SlideShare a Scribd company logo
1 of 172
Download to read offline
National Aeronautics and Space Administration




                                            STS-135:
                           The Final Mission
              Dedicated to the courageous men and women who have devoted their lives
                  to the Space Shuttle Program and the pursuit of space exploration




                                                PRESS KIT / JULY 2011




www.nasa.gov
2011

                                   2009


                            2008

2007

              2003
       2002

                     2001
1999                        1998


              1996


              1994

       1992
                     1991
1990
                 1989
           STS-1:
       The First Mission



1985




                                  1981
CONTENTS

Section                                                                                                                                                                                                                                                                                         Page

SPACE SHUTTLE HISTORY ......................................................................................................                                                                                                                                                                       1
    I N T RO D U CT IO N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . .      1
    S PA C E SH U TT L E C O N C EP T A ND DEVELOPM ENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                      2
    T H E S PA C E SH UT TL E ER A B E G I N S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . .                                        7
    N A SA R EB O UND S INTO SPA C E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . .                                       14
    F R OM M I R TO TH E I NT E RNA TI O NAL S PA C E S TAT I O N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                             20
    S T AT I ON A SSEM BL Y C OMPL ET E D AFT ER C O L UMB IA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                               25
    M I SSI O N C ON T R OL R O S ES E X P R ES S THA N K S , S UPP OR T . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                                 30
    S PA C E SH U TT L E PR O GRAM ’ S K EY S TAT I ST I C S (T HR U S TS -1 3 4 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                                                32
    T H E O RB I T ER F L E ET . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .          32
    S H UT TL E UPS A N D DOW NS : L AU N C H, LAND AND LAUNCH A GA I N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                                                             41
    T HR E E L A N D ING S I TES U SE D , MANY M OR E A VA IL A BLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                                 44
    A S TR O NA UT C O RP S M ARKS C HA N G E S IN S PAC E , S OC I E T Y . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                                         46
    H U BBL E A ND T H E S HU TT L E: N E W VI E WS O F O U R U NI V E R S E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                                         49

STS-135 MISSION OVERVIEW ...............................................................................................                                                                                                                                                                         51

STS-135 TIMELINE OVERVIEW ...............................................................................................                                                                                                                                                                        61

STS-135 MISSION PROFILE ...................................................................................................                                                                                                                                                                      63

STS-135 MISSION OBJECTIVES .............................................................................................                                                                                                                                                                         65

MISSION PERSONNEL .............................................................................................................                                                                                                                                                                  67

STS-135 ATLANTIS CREW ......................................................................................................                                                                                                                                                                     69

PAYLOAD OVERVIEW ..............................................................................................................                                                                                                                                                                  75
    R A F FA EL L O MUL T I -P UR POSE L OG I ST I CS M O DUL E (MP L M ) FLI GHT MO D UL E 2 ( F M2 ) . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                                                                                        77
    MP L M B A CKG R O UN D I N FORM AT ION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                 78
    T H E L I GH TWE I GH T M UL T I- P UR PO S E EXP E RIM E N T SUPP O RT ST RUC T UR E C ARR I ER (L M C) . . . . . . . . . . . . . . . .                                                                                                                                                      79
    R O B OT I C R E FUE L I N G M I SSI O N ( RRM ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..                                              82
    P UM P MOD UL E (PM ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . .                   85




JULY 2011                                                                                                                              CONTENTS                                                                                                                                                    i
Section                                                                                                                                                                                                                                                                                                        Page

RENDEZVOUS & DOCKING .......................................................................................................                                                                                                                                                                                     87
     U N D O CK I NG , S E PA RA TI O N A N D D EPA RTU R E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                        88

SPACEWALKS .........................................................................................................................                                                                                                                                                                            89

STS-135 EXPERIMENTS ..........................................................................................................                                                                                                                                                                                  93
     S T S -1 3 5 / UL F7 R E S EA R CH A N D TE C HN OL OG Y D EV EL OPM E N T . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                                                      93
     S H OR T- D UR AT I O N R E S EA RC H TO B E C OMP LETED ON STS-135 / UL F7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                                                                             94
     R E S EA R CH TO B E D EL I V ER E D TO S TA TI O N O N SH UTT L E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                                              96
     R E S EA R CH OF O PP O RT U NI T Y . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . .                                              97
     R E S EA R CH TO B E R ET UR NE D O N S PA C E S H UT TL E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                                    98
     PICO-SAT ELLITE SOLA R CEL L TES T BED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .                                                                        100
     D E V E L O PM E NT T E ST O B JEC T I V E S ( DT O) A N D D ETA ILE D S U PPL EMEN T AR Y O B J ECTIVES (DSO) . . . . . . . . . .                                                                                                                                                                         102
     S T U D E NT EXP ERIM E N T S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . .                                   105

SHUTTLE REFERENCE DATA ....................................................................................................                                                                                                                                                                                     117

LAUNCH & LANDING ................................................................................................................                                                                                                                                                                              135
     L A U N CH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . .    135
     A B OR T T O OR B IT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . .                      135
     T RA N S O C EA NI C A BO RT L AN D I N G . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .                                                   135
     R E T UR N TO L A UNCH SIT E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . .                                        135
     A B OR T O N C E A RO U N D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . .                               135
     L A N D I NG . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .      135

ACRONYMS & ABBREVIATIONS ..............................................................................................                                                                                                                                                                                         137

MEDIA ASSISTANCE ...............................................................................................................                                                                                                                                                                               153

SPACE SHUTTLE AND INTERNATIONAL SPACE STATION − PUBLIC AFFAIRS CONTACTS .....                                                                                                                                                                                                                                  155

THE FUTURE ............................................................................................................................                                                                                                                                                                        159
     O R I ON MUL T I- P UR PO S E CR E W V EHI CLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                   15 9
     N A SA C OMMER C IAL C R EW PR OG RAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .                                                                    1 62




ii                                                                                                                                             CONTENTS                                                                                                                                                JULY 2011
SPACE SHUTTLE HISTORY
INTRODUCTION                                          Engineering and technological advances were
                                                      required in development of the shuttle. It
Shuttle History: Knowledge,                           was called the most complex machine ever
Capabilities, and Cooperation                         built. Its main engines stretched design and
                                                      metallurgical capabilities.      Its thermal
For 30 years, the space shuttle has been the U.S.
                                                      protection system, which shielded the orbiter
human access to space. It has capabilities no
                                                      from temperatures as high as 3,000 degrees
other spacecraft can claim. No other spacecraft
                                                      Fahrenheit during re-entry, was a work in
is likely to match those capabilities in this
                                                      progress until shortly before the first shuttle
generation.
                                                      launch. Engines and the thermal protection
It is the fastest winged vehicle ever to fly, with    system were designed for repeated reuse.
an orbital velocity of 17,500 mph, 10 times the
                                                      Both have been continually improved during
speed of a high-powered rifle bullet. It is the
                                                      the life of the Space Shuttle Program. So has
only winged vehicle to reach orbit, and the only
                                                      just about every other major shuttle system.
reusable space launch and landing vehicle.
                                                      Science, in addition to the advances required
The shuttle can carry cargos of substantial
                                                      for the spacecraft’s development, has made
weight and dimensions. It has taken into space
                                                      huge strides with the help of the space shuttle.
more than half the mass of all payloads
                                                      We have learned more about ourselves, about
launched by all nations since Sputnik in 1957 –
                                                      how our bodies and those of other organisms
3,450,143 pounds (though STS-132) and
                                                      function, from the subcellular level on up. We
counting as the final shuttle launch approaches.
                                                      have learned how we as individuals interact
More singular still is the shuttle’s ability to       with one another under unusual and stressful
return payloads from space. It has brought            circumstances – and how to work together.
back from orbit more than 97 percent of
                                                      We have learned about our planet, its land
all mass returned to Earth, a total of
                                                      masses, its oceans, its atmosphere and its
225,574 pounds (though STS-132) before the
                                                      environment as a whole. With the help of the
upcoming final flight.
                                                      shuttle we have learned more about our moon,
It has launched 802 crew members including            solar system, our galaxy and our universe.
those lost on Challenger and Columbia. Crew
                                                      The Hubble Space Telescope, for example,
members returning on the shuttle numbered
                                                      launched and repeatedly upgraded and
789. Many crew members flew more than once.
                                                      repaired on shuttle missions, has given us
A total of 356 different individuals have flown
                                                      unprecedented vision of distant stars, some
aboard the shuttle (all through STS-132).
                                                      with planets orbiting them. It has allowed us to
It leaves a significant legacy.                       look at objects so distant that viewing the light
                                                      from them takes us back in time to nearer the
                                                      beginning of the universe.


JULY 2011                                SPACE SHUTTLE HISTORY                                        1
Scientific advances continue aboard the             ranged from political and funding concerns to
International Space Station. The shuttle has        competing design ideas and conflicting systems
been instrumental in the station’s construction     requirements – when one system changed
and operation.                                      others were impacted.

Perhaps as important as any element of the          There were different requirements of users.
shuttle legacy is the development of                Contractors and program managers worked out
international cooperation in space. Humans          compromises of their own.
from many nations have begun to work
together in space. Shuttle visits to the Russian    All in all, more than 50 different shuttle
space station Mir were a beginning that led to      versions were developed during the design
that new cooperation we see today aboard the        process. Eventually, they evolved into the
International Space Station.                        space shuttle that has flown since Columbia’s
                                                    first launch in April 1981. It was the first of
It has helped to develop respect and                135 launches, a string scheduled to end in July.
understanding for people and technological
capabilities of many countries, including some      The prospect of reusable spacecraft capable of
former enemies. Such synergies could give           carrying large cargos and humans into space
humans as a whole greater potential for space       had been talked about for decades in science
exploration and development that any single         fiction and by scientists since shortly after
nation could achieve alone. Such capabilities       World War II.
eventually could be critical in how well our        Indeed, a German design looked at a winged
species flourishes or, indeed, survives.            craft to be launched from a supersonic sled,
The shuttle has provided inspiration – for the      rocket itself into suborbital space, skip along
young and the not so young.                         the upper atmosphere and bomb New York.
                                                    After gliding to a landing and refueling, it
It has encouraged uncounted youths to focus         would return home using the same technique.
on science and technology.       The idea of
becoming an astronaut, as some certainly            Ideas for the next generation of U.S. human
will, is a powerful motivation. So too is the       spacecraft had been discussed within NASA
prospect of using such an education to advance      and the Department of Defense. In late 1958,
human knowledge and understanding in space.         NASA had established a working group based
                                                    at Langley Research Center in Hampton, Va., to
People of all the nations contributing to the       look at the nation’s future human space
space shuttle’s design and operation can take       program.
pride in its accomplishments.
                                                    Among the group’s 37 original engineers
SPACE SHUTTLE CONCEPT AND                           headed by Robert Gilruth were Maxime Faget,
DEVELOPMENT                                         head of engineering; Chris Kraft of flight
                                                    operations; and Glynn Lunney, who, at 21, was
Like any project of its magnitude, the space        the youngest member of the team.
shuttle was a series of compromises. They



2                                      SPACE SHUTTLE HISTORY                              JULY 2011
On April 1, 1969, Faget, director of engineering     President Spiro Agnew, was established that
and development at the Manned Spacecraft             February.    It issued a report called “The
Center (now Johnson Space Center (JSC), held a       Post-Apollo Space Program: Directions for the
meeting with 20 colleagues at which he               Future” in September 1969.
presented a balsa-framed, paper-skinned
model. It was about 18 inches long, had              The Space Task Group recommended, among
straight, stubby wings and a shark-like nose.        other things, “low-cost, flexible, long-lived,
                                                     highly reusable, operational space systems with
Faget, who designed the Mercury spacecraft           a high degree of commonality and reusability.”
and contributed to U.S. spacecraft design            It suggested a system that could carry people,
through the space shuttle, told them, “We’re         equipment, supplies and fuel to and from orbit
going to build America’s next spacecraft. It’s       routinely, as well as support a range of
going to launch like a spacecraft; it’s going to     Department of Defense missions.
land like a plane.” The first humans landed on
the moon the following July 20.                      Phase B contracts for project definition went to
                                                     two orbiter teams, one McDonnell Douglas and
A request for proposals for “An Integral             Martin Marietta, and the other North American
Launch and Reentry Vehicle” had been issued          Rockwell and General Dynamics. Both teams
on Oct. 30, 1968, through the Manned                 would look at competing NASA designs, the
Spacecraft Center in Houston and the Marshall        Maxime Faget design with limited cross-range
Space Flight Center in Huntsville, Ala. It called    and cargo capabilities but lower heating on
for studies on configurations for launch and         re-entry and a high cross-range design with
landing vehicles. Safety and economy were            a delta wing, a larger cargo bay and cargo
emphasized over the capability to carry heavy        capability. Main engine contracts went to
cargos.                                              Pratt & Whitney, Rocketdyne and Aerojet.

Four companies got 10-month study contracts          Funding limitations caused Phase B to be
in February 1969.         General Dynamics,          amended, with the option of an expendable
Lockheed, McDonnell Douglas, and North               external tank. Eventually, that concept was
American Rockwell came up with various               adopted, and solid rocket boosters were
concepts, some involving expendable and some         attached to the tank. The Air Force insisted on
reusable launchers. Engine contracts went to         the long cargo bay and heavy payload
Pratt & Whitney and Rocketdyne. This was the         capability as well as a cross range of 1,265 miles
beginning of Phase A of a four-step process          to launch large satellites into polar orbit from
culminating in production and operation of a         Vandenberg Air Force Base in California and
national space shuttle.                              return there after a single orbit. Department of
                                                     Defense political support was an important
NASA decided during Phase A that it wanted a         shuttle consideration.
two-stage craft, both stages reusable.
                                                     Cargo bay dimensions were an example of the
While those studies were going on, the Space         compromises at work. The length, which
Task Group, established by newly elected             wound up being 60 feet, was the Air Force
President Richard Nixon and chaired by Vice


JULY 2011                               SPACE SHUTTLE HISTORY                                        3
requirement, while NASA required the 15-foot        orbital maneuvering system engines.          But
width to accommodate space station modules.         Enterprise would provide additional valuable
                                                    information on flight characteristics, atop a
The requirement for two fly-back stages was         shuttle carrier aircraft and in free flight.
dropped as was, in early 1974, the idea to
provide air-breathing engines for the orbiter       When the shuttle’s air-breathing engines were
approach and landing and ferry flights under        dropped, it became apparent that NASA would
its own power.                                      have to find a way to transport the orbiter.
                                                    Designing a specific-purpose aircraft and using
Phases C (design) and D (production and             the Air Force C5A were considered.
operation) were combined. President Nixon
gave NASA the OK to go ahead with the larger        Eventually, NASA settled for a used 747-100
payload bay on Jan. 3, 1972. North American         that had flown almost 9,000 hours for American
Rockwell was named winner of the orbiter            Airlines, most on its New York-Los Angeles
contract on July 26 of that year.                   route. It bought the plane on July 18, 1974.
                                                    (A second used 747 was acquired from Japan
Rocketdyne, a division of North American            Air Lines for NASA by Boeing in April 1988
Rockwell, had been named winner of the              and delivered to the space agency in
engine contract on July 13. NASA announced          November 1990.)
Thiokol as winner of the Solid Rocket Booster
development contract on June 24, 1973, and less     Under a $30 million contract with Boeing, the
than a month later, Martin Marietta got the nod     former American Airlines plane’s structure was
to design, develop and test the external tank.      strengthened and instrumentation improved,
                                                    orbiter mounting assembly fittings were
The war in Southeast Asia, a recession and the      installed and vertical endplates were added to
fading of the excitement of the Apollo moon         its horizontal stabilizers. The modifications
landings had made spaceflight funding tight.        were completed by January 1977.
Shuttle development was to be stretched over
a longer time and the space station, one            Approach and landing tests using Enterprise
justification for the shuttle’s development, was    and the 747 (its American Airlines logo still
put on hold. Appeals of some of the contract        faintly visible on each side) began the following
awards also caused delays.                          month at Edwards Air Force Base in California.
                                                    First came three taxi tests on Feb. 15, the third
Rockwell began building the first orbiter,          reaching a speed of 157 mph. Five “inactive”
Orbiter Vehicle 101, in Palmdale, Calif., on        flight tests followed from Feb. 18 to March 2.
June 4, 1974. It was to have been named
Constitution, but after 100,000 fans of the TV      Two astronaut crews, the first Fred Haise and
series “Star Trek” wrote in, the name was           Charles “Gordon” Fullerton and the second
changed to Enterprise. It was rolled out on         Joe Engle and Richard Truly, alternated at
Sept. 17, 1976.                                     Enterprise controls for three active test flights
                                                    captive atop the 747 beginning Aug. 12 and five
By then, it already had been subjected to a         free flights involving Enterprise being released
series of vibration tests. It had no main or        from the aircraft and landing at Edwards.


4                                      SPACE SHUTTLE HISTORY                               JULY 2011
The first four of the five, beginning Aug. 12,       Gulfstreams were acquired in the 1980s and
landed on Edwards’ dry lakebed. The fifth, on        converted to shuttle trainers.)
Oct. 26, wound up the 1977 test series with an
exciting Enterprise landing by Haise and             New crew members would be needed. In
Fullerton on Edwards’ concrete runway. The           January 1978 a new group of astronauts was
fourth and fifth of those flights were flown         selected. It was the first new astronaut class
without the tail cone, giving a more accurate        since the seven new astronauts had been
picture of how an orbiter would glide to a           selected in August 1969.
landing after a spaceflight.                         The group, the eighth beginning with the
After some additional tests, Enterprise was to       Mercury astronauts selected in 1957, was unlike
have been returned to Rockwell to be outfitted       any chosen before. Six of the 35 members were
to fly in space, but it was not to be. NASA          women; two of them were medical doctors and
decided it would be quicker and cheaper to           the others held Ph.D.s. Three were African
convert a structural test article, OV-99, into a     American; two of them held Ph.D.s. One was an
flight orbiter.    That orbiter was named            Asian American.
Challenger.                                          Many members of the new group would
Enterprise was subjected to additional tests,        become the heart of the new category of
including some at Vandenberg, and was                astronauts, shuttle mission specialists. Their
displayed at several locations, including the        qualifications were varied from the mostly test
Paris Air Show in 1983 and the World’s Fair          pilots who made up earlier groups. Several of
in New Orleans in 1985. It was officially            the new selectees were civilians, often with
transferred to the Smithsonian Institution’s         considerably different perspectives than their
National Air and Space Museum on                     military predecessors.
Nov. 18, 1985, though NASA continued to              Mission specialist physical qualifications were
borrow parts from it for testing in subsequent       different, and still differ slightly, for pilots and
years.                                               mission specialists. Mercury astronauts could
Other preparations for shuttle flight continued:     be no taller than 5 feet 11 inches – for groups of
                                                     the Gemini and Apollo era, the maximum was
NASA bought two Gulfstream II business jets          6 feet -- so they would fit into space capsules.
and converted them into shuttle training             Now astronauts well over six feet tall could fly
aircraft.    They realistically simulate the         in space.
behavior of a returning orbiter between
35,000 feet and a point just above the runway –      Launch facilities and equipment were modified
the height of the spacecraft’s cockpit on            at Kennedy Space Center in Florida and a new
landing.                                             launch site was being built at Vandenberg.
                                                     Various contractor and NASA field center test
The controls on the left side are much like          facilities were established or modified.
those used by a space shuttle commander
on landing, and the plane reacts to inputs           As development continued, efforts were made
like a descending orbiter. (Two additional           to reduce spacecraft weight and improve



JULY 2011                               SPACE SHUTTLE HISTORY                                          5
performance. Qualification testing, aimed at           number of problems. In April 1977, a test of
showing various elements of the shuttle were           two engines was dubbed successful, but
ready to fly safely, was heating up.                   turbopump problems continued.

By early 1980, formal qualification tests had          Finally, by late 1980, the difficulties seemed
been completed on the orbital maneuvering              to be largely resolved.      A key test was
system engines and the reaction control system         completed on Jan. 17, 1981. Columbia’s three
jets. Testing for qualification of the solid rocket    main engines were successfully test fired at the
boosters was completed about that time.                launch pad for 20 seconds on Feb. 20, providing
                                                       additional confidence for launch of STS-1 less
NASA had not used solid rockets in human               than two months later, on April 12.
spaceflight before. Each solid rocket booster
has four motor segments. They are transported          The thermal protection system, particularly the
by rail from Thiokol’s Utah facility and that          tiles, was a persistent problem. The ablative
mode of travel, with its curves and tunnels,           heat shields used from Mercury through Apollo
necessitated their being built in segments and         were obviously not reusable.        Reinforced
attached to one another once they reach Florida.       carbon-carbon was used in areas subject to the
                                                       greatest heating like the nose cone and wing
Marshall Space Flight Center did a series of           leading edges.
tests on the external tank.      A series of
weight-saving measures, and additional tests,          After a lot of testing, a ceramic heat shield was
were introduced during early phases of tank            chosen to protect much of the aluminum body
construction and beyond. Later tanks were              of the orbiter. Shielding in these areas was
more than 10,000 pounds lighter than the early         made up of tiles.
production models.
                                                       Black tiles were used where heat did not exceed
It became apparent that the greatest threat of         2,300 degrees Fahrenheit (e.g., orbiter’s bottom)
delay was in development of the shuttle main           and white tiles were used where temperatures
engines and the thermal protection system.             did not get above 1,200 degrees. Thermal
                                                       blankets were used in areas that stayed below
The main engine was a challenge. Chamber               700 degrees.
pressures were higher than those of any
previous liquid-fueled rocket engine.       The        Attaching the rigid tiles to the aluminum skin
design was for a reusable, two-stage engine that       of the orbiter was a problem. An intervening
could be throttled. It required turbopumps that        felt pad was thought to be a solution. A
operated at higher speeds and higher pressures         stronger bond between the tile and the pad was
than any before.                                       found to be necessary, but when that was done,
                                                       the combination of adhesive, felt, adhesive, tile
Rocketdyne built an engine test bed at a NASA          resulted in a loss of about 50 percent of the
facility in Mississippi, at what is now Stennis        strength of the four elements.
Space Center, where it tested an engine larger
and heavier than those built for flight, which         NASA decided to fill voids on the inward side
were not yet available. It found and resolved a        of the tile, a “densification” process. Far



6                                         SPACE SHUTTLE HISTORY                               JULY 2011
behind schedule because of the delays, NASA            Young and Crippen landed Columbia on the
decided to fly Columbia from Palmdale to               dry lakebed at Edwards Air Force Base.
Kennedy in March 1979, with about 6,000 of the
30,000 tiles still not installed. A number of tiles    STS-2, commanded by Joe Engle and piloted by
that had been installed were lost during that          Richard Truly, launched Nov. 12 marking the
flight.                                                first time a launch and entry spacecraft had
                                                       been used. It was the first flight of the
Nondestructive tests were developed to check           Canadian robotic arm, which was tested
tiles’ conditions, and gap fillers were installed      thoroughly during the mission.
to prevent tile rotation under shock-wave
stress. Tile installation and testing went on          The arm, just over 50 feet long, was an early
around the clock six days a week for 20 months.        international contribution to the shuttle
Many newly installed tiles had to be removed           program. Stowed on the left sill of the payload
after testing and reinstalled. By the end of           bay, it can deploy and retrieve payloads, move
November 1980, the number of tiles to be               spacewalkers around and help inspect the
installed was below 1,000.                             orbiter.

Finally, on Dec. 29, 1980, Columbia was rolled         Although the flight was shortened from
out on the newly modified mobile launch                five days to two days, six hours after one of
platform, from Kennedy’s Vehicle Assembly              three fuel cells failed, the two crew members
Building to Pad 39A. Its gleaming white                completed most of their planned tasks. They
external tank seemed to harmonize with the             also landed on Edwards’ dry lake bed.
white of the solid rocket boosters and the             The third flight was different in a number of
black-trimmed white of the orbiter.                    ways, beginning visually. The external tank,
                                                       which had been painted white on the
THE SPACE SHUTTLE ERA BEGINS
                                                       first two flights, was now the rust color that
On April 12, 1981, Commander John Young and            characterized it from then on.       Engineers
Pilot Robert Crippen launched from Kennedy             decided the white paint was not needed. That
Space Center’s Pad 39A aboard Columbia on              decision resulted in a weight savings of
STS-1.                                                 595 pounds, almost all of it translating into
                                                       increased cargo capacity.
The space shuttle era was under way.
                                                       Commander       Jack    Lousma   and     Pilot
STS-1 was the first of four test flights. Each         Gordon     Fullerton   launched   STS-3     on
carried a two-man crew. The commander and              March 22, 1982. They flew Columbia in various
pilot had ejection seats.                              attitudes to check out thermal characteristics,
                                                       conducted more tests of the robotic arm and
The first flight lasted just over two days,
                                                       did scientific experiments, some involving
six hours and 20 minutes. It orbited the Earth
                                                       plants and insects.
36 times at an inclination of 40 degrees and an
altitude of 166 statute miles and traveled             Rain at Edwards caused the landing to be
1,074,111 miles. After testing orbiter systems,        moved to the strip on the White Sands Missile



JULY 2011                                 SPACE SHUTTLE HISTORY                                      7
Range, and a New Mexico dust storm delayed           Privately owned communications satellites had
it for a day. Finally, on March 30, they landed      become a growing field while the shuttle was
after a flight of just over eight days.              being developed and more and more
                                                     communications satellites would require launch
The final test flight launched June 27, 1982,        and the shuttle seemed perfectly suited to
with Commander Ken Mattingly and Pilot               provide it.
Henry Hartsfield. They did extensive tests of
Columbia systems and conducted several               Legislation had given the space agency a
experiments.                                         monopoly on the domestic satellite launch
                                                     market. NASA aggressively marketed that
Among the experiments was a classified one           launch capability, both domestically and
from the Department of Defense. It marked a          internationally.    Estimates had foreseen
new way of doing things for NASA. Previous           between 30 and 60 shuttle flights.
public openness was partly muted. No camera
views of the payload bay were transmitted to         Bargain prices were offered for multiple
Earth and oral communications relating to            launches over the firsts five years of the
the payload were conducted in a simple, but          program, with the idea of building repeat
effective code.                                      business.

After a flight of more than seven days and           Columbia launched on the first operational
3.3 million miles, STS-4 landed on Edwards’          flight on Nov. 11, 1982.            In the crew
concrete runway, a first for an orbiter returning    compartment, in addition to Commander
from space.                                          Vance Brand and Pilot Robert Overmyer, were
                                                     the first mission specialists, Joseph P. Allen and
At Edwards, they got a July 4 welcome from           William Lenore.        Both had been among
President Ronald Reagan and his wife Nancy           the Group 6 science astronauts selected in
and a holiday crowd of thousands. At the             August 1967.
ceremony, NASA Administrator James Beggs
declared the space shuttle operational.              Two commercial satellites were in the payload
                                                     bay. The first to be launched from a shuttle,
The president compared the completion of             SBS-C, left the payload bay about eight hours
the test flight series to the driving of the         into the flight.     The Canadian Telesat-E
gold spike marking completion of the                 followed. Both were successfully boosted into
transcontinental railroad.      “It marks our        geostationary orbits, 22,300 feet above the
entrance into a new era,” he said.                   Earth, by Payload Assist Modules.
Shortly after Columbia had landed, Challenger        By mid-January 1986, a total of 24 commercial
passed close by. Atop the shuttle carrier            satellites had been deployed from the shuttle.
aircraft, it was departing on its first cross        Of those, the Payload Assist Module boosters
country flight, its delivery to Kennedy Space        of two, the Indonesian Palapa B2 and the
Center.                                              Westar-VI, had failed to fire, leaving the
With the test phase finished, it was time to get     satellites useless in a low orbit.
down to business.


8                                       SPACE SHUTTLE HISTORY                                JULY 2011
The astronauts aboard Challenger on that 10th          The TDRS booster sustained failure, leaving the
shuttle flight, STS-41-B, in February 1984 had         spacecraft well below geosynchronous altitude
performed flawlessly. But the failure of the           but far too high for the shuttle to reach. NASA
boosters gave the shuttle a chance to                  and TDRS builder, TRW, came up with a
demonstrate another capability.                        method to use its thrusters to gradually lift it to
                                                       the proper orbit, a process that took several
Both those satellites were later retrieved and         weeks.
returned to Earth by Discovery astronauts on
the 14th shuttle mission, STS-51-A.       They         Challenger’s STS-7 mission launched June 18 to
worked under contract with the insurance               deploy two commercial satellites. It carried
companies, which already had paid the owners           various experiments, including those on the
for their loss.                                        German Shuttle Pallet Satellite which was
                                                       deployed from the cargo bay by the robotic
Lloyds of London was delighted with the                arm. After a time as a free flyer in its own orbit,
recovery, and rang its Lutine bell to mark the         Challenger rendezvoused with it, grappled it
importance of the event. It gave the insurance         with the arm and secured it in the cargo bay for
companies partial reimbursement. It was then           return home.
called monetarily the largest salvage recovery.
The satellites were refurbished and sold to new        Commander Crippen’s four crew members
owners to be launched again.                           were from the shuttle-focused astronaut
                                                       Group 8. It included Sally Ride, the first
The new numbering system for shuttle flights           U.S. woman in space.
was introduced after STS-9. The following
flight became STS-41-B. The first number               The next Challenger mission, STS-8, had
designated the fiscal year and the second              three more Group 8 alumnae, including
number was the launch site – 1 for Kennedy             Guyon Bluford, the first U.S. black in space.
and 2 for Vandenberg Air Force Base. The               Commanded by Truly, it was the first to launch
letter was the order of launch assignment, so B        at night, on Aug. 30, 1983. It deployed a
was the second scheduled for that fiscal year.         satellite from India. Its landing also was at
                                                       night.
The old numbering system was revived for
                                                       Columbia was back for STS-9, launched Nov. 28
STS-26, the return-to-flight mission after the
                                                       as the final flight of 1983. It was the first
Challenger accident.
                                                       Spacelab flight.     Commanded by Young
The STS-6 mission, Challenger’s first flight,          (making the last of his six spaceflights, which
launched April 4, 1983, and began a series of          included two missions to the moon) with
other firsts. The flight carried the first Tracking    Brewster Shaw as pilot, its six-man crew
and Data Relay Satellite (TDRS). The TDRS              included the first payload specialists,
system replaced the ground, a NASA                     Byron Lichtenberg of Massachusetts Institute of
communications satellite which began the               Technology and Ulf Merbold, a German
replacement of the ground stations on which            physicist.
the space agency had relied through the end of
                                                       The European Space Agency built the
the Apollo era.
                                                       $1-billion, 23-foot laboratory flown in


JULY 2011                                 SPACE SHUTTLE HISTORY                                         9
Columbia’s cargo bay. The crew, including              replaced failed components. Hart put it back
Mission Specialists Robert Parker and                  into its own orbit with the arm.
Owen Garriott, worked around the clock in two
shifts, conducting more than 70 experiments.           After an attention-getting June 26 abort seconds
                                                       before scheduled liftoff, Discovery launched on
The 10th shuttle flight, STS-41-B, saw the             its first flight, STS-41-D, flight 12, on Aug. 30
program’s first spacewalks, and with them,             with Commander Hartsfield and Pilot
demonstration of a jet backpack that took              Michael Coats.         With Mission Specialists
Mission Specialists Bruce McCandless and               Richard Mullane, Steve Hawley, Judith Resnik
Robert Stewart untethered out of the cargo bay.        and Charles Walker, they launched two
                                                       communications satellites and deployed, tested
The mission, launched Feb. 3, 1984, with               and restowed a large solar array.
Commander Vance Brad, Pilot Robert Gibson
and Mission Specialist Ronald McNair, was              Crippen commanded STS-41-G.         The 13th
demonstrating the use of the Manned                    flight launched with Pilot Jon McBride on
Maneuvering Unit’s potential in the capture            Oct. 5 on board Challenger. It was the first to
and repair of the Solar Maximum Satellite,             have two women mission specialists, Ride and
scheduled for the next flight. They could not          Kathryn Sullivan. Sullivan became the first
guess how important the jet backpack would be          female spacewalker on a 3.5-hour outing with
to the future of the two satellites deployed from      Mission Specialist Dave Leestma to test a
their cargo bay, the Indonesian Palapa B2 and          satellite refueling system.
the Westar-VI.
                                                       Two mission specialists, Paul Scully-Power,
It was the first mission to land at Kennedy            an Australian oceanographer, and Canadian
Space Center.                                          Marc Garneau made this seven-member crew
                                                       the largest yet. The largely scientific flight
Crippen commanded the STS-41-C flight, the             focusing on Earth included release of a satellite
program’s 11th, with Pilot Francis “Dick”              to measure solar radiation reaching Earth.
Scobee and Mission Specialist van Hoften. It
launched April 6 with a 30-foot, 22,000-pound          The two-satellite retrieval mission, STS-51-A,
Long Duration Exposure Facility and its                was commanded by Frederick Hauck. Crew
57 experiments in the cargo bay. On the way to         members were Pilot Dave Walker and Mission
the ailing satellite, Mission Specialist Terry Hart    Specialists Joseph Allen, Anna Fisher and
used the robotic arm to deploy the container,          Dale Gardner. Discovery launched Nov. 8 on
scheduled to stay in orbit for a year.                 the year’s final flight.

After rendezvous with the satellite, Mission           An early task was to launch two
Specialist George Nelson flew to it with the jet       communications satellites it had brought into
backpack. Initial efforts to attach a docking          orbit. Then, after rendezvous with Palapa B-2,
device failed, but succeeded the next day after        Allen jetted to the satellite with the backpack
some help from Goddard Space Flight Center.            and attached a capture device. Fisher used the
In the cargo bay Nelson and van Hoften                 arm to bring it back to Discovery, but a
                                                       problem prevented its docking in the cargo bay.


10                                        SPACE SHUTTLE HISTORY                               JULY 2011
Using a backup plan, Allen got into foot             Garn, who chaired the Senate committee with
restraints, removed the satellite from the           NASA budget oversight, volunteered for space
arm and held it over his head for about              sickness studies. He said later he had indeed
90 minutes, one orbit of the Earth.      The         suffered from that malady.
satellite’s weight on Earth was about
1,600 pounds, about nine times that of Allen.        Challenger’s STS-51-B flight, the 17th of
Gardner attached an adapter and secured the          the program, launched April 29 and was the
satellite for the trip home.                         second Spacelab mission.    Crew members
                                                     were      Commander     Overmyer,      Pilot
The Westar VI was less of a problem. Using           Frederick    Gregory,  Mission    Specialists
their experience two days before, Gardner            Don Leslie Lind, Norman Thagard and
jetted to the satellite and together they secured    William Thornton, and Payload Specialists
it in the cargo bay.                                 Taylor E. Wang (a Jet Propulsion Laboratory
                                                     physicist) and Lodewijk van der Berg, an
Discovery’s flight STS-51-C, the 15th flight         EG & G scientist.
was a Department of Defense mission,
launched Jan. 24, 1985.          Commanded by        Again, the crew worked around the clock, in
Mattingly, it lasted just over three days and had    two shifts.   The wide-ranging experiments
an all-military-astronaut crew.                      involved disciplines, ranging from astronomy
                                                     to materials processing.     In the lab were
The launch had been delayed one day because          two squirrel monkeys and 24 rats flown to test
of freezing weather.                                 cages, which proved inadequate.
U.S. Senator Jake Garn of Utah, a former Navy        When the cages were opened to feed the
pilot, was aboard Discovery for the 16th             occupants, food debris and feces were released
shuttle flight, STS-51-D. Launched on April 12       to float throughout the lab and even into the
and commanded by Karol Bobko, the flight             crew compartment. The problem was solved
included Pilot Donald Williams, Mission              by putting plastic bags over food trays when
Specialists Jeffrey Hoffman, David Griggs            crew members, in surgical masks, removed
and Rhea Seddon and Payload Specialist               them, and using a vacuum cleaner.
Charles Walker.
                                                     Daniel Brandenstein commanded the 18th
The flight launched two communications               shuttle flight, STS-51-G, in Discovery, with
satellites, but the booster of one did not           Pilot John Creighton, Mission Specialists
activate.    Crew members spent an extra             John Fabian, Steve Nagel and Shannon Lucid,
two days in orbit, using the robotic arm with a      and Payload Specialists Patrick Baudry
flyswatter-like device at its end, trying without    (a French astronomer) and Saudi Arabian
success to activate a switch satellite thought       Prince Sultan Salman Abdul Azziz Al Sa’ud.
to be in the wrong position on the Leasat 3. The
satellite was repaired on flight STS-51-I that       The flight, launched June 17, deployed three
October.                                             communications satellites, one for Mexico, one
                                                     for Saudi Arabia and one U.S. A satellite called
                                                     Spartan, an astronomy experiment, was


JULY 2011                               SPACE SHUTTLE HISTORY                                      11
deployed with the robotic arm and,                   successfully deployed the new satellites (one
subsequently, after a separation of more than        Australian and two U.S., including Leasat-4),
100 miles, was recaptured and returned to            then successfully rendezvoused with and
Earth. A number of other experiments were            captured the Leasat-3. Van Hoften and Fisher,
aboard including several from France.                a surgeon, repaired it during two spacewalks
                                                     and it was redeployed.
Challenger’s flight STS-51-F, the program’s
19th, started badly.        Five minutes and         Atlantis made its first flight on STS-51-J, the
45 seconds after the July 29 launch the No. 1        21st flight of the shuttle program.          The
engine shut down prematurely (the cause              Department of Defense mission, commanded
turned out to be a faulty sensor reading) and an     by Bobko with Pilot Ronald J. Grabe, Mission
abort to orbit was declared.                         Specialists David C. Hilmers and Stewart and
                                                     Payload Specialist William A. Pailes, lasted just
After running the remaining two main engines         over four days and reached a then-record
for almost a minute and a half longer than           altitude of 319 statute miles.
planned, Challenger wound up in a lower than
normal orbit, 164 by 124 statute miles. The          Challenger flew the Spacelab module with its
orbital maneuvering system engines were used         76 experiments on 61-A, Mission No. 22. A
to raise the orbit enough to continue to the         record eight crew members were aboard,
flight’s planned conclusion.                         Commander Hartsfield, Pilot Nagel, Mission
                                                     Specialists James. F. Buchli, Bluford and
This was another Spacelab mission, though the        Bonnie J. Dunbar and Payload Specialists
module was not aboard. Many experiments              Reinhard Furrer of Germany, Wubbo Ockels of
were on a pallet in the cargo bay. The crew,         the Netherlands and Ernst Messerschmid, also
Commander Fullerton, Pilot Roy Bridges,              of Germany.
Mission      Specialists     Story  Musgrave,
Anthony England and Karl Heinz, and Payload          The mission was largely financed by West
Specialists Loren Acton (a Lockheed solar            Germany.    The mostly material processing
physicist) and John-David Bartoe from the            experiments were operated by two shifts of
Naval Research Laboratory, worked around             three crew members with the other two
the clock in 12-hour shifts.                         working as needed.

The 20th shuttle flight, STS-51-I, launched          The last mission of 1985, the 23rd for a shuttle,
Aug. 27 on Discovery, to deploy three                61-B by Atlantis, launched the night of Nov. 26
communications satellites, then capture, repair      on a flight that put the space station on the
and release another – the Leasat-3. It had been      spaceflight stage. President Reagan had told
the object of the unsuccessful flyswatter efforts    NASA to start work on a space station during
by STS-51-D astronauts when it failed to             his State of the Union message in 1984.
activate after its deployment the previous April.
                                                     Two spacewalks, both by Mission Specialists
The    crew,   Commander      Engle,   Pilot         Sherwood Spring and Jerry Ross, saw repeated
Richard Covey and Mission Specialists                assembly and disassembly of a framework
van Hoften, William Fisher and John Lounge,          beam using almost 100 tube-like struts that


12                                      SPACE SHUTTLE HISTORY                               JULY 2011
snapped together. They also assembled and           Nelson represented the district that included
disassembled an upside-down pyramid frame           Kennedy Space Center, and was chairman
using six 12-foot aluminum bars. After the          of the Subcommittee on Space Science and
second spacewalk, they pronounced themselves        Applications.   He participated on some
ready to build a space station.                     experiments on the flight, which launched an
                                                    RCA communications satellite.
Brewster Shaw commanded the flight with
Bryan D. O’Connor as pilot. Mary Cleave was         With Columbia scheduled to launch again in
the third mission specialist and payload            early March and several experiments hampered
specialists were Charles Walker of McDonnell        by instrument failures, the flight was shortened
Douglas and Rudolfo Neri Vela of Mexico.            from five days to four. But weather caused
Early in the flight, three satellites were          attempts to return to Kennedy on the new
deployed, one U.S., one Mexican and one             landing day and the day after that. With
Australian.                                         Florida weather still not cooperating on day 3,
                                                    Columbia landed at Edwards.
Columbia returned after a two-year refit,
without its ejection seats (they had been           On a cold, clear, bright Florida day,
disabled after the last test flight and removed     Jan. 28, 1986, Challenger launched at 11:38 a.m.
during the overhaul) and with the agency            local time. The spacecraft exploded 73 seconds
anxious to get started on the 15 launches           after launch at an altitude of almost nine miles.
scheduled for 1986.
                                                    The seven crew members, Commander
Weather and technical problems caused seven         Francis R. “Dick” Scobee, Pilot Michael J. Smith,
postponements before 61-C., Flight No. 24, was      Mission Specialists Ellison S. Onizuka,
launched on Jan 12.     Gibson commanded            Judith A. Resnik and Ronald E. McNair, and
Columbia, with Pilot Charles Bolden, Mission        Payload Specialists Gregory Jarvis and Teacher
Specialists George Nelson, Hawley and               in Space Sharon Christa McAuliffe, were killed.
Franklin Chang-Diaz, and Payload Specialists
Robert Cenker (an RCA engineer) and U.S. Rep.
Bill Nelson.




JULY 2011                              SPACE SHUTTLE HISTORY                                      13
Five astronauts and two payload specialists made up the Challenger crew in January of 1986.
  Crew members are (left to right, front row) astronauts Michael J. Smith, Francis R. (Dick) Scobee
     and Ronald E. McNair; Ellison S. Onizuka, Sharon Christa McAuliffe, Gregory Jarvis and
                                           Judith A. Resnik.

NASA REBOUNDS INTO SPACE                              than at any previous launch. No one really
                                                      understood how the seals on the boosters’ field
The first sign of trouble had been a puff of gray     joints worked, or how potentially serious the
smoke from the aft field joint of the right solid     partial burn-through of O-ring seals seen in
rocket booster about half a second after              those joints after some previous flights had
Challenger’s launch, the investigation revealed.      been.
It was followed by additional puffs, then flame
and finally the explosion.                            Over the next three months, search teams
                                                      recovered about 30 percent of the orbiter and
The temperature that Jan. 28 at 11:38 a.m. was        parts of the boosters were recovered from the
36 degrees Fahrenheit, about 15 degrees colder        bottom of the Atlantic off Florida.


14                                      SPACE SHUTTLE HISTORY                               JULY 2011
On Feb. 3, President Reagan named a                      forbidden, with certain exceptions, to launch
commission to investigate the accident. It               commercial satellites.
was chaired by former Secretary of State
William P. Rogers. Among its 14 members                  Thirty-two months later, after overhauls that
were     astronauts     Neil    Armstrong     and        brought more than 450 changes to each of the
Sally Ride, test pilot and retired Air Force Brig.       remaining three orbiters, with redesigned solid
Gen. Chuck Yeager, physicist and Nobel                   rocket boosters, a plethora of changes in
laureate Richard P. Feynman and other leading            processes and management procedures and
scientists and engineers.                                more, NASA was ready to fly again.

Among its recommendations                                Discovery launched on STS-26, the Return To
                                                         Flight mission, on Sept. 29, 1988. The orbiter
•   The faulty booster joint seal must be                carried a veteran five-man crew commanded by
    changed.                                             Frederick Hauk. The TDRS-C, a new Tracking
                                                         and Data Relay Satellite replacing the one lost
•   The Shuttle Program management structure             on Challenger, was in the cargo bay.
    should be reviewed.
                                                         NASA had returned to the flight numbering
•   NASA should encourage transition of                  system used until STS-9. The missions retained
    qualified astronauts into management                 the assigned number even if the launch
    positions.                                           sequence changed.
•   NASA should establish an office of Safety,           Mission      Specialists   John    Lounge    and
    Reliability and Quality Assurance reporting          David Hilmers deployed the TDRS-C six hours
    directly to the administrator.                       into the flight. Scientific experiments and tests
•   Reliance on a single launch capability               of the upgraded orbiter occupied other
    should be avoided and NASA must                      crewmen, Pilot Richard Covey and Mission
    establish a flight rate consistent with its          Specialist George Nelson, during much of the
    resources.                                           four-day flight.

Eventually, after NASA and the National                  During a news conference from orbit the day
Transportation Safety Board had done a                   before landing, crew members delivered
thorough evaluation of the Challenger debris,            moving tributes to the Challenger crew.
they were sealed in unused Minuteman missile             Discovery landed on a dry-lakebed runway at
silos not far from the spacecraft’s launch pad.          Edwards Air Force Base.          Managers had
                                                         decided to end all missions there until the brake
Challenger had changed a lot.      It was a              and landing system upgrades could be checked
very public disaster, watched on live TV by              out.
millions and millions more on subsequent
newscasts.    The space agency and its                   A four-day, nine-hour STS-27 Department of
contractors changed in management and                    Defense (DoD) mission with five crew members
philosophy.    And following the Rogers                  aboard Atlantis commanded by Robert Gibson
Commission recommendation, NASA was                      was launched Dec. 2 as the last flight of 1988.



JULY 2011                                   SPACE SHUTTLE HISTORY                                      15
The TDRS-D was deployed on STS-29 shortly           intentionally crashed to gather information
after Discovery’s launch March 13, 1989, by         about its atmosphere.
Mission Specialists Robert Springer and
James Bagian. With its predecessor, TDRS-A,         The explorer did not fare as well – he was killed
the new satellite in its geosynchronous orbit       in the Philippines in 1521, but 18 of his 237 men
was able, after its checkout, to provide            returned to Spain, completing the first
communications with a shuttle about 85 percent      circumnavigation. The satellite circled Venus
of the time. The figure for ground stations was     thousands of times, and sent back data that
less than 20 percent.                               changed our ideas about the planet.

Commander Michael Coats, Pilot John Blaha           Another DoD mission, STS-28, commanded by
and Mission Specialist James Buchli worked          Brewster Shaw, followed with an Aug. 8
with experiments during the five-day flight.        launch. Next up was the shuttle’s second
They also captured extensive Earth views with       planetary payload deployment
a 70 mm IMAX camera. Discovery landed on            Atlantis, commanded by Donald Williams and
Edwards’ concrete runway.                           piloted by Michael McCulley, launched on
While NASA generally could not launch               STS-34 Oct. 18 with the $l.5-billion Galileo
commercial satellites, a backlog of other           spacecraft. Mission Specialists Shannon Lucid,
spacecraft, including government satellites and     Ellen Baker and Franklin Chang-Diaz deployed
planetary probes, had accumulated while the         Galileo a little over six hours after liftoff.
shuttle was not flying.                             Galileo, managed by NASA’s Jet Propulsion
Magellan was the first planetary mission to be      Laboratory in Pasadena, Calif., swung around
launched by a space shuttle. Its flight to Venus    Venus, then twice around Earth to gain
began on STS-30 in Atlantis’ cargo bay on           momentum. En route to Jupiter, it captured
May 4. Six hours later it was deployed.             images     of   two     asteroids   (one with
                                                    the first asteroid moon discovered). It also
Magellan’s departure was the highlight of the       observed fragments of Comet Shoemaker-Levy
four-day flight of Atlantis crew members,           crashing into Jupiter in July 1994.
Commander David Walker, Pilot Ronald Grabe
and Mission Specialists Norman Thagard,             Galileo went into orbit around Jupiter
Mary Cleave and Mark Brown. The 15-month            Dec. 7, 1995, and dropped a probe into its
flight to Venus took it 1 1/2 times around the      atmosphere. Galileo itself was intentionally
sun before it went into orbit around the target     crashed into Jupiter on Sept. 21, 2003, but not
planet.                                             before returning a wealth of information about
                                                    the gas giant and four of its moons.
Like its explorer namesake, Ferdinand
Magellan, the spacecraft did not make it home.      The fifth shuttle DoD mission and 1989’s final
But it was not supposed to. After radar             flight, STS-33 by Discovery, was launched in
mapping of 98 percent of Venus’ surface and         darkness on Nov. 22 under command of
measuring its gravity field, Magellan was           Frederick Gregory.




16                                     SPACE SHUTTLE HISTORY                               JULY 2011
An 11-day flight, the longest to that time, was      Some observations were possible, particularly
commanded by Daniel Brandenstein and                 those of bright objects, before the replanned
launched Jan. 9, 1990, as STS-32 in Columbia. It     first servicing mission was flown. Scientists
deployed a Navy communications satellite and         were able to use image processing to improve
retrieved the Long Duration Exposure                 results. But there was considerable criticism
Facility (LDEF).                                     from the public, political figures and the
                                                     scientific community.
LDEF, launched on April 6, 1984, on Flight
41-C, the 11th of the shuttle program, with          That first servicing mission, STS-61, launched
57 experiments expected to stay in orbit for a       on Endeavour Dec. 2, 1993, with seven crew
year. Its retrieval was first deferred to a later    members. After five lengthy spacewalks, a
mission then delayed after the Challenger            reboosted Hubble was released with cleared
accident.                                            vision, one new camera, new solar arrays, four
                                                     (of six) new gyroscopes and some new
After the sixth DoD flight of the program,           electronics.
STS-36    on     Atlantis   commanded     by
John Creighton launched Feb. 28, 1990,               In early January, NASA declared the mission a
perhaps one of the most meaningful payloads          success, and released the first of thousands of
launched aboard a shuttle went into orbit            sharp, remarkable images Hubble has sent
aboard Discovery on April 24. The Hubble             down over the years. The space telescope was
Space Telescope helped change the way we see,        functioning as advertised.
and think about, our universe.
                                                     Four more servicing missions followed, the
It was the first of four NASA Great                  most recent in May 2009 on Atlantis. Each of
Observatories, three of them taken into orbit by     those missions upgraded Hubble’s capabilities
space shuttles.                                      and extended its life. (See related story.)

The Discovery crew on that STS-31 flight             Ulysses, a joint NASA-European Space Agency
was Commander Loren Shriver, Pilot                   mission, was launched Oct. 6, 1990, in
Charles Bolden and Mission Specialists               Discovery’s cargo bay on the STS-41 flight
Steven Hawley, Bruce McCandless and                  commanded by Richard Richards and piloted
Kathryn Sullivan.      They deployed Hubble          by Robert Cabana. Ulysses made a swing
about 24 hours after launch at an altitude of        around Jupiter before entering a solar polar
about 380 statute miles.                             orbit.

The deployment went flawlessly, but it soon          Expected to have a lifetime of five years,
became apparent that all was not well with           Ulysses made almost three orbits around the
Hubble. A mistake had been made in the               sun and gathered information on most of
grinding of its main mirror. The mirror had          two 11-year solar cycles. It was deactivated in
been ground to the wrong shape, but ground           mid-2009.
precisely so that correction was possible.




JULY 2011                               SPACE SHUTTLE HISTORY                                     17
After a DoD mission in November 1990 and a             commanded by Daniel Brandenstein and
science flight, the last of the year, the second of    piloted by Kevin Chilton was the Intelsat VI,
NASA’s great observatories, the Gamma-Ray              stranded in a useless orbit since its March 1990
Observatory, was ready to go. Its STS-37               launch on a Titan III.
mission would see an unplanned spacewalk to
free a stuck antenna on the spacecraft. It was         On the flight’s first spacewalk, Mission
the first spacewalk in almost six years.               Specialists Pierre Thuot and Richard Hieb
                                                       could not attach a capture bar to the satellite.
Atlantis launched on the deployment mission            A second attempt the next day also was
on April 5, 1991. The observatory’s high-gain          unsuccessful.
antenna did not deploy correctly when
commanded by the ground. Mission Specialists           After a day off and discussion with Mission
Jerry Ross and Jerome Apt freed the antenna            Control, the spacewalk plan for the third
during a 4 1/2-hour spacewalk.                         spacewalk called for three spacewalkers, with
                                                       the     addition   of     Mission   Specialist
They also completed a planned spacewalk of a           Thomas Akers. Perched on the payload bay
little over six hours the following day to test        sill, they would grab the satellite when
ideas about how to move about and move                 Brandenstein maneuvered Endeavour close
equipment during space station assembly and            enough for them to reach it.
maintenance.
                                                       It worked. The new booster they attached sent
After a science flight, a Spacelab Life                Intelsat into its proper orbit. It was the first
Sciences mission, deployment of TDRS-D and             three-person spacewalk. The flight was a
deployment of an Upper Atmosphere Research             powerful argument for the value of humans in
Satellite, Atlantis on STS-44 wound up the 1991        space. It also marked the first use of a drag
flight year with a Nov. 24 launch to deploy a          parachute when Endeavour landed at Edwards.
Defense Support Program satellite.
                                                       The following microgravity laboratory flight
Discovery on STS-42 began 1992 with a Jan. 22          launched in June 1992. STS-50, in Columbia,
launch of an around-the-clock flight of the            was the longest by a shuttle to that time,
International Microgravity Laboratory in the           13 days, 19 hours and 30 minutes. Atlantis,
Spacelab module. It was followed by a March            launched in July, tested a tethered satellite as a
launch of Atlantis with the Atmospheric                power generator.
Laboratory for Applications and Science, made
up of 12 instruments from seven countries. It          Endeavour’s second flight, STS-47 in September
was mounted on Spacelab pallets in the cargo           with Spacelab life sciences and materials
bay.                                                   processing experiments, boasted a number of
                                                       shuttle firsts – the first Japanese astronaut,
The first flight of Endeavour, the replacement         Mamoru Mohri; the first black woman
for Challenger put together largely with               astronaut, Mae Jemison; and the first married
available spare parts, launched May 7 on a             couple to fly together, Mission Specialists
dramatic communications satellite rescue               Mark Lee and N. Jan Davis.
attempt. The target of the STS-49 mission


18                                        SPACE SHUTTLE HISTORY                                JULY 2011
A science and satellite deployment mission,           The mission, with Mission Specialists
STS-52 on Columbia, followed in October.              Michael Foale, Janice Voss and Bernard Harris,
Next came the STS-53 mission on Discovery,            was a step toward development of the
the last of 1992 and the last of 11 dedicated         International Space Station. It was one of the
DoD flights on shuttles. Endeavour began 1993         things the space shuttle had been designed to
with the January launch of STS-54 to deploy the       do.
TDRS-F satellite.
                                                      In the 1984 State of the Union Address,
STS-56 on Discovery took scientific experiments       President Ronald Reagan had directed NASA
into orbit in March and STS-55 in Columbia            to start working on a space station. That
followed with a Spacelab mission in April.            concept, an American orbiting outpost named
Launched in June, STS-57 saw the first flight of      Freedom, languished, particularly after the
a Spacehab module, a commercially owned               Challenger accident.
pressurized module in the cargo bay, and a
                                                      But in 1992, President George H.W. Bush and
spacewalk rehearsal for the first Hubble
                                                      Russian President Boris Yeltsin signed an
Servicing Mission and for station construction.
                                                      agreement for collaboration in space.
A Spacelab life science mission followed with
                                                      Cosmonauts would fly on space shuttles and
an October launch on Columbia mission
                                                      astronauts would serve on Mir. That was the
STS-58.
                                                      beginning of the Shuttle-Mir Program.
The long awaited Hubble flight followed. That
                                                      After an intervening scientific shuttle
mission, STS-61 on Endeavour, was followed
                                                      mission, cosmonauts Anatoly Solovyez and
by one that was a precursor of far-reaching
                                                      Nikolai Budarin launched on STS-71 aboard
changes in shuttle activities.     One of the
                                                      Atlantis   June   27     with    Commander
mission specialists on Discovery’s STS-60
                                                      Robert Gibson, Pilot Charles Precourt
flight launched Feb. 3, 1994, was cosmonaut
                                                      and    Mission   Specialists  Ellen  Baker,
Sergei Krikalev of the Russian Space Agency.
                                                      Gregory Harbaugh and Bonnie Dunbar.
Krikalev’s flight seemed to have little direct        Atlantis brought water, tools and supplies to
connection with station-related activities. But,      Mir and took home experiment results and a
after a series of half-a-dozen mostly scientific      broken Mir computer.
shuttle missions, the flight of fellow cosmonaut
Vladimir Titov certainly did.                         Also coming home aboard Atlantis was
                                                      Norman Thagard, who had launched to Mir on
As part of the Shuttle-Mir Program, he came           a Soyuz spacecraft four months before, and his
within about 40 feet of the Russian space             fellow Mir crew members, cosmonauts
station     on    Discovery’s      STS-63   flight    Vladimir Dezhurov and Gennadiy Strekalov.
launched Feb. 3, 1995. After the rendezvous           The cosmonauts who had come to Mir in
and approach to Mir (peace), Commander                Atlantis got into a Soyuz to film Atlantis
James Wetherbee and Pilot Eileen Collins              separating from Mir.
(the first female shuttle pilot) guided Discovery
on a fly-around of the station.                       After Thagard’s mission and the visit of
                                                      Atlantis, things would never be the same.


JULY 2011                                SPACE SHUTTLE HISTORY                                   19
FROM MIR TO THE INTERNATIONAL                       It marked the first time representatives of those
SPACE STATION                                       four agencies had been together in space. It
                                                    would not be the last.
A total of nine space shuttle flights docked to
the Russian space station Mir. Each brought         The flight brought water, equipment and
equipment and supplies. Each provided new           supplies and returned scientific samples to
knowledge and new understanding among the           Earth.   The new docking module, which
U.S., Russians and other international partners.    provided better clearance for shuttle dockings,
                                                    remained on Mir.
Working together on those missions, their
preparation and execution, created a respect        Astronaut Shannon Lucid was aboard STS-76
among astronauts and cosmonauts, and among          on her way to become the second
the people and programs supporting them.            U.S. crew member on Mir.           Launched
Shuttle-Mir also helped lay a firm foundation       March 22, 1996, with a Spacehab module
for development, construction and operation of      containing equipment and supplies, the flight
the International Space Station.                    began a record-breaking stay for Lucid and
                                                    two years of continuous U.S. astronaut
The first Mir docking flight by Atlantis on         presence on Mir.
STS-71 brought home on July 7, 1995, a
wealth of information with astronaut                A Spacehab double module with 4,000 pounds
Norman Thagard, who had served a pioneering         of equipment and supplies was aboard Atlantis
four months aboard the Russian space station        on STS-79 when it brought astronaut
with two cosmonaut crewmates. It caused both        John Blaha to Mir to replace Lucid. When she
sides to look at how the other did things in        landed on Sept. 26, she had spent 188 days
space and sometimes used that knowledge to          space, a new U.S. record and a world record for
improve their own methods or to develop new         a woman.
ways combining the best elements of both.
                                                    The first shuttle flight of 1997, STS-81 was
The next flight, STS-70 on Discovery, was the       launched on Atlantis Jan. 12, again with a
launch of TDRS G. It was notable, in part, for a    Spacehab double module packed with water,
delay caused by nesting Flicker Woodpeckers         supplies and equipment for Mir. Aboard was
damaging the external tank – they made more         astronaut Jerry Linenger, Blaha’s replacement.
than 70 holes ranging from four inches to half
                                                    During his increment, Linenger and his
an inch in diameter over the Memorial Day
                                                    crewmates successfully fought a Feb. 23 fire
weekend and caused a rollback for repairs. The
                                                    that had broken out in an oxygen-generating
flight finally launched July 13.
                                                    “candle.” It filled the station with smoke, but
Atlantis launched to Mir again on Nov. 12,          none of the six people aboard was badly hurt.
STS-74,    with    a   new     Russian-built
                                                    Atlantis launched May 15 on STS-84 with
docking module and Canadian astronaut
                                                    Linenger’s replacement, Michael Foale, and
Chris Hadfield. On Mir was European Space
                                                    about 7,500 pounds of material for the station.
Agency astronaut Thomas Reiter of Germany.
                                                    His increment, like Linenger’s, was in many
No crew members were exchanged.


20                                     SPACE SHUTTLE HISTORY                               JULY 2011
ways successful, but it too was punctuated by       It gave us valuable experience in training crew
an accident.                                        members from different nations, and showed
                                                    us how to operate an international space
An unpiloted Progress collided with Mir on          program. It gave us experience in support of
June 25, causing a breech in the hull. One          long-duration spaceflight and in dealing with
compartment was sealed off and internal and         unexpected challenges.
external spacewalks, including one by Foale,
were done later to rectify and inspect damage.      It helped develop the cooperation and trust we
                                                    see each day on the International Space Station
Both accidents, and especially the weeks-long       and in control centers around the world.
recovery from the collision, were learning
experiences.                                        In addition to the woodpecker-plagued STS-70
                                                    flight on Discovery, total of 13 non-Mir shuttle
STS-86, again on Atlantis, launched on Sept. 25     flights took place between the time of the first
and brought astronaut David Wolf to Mir along       and the final shuttle dockings to Mir. Each
with a Spacehab double module with                  contributed to science, to development of
equipment and supplies, and returned home           techniques to build the International Space
with Foale. Wolf’s 119 days aboard Mir were         Station and/or to better spaceflight operational
relatively uneventful, in that his increment        understanding and capability.
went largely as planned.
                                                    Among them were
Endeavour became the first orbiter other
than Atlantis to dock at Mir after its STS-89       •   Endeavour’s STS-69 flight in
launch on Jan. 22, 1998. It brought another             September 1995 which included the
8,000 pounds of equipment and supplies, along           Spartan astronomy tool and a spacewalk
with Andrew Thomas, the Australian-born U.S.            to check out International Space Station
astronaut, and cosmonaut Salizhan Sharipov.             assembly and maintenance tools and
                                                        procedures.
The final flight of the Shuttle-Mir Program
was STS-91 launched June 2 on Discovery. It         •   Endeavour’s January 1996 mission,
delivered about 6,000 pounds of equipment and           STS-72, with two spacewalks to evaluate
supplies and returned to Earth with Thomas              International Space Station fixtures, tool
and long-term U.S. experiments from Mir.                holders and an umbilical holder.

The    Shuttle-Mir   Program     provided     a     •   The STS-82 flight of Discovery in
foundation for the International Space Station.         February 1997, the second Hubble Space
It gave U.S. astronauts extended time in orbit.         Telescope servicing mission. (See related
The science program provided a basis for the            story.)
more extensive International Space Station
science activities.




JULY 2011                              SPACE SHUTTLE HISTORY                                         21
•    The July 1997, STS-94 mission of                 Launched May 27, 1999, the Spacehab double
     Columbia with the first Microgravity             module in the cargo bay held supplies and
     Science Laboratory, in a Spacelab module         internal outfitting equipment.
     in the orbiter’s cargo bay.
                                                      An Integrated Cargo Carrier held a Russian
•    The Neurolab mission, STS-90, in                 Strela crane and a U.S. crane, both installed on
     April 1998, also in a Spacelab module in         the station during a spacewalk.
     Columbia’s cargo bay.
                                                      The third of NASA’s great observatories, the
A single shuttle mission was flown between            Chandra X-Ray Observatory, was launched on
the final flight to Mir and the first shuttle         Columbia’s STS-93 flight July 23. The flight
launch of an International Space Station              was the first with a female commander,
module. That single mission was STS-95 on             Eileen Collins.
Discovery, launched Oct. 29, 1998. Among its
crew members was Payload Specialist                   Next up was Hubble Space Telescope Servicing
John Glenn.                                           Mission 3A, 1999’s last mission launched
                                                      Dec 19.
Glenn had become the first American to orbit
the Earth on Feb. 20, 1962, in his Friendship 7       The Shuttle Radar Topography Mission
Mercury spacecraft, a flight of just under            provided      mapping       information      of
five hours. More than 36 years and a stint in         unprecedented accuracy covering about
the U.S. Senate later, he was back in space,          80 percent of the Earth’s land surface, home
this time for almost nine days on a largely           to 95 percent of its population.         STS-99
scientific mission.                                   launched on Endeavour Feb. 11, 2000.
                                                      The    around-the-clock    mission     gathered
Assembly of the International Space Station           simultaneous radar images from an antenna in
began on the STS-88 mission of Endeavour,             the cargo bay and another at the end of a
launched Dec. 4, 1998.    With Commander              197-foot boom, providing strips of 3D images of
Robert Cabana and Pilot Rick Sturckow were            the Earth below.
robotic  arm     operator    Nancy  Currie,
spacewalkers Jerry Ross and James Newman,             After that flight, the shuttle flight focus was on
and cosmonaut Sergei Krikalev.                        the space station.

The Unity Node, Node 1, a connector module            Atlantis launched May 19 on STS-101, the first
was mated late Dec. 6 with the Russian-built          flight of the new glass cockpit, to take
Zarya module, launched the previous Nov. 20           equipment and supplies to the station. A
from the Baikonur Cosmodrome in Kazakhstan.           spacewalk by James Voss and Jeffery Williams
Ross and Newman did three spacewalks to               made equipment changes before the arrival of
connect power and data cables.                        the Zevzda Service Module.

Another rollback, this one caused by hail             Zvezda, the first fully Russian contribution
damage, delayed the start of Discovery’s STS-96       to the ISS – Zarya was Russian built, but U.S.
flight, the first logistics flight to the station.    funded – launched from the Baikonur
                                                      Cosmodrome and docked to the station July 25.


22                                       SPACE SHUTTLE HISTORY                                JULY 2011
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis
Press kit for the final space shuttle mission, STS-135 on Atlantis

More Related Content

What's hot

2009 Media Guide All In One Final
2009 Media Guide All In One Final2009 Media Guide All In One Final
2009 Media Guide All In One Finalguestbe41eb
 
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance SummariesLink SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summariesgasanden
 
Practitioner’s guide to the u.s. court of appeals for the fifth circuit 101...
Practitioner’s guide to the u.s. court of appeals for the fifth circuit   101...Practitioner’s guide to the u.s. court of appeals for the fifth circuit   101...
Practitioner’s guide to the u.s. court of appeals for the fifth circuit 101...Umesh Heendeniya
 
Production schedule
Production scheduleProduction schedule
Production schedulefrancis1995
 
New microsoft word document (2)
New microsoft word document (2)New microsoft word document (2)
New microsoft word document (2)GeminiVuive
 
Gpub11712 00001 Full Interior
Gpub11712 00001 Full InteriorGpub11712 00001 Full Interior
Gpub11712 00001 Full InteriorPHD910
 
Patterns of Reading Impairments in Cases of Anomia - Dr Christopher Williams
Patterns of Reading Impairments in Cases of Anomia - Dr Christopher WilliamsPatterns of Reading Impairments in Cases of Anomia - Dr Christopher Williams
Patterns of Reading Impairments in Cases of Anomia - Dr Christopher WilliamsDr Christopher Williams
 
Manual t.o.w. ford 300 tc (tig) tractor 2004.01
Manual t.o.w.  ford 300 tc (tig) tractor 2004.01Manual t.o.w.  ford 300 tc (tig) tractor 2004.01
Manual t.o.w. ford 300 tc (tig) tractor 2004.01Aldo Alcantara
 
0620_w11_qp_31
0620_w11_qp_310620_w11_qp_31
0620_w11_qp_31King Ali
 
Raj Ambasana underground box structure
Raj Ambasana underground box structureRaj Ambasana underground box structure
Raj Ambasana underground box structureRaj Ambasana
 
History of life on earth
History of life on earthHistory of life on earth
History of life on earthrizwanamin
 

What's hot (14)

Georgia Profile
Georgia ProfileGeorgia Profile
Georgia Profile
 
2009 Media Guide All In One Final
2009 Media Guide All In One Final2009 Media Guide All In One Final
2009 Media Guide All In One Final
 
Link SDVOSB Past Performance Summaries
Link SDVOSB Past Performance SummariesLink SDVOSB Past Performance Summaries
Link SDVOSB Past Performance Summaries
 
Practitioner’s guide to the u.s. court of appeals for the fifth circuit 101...
Practitioner’s guide to the u.s. court of appeals for the fifth circuit   101...Practitioner’s guide to the u.s. court of appeals for the fifth circuit   101...
Practitioner’s guide to the u.s. court of appeals for the fifth circuit 101...
 
Production schedule
Production scheduleProduction schedule
Production schedule
 
New microsoft word document (2)
New microsoft word document (2)New microsoft word document (2)
New microsoft word document (2)
 
Gpub11712 00001 Full Interior
Gpub11712 00001 Full InteriorGpub11712 00001 Full Interior
Gpub11712 00001 Full Interior
 
Patterns of Reading Impairments in Cases of Anomia - Dr Christopher Williams
Patterns of Reading Impairments in Cases of Anomia - Dr Christopher WilliamsPatterns of Reading Impairments in Cases of Anomia - Dr Christopher Williams
Patterns of Reading Impairments in Cases of Anomia - Dr Christopher Williams
 
Daether Jackson Seminar slide cast
Daether Jackson Seminar slide castDaether Jackson Seminar slide cast
Daether Jackson Seminar slide cast
 
Manual t.o.w. ford 300 tc (tig) tractor 2004.01
Manual t.o.w.  ford 300 tc (tig) tractor 2004.01Manual t.o.w.  ford 300 tc (tig) tractor 2004.01
Manual t.o.w. ford 300 tc (tig) tractor 2004.01
 
Fundación Bavaria_Final Report
Fundación Bavaria_Final ReportFundación Bavaria_Final Report
Fundación Bavaria_Final Report
 
0620_w11_qp_31
0620_w11_qp_310620_w11_qp_31
0620_w11_qp_31
 
Raj Ambasana underground box structure
Raj Ambasana underground box structureRaj Ambasana underground box structure
Raj Ambasana underground box structure
 
History of life on earth
History of life on earthHistory of life on earth
History of life on earth
 

Similar to Press kit for the final space shuttle mission, STS-135 on Atlantis

538352main sts134 presskit_508
538352main sts134 presskit_508538352main sts134 presskit_508
538352main sts134 presskit_508Sérgio Sacani
 
An Inquiry Into Pricing Of Hotels
An Inquiry Into Pricing Of HotelsAn Inquiry Into Pricing Of Hotels
An Inquiry Into Pricing Of HotelsAliasger_Lehry
 
Tu dien tranh tau thuy
Tu dien tranh tau thuyTu dien tranh tau thuy
Tu dien tranh tau thuyngovanhao
 
Tu dien tranh tau thuy
Tu dien tranh tau thuyTu dien tranh tau thuy
Tu dien tranh tau thuyAnna Ho
 
Quick Permanent Weightloss
Quick Permanent WeightlossQuick Permanent Weightloss
Quick Permanent WeightlossValene Dubbelman
 
Ozone Mastering Guide
Ozone Mastering GuideOzone Mastering Guide
Ozone Mastering Guideguest0d9408
 
Pmma 技術資料(物性編)mt01
Pmma 技術資料(物性編)mt01Pmma 技術資料(物性編)mt01
Pmma 技術資料(物性編)mt01Chia Ang
 
lloyd Irvin | Classical Martial Arts Center
lloyd Irvin | Classical Martial Arts Centerlloyd Irvin | Classical Martial Arts Center
lloyd Irvin | Classical Martial Arts CenterLloyd Irvin
 
Rapport de la Banque Mondiale sur la Production et la Consommation du Charbon...
Rapport de la Banque Mondiale sur la Production et la Consommation du Charbon...Rapport de la Banque Mondiale sur la Production et la Consommation du Charbon...
Rapport de la Banque Mondiale sur la Production et la Consommation du Charbon...Stanleylucas
 
Stars and Stripes Village Master Plan
Stars and Stripes Village Master PlanStars and Stripes Village Master Plan
Stars and Stripes Village Master Planjeaster
 
Psy 6100 course procedures summer 2011
Psy 6100 course procedures summer 2011Psy 6100 course procedures summer 2011
Psy 6100 course procedures summer 2011k3stone
 
1. unit 5, proofreading
1. unit 5, proofreading1. unit 5, proofreading
1. unit 5, proofreadingEn Chomrong
 
8.topic sentence
8.topic sentence8.topic sentence
8.topic sentenceEn Chomrong
 
Jazz and blues theory piano 1
Jazz and blues theory piano 1Jazz and blues theory piano 1
Jazz and blues theory piano 1Saulo Gomes
 
Phrasalverb
PhrasalverbPhrasalverb
Phrasalverbitu
 
Longust Pool Tile Catalog 2010
Longust Pool Tile Catalog 2010Longust Pool Tile Catalog 2010
Longust Pool Tile Catalog 2010Anita Challis
 
1.what is a paragraph
1.what is a paragraph1.what is a paragraph
1.what is a paragraphEn Chomrong
 
William Lyne - Pentagon Aliens-Creatopia (2007).pdf
William Lyne - Pentagon Aliens-Creatopia (2007).pdfWilliam Lyne - Pentagon Aliens-Creatopia (2007).pdf
William Lyne - Pentagon Aliens-Creatopia (2007).pdfGodsExecutioner
 

Similar to Press kit for the final space shuttle mission, STS-135 on Atlantis (20)

538352main sts134 presskit_508
538352main sts134 presskit_508538352main sts134 presskit_508
538352main sts134 presskit_508
 
Press Kit for Space Shuttle Endeavour's Final Mission, STS-134
Press Kit for Space Shuttle Endeavour's Final Mission, STS-134Press Kit for Space Shuttle Endeavour's Final Mission, STS-134
Press Kit for Space Shuttle Endeavour's Final Mission, STS-134
 
An Inquiry Into Pricing Of Hotels
An Inquiry Into Pricing Of HotelsAn Inquiry Into Pricing Of Hotels
An Inquiry Into Pricing Of Hotels
 
Tu dien tranh tau thuy
Tu dien tranh tau thuyTu dien tranh tau thuy
Tu dien tranh tau thuy
 
Tu dien tranh tau thuy
Tu dien tranh tau thuyTu dien tranh tau thuy
Tu dien tranh tau thuy
 
Quick Permanent Weightloss
Quick Permanent WeightlossQuick Permanent Weightloss
Quick Permanent Weightloss
 
Ozone Mastering Guide
Ozone Mastering GuideOzone Mastering Guide
Ozone Mastering Guide
 
Pmma 技術資料(物性編)mt01
Pmma 技術資料(物性編)mt01Pmma 技術資料(物性編)mt01
Pmma 技術資料(物性編)mt01
 
lloyd Irvin | Classical Martial Arts Center
lloyd Irvin | Classical Martial Arts Centerlloyd Irvin | Classical Martial Arts Center
lloyd Irvin | Classical Martial Arts Center
 
Clark, herbert l book
Clark, herbert l bookClark, herbert l book
Clark, herbert l book
 
Rapport de la Banque Mondiale sur la Production et la Consommation du Charbon...
Rapport de la Banque Mondiale sur la Production et la Consommation du Charbon...Rapport de la Banque Mondiale sur la Production et la Consommation du Charbon...
Rapport de la Banque Mondiale sur la Production et la Consommation du Charbon...
 
Stars and Stripes Village Master Plan
Stars and Stripes Village Master PlanStars and Stripes Village Master Plan
Stars and Stripes Village Master Plan
 
Psy 6100 course procedures summer 2011
Psy 6100 course procedures summer 2011Psy 6100 course procedures summer 2011
Psy 6100 course procedures summer 2011
 
1. unit 5, proofreading
1. unit 5, proofreading1. unit 5, proofreading
1. unit 5, proofreading
 
8.topic sentence
8.topic sentence8.topic sentence
8.topic sentence
 
Jazz and blues theory piano 1
Jazz and blues theory piano 1Jazz and blues theory piano 1
Jazz and blues theory piano 1
 
Phrasalverb
PhrasalverbPhrasalverb
Phrasalverb
 
Longust Pool Tile Catalog 2010
Longust Pool Tile Catalog 2010Longust Pool Tile Catalog 2010
Longust Pool Tile Catalog 2010
 
1.what is a paragraph
1.what is a paragraph1.what is a paragraph
1.what is a paragraph
 
William Lyne - Pentagon Aliens-Creatopia (2007).pdf
William Lyne - Pentagon Aliens-Creatopia (2007).pdfWilliam Lyne - Pentagon Aliens-Creatopia (2007).pdf
William Lyne - Pentagon Aliens-Creatopia (2007).pdf
 

More from NASA - National Aeronautics and Space Administration

More from NASA - National Aeronautics and Space Administration (20)

Infographic: 15 Years of the International Space Station
Infographic: 15 Years of the International Space StationInfographic: 15 Years of the International Space Station
Infographic: 15 Years of the International Space Station
 
Google+ Hangouts Training for Digital Government University
Google+ Hangouts Training for Digital Government UniversityGoogle+ Hangouts Training for Digital Government University
Google+ Hangouts Training for Digital Government University
 
Quick Overview of Google+ Hangout Usage at NASA
Quick Overview of Google+ Hangout Usage at NASAQuick Overview of Google+ Hangout Usage at NASA
Quick Overview of Google+ Hangout Usage at NASA
 
Doing a Google+ Hangout at NASA
Doing a Google+ Hangout at NASADoing a Google+ Hangout at NASA
Doing a Google+ Hangout at NASA
 
NASA.gov Metrics 2003 to 2012
NASA.gov Metrics 2003 to 2012NASA.gov Metrics 2003 to 2012
NASA.gov Metrics 2003 to 2012
 
Social Media at NASA, 2012 Edition
Social Media at NASA, 2012 EditionSocial Media at NASA, 2012 Edition
Social Media at NASA, 2012 Edition
 
NASA Socials & the Mars Curiosity Landing
NASA Socials & the Mars Curiosity LandingNASA Socials & the Mars Curiosity Landing
NASA Socials & the Mars Curiosity Landing
 
Sharing Our Universe: Tips for Social Media Content
Sharing Our Universe: Tips for Social Media ContentSharing Our Universe: Tips for Social Media Content
Sharing Our Universe: Tips for Social Media Content
 
Creating Social Media Worth Following at NASA
Creating Social Media Worth Following at NASACreating Social Media Worth Following at NASA
Creating Social Media Worth Following at NASA
 
How to host a tweetup: Lessons from #NASATweetup
How to host a tweetup: Lessons from #NASATweetupHow to host a tweetup: Lessons from #NASATweetup
How to host a tweetup: Lessons from #NASATweetup
 
Managing Social Media at NASA
Managing Social Media at NASA Managing Social Media at NASA
Managing Social Media at NASA
 
How NASA Uses Social Media to Connect
How NASA Uses Social Media to ConnectHow NASA Uses Social Media to Connect
How NASA Uses Social Media to Connect
 
STS-135 Mission Summary - Space Shuttle Atlantis
STS-135 Mission Summary - Space Shuttle AtlantisSTS-135 Mission Summary - Space Shuttle Atlantis
STS-135 Mission Summary - Space Shuttle Atlantis
 
Overview of NASA's Science Mission Directorate
Overview of NASA's Science Mission DirectorateOverview of NASA's Science Mission Directorate
Overview of NASA's Science Mission Directorate
 
Space Shuttle Missions
Space Shuttle MissionsSpace Shuttle Missions
Space Shuttle Missions
 
Space Shuttle Launch and Landing Weather Rules
Space Shuttle Launch and Landing Weather RulesSpace Shuttle Launch and Landing Weather Rules
Space Shuttle Launch and Landing Weather Rules
 
Space Shuttle Fleet
Space Shuttle FleetSpace Shuttle Fleet
Space Shuttle Fleet
 
Fact Sheet for Space Shuttle Endeavour's Final Mission STS-134
Fact Sheet for Space Shuttle Endeavour's Final  Mission STS-134Fact Sheet for Space Shuttle Endeavour's Final  Mission STS-134
Fact Sheet for Space Shuttle Endeavour's Final Mission STS-134
 
Fun Facts About the Space Shuttle Orbiter - Infographic
Fun Facts About the Space Shuttle Orbiter - InfographicFun Facts About the Space Shuttle Orbiter - Infographic
Fun Facts About the Space Shuttle Orbiter - Infographic
 
Flights of Space Shuttle Atlantis
Flights of Space Shuttle Atlantis Flights of Space Shuttle Atlantis
Flights of Space Shuttle Atlantis
 

Recently uploaded

Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
VoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXVoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXTarek Kalaji
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Will Schroeder
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaborationbruanjhuli
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureEric D. Schabell
 
Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.YounusS2
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-pyJamie (Taka) Wang
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfAijun Zhang
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1DianaGray10
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfDaniel Santiago Silva Capera
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopBachir Benyammi
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfDianaGray10
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding TeamAdam Moalla
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationIES VE
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IES VE
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1DianaGray10
 
UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8DianaGray10
 
UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6DianaGray10
 
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDEADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDELiveplex
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemAsko Soukka
 

Recently uploaded (20)

Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
VoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXVoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBX
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability Adventure
 
Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.
 
20230202 - Introduction to tis-py
20230202 - Introduction to tis-py20230202 - Introduction to tis-py
20230202 - Introduction to tis-py
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdf
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 Workshop
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team
 
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve DecarbonizationUsing IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
Using IESVE for Loads, Sizing and Heat Pump Modeling to Achieve Decarbonization
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
 
UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8UiPath Studio Web workshop series - Day 8
UiPath Studio Web workshop series - Day 8
 
UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6
 
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDEADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystem
 

Press kit for the final space shuttle mission, STS-135 on Atlantis

  • 1. National Aeronautics and Space Administration STS-135: The Final Mission Dedicated to the courageous men and women who have devoted their lives to the Space Shuttle Program and the pursuit of space exploration PRESS KIT / JULY 2011 www.nasa.gov
  • 2. 2011 2009 2008 2007 2003 2002 2001
  • 3. 1999 1998 1996 1994 1992 1991
  • 4. 1990 1989 STS-1: The First Mission 1985 1981
  • 5. CONTENTS Section Page SPACE SHUTTLE HISTORY ...................................................................................................... 1 I N T RO D U CT IO N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . 1 S PA C E SH U TT L E C O N C EP T A ND DEVELOPM ENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 T H E S PA C E SH UT TL E ER A B E G I N S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . 7 N A SA R EB O UND S INTO SPA C E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . 14 F R OM M I R TO TH E I NT E RNA TI O NAL S PA C E S TAT I O N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 S T AT I ON A SSEM BL Y C OMPL ET E D AFT ER C O L UMB IA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 M I SSI O N C ON T R OL R O S ES E X P R ES S THA N K S , S UPP OR T . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 S PA C E SH U TT L E PR O GRAM ’ S K EY S TAT I ST I C S (T HR U S TS -1 3 4 ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 T H E O RB I T ER F L E ET . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . 32 S H UT TL E UPS A N D DOW NS : L AU N C H, LAND AND LAUNCH A GA I N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 T HR E E L A N D ING S I TES U SE D , MANY M OR E A VA IL A BLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 A S TR O NA UT C O RP S M ARKS C HA N G E S IN S PAC E , S OC I E T Y . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46 H U BBL E A ND T H E S HU TT L E: N E W VI E WS O F O U R U NI V E R S E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49 STS-135 MISSION OVERVIEW ............................................................................................... 51 STS-135 TIMELINE OVERVIEW ............................................................................................... 61 STS-135 MISSION PROFILE ................................................................................................... 63 STS-135 MISSION OBJECTIVES ............................................................................................. 65 MISSION PERSONNEL ............................................................................................................. 67 STS-135 ATLANTIS CREW ...................................................................................................... 69 PAYLOAD OVERVIEW .............................................................................................................. 75 R A F FA EL L O MUL T I -P UR POSE L OG I ST I CS M O DUL E (MP L M ) FLI GHT MO D UL E 2 ( F M2 ) . . . . . . . . . . . . . . . . . . . . . . . . . . 77 MP L M B A CKG R O UN D I N FORM AT ION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78 T H E L I GH TWE I GH T M UL T I- P UR PO S E EXP E RIM E N T SUPP O RT ST RUC T UR E C ARR I ER (L M C) . . . . . . . . . . . . . . . . 79 R O B OT I C R E FUE L I N G M I SSI O N ( RRM ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 82 P UM P MOD UL E (PM ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . 85 JULY 2011 CONTENTS i
  • 6. Section Page RENDEZVOUS & DOCKING ....................................................................................................... 87 U N D O CK I NG , S E PA RA TI O N A N D D EPA RTU R E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88 SPACEWALKS ......................................................................................................................... 89 STS-135 EXPERIMENTS .......................................................................................................... 93 S T S -1 3 5 / UL F7 R E S EA R CH A N D TE C HN OL OG Y D EV EL OPM E N T . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93 S H OR T- D UR AT I O N R E S EA RC H TO B E C OMP LETED ON STS-135 / UL F7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94 R E S EA R CH TO B E D EL I V ER E D TO S TA TI O N O N SH UTT L E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96 R E S EA R CH OF O PP O RT U NI T Y . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . 97 R E S EA R CH TO B E R ET UR NE D O N S PA C E S H UT TL E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 98 PICO-SAT ELLITE SOLA R CEL L TES T BED . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . 100 D E V E L O PM E NT T E ST O B JEC T I V E S ( DT O) A N D D ETA ILE D S U PPL EMEN T AR Y O B J ECTIVES (DSO) . . . . . . . . . . 102 S T U D E NT EXP ERIM E N T S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . 105 SHUTTLE REFERENCE DATA .................................................................................................... 117 LAUNCH & LANDING ................................................................................................................ 135 L A U N CH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . 135 A B OR T T O OR B IT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . 135 T RA N S O C EA NI C A BO RT L AN D I N G . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 135 R E T UR N TO L A UNCH SIT E . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . 135 A B OR T O N C E A RO U N D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . 135 L A N D I NG . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . 135 ACRONYMS & ABBREVIATIONS .............................................................................................. 137 MEDIA ASSISTANCE ............................................................................................................... 153 SPACE SHUTTLE AND INTERNATIONAL SPACE STATION − PUBLIC AFFAIRS CONTACTS ..... 155 THE FUTURE ............................................................................................................................ 159 O R I ON MUL T I- P UR PO S E CR E W V EHI CLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 9 N A SA C OMMER C IAL C R EW PR OG RAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 62 ii CONTENTS JULY 2011
  • 7. SPACE SHUTTLE HISTORY INTRODUCTION Engineering and technological advances were required in development of the shuttle. It Shuttle History: Knowledge, was called the most complex machine ever Capabilities, and Cooperation built. Its main engines stretched design and metallurgical capabilities. Its thermal For 30 years, the space shuttle has been the U.S. protection system, which shielded the orbiter human access to space. It has capabilities no from temperatures as high as 3,000 degrees other spacecraft can claim. No other spacecraft Fahrenheit during re-entry, was a work in is likely to match those capabilities in this progress until shortly before the first shuttle generation. launch. Engines and the thermal protection It is the fastest winged vehicle ever to fly, with system were designed for repeated reuse. an orbital velocity of 17,500 mph, 10 times the Both have been continually improved during speed of a high-powered rifle bullet. It is the the life of the Space Shuttle Program. So has only winged vehicle to reach orbit, and the only just about every other major shuttle system. reusable space launch and landing vehicle. Science, in addition to the advances required The shuttle can carry cargos of substantial for the spacecraft’s development, has made weight and dimensions. It has taken into space huge strides with the help of the space shuttle. more than half the mass of all payloads We have learned more about ourselves, about launched by all nations since Sputnik in 1957 – how our bodies and those of other organisms 3,450,143 pounds (though STS-132) and function, from the subcellular level on up. We counting as the final shuttle launch approaches. have learned how we as individuals interact More singular still is the shuttle’s ability to with one another under unusual and stressful return payloads from space. It has brought circumstances – and how to work together. back from orbit more than 97 percent of We have learned about our planet, its land all mass returned to Earth, a total of masses, its oceans, its atmosphere and its 225,574 pounds (though STS-132) before the environment as a whole. With the help of the upcoming final flight. shuttle we have learned more about our moon, It has launched 802 crew members including solar system, our galaxy and our universe. those lost on Challenger and Columbia. Crew The Hubble Space Telescope, for example, members returning on the shuttle numbered launched and repeatedly upgraded and 789. Many crew members flew more than once. repaired on shuttle missions, has given us A total of 356 different individuals have flown unprecedented vision of distant stars, some aboard the shuttle (all through STS-132). with planets orbiting them. It has allowed us to It leaves a significant legacy. look at objects so distant that viewing the light from them takes us back in time to nearer the beginning of the universe. JULY 2011 SPACE SHUTTLE HISTORY 1
  • 8. Scientific advances continue aboard the ranged from political and funding concerns to International Space Station. The shuttle has competing design ideas and conflicting systems been instrumental in the station’s construction requirements – when one system changed and operation. others were impacted. Perhaps as important as any element of the There were different requirements of users. shuttle legacy is the development of Contractors and program managers worked out international cooperation in space. Humans compromises of their own. from many nations have begun to work together in space. Shuttle visits to the Russian All in all, more than 50 different shuttle space station Mir were a beginning that led to versions were developed during the design that new cooperation we see today aboard the process. Eventually, they evolved into the International Space Station. space shuttle that has flown since Columbia’s first launch in April 1981. It was the first of It has helped to develop respect and 135 launches, a string scheduled to end in July. understanding for people and technological capabilities of many countries, including some The prospect of reusable spacecraft capable of former enemies. Such synergies could give carrying large cargos and humans into space humans as a whole greater potential for space had been talked about for decades in science exploration and development that any single fiction and by scientists since shortly after nation could achieve alone. Such capabilities World War II. eventually could be critical in how well our Indeed, a German design looked at a winged species flourishes or, indeed, survives. craft to be launched from a supersonic sled, The shuttle has provided inspiration – for the rocket itself into suborbital space, skip along young and the not so young. the upper atmosphere and bomb New York. After gliding to a landing and refueling, it It has encouraged uncounted youths to focus would return home using the same technique. on science and technology. The idea of becoming an astronaut, as some certainly Ideas for the next generation of U.S. human will, is a powerful motivation. So too is the spacecraft had been discussed within NASA prospect of using such an education to advance and the Department of Defense. In late 1958, human knowledge and understanding in space. NASA had established a working group based at Langley Research Center in Hampton, Va., to People of all the nations contributing to the look at the nation’s future human space space shuttle’s design and operation can take program. pride in its accomplishments. Among the group’s 37 original engineers SPACE SHUTTLE CONCEPT AND headed by Robert Gilruth were Maxime Faget, DEVELOPMENT head of engineering; Chris Kraft of flight operations; and Glynn Lunney, who, at 21, was Like any project of its magnitude, the space the youngest member of the team. shuttle was a series of compromises. They 2 SPACE SHUTTLE HISTORY JULY 2011
  • 9. On April 1, 1969, Faget, director of engineering President Spiro Agnew, was established that and development at the Manned Spacecraft February. It issued a report called “The Center (now Johnson Space Center (JSC), held a Post-Apollo Space Program: Directions for the meeting with 20 colleagues at which he Future” in September 1969. presented a balsa-framed, paper-skinned model. It was about 18 inches long, had The Space Task Group recommended, among straight, stubby wings and a shark-like nose. other things, “low-cost, flexible, long-lived, highly reusable, operational space systems with Faget, who designed the Mercury spacecraft a high degree of commonality and reusability.” and contributed to U.S. spacecraft design It suggested a system that could carry people, through the space shuttle, told them, “We’re equipment, supplies and fuel to and from orbit going to build America’s next spacecraft. It’s routinely, as well as support a range of going to launch like a spacecraft; it’s going to Department of Defense missions. land like a plane.” The first humans landed on the moon the following July 20. Phase B contracts for project definition went to two orbiter teams, one McDonnell Douglas and A request for proposals for “An Integral Martin Marietta, and the other North American Launch and Reentry Vehicle” had been issued Rockwell and General Dynamics. Both teams on Oct. 30, 1968, through the Manned would look at competing NASA designs, the Spacecraft Center in Houston and the Marshall Maxime Faget design with limited cross-range Space Flight Center in Huntsville, Ala. It called and cargo capabilities but lower heating on for studies on configurations for launch and re-entry and a high cross-range design with landing vehicles. Safety and economy were a delta wing, a larger cargo bay and cargo emphasized over the capability to carry heavy capability. Main engine contracts went to cargos. Pratt & Whitney, Rocketdyne and Aerojet. Four companies got 10-month study contracts Funding limitations caused Phase B to be in February 1969. General Dynamics, amended, with the option of an expendable Lockheed, McDonnell Douglas, and North external tank. Eventually, that concept was American Rockwell came up with various adopted, and solid rocket boosters were concepts, some involving expendable and some attached to the tank. The Air Force insisted on reusable launchers. Engine contracts went to the long cargo bay and heavy payload Pratt & Whitney and Rocketdyne. This was the capability as well as a cross range of 1,265 miles beginning of Phase A of a four-step process to launch large satellites into polar orbit from culminating in production and operation of a Vandenberg Air Force Base in California and national space shuttle. return there after a single orbit. Department of Defense political support was an important NASA decided during Phase A that it wanted a shuttle consideration. two-stage craft, both stages reusable. Cargo bay dimensions were an example of the While those studies were going on, the Space compromises at work. The length, which Task Group, established by newly elected wound up being 60 feet, was the Air Force President Richard Nixon and chaired by Vice JULY 2011 SPACE SHUTTLE HISTORY 3
  • 10. requirement, while NASA required the 15-foot orbital maneuvering system engines. But width to accommodate space station modules. Enterprise would provide additional valuable information on flight characteristics, atop a The requirement for two fly-back stages was shuttle carrier aircraft and in free flight. dropped as was, in early 1974, the idea to provide air-breathing engines for the orbiter When the shuttle’s air-breathing engines were approach and landing and ferry flights under dropped, it became apparent that NASA would its own power. have to find a way to transport the orbiter. Designing a specific-purpose aircraft and using Phases C (design) and D (production and the Air Force C5A were considered. operation) were combined. President Nixon gave NASA the OK to go ahead with the larger Eventually, NASA settled for a used 747-100 payload bay on Jan. 3, 1972. North American that had flown almost 9,000 hours for American Rockwell was named winner of the orbiter Airlines, most on its New York-Los Angeles contract on July 26 of that year. route. It bought the plane on July 18, 1974. (A second used 747 was acquired from Japan Rocketdyne, a division of North American Air Lines for NASA by Boeing in April 1988 Rockwell, had been named winner of the and delivered to the space agency in engine contract on July 13. NASA announced November 1990.) Thiokol as winner of the Solid Rocket Booster development contract on June 24, 1973, and less Under a $30 million contract with Boeing, the than a month later, Martin Marietta got the nod former American Airlines plane’s structure was to design, develop and test the external tank. strengthened and instrumentation improved, orbiter mounting assembly fittings were The war in Southeast Asia, a recession and the installed and vertical endplates were added to fading of the excitement of the Apollo moon its horizontal stabilizers. The modifications landings had made spaceflight funding tight. were completed by January 1977. Shuttle development was to be stretched over a longer time and the space station, one Approach and landing tests using Enterprise justification for the shuttle’s development, was and the 747 (its American Airlines logo still put on hold. Appeals of some of the contract faintly visible on each side) began the following awards also caused delays. month at Edwards Air Force Base in California. First came three taxi tests on Feb. 15, the third Rockwell began building the first orbiter, reaching a speed of 157 mph. Five “inactive” Orbiter Vehicle 101, in Palmdale, Calif., on flight tests followed from Feb. 18 to March 2. June 4, 1974. It was to have been named Constitution, but after 100,000 fans of the TV Two astronaut crews, the first Fred Haise and series “Star Trek” wrote in, the name was Charles “Gordon” Fullerton and the second changed to Enterprise. It was rolled out on Joe Engle and Richard Truly, alternated at Sept. 17, 1976. Enterprise controls for three active test flights captive atop the 747 beginning Aug. 12 and five By then, it already had been subjected to a free flights involving Enterprise being released series of vibration tests. It had no main or from the aircraft and landing at Edwards. 4 SPACE SHUTTLE HISTORY JULY 2011
  • 11. The first four of the five, beginning Aug. 12, Gulfstreams were acquired in the 1980s and landed on Edwards’ dry lakebed. The fifth, on converted to shuttle trainers.) Oct. 26, wound up the 1977 test series with an exciting Enterprise landing by Haise and New crew members would be needed. In Fullerton on Edwards’ concrete runway. The January 1978 a new group of astronauts was fourth and fifth of those flights were flown selected. It was the first new astronaut class without the tail cone, giving a more accurate since the seven new astronauts had been picture of how an orbiter would glide to a selected in August 1969. landing after a spaceflight. The group, the eighth beginning with the After some additional tests, Enterprise was to Mercury astronauts selected in 1957, was unlike have been returned to Rockwell to be outfitted any chosen before. Six of the 35 members were to fly in space, but it was not to be. NASA women; two of them were medical doctors and decided it would be quicker and cheaper to the others held Ph.D.s. Three were African convert a structural test article, OV-99, into a American; two of them held Ph.D.s. One was an flight orbiter. That orbiter was named Asian American. Challenger. Many members of the new group would Enterprise was subjected to additional tests, become the heart of the new category of including some at Vandenberg, and was astronauts, shuttle mission specialists. Their displayed at several locations, including the qualifications were varied from the mostly test Paris Air Show in 1983 and the World’s Fair pilots who made up earlier groups. Several of in New Orleans in 1985. It was officially the new selectees were civilians, often with transferred to the Smithsonian Institution’s considerably different perspectives than their National Air and Space Museum on military predecessors. Nov. 18, 1985, though NASA continued to Mission specialist physical qualifications were borrow parts from it for testing in subsequent different, and still differ slightly, for pilots and years. mission specialists. Mercury astronauts could Other preparations for shuttle flight continued: be no taller than 5 feet 11 inches – for groups of the Gemini and Apollo era, the maximum was NASA bought two Gulfstream II business jets 6 feet -- so they would fit into space capsules. and converted them into shuttle training Now astronauts well over six feet tall could fly aircraft. They realistically simulate the in space. behavior of a returning orbiter between 35,000 feet and a point just above the runway – Launch facilities and equipment were modified the height of the spacecraft’s cockpit on at Kennedy Space Center in Florida and a new landing. launch site was being built at Vandenberg. Various contractor and NASA field center test The controls on the left side are much like facilities were established or modified. those used by a space shuttle commander on landing, and the plane reacts to inputs As development continued, efforts were made like a descending orbiter. (Two additional to reduce spacecraft weight and improve JULY 2011 SPACE SHUTTLE HISTORY 5
  • 12. performance. Qualification testing, aimed at number of problems. In April 1977, a test of showing various elements of the shuttle were two engines was dubbed successful, but ready to fly safely, was heating up. turbopump problems continued. By early 1980, formal qualification tests had Finally, by late 1980, the difficulties seemed been completed on the orbital maneuvering to be largely resolved. A key test was system engines and the reaction control system completed on Jan. 17, 1981. Columbia’s three jets. Testing for qualification of the solid rocket main engines were successfully test fired at the boosters was completed about that time. launch pad for 20 seconds on Feb. 20, providing additional confidence for launch of STS-1 less NASA had not used solid rockets in human than two months later, on April 12. spaceflight before. Each solid rocket booster has four motor segments. They are transported The thermal protection system, particularly the by rail from Thiokol’s Utah facility and that tiles, was a persistent problem. The ablative mode of travel, with its curves and tunnels, heat shields used from Mercury through Apollo necessitated their being built in segments and were obviously not reusable. Reinforced attached to one another once they reach Florida. carbon-carbon was used in areas subject to the greatest heating like the nose cone and wing Marshall Space Flight Center did a series of leading edges. tests on the external tank. A series of weight-saving measures, and additional tests, After a lot of testing, a ceramic heat shield was were introduced during early phases of tank chosen to protect much of the aluminum body construction and beyond. Later tanks were of the orbiter. Shielding in these areas was more than 10,000 pounds lighter than the early made up of tiles. production models. Black tiles were used where heat did not exceed It became apparent that the greatest threat of 2,300 degrees Fahrenheit (e.g., orbiter’s bottom) delay was in development of the shuttle main and white tiles were used where temperatures engines and the thermal protection system. did not get above 1,200 degrees. Thermal blankets were used in areas that stayed below The main engine was a challenge. Chamber 700 degrees. pressures were higher than those of any previous liquid-fueled rocket engine. The Attaching the rigid tiles to the aluminum skin design was for a reusable, two-stage engine that of the orbiter was a problem. An intervening could be throttled. It required turbopumps that felt pad was thought to be a solution. A operated at higher speeds and higher pressures stronger bond between the tile and the pad was than any before. found to be necessary, but when that was done, the combination of adhesive, felt, adhesive, tile Rocketdyne built an engine test bed at a NASA resulted in a loss of about 50 percent of the facility in Mississippi, at what is now Stennis strength of the four elements. Space Center, where it tested an engine larger and heavier than those built for flight, which NASA decided to fill voids on the inward side were not yet available. It found and resolved a of the tile, a “densification” process. Far 6 SPACE SHUTTLE HISTORY JULY 2011
  • 13. behind schedule because of the delays, NASA Young and Crippen landed Columbia on the decided to fly Columbia from Palmdale to dry lakebed at Edwards Air Force Base. Kennedy in March 1979, with about 6,000 of the 30,000 tiles still not installed. A number of tiles STS-2, commanded by Joe Engle and piloted by that had been installed were lost during that Richard Truly, launched Nov. 12 marking the flight. first time a launch and entry spacecraft had been used. It was the first flight of the Nondestructive tests were developed to check Canadian robotic arm, which was tested tiles’ conditions, and gap fillers were installed thoroughly during the mission. to prevent tile rotation under shock-wave stress. Tile installation and testing went on The arm, just over 50 feet long, was an early around the clock six days a week for 20 months. international contribution to the shuttle Many newly installed tiles had to be removed program. Stowed on the left sill of the payload after testing and reinstalled. By the end of bay, it can deploy and retrieve payloads, move November 1980, the number of tiles to be spacewalkers around and help inspect the installed was below 1,000. orbiter. Finally, on Dec. 29, 1980, Columbia was rolled Although the flight was shortened from out on the newly modified mobile launch five days to two days, six hours after one of platform, from Kennedy’s Vehicle Assembly three fuel cells failed, the two crew members Building to Pad 39A. Its gleaming white completed most of their planned tasks. They external tank seemed to harmonize with the also landed on Edwards’ dry lake bed. white of the solid rocket boosters and the The third flight was different in a number of black-trimmed white of the orbiter. ways, beginning visually. The external tank, which had been painted white on the THE SPACE SHUTTLE ERA BEGINS first two flights, was now the rust color that On April 12, 1981, Commander John Young and characterized it from then on. Engineers Pilot Robert Crippen launched from Kennedy decided the white paint was not needed. That Space Center’s Pad 39A aboard Columbia on decision resulted in a weight savings of STS-1. 595 pounds, almost all of it translating into increased cargo capacity. The space shuttle era was under way. Commander Jack Lousma and Pilot STS-1 was the first of four test flights. Each Gordon Fullerton launched STS-3 on carried a two-man crew. The commander and March 22, 1982. They flew Columbia in various pilot had ejection seats. attitudes to check out thermal characteristics, conducted more tests of the robotic arm and The first flight lasted just over two days, did scientific experiments, some involving six hours and 20 minutes. It orbited the Earth plants and insects. 36 times at an inclination of 40 degrees and an altitude of 166 statute miles and traveled Rain at Edwards caused the landing to be 1,074,111 miles. After testing orbiter systems, moved to the strip on the White Sands Missile JULY 2011 SPACE SHUTTLE HISTORY 7
  • 14. Range, and a New Mexico dust storm delayed Privately owned communications satellites had it for a day. Finally, on March 30, they landed become a growing field while the shuttle was after a flight of just over eight days. being developed and more and more communications satellites would require launch The final test flight launched June 27, 1982, and the shuttle seemed perfectly suited to with Commander Ken Mattingly and Pilot provide it. Henry Hartsfield. They did extensive tests of Columbia systems and conducted several Legislation had given the space agency a experiments. monopoly on the domestic satellite launch market. NASA aggressively marketed that Among the experiments was a classified one launch capability, both domestically and from the Department of Defense. It marked a internationally. Estimates had foreseen new way of doing things for NASA. Previous between 30 and 60 shuttle flights. public openness was partly muted. No camera views of the payload bay were transmitted to Bargain prices were offered for multiple Earth and oral communications relating to launches over the firsts five years of the the payload were conducted in a simple, but program, with the idea of building repeat effective code. business. After a flight of more than seven days and Columbia launched on the first operational 3.3 million miles, STS-4 landed on Edwards’ flight on Nov. 11, 1982. In the crew concrete runway, a first for an orbiter returning compartment, in addition to Commander from space. Vance Brand and Pilot Robert Overmyer, were the first mission specialists, Joseph P. Allen and At Edwards, they got a July 4 welcome from William Lenore. Both had been among President Ronald Reagan and his wife Nancy the Group 6 science astronauts selected in and a holiday crowd of thousands. At the August 1967. ceremony, NASA Administrator James Beggs declared the space shuttle operational. Two commercial satellites were in the payload bay. The first to be launched from a shuttle, The president compared the completion of SBS-C, left the payload bay about eight hours the test flight series to the driving of the into the flight. The Canadian Telesat-E gold spike marking completion of the followed. Both were successfully boosted into transcontinental railroad. “It marks our geostationary orbits, 22,300 feet above the entrance into a new era,” he said. Earth, by Payload Assist Modules. Shortly after Columbia had landed, Challenger By mid-January 1986, a total of 24 commercial passed close by. Atop the shuttle carrier satellites had been deployed from the shuttle. aircraft, it was departing on its first cross Of those, the Payload Assist Module boosters country flight, its delivery to Kennedy Space of two, the Indonesian Palapa B2 and the Center. Westar-VI, had failed to fire, leaving the With the test phase finished, it was time to get satellites useless in a low orbit. down to business. 8 SPACE SHUTTLE HISTORY JULY 2011
  • 15. The astronauts aboard Challenger on that 10th The TDRS booster sustained failure, leaving the shuttle flight, STS-41-B, in February 1984 had spacecraft well below geosynchronous altitude performed flawlessly. But the failure of the but far too high for the shuttle to reach. NASA boosters gave the shuttle a chance to and TDRS builder, TRW, came up with a demonstrate another capability. method to use its thrusters to gradually lift it to the proper orbit, a process that took several Both those satellites were later retrieved and weeks. returned to Earth by Discovery astronauts on the 14th shuttle mission, STS-51-A. They Challenger’s STS-7 mission launched June 18 to worked under contract with the insurance deploy two commercial satellites. It carried companies, which already had paid the owners various experiments, including those on the for their loss. German Shuttle Pallet Satellite which was deployed from the cargo bay by the robotic Lloyds of London was delighted with the arm. After a time as a free flyer in its own orbit, recovery, and rang its Lutine bell to mark the Challenger rendezvoused with it, grappled it importance of the event. It gave the insurance with the arm and secured it in the cargo bay for companies partial reimbursement. It was then return home. called monetarily the largest salvage recovery. The satellites were refurbished and sold to new Commander Crippen’s four crew members owners to be launched again. were from the shuttle-focused astronaut Group 8. It included Sally Ride, the first The new numbering system for shuttle flights U.S. woman in space. was introduced after STS-9. The following flight became STS-41-B. The first number The next Challenger mission, STS-8, had designated the fiscal year and the second three more Group 8 alumnae, including number was the launch site – 1 for Kennedy Guyon Bluford, the first U.S. black in space. and 2 for Vandenberg Air Force Base. The Commanded by Truly, it was the first to launch letter was the order of launch assignment, so B at night, on Aug. 30, 1983. It deployed a was the second scheduled for that fiscal year. satellite from India. Its landing also was at night. The old numbering system was revived for Columbia was back for STS-9, launched Nov. 28 STS-26, the return-to-flight mission after the as the final flight of 1983. It was the first Challenger accident. Spacelab flight. Commanded by Young The STS-6 mission, Challenger’s first flight, (making the last of his six spaceflights, which launched April 4, 1983, and began a series of included two missions to the moon) with other firsts. The flight carried the first Tracking Brewster Shaw as pilot, its six-man crew and Data Relay Satellite (TDRS). The TDRS included the first payload specialists, system replaced the ground, a NASA Byron Lichtenberg of Massachusetts Institute of communications satellite which began the Technology and Ulf Merbold, a German replacement of the ground stations on which physicist. the space agency had relied through the end of The European Space Agency built the the Apollo era. $1-billion, 23-foot laboratory flown in JULY 2011 SPACE SHUTTLE HISTORY 9
  • 16. Columbia’s cargo bay. The crew, including replaced failed components. Hart put it back Mission Specialists Robert Parker and into its own orbit with the arm. Owen Garriott, worked around the clock in two shifts, conducting more than 70 experiments. After an attention-getting June 26 abort seconds before scheduled liftoff, Discovery launched on The 10th shuttle flight, STS-41-B, saw the its first flight, STS-41-D, flight 12, on Aug. 30 program’s first spacewalks, and with them, with Commander Hartsfield and Pilot demonstration of a jet backpack that took Michael Coats. With Mission Specialists Mission Specialists Bruce McCandless and Richard Mullane, Steve Hawley, Judith Resnik Robert Stewart untethered out of the cargo bay. and Charles Walker, they launched two communications satellites and deployed, tested The mission, launched Feb. 3, 1984, with and restowed a large solar array. Commander Vance Brad, Pilot Robert Gibson and Mission Specialist Ronald McNair, was Crippen commanded STS-41-G. The 13th demonstrating the use of the Manned flight launched with Pilot Jon McBride on Maneuvering Unit’s potential in the capture Oct. 5 on board Challenger. It was the first to and repair of the Solar Maximum Satellite, have two women mission specialists, Ride and scheduled for the next flight. They could not Kathryn Sullivan. Sullivan became the first guess how important the jet backpack would be female spacewalker on a 3.5-hour outing with to the future of the two satellites deployed from Mission Specialist Dave Leestma to test a their cargo bay, the Indonesian Palapa B2 and satellite refueling system. the Westar-VI. Two mission specialists, Paul Scully-Power, It was the first mission to land at Kennedy an Australian oceanographer, and Canadian Space Center. Marc Garneau made this seven-member crew the largest yet. The largely scientific flight Crippen commanded the STS-41-C flight, the focusing on Earth included release of a satellite program’s 11th, with Pilot Francis “Dick” to measure solar radiation reaching Earth. Scobee and Mission Specialist van Hoften. It launched April 6 with a 30-foot, 22,000-pound The two-satellite retrieval mission, STS-51-A, Long Duration Exposure Facility and its was commanded by Frederick Hauck. Crew 57 experiments in the cargo bay. On the way to members were Pilot Dave Walker and Mission the ailing satellite, Mission Specialist Terry Hart Specialists Joseph Allen, Anna Fisher and used the robotic arm to deploy the container, Dale Gardner. Discovery launched Nov. 8 on scheduled to stay in orbit for a year. the year’s final flight. After rendezvous with the satellite, Mission An early task was to launch two Specialist George Nelson flew to it with the jet communications satellites it had brought into backpack. Initial efforts to attach a docking orbit. Then, after rendezvous with Palapa B-2, device failed, but succeeded the next day after Allen jetted to the satellite with the backpack some help from Goddard Space Flight Center. and attached a capture device. Fisher used the In the cargo bay Nelson and van Hoften arm to bring it back to Discovery, but a problem prevented its docking in the cargo bay. 10 SPACE SHUTTLE HISTORY JULY 2011
  • 17. Using a backup plan, Allen got into foot Garn, who chaired the Senate committee with restraints, removed the satellite from the NASA budget oversight, volunteered for space arm and held it over his head for about sickness studies. He said later he had indeed 90 minutes, one orbit of the Earth. The suffered from that malady. satellite’s weight on Earth was about 1,600 pounds, about nine times that of Allen. Challenger’s STS-51-B flight, the 17th of Gardner attached an adapter and secured the the program, launched April 29 and was the satellite for the trip home. second Spacelab mission. Crew members were Commander Overmyer, Pilot The Westar VI was less of a problem. Using Frederick Gregory, Mission Specialists their experience two days before, Gardner Don Leslie Lind, Norman Thagard and jetted to the satellite and together they secured William Thornton, and Payload Specialists it in the cargo bay. Taylor E. Wang (a Jet Propulsion Laboratory physicist) and Lodewijk van der Berg, an Discovery’s flight STS-51-C, the 15th flight EG & G scientist. was a Department of Defense mission, launched Jan. 24, 1985. Commanded by Again, the crew worked around the clock, in Mattingly, it lasted just over three days and had two shifts. The wide-ranging experiments an all-military-astronaut crew. involved disciplines, ranging from astronomy to materials processing. In the lab were The launch had been delayed one day because two squirrel monkeys and 24 rats flown to test of freezing weather. cages, which proved inadequate. U.S. Senator Jake Garn of Utah, a former Navy When the cages were opened to feed the pilot, was aboard Discovery for the 16th occupants, food debris and feces were released shuttle flight, STS-51-D. Launched on April 12 to float throughout the lab and even into the and commanded by Karol Bobko, the flight crew compartment. The problem was solved included Pilot Donald Williams, Mission by putting plastic bags over food trays when Specialists Jeffrey Hoffman, David Griggs crew members, in surgical masks, removed and Rhea Seddon and Payload Specialist them, and using a vacuum cleaner. Charles Walker. Daniel Brandenstein commanded the 18th The flight launched two communications shuttle flight, STS-51-G, in Discovery, with satellites, but the booster of one did not Pilot John Creighton, Mission Specialists activate. Crew members spent an extra John Fabian, Steve Nagel and Shannon Lucid, two days in orbit, using the robotic arm with a and Payload Specialists Patrick Baudry flyswatter-like device at its end, trying without (a French astronomer) and Saudi Arabian success to activate a switch satellite thought Prince Sultan Salman Abdul Azziz Al Sa’ud. to be in the wrong position on the Leasat 3. The satellite was repaired on flight STS-51-I that The flight, launched June 17, deployed three October. communications satellites, one for Mexico, one for Saudi Arabia and one U.S. A satellite called Spartan, an astronomy experiment, was JULY 2011 SPACE SHUTTLE HISTORY 11
  • 18. deployed with the robotic arm and, successfully deployed the new satellites (one subsequently, after a separation of more than Australian and two U.S., including Leasat-4), 100 miles, was recaptured and returned to then successfully rendezvoused with and Earth. A number of other experiments were captured the Leasat-3. Van Hoften and Fisher, aboard including several from France. a surgeon, repaired it during two spacewalks and it was redeployed. Challenger’s flight STS-51-F, the program’s 19th, started badly. Five minutes and Atlantis made its first flight on STS-51-J, the 45 seconds after the July 29 launch the No. 1 21st flight of the shuttle program. The engine shut down prematurely (the cause Department of Defense mission, commanded turned out to be a faulty sensor reading) and an by Bobko with Pilot Ronald J. Grabe, Mission abort to orbit was declared. Specialists David C. Hilmers and Stewart and Payload Specialist William A. Pailes, lasted just After running the remaining two main engines over four days and reached a then-record for almost a minute and a half longer than altitude of 319 statute miles. planned, Challenger wound up in a lower than normal orbit, 164 by 124 statute miles. The Challenger flew the Spacelab module with its orbital maneuvering system engines were used 76 experiments on 61-A, Mission No. 22. A to raise the orbit enough to continue to the record eight crew members were aboard, flight’s planned conclusion. Commander Hartsfield, Pilot Nagel, Mission Specialists James. F. Buchli, Bluford and This was another Spacelab mission, though the Bonnie J. Dunbar and Payload Specialists module was not aboard. Many experiments Reinhard Furrer of Germany, Wubbo Ockels of were on a pallet in the cargo bay. The crew, the Netherlands and Ernst Messerschmid, also Commander Fullerton, Pilot Roy Bridges, of Germany. Mission Specialists Story Musgrave, Anthony England and Karl Heinz, and Payload The mission was largely financed by West Specialists Loren Acton (a Lockheed solar Germany. The mostly material processing physicist) and John-David Bartoe from the experiments were operated by two shifts of Naval Research Laboratory, worked around three crew members with the other two the clock in 12-hour shifts. working as needed. The 20th shuttle flight, STS-51-I, launched The last mission of 1985, the 23rd for a shuttle, Aug. 27 on Discovery, to deploy three 61-B by Atlantis, launched the night of Nov. 26 communications satellites, then capture, repair on a flight that put the space station on the and release another – the Leasat-3. It had been spaceflight stage. President Reagan had told the object of the unsuccessful flyswatter efforts NASA to start work on a space station during by STS-51-D astronauts when it failed to his State of the Union message in 1984. activate after its deployment the previous April. Two spacewalks, both by Mission Specialists The crew, Commander Engle, Pilot Sherwood Spring and Jerry Ross, saw repeated Richard Covey and Mission Specialists assembly and disassembly of a framework van Hoften, William Fisher and John Lounge, beam using almost 100 tube-like struts that 12 SPACE SHUTTLE HISTORY JULY 2011
  • 19. snapped together. They also assembled and Nelson represented the district that included disassembled an upside-down pyramid frame Kennedy Space Center, and was chairman using six 12-foot aluminum bars. After the of the Subcommittee on Space Science and second spacewalk, they pronounced themselves Applications. He participated on some ready to build a space station. experiments on the flight, which launched an RCA communications satellite. Brewster Shaw commanded the flight with Bryan D. O’Connor as pilot. Mary Cleave was With Columbia scheduled to launch again in the third mission specialist and payload early March and several experiments hampered specialists were Charles Walker of McDonnell by instrument failures, the flight was shortened Douglas and Rudolfo Neri Vela of Mexico. from five days to four. But weather caused Early in the flight, three satellites were attempts to return to Kennedy on the new deployed, one U.S., one Mexican and one landing day and the day after that. With Australian. Florida weather still not cooperating on day 3, Columbia landed at Edwards. Columbia returned after a two-year refit, without its ejection seats (they had been On a cold, clear, bright Florida day, disabled after the last test flight and removed Jan. 28, 1986, Challenger launched at 11:38 a.m. during the overhaul) and with the agency local time. The spacecraft exploded 73 seconds anxious to get started on the 15 launches after launch at an altitude of almost nine miles. scheduled for 1986. The seven crew members, Commander Weather and technical problems caused seven Francis R. “Dick” Scobee, Pilot Michael J. Smith, postponements before 61-C., Flight No. 24, was Mission Specialists Ellison S. Onizuka, launched on Jan 12. Gibson commanded Judith A. Resnik and Ronald E. McNair, and Columbia, with Pilot Charles Bolden, Mission Payload Specialists Gregory Jarvis and Teacher Specialists George Nelson, Hawley and in Space Sharon Christa McAuliffe, were killed. Franklin Chang-Diaz, and Payload Specialists Robert Cenker (an RCA engineer) and U.S. Rep. Bill Nelson. JULY 2011 SPACE SHUTTLE HISTORY 13
  • 20. Five astronauts and two payload specialists made up the Challenger crew in January of 1986. Crew members are (left to right, front row) astronauts Michael J. Smith, Francis R. (Dick) Scobee and Ronald E. McNair; Ellison S. Onizuka, Sharon Christa McAuliffe, Gregory Jarvis and Judith A. Resnik. NASA REBOUNDS INTO SPACE than at any previous launch. No one really understood how the seals on the boosters’ field The first sign of trouble had been a puff of gray joints worked, or how potentially serious the smoke from the aft field joint of the right solid partial burn-through of O-ring seals seen in rocket booster about half a second after those joints after some previous flights had Challenger’s launch, the investigation revealed. been. It was followed by additional puffs, then flame and finally the explosion. Over the next three months, search teams recovered about 30 percent of the orbiter and The temperature that Jan. 28 at 11:38 a.m. was parts of the boosters were recovered from the 36 degrees Fahrenheit, about 15 degrees colder bottom of the Atlantic off Florida. 14 SPACE SHUTTLE HISTORY JULY 2011
  • 21. On Feb. 3, President Reagan named a forbidden, with certain exceptions, to launch commission to investigate the accident. It commercial satellites. was chaired by former Secretary of State William P. Rogers. Among its 14 members Thirty-two months later, after overhauls that were astronauts Neil Armstrong and brought more than 450 changes to each of the Sally Ride, test pilot and retired Air Force Brig. remaining three orbiters, with redesigned solid Gen. Chuck Yeager, physicist and Nobel rocket boosters, a plethora of changes in laureate Richard P. Feynman and other leading processes and management procedures and scientists and engineers. more, NASA was ready to fly again. Among its recommendations Discovery launched on STS-26, the Return To Flight mission, on Sept. 29, 1988. The orbiter • The faulty booster joint seal must be carried a veteran five-man crew commanded by changed. Frederick Hauk. The TDRS-C, a new Tracking and Data Relay Satellite replacing the one lost • The Shuttle Program management structure on Challenger, was in the cargo bay. should be reviewed. NASA had returned to the flight numbering • NASA should encourage transition of system used until STS-9. The missions retained qualified astronauts into management the assigned number even if the launch positions. sequence changed. • NASA should establish an office of Safety, Mission Specialists John Lounge and Reliability and Quality Assurance reporting David Hilmers deployed the TDRS-C six hours directly to the administrator. into the flight. Scientific experiments and tests • Reliance on a single launch capability of the upgraded orbiter occupied other should be avoided and NASA must crewmen, Pilot Richard Covey and Mission establish a flight rate consistent with its Specialist George Nelson, during much of the resources. four-day flight. Eventually, after NASA and the National During a news conference from orbit the day Transportation Safety Board had done a before landing, crew members delivered thorough evaluation of the Challenger debris, moving tributes to the Challenger crew. they were sealed in unused Minuteman missile Discovery landed on a dry-lakebed runway at silos not far from the spacecraft’s launch pad. Edwards Air Force Base. Managers had decided to end all missions there until the brake Challenger had changed a lot. It was a and landing system upgrades could be checked very public disaster, watched on live TV by out. millions and millions more on subsequent newscasts. The space agency and its A four-day, nine-hour STS-27 Department of contractors changed in management and Defense (DoD) mission with five crew members philosophy. And following the Rogers aboard Atlantis commanded by Robert Gibson Commission recommendation, NASA was was launched Dec. 2 as the last flight of 1988. JULY 2011 SPACE SHUTTLE HISTORY 15
  • 22. The TDRS-D was deployed on STS-29 shortly intentionally crashed to gather information after Discovery’s launch March 13, 1989, by about its atmosphere. Mission Specialists Robert Springer and James Bagian. With its predecessor, TDRS-A, The explorer did not fare as well – he was killed the new satellite in its geosynchronous orbit in the Philippines in 1521, but 18 of his 237 men was able, after its checkout, to provide returned to Spain, completing the first communications with a shuttle about 85 percent circumnavigation. The satellite circled Venus of the time. The figure for ground stations was thousands of times, and sent back data that less than 20 percent. changed our ideas about the planet. Commander Michael Coats, Pilot John Blaha Another DoD mission, STS-28, commanded by and Mission Specialist James Buchli worked Brewster Shaw, followed with an Aug. 8 with experiments during the five-day flight. launch. Next up was the shuttle’s second They also captured extensive Earth views with planetary payload deployment a 70 mm IMAX camera. Discovery landed on Atlantis, commanded by Donald Williams and Edwards’ concrete runway. piloted by Michael McCulley, launched on While NASA generally could not launch STS-34 Oct. 18 with the $l.5-billion Galileo commercial satellites, a backlog of other spacecraft. Mission Specialists Shannon Lucid, spacecraft, including government satellites and Ellen Baker and Franklin Chang-Diaz deployed planetary probes, had accumulated while the Galileo a little over six hours after liftoff. shuttle was not flying. Galileo, managed by NASA’s Jet Propulsion Magellan was the first planetary mission to be Laboratory in Pasadena, Calif., swung around launched by a space shuttle. Its flight to Venus Venus, then twice around Earth to gain began on STS-30 in Atlantis’ cargo bay on momentum. En route to Jupiter, it captured May 4. Six hours later it was deployed. images of two asteroids (one with the first asteroid moon discovered). It also Magellan’s departure was the highlight of the observed fragments of Comet Shoemaker-Levy four-day flight of Atlantis crew members, crashing into Jupiter in July 1994. Commander David Walker, Pilot Ronald Grabe and Mission Specialists Norman Thagard, Galileo went into orbit around Jupiter Mary Cleave and Mark Brown. The 15-month Dec. 7, 1995, and dropped a probe into its flight to Venus took it 1 1/2 times around the atmosphere. Galileo itself was intentionally sun before it went into orbit around the target crashed into Jupiter on Sept. 21, 2003, but not planet. before returning a wealth of information about the gas giant and four of its moons. Like its explorer namesake, Ferdinand Magellan, the spacecraft did not make it home. The fifth shuttle DoD mission and 1989’s final But it was not supposed to. After radar flight, STS-33 by Discovery, was launched in mapping of 98 percent of Venus’ surface and darkness on Nov. 22 under command of measuring its gravity field, Magellan was Frederick Gregory. 16 SPACE SHUTTLE HISTORY JULY 2011
  • 23. An 11-day flight, the longest to that time, was Some observations were possible, particularly commanded by Daniel Brandenstein and those of bright objects, before the replanned launched Jan. 9, 1990, as STS-32 in Columbia. It first servicing mission was flown. Scientists deployed a Navy communications satellite and were able to use image processing to improve retrieved the Long Duration Exposure results. But there was considerable criticism Facility (LDEF). from the public, political figures and the scientific community. LDEF, launched on April 6, 1984, on Flight 41-C, the 11th of the shuttle program, with That first servicing mission, STS-61, launched 57 experiments expected to stay in orbit for a on Endeavour Dec. 2, 1993, with seven crew year. Its retrieval was first deferred to a later members. After five lengthy spacewalks, a mission then delayed after the Challenger reboosted Hubble was released with cleared accident. vision, one new camera, new solar arrays, four (of six) new gyroscopes and some new After the sixth DoD flight of the program, electronics. STS-36 on Atlantis commanded by John Creighton launched Feb. 28, 1990, In early January, NASA declared the mission a perhaps one of the most meaningful payloads success, and released the first of thousands of launched aboard a shuttle went into orbit sharp, remarkable images Hubble has sent aboard Discovery on April 24. The Hubble down over the years. The space telescope was Space Telescope helped change the way we see, functioning as advertised. and think about, our universe. Four more servicing missions followed, the It was the first of four NASA Great most recent in May 2009 on Atlantis. Each of Observatories, three of them taken into orbit by those missions upgraded Hubble’s capabilities space shuttles. and extended its life. (See related story.) The Discovery crew on that STS-31 flight Ulysses, a joint NASA-European Space Agency was Commander Loren Shriver, Pilot mission, was launched Oct. 6, 1990, in Charles Bolden and Mission Specialists Discovery’s cargo bay on the STS-41 flight Steven Hawley, Bruce McCandless and commanded by Richard Richards and piloted Kathryn Sullivan. They deployed Hubble by Robert Cabana. Ulysses made a swing about 24 hours after launch at an altitude of around Jupiter before entering a solar polar about 380 statute miles. orbit. The deployment went flawlessly, but it soon Expected to have a lifetime of five years, became apparent that all was not well with Ulysses made almost three orbits around the Hubble. A mistake had been made in the sun and gathered information on most of grinding of its main mirror. The mirror had two 11-year solar cycles. It was deactivated in been ground to the wrong shape, but ground mid-2009. precisely so that correction was possible. JULY 2011 SPACE SHUTTLE HISTORY 17
  • 24. After a DoD mission in November 1990 and a commanded by Daniel Brandenstein and science flight, the last of the year, the second of piloted by Kevin Chilton was the Intelsat VI, NASA’s great observatories, the Gamma-Ray stranded in a useless orbit since its March 1990 Observatory, was ready to go. Its STS-37 launch on a Titan III. mission would see an unplanned spacewalk to free a stuck antenna on the spacecraft. It was On the flight’s first spacewalk, Mission the first spacewalk in almost six years. Specialists Pierre Thuot and Richard Hieb could not attach a capture bar to the satellite. Atlantis launched on the deployment mission A second attempt the next day also was on April 5, 1991. The observatory’s high-gain unsuccessful. antenna did not deploy correctly when commanded by the ground. Mission Specialists After a day off and discussion with Mission Jerry Ross and Jerome Apt freed the antenna Control, the spacewalk plan for the third during a 4 1/2-hour spacewalk. spacewalk called for three spacewalkers, with the addition of Mission Specialist They also completed a planned spacewalk of a Thomas Akers. Perched on the payload bay little over six hours the following day to test sill, they would grab the satellite when ideas about how to move about and move Brandenstein maneuvered Endeavour close equipment during space station assembly and enough for them to reach it. maintenance. It worked. The new booster they attached sent After a science flight, a Spacelab Life Intelsat into its proper orbit. It was the first Sciences mission, deployment of TDRS-D and three-person spacewalk. The flight was a deployment of an Upper Atmosphere Research powerful argument for the value of humans in Satellite, Atlantis on STS-44 wound up the 1991 space. It also marked the first use of a drag flight year with a Nov. 24 launch to deploy a parachute when Endeavour landed at Edwards. Defense Support Program satellite. The following microgravity laboratory flight Discovery on STS-42 began 1992 with a Jan. 22 launched in June 1992. STS-50, in Columbia, launch of an around-the-clock flight of the was the longest by a shuttle to that time, International Microgravity Laboratory in the 13 days, 19 hours and 30 minutes. Atlantis, Spacelab module. It was followed by a March launched in July, tested a tethered satellite as a launch of Atlantis with the Atmospheric power generator. Laboratory for Applications and Science, made up of 12 instruments from seven countries. It Endeavour’s second flight, STS-47 in September was mounted on Spacelab pallets in the cargo with Spacelab life sciences and materials bay. processing experiments, boasted a number of shuttle firsts – the first Japanese astronaut, The first flight of Endeavour, the replacement Mamoru Mohri; the first black woman for Challenger put together largely with astronaut, Mae Jemison; and the first married available spare parts, launched May 7 on a couple to fly together, Mission Specialists dramatic communications satellite rescue Mark Lee and N. Jan Davis. attempt. The target of the STS-49 mission 18 SPACE SHUTTLE HISTORY JULY 2011
  • 25. A science and satellite deployment mission, The mission, with Mission Specialists STS-52 on Columbia, followed in October. Michael Foale, Janice Voss and Bernard Harris, Next came the STS-53 mission on Discovery, was a step toward development of the the last of 1992 and the last of 11 dedicated International Space Station. It was one of the DoD flights on shuttles. Endeavour began 1993 things the space shuttle had been designed to with the January launch of STS-54 to deploy the do. TDRS-F satellite. In the 1984 State of the Union Address, STS-56 on Discovery took scientific experiments President Ronald Reagan had directed NASA into orbit in March and STS-55 in Columbia to start working on a space station. That followed with a Spacelab mission in April. concept, an American orbiting outpost named Launched in June, STS-57 saw the first flight of Freedom, languished, particularly after the a Spacehab module, a commercially owned Challenger accident. pressurized module in the cargo bay, and a But in 1992, President George H.W. Bush and spacewalk rehearsal for the first Hubble Russian President Boris Yeltsin signed an Servicing Mission and for station construction. agreement for collaboration in space. A Spacelab life science mission followed with Cosmonauts would fly on space shuttles and an October launch on Columbia mission astronauts would serve on Mir. That was the STS-58. beginning of the Shuttle-Mir Program. The long awaited Hubble flight followed. That After an intervening scientific shuttle mission, STS-61 on Endeavour, was followed mission, cosmonauts Anatoly Solovyez and by one that was a precursor of far-reaching Nikolai Budarin launched on STS-71 aboard changes in shuttle activities. One of the Atlantis June 27 with Commander mission specialists on Discovery’s STS-60 Robert Gibson, Pilot Charles Precourt flight launched Feb. 3, 1994, was cosmonaut and Mission Specialists Ellen Baker, Sergei Krikalev of the Russian Space Agency. Gregory Harbaugh and Bonnie Dunbar. Krikalev’s flight seemed to have little direct Atlantis brought water, tools and supplies to connection with station-related activities. But, Mir and took home experiment results and a after a series of half-a-dozen mostly scientific broken Mir computer. shuttle missions, the flight of fellow cosmonaut Vladimir Titov certainly did. Also coming home aboard Atlantis was Norman Thagard, who had launched to Mir on As part of the Shuttle-Mir Program, he came a Soyuz spacecraft four months before, and his within about 40 feet of the Russian space fellow Mir crew members, cosmonauts station on Discovery’s STS-63 flight Vladimir Dezhurov and Gennadiy Strekalov. launched Feb. 3, 1995. After the rendezvous The cosmonauts who had come to Mir in and approach to Mir (peace), Commander Atlantis got into a Soyuz to film Atlantis James Wetherbee and Pilot Eileen Collins separating from Mir. (the first female shuttle pilot) guided Discovery on a fly-around of the station. After Thagard’s mission and the visit of Atlantis, things would never be the same. JULY 2011 SPACE SHUTTLE HISTORY 19
  • 26. FROM MIR TO THE INTERNATIONAL It marked the first time representatives of those SPACE STATION four agencies had been together in space. It would not be the last. A total of nine space shuttle flights docked to the Russian space station Mir. Each brought The flight brought water, equipment and equipment and supplies. Each provided new supplies and returned scientific samples to knowledge and new understanding among the Earth. The new docking module, which U.S., Russians and other international partners. provided better clearance for shuttle dockings, remained on Mir. Working together on those missions, their preparation and execution, created a respect Astronaut Shannon Lucid was aboard STS-76 among astronauts and cosmonauts, and among on her way to become the second the people and programs supporting them. U.S. crew member on Mir. Launched Shuttle-Mir also helped lay a firm foundation March 22, 1996, with a Spacehab module for development, construction and operation of containing equipment and supplies, the flight the International Space Station. began a record-breaking stay for Lucid and two years of continuous U.S. astronaut The first Mir docking flight by Atlantis on presence on Mir. STS-71 brought home on July 7, 1995, a wealth of information with astronaut A Spacehab double module with 4,000 pounds Norman Thagard, who had served a pioneering of equipment and supplies was aboard Atlantis four months aboard the Russian space station on STS-79 when it brought astronaut with two cosmonaut crewmates. It caused both John Blaha to Mir to replace Lucid. When she sides to look at how the other did things in landed on Sept. 26, she had spent 188 days space and sometimes used that knowledge to space, a new U.S. record and a world record for improve their own methods or to develop new a woman. ways combining the best elements of both. The first shuttle flight of 1997, STS-81 was The next flight, STS-70 on Discovery, was the launched on Atlantis Jan. 12, again with a launch of TDRS G. It was notable, in part, for a Spacehab double module packed with water, delay caused by nesting Flicker Woodpeckers supplies and equipment for Mir. Aboard was damaging the external tank – they made more astronaut Jerry Linenger, Blaha’s replacement. than 70 holes ranging from four inches to half During his increment, Linenger and his an inch in diameter over the Memorial Day crewmates successfully fought a Feb. 23 fire weekend and caused a rollback for repairs. The that had broken out in an oxygen-generating flight finally launched July 13. “candle.” It filled the station with smoke, but Atlantis launched to Mir again on Nov. 12, none of the six people aboard was badly hurt. STS-74, with a new Russian-built Atlantis launched May 15 on STS-84 with docking module and Canadian astronaut Linenger’s replacement, Michael Foale, and Chris Hadfield. On Mir was European Space about 7,500 pounds of material for the station. Agency astronaut Thomas Reiter of Germany. His increment, like Linenger’s, was in many No crew members were exchanged. 20 SPACE SHUTTLE HISTORY JULY 2011
  • 27. ways successful, but it too was punctuated by It gave us valuable experience in training crew an accident. members from different nations, and showed us how to operate an international space An unpiloted Progress collided with Mir on program. It gave us experience in support of June 25, causing a breech in the hull. One long-duration spaceflight and in dealing with compartment was sealed off and internal and unexpected challenges. external spacewalks, including one by Foale, were done later to rectify and inspect damage. It helped develop the cooperation and trust we see each day on the International Space Station Both accidents, and especially the weeks-long and in control centers around the world. recovery from the collision, were learning experiences. In addition to the woodpecker-plagued STS-70 flight on Discovery, total of 13 non-Mir shuttle STS-86, again on Atlantis, launched on Sept. 25 flights took place between the time of the first and brought astronaut David Wolf to Mir along and the final shuttle dockings to Mir. Each with a Spacehab double module with contributed to science, to development of equipment and supplies, and returned home techniques to build the International Space with Foale. Wolf’s 119 days aboard Mir were Station and/or to better spaceflight operational relatively uneventful, in that his increment understanding and capability. went largely as planned. Among them were Endeavour became the first orbiter other than Atlantis to dock at Mir after its STS-89 • Endeavour’s STS-69 flight in launch on Jan. 22, 1998. It brought another September 1995 which included the 8,000 pounds of equipment and supplies, along Spartan astronomy tool and a spacewalk with Andrew Thomas, the Australian-born U.S. to check out International Space Station astronaut, and cosmonaut Salizhan Sharipov. assembly and maintenance tools and procedures. The final flight of the Shuttle-Mir Program was STS-91 launched June 2 on Discovery. It • Endeavour’s January 1996 mission, delivered about 6,000 pounds of equipment and STS-72, with two spacewalks to evaluate supplies and returned to Earth with Thomas International Space Station fixtures, tool and long-term U.S. experiments from Mir. holders and an umbilical holder. The Shuttle-Mir Program provided a • The STS-82 flight of Discovery in foundation for the International Space Station. February 1997, the second Hubble Space It gave U.S. astronauts extended time in orbit. Telescope servicing mission. (See related The science program provided a basis for the story.) more extensive International Space Station science activities. JULY 2011 SPACE SHUTTLE HISTORY 21
  • 28. The July 1997, STS-94 mission of Launched May 27, 1999, the Spacehab double Columbia with the first Microgravity module in the cargo bay held supplies and Science Laboratory, in a Spacelab module internal outfitting equipment. in the orbiter’s cargo bay. An Integrated Cargo Carrier held a Russian • The Neurolab mission, STS-90, in Strela crane and a U.S. crane, both installed on April 1998, also in a Spacelab module in the station during a spacewalk. Columbia’s cargo bay. The third of NASA’s great observatories, the A single shuttle mission was flown between Chandra X-Ray Observatory, was launched on the final flight to Mir and the first shuttle Columbia’s STS-93 flight July 23. The flight launch of an International Space Station was the first with a female commander, module. That single mission was STS-95 on Eileen Collins. Discovery, launched Oct. 29, 1998. Among its crew members was Payload Specialist Next up was Hubble Space Telescope Servicing John Glenn. Mission 3A, 1999’s last mission launched Dec 19. Glenn had become the first American to orbit the Earth on Feb. 20, 1962, in his Friendship 7 The Shuttle Radar Topography Mission Mercury spacecraft, a flight of just under provided mapping information of five hours. More than 36 years and a stint in unprecedented accuracy covering about the U.S. Senate later, he was back in space, 80 percent of the Earth’s land surface, home this time for almost nine days on a largely to 95 percent of its population. STS-99 scientific mission. launched on Endeavour Feb. 11, 2000. The around-the-clock mission gathered Assembly of the International Space Station simultaneous radar images from an antenna in began on the STS-88 mission of Endeavour, the cargo bay and another at the end of a launched Dec. 4, 1998. With Commander 197-foot boom, providing strips of 3D images of Robert Cabana and Pilot Rick Sturckow were the Earth below. robotic arm operator Nancy Currie, spacewalkers Jerry Ross and James Newman, After that flight, the shuttle flight focus was on and cosmonaut Sergei Krikalev. the space station. The Unity Node, Node 1, a connector module Atlantis launched May 19 on STS-101, the first was mated late Dec. 6 with the Russian-built flight of the new glass cockpit, to take Zarya module, launched the previous Nov. 20 equipment and supplies to the station. A from the Baikonur Cosmodrome in Kazakhstan. spacewalk by James Voss and Jeffery Williams Ross and Newman did three spacewalks to made equipment changes before the arrival of connect power and data cables. the Zevzda Service Module. Another rollback, this one caused by hail Zvezda, the first fully Russian contribution damage, delayed the start of Discovery’s STS-96 to the ISS – Zarya was Russian built, but U.S. flight, the first logistics flight to the station. funded – launched from the Baikonur Cosmodrome and docked to the station July 25. 22 SPACE SHUTTLE HISTORY JULY 2011