0. Roles & Responsibilities
1. Plan Human Resource Management
2. Acquire Project Team
3. Develop Project Team
4. Manage Project Team
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Sponsor
• Initiation: Provide financial resources for the project, determine
requirements and initial scope, giving authority to project manager,
provide information required to develop project charter
• Planning: Define required reports, identify high level risks, and authorize
project management plan,
• Execution and M/C: Authorize changes, solving problems out of project
manager scope, answering questions regarding project scope, and
impose quality policy
• Closing: Final acceptance for the product (If he was the client)
Lecture 09 : Project Human Resource Management (2/31)
Roles & Responsibilities
Functional manager
• Individuals who manage resources in specific department
• Assign resources with project manager
• Approve final schedule and final project management plan
• Recommend changes to the project
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Portfolio Manager
• Manage unrelated projects
• Ensure that selected projects provide value to the organization
• Getting the best return from resources invested
Lecture 09 : Project Human Resource Management (3/31)
Roles & Responsibilities
Program Manager
• Manage group of related projects
• Adjust projects for program benefit
• Guide and support project managers
Team
• Help identifying requirements, constraints, and assumptions
• Help creating WBS, and time/cost estimations
• Execute/comply with project management plan
• Recommend changes
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Project Manager
• In charge of the project and doesn’t have to be technical expert
• Influence project team and atmosphere
• Coordinate interaction between project and key persons
• Select appropriate processes for the project
• Lead / direct planning efforts
• Identify / analyze constraints and assumptions
• Assist and support team during execution
• Determine and deliver required levels of quality
• Determine need for changes
• Maintain control over project
• Must say No when necessary
• Apply project management knowledge
• Spend more time being proactive than reacting with problems
Lecture 09 : Project Human Resource Management (4/31)
Roles & Responsibilities
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Project Manager ( With Human Resources)
• Determine what resources will be needed
• Create job descriptions
• Create project team directory
• Create human resource plan
• Create recognition and reward system
• Make sure that all roles and responsibilities are clearly assigned
• Report team members performance
• Understand training needs for team members
Lecture 09 : Project Human Resource Management (5/31)
Roles & Responsibilities
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
H u m a n R e s o u r c e M a n a g e m e n t
9.1 Plan Human Resource Management
Inputs :
 Project Management Plan
 Activity Resource Requirements
 Enterprise Environmental Factors
 Organizational Process Assets
Tools and Techniques :
 Organization Charts and Position Descriptions
 Networking
 Organizational Theory
 Expert Judgment
 Meetings
Outputs :
 Human Resource Management Plan
Lecture 09 : Project Human Resource Management (6/31)
01. Plan Human Resource Management
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Organization Charts and Position Descriptions:
Document team members roles and responsibilities to ensure that each work
package has owner using one of the following formats:
Lecture 09 : Project Human Resource Management (7/31)
01. Plan Human Resource Management
• Hierarchical
Ex: OBS, RBS, WBS
• Responsibility Assignment Matrix (RAM)
This type illustrates connection between
activities and team members
Ex: RACI (R= Responsible, A= Accountable,
C= Consult, I= Inform)
• Text-Oriented Formats
Also known as Position Descriptions,
and Role-Responsibility- Authority Form
TT
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (8/31)
01. Plan Human Resource Management
Networking:
Formal and informal interactions with others
Ex: Luncheon meetings, informal conversation, events, and conferences.
TT
Organizational Theory:
Addressing the way people and organizational units behave.
Different organizational structures have different individual response,
individual performance, and personal relationship characteristics.
Ex: Scientific management, bureaucracy model, simple structure,
hierarchical structure, functional organizations, and matrix organizations.
TT
Expert Judgment:
List required skills and determine reporting relationship needed
TT
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (9/31)
01. Plan Human Resource Management
Human Resource Management Plan:
How human resources will be defined, staffed, managed, and released.
Part of PM Plan and may include:
O
1- Roles and Responsibilities:
• Role: Function assigned to a person in the project. Ex: Civil Engineer
• Authority: The right to make a decision, approval, acceptance … etc.
Ex: Quality acceptance, change approval.
• Responsibility: Assigned duties. Ex: Construction of concrete skeleton.
• Competency: Skills required to complete activities.
2- Project Organization Chart:
• Graphic display of project team members and their reporting relationships.
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (10/31)
01. Plan Human Resource Management
3- Staffing Management Plan:
• Where they will come from (acquisition)
• When recruiting should be start (calendar and histograms)
• Staff release plan (help mitigate risks and improve morale)
• Training Needs (if expecting team members will not have required skills)
• Compliance with HR rules and governmental regulations
• Safety policies and procedures
• Recognition & reward systems :
• Say (Thank You)
• Member of the month prize / performance prize
• Recommend him/her for raises
• Parties, events, and celebrations
• Training courses (paid)
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
H u m a n R e s o u r c e M a n a g e m e n t
9.2 Acquire Project Team
Inputs :
 Human Resource Management Plan
 Enterprise Environmental Factors
 Organizational Process Assets
Tools and Techniques :
 Pre-Assignment
 Negotiation
 Acquisition
 Virtual terms
 Multi-Criteria Decision Analysis
Outputs :
 Project Staff Assignments
 Resource Calendars
 Project Management Plan Updates
Lecture 09 : Project Human Resource Management (11/31)
02. Acquire Project Team
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (12/31)
02. Acquire Project Team
Pre-Assignment:
Sometimes resources are assigned in advance (defined within charter)
because of their experience or the sponsor require these resources to be
assigned in the project.
TT
Negotiation:
• Negotiate with functional manager, other PM teams within organization to
assign scarce and specialized resources, or with external organizations and
contractors
• When negotiating from within your organization:
1. Know the needs of your project and its priority in the organization
2. Understand that the resource manager has his own work to do
3. Don’t ask for the best resource if the project does not need them
4. Be able to prove why project requires stated resources quantity an quality
5. Build relationship with resource manager and discover what he will need
from you
TT
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (13/31)
02. Acquire Project Team
Acquisition:
When organization is unable to provide the staff needed, you can get the
work done through outsourcing or by subcontracting the work to another
organization .
TT
Virtual Teams:
Team members with little or no time spent meeting face to face.
Advantages:
1. Use special expertise even if the expert is not in the same area
2. Incorporate employees who work from home
3. Include people with mobility limitations or disabilities
4. Work in projects that would have been ignored due to travel expenses
Disadvantage:
1. Possibility for misunderstanding
2. Difficulties of sharing knowledge and experience between members
3. Cost of applying communication technology
TT
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (14/31)
02. Acquire Project Team
Multi-Criteria Decision Analysis:
Using analysis tool, criteria are used to rate or score team member like:
availability, cost, experience, ability, knowledge, skills, and attitude
• Halo effect is the tendency to rate employee on all factors due to one
factor. This action has negative impacts and should be avoided
Ex: Assigning a project manager because he is a great programmer
TT
Project Staff Assignments:
When appropriate people have been assigned,
1. Document this assignment in Project Team Directory
2. Send memos to team members
3. Insert name in organization chart
O
Resource Calendar:
It documents the time period that each team member can work including
persons availability, vacation time, holidays, work hours, … etc.
O
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
H u m a n R e s o u r c e M a n a g e m e n t
9.3 Develop Project Team
Inputs :
 Human Resource Management Plan
 Project Staff Assignments
 Resource Calendars
Tools and Techniques :
 Interpersonal skills
 Training
 Team-Building Activities
 Ground Rules
 Co location
 Recognition and Rewards
 Personnel Assessment Tools
Outputs :
 Team Performance Assessments
 Enterprise Environmental Factors Updates
Lecture 09 : Project Human Resource Management (15/31)
03. Develop Project Team
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (16/31)
03. Develop Project Team
Interpersonal Skills: (Soft Skills)
Assessing and controlling team members sentiments ‫مشاعر‬ and following up
their issues increase cooperation and reduce tension.
Ex: Communication skills, emotional intelligence, conflict resolution,
negotiation, influence, creativity, and team building.
Encourage team, communicate honestly, establish and maintain trust.
TT
Training:
Enhance competencies to reduce overall project cost
Scheduled training takes place as stated in human resource plan
Unplanned training takes place as a result of observation
TT
Ground Rules:
What behavior is acceptable and what is not acceptable for example:
• How should team member resolve conflicts with others
• Who is authorized to give direction to contractors
• Acceptable behavior during meetings
TT
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (17/31)
03. Develop Project Team
Team-Building Activities
Team building is to help team members work together effectively exercising
the following :
• Handle team members problems & discuss them as team members
issues
• Introduce appropriate rewards and recognition
• Manage conflicts effectively
• Provide good leadership
• Promote trust and open communication among team members
• WBS creation is a team-building tool
In Matrix organization you don’t have the ability to give team a rise or
promotion. Trust as well as recognition and reward system will make you
able to get people to cooperate.
TT
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (18/31)
03. Develop Project Team
Team Development Stages:
It is one of the models used to describe team development
1. Forming: People are brought together as a team
2. Storming: There are disagreements as people learn to work
together
3. Norming: Team members begin to build good relationships, begin
trust each other
4. Performing: Team members work effectively together as well-
organized unit
5. Adjourning: Team members complete the work and moves on from
the project
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (19/31)
03. Develop Project Team
Co-Location:
Placing the active team members in the same location (war room) to
enhance their ability to perform as a team.
War room is a central location for project coordination usually with WBS,
networks, schedule, … etc. posted on the wall
TT
Personnel Assessment Tools:
These tools help project manager assess team members preferences,
aspirations, how they organize information, how they make decisions, and
how they prefer to interact with people.
Examples of these tools are surveys, interviews, and focus groups.
These tools provide improved understanding, communication, and trust
among the team.
TT
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (20/31)
03. Develop Project Team
Team Performance Assessments:
The evaluation of a team’s effectiveness may include indicators such as:
1. Improvement in skills
2. Improvement in competencies
3. Increased team cohesiveness
4. Reduce staff turnover rate
Note: Team performance assessment is done by project manager or by
project management team for all team , not for individuals.
O
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
H u m a n R e s o u r c e M a n a g e m e n t
9.4 Manage Project Team
Inputs :
 Human Resource Management Plan ■ Project Staff Assignments
 Team Performance Assessments ■ Issue Log
 Work Performance Reports ■ Organizational Process Assets
Tools and Techniques :
 Observation and Conversation ■ Project Performance Appraisals
 Conflict Management ■ Interpersonal Skills
Outputs :
 Change Requests
 Project Management Plan Updates
 Project Documents Updates
 Enterprise Environmental Factors Updates
 Organizational Process Assets Updates
Lecture 09 : Project Human Resource Management (21/31)
04. Manage Project Team
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (22/31)
04. Manage Project Team
Issue Log:
Output of “Manage Stake Holder Engagement“ process and used to manage
and follow up issues .
I
Observation and Conversation:
Used to stay in touch with the work and attitude of team members.
TT
Issue
No
Issue
Date
Added
Raised
By
Person
Assigned
Resolution
Due Date
Status
Date
Resolved
Resolution
Project Performance Appraisals:
Evaluation of employees’ performance by their supervision.
360-Degree Review is one of the ways to complete appraisal by including
the input of coworkers, subordinates, and supervisors.
TT
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (23/31)
04. Manage Project Team
Conflict Management:TT
A - Conflict Sources:
1- Schedule 2- Project Priorities 3- Technical Opinions
4- Resources 5- Administrative Procedures 6- Cost
7- Personality ‫األخيرة‬ ‫هى‬ ‫الشخصية‬ ‫ان‬ ‫وتذكر‬ ‫أربعة‬ ‫أول‬ ‫تذكر‬
B - Conflict Properties:
1. Conflict is natural and inevitable
2. Conflict is consequence of organizational interaction
3. Conflict resolution needs openness
4. Conflict resolution should focus on issues not personalities
5. Conflict resolution should focus on present not past
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (24/31)
04. Manage Project Team
Conflict Management:TT
C - Conflict Avoiding Techniques:
1- Ground Rules 2- Role Definition 3- Communication Planning
4- Inform team of project objectives, constraints, charter
5- Make work assignments interesting and challenging
D - Resolution Responsibility:
1. Conflict is best resolved by those involved in the conflict
2. If conflict escalate, project manager should help facilitate satisfactory
resolution.
3. If disruptive conflict continues, formal procedures should be used including
disciplinary actions. ‫إجراءات‬‫تأديبية‬
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (25/31)
04. Manage Project Team
Conflict Management:TT
E - Conflict Resolution Techniques:
1. Collaborate/Confront (Problem Solving): Incorporate multiple viewpoint
to lead to consensus then problem goes away leading to win-win situation.
2. Compromise/Reconcile : Bring some degree of satisfaction to all parties,
then no party gets everything, leading to lose-lose situation. Compromising
in not the best choice but rather second to confronting.
3. Withdraw/Avoid: Parties retreat ‫يتراجع‬ or postpone a decision.
4. Smooth/Accommodate: Emphasize agreements rather than difference in
opinions, conceding ‫خضوع‬ one’s position to the needs of others to maintain
harmony and relationships.
5. Force/Direct: Pushing one viewpoint at the expense of others.
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (26/31)
04. Manage Project Team
Interpersonal Skills: ‫مهارات‬‫التعامل‬‫مع‬‫اآلخرين‬TT
A. Powers of project manager:
1. Formal (Legitimate): Based on your position ‫رسمي‬(‫شرعي‬)
2. Reward: Giving rewards and prizes.
3. Penalty (Coercive): For example removing from some team ‫العقاب‬(‫اإلكراه‬)
4. Expert: Power comes from being project management expert.
5. Referent: The ability of a leader to influence a follower because of the
follower's loyalty, respect, or admiration. It’s the power of charisma.
Notes:
• Best powers are Expert and Reward. The worst is Penalty.
• Powers derived from PM position are Formal, Reward, and Penalty
• Power earned on your own is Expert
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (27/31)
04. Manage Project Team
Interpersonal Skills: ‫مهارات‬‫التعامل‬‫مع‬‫اآلخرين‬TT
B. Management and Leadership Styles:
• At the beginning of project use directing styles.
• At the project execution use coaching, facilitating, and supporting.
1. Directing: Telling others what to do.
2. Facilitating: Coordinating the inputs of others.
3. Coaching: Helping other achieve their goal.
4. Supporting: Providing assistance along the way.
5. Autocratic: Manager has power to do what he want. ‫استبدادي‬
6. Consultative: Manager obtains others’ opinions & act as servant for team
7. Consultative- Autocratic: Manager takes input from team members but
retains decision-making authority for him self.
8. Consensus: Making decisions base on group agreement.
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (28/31)
04. Manage Project Team
Interpersonal Skills: ‫مهارات‬‫التعامل‬‫مع‬‫اآلخرين‬TT
B. Management and Leadership Styles:
9. Delegation: Establish goals then give team authority to complete the work.
10.Bureaucratic : Following procedures exactly. Appropriate for critical work.
11.Charismatic: Energize and encourage team in performing.
12.Democratic (Participative): Team own the decision made by group.
13.Laissez-Faire: Leave alone/Allow to act. Manager is not directly involved
in team work but consult as necessary. ‫دعه‬‫يعمل‬
14.Analytical: Manager asks questions to get facts.
15.Driver: Constantly giving directions. His attitude drives team to win.
16.Influencing: This style emphasizes team work, teambuilding, and team
working. These managers work with their teams to influence project
implementation. Influence skills include: persuasive – listening – mutual
trust – consideration of various perspectives.
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (29/31)
04. Manage Project Team
Important Notes
Problem Solving Method:
1- Define the real problem 2- Analyze problem
3- Identify solutions 4- Pick a solution
5- Implement solution 6- Confirm solution solved problem
Special Terms :
A. Expectancy Theory: Employees who expect to be rewarded for their
accomplishments remains productive as rewards meet their expectations.
B. Perquisites (Perks): Some employees receive special rewards such as
assigned parking space or executive dining. ‫االمتيازات‬‫االستثنائية‬
C. Fringe Benefits : Standard benefits formally given to all employees such
as educational benefits, insurance, and profit sharing. ‫المزايا‬‫االضافية‬
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (30/31)
04. Manage Project Team
Motivation Theories
A- McGregor’s theory of X & Y:
Theory X: Managers who believe that people need to be watched every minute.
Theory Y: Managers who believe people are willing to work without supervision
B- Maslow’s theory hierarchy of need:
To ascend next level you should fulfill levels below.
Starting from the pyramid base :
1. Physiological: Air, water, ... etc.
2. Safety: Security, Stability, ... etc.
3. Social: Like, love, friends, ... etc.
4. Esteem: Attention, respect, ... etc.
5. Self Actualization: Learning, growth, … etc.
PMP Lectures Prepared By: Eng. Mohamed
ElSaadany
Lecture 09 : Project Human Resource Management (31/31)
04. Manage Project Team
C- David McClelland's Theory of Needs:
Also Called Acquired Needs Theory
1. People need achievement  They like recognition  Give them challenging
projects.
2. People need Affiliation  They seek approval rather than recognition  Let
him cooperate with others.
3. People need Power  Effective Leader  If socially oriented(not personally
oriented), allow him to manage others.
D- Herzberg’s Theory:
1. Hygiene Factors: Work condition, salary, security, personal life, relationship at
work.
2. Motivating Agents: Responsibility, self-actualization, recognition, professional
growth.
Poor hygiene factors may destroy motivation but improving them will not improve
motivation

More Related Content

What's hot

Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12Dreams Design
 
Structure of project plan and schedule
Structure of project plan and scheduleStructure of project plan and schedule
Structure of project plan and scheduleMr SMAK
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
 
Spm ksp
Spm kspSpm ksp
Spm kspktosri
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management ConceptsSaqib Raza
 
Infrastructure Project Manager
Infrastructure Project ManagerInfrastructure Project Manager
Infrastructure Project Managergaryclough
 
A Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project ManagementA Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project ManagementWorkfront
 

What's hot (20)

Pmp hr chapter 9
Pmp hr chapter 9Pmp hr chapter 9
Pmp hr chapter 9
 
4 Scheduling Monitoring
4 Scheduling Monitoring4 Scheduling Monitoring
4 Scheduling Monitoring
 
Project mangement chp 1 12
Project mangement chp 1 12Project mangement chp 1 12
Project mangement chp 1 12
 
software project management
software project managementsoftware project management
software project management
 
Structure of project plan and schedule
Structure of project plan and scheduleStructure of project plan and schedule
Structure of project plan and schedule
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project Management
 
An Introduction to Project management(project management tutorials)
An Introduction to Project management(project management tutorials)An Introduction to Project management(project management tutorials)
An Introduction to Project management(project management tutorials)
 
Session 7 gdas pmp study group presentation
Session 7   gdas pmp study group presentationSession 7   gdas pmp study group presentation
Session 7 gdas pmp study group presentation
 
Spm ksp
Spm kspSpm ksp
Spm ksp
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 
Unit 2 spm
Unit 2 spmUnit 2 spm
Unit 2 spm
 
PPRPreparationGuide
PPRPreparationGuidePPRPreparationGuide
PPRPreparationGuide
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
MCP1
MCP1MCP1
MCP1
 
Spm l01
Spm l01Spm l01
Spm l01
 
Infrastructure Project Manager
Infrastructure Project ManagerInfrastructure Project Manager
Infrastructure Project Manager
 
Project Mangement
Project MangementProject Mangement
Project Mangement
 
Spm unit2
Spm unit2Spm unit2
Spm unit2
 
Pmp communication chapter 10
Pmp communication chapter 10Pmp communication chapter 10
Pmp communication chapter 10
 
A Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project ManagementA Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project Management
 

Viewers also liked

ひろ子 in Objective-C
ひろ子 in Objective-Cひろ子 in Objective-C
ひろ子 in Objective-CTaketo Sano
 
2.5 Trillion Oil Scam
2.5 Trillion Oil Scam2.5 Trillion Oil Scam
2.5 Trillion Oil Scamtheoilman
 
07 09 04 Ctqi Standard
07 09 04 Ctqi Standard07 09 04 Ctqi Standard
07 09 04 Ctqi StandardKieran F Ring
 
Isotopes And Radioactivity 09
Isotopes And Radioactivity 09Isotopes And Radioactivity 09
Isotopes And Radioactivity 09Paula Mills
 
The Art Of Writing A Business Plan (Zafar)
The Art Of Writing A Business Plan (Zafar)The Art Of Writing A Business Plan (Zafar)
The Art Of Writing A Business Plan (Zafar)Naeem Zafar
 
Cmc chapter 09
Cmc chapter 09Cmc chapter 09
Cmc chapter 09Jane Hamze
 
Python and R for quantitative finance
Python and R for quantitative financePython and R for quantitative finance
Python and R for quantitative financeLuca Sbardella
 
09. Development Plan For Pcmc
09. Development Plan For Pcmc09. Development Plan For Pcmc
09. Development Plan For PcmcRanjit Gadgil
 
Abc analysis1234
Abc analysis1234Abc analysis1234
Abc analysis1234Ashok Reddy
 
Seductive Interactions (Idea 09 Version)
Seductive Interactions (Idea 09 Version)Seductive Interactions (Idea 09 Version)
Seductive Interactions (Idea 09 Version)Stephen Anderson
 
Infographics Jayan Narayanan
Infographics   Jayan NarayananInfographics   Jayan Narayanan
Infographics Jayan NarayananJayan Narayanan
 
JavaScript for PHP developers
JavaScript for PHP developersJavaScript for PHP developers
JavaScript for PHP developersStoyan Stefanov
 
Unbezahlte arbeitszeit in_Österreich
Unbezahlte arbeitszeit in_ÖsterreichUnbezahlte arbeitszeit in_Österreich
Unbezahlte arbeitszeit in_ÖsterreichFESD GKr
 
Lernen Mit Web 2.0 (IHK Stuttgart Juli 2009)
Lernen Mit Web 2.0 (IHK Stuttgart Juli 2009)Lernen Mit Web 2.0 (IHK Stuttgart Juli 2009)
Lernen Mit Web 2.0 (IHK Stuttgart Juli 2009)Martina Goehring
 
E Co C Bratislava 09 Persoenlichkeit
E Co C Bratislava 09 PersoenlichkeitE Co C Bratislava 09 Persoenlichkeit
E Co C Bratislava 09 Persoenlichkeitthomasabauer
 
mediscript Kalendar 2013 "Lernen heisst Entdecken"
mediscript Kalendar 2013 "Lernen heisst Entdecken"mediscript Kalendar 2013 "Lernen heisst Entdecken"
mediscript Kalendar 2013 "Lernen heisst Entdecken"mediscript Team
 
Kelantan
KelantanKelantan
Kelantanwmzuri
 
Financial Institutions Must Support Their Clients on Twitter
Financial Institutions Must Support Their Clients on TwitterFinancial Institutions Must Support Their Clients on Twitter
Financial Institutions Must Support Their Clients on TwitterChristophe Langlois
 
EdChang - Parallel Algorithms For Mining Large Scale Data
EdChang - Parallel Algorithms For Mining Large Scale DataEdChang - Parallel Algorithms For Mining Large Scale Data
EdChang - Parallel Algorithms For Mining Large Scale Datagu wendong
 

Viewers also liked (20)

ひろ子 in Objective-C
ひろ子 in Objective-Cひろ子 in Objective-C
ひろ子 in Objective-C
 
Tagging - web 2 expo 2008
Tagging - web 2 expo 2008Tagging - web 2 expo 2008
Tagging - web 2 expo 2008
 
2.5 Trillion Oil Scam
2.5 Trillion Oil Scam2.5 Trillion Oil Scam
2.5 Trillion Oil Scam
 
07 09 04 Ctqi Standard
07 09 04 Ctqi Standard07 09 04 Ctqi Standard
07 09 04 Ctqi Standard
 
Isotopes And Radioactivity 09
Isotopes And Radioactivity 09Isotopes And Radioactivity 09
Isotopes And Radioactivity 09
 
The Art Of Writing A Business Plan (Zafar)
The Art Of Writing A Business Plan (Zafar)The Art Of Writing A Business Plan (Zafar)
The Art Of Writing A Business Plan (Zafar)
 
Cmc chapter 09
Cmc chapter 09Cmc chapter 09
Cmc chapter 09
 
Python and R for quantitative finance
Python and R for quantitative financePython and R for quantitative finance
Python and R for quantitative finance
 
09. Development Plan For Pcmc
09. Development Plan For Pcmc09. Development Plan For Pcmc
09. Development Plan For Pcmc
 
Abc analysis1234
Abc analysis1234Abc analysis1234
Abc analysis1234
 
Seductive Interactions (Idea 09 Version)
Seductive Interactions (Idea 09 Version)Seductive Interactions (Idea 09 Version)
Seductive Interactions (Idea 09 Version)
 
Infographics Jayan Narayanan
Infographics   Jayan NarayananInfographics   Jayan Narayanan
Infographics Jayan Narayanan
 
JavaScript for PHP developers
JavaScript for PHP developersJavaScript for PHP developers
JavaScript for PHP developers
 
Unbezahlte arbeitszeit in_Österreich
Unbezahlte arbeitszeit in_ÖsterreichUnbezahlte arbeitszeit in_Österreich
Unbezahlte arbeitszeit in_Österreich
 
Lernen Mit Web 2.0 (IHK Stuttgart Juli 2009)
Lernen Mit Web 2.0 (IHK Stuttgart Juli 2009)Lernen Mit Web 2.0 (IHK Stuttgart Juli 2009)
Lernen Mit Web 2.0 (IHK Stuttgart Juli 2009)
 
E Co C Bratislava 09 Persoenlichkeit
E Co C Bratislava 09 PersoenlichkeitE Co C Bratislava 09 Persoenlichkeit
E Co C Bratislava 09 Persoenlichkeit
 
mediscript Kalendar 2013 "Lernen heisst Entdecken"
mediscript Kalendar 2013 "Lernen heisst Entdecken"mediscript Kalendar 2013 "Lernen heisst Entdecken"
mediscript Kalendar 2013 "Lernen heisst Entdecken"
 
Kelantan
KelantanKelantan
Kelantan
 
Financial Institutions Must Support Their Clients on Twitter
Financial Institutions Must Support Their Clients on TwitterFinancial Institutions Must Support Their Clients on Twitter
Financial Institutions Must Support Their Clients on Twitter
 
EdChang - Parallel Algorithms For Mining Large Scale Data
EdChang - Parallel Algorithms For Mining Large Scale DataEdChang - Parallel Algorithms For Mining Large Scale Data
EdChang - Parallel Algorithms For Mining Large Scale Data
 

Similar to PMP Preparation - 09 Human Resource Management

project human resources management
project human resources managementproject human resources management
project human resources managementMohamed , PMP
 
Project Human Resource Management 1.ppt
Project Human Resource Management 1.pptProject Human Resource Management 1.ppt
Project Human Resource Management 1.pptMohammadReza60255
 
CAPM Muzette Charles Week5 Chapter9-10
CAPM Muzette Charles Week5 Chapter9-10CAPM Muzette Charles Week5 Chapter9-10
CAPM Muzette Charles Week5 Chapter9-10Muzette Charles, PMP
 
2.09 hr management 1
2.09 hr management 12.09 hr management 1
2.09 hr management 1reddvise
 
PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10Muzette Charles, PMP
 
Introduction to project management framework v2
Introduction to project management framework v2Introduction to project management framework v2
Introduction to project management framework v2Qussay Karam
 
project human resource managment
project human resource managmentproject human resource managment
project human resource managmentAroosa Chodhary
 
Project-Manager.ppt
Project-Manager.pptProject-Manager.ppt
Project-Manager.pptTecnicoItca
 
Session 1 - Intro - Org .ppt
Session 1 - Intro - Org .pptSession 1 - Intro - Org .ppt
Session 1 - Intro - Org .pptHamdiaAwadMansour
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource managementejlp12
 
(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptxgarkapifye
 
NCV 3 Project Management Hands-On Support Slide Show - Module 1
NCV 3 Project Management Hands-On Support Slide Show - Module 1NCV 3 Project Management Hands-On Support Slide Show - Module 1
NCV 3 Project Management Hands-On Support Slide Show - Module 1Future Managers
 

Similar to PMP Preparation - 09 Human Resource Management (20)

project human resources management
project human resources managementproject human resources management
project human resources management
 
Project Human Resource Management 1.ppt
Project Human Resource Management 1.pptProject Human Resource Management 1.ppt
Project Human Resource Management 1.ppt
 
CAPM Muzette Charles Week5 Chapter9-10
CAPM Muzette Charles Week5 Chapter9-10CAPM Muzette Charles Week5 Chapter9-10
CAPM Muzette Charles Week5 Chapter9-10
 
Competancy Model
Competancy ModelCompetancy Model
Competancy Model
 
2.09 hr management 1
2.09 hr management 12.09 hr management 1
2.09 hr management 1
 
Session 14 4th edition PMP
Session  14 4th edition PMPSession  14 4th edition PMP
Session 14 4th edition PMP
 
PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10PMP Muzette Charles_Spring2019_Week4_Chapter9_10
PMP Muzette Charles_Spring2019_Week4_Chapter9_10
 
Introduction to project management framework v2
Introduction to project management framework v2Introduction to project management framework v2
Introduction to project management framework v2
 
day 4 PMP.pptx
day 4 PMP.pptxday 4 PMP.pptx
day 4 PMP.pptx
 
day 4 PMP.pptx
day 4 PMP.pptxday 4 PMP.pptx
day 4 PMP.pptx
 
project human resource managment
project human resource managmentproject human resource managment
project human resource managment
 
Project-Manager.ppt
Project-Manager.pptProject-Manager.ppt
Project-Manager.ppt
 
Session 1 - Intro - Org .ppt
Session 1 - Intro - Org .pptSession 1 - Intro - Org .ppt
Session 1 - Intro - Org .ppt
 
PMP Training - 09 project human resource management
PMP Training - 09 project human resource managementPMP Training - 09 project human resource management
PMP Training - 09 project human resource management
 
PMP Preparation - 06 Time Management
PMP Preparation - 06 Time ManagementPMP Preparation - 06 Time Management
PMP Preparation - 06 Time Management
 
CAPM Week 3 Chapter 9
CAPM Week 3 Chapter 9CAPM Week 3 Chapter 9
CAPM Week 3 Chapter 9
 
(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx(Fall2016)Lecture2.pptx
(Fall2016)Lecture2.pptx
 
NCV 3 Project Management Hands-On Support Slide Show - Module 1
NCV 3 Project Management Hands-On Support Slide Show - Module 1NCV 3 Project Management Hands-On Support Slide Show - Module 1
NCV 3 Project Management Hands-On Support Slide Show - Module 1
 
Chapter 2
Chapter 2Chapter 2
Chapter 2
 
Session 15 4th edition PMP
Session 15 4th edition PMPSession 15 4th edition PMP
Session 15 4th edition PMP
 

More from Mohamed ElSaadany, PMP, CCP, PMI-RMP, SCE-PE (9)

مكتب إدارة المشاريع. الفرص والتحديات
مكتب إدارة المشاريع. الفرص والتحدياتمكتب إدارة المشاريع. الفرص والتحديات
مكتب إدارة المشاريع. الفرص والتحديات
 
A lecture on CCP Certificate
A lecture on CCP CertificateA lecture on CCP Certificate
A lecture on CCP Certificate
 
Construction KPIs & Dashboards
Construction KPIs & DashboardsConstruction KPIs & Dashboards
Construction KPIs & Dashboards
 
CCP Material
CCP MaterialCCP Material
CCP Material
 
PMP Preparation - 07 Cost Management
PMP Preparation - 07 Cost ManagementPMP Preparation - 07 Cost Management
PMP Preparation - 07 Cost Management
 
PMP Preparation - 05 Scope Management
PMP Preparation - 05 Scope ManagementPMP Preparation - 05 Scope Management
PMP Preparation - 05 Scope Management
 
PMP Preparation - 02 FAQ
PMP Preparation - 02 FAQPMP Preparation - 02 FAQ
PMP Preparation - 02 FAQ
 
PMP Preparation - 01 Get Ready
PMP Preparation - 01 Get ReadyPMP Preparation - 01 Get Ready
PMP Preparation - 01 Get Ready
 
Project Management Applications Using Google Documents
Project Management Applications Using Google DocumentsProject Management Applications Using Google Documents
Project Management Applications Using Google Documents
 

Recently uploaded

Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Millenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxMillenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxJanEmmanBrigoli
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsRommel Regala
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEaurabinda banchhor
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 

Recently uploaded (20)

Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Millenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxMillenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptx
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World Politics
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSE
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 

PMP Preparation - 09 Human Resource Management

  • 1. Lecture 09 : Project Human Resource Management (1/31) Contents PMP Lectures Prepared By: Eng. Mohamed ElSaadany 0. Roles & Responsibilities 1. Plan Human Resource Management 2. Acquire Project Team 3. Develop Project Team 4. Manage Project Team
  • 2. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Sponsor • Initiation: Provide financial resources for the project, determine requirements and initial scope, giving authority to project manager, provide information required to develop project charter • Planning: Define required reports, identify high level risks, and authorize project management plan, • Execution and M/C: Authorize changes, solving problems out of project manager scope, answering questions regarding project scope, and impose quality policy • Closing: Final acceptance for the product (If he was the client) Lecture 09 : Project Human Resource Management (2/31) Roles & Responsibilities Functional manager • Individuals who manage resources in specific department • Assign resources with project manager • Approve final schedule and final project management plan • Recommend changes to the project
  • 3. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Portfolio Manager • Manage unrelated projects • Ensure that selected projects provide value to the organization • Getting the best return from resources invested Lecture 09 : Project Human Resource Management (3/31) Roles & Responsibilities Program Manager • Manage group of related projects • Adjust projects for program benefit • Guide and support project managers Team • Help identifying requirements, constraints, and assumptions • Help creating WBS, and time/cost estimations • Execute/comply with project management plan • Recommend changes
  • 4. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Project Manager • In charge of the project and doesn’t have to be technical expert • Influence project team and atmosphere • Coordinate interaction between project and key persons • Select appropriate processes for the project • Lead / direct planning efforts • Identify / analyze constraints and assumptions • Assist and support team during execution • Determine and deliver required levels of quality • Determine need for changes • Maintain control over project • Must say No when necessary • Apply project management knowledge • Spend more time being proactive than reacting with problems Lecture 09 : Project Human Resource Management (4/31) Roles & Responsibilities
  • 5. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Project Manager ( With Human Resources) • Determine what resources will be needed • Create job descriptions • Create project team directory • Create human resource plan • Create recognition and reward system • Make sure that all roles and responsibilities are clearly assigned • Report team members performance • Understand training needs for team members Lecture 09 : Project Human Resource Management (5/31) Roles & Responsibilities
  • 6. PMP Lectures Prepared By: Eng. Mohamed ElSaadany H u m a n R e s o u r c e M a n a g e m e n t 9.1 Plan Human Resource Management Inputs :  Project Management Plan  Activity Resource Requirements  Enterprise Environmental Factors  Organizational Process Assets Tools and Techniques :  Organization Charts and Position Descriptions  Networking  Organizational Theory  Expert Judgment  Meetings Outputs :  Human Resource Management Plan Lecture 09 : Project Human Resource Management (6/31) 01. Plan Human Resource Management
  • 7. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Organization Charts and Position Descriptions: Document team members roles and responsibilities to ensure that each work package has owner using one of the following formats: Lecture 09 : Project Human Resource Management (7/31) 01. Plan Human Resource Management • Hierarchical Ex: OBS, RBS, WBS • Responsibility Assignment Matrix (RAM) This type illustrates connection between activities and team members Ex: RACI (R= Responsible, A= Accountable, C= Consult, I= Inform) • Text-Oriented Formats Also known as Position Descriptions, and Role-Responsibility- Authority Form TT
  • 8. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (8/31) 01. Plan Human Resource Management Networking: Formal and informal interactions with others Ex: Luncheon meetings, informal conversation, events, and conferences. TT Organizational Theory: Addressing the way people and organizational units behave. Different organizational structures have different individual response, individual performance, and personal relationship characteristics. Ex: Scientific management, bureaucracy model, simple structure, hierarchical structure, functional organizations, and matrix organizations. TT Expert Judgment: List required skills and determine reporting relationship needed TT
  • 9. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (9/31) 01. Plan Human Resource Management Human Resource Management Plan: How human resources will be defined, staffed, managed, and released. Part of PM Plan and may include: O 1- Roles and Responsibilities: • Role: Function assigned to a person in the project. Ex: Civil Engineer • Authority: The right to make a decision, approval, acceptance … etc. Ex: Quality acceptance, change approval. • Responsibility: Assigned duties. Ex: Construction of concrete skeleton. • Competency: Skills required to complete activities. 2- Project Organization Chart: • Graphic display of project team members and their reporting relationships.
  • 10. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (10/31) 01. Plan Human Resource Management 3- Staffing Management Plan: • Where they will come from (acquisition) • When recruiting should be start (calendar and histograms) • Staff release plan (help mitigate risks and improve morale) • Training Needs (if expecting team members will not have required skills) • Compliance with HR rules and governmental regulations • Safety policies and procedures • Recognition & reward systems : • Say (Thank You) • Member of the month prize / performance prize • Recommend him/her for raises • Parties, events, and celebrations • Training courses (paid)
  • 11. PMP Lectures Prepared By: Eng. Mohamed ElSaadany H u m a n R e s o u r c e M a n a g e m e n t 9.2 Acquire Project Team Inputs :  Human Resource Management Plan  Enterprise Environmental Factors  Organizational Process Assets Tools and Techniques :  Pre-Assignment  Negotiation  Acquisition  Virtual terms  Multi-Criteria Decision Analysis Outputs :  Project Staff Assignments  Resource Calendars  Project Management Plan Updates Lecture 09 : Project Human Resource Management (11/31) 02. Acquire Project Team
  • 12. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (12/31) 02. Acquire Project Team Pre-Assignment: Sometimes resources are assigned in advance (defined within charter) because of their experience or the sponsor require these resources to be assigned in the project. TT Negotiation: • Negotiate with functional manager, other PM teams within organization to assign scarce and specialized resources, or with external organizations and contractors • When negotiating from within your organization: 1. Know the needs of your project and its priority in the organization 2. Understand that the resource manager has his own work to do 3. Don’t ask for the best resource if the project does not need them 4. Be able to prove why project requires stated resources quantity an quality 5. Build relationship with resource manager and discover what he will need from you TT
  • 13. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (13/31) 02. Acquire Project Team Acquisition: When organization is unable to provide the staff needed, you can get the work done through outsourcing or by subcontracting the work to another organization . TT Virtual Teams: Team members with little or no time spent meeting face to face. Advantages: 1. Use special expertise even if the expert is not in the same area 2. Incorporate employees who work from home 3. Include people with mobility limitations or disabilities 4. Work in projects that would have been ignored due to travel expenses Disadvantage: 1. Possibility for misunderstanding 2. Difficulties of sharing knowledge and experience between members 3. Cost of applying communication technology TT
  • 14. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (14/31) 02. Acquire Project Team Multi-Criteria Decision Analysis: Using analysis tool, criteria are used to rate or score team member like: availability, cost, experience, ability, knowledge, skills, and attitude • Halo effect is the tendency to rate employee on all factors due to one factor. This action has negative impacts and should be avoided Ex: Assigning a project manager because he is a great programmer TT Project Staff Assignments: When appropriate people have been assigned, 1. Document this assignment in Project Team Directory 2. Send memos to team members 3. Insert name in organization chart O Resource Calendar: It documents the time period that each team member can work including persons availability, vacation time, holidays, work hours, … etc. O
  • 15. PMP Lectures Prepared By: Eng. Mohamed ElSaadany H u m a n R e s o u r c e M a n a g e m e n t 9.3 Develop Project Team Inputs :  Human Resource Management Plan  Project Staff Assignments  Resource Calendars Tools and Techniques :  Interpersonal skills  Training  Team-Building Activities  Ground Rules  Co location  Recognition and Rewards  Personnel Assessment Tools Outputs :  Team Performance Assessments  Enterprise Environmental Factors Updates Lecture 09 : Project Human Resource Management (15/31) 03. Develop Project Team
  • 16. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (16/31) 03. Develop Project Team Interpersonal Skills: (Soft Skills) Assessing and controlling team members sentiments ‫مشاعر‬ and following up their issues increase cooperation and reduce tension. Ex: Communication skills, emotional intelligence, conflict resolution, negotiation, influence, creativity, and team building. Encourage team, communicate honestly, establish and maintain trust. TT Training: Enhance competencies to reduce overall project cost Scheduled training takes place as stated in human resource plan Unplanned training takes place as a result of observation TT Ground Rules: What behavior is acceptable and what is not acceptable for example: • How should team member resolve conflicts with others • Who is authorized to give direction to contractors • Acceptable behavior during meetings TT
  • 17. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (17/31) 03. Develop Project Team Team-Building Activities Team building is to help team members work together effectively exercising the following : • Handle team members problems & discuss them as team members issues • Introduce appropriate rewards and recognition • Manage conflicts effectively • Provide good leadership • Promote trust and open communication among team members • WBS creation is a team-building tool In Matrix organization you don’t have the ability to give team a rise or promotion. Trust as well as recognition and reward system will make you able to get people to cooperate. TT
  • 18. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (18/31) 03. Develop Project Team Team Development Stages: It is one of the models used to describe team development 1. Forming: People are brought together as a team 2. Storming: There are disagreements as people learn to work together 3. Norming: Team members begin to build good relationships, begin trust each other 4. Performing: Team members work effectively together as well- organized unit 5. Adjourning: Team members complete the work and moves on from the project
  • 19. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (19/31) 03. Develop Project Team Co-Location: Placing the active team members in the same location (war room) to enhance their ability to perform as a team. War room is a central location for project coordination usually with WBS, networks, schedule, … etc. posted on the wall TT Personnel Assessment Tools: These tools help project manager assess team members preferences, aspirations, how they organize information, how they make decisions, and how they prefer to interact with people. Examples of these tools are surveys, interviews, and focus groups. These tools provide improved understanding, communication, and trust among the team. TT
  • 20. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (20/31) 03. Develop Project Team Team Performance Assessments: The evaluation of a team’s effectiveness may include indicators such as: 1. Improvement in skills 2. Improvement in competencies 3. Increased team cohesiveness 4. Reduce staff turnover rate Note: Team performance assessment is done by project manager or by project management team for all team , not for individuals. O
  • 21. PMP Lectures Prepared By: Eng. Mohamed ElSaadany H u m a n R e s o u r c e M a n a g e m e n t 9.4 Manage Project Team Inputs :  Human Resource Management Plan ■ Project Staff Assignments  Team Performance Assessments ■ Issue Log  Work Performance Reports ■ Organizational Process Assets Tools and Techniques :  Observation and Conversation ■ Project Performance Appraisals  Conflict Management ■ Interpersonal Skills Outputs :  Change Requests  Project Management Plan Updates  Project Documents Updates  Enterprise Environmental Factors Updates  Organizational Process Assets Updates Lecture 09 : Project Human Resource Management (21/31) 04. Manage Project Team
  • 22. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (22/31) 04. Manage Project Team Issue Log: Output of “Manage Stake Holder Engagement“ process and used to manage and follow up issues . I Observation and Conversation: Used to stay in touch with the work and attitude of team members. TT Issue No Issue Date Added Raised By Person Assigned Resolution Due Date Status Date Resolved Resolution Project Performance Appraisals: Evaluation of employees’ performance by their supervision. 360-Degree Review is one of the ways to complete appraisal by including the input of coworkers, subordinates, and supervisors. TT
  • 23. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (23/31) 04. Manage Project Team Conflict Management:TT A - Conflict Sources: 1- Schedule 2- Project Priorities 3- Technical Opinions 4- Resources 5- Administrative Procedures 6- Cost 7- Personality ‫األخيرة‬ ‫هى‬ ‫الشخصية‬ ‫ان‬ ‫وتذكر‬ ‫أربعة‬ ‫أول‬ ‫تذكر‬ B - Conflict Properties: 1. Conflict is natural and inevitable 2. Conflict is consequence of organizational interaction 3. Conflict resolution needs openness 4. Conflict resolution should focus on issues not personalities 5. Conflict resolution should focus on present not past
  • 24. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (24/31) 04. Manage Project Team Conflict Management:TT C - Conflict Avoiding Techniques: 1- Ground Rules 2- Role Definition 3- Communication Planning 4- Inform team of project objectives, constraints, charter 5- Make work assignments interesting and challenging D - Resolution Responsibility: 1. Conflict is best resolved by those involved in the conflict 2. If conflict escalate, project manager should help facilitate satisfactory resolution. 3. If disruptive conflict continues, formal procedures should be used including disciplinary actions. ‫إجراءات‬‫تأديبية‬
  • 25. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (25/31) 04. Manage Project Team Conflict Management:TT E - Conflict Resolution Techniques: 1. Collaborate/Confront (Problem Solving): Incorporate multiple viewpoint to lead to consensus then problem goes away leading to win-win situation. 2. Compromise/Reconcile : Bring some degree of satisfaction to all parties, then no party gets everything, leading to lose-lose situation. Compromising in not the best choice but rather second to confronting. 3. Withdraw/Avoid: Parties retreat ‫يتراجع‬ or postpone a decision. 4. Smooth/Accommodate: Emphasize agreements rather than difference in opinions, conceding ‫خضوع‬ one’s position to the needs of others to maintain harmony and relationships. 5. Force/Direct: Pushing one viewpoint at the expense of others.
  • 26. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (26/31) 04. Manage Project Team Interpersonal Skills: ‫مهارات‬‫التعامل‬‫مع‬‫اآلخرين‬TT A. Powers of project manager: 1. Formal (Legitimate): Based on your position ‫رسمي‬(‫شرعي‬) 2. Reward: Giving rewards and prizes. 3. Penalty (Coercive): For example removing from some team ‫العقاب‬(‫اإلكراه‬) 4. Expert: Power comes from being project management expert. 5. Referent: The ability of a leader to influence a follower because of the follower's loyalty, respect, or admiration. It’s the power of charisma. Notes: • Best powers are Expert and Reward. The worst is Penalty. • Powers derived from PM position are Formal, Reward, and Penalty • Power earned on your own is Expert
  • 27. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (27/31) 04. Manage Project Team Interpersonal Skills: ‫مهارات‬‫التعامل‬‫مع‬‫اآلخرين‬TT B. Management and Leadership Styles: • At the beginning of project use directing styles. • At the project execution use coaching, facilitating, and supporting. 1. Directing: Telling others what to do. 2. Facilitating: Coordinating the inputs of others. 3. Coaching: Helping other achieve their goal. 4. Supporting: Providing assistance along the way. 5. Autocratic: Manager has power to do what he want. ‫استبدادي‬ 6. Consultative: Manager obtains others’ opinions & act as servant for team 7. Consultative- Autocratic: Manager takes input from team members but retains decision-making authority for him self. 8. Consensus: Making decisions base on group agreement.
  • 28. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (28/31) 04. Manage Project Team Interpersonal Skills: ‫مهارات‬‫التعامل‬‫مع‬‫اآلخرين‬TT B. Management and Leadership Styles: 9. Delegation: Establish goals then give team authority to complete the work. 10.Bureaucratic : Following procedures exactly. Appropriate for critical work. 11.Charismatic: Energize and encourage team in performing. 12.Democratic (Participative): Team own the decision made by group. 13.Laissez-Faire: Leave alone/Allow to act. Manager is not directly involved in team work but consult as necessary. ‫دعه‬‫يعمل‬ 14.Analytical: Manager asks questions to get facts. 15.Driver: Constantly giving directions. His attitude drives team to win. 16.Influencing: This style emphasizes team work, teambuilding, and team working. These managers work with their teams to influence project implementation. Influence skills include: persuasive – listening – mutual trust – consideration of various perspectives.
  • 29. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (29/31) 04. Manage Project Team Important Notes Problem Solving Method: 1- Define the real problem 2- Analyze problem 3- Identify solutions 4- Pick a solution 5- Implement solution 6- Confirm solution solved problem Special Terms : A. Expectancy Theory: Employees who expect to be rewarded for their accomplishments remains productive as rewards meet their expectations. B. Perquisites (Perks): Some employees receive special rewards such as assigned parking space or executive dining. ‫االمتيازات‬‫االستثنائية‬ C. Fringe Benefits : Standard benefits formally given to all employees such as educational benefits, insurance, and profit sharing. ‫المزايا‬‫االضافية‬
  • 30. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (30/31) 04. Manage Project Team Motivation Theories A- McGregor’s theory of X & Y: Theory X: Managers who believe that people need to be watched every minute. Theory Y: Managers who believe people are willing to work without supervision B- Maslow’s theory hierarchy of need: To ascend next level you should fulfill levels below. Starting from the pyramid base : 1. Physiological: Air, water, ... etc. 2. Safety: Security, Stability, ... etc. 3. Social: Like, love, friends, ... etc. 4. Esteem: Attention, respect, ... etc. 5. Self Actualization: Learning, growth, … etc.
  • 31. PMP Lectures Prepared By: Eng. Mohamed ElSaadany Lecture 09 : Project Human Resource Management (31/31) 04. Manage Project Team C- David McClelland's Theory of Needs: Also Called Acquired Needs Theory 1. People need achievement  They like recognition  Give them challenging projects. 2. People need Affiliation  They seek approval rather than recognition  Let him cooperate with others. 3. People need Power  Effective Leader  If socially oriented(not personally oriented), allow him to manage others. D- Herzberg’s Theory: 1. Hygiene Factors: Work condition, salary, security, personal life, relationship at work. 2. Motivating Agents: Responsibility, self-actualization, recognition, professional growth. Poor hygiene factors may destroy motivation but improving them will not improve motivation