Kota Super Thermal Power Plant
Introduction
• It was established in 1983.
• KSTPS is designed in following stages.
Stage Unit
Number
Installed
Capacity (MW)
Date of
Commissioning
Status
Stage I 1 110 January 1983 Running
Stage I 2 110 July 1983 Running
Stage II 3 210 September 1988 Running
Stage II 4 210 May 1989 Running
Stage III 5 210 March 1994 Running
Stage IV 6 195 July 2003 Running
Stage V 7 195 May 2009 Running
• Total generation capacity is 1240 MW.
• It is located at the left bank of the CHAMBAL River at the upstream of
KOTA BAIRAJ.
• Bituminous Coal is used as fuel.
• Its Calorific Value is 3300 K.cal/Kg.
• Coal India Limited supplies coal from its coal mines of coal producing
subsidiaries SECL & NCL to Kota Thermal Power Plant.
 General Layout & Basic Idea
 Coal Handling Plant
 Boiler
 Ash Handling Plant
 Steam Turbine
 Electricity Generator
 Cooling System
 Transformer
 Control Panel
Main & Auxiliaries Parts of KSTPS
General Layout & Basic Idea
 Fuel & Ash Circuit
 Air & Gas Circuit
 Feed Water & Steam Circuit
 Cooling Water Circuit
Air
Coal Handling Plant
Coal Handling Plant can be called the heart of the thermal power plant.
It Can be divided into 3 sections.
Wagon
Unloading
System
Crushing
System
Conveying
System
Wagon Unloading System
•Wagon Tripler unloads the coal from wagon to hopper.
•Hopper is made of iron, is in the form of net.
•Hopper allows to pass coal less than 200mm.
Crushing System
Crusher House :- Its main Function is to crush the coal to 20mm. Size.
Two types of crushers in KSTPS
Primary
Crushers
Secondary
Crushers
Primary Crusher:-
• Roll Crusher
Feed Size : 1200 mm.
End Product Size : 500mm
• Rotary Breaker
Feed Coal size : 500mm
End Product size : 0-200mm
 Secondary Crusher:-
It employs a combination of Impact,
shearing, Compression.
Roll Crusher
Conveying System:-
Belts are used to convey coal from coal handling plant to furnace.
Conveyor belt specification:-
Belt width : 1400 mm.
Speed : 2.2 m/sec.
Capacity : 750/1350 ton/hr.
No. of conveyor : 38
Total Installed Power : 360 KW
Boiler
 Water Tube Boiler:- In this type of boiler water flows inside the
tubes and hot gases flow outside the tubes.
A Boiler (or Steam Generator) is a closed vessel in which water,
under pressure is converted into steam.
(i) Fire Tube Boiler (ii) Water Tube Boiler
 Furnace:- Furnace is primary part of the boiler where the chemical
energy of coal is converted into thermal energy by combustion.
Boiler Drum
Its function is to separate
water and steam from
mixture of steam & water
generated in the furnace
walls.
Economizer
An Economizer extracts a part of heat
from the flue gases and uses it for
heating the feed water before it enters
into the steam drum.
Air Pre-heater Super heater
Air Pre heaters are employed to
recover the heat from the flue gases
leaving the Economizer & are used to
incoming air for combustion.
A Super heater is a device which
removes the last traces of moisture from
the saturated steam leaving the boiler
tubes & also increases the temperature .
Super heater consists a group of tubes.
Ash Handling Plant
In Thermal Plant coal is generally used as fuel & hence the ash is
produced as the byproduct. Ash generated in power plant is about
30-40% of total coal consumption.
Air & Gas Plant
Fuel & Ash
Plant
Air & Gas
Plant
Ash Disposal &
Dust Collection
Plant
Air
(Atmosphere) Air Pre heater Boiler
Boiler Tubes
Flue gases
(Due to
combustion)
Super HeaterChimney Economizer
Ash Disposal & Dust Collection Plant
The ash is removed from fly ash hoppers in dry state & it is carried out to
collecting equipment where it is mixed with water & resulting slurry is
discharged.
Steam Turbine
Steam Turbine is a machine in which a shaft is rotated steadily by impact
or reaction of current or stream of working substances (Steam , Air,
Water, Gases) upon Blades of a wheel.
Technical Data of Turbines
Rated Output
110MW
Rated Speed
3000 RPM
Clockwise
Direction
Maximum
Steam Pressure
146atm
 An electrical generator is a machine which converts mechanical energy
into electrical energy through electro mechanical energy conversion.
Electricity Generator
The generator is driven by directly coupled steam turbine at a
speed of 3000 RPM.
Current : 7720A Frequency: 50Hz
For
generator
(110MW)
Terminals: 6
Cooling System
 In KSTPS Hydrogen Cooling System is employed for generator cooling.
 Hydrogen is used Because of its superior cooling properties & we can
eliminate the fire risk because it doesn’t support combustion.
 Thermal conductivity of H2 is 7.3 times of air.
Transformer
 Transformer is a static device which is used to change the voltage level
keeping the power & frequency same.
 There are about 83 transformers installed at various places in plant to
operate the auxiliaries.
Generator Transformer A Steps up (16.5KV to 220KV)
Generator Transformer B Steps up (16.5KV to 400KV)
Unit Auxiliary Transformer Steps down (16.5KV to 6.9KV)
Station Service Transformer Steps down(6.9KV to 0.433KV)
Types of Installed Transformer
Control Panel
Control Panel I Fan Control Desk
Control Panel II Fuel Control Desk
Control Panel III Steam & Water Control Desk
Control Panel IV Turbine Control Desk
Control Panel V Generator Control Panel
All the Basic Parameters like Temperature of steam & air, Flow of water &
air, pressure, Electricity generation etc. are controlled in Control Panel.
A best ppt on kota super thermal power station

More Related Content

What's hot

Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Stationpukhraj palariya
 
Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plantHîmãńshu Mêęńä
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantViren Patel
 
kota super thermal Power station training report
kota super thermal Power station training reportkota super thermal Power station training report
kota super thermal Power station training reportEr. Aman Agrawal
 
Kota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportKota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportDeepak Solanki
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plantravi kant
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipatpratikguptateddy
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant vishal patel
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantRahul Jalan
 
Thermal power station
Thermal power stationThermal power station
Thermal power stationvishal gupta
 
Thermal Power Generation
Thermal Power GenerationThermal Power Generation
Thermal Power GenerationRavinder Jangid
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT Amit Gupta
 
Thermal Power Plant Basic to Knowledge
Thermal Power Plant Basic to KnowledgeThermal Power Plant Basic to Knowledge
Thermal Power Plant Basic to KnowledgeAnshuman Tyagi
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plantsagar20jain
 

What's hot (20)

Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
Presentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power StationPresentation on Kota super Thermal Power Station
Presentation on Kota super Thermal Power Station
 
Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
kota super thermal Power station training report
kota super thermal Power station training reportkota super thermal Power station training report
kota super thermal Power station training report
 
Kota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training reportKota Super Thermal Power Station Training report
Kota Super Thermal Power Station Training report
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power station
Thermal power stationThermal power station
Thermal power station
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
Thermal Power Generation
Thermal Power GenerationThermal Power Generation
Thermal Power Generation
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
coal based thermal power plant
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
 
Thermal Power Plant Basic to Knowledge
Thermal Power Plant Basic to KnowledgeThermal Power Plant Basic to Knowledge
Thermal Power Plant Basic to Knowledge
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
 

Similar to A best ppt on kota super thermal power station

Summer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationSummer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationFellowBuddy.com
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxssuser4c2635
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plantR G Sanjay Prakash
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminarCentury Rayon
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant pptPrakash Jarotia
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingRadhe Shyam
 
Thermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurThermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurChandra veer singh
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator TrainingVedant Sumaria
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantAbhishek Kumar
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Stationsagnikchoudhury
 
obra thermal power plant ppt
obra thermal power plant pptobra thermal power plant ppt
obra thermal power plant pptAshish Singh
 
Anil thermal power plant
Anil thermal power plantAnil thermal power plant
Anil thermal power plantANIL SHARMA
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptxParulChandna6
 
Suratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power PlantSuratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power PlantHarshit Madaan
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavmukesh yadav
 

Similar to A best ppt on kota super thermal power station (20)

Summer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power StationSummer Training Presentation Kota Super Thermal Power Station
Summer Training Presentation Kota Super Thermal Power Station
 
KSTPS PPT Astha.pptx
KSTPS PPT Astha.pptxKSTPS PPT Astha.pptx
KSTPS PPT Astha.pptx
 
kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plant
 
Kota super thermal power plant
Kota super thermal power plantKota super thermal power plant
Kota super thermal power plant
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminar
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Ppt on btps bokaro industrial training
Ppt on btps bokaro industrial trainingPpt on btps bokaro industrial training
Ppt on btps bokaro industrial training
 
KTPS
KTPSKTPS
KTPS
 
Thermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurThermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E Jaipur
 
Thermal Power Simulator Training
Thermal Power Simulator TrainingThermal Power Simulator Training
Thermal Power Simulator Training
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
 
power plant ppt
power plant pptpower plant ppt
power plant ppt
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
obra thermal power plant ppt
obra thermal power plant pptobra thermal power plant ppt
obra thermal power plant ppt
 
Anil thermal power plant
Anil thermal power plantAnil thermal power plant
Anil thermal power plant
 
report on VTPS
report on VTPSreport on VTPS
report on VTPS
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
Suratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power PlantSuratgarh Super Thermal Power Plant
Suratgarh Super Thermal Power Plant
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadav
 

Recently uploaded

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 

Recently uploaded (20)

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 

A best ppt on kota super thermal power station

  • 1. Welcome to Presentation on Kota Super Thermal Power Station (KSTPS) Submitted by : - Naveen Kumar Saini 7th Sem., EI&CE (11EEBEI037) Govt. Engineering College Bikaner Submitted to: Pooja Bhardwaj (Assistant Processor) EI&CE
  • 2. Kota Super Thermal Power Plant
  • 3. Introduction • It was established in 1983. • KSTPS is designed in following stages. Stage Unit Number Installed Capacity (MW) Date of Commissioning Status Stage I 1 110 January 1983 Running Stage I 2 110 July 1983 Running Stage II 3 210 September 1988 Running Stage II 4 210 May 1989 Running Stage III 5 210 March 1994 Running Stage IV 6 195 July 2003 Running Stage V 7 195 May 2009 Running • Total generation capacity is 1240 MW. • It is located at the left bank of the CHAMBAL River at the upstream of KOTA BAIRAJ.
  • 4. • Bituminous Coal is used as fuel. • Its Calorific Value is 3300 K.cal/Kg. • Coal India Limited supplies coal from its coal mines of coal producing subsidiaries SECL & NCL to Kota Thermal Power Plant.
  • 5.  General Layout & Basic Idea  Coal Handling Plant  Boiler  Ash Handling Plant  Steam Turbine  Electricity Generator  Cooling System  Transformer  Control Panel Main & Auxiliaries Parts of KSTPS
  • 6. General Layout & Basic Idea  Fuel & Ash Circuit  Air & Gas Circuit  Feed Water & Steam Circuit  Cooling Water Circuit Air
  • 7. Coal Handling Plant Coal Handling Plant can be called the heart of the thermal power plant. It Can be divided into 3 sections. Wagon Unloading System Crushing System Conveying System Wagon Unloading System •Wagon Tripler unloads the coal from wagon to hopper. •Hopper is made of iron, is in the form of net. •Hopper allows to pass coal less than 200mm.
  • 8. Crushing System Crusher House :- Its main Function is to crush the coal to 20mm. Size. Two types of crushers in KSTPS Primary Crushers Secondary Crushers Primary Crusher:- • Roll Crusher Feed Size : 1200 mm. End Product Size : 500mm • Rotary Breaker Feed Coal size : 500mm End Product size : 0-200mm  Secondary Crusher:- It employs a combination of Impact, shearing, Compression. Roll Crusher
  • 9. Conveying System:- Belts are used to convey coal from coal handling plant to furnace. Conveyor belt specification:- Belt width : 1400 mm. Speed : 2.2 m/sec. Capacity : 750/1350 ton/hr. No. of conveyor : 38 Total Installed Power : 360 KW
  • 10. Boiler  Water Tube Boiler:- In this type of boiler water flows inside the tubes and hot gases flow outside the tubes. A Boiler (or Steam Generator) is a closed vessel in which water, under pressure is converted into steam. (i) Fire Tube Boiler (ii) Water Tube Boiler  Furnace:- Furnace is primary part of the boiler where the chemical energy of coal is converted into thermal energy by combustion.
  • 11. Boiler Drum Its function is to separate water and steam from mixture of steam & water generated in the furnace walls. Economizer An Economizer extracts a part of heat from the flue gases and uses it for heating the feed water before it enters into the steam drum.
  • 12. Air Pre-heater Super heater Air Pre heaters are employed to recover the heat from the flue gases leaving the Economizer & are used to incoming air for combustion. A Super heater is a device which removes the last traces of moisture from the saturated steam leaving the boiler tubes & also increases the temperature . Super heater consists a group of tubes.
  • 13. Ash Handling Plant In Thermal Plant coal is generally used as fuel & hence the ash is produced as the byproduct. Ash generated in power plant is about 30-40% of total coal consumption. Air & Gas Plant Fuel & Ash Plant Air & Gas Plant Ash Disposal & Dust Collection Plant Air (Atmosphere) Air Pre heater Boiler Boiler Tubes Flue gases (Due to combustion) Super HeaterChimney Economizer
  • 14. Ash Disposal & Dust Collection Plant The ash is removed from fly ash hoppers in dry state & it is carried out to collecting equipment where it is mixed with water & resulting slurry is discharged.
  • 15. Steam Turbine Steam Turbine is a machine in which a shaft is rotated steadily by impact or reaction of current or stream of working substances (Steam , Air, Water, Gases) upon Blades of a wheel. Technical Data of Turbines Rated Output 110MW Rated Speed 3000 RPM Clockwise Direction Maximum Steam Pressure 146atm
  • 16.  An electrical generator is a machine which converts mechanical energy into electrical energy through electro mechanical energy conversion. Electricity Generator The generator is driven by directly coupled steam turbine at a speed of 3000 RPM. Current : 7720A Frequency: 50Hz For generator (110MW) Terminals: 6
  • 17. Cooling System  In KSTPS Hydrogen Cooling System is employed for generator cooling.  Hydrogen is used Because of its superior cooling properties & we can eliminate the fire risk because it doesn’t support combustion.  Thermal conductivity of H2 is 7.3 times of air.
  • 18. Transformer  Transformer is a static device which is used to change the voltage level keeping the power & frequency same.  There are about 83 transformers installed at various places in plant to operate the auxiliaries. Generator Transformer A Steps up (16.5KV to 220KV) Generator Transformer B Steps up (16.5KV to 400KV) Unit Auxiliary Transformer Steps down (16.5KV to 6.9KV) Station Service Transformer Steps down(6.9KV to 0.433KV) Types of Installed Transformer
  • 19. Control Panel Control Panel I Fan Control Desk Control Panel II Fuel Control Desk Control Panel III Steam & Water Control Desk Control Panel IV Turbine Control Desk Control Panel V Generator Control Panel All the Basic Parameters like Temperature of steam & air, Flow of water & air, pressure, Electricity generation etc. are controlled in Control Panel.