1. Knitting Production Report
Reports Outline Following Ahead
1. Knitting Production Report
2. Date wise Production Report ( From date to Date)
3. Date wise Production Summary (From date to date)
4. Shift and Operator Wise Production Summary (From date)
5. Shift and Item Wise Production Summary (From date)
6. Hall and item wise Production Summary (From date)
7. Operator Efficiency (From date To date)
Additional Reports Demanded By Knitting Departments
1. Shift and Machine Wise Production
2. Hall wise Reports like a Hall Shift A, B and C article wise
summary like a Hall shift A, B, and C.
3. All Hall shift A,B and c wise summary
4. 24 hours article wise Production summary and purchase order
status
5. Total order & article wise & date wise Production, Efficiency
and wastage summary
6. All halls and Shifts operator wise and average efficiency and
wastage summary.
2. ADDITIONAL REPORT
1. Total order and article wise & date wise Production Efficiency
and wastage %.
2. All Halls shift wise Summary A,B and C.
3. Hall Shift and article wise Summary K1,K2 and k3.
4. Shift & Machine wise Production Report.
Reforms of Reports
1. Reports rectification is required.
2. Name of reports is wrongly mentioned over reports.
3. Some reports columns ascending and descending problems in
which included columns and some reports missing wastage %age
column.
4. Operator Efficiency is also wrongly mentioned in % efficiency
column by reports.
5. One article mentioned completely report since running of this
article.
6. Some changes replaceable
7. Reports display the foreman and shift in charge
8. Reports mentioned 12 hrs and 24 hrs basis reports.
9. Operator efficiency report should display the total efficiency
column also.