Objective
To understand
and study Solid
Waste
Management
Models that are
currently in use.
Develop and
study the
feasibility of the
decentralised
SWM Model.
Selecting
equipment and
designing of
Vibrating
Screen.
Find the
parameters for
the most
efficient system
Methodology
Literature Study.
Visit to Centre of Environmental
Education (Government Organisation
Visit to NEPRA (Solid waste
Segregation Plant).
Feasibility Study
Design development
Future Scope
Designing equipment.
Developing Generalised Feasibility Solution
Functional Elements of Waste Management
To implement proper waste management, various aspects
have to be considered such as
– source reduction
– onsite storage
– collection and transfer
– processing techniques
– disposal
Waste
Generation
Storage
Collection
Transfer and
Transport
Processing
and
Recovery
Disposal
Decentralised SWM
Segregation Processes
• 2D and 3D objects are manually fed into a Vibratoscope which is a device that segregates
dimensional and dimensional objects.
• The design of the device is similar to a piston crank mechanism of an engine. Here the lateral
motion of the piston movement is converted into a rotary motion through fulcrum.
• The 3D objects are pulled over by the movement of the blocks.
• The 2D objects are flown away by the upward movement of the blocks.
Vibrating Screen
• The vibrating screen is used to separate the
sand particles and smaller particulate to
bottom of the screen and rest matter is carried
forward to the conveyer belt for manual
segregation.
Manual Segregation
• The Manual segregation process consists
of an oval shaped conveyor system
where workers are arranged on the
periphery.
• These workers are divided into a group
of three in a line and are given a specific
matter to pick from the conveyor belt
and collect it in a bag or the fill it in the
blue box that form a ballet of a particular
item.
Hydraulic Press
• The press shown here is a two
container Hydraulic Press.
• When one container is pressed the
other is filled up manually by the
workers hence increasing efficiency
and saving time.
Feasibility of DSWM
Waste
percentage of
waste output price per unit total revenue
percentage of
revenue
green waste(fertilizer) 38.6 0.75 3 86.85 22.93947518
green waste(biogas) 38.6 0.25 9.5 91.675 24.21389047
paper 5.6 1 7 39.2 10.35379881
plastic 6 1 8 48 12.678121
RDF(refuse derived fuel) 6.6 1 1.5 9.9 2.614862456
metals 0.2 1 15 3 0.792382562
C&D (construction and demolition) 25 1 0.3 7.5 1.980956406
non recyclable materials 13 1 0 0 0
Fish market/Caracas + Hotel Restaurant
and Kitchen Waste 5 0.6 25 75 19.80956406
fish market/Caracas 1 0.4 9.5 3.8 1.003684579
hotel restaurant and Kitchen waste 4 0.36 9.5 13.68 3.613264484
Total 100 378.605 100
Calculations
1. Domestic use purpose biogas plant
• Break-even point
Considering capital investment break-even including compound interest @ 10%
E = A . r(1+r)n / ((1+r)n - 1)
Where,
A = Amount borrowed
E = EMI or Monthly payment
r = interest rate in % divided by 12
n = total number of months
Break-even point =57 months
2. For medium scale SWM plant
• Factors taken into consideration
municipal solid waste generation per month
cost of collection
cost of transportation
cost of disposal
• Cost of collection
waste generated per day
waste that can be collected by each worker per day
salary of each worker per day
collection cost per day
number of bins used for collection
cost of each bin
total cost of bins
• Cost of transportation
length of travel per truck per year
cost of travel per truck per tonne in a month
number of trucks required
travel cost per tonne
total cost of transport
• Cost of disposal
cost of maintenance of disposal sites
3. Break-even point
• Considering capital investment break-even including compound interest @ 10%
E = A . r(1+r)n / ((1+r)n - 1)
Where,
A = Amount borrowed
E = EMI or Monthly payment
r = interest rate in % divided by 12
n = total number of months
Break-even point =23 months
(This does not include the value of land saved by not dumping the waste.)
Result and Conclusion
• Thus the distance travelled is kept such that the door to door pickup truck can gather
the waste and deliver it to the waste processing and segregation plant.
• Amount of waste collected by one door to door pickup truck -2 tonnes=5000 people
considering a population density of 5000 people/Km2 this truck is expected to cover an
area of 0.5 Km2 covering a total distance of 5-6 Km in the process
• A solid waste management system for 30000 people is the most efficient because it has
a better breakeven period than domestic waste management system due to material
recovery
• While considering the population density for more than 30000 people if the plant is
made, the cost of collection and disposal is the same per tonne while the cost of
transportation increases as the waste has to collected at a dumping site by the door to
door collectors .this waste has to be transported to a processing plant by a different
truck and hence the cost adds up.
Software Design of Vibrating Screen
Hydraulic Press Side view
Hydraulic Press Top View
Hydraulic Press orthogonal view
Cost analysis for Large Scale Plants
Assumptions taken for calculations
• The waste collected in all cities is similar to the waste breakup found in Ahmedabad.
• The land value is not taken into consideration as it depends on the city as well as it
varies from area to area. The land required by segregation plants is assumed to be
the same as the saving in land required by landfill sites.
• The value of 3.8 Rs. Per Kg is derived for the case of Ahmedabad based on current
price trends of obtained components
• Each collector truck goes for one trip a day and has a capacity of 2 Tonnes
• Each Dumper truck has a carrying capacity of 12 Tonnes and goes for 3 trips a day
• The cost of collector vehicle is 600000 Rs.
• The cost of Dumper truck is 2000000 Rs.
• Maintenance and depreciation is kept at 2% per month or 24% per year in line with
industry standards
• Compound interest is taken into consideration for payback period
• Total capital costs for segregation plants is taken from sources and interpolated
linearly
• The salaries of workers and the number of workers required are taken from the AMC
models and NEPRA plants.
• The cost of segregation plant varies linearly with its size for a plant of sufficient size.
• The waste segregation takes place at the source where green waste, recyclable
materials and non recyclable materials go in different bins
• Operating cost of collector vehicles is kept at Rs. 8 per Km
• Operating costs of Dumper vehicles is kept at Rs. 30 per Km
• The collector vehicles are assumed to travel every road of the city and the total
distance travelled by them is equal to the total road length of the city
Matlab Analysis
Profit V/S number of plants
Profit V/S landfill Ratio
Payback period V/S landfill Ratio
Conclusion
• The feasibility analysis of DSWM as used in our matlab analysis fall in line with the current budget
of AMC. It is observed that after a landfill ratio of more than 50% to the total waste, the business is
unprofitable.
• It is also seen that as the number of waste segregation centers increase, the profitability increases
as expected. This is because of the fact that collector trucks have to travel shorter distance saving
on fuel cost.
• It is seen that almost 60-70% of the revenue comes from green waste conversion into biogas and
fertilizer while 30-40% revenue comes from segregation of waste.
Bibliography
Zurbrugg, C. (2002). Urban solid waste management in low-income countries of Asia: How to cope
with the garbage crisis. Presented for: Scientific Committee on Problems of the Environment
(SCOPE) Urban Solid Waste Management Review Session, Durban, South Africa, 1-13.
Zia, H., & Devadas, V. (2008). Urban solid waste management in Kanpur: Opportunities and
perspectives. Habitat International, 32(1), 58-73.
Talyan, V., Dahiya, R. P., & Sreekrishnan, T. R. (2008). State of municipal solid waste
management in Delhi, the capital of India. Waste Management, 28(7), 1276-1287.
Yedla, S., & Kansal, S. (2003). Economic insight into municipal solid waste management in
Mumbai: a critical analysis. International Journal of Environment and Pollution, 19(5), 516-527.
Srivastava, P. K., Kulshreshtha, K., Mohanty, C. S., Pushpangadan, P., & Singh, A. (2005).
Stakeholder-based SWOT analysis for successful municipal solid waste management in Lucknow,
India. Waste management, 25(5), 531-537.
Rathi, S. (2007). Optimization model for integrated municipal solid waste management in Mumbai,
India. Environment and development economics, 12(01), 105-121.
Subramani, T., Umarani, R., & Devi, S. B. (2014). Sustainable Decentralized Model For Solid
Waste Management In Urban India. International Journal of engineering Research and
Applications, 1(4), 264-269.
Hokkanen, J., & Salminen, P. (1997). Choosing a solid waste management system using
multicriteria decision analysis. European journal of operational research, 98(1), 19-36.
Arena, U., Mastellone, M. L., & Perugini, F. (2003). The environmental performance of alternative
solid waste management options: a life cycle assessment study. Chemical Engineering Journal,
96(1), 207-222.
www.ceeindia.org/
www.teriin.org/

More Related Content

What's hot

on site storage techniques
on site storage techniqueson site storage techniques
on site storage techniques
srija juluru
 
C and d waste ppt
C and d waste pptC and d waste ppt
C and d waste ppt
kybabita
 

What's hot (20)

Solid waste management ppt
Solid waste management pptSolid waste management ppt
Solid waste management ppt
 
on site storage techniques
on site storage techniqueson site storage techniques
on site storage techniques
 
SEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOWSEWAGE TREATMENT PLANT,LUCKNOW
SEWAGE TREATMENT PLANT,LUCKNOW
 
Construction and Demolition Waste as a Resource
Construction and Demolition Waste as a ResourceConstruction and Demolition Waste as a Resource
Construction and Demolition Waste as a Resource
 
C and d waste ppt
C and d waste pptC and d waste ppt
C and d waste ppt
 
cetp
cetpcetp
cetp
 
landfill liners
landfill linerslandfill liners
landfill liners
 
Planning of industrial estate
Planning of industrial estatePlanning of industrial estate
Planning of industrial estate
 
Processing of solid waste
Processing of solid wasteProcessing of solid waste
Processing of solid waste
 
Municipal Solid Waste Management
Municipal Solid Waste ManagementMunicipal Solid Waste Management
Municipal Solid Waste Management
 
Environmental clearance
Environmental clearanceEnvironmental clearance
Environmental clearance
 
Integrated solid waste management
Integrated solid waste managementIntegrated solid waste management
Integrated solid waste management
 
DEWATS Decentralized waste water treatment technology
DEWATS Decentralized waste water treatment  technologyDEWATS Decentralized waste water treatment  technology
DEWATS Decentralized waste water treatment technology
 
Transportation of solid wastes
Transportation of solid wastesTransportation of solid wastes
Transportation of solid wastes
 
Waste free indore
Waste free indoreWaste free indore
Waste free indore
 
Landfill design and operation
Landfill design and operationLandfill design and operation
Landfill design and operation
 
Route optimization for collection of municipal solid waste
Route optimization for collection of municipal solid wasteRoute optimization for collection of municipal solid waste
Route optimization for collection of municipal solid waste
 
On-site handling methods - Municipal Solid Wastes
On-site handling methods - Municipal Solid WastesOn-site handling methods - Municipal Solid Wastes
On-site handling methods - Municipal Solid Wastes
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
 
waste collection and transportation present
waste collection and transportation presentwaste collection and transportation present
waste collection and transportation present
 

Similar to Decentraized solid waste management

MEE 5901, Advanced Solid Waste ManagementUnit II Assignment.docx
MEE 5901, Advanced Solid Waste ManagementUnit II Assignment.docxMEE 5901, Advanced Solid Waste ManagementUnit II Assignment.docx
MEE 5901, Advanced Solid Waste ManagementUnit II Assignment.docx
ARIV4
 
I CSU Math Center 1-800-977-8449 x6538 [em.docx
I   CSU Math Center  1-800-977-8449 x6538  [em.docxI   CSU Math Center  1-800-977-8449 x6538  [em.docx
I CSU Math Center 1-800-977-8449 x6538 [em.docx
wilcockiris
 

Similar to Decentraized solid waste management (20)

P-Solid Waste Mgmt Planning_Reflections from a Case Study-220212.pptx
P-Solid Waste Mgmt Planning_Reflections from a Case Study-220212.pptxP-Solid Waste Mgmt Planning_Reflections from a Case Study-220212.pptx
P-Solid Waste Mgmt Planning_Reflections from a Case Study-220212.pptx
 
Assessment the Need of Al Kut City for Solid Waste Transfer Station
Assessment the Need of Al Kut City for Solid Waste Transfer StationAssessment the Need of Al Kut City for Solid Waste Transfer Station
Assessment the Need of Al Kut City for Solid Waste Transfer Station
 
Msw Jns
Msw  JnsMsw  Jns
Msw Jns
 
IRJET- Integrated Waste Management of Smart City Gandhinagar
IRJET- Integrated Waste Management of Smart City GandhinagarIRJET- Integrated Waste Management of Smart City Gandhinagar
IRJET- Integrated Waste Management of Smart City Gandhinagar
 
Psp damascus experement
Psp damascus experementPsp damascus experement
Psp damascus experement
 
MEE 5901, Advanced Solid Waste ManagementUnit II Assignment.docx
MEE 5901, Advanced Solid Waste ManagementUnit II Assignment.docxMEE 5901, Advanced Solid Waste ManagementUnit II Assignment.docx
MEE 5901, Advanced Solid Waste ManagementUnit II Assignment.docx
 
Application Of Numerical Analysis In real life new updated.pptx
Application Of Numerical Analysis In real life new  updated.pptxApplication Of Numerical Analysis In real life new  updated.pptx
Application Of Numerical Analysis In real life new updated.pptx
 
I CSU Math Center 1-800-977-8449 x6538 [em.docx
I   CSU Math Center  1-800-977-8449 x6538  [em.docxI   CSU Math Center  1-800-977-8449 x6538  [em.docx
I CSU Math Center 1-800-977-8449 x6538 [em.docx
 
Ar31302307
Ar31302307Ar31302307
Ar31302307
 
Smart solid waste management-surat city.
Smart solid waste management-surat city.Smart solid waste management-surat city.
Smart solid waste management-surat city.
 
Solid Waste Management of Dhaka City Corporation
Solid Waste Management of Dhaka City CorporationSolid Waste Management of Dhaka City Corporation
Solid Waste Management of Dhaka City Corporation
 
Urban waste management
Urban waste managementUrban waste management
Urban waste management
 
Preliminary project work .pptx
Preliminary project work .pptxPreliminary project work .pptx
Preliminary project work .pptx
 
Waste Management Hierarchy
Waste Management Hierarchy Waste Management Hierarchy
Waste Management Hierarchy
 
Waste Collection: Solid and Hazardous Waste Management
Waste Collection: Solid and Hazardous Waste ManagementWaste Collection: Solid and Hazardous Waste Management
Waste Collection: Solid and Hazardous Waste Management
 
Waste management project proposal for sri lanka
Waste management project proposal for sri lankaWaste management project proposal for sri lanka
Waste management project proposal for sri lanka
 
Route optimization for collection of municipal solid waste in Katpadi, Vellore
Route optimization for collection of municipal solid waste in Katpadi, VelloreRoute optimization for collection of municipal solid waste in Katpadi, Vellore
Route optimization for collection of municipal solid waste in Katpadi, Vellore
 
Novateurs
NovateursNovateurs
Novateurs
 
A GIS-BASED TRANSPORTATION ROUTE OPTIMIZATION FOR SOLID WASTE MANAGEMENT: STU...
A GIS-BASED TRANSPORTATION ROUTE OPTIMIZATION FOR SOLID WASTE MANAGEMENT: STU...A GIS-BASED TRANSPORTATION ROUTE OPTIMIZATION FOR SOLID WASTE MANAGEMENT: STU...
A GIS-BASED TRANSPORTATION ROUTE OPTIMIZATION FOR SOLID WASTE MANAGEMENT: STU...
 
Solid Resource (Waste) Management_IICA.pptx
Solid Resource (Waste) Management_IICA.pptxSolid Resource (Waste) Management_IICA.pptx
Solid Resource (Waste) Management_IICA.pptx
 

Recently uploaded

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

Decentraized solid waste management

  • 1. - Presented by - Nisarg Shah (13BME 100) - Harshil Solanki (13BME 108) - Pradip Bariya (13BME 010) - Guide : Dr. Anurag Mudgal Feasibility of Decentralized Solid Waste Management System. Study and Prototype Development
  • 2. Objective To understand and study Solid Waste Management Models that are currently in use. Develop and study the feasibility of the decentralised SWM Model. Selecting equipment and designing of Vibrating Screen. Find the parameters for the most efficient system
  • 3. Methodology Literature Study. Visit to Centre of Environmental Education (Government Organisation Visit to NEPRA (Solid waste Segregation Plant). Feasibility Study Design development
  • 4. Future Scope Designing equipment. Developing Generalised Feasibility Solution
  • 5. Functional Elements of Waste Management To implement proper waste management, various aspects have to be considered such as – source reduction – onsite storage – collection and transfer – processing techniques – disposal
  • 7. Decentralised SWM Segregation Processes • 2D and 3D objects are manually fed into a Vibratoscope which is a device that segregates dimensional and dimensional objects. • The design of the device is similar to a piston crank mechanism of an engine. Here the lateral motion of the piston movement is converted into a rotary motion through fulcrum.
  • 8. • The 3D objects are pulled over by the movement of the blocks. • The 2D objects are flown away by the upward movement of the blocks.
  • 9. Vibrating Screen • The vibrating screen is used to separate the sand particles and smaller particulate to bottom of the screen and rest matter is carried forward to the conveyer belt for manual segregation.
  • 10. Manual Segregation • The Manual segregation process consists of an oval shaped conveyor system where workers are arranged on the periphery. • These workers are divided into a group of three in a line and are given a specific matter to pick from the conveyor belt and collect it in a bag or the fill it in the blue box that form a ballet of a particular item.
  • 11. Hydraulic Press • The press shown here is a two container Hydraulic Press. • When one container is pressed the other is filled up manually by the workers hence increasing efficiency and saving time.
  • 12.
  • 13. Feasibility of DSWM Waste percentage of waste output price per unit total revenue percentage of revenue green waste(fertilizer) 38.6 0.75 3 86.85 22.93947518 green waste(biogas) 38.6 0.25 9.5 91.675 24.21389047 paper 5.6 1 7 39.2 10.35379881 plastic 6 1 8 48 12.678121 RDF(refuse derived fuel) 6.6 1 1.5 9.9 2.614862456 metals 0.2 1 15 3 0.792382562 C&D (construction and demolition) 25 1 0.3 7.5 1.980956406 non recyclable materials 13 1 0 0 0 Fish market/Caracas + Hotel Restaurant and Kitchen Waste 5 0.6 25 75 19.80956406 fish market/Caracas 1 0.4 9.5 3.8 1.003684579 hotel restaurant and Kitchen waste 4 0.36 9.5 13.68 3.613264484 Total 100 378.605 100
  • 14.
  • 15.
  • 16.
  • 17. Calculations 1. Domestic use purpose biogas plant
  • 18. • Break-even point Considering capital investment break-even including compound interest @ 10% E = A . r(1+r)n / ((1+r)n - 1) Where, A = Amount borrowed E = EMI or Monthly payment r = interest rate in % divided by 12 n = total number of months Break-even point =57 months
  • 19. 2. For medium scale SWM plant • Factors taken into consideration municipal solid waste generation per month cost of collection cost of transportation cost of disposal • Cost of collection waste generated per day waste that can be collected by each worker per day salary of each worker per day collection cost per day number of bins used for collection cost of each bin total cost of bins
  • 20. • Cost of transportation length of travel per truck per year cost of travel per truck per tonne in a month number of trucks required travel cost per tonne total cost of transport • Cost of disposal cost of maintenance of disposal sites
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. 3. Break-even point • Considering capital investment break-even including compound interest @ 10% E = A . r(1+r)n / ((1+r)n - 1) Where, A = Amount borrowed E = EMI or Monthly payment r = interest rate in % divided by 12 n = total number of months Break-even point =23 months (This does not include the value of land saved by not dumping the waste.)
  • 26. Result and Conclusion • Thus the distance travelled is kept such that the door to door pickup truck can gather the waste and deliver it to the waste processing and segregation plant. • Amount of waste collected by one door to door pickup truck -2 tonnes=5000 people considering a population density of 5000 people/Km2 this truck is expected to cover an area of 0.5 Km2 covering a total distance of 5-6 Km in the process • A solid waste management system for 30000 people is the most efficient because it has a better breakeven period than domestic waste management system due to material recovery • While considering the population density for more than 30000 people if the plant is made, the cost of collection and disposal is the same per tonne while the cost of transportation increases as the waste has to collected at a dumping site by the door to door collectors .this waste has to be transported to a processing plant by a different truck and hence the cost adds up.
  • 27. Software Design of Vibrating Screen
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 36. Cost analysis for Large Scale Plants Assumptions taken for calculations • The waste collected in all cities is similar to the waste breakup found in Ahmedabad. • The land value is not taken into consideration as it depends on the city as well as it varies from area to area. The land required by segregation plants is assumed to be the same as the saving in land required by landfill sites. • The value of 3.8 Rs. Per Kg is derived for the case of Ahmedabad based on current price trends of obtained components • Each collector truck goes for one trip a day and has a capacity of 2 Tonnes • Each Dumper truck has a carrying capacity of 12 Tonnes and goes for 3 trips a day • The cost of collector vehicle is 600000 Rs. • The cost of Dumper truck is 2000000 Rs. • Maintenance and depreciation is kept at 2% per month or 24% per year in line with industry standards
  • 37. • Compound interest is taken into consideration for payback period • Total capital costs for segregation plants is taken from sources and interpolated linearly • The salaries of workers and the number of workers required are taken from the AMC models and NEPRA plants. • The cost of segregation plant varies linearly with its size for a plant of sufficient size. • The waste segregation takes place at the source where green waste, recyclable materials and non recyclable materials go in different bins • Operating cost of collector vehicles is kept at Rs. 8 per Km • Operating costs of Dumper vehicles is kept at Rs. 30 per Km • The collector vehicles are assumed to travel every road of the city and the total distance travelled by them is equal to the total road length of the city
  • 39. Profit V/S number of plants
  • 41. Payback period V/S landfill Ratio
  • 42. Conclusion • The feasibility analysis of DSWM as used in our matlab analysis fall in line with the current budget of AMC. It is observed that after a landfill ratio of more than 50% to the total waste, the business is unprofitable. • It is also seen that as the number of waste segregation centers increase, the profitability increases as expected. This is because of the fact that collector trucks have to travel shorter distance saving on fuel cost. • It is seen that almost 60-70% of the revenue comes from green waste conversion into biogas and fertilizer while 30-40% revenue comes from segregation of waste.
  • 43. Bibliography Zurbrugg, C. (2002). Urban solid waste management in low-income countries of Asia: How to cope with the garbage crisis. Presented for: Scientific Committee on Problems of the Environment (SCOPE) Urban Solid Waste Management Review Session, Durban, South Africa, 1-13. Zia, H., & Devadas, V. (2008). Urban solid waste management in Kanpur: Opportunities and perspectives. Habitat International, 32(1), 58-73. Talyan, V., Dahiya, R. P., & Sreekrishnan, T. R. (2008). State of municipal solid waste management in Delhi, the capital of India. Waste Management, 28(7), 1276-1287. Yedla, S., & Kansal, S. (2003). Economic insight into municipal solid waste management in Mumbai: a critical analysis. International Journal of Environment and Pollution, 19(5), 516-527. Srivastava, P. K., Kulshreshtha, K., Mohanty, C. S., Pushpangadan, P., & Singh, A. (2005). Stakeholder-based SWOT analysis for successful municipal solid waste management in Lucknow, India. Waste management, 25(5), 531-537.
  • 44. Rathi, S. (2007). Optimization model for integrated municipal solid waste management in Mumbai, India. Environment and development economics, 12(01), 105-121. Subramani, T., Umarani, R., & Devi, S. B. (2014). Sustainable Decentralized Model For Solid Waste Management In Urban India. International Journal of engineering Research and Applications, 1(4), 264-269. Hokkanen, J., & Salminen, P. (1997). Choosing a solid waste management system using multicriteria decision analysis. European journal of operational research, 98(1), 19-36. Arena, U., Mastellone, M. L., & Perugini, F. (2003). The environmental performance of alternative solid waste management options: a life cycle assessment study. Chemical Engineering Journal, 96(1), 207-222. www.ceeindia.org/ www.teriin.org/