LEAN SUPPLY CHAIN
                                                     MANAGEMENT
                                                    [Toyota Indonesia Case]

                                                                  Sharing on 6th Indonesia Supply Chain and Logistics
                                                           Conference and Expo 2011 (ISCL)  “New Era of Indonesia
                                                                Supply Chain and Logistics : Center of South East Asia




                                                                               J
                                                                               akarta, Novem 3rd, 2011
                                                                                            ber
                                                                                 J.F. Ferry Yanto
Safety awareness : I will not use hand phone during drive the
                                                          car
OUTLINE

       OVERVIEW [Lean in Toyota]
       ◙

N MANAGEMENT STRATEGY <simple Concept>
     ◙
    Sample of LEAN IMPLEMENTATION
      ◙
       ◙    SUMMARY
LLENGE LEAN MANAGEMENT IMPLEMENTATION
     ◙

e Considered for Lean Management Implementation
      ◙




                                                              1/17
 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
OVERVIEW

      ◙ GOAL of LEAN ACTIVITY                  COST REDUCTION PROFIT      INCREASE
      ◙    In TOYOTA CASE ,

                      No Cost Reduction , , No Profit Increase
                      No Cost Reduction No Profit Increase

           as Basic Philosophy

                          (1) SALES PRICE = COST + PROFIT
                        (2) PROFIT           = SALES PRICE - COST

                                 Sales Price Determined by CUSTOMERS



PROFIT (        ) = SALES PRICE ( = ) – COST (                   )


                                                                                2/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
OVERVIEW

                                                                           MUDA OVER PRODUCTION
                                                                           MUDA OVER PRODUCTION
  TO REDUCE COST                ELIMINATE WASTE ( MUDA )
                                 [ Reduce Non Added Value Work ]
                                                                              WAS THE WORST ! !
                                                                              WAS THE WORST

                                      [ 7 TYPE OF MUDA]

                                                               (1) OVER PRODUCTION HIDE PROBLEMS
                                                                   and MAKE IT IMPOSSIBLE TO BE SOLVED
   ◙
   COST DEPENDENT ON PRODUCTION METHODE
                                                                          (-) Excess Man Power or
                                                                              machine capacity ?
   ◙    COST BREAKDOWN ANALYSIS
                                                                        IMPACT TO COST INCREASE

Traditional Production

                                                            Material
                                            Operator A


                                                                                       Finished
                                                                                       Products
                   Operator B                                          Operator C




                                                                                                    3/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
OVERVIEW
 Continuous Flow Production
      Material

                                                                                Finished

                                                                                Products
                         Operator A        Operator B          Operator C



  Comparison as the traditional way production & continuous flow production:
 - √ Eliminate MUDA stock
 - √ Eliminate MUDA move
 - √ Save more space




                        In TOYOTA PRODUCTION SYSTEM :
                          Always “CUSTOMER FIRST” Attitude
                  ( Produce Good Products with Low Cost in a Timely Manner )



                                                                                           4/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
LEAN MANAGEMENT STRATEGY < SIMPLE CONCEPT >




          Lead     Lead      Lead     Lead           Lead          Lead     Lead   Lead
          Time     Time      Time     Time           Time          Time     Time   Time



                                    TOTAL LEAD TIME
                                    TOTAL LEAD TIME


                          (1) SHORTENING LEAD
                          TIMESimplifying the Process
                              ●

                             ● Continuous Flow ( One Piece Flow Process )


                          (2) REDUCE INVENTORY LEVEL


                                                                                          5/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
SAMPLE of LEAN IMPLEMENTATION
              SUPPLY CHAIN IN MANUFACTURING
        VENDOR                         MANUFACTURING              DEALER   CUSTOMER
        Loca
              l Part
                    s




                                                                     

                          Receiving   PC store      Production   Dealer   Customer
      Import Parts           Dock




                                                                               6/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
SAMPLE of LEAN IMPLEMENTATION

        VENDOR                         MANUFACTURING              DEALER   CUSTOMER

        Loca
              l Part
                    s




                           Receiving   PC store      Production   Dealer   Customer
      Import Parts           Dock




                                                                               7/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
SAMPLE of LEAN IMPLEMENTATION

   Domestics Logistics / Conveyance
       SINGLE DELIVERY                                       MILK RUN
                                        Stock                                Stock
                                        4                                    1
                      4x / day
           (A)                          Hour           (A)                   Hour


                                        2                                    1
                      8x / day          Hour                                 Hour
                                                                 12x / day
           (B)                                         (B)

                                                                             1
                                        16
                      1x / day                                               Hour
                                        Hour
           (C)                                         (C)



                                        Variety                              1 Hour
      Running Stock
                                      2 ~ 16 Hour       Stock Reduction



                                                                                      8/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
SAMPLE of LEAN IMPLEMENTATION
    Domestics Logistics / Conveyance
                             (D)
     SINGLE                                           Plant 1

    DELIVERY          (E)


                                                      Plant 2
                             (F)




                              (D)
   MILK RUN                                            Plant 1

   X-DOCK and          (E)                  X-Dock
  INTERPLANT
                                                       Plant 2
                              (F)




     MILK RUN                             (D)
                                                                 Plant 1

  , INTERPLANT                      (E)


                                                                 Plant 2
                                          (F)

                                                                           9/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
SAMPLE of LEAN IMPLEMENTATION

        VENDOR                         MANUFACTURING              DEALER   CUSTOMER

         Loca
              l Part
                    s




                                  

                           Receiving   PC store      Production   Dealer   Customer
      Import Parts           Dock




                                                                             10/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
SAMPLE of LEAN IMPLEMENTATION

  Internal Logistics
      Simplify Process  Re-arrangement of Process




                                                             11/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
SAMPLE of LEAN IMPLEMENTATION


    &           Linked between internal and vendor

 STOCK REDUCTION USING KANBAN ( Kanban Cyclic )
          SEQUENTIAL PARTS DELIVERY
            etc.




                                                             12/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
SAMPLE of LEAN IMPLEMENTATION

        VENDOR                         MANUFACTURING              DEALER   CUSTOMER

         Loca
              l Part
                    s




                                                        

                           Receiving   PC store      Production   Dealer   Customer
      Import Parts           Dock




                                                                             13/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
SAMPLE of LEAN IMPLEMENTATION

   Process                         PRODUCTIVITY UP with elimination MUDA
                                                                                 Reduce MP with same output
  ► Others Example how to proceed ?                                     MP           : 10λ          : 9λ
                                                                        Output       : 200 Unit     : 200 Unit
                  Yamazumi Chart MP Process Line #1

                                                 Highest CT


                                                                                                  Target Reduce




      Problem :
                                                              Process Analysis
        Unbalance Loading MP in
           Process Line #1


                                                              Improvement / Kaizen



                                                              Achieve Target



                                                                                                             14/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
SUMMARY

         TOYOTA Indonesia utilize Toyota Production System as the base of
          manufacturing process, and Lean was blend inside of TPS as the focus point
          in TPS Basic Philosophy : Cost Awareness with Customer First and Quality
          as priority.




         Currently, Continuous Improvement/Kaizen is implemented with PDCA
          cycle .




                                                                              15/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
CHALLENGE LEAN MANAGEMENT
                                                                             IMPLEMENTATION

                                                                                                        NEW CHALLENGE … …
                                                                                                         Flexible Market Demand




                           4
                                 WEAK In INDUSTRIAL RELATIONSHIP ( Coy VS
                           .     Union )
                                        SAME DIRECTION / VISION ( Mutual Understanding )

                                              Need Support From Government
  1                                                                     2
       2 nd TIER and 1 st TIER are NOT                                      MUTUAL UNDERSTANDING in BUSINESS
  .                                                                     .
       CENTRALIZED                                                          (LEAN)
             Base on Demography or Mapping Area                                       Gap of Knowledge

                       ● Good Infrastructure
                                                                                     Development and Growth Together
                       ●       Optimizing Current
      Ideal Condition : All in 1 Area
                                                                               3
 5                                                                                 COMMITMENT MANAGEMENT
       OTHERS                                                                  .
 .                                                                                             Inconsistency Condition
       ► Government Regulation / Policy in Industrial
                                 How to link with Lean Concept
       ► IT / SYSTEM Development  Readiness Company Adopt ?                       Be a Coy Culture & Reflected in People Development
       ► Less Localization ?  Enhance Localization

                                                                                                                                16/17
THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
Items to be Considered for Lean
                                      Management Implementation
 Supply Chain Management is one complete cycle and have synergy with one
another
      Skillful RESOURCES is the key point
             • Knowledge and break through idea/creative idea
             • Good TEAM WORK
      Strong COMMITMENT Management
             • Top Management concern and monitoring required

      Business Relations [company with vendor]
             • Mutual understanding  Spirit of Efficient Process
                • Good relationship between company and employee (union)
       Infrastructure [road condition, others facility etc]

  Force LOCALIZATION , as a big opportunity for reducing Lead time  CR


                                                                            17/17
 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
POOR METHODE of CONVEYANCE and
                                                     LOGISTICS

        ◙ Poor method results in stagnation

asically : Conveyance is NON ADDED VALUE operations

                Eliminating conveyance is the best way

■ If   Conveyance is Needed,

                      Best possible way is to make JIT material flow


                When it is needed

                     Only what is needed

                            In the amount needed


 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
SUPPLY CHAIN

 (1) SUPPLY CHAIN MANAGEMENT BECOMING MORE IMPORTANT
        1. Grasp Current Situation Accurately ( Time and Volume Stagnation included )

        2. Procure Parts from Supplier close by


 (2) SIMPLIFY THE FLOW
        a) Macroscopic Flow




        a) Microscopic Flow ( Demerits of Complicated Flow )




THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
SUPPLY CHAIN

                                   Goal
   REDUCE LOT SIZE                               1 Pieces Production
                                                  No Stagnation
                                                  Guarantee Quality            Kanban Pulling
                                                                                   System


        Production       =                           +
          Lead Time            Processing Time                Lot Size

                                  1 Hour                     10 Lot = 10 days
                                                                                   Productivity Up
                                                                                      ( Improve
                                                                                      Chance )
                                                             1 Lot = 1 hours




THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
INVENTORY

   What is Needed to Reduce Inventory

   (2)   Reduction of
Production
      Lead Time

                    Lead
                    Time


                                                        S h ipping
                                                                        Customer
                                                                           Customer
                   production line


                                                             (1)
                                                                         Logistics Kaizen
                                                                       物流改善
   (3)   Increase reliability of                         (1)   Logistic Kaizen
     Production Line                                         • Leveled frequent supply
                                                               Leveled Frequent Delivery
                                                               平準化した多回納入
   (4)   Reduce and Limit                                      Leveled Frequent Pick Up
variety



THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA                                  23
SUPPLY CHAIN IN MANUFACTURING

        VENDOR                         MANUFACTURING              DEALER   CUSTOMER

         Loca
              l Part
                    s




                          Receiving   PC store      Production   Dealer   Customer
      Import Parts           Dock




THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
LEAN MANAGEMENT STRATEGY

      Long lead time conveyance/Logistics [Import parts]
    √Lot Based                                           √PxP Based
                                             a   f        Part No.   Order   Box
    AA        AA-2             10 Part No.   b   g          a         10      5
                                             c   h          b         20      6
                                             d   i          c
                                             e   j          d
                                                            e
                               15 Part No.   a   f   k
              AA-1                           b   g   l
                                                            f                         Minimum = 5 ~ 10 % reduction

                                             c   h   m      g
                                                            h
                                             d   i   n
                                             e   j   o      i
                                                            j


     Order   1 lot = 10 Unit                                                       1 box             1 box
                                                                                   : 10 pcs          : 12 pcs


    √X-Dock




THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
LEAN MANAGEMENT STRATEGY

     Delivery ~ Customers
eduction the Stock with giving Flexibility for absorbing miss forecast

   → Monthly Firm to Monthly Firm with Weekly Order Change




 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
SUPPLY CHAIN IN MANUFACTURING

        VENDOR                         MANUFACTURING              DEALER   CUSTOMER

         Loca
              l Part
                    s




                                                                       

                           Receiving   PC store      Production   Dealer   Customer
      Import Parts           Dock




THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA

More Related Content

What's hot

Lean production System - TPS
Lean production System - TPSLean production System - TPS
Lean production System - TPSPrakash Prakash
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production Systemjasonhian
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution pptAkshay Jain
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhusashi prabhu
 
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)Abdul Qadir Master
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)Prasanna3804
 
Jit (us), kanban, lean
Jit (us), kanban, leanJit (us), kanban, lean
Jit (us), kanban, leanNishit Patel
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturingHammaduddin
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean ManagementRuhi Beri
 
Just in time in supply chain management &
Just in time in supply chain management &Just in time in supply chain management &
Just in time in supply chain management &ganessh04
 
Just In Time - Operations Management
Just In Time - Operations ManagementJust In Time - Operations Management
Just In Time - Operations ManagementGargi Kapadia
 
World class manufacturing (wcm)
World class manufacturing (wcm)World class manufacturing (wcm)
World class manufacturing (wcm)Rahul Hedau
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturingravindra sharma
 

What's hot (20)

Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Lean production System - TPS
Lean production System - TPSLean production System - TPS
Lean production System - TPS
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
 
Lean manufacturing report
Lean manufacturing reportLean manufacturing report
Lean manufacturing report
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
JIT, Kanban, Kaizen, Muda in TPS (Toyota Production System)
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
 
Jit (us), kanban, lean
Jit (us), kanban, leanJit (us), kanban, lean
Jit (us), kanban, lean
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
The Toyota Way
The Toyota WayThe Toyota Way
The Toyota Way
 
Just In Time and Lean Management
Just In Time and Lean ManagementJust In Time and Lean Management
Just In Time and Lean Management
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Just in time concept
Just in time conceptJust in time concept
Just in time concept
 
Just in time in supply chain management &
Just in time in supply chain management &Just in time in supply chain management &
Just in time in supply chain management &
 
Just In Time - Operations Management
Just In Time - Operations ManagementJust In Time - Operations Management
Just In Time - Operations Management
 
World class manufacturing (wcm)
World class manufacturing (wcm)World class manufacturing (wcm)
World class manufacturing (wcm)
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
Lean basics
Lean basicsLean basics
Lean basics
 

Viewers also liked

Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.Sabio Bernard
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation pptbwu.nl
 
How to Build Hardware Lean
How to Build Hardware LeanHow to Build Hardware Lean
How to Build Hardware LeanDiUS
 
Lean Agile Evaluation - A disruptive Approach for sourcing
Lean Agile Evaluation - A disruptive Approach for sourcingLean Agile Evaluation - A disruptive Approach for sourcing
Lean Agile Evaluation - A disruptive Approach for sourcingMirko Kleiner
 
The RFP is dead: A disruptive Approach for a successful sourcing in just 1 day
The RFP is dead: A disruptive Approach for a successful sourcing in just 1 dayThe RFP is dead: A disruptive Approach for a successful sourcing in just 1 day
The RFP is dead: A disruptive Approach for a successful sourcing in just 1 dayflowdays
 
Tps (toyota production system)
Tps (toyota production system)Tps (toyota production system)
Tps (toyota production system)systech indonesia
 
How do we get started with Toyota Kata?
How do we get started with Toyota Kata?How do we get started with Toyota Kata?
How do we get started with Toyota Kata?EmielVanEst
 
Evolving a Learning Analytics Platform
Evolving a Learning Analytics PlatformEvolving a Learning Analytics Platform
Evolving a Learning Analytics PlatformAri Bader-Natal
 
Indian auto components industry outlook edition 2012
Indian auto components industry outlook edition 2012Indian auto components industry outlook edition 2012
Indian auto components industry outlook edition 2012AMMindpower
 
Jeff Katz on Lean Hardware Startups
Jeff Katz on Lean Hardware StartupsJeff Katz on Lean Hardware Startups
Jeff Katz on Lean Hardware StartupsJeff Katz
 
Toyota Social Innovation: Experience to Society
Toyota Social Innovation: Experience to SocietyToyota Social Innovation: Experience to Society
Toyota Social Innovation: Experience to SocietySasin SEC
 
ZERO STOCK OUT CASE STUDY
ZERO STOCK OUT CASE STUDYZERO STOCK OUT CASE STUDY
ZERO STOCK OUT CASE STUDYBuen Guido
 
How Well Does ERP Facilitate Project Based Business Models?
How Well Does ERP Facilitate Project Based Business Models?How Well Does ERP Facilitate Project Based Business Models?
How Well Does ERP Facilitate Project Based Business Models?Charles Rathmann
 

Viewers also liked (20)

Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.
 
Toyota Logistics
Toyota Logistics Toyota Logistics
Toyota Logistics
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
How to Build Hardware Lean
How to Build Hardware LeanHow to Build Hardware Lean
How to Build Hardware Lean
 
Group b opm-ppt_final
Group b opm-ppt_finalGroup b opm-ppt_final
Group b opm-ppt_final
 
Lean Agile Evaluation - A disruptive Approach for sourcing
Lean Agile Evaluation - A disruptive Approach for sourcingLean Agile Evaluation - A disruptive Approach for sourcing
Lean Agile Evaluation - A disruptive Approach for sourcing
 
The RFP is dead: A disruptive Approach for a successful sourcing in just 1 day
The RFP is dead: A disruptive Approach for a successful sourcing in just 1 dayThe RFP is dead: A disruptive Approach for a successful sourcing in just 1 day
The RFP is dead: A disruptive Approach for a successful sourcing in just 1 day
 
Kaizen S pertama (seiri)
Kaizen S pertama (seiri)Kaizen S pertama (seiri)
Kaizen S pertama (seiri)
 
Tps (toyota production system)
Tps (toyota production system)Tps (toyota production system)
Tps (toyota production system)
 
How do we get started with Toyota Kata?
How do we get started with Toyota Kata?How do we get started with Toyota Kata?
How do we get started with Toyota Kata?
 
Evolving a Learning Analytics Platform
Evolving a Learning Analytics PlatformEvolving a Learning Analytics Platform
Evolving a Learning Analytics Platform
 
Indian auto components industry outlook edition 2012
Indian auto components industry outlook edition 2012Indian auto components industry outlook edition 2012
Indian auto components industry outlook edition 2012
 
Jeff Katz on Lean Hardware Startups
Jeff Katz on Lean Hardware StartupsJeff Katz on Lean Hardware Startups
Jeff Katz on Lean Hardware Startups
 
Kaizen (Continual Improvement)
Kaizen (Continual Improvement)Kaizen (Continual Improvement)
Kaizen (Continual Improvement)
 
PENELITIAN OPERASIONAL - PROGRAMA LINIER - METODE PRIMAL DUAL
PENELITIAN OPERASIONAL - PROGRAMA LINIER - METODE PRIMAL DUALPENELITIAN OPERASIONAL - PROGRAMA LINIER - METODE PRIMAL DUAL
PENELITIAN OPERASIONAL - PROGRAMA LINIER - METODE PRIMAL DUAL
 
Toyota Social Innovation: Experience to Society
Toyota Social Innovation: Experience to SocietyToyota Social Innovation: Experience to Society
Toyota Social Innovation: Experience to Society
 
ZERO STOCK OUT CASE STUDY
ZERO STOCK OUT CASE STUDYZERO STOCK OUT CASE STUDY
ZERO STOCK OUT CASE STUDY
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
How Well Does ERP Facilitate Project Based Business Models?
How Well Does ERP Facilitate Project Based Business Models?How Well Does ERP Facilitate Project Based Business Models?
How Well Does ERP Facilitate Project Based Business Models?
 

Similar to Lean manufacturing toyota indonesia 2011_2

Operations Strategies of EasyJet vs Virgin Atlantic
Operations Strategies of EasyJet vs Virgin AtlanticOperations Strategies of EasyJet vs Virgin Atlantic
Operations Strategies of EasyJet vs Virgin AtlanticRonantonnoel
 
OR Society workshop: Practical process improvement using Lean and 6 Sigma
OR Society workshop: Practical process improvement using Lean and 6 SigmaOR Society workshop: Practical process improvement using Lean and 6 Sigma
OR Society workshop: Practical process improvement using Lean and 6 SigmaImprovement Skills Consulting Ltd.
 
Toyota production system
Toyota production systemToyota production system
Toyota production systemParag Chaubey
 
Business Model Innovation for Next Generation Enterprise
Business Model Innovation for Next Generation EnterpriseBusiness Model Innovation for Next Generation Enterprise
Business Model Innovation for Next Generation EnterpriseSachin Joshi
 
Strome | Innovation in expense management
Strome | Innovation in expense managementStrome | Innovation in expense management
Strome | Innovation in expense managementstromeslides
 
Agile Framework
Agile FrameworkAgile Framework
Agile FrameworkSubbuiyer
 
Operations management project
Operations management projectOperations management project
Operations management projectakshah67
 
profitability cost mgt
 profitability cost mgt profitability cost mgt
profitability cost mgtguesta7ae170
 
Responding to R&D Challenges in a Changing Industry
Responding to R&D Challenges in a Changing IndustryResponding to R&D Challenges in a Changing Industry
Responding to R&D Challenges in a Changing IndustryInnoval Technology
 
Dyer at kearny presentation
Dyer at kearny presentationDyer at kearny presentation
Dyer at kearny presentationCALSTART
 
Jerry Riordan from CEVA Americas; ‘Develop a Culture of Innovation: Dissemina...
Jerry Riordan from CEVA Americas; ‘Develop a Culture of Innovation: Dissemina...Jerry Riordan from CEVA Americas; ‘Develop a Culture of Innovation: Dissemina...
Jerry Riordan from CEVA Americas; ‘Develop a Culture of Innovation: Dissemina...eyefortransport
 
Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...Vector Consulting Group
 
Lean Construction Webinar
Lean Construction WebinarLean Construction Webinar
Lean Construction WebinarBMGI India
 
Asset Performance Management I Maintain 2012
Asset Performance Management I Maintain 2012Asset Performance Management I Maintain 2012
Asset Performance Management I Maintain 2012marc_hoppenbrouwers
 
Developing Content for the Digital Conversaton
Developing Content for the Digital ConversatonDeveloping Content for the Digital Conversaton
Developing Content for the Digital ConversatonG3 Communications
 
TPM For New Person
TPM For New PersonTPM For New Person
TPM For New Personabir014
 
Empirical Evidence Of Agile Methods
Empirical Evidence Of Agile MethodsEmpirical Evidence Of Agile Methods
Empirical Evidence Of Agile MethodsGrigori Melnik
 
Changing the Game by Simplifying IT
Changing the Game by Simplifying ITChanging the Game by Simplifying IT
Changing the Game by Simplifying ITOracle Day
 

Similar to Lean manufacturing toyota indonesia 2011_2 (20)

Operations Strategies of EasyJet vs Virgin Atlantic
Operations Strategies of EasyJet vs Virgin AtlanticOperations Strategies of EasyJet vs Virgin Atlantic
Operations Strategies of EasyJet vs Virgin Atlantic
 
OR Society workshop: Practical process improvement using Lean and 6 Sigma
OR Society workshop: Practical process improvement using Lean and 6 SigmaOR Society workshop: Practical process improvement using Lean and 6 Sigma
OR Society workshop: Practical process improvement using Lean and 6 Sigma
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Business Model Innovation for Next Generation Enterprise
Business Model Innovation for Next Generation EnterpriseBusiness Model Innovation for Next Generation Enterprise
Business Model Innovation for Next Generation Enterprise
 
Strome | Innovation in expense management
Strome | Innovation in expense managementStrome | Innovation in expense management
Strome | Innovation in expense management
 
Lean outlook
Lean outlookLean outlook
Lean outlook
 
Agile Framework
Agile FrameworkAgile Framework
Agile Framework
 
Operations management project
Operations management projectOperations management project
Operations management project
 
profitability cost mgt
 profitability cost mgt profitability cost mgt
profitability cost mgt
 
Responding to R&D Challenges in a Changing Industry
Responding to R&D Challenges in a Changing IndustryResponding to R&D Challenges in a Changing Industry
Responding to R&D Challenges in a Changing Industry
 
Dyer at kearny presentation
Dyer at kearny presentationDyer at kearny presentation
Dyer at kearny presentation
 
Jerry Riordan from CEVA Americas; ‘Develop a Culture of Innovation: Dissemina...
Jerry Riordan from CEVA Americas; ‘Develop a Culture of Innovation: Dissemina...Jerry Riordan from CEVA Americas; ‘Develop a Culture of Innovation: Dissemina...
Jerry Riordan from CEVA Americas; ‘Develop a Culture of Innovation: Dissemina...
 
Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...Understand the differences and similarities between techniques of Lean Manufa...
Understand the differences and similarities between techniques of Lean Manufa...
 
Lean Construction Webinar
Lean Construction WebinarLean Construction Webinar
Lean Construction Webinar
 
Asset Performance Management I Maintain 2012
Asset Performance Management I Maintain 2012Asset Performance Management I Maintain 2012
Asset Performance Management I Maintain 2012
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
 
Developing Content for the Digital Conversaton
Developing Content for the Digital ConversatonDeveloping Content for the Digital Conversaton
Developing Content for the Digital Conversaton
 
TPM For New Person
TPM For New PersonTPM For New Person
TPM For New Person
 
Empirical Evidence Of Agile Methods
Empirical Evidence Of Agile MethodsEmpirical Evidence Of Agile Methods
Empirical Evidence Of Agile Methods
 
Changing the Game by Simplifying IT
Changing the Game by Simplifying ITChanging the Game by Simplifying IT
Changing the Game by Simplifying IT
 

More from Muljati Muli

Shorten power application payment request
Shorten power application payment requestShorten power application payment request
Shorten power application payment requestMuljati Muli
 
5 g peek from cmcc 20may2013
5 g peek from cmcc 20may20135 g peek from cmcc 20may2013
5 g peek from cmcc 20may2013Muljati Muli
 
PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)
PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)
PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)Muljati Muli
 
Business data in Pekanbaru Riau
Business data in Pekanbaru RiauBusiness data in Pekanbaru Riau
Business data in Pekanbaru RiauMuljati Muli
 
Wimax Pakistan Case Study
Wimax Pakistan Case StudyWimax Pakistan Case Study
Wimax Pakistan Case StudyMuljati Muli
 
Wimax deployment considerations
Wimax deployment considerationsWimax deployment considerations
Wimax deployment considerationsMuljati Muli
 
Tatacara pengadaan pemerintah
Tatacara pengadaan pemerintahTatacara pengadaan pemerintah
Tatacara pengadaan pemerintahMuljati Muli
 
Sustaining market through supply chain
Sustaining market through supply chainSustaining market through supply chain
Sustaining market through supply chainMuljati Muli
 
Fishbone diagram template
Fishbone diagram templateFishbone diagram template
Fishbone diagram templateMuljati Muli
 
Why retail stores fail
Why retail stores failWhy retail stores fail
Why retail stores failMuljati Muli
 
Making yourself indispensable
Making yourself indispensableMaking yourself indispensable
Making yourself indispensableMuljati Muli
 
Deliver presentation like Steve Jobs
Deliver presentation like Steve JobsDeliver presentation like Steve Jobs
Deliver presentation like Steve JobsMuljati Muli
 
Indonesia Submarine Cables
Indonesia Submarine CablesIndonesia Submarine Cables
Indonesia Submarine CablesMuljati Muli
 

More from Muljati Muli (18)

Shorten power application payment request
Shorten power application payment requestShorten power application payment request
Shorten power application payment request
 
5 g peek from cmcc 20may2013
5 g peek from cmcc 20may20135 g peek from cmcc 20may2013
5 g peek from cmcc 20may2013
 
TD LTE MAP GSA
TD LTE MAP GSATD LTE MAP GSA
TD LTE MAP GSA
 
PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)
PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)
PAYMENT PROCESS FOR BUDGETED STATE SPENDING (Indonesia)
 
Mobile lifecycle
Mobile lifecycleMobile lifecycle
Mobile lifecycle
 
LTE Vision 2020
LTE Vision 2020LTE Vision 2020
LTE Vision 2020
 
Business data in Pekanbaru Riau
Business data in Pekanbaru RiauBusiness data in Pekanbaru Riau
Business data in Pekanbaru Riau
 
Wimax Pakistan Case Study
Wimax Pakistan Case StudyWimax Pakistan Case Study
Wimax Pakistan Case Study
 
Wimax deployment considerations
Wimax deployment considerationsWimax deployment considerations
Wimax deployment considerations
 
Tatacara pengadaan pemerintah
Tatacara pengadaan pemerintahTatacara pengadaan pemerintah
Tatacara pengadaan pemerintah
 
Sustaining market through supply chain
Sustaining market through supply chainSustaining market through supply chain
Sustaining market through supply chain
 
Fishbone diagram template
Fishbone diagram templateFishbone diagram template
Fishbone diagram template
 
Pekanbaru Riau
Pekanbaru RiauPekanbaru Riau
Pekanbaru Riau
 
Career guide
Career guideCareer guide
Career guide
 
Why retail stores fail
Why retail stores failWhy retail stores fail
Why retail stores fail
 
Making yourself indispensable
Making yourself indispensableMaking yourself indispensable
Making yourself indispensable
 
Deliver presentation like Steve Jobs
Deliver presentation like Steve JobsDeliver presentation like Steve Jobs
Deliver presentation like Steve Jobs
 
Indonesia Submarine Cables
Indonesia Submarine CablesIndonesia Submarine Cables
Indonesia Submarine Cables
 

Recently uploaded

Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 

Recently uploaded (20)

Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 

Lean manufacturing toyota indonesia 2011_2

  • 1. LEAN SUPPLY CHAIN MANAGEMENT [Toyota Indonesia Case] Sharing on 6th Indonesia Supply Chain and Logistics Conference and Expo 2011 (ISCL)  “New Era of Indonesia Supply Chain and Logistics : Center of South East Asia J akarta, Novem 3rd, 2011 ber J.F. Ferry Yanto Safety awareness : I will not use hand phone during drive the car
  • 2. OUTLINE OVERVIEW [Lean in Toyota] ◙ N MANAGEMENT STRATEGY <simple Concept> ◙ Sample of LEAN IMPLEMENTATION ◙ ◙ SUMMARY LLENGE LEAN MANAGEMENT IMPLEMENTATION ◙ e Considered for Lean Management Implementation ◙ 1/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 3. OVERVIEW ◙ GOAL of LEAN ACTIVITY COST REDUCTION PROFIT INCREASE ◙ In TOYOTA CASE , No Cost Reduction , , No Profit Increase No Cost Reduction No Profit Increase as Basic Philosophy (1) SALES PRICE = COST + PROFIT (2) PROFIT = SALES PRICE - COST Sales Price Determined by CUSTOMERS PROFIT ( ) = SALES PRICE ( = ) – COST ( ) 2/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 4. OVERVIEW MUDA OVER PRODUCTION MUDA OVER PRODUCTION TO REDUCE COST ELIMINATE WASTE ( MUDA ) [ Reduce Non Added Value Work ] WAS THE WORST ! ! WAS THE WORST [ 7 TYPE OF MUDA] (1) OVER PRODUCTION HIDE PROBLEMS and MAKE IT IMPOSSIBLE TO BE SOLVED ◙ COST DEPENDENT ON PRODUCTION METHODE (-) Excess Man Power or machine capacity ? ◙ COST BREAKDOWN ANALYSIS IMPACT TO COST INCREASE Traditional Production Material Operator A Finished Products Operator B Operator C 3/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 5. OVERVIEW Continuous Flow Production Material Finished Products Operator A Operator B Operator C  Comparison as the traditional way production & continuous flow production: - √ Eliminate MUDA stock - √ Eliminate MUDA move - √ Save more space In TOYOTA PRODUCTION SYSTEM : Always “CUSTOMER FIRST” Attitude ( Produce Good Products with Low Cost in a Timely Manner ) 4/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 6. LEAN MANAGEMENT STRATEGY < SIMPLE CONCEPT > Lead Lead Lead Lead Lead Lead Lead Lead Time Time Time Time Time Time Time Time TOTAL LEAD TIME TOTAL LEAD TIME (1) SHORTENING LEAD TIMESimplifying the Process ● ● Continuous Flow ( One Piece Flow Process ) (2) REDUCE INVENTORY LEVEL 5/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 7. SAMPLE of LEAN IMPLEMENTATION SUPPLY CHAIN IN MANUFACTURING VENDOR MANUFACTURING DEALER CUSTOMER  Loca l Part s     Receiving PC store Production Dealer Customer Import Parts Dock 6/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 8. SAMPLE of LEAN IMPLEMENTATION VENDOR MANUFACTURING DEALER CUSTOMER  Loca l Part s Receiving PC store Production Dealer Customer Import Parts Dock 7/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 9. SAMPLE of LEAN IMPLEMENTATION  Domestics Logistics / Conveyance SINGLE DELIVERY MILK RUN Stock Stock 4 1 4x / day (A) Hour (A) Hour 2 1 8x / day Hour Hour 12x / day (B) (B) 1 16 1x / day Hour Hour (C) (C) Variety 1 Hour Running Stock 2 ~ 16 Hour Stock Reduction 8/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 10. SAMPLE of LEAN IMPLEMENTATION  Domestics Logistics / Conveyance (D) SINGLE Plant 1 DELIVERY (E) Plant 2 (F) (D) MILK RUN Plant 1 X-DOCK and (E) X-Dock INTERPLANT Plant 2 (F) MILK RUN (D) Plant 1 , INTERPLANT (E) Plant 2 (F) 9/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 11. SAMPLE of LEAN IMPLEMENTATION VENDOR MANUFACTURING DEALER CUSTOMER Loca l Part s  Receiving PC store Production Dealer Customer Import Parts Dock 10/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 12. SAMPLE of LEAN IMPLEMENTATION  Internal Logistics Simplify Process  Re-arrangement of Process 11/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 13. SAMPLE of LEAN IMPLEMENTATION &  Linked between internal and vendor  STOCK REDUCTION USING KANBAN ( Kanban Cyclic )  SEQUENTIAL PARTS DELIVERY  etc. 12/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 14. SAMPLE of LEAN IMPLEMENTATION VENDOR MANUFACTURING DEALER CUSTOMER Loca l Part s  Receiving PC store Production Dealer Customer Import Parts Dock 13/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 15. SAMPLE of LEAN IMPLEMENTATION  Process PRODUCTIVITY UP with elimination MUDA Reduce MP with same output ► Others Example how to proceed ? MP : 10λ : 9λ Output : 200 Unit : 200 Unit Yamazumi Chart MP Process Line #1 Highest CT Target Reduce Problem : Process Analysis Unbalance Loading MP in Process Line #1 Improvement / Kaizen Achieve Target 14/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 16. SUMMARY  TOYOTA Indonesia utilize Toyota Production System as the base of manufacturing process, and Lean was blend inside of TPS as the focus point in TPS Basic Philosophy : Cost Awareness with Customer First and Quality as priority.  Currently, Continuous Improvement/Kaizen is implemented with PDCA cycle . 15/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 17. CHALLENGE LEAN MANAGEMENT IMPLEMENTATION NEW CHALLENGE … …  Flexible Market Demand 4 WEAK In INDUSTRIAL RELATIONSHIP ( Coy VS . Union ) SAME DIRECTION / VISION ( Mutual Understanding ) Need Support From Government 1 2 2 nd TIER and 1 st TIER are NOT MUTUAL UNDERSTANDING in BUSINESS . . CENTRALIZED (LEAN) Base on Demography or Mapping Area Gap of Knowledge ● Good Infrastructure Development and Growth Together ● Optimizing Current Ideal Condition : All in 1 Area 3 5 COMMITMENT MANAGEMENT OTHERS . . Inconsistency Condition ► Government Regulation / Policy in Industrial How to link with Lean Concept ► IT / SYSTEM Development  Readiness Company Adopt ? Be a Coy Culture & Reflected in People Development ► Less Localization ?  Enhance Localization 16/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 18. Items to be Considered for Lean Management Implementation  Supply Chain Management is one complete cycle and have synergy with one another  Skillful RESOURCES is the key point • Knowledge and break through idea/creative idea • Good TEAM WORK  Strong COMMITMENT Management • Top Management concern and monitoring required  Business Relations [company with vendor] • Mutual understanding  Spirit of Efficient Process • Good relationship between company and employee (union)  Infrastructure [road condition, others facility etc]  Force LOCALIZATION , as a big opportunity for reducing Lead time  CR 17/17 THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 19.
  • 20. POOR METHODE of CONVEYANCE and LOGISTICS ◙ Poor method results in stagnation asically : Conveyance is NON ADDED VALUE operations Eliminating conveyance is the best way ■ If Conveyance is Needed,  Best possible way is to make JIT material flow When it is needed Only what is needed In the amount needed THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 21. SUPPLY CHAIN (1) SUPPLY CHAIN MANAGEMENT BECOMING MORE IMPORTANT 1. Grasp Current Situation Accurately ( Time and Volume Stagnation included ) 2. Procure Parts from Supplier close by (2) SIMPLIFY THE FLOW a) Macroscopic Flow a) Microscopic Flow ( Demerits of Complicated Flow ) THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 22. SUPPLY CHAIN Goal REDUCE LOT SIZE 1 Pieces Production  No Stagnation  Guarantee Quality Kanban Pulling System Production = + Lead Time Processing Time Lot Size 1 Hour 10 Lot = 10 days Productivity Up ( Improve Chance ) 1 Lot = 1 hours THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 23. INVENTORY What is Needed to Reduce Inventory    (2)   Reduction of Production Lead Time Lead Time S h ipping Customer Customer production line (1)    Logistics Kaizen              物流改善    (3)   Increase reliability of    (1)   Logistic Kaizen Production Line • Leveled frequent supply  Leveled Frequent Delivery 平準化した多回納入    (4)   Reduce and Limit  Leveled Frequent Pick Up variety THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA 23
  • 24. SUPPLY CHAIN IN MANUFACTURING VENDOR MANUFACTURING DEALER CUSTOMER Loca l Part s  Receiving PC store Production Dealer Customer Import Parts Dock THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 25. LEAN MANAGEMENT STRATEGY  Long lead time conveyance/Logistics [Import parts] √Lot Based √PxP Based a f Part No. Order Box AA AA-2 10 Part No. b g a 10 5 c h b 20 6 d i c e j d e 15 Part No. a f k AA-1 b g l f Minimum = 5 ~ 10 % reduction c h m g h d i n e j o i j Order 1 lot = 10 Unit 1 box 1 box : 10 pcs : 12 pcs √X-Dock THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 26. LEAN MANAGEMENT STRATEGY  Delivery ~ Customers eduction the Stock with giving Flexibility for absorbing miss forecast → Monthly Firm to Monthly Firm with Weekly Order Change THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA
  • 27. SUPPLY CHAIN IN MANUFACTURING VENDOR MANUFACTURING DEALER CUSTOMER Loca l Part s  Receiving PC store Production Dealer Customer Import Parts Dock THE CHALLENGE IN IMPLEMENTING LEAN MANAGEMENT IN INDONESIA