETL41/42
Power line carrier communication,ETL41/42
 
Reactive power management and voltage control by using statcom
Reactive power management and voltage control by using statcomReactive power management and voltage control by using statcom
Reactive power management and voltage control by using statcom
 
Relays
RelaysRelays
Relays
 
Loading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission LinesLoading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission Lines
 
Power Line Communication
Power Line CommunicationPower Line Communication
Power Line Communication
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
Differential Protection Relay
DifferentialProtection RelayDifferentialProtection Relay
Differential Protection Relay
 
33kv substation
33kv substation33kv substation
33kv substation
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communicationRrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
Rrvpnl summer-industrial-training-ajmer-in-power-line-carrier-communication
 

Viewers also liked

powerline communication system
powerline communication systempowerline communication system
powerline communication systemAhmed Hassan
 
Power line carrier communication
Power  line  carrier  communicationPower  line  carrier  communication
Power line carrier communicationRahul Mehta
 
Smart Metering - Power Management & Power Line Communications
Smart Metering - Power Management & Power Line CommunicationsSmart Metering - Power Management & Power Line Communications
Smart Metering - Power Management & Power Line CommunicationsON Semiconductor
 
switching substation, plcc and scada
switching substation, plcc and scadaswitching substation, plcc and scada
switching substation, plcc and scadaHemendra Kumar Rajput
 
Ultrasonic motor
Ultrasonic motorUltrasonic motor
Ultrasonic motorPintu Khan
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 
Power theft detection via plc
Power theft detection via plcPower theft detection via plc
Power theft detection via plcbbshashanka
 
Wireless power transmission
Wireless power transmissionWireless power transmission
Wireless power transmissionrakeshkk
 
Ruby onrails overview
Ruby onrails overviewRuby onrails overview
Ruby onrails overviewPiyush Chand
 
Communication & Your Career
Communication & Your CareerCommunication & Your Career
Communication & Your CareerM.T.H Group
 

Viewers also liked (19)

powerline communication system
powerline communication systempowerline communication system
powerline communication system
 
Power line carrier communication
Power  line  carrier  communicationPower  line  carrier  communication
Power line carrier communication
 
Power line communication
Power line communicationPower line communication
Power line communication
 
Plcc
PlccPlcc
Plcc
 
Plcc
PlccPlcc
Plcc
 
Smart Metering - Power Management & Power Line Communications
Smart Metering - Power Management & Power Line CommunicationsSmart Metering - Power Management & Power Line Communications
Smart Metering - Power Management & Power Line Communications
 
POWER LINE COMMUNICATION
POWER LINE COMMUNICATIONPOWER LINE COMMUNICATION
POWER LINE COMMUNICATION
 
Final rohit bpl
Final rohit bplFinal rohit bpl
Final rohit bpl
 
switching substation, plcc and scada
switching substation, plcc and scadaswitching substation, plcc and scada
switching substation, plcc and scada
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 
Presentation of bpl
Presentation of bplPresentation of bpl
Presentation of bpl
 
Ultra sonic motor
Ultra sonic motorUltra sonic motor
Ultra sonic motor
 
Ultrasonic motor
Ultrasonic motorUltrasonic motor
Ultrasonic motor
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
Power theft detection via plc
Power theft detection via plcPower theft detection via plc
Power theft detection via plc
 
Wireless power transmission
Wireless power transmissionWireless power transmission
Wireless power transmission
 
Ruby onrails overview
Ruby onrails overviewRuby onrails overview
Ruby onrails overview
 
Communication & Your Career
Communication & Your CareerCommunication & Your Career
Communication & Your Career
 

Similar to Power line carrier communication(with awesome animation work)

Presentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagarPresentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagarRamanand Sagar
 
Power_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptxPower_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptxVara Prasad
 
Power_LIne_Communication_Basics.pptx
Power_LIne_Communication_Basics.pptxPower_LIne_Communication_Basics.pptx
Power_LIne_Communication_Basics.pptxNashiIhsan
 
Power line carrier communication
Power line carrier communicationPower line carrier communication
Power line carrier communicationuttarakhatik
 
Presentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapperPresentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapperJyoti Rawat
 
20BEE042 5th semester Internship PPT.pptx
20BEE042 5th semester Internship PPT.pptx20BEE042 5th semester Internship PPT.pptx
20BEE042 5th semester Internship PPT.pptxSumitRajput83
 
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...Vikram Rawani
 
A new approach to motor condition monitoring
A new approach to motor condition monitoringA new approach to motor condition monitoring
A new approach to motor condition monitoringUFRN
 
SEG 3 unit ppt.pptx
SEG 3 unit ppt.pptxSEG 3 unit ppt.pptx
SEG 3 unit ppt.pptxIshuIswarya3
 
Abhishek scada ppt
Abhishek scada pptAbhishek scada ppt
Abhishek scada pptanilakib
 
Abhishek scada ppt
Abhishek scada pptAbhishek scada ppt
Abhishek scada pptanilakib
 

Similar to Power line carrier communication(with awesome animation work) (20)

Ppt
PptPpt
Ppt
 
Presentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagarPresentation on power line career communication by ramanand sagar
Presentation on power line career communication by ramanand sagar
 
Power_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptxPower_Line_Carrier_Communication.pptx
Power_Line_Carrier_Communication.pptx
 
Ppt.aslam
Ppt.aslamPpt.aslam
Ppt.aslam
 
Power_LIne_Communication_Basics.pptx
Power_LIne_Communication_Basics.pptxPower_LIne_Communication_Basics.pptx
Power_LIne_Communication_Basics.pptx
 
Power line carrier communication
Power line carrier communicationPower line carrier communication
Power line carrier communication
 
CSPTCL DANGANIYA RAIPUR (C.G.)
CSPTCL   DANGANIYA RAIPUR (C.G.)CSPTCL   DANGANIYA RAIPUR (C.G.)
CSPTCL DANGANIYA RAIPUR (C.G.)
 
Presentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapperPresentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapper
 
132 kv seminar ppt
132 kv seminar ppt132 kv seminar ppt
132 kv seminar ppt
 
132 kv
132 kv132 kv
132 kv
 
Communicating to Your Meters
Communicating to Your MetersCommunicating to Your Meters
Communicating to Your Meters
 
Wireless Charging
Wireless ChargingWireless Charging
Wireless Charging
 
20BEE042 5th semester Internship PPT.pptx
20BEE042 5th semester Internship PPT.pptx20BEE042 5th semester Internship PPT.pptx
20BEE042 5th semester Internship PPT.pptx
 
TESCO Tuesday: Communication Equipment
TESCO Tuesday: Communication EquipmentTESCO Tuesday: Communication Equipment
TESCO Tuesday: Communication Equipment
 
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...ppt of Three phase fault analysis with auto reset for temporary fault and tri...
ppt of Three phase fault analysis with auto reset for temporary fault and tri...
 
A new approach to motor condition monitoring
A new approach to motor condition monitoringA new approach to motor condition monitoring
A new approach to motor condition monitoring
 
SEG 3 unit ppt.pptx
SEG 3 unit ppt.pptxSEG 3 unit ppt.pptx
SEG 3 unit ppt.pptx
 
16928 6274 1
16928 6274 116928 6274 1
16928 6274 1
 
Abhishek scada ppt
Abhishek scada pptAbhishek scada ppt
Abhishek scada ppt
 
Abhishek scada ppt
Abhishek scada pptAbhishek scada ppt
Abhishek scada ppt
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 

Recently uploaded (20)

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 

Power line carrier communication(with awesome animation work)

  • 1. POWER LINE CARRIER COMMUNICATION PRESENTED BY MOHIT AGARWAL CGI/ECE/ 7TH SEM/15
  • 2. INDEX • TRAINING OVERVIEW • INTRODUCTION • BASIC PRINCIPAL OF PLCC • SIGNALS FOR PLCC • COMPONENTS • PLCC STATION • BLOCK DIAGRAM OF CIRCUIT • BASIC COUPLING ARRANGEMENT • MAINTAINENCE AND FAULT TRACKING • ADVANTAGE • LIMITATIONS • CONCLUSION
  • 3. TRAINING OVERVIEW  Name Of Industry : Rajasthan Rajya Vidyut Prasaran Nigam Limited  Location: 220KV GSS PREMISES, RIICO INDUSTRIAL AREA, BHARATPUR  Reporting Officer: A. K. MITTAL  Duration of training : 3rd June to 18th July, 2014  Department of training :Electronics & Communication
  • 4. INTRODUCTION  PLCC is the method of transmitting information using power network.  Its equipment are used for point-to-point communication over high voltage power lines  It’s equipments are used to send/receive speech/data/teleprotection signals.  It’s the most economical and reliable method of communication for medium or long distance.
  • 5. BASIC PRINCIPAL OF PLCC  The telephone communication system cannot be directly connected to the high voltage lines so, we use suitably designed coupling devices for communication.  These usually consist of high voltage capacitor used in conjunction with suitable line matching unit (LMU) for matching the impedance of line to that of the coaxial cable connecting the unit to the PLC transmiter-receiver equipment.
  • 6. SIGNALS FOR PLCC The signal that can be transmitted over the PLCC include  Speech signal (300-2000Hz )  Data signal (2000-3000Hz)
  • 7. Components • PLCC station • Line matching Unit • CVT/CC • Earth Switch • Lightening Arrestor • Wave Trap • Co axial Cable 7 EPAX RF carrier (40-500kHz) Power Line (50Hz) C.C RTU L.T PLCC TERMINAL
  • 8. PLCC station • It is the station where (modulation)Transmission , Receiving (Demodulation ) , Amplification and Filtration are performed. • Transmitter : 8
  • 10. CVT/CC • It is Control Voltage transformer/ Coupling capacitor. • This is used for blocking the high voltage entering to the PLCC equipment. Earth Switch • This is used at the time of maintenance of LMU.
  • 11. Lightening Arrestor • Used to protect the system from the damaging effect of lightening. • It works as an insulator between light and the power line. Co axial Cable • This is used for inter connection between PLCC & L.M.U for carrying the high frequency signal.
  • 12. Line Matching Unit The out-put of PLCC is connected to the matching unit before the power lines to achieve the proper impedance matching and protection in between PLCC Equipments and power line. Module Cabinet
  • 13. Wave Trap • Consists of a number choke coils connected in series. • It is connected in series with the power line and prevents carrier current from entering to the power equipment. • Offer negligible impedance to power frequency & high impedance to carrier frequency. PLC signal Blocking HV Line Substation Power energy PLC Signal
  • 14. Block diagram 0f Circuit
  • 15. BASIC COUPLING ARRANGEMENT  The power frequency and radio frequency currents are sorted by this arrangement .  Carrier currents are prevented to enter station bus by wave trap & power frequency current is blocked by coupling capacitor, from the PLC equipment.  Hence we get power current at the bus & carrier current at PLC equipment.
  • 16. BATTERY CHARGER • PLCC work on rectified AC or main supply, when supply goes off, we make use of a device for proper functioning of PLCC called battery charger. • This is the device that provide supply to the PLCC equipment for uninterrupted working. • It provide DC to the panel by battery. 16
  • 17. Maintenance & Fault Tracking • FAULT ANALYSIS In fault analysis the faulty devices are checked in this serial or manner:- 1. Telephone or tale operation signal 2. Cabling low frequency circuit or DC power supply 3. PLC equipment 4. HF transmission path
  • 18. MAINTAINANCE AND FAULT TRACING PROCEDURE 1. The control circuit boards should be inserted far firmly. 2. The charger should be switch off once in every month. 3. The battery terminal should be connected first and the AC input after that. 4. All mounting bolts should be checked before energizing.
  • 19. Advantages  No separate wires are needed for communication purpose.  Both communication and power transfer can be possible on same circuit.  Power lines provides the shortest route between the power station.  Increased reliability.  Lower attenuation over long distance.  Implementation cost is reduced.
  • 20. Limitations  Reflection are produced on spur lines connected to high voltage line. This increased attenuation and create other problem.  High voltage lines have transformer connections, which attenuate carrier currents.  Noise introduced by power lines is far more than in case of telephone lines.
  • 21. Key learning • PLCC is mainly used for telecommunication, tele-protection and tele-monitoring between electrical substations through power lines. • In a PLCC system the communication is established through the power line. • The carrier frequency range is allocated to include the audio signal, protection and the pilot frequency.
  • 22. CONCLUSION The Training was based on communication over existing power line.

Editor's Notes

  1. This template can be used as a starter file for presenting training materials in a group setting. Sections Right-click on a slide to add sections. Sections can help to organize your slides or facilitate collaboration between multiple authors. Notes Use the Notes section for delivery notes or to provide additional details for the audience. View these notes in Presentation View during your presentation. Keep in mind the font size (important for accessibility, visibility, videotaping, and online production) Coordinated colors Pay particular attention to the graphs, charts, and text boxes. Consider that attendees will print in black and white or grayscale. Run a test print to make sure your colors work when printed in pure black and white and grayscale. Graphics, tables, and graphs Keep it simple: If possible, use consistent, non-distracting styles and colors. Label all graphs and tables.
  2. What will the audience be able to do after this training is complete? Briefly describe each objective how the audience will benefit from this presentation.
  3. Microsoft Confidential