Lawyer in Vietnam Oliver Massmann
- Vietnam a future International Competitor in Wind Energy?
Oliver Massmann – Ho Gia Le Hoang
Potential of Wind Energy Industry in Vietnam
Vietnam has a significant potential for wind energy with an average wind speed of more than 6m/s,
surpassing that of all neighbouring Southeast Asian countries. With more than 3,000km coastline and
plenty of islands, the total potential of wind energy in Vietnam is estimated to be as high as 713,000MW
– 510,000 MW on land and 203,000 MW in islands. In comparison, this is 200 times more than the
production volume of the largest hydropower plant, Son La (Vietnam), in Southeast Asia and 10 times
larger than the projected total capacity of the electricity industry in 2020.
Since the electricity demand in Vietnam is forecasted to increase by up to 14.2 pct. annually for the 2011-
2015 period and 11.4 pct. for the 2016-2020 period1
, and the electricity demand is expected to increase 7
times to 800 billion Kwh in 2030, Vietnam will then have to invest in energy sources to meet this big
demand. Such investment is vital given Vietnam‟s expected dependence on imported coal, one of their
primary resources for electricity production, by 2015. Additionally, hydroelectric energy is quite
abundant in Vietnam but poses certain underlying risks. Therefore, Vietnam will have no choice for
power development other than renewable energy in general and wind energy in particular.
Government’s Policy On Development Of Renewable Energy
The important role of renewable energy in general and wind energy in particular is recognized by
Vietnamese government and reflected in the Master plan VII about energy development in Vietnam. The
renewable energy is increasingly accounting for power sources (4.5% in 2020 and 6.0% in 2030 of the
total power supply). The Master plan VII sets the renewable energy target rate at 5.6 pct. of total primary
energy consumption by 2020 and 9.4 pct. by 2030. The Government‟s target is to increase the wind power
to 1,000 MW (0.7 pct. of electricity production) by 2020 and 6,200 MW (2.4 pct.) by 2030.
Moreover, as the energy prices in Vietnam are not very high, there are many incentives and preferential
treatment offered by the Vietnamese Government to the wind power industry. Decision 37 offers the
following incentives and preferential treatment in terms of funding, tax and fee to wind energy project as
follows:
i. Funding: The investor can raise funds in different forms permitted by relevant lawsfrom
individuals and organizations in and out of the country and may have access to State credit for
investment pursuant to the laws.
ii. Tariff: The investor is exempted from tariff on goods imported to create fixed assets and goods
used as raw materials, input or semi-finished products that are not available at home for the
project‟s operation in line with the Law on Import and Export Duties2
, Law on Tax
Mangagement3
and other relevant regulations on export and import duties.
1
http://www.adb.org/sites/default/files/linked-documents/42039-033-vie-ea.pdf
2
Law on Export and Import Duties No. 45/2005/QH11 dated 14 June 2005 as amended
3
Law on Tax Mangagement No. 78/2006/QH11 dated 29 November 2006 as amended
iii. Corporate income tax: Wind power projects enjoy the same preferential treatment in investment
in terms of exemption and reduction of corporate income tax as for other projects in line with the
Law on Investment4
, Law on Corporate Income Tax5
and other documents guiding the
enforcement of these laws : Perferential corporate income tax rate of 10% applies to newly-
established enterprises for 15 years.
If the given project is classified as a large scale project, a project using high or new technology
and in special need of investment, the above preferential tax rate may be extended to less than 30
years following a decision of the Prime Minister.
In addition, other preferential treatments in infrastructure for wind energy projects are available as
follows:
i. Projects on installing wind powers, lines and transformer stations connected to the national grids
enjoy the same exemptions and reductions in land rental as projects being entitled to special
investment treatment.
ii. In line with the approved power development plan, the provincial people‟s committee allocates
land to the investor to implement wind power projects. The compensation for existing land users
and support for site clearance complies with the provisions of land law in force.
In addition, in accordance with Decision 37, Electricity of Vietnam (“EVN”) is to buy all of the plant‟s
wind energy outputand the Vietnam Environment Protect Fund will accordingly subsidize to EVN with
the current subsidized tariff of 204 VND/kWh (about 01 UScent).
Market Access Of Foreign Investor
Currently, there is no foreign ownership restriction in energy sector in Vietnam. The foreign investor may
choose among permitted investment forms: 100% foreign invested company, joint venture or public
private partnership (“PPP”) in the form of BOT contract.
Wind energy projects require high investment rates, while the electricity production costs are always high.
Though the Government agrees to buy wind energy at high price, the investors still do not dare to pour
their money into the sector for fear of the risks resulting from unstable policies.
In such circumstances, PPP is the most reasonable solution. Recently on 14 February 2015, the
Government issued a long-awaited Decree on PPP models, Decree 15/2015/ND-CP which will replace
previous legal regulations on PPP or BOT with the intention of promoting private investment in
infrastructure to boost economic growth in Vietnam. The PPP model can help ease the burden on capital
arrangement, share and minimize risks, take full advantage of the management resources and improve the
policies‟ transparency, thus bringing the highest possible effectiveness of the projects. For its great
advantages, PPP has been applied in many countries in the world.
In Vietnam, BOT is the best investment form for energy projects since it is easier to negotiate more
favorable electricity rates and obtain more government guarantees, especially in the context that EVN – a
state-owned electricity company, is obliged to purchase all electricity from the projects. Moreover, the
investor can receive more fiscal and financial incentives.
Wind energy will be an interesting sector in Vietnam for a foreign investor in the middle and long term,
especially at the stage of fully competitive retail market. Despite the main obstacles to foreign investors
such as high production cost, time taken for investors for investment capital recovery, and the lack of a
4
Law on Investment No. 59/2005/QH11 dated 29 November 2005
5
Law on Corporate Income Tax No, 14/2008/QH12 dated 03 June 2006 as amended
competitive sale price, foreign investors still receive many preferential policies and incentives. When
Vietnam energy market becomes a fully competitive retail market, the wind energy project will play a
more important role and the investor will gain higher actual profits.
Starting Up A Wind Energy Project
Generally speaking, the start-up process in Vietnam is now still pretty complicated with the involvement
of many licensing authorities and state agencies that make time-consuming and costly for developers.
However, with the recent promulgation of new Investment Law and Enterprises Law which will take
effect from 01 July 2015, the Government of Vietnam has showed the sign on improvement of bussiness
and investment enviroment and both new laws are aimed at reducing licensing complexity and granting
easier market access.
Currently there has yet been any national plan for wind energy and consequently, there is no specific
procedure for investment in wind energy project. Thus, until such a plan is finalized, the investment
procedure remains uncertain. Wind energy projects must be in alignment with the national energy sector‟s
development and priorities will be given to those with high economic and financial efficiency, as well as
plans to connect with national or regional grids.
Acording to Decision 376
, until the planning is completed and approved, the Prime Minister will have to
decide on any wind energy project. Moreover, under Circular 327
, the investor can only invest in the wind
energy project included in the list of wind energy projects approved by the Ministry of Industry and Trade
(“MOIT”). The MOIT requires project owners follow its guidelines and stipulates that capital investment
from a project owner must exceed 20 percent of the project total investment capital. The provincial
people‟s committees will be the sole authorities to grant licenses after getting approval from the MOIT.
In order to commence the construction, the investor must satisfy many requirements, including but not
limited to obtaining the investment certificate, having signed the power purchase agreement and
electricity integration agreement. Gerally speaking, the start-up process involve many state authorities
from local level to the central level.
For reference, according to the GIZ/MOIT Wind Energy Project8
, to set up a wind energy project, the
developer must take the following steps:
Step 1: Site selection – Due to the absence of a national wind power plan, site selection is based
on relevant past data such as wind data, wind energy atlas, etc. Permission from the provincial
people‟s committee (PPC) and provincial Department of Industry and Trade (DoIT) is needed for
site surveying and resource assessment is needed for a feasibility study.
Step 2: Assessment of wind resources at the selected site – Wind measuring poles are installed
(if not available at the selected site) and wind is measured for at least 1 year.
Step 3: Pre-feasibility study and request for inclusion in the power development plan – If the
project area has wind resources, a pre-feasibility study for investment in the area is prepared and
submitted to the MOIT together with a request to include the project in the power development
plan. The MOIT shall consider and submit it to the Prime Minister for approval (as wind power is
still new in Vietnam and there is a missing protocol for it, all wind power projects larger than 50
6
Decision 37/2011/QD-TTg of the Prime Minister dated 29 June 2011 on the mechanism supporting the
development of wind power project in Vietnam (“Decision 37”)
7
Circular No. 32/2012/TT-BCT of the Ministry of Industry and Trade dated 12 November 2012 regulating the
implementation of wind power project development and power purchase and sale contract form for wind power
projects (“Circular No. 32/2012/TT-BCT”)
8
GIZ/MoIT (2011) Information on wind energy in Vietnam. Prepared by Khanh NQ. Website:
http://www.renewableenergy.org.vn/. In practice, the state authorities may require further steps or documents.
MW need approval by the Prime Minister. After the Prime Minister approval, the project
documents are to be submitted to the DoIT for approval.
Step 4: Investment report (Feasibility study) – After the DoIT approval of the pre-feasibility
study, an investment report (feasibility study) is prepared and submitted to the MOIT for
appraisal.
Step 5: Signing of power sale contract with the EVN – In accordance with Decision 37, EVN is
to buy all of the plant‟s wind power output. Contracts on power sale, grid connection and electric
measurement system design must be signed.
Step 6: Project implementation – The project will not start until the approval of the technical
design and investment report by the related agencies such as DoIT, Department of Construction,
Department of Natural Resources and Environment and others.
Step 7: Building – Building starts.
Above steps are the technical approval process that a wind power developer needs to comply with to be
approved for project implementation. However, the developer needs also to work with the licensing
authorities (i.e. the Department of Planning and Investment of the province where the project is located
and the Ministry of Planning and Investment) in line with the investment procedure under the Investment
Law. In Vietnam, the investment certificate is an official legal document issued by the State authority to
certify the rights and obligations of the project developer and also the incentives that the developer may
enjoy from the project implementation.
The developer needs to perform the procedures for obtaining investment certificate in parallel with the
technical approval since the beginning of the site selection steps . The current Investment Law provides
for a 45-day time frame for issuance of an investment certificate (while the New Investment Law which
takes effect from 01 July 2015 shortens this time frame to 15 days), starting from the date of receipt of a
„complete‟ application dossier. Our experience in dealing with typical investment projects indicates that
you should anticipate this process to take longer than the statutory time limit, even from 6 to 8 months at
least.
Vietnam - Future International Competitor In Wind Energy?
Theoritically speaking, Vietnam can be seen as an international competitor in wind energy because it has
a significant potential for wind energy, an increase of electricity demand and Government‟s preferential
policies and incentives to facilitate renewable energy in general and wind energy in particular. According
to World Bank research to build wind power potential map for Vietnam, Thailand, Laos and Cambodia,
Vietnam has higher wind power than other South East Asia countries with 8.6 percent of Vietnam‟s
territory having wind energy development potential (in comparison with 2.9% in Laos, and just 0.2% in
Cambodia and Thailand). In practice, there are increasing interest and new projects in wind energy from
Vietnamese and foreign investors. According to the website of GIZ Wind Energy Project:
http://www.renewableenergy.org.vn/, until May 2012, there are 67 wind energy projects in Vietnam
which are developing at different stages and this number is expected to increase in the upcoming time.
Although Vietnam possesses considerable potential for the development of wind power, an energy sector
which has attracted strong interest from domestic and foreign investors, the current wind energy project
development has only tapped into a small portion of Vietnam‟s wind potential, and there are still many
things Vietnam needs to change and take stronger action. Otherwise, Vietnam can hardly become an
international competitor in wind energy.
Up to now, the total potential of wind energy in Vietnam is only an estimate while a final issue for the
bankability of a wind energy project is the wind speed feasibilty studies for that the investors need
reliable wind speed studies and wind speed towers to measure. In practice, the standard requirements of
foreign banks are such feasibility studies involve about 2 years of measurement. However, the "reliable"
studies in Vietnam‟s wind energy are still lacking to our best knowledge.
At present, Vietnam still features the “Single Buyer Model” with EVN who is the only offtaker, except
for power generation projects under 3 MW. The EVN monopoly in power sector should be removed and
EVN must be restructured by splitting up into many corporations with separate powers and duties (i.e,
operation, transmion, distribution).
In the meantime, Vietnam needs to highly prioritie the application of more transparent policies and
mechanisms. Under Circular No. 32/2012/TT-BCT, Vietnam provides a standard power purpose
agreement (“PPA”) form for all wind energy projects on power sale, grid connection and electric
measurement system design. This standard PPA is a good start but still needs to be improved to make
wind energy projects bankable. However, the negotiation process of the PPA signing with EVN is very
time consuming and it is almost impossible to predict how long it will take to negotiate the relevant PPA
with EVN, even it has taken up to 6 years in some cases to negotiate a PPA for a coal fired power plant
with EVN in the past. That is a deterrent for foreign investors if they cannot calculate that into the
development costs. Meanwhile with such red-tape hurdle, the operation costs for wind energy projects in
Vietnam are still much more an overal “estimate” than a “real and realistic calculation”.
The low power purchasing price is also a big barrier to wind energy projects. The Government should
also adopt a feed-in tariff (“FIT”) for wind energy in particular and renewable energy in general. The
basics of a FIT mechanism is that additional costs for production of energy will be divided among
electricity users to assure a stable cash flow for renewable energy developers. Under Decision 37, EVN
has the responsibility for buying the whole electric output from wind power projects with the electric
buying price at the point of electricity receipt is 1,614 dong/kwh (excluding VAT, equivalent to 7.8
UScents/kwh). This current subsidized tariff is too low in comparison with that in other ASEAN
countries (19 UScents/kWh in Thailand9
and 21.8 UScents/kWh in Philippines10
). In practice, the wind
energy producers in Vietnam keep complaing about very low purchasing price while the current cost of
electricity generated from wind power plants is still quite high due to large technical investment.
Recently, Vietnam‟s Prime Minister issued Decision 31/2014/QD-TTg on solid waste-to-energy projects
to provide a ground-breaking feed-in tariff for power suppliers of up to “VND 2,114/kWh (equivalent to
10.05 US cents/kWh)”, whichis more than 25 percent higher than the 7.8 cent applicable to wind energy
projects. From the internet, we have also been told that the MOIT proposed to the Government to approve
for an FIT increase of up to 12 UScents/kwh to make the wind energy projects become more financially
feasible. With this trend of development, the Goverment showsan effort to pave the way for the
development of more wind power projects in Vietnam.
If the FIT is not increased to region levels and until there is no clear roadmap for negotiating the PPA, it
will be very difficult to attract foreign investors. The foreign investors have the choice in which country
they will invest and if the FIT, for example, in the Phillipines is about TRIPLE more than that in
Vietnam, then the investors will not think twice whether to come to Vietnam or invest in the Phillipines
---o0o---
Please do not hesitate to contact Mr. Oliver Massmann under omassmann@duanemorris.com if you have
any questions on the above. Oliver Massmann is the General Director of Duane Morris Vietnam
LLC.
INTERESTED IN DOING BUSINESS IN VIETNAM? VISIT: www.vietnamlaws.xyz
9
http://www.renewableenergy-asia.com/portals/0/seminar/2_rea14_wind_power_in_thailand.pdf
10
http://www.renewableenergyworld.com/rea/blog/post/2012/07/fit-now-out-in-the-philippines
THANK YOU VERY MUCH!

More Related Content

Viewers also liked

Small Steps: A Good Start, But Not Enough
Small Steps: A Good Start, But Not EnoughSmall Steps: A Good Start, But Not Enough
Small Steps: A Good Start, But Not EnoughHES
 
Lawyer in Vietnam Oliver Massmann TPP and EUVN FTA Rules of Origin Analysis
Lawyer in Vietnam Oliver Massmann TPP and EUVN FTA Rules of Origin AnalysisLawyer in Vietnam Oliver Massmann TPP and EUVN FTA Rules of Origin Analysis
Lawyer in Vietnam Oliver Massmann TPP and EUVN FTA Rules of Origin AnalysisDr. Oliver Massmann
 
Marshall hm poster_vra2015
Marshall hm poster_vra2015Marshall hm poster_vra2015
Marshall hm poster_vra2015Hannah Marshall
 
Boletín 30/03/2017
Boletín 30/03/2017Boletín 30/03/2017
Boletín 30/03/2017Openbank
 
VISTO BUENO AL PLIEGO PARA LA CONTRATACIÓN DE DIFERENTES SERVICIOS PARA LA FE...
VISTO BUENO AL PLIEGO PARA LA CONTRATACIÓN DE DIFERENTES SERVICIOS PARA LA FE...VISTO BUENO AL PLIEGO PARA LA CONTRATACIÓN DE DIFERENTES SERVICIOS PARA LA FE...
VISTO BUENO AL PLIEGO PARA LA CONTRATACIÓN DE DIFERENTES SERVICIOS PARA LA FE...Ayuntamiento de Málaga
 
How Functional Programming Made Me A Better Developer
How Functional Programming Made Me A Better DeveloperHow Functional Programming Made Me A Better Developer
How Functional Programming Made Me A Better DeveloperCameron Presley
 
How to actually get software build
How to actually get software buildHow to actually get software build
How to actually get software buildAndreas - Creten
 
Нетехническая ТРИЗ для ваших профи, продавца, исследователя
Нетехническая ТРИЗ для ваших профи, продавца, исследователяНетехническая ТРИЗ для ваших профи, продавца, исследователя
Нетехническая ТРИЗ для ваших профи, продавца, исследователяTatiana Novoselova
 
The London Underground. Your 100 year old guide to website navigation
The London Underground. Your 100 year old guide to website navigationThe London Underground. Your 100 year old guide to website navigation
The London Underground. Your 100 year old guide to website navigationPeter Winchester
 
How to Increase Employee Participation in Social Good Programs
How to Increase Employee Participation in Social Good Programs How to Increase Employee Participation in Social Good Programs
How to Increase Employee Participation in Social Good Programs Workology
 
Its all about the domain honey
Its all about the domain honeyIts all about the domain honey
Its all about the domain honeyCarola Lilienthal
 

Viewers also liked (12)

Small Steps: A Good Start, But Not Enough
Small Steps: A Good Start, But Not EnoughSmall Steps: A Good Start, But Not Enough
Small Steps: A Good Start, But Not Enough
 
Lawyer in Vietnam Oliver Massmann TPP and EUVN FTA Rules of Origin Analysis
Lawyer in Vietnam Oliver Massmann TPP and EUVN FTA Rules of Origin AnalysisLawyer in Vietnam Oliver Massmann TPP and EUVN FTA Rules of Origin Analysis
Lawyer in Vietnam Oliver Massmann TPP and EUVN FTA Rules of Origin Analysis
 
Marshall hm poster_vra2015
Marshall hm poster_vra2015Marshall hm poster_vra2015
Marshall hm poster_vra2015
 
Boletín 30/03/2017
Boletín 30/03/2017Boletín 30/03/2017
Boletín 30/03/2017
 
Recull de premsa #Figueres - 30/03/2017
Recull de premsa #Figueres - 30/03/2017Recull de premsa #Figueres - 30/03/2017
Recull de premsa #Figueres - 30/03/2017
 
VISTO BUENO AL PLIEGO PARA LA CONTRATACIÓN DE DIFERENTES SERVICIOS PARA LA FE...
VISTO BUENO AL PLIEGO PARA LA CONTRATACIÓN DE DIFERENTES SERVICIOS PARA LA FE...VISTO BUENO AL PLIEGO PARA LA CONTRATACIÓN DE DIFERENTES SERVICIOS PARA LA FE...
VISTO BUENO AL PLIEGO PARA LA CONTRATACIÓN DE DIFERENTES SERVICIOS PARA LA FE...
 
How Functional Programming Made Me A Better Developer
How Functional Programming Made Me A Better DeveloperHow Functional Programming Made Me A Better Developer
How Functional Programming Made Me A Better Developer
 
How to actually get software build
How to actually get software buildHow to actually get software build
How to actually get software build
 
Нетехническая ТРИЗ для ваших профи, продавца, исследователя
Нетехническая ТРИЗ для ваших профи, продавца, исследователяНетехническая ТРИЗ для ваших профи, продавца, исследователя
Нетехническая ТРИЗ для ваших профи, продавца, исследователя
 
The London Underground. Your 100 year old guide to website navigation
The London Underground. Your 100 year old guide to website navigationThe London Underground. Your 100 year old guide to website navigation
The London Underground. Your 100 year old guide to website navigation
 
How to Increase Employee Participation in Social Good Programs
How to Increase Employee Participation in Social Good Programs How to Increase Employee Participation in Social Good Programs
How to Increase Employee Participation in Social Good Programs
 
Its all about the domain honey
Its all about the domain honeyIts all about the domain honey
Its all about the domain honey
 

More from Dr. Oliver Massmann

Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...Dr. Oliver Massmann
 
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...Dr. Oliver Massmann
 
Vietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsVietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsDr. Oliver Massmann
 
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:Dr. Oliver Massmann
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Dr. Oliver Massmann
 
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...Dr. Oliver Massmann
 
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...Dr. Oliver Massmann
 
Vietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key HighlightsVietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key HighlightsDr. Oliver Massmann
 
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...Dr. Oliver Massmann
 
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...Dr. Oliver Massmann
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Dr. Oliver Massmann
 
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...Dr. Oliver Massmann
 
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...Dr. Oliver Massmann
 
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...Dr. Oliver Massmann
 
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...Dr. Oliver Massmann
 
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...Dr. Oliver Massmann
 
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the WorldLawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the WorldDr. Oliver Massmann
 
VIETNAM - INSURANCE - Regulatory Update Asia Insurance Review interviewing Dr...
VIETNAM - INSURANCE - Regulatory Update Asia Insurance Review interviewing Dr...VIETNAM - INSURANCE - Regulatory Update Asia Insurance Review interviewing Dr...
VIETNAM - INSURANCE - Regulatory Update Asia Insurance Review interviewing Dr...Dr. Oliver Massmann
 
Dr. Oliver Massmann - Vietnam and the World-240223
Dr. Oliver Massmann - Vietnam and the World-240223Dr. Oliver Massmann - Vietnam and the World-240223
Dr. Oliver Massmann - Vietnam and the World-240223Dr. Oliver Massmann
 
Vietnam - Dr Oliver Massmann interviewed by Asia Business Law Journal - Deal ...
Vietnam - Dr Oliver Massmann interviewed by Asia Business Law Journal - Deal ...Vietnam - Dr Oliver Massmann interviewed by Asia Business Law Journal - Deal ...
Vietnam - Dr Oliver Massmann interviewed by Asia Business Law Journal - Deal ...Dr. Oliver Massmann
 

More from Dr. Oliver Massmann (20)

Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
Anwalt in Vietnam Dr. Oliver Massmann - Vietnam's Plan für die Implementierun...
 
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
 
Vietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsVietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key Highlights
 
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
VIETNAM - THE NEW LAW ON CREDIT INSTITUTIONS - WHAT YOU MUST KNOW:
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
ANWALT IN VIETNAM DR. OLIVER MASSMANN RECHTLICHER HINWEIS ZUM RUNDSCHREIBEN M...
 
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
VIETNAM - LEGAL ALERT ON CIRCULAR PROVIDING REGULATIONS ON METHOD TO FORMULAT...
 
Vietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key HighlightsVietnam's National Energy Development Strategy – Key Highlights
Vietnam's National Energy Development Strategy – Key Highlights
 
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
Anwalt in Vietnam Dr. Oliver Massmann Corporate Sustainability Due Diligence ...
 
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
ANWALT IN VIETNAM DR OLIVER MASSMANN MÖGLICHE RATIFIZIERUNG DES ÜBEREINKOMMEN...
 
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
Corporate Sustainability Due Diligence Directive (CSDDD or the EU Supply Chai...
 
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
Anwalt in Vietnam Dr. Oliver Massmann- Franchising – Eine Strategie als Schlü...
 
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
POTENTIAL RATIFICATION OF CONVENTION 87 OF THE INTERNATIONAL LABOUR ORGANIZAT...
 
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
KEY TASKS SET OUT BY THE PRIME MINISTER FOR THE YEAR 2024 AND THE EMERGING MA...
 
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
Lawyer in Vietnam Dr. Oliver Massmann - Doing Business and Getting Deals Done...
 
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
Anwalt in Vietnam Dr. Oliver Massmann im Interview mit Asia Business Law Jour...
 
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the WorldLawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
Lawyer in Vietnam Dr Oliver Massmann - Vietnam and the World
 
VIETNAM - INSURANCE - Regulatory Update Asia Insurance Review interviewing Dr...
VIETNAM - INSURANCE - Regulatory Update Asia Insurance Review interviewing Dr...VIETNAM - INSURANCE - Regulatory Update Asia Insurance Review interviewing Dr...
VIETNAM - INSURANCE - Regulatory Update Asia Insurance Review interviewing Dr...
 
Dr. Oliver Massmann - Vietnam and the World-240223
Dr. Oliver Massmann - Vietnam and the World-240223Dr. Oliver Massmann - Vietnam and the World-240223
Dr. Oliver Massmann - Vietnam and the World-240223
 
Vietnam - Dr Oliver Massmann interviewed by Asia Business Law Journal - Deal ...
Vietnam - Dr Oliver Massmann interviewed by Asia Business Law Journal - Deal ...Vietnam - Dr Oliver Massmann interviewed by Asia Business Law Journal - Deal ...
Vietnam - Dr Oliver Massmann interviewed by Asia Business Law Journal - Deal ...
 

Recently uploaded

Grey Area of the Information Technology Act, 2000.pptx
Grey Area of the Information Technology Act, 2000.pptxGrey Area of the Information Technology Act, 2000.pptx
Grey Area of the Information Technology Act, 2000.pptxBharatMunjal4
 
citizenship in the Philippines as to the laws applicable
citizenship in the Philippines as to the laws applicablecitizenship in the Philippines as to the laws applicable
citizenship in the Philippines as to the laws applicableSaraSantiago44
 
Hungarian legislation made by Robert Miklos
Hungarian legislation made by Robert MiklosHungarian legislation made by Robert Miklos
Hungarian legislation made by Robert Miklosbeduinpower135
 
Town of Haverhill's Statement of Facts for Summary Judgment on Counterclaims ...
Town of Haverhill's Statement of Facts for Summary Judgment on Counterclaims ...Town of Haverhill's Statement of Facts for Summary Judgment on Counterclaims ...
Town of Haverhill's Statement of Facts for Summary Judgment on Counterclaims ...Rich Bergeron
 
The Punjab Land Reforms AcT 1972 HIRDEBIR.pptx
The Punjab Land Reforms AcT 1972 HIRDEBIR.pptxThe Punjab Land Reforms AcT 1972 HIRDEBIR.pptx
The Punjab Land Reforms AcT 1972 HIRDEBIR.pptxgurcharnsinghlecengl
 
Choosing the Right Business Structure for Your Small Business in Texas
Choosing the Right Business Structure for Your Small Business in TexasChoosing the Right Business Structure for Your Small Business in Texas
Choosing the Right Business Structure for Your Small Business in TexasBrandy Austin
 
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptxSarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptxAnto Jebin
 
Illinois Department Of Corrections reentry guide
Illinois Department Of Corrections reentry guideIllinois Department Of Corrections reentry guide
Illinois Department Of Corrections reentry guideillinoisworknet11
 
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdfWurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdfssuser3e15612
 
Understanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
Understanding Cyber Crime Litigation: Key Concepts and Legal FrameworksUnderstanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
Understanding Cyber Crime Litigation: Key Concepts and Legal FrameworksFinlaw Associates
 
Right to life and personal liberty under article 21
Right to life and personal liberty under article 21Right to life and personal liberty under article 21
Right to life and personal liberty under article 21vasanthakumarsk17
 
Analysis on Law of Domicile under Private International laws.
Analysis on Law of Domicile under Private International laws.Analysis on Law of Domicile under Private International laws.
Analysis on Law of Domicile under Private International laws.2020000445musaib
 
1990-2004 Bar Questions and Answers in Sales
1990-2004 Bar Questions and Answers in Sales1990-2004 Bar Questions and Answers in Sales
1990-2004 Bar Questions and Answers in SalesMelvinPernez2
 
Town of Haverhill's Motion for Summary Judgment on DTC Counterclaims
Town of Haverhill's Motion for Summary Judgment on DTC CounterclaimsTown of Haverhill's Motion for Summary Judgment on DTC Counterclaims
Town of Haverhill's Motion for Summary Judgment on DTC CounterclaimsRich Bergeron
 
Town of Haverhill's Summary Judgment Motion for Declaratory Judgment Case
Town of Haverhill's Summary Judgment Motion for Declaratory Judgment CaseTown of Haverhill's Summary Judgment Motion for Declaratory Judgment Case
Town of Haverhill's Summary Judgment Motion for Declaratory Judgment CaseRich Bergeron
 
RA. 7432 and RA 9994 Senior Citizen .pptx
RA. 7432 and RA 9994 Senior Citizen .pptxRA. 7432 and RA 9994 Senior Citizen .pptx
RA. 7432 and RA 9994 Senior Citizen .pptxJFSB1
 
PPT Template - Federal Law Enforcement Training Center
PPT Template - Federal Law Enforcement Training CenterPPT Template - Federal Law Enforcement Training Center
PPT Template - Federal Law Enforcement Training Centerejlfernandez22
 
Town of Haverhill's Statement of Material Facts For Declaratory Judgment Moti...
Town of Haverhill's Statement of Material Facts For Declaratory Judgment Moti...Town of Haverhill's Statement of Material Facts For Declaratory Judgment Moti...
Town of Haverhill's Statement of Material Facts For Declaratory Judgment Moti...Rich Bergeron
 
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los AngelesAre There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los AngelesChesley Lawyer
 
THE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTS
THE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTSTHE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTS
THE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTSRoshniSingh312153
 

Recently uploaded (20)

Grey Area of the Information Technology Act, 2000.pptx
Grey Area of the Information Technology Act, 2000.pptxGrey Area of the Information Technology Act, 2000.pptx
Grey Area of the Information Technology Act, 2000.pptx
 
citizenship in the Philippines as to the laws applicable
citizenship in the Philippines as to the laws applicablecitizenship in the Philippines as to the laws applicable
citizenship in the Philippines as to the laws applicable
 
Hungarian legislation made by Robert Miklos
Hungarian legislation made by Robert MiklosHungarian legislation made by Robert Miklos
Hungarian legislation made by Robert Miklos
 
Town of Haverhill's Statement of Facts for Summary Judgment on Counterclaims ...
Town of Haverhill's Statement of Facts for Summary Judgment on Counterclaims ...Town of Haverhill's Statement of Facts for Summary Judgment on Counterclaims ...
Town of Haverhill's Statement of Facts for Summary Judgment on Counterclaims ...
 
The Punjab Land Reforms AcT 1972 HIRDEBIR.pptx
The Punjab Land Reforms AcT 1972 HIRDEBIR.pptxThe Punjab Land Reforms AcT 1972 HIRDEBIR.pptx
The Punjab Land Reforms AcT 1972 HIRDEBIR.pptx
 
Choosing the Right Business Structure for Your Small Business in Texas
Choosing the Right Business Structure for Your Small Business in TexasChoosing the Right Business Structure for Your Small Business in Texas
Choosing the Right Business Structure for Your Small Business in Texas
 
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptxSarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
Sarvesh Raj IPS - A Journey of Dedication and Leadership.pptx
 
Illinois Department Of Corrections reentry guide
Illinois Department Of Corrections reentry guideIllinois Department Of Corrections reentry guide
Illinois Department Of Corrections reentry guide
 
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdfWurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
Wurz Financial - Wealth Counsel to Law Firm Owners Services Guide.pdf
 
Understanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
Understanding Cyber Crime Litigation: Key Concepts and Legal FrameworksUnderstanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
Understanding Cyber Crime Litigation: Key Concepts and Legal Frameworks
 
Right to life and personal liberty under article 21
Right to life and personal liberty under article 21Right to life and personal liberty under article 21
Right to life and personal liberty under article 21
 
Analysis on Law of Domicile under Private International laws.
Analysis on Law of Domicile under Private International laws.Analysis on Law of Domicile under Private International laws.
Analysis on Law of Domicile under Private International laws.
 
1990-2004 Bar Questions and Answers in Sales
1990-2004 Bar Questions and Answers in Sales1990-2004 Bar Questions and Answers in Sales
1990-2004 Bar Questions and Answers in Sales
 
Town of Haverhill's Motion for Summary Judgment on DTC Counterclaims
Town of Haverhill's Motion for Summary Judgment on DTC CounterclaimsTown of Haverhill's Motion for Summary Judgment on DTC Counterclaims
Town of Haverhill's Motion for Summary Judgment on DTC Counterclaims
 
Town of Haverhill's Summary Judgment Motion for Declaratory Judgment Case
Town of Haverhill's Summary Judgment Motion for Declaratory Judgment CaseTown of Haverhill's Summary Judgment Motion for Declaratory Judgment Case
Town of Haverhill's Summary Judgment Motion for Declaratory Judgment Case
 
RA. 7432 and RA 9994 Senior Citizen .pptx
RA. 7432 and RA 9994 Senior Citizen .pptxRA. 7432 and RA 9994 Senior Citizen .pptx
RA. 7432 and RA 9994 Senior Citizen .pptx
 
PPT Template - Federal Law Enforcement Training Center
PPT Template - Federal Law Enforcement Training CenterPPT Template - Federal Law Enforcement Training Center
PPT Template - Federal Law Enforcement Training Center
 
Town of Haverhill's Statement of Material Facts For Declaratory Judgment Moti...
Town of Haverhill's Statement of Material Facts For Declaratory Judgment Moti...Town of Haverhill's Statement of Material Facts For Declaratory Judgment Moti...
Town of Haverhill's Statement of Material Facts For Declaratory Judgment Moti...
 
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los AngelesAre There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
Are There Any Alternatives To Jail Time For Sex Crime Convictions in Los Angeles
 
THE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTS
THE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTSTHE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTS
THE INDIAN CONTRACT ACT 1872 NOTES FOR STUDENTS
 

Vietnam - A Future International Competitor in Wind Energy

  • 1. Lawyer in Vietnam Oliver Massmann - Vietnam a future International Competitor in Wind Energy? Oliver Massmann – Ho Gia Le Hoang Potential of Wind Energy Industry in Vietnam Vietnam has a significant potential for wind energy with an average wind speed of more than 6m/s, surpassing that of all neighbouring Southeast Asian countries. With more than 3,000km coastline and plenty of islands, the total potential of wind energy in Vietnam is estimated to be as high as 713,000MW – 510,000 MW on land and 203,000 MW in islands. In comparison, this is 200 times more than the production volume of the largest hydropower plant, Son La (Vietnam), in Southeast Asia and 10 times larger than the projected total capacity of the electricity industry in 2020. Since the electricity demand in Vietnam is forecasted to increase by up to 14.2 pct. annually for the 2011- 2015 period and 11.4 pct. for the 2016-2020 period1 , and the electricity demand is expected to increase 7 times to 800 billion Kwh in 2030, Vietnam will then have to invest in energy sources to meet this big demand. Such investment is vital given Vietnam‟s expected dependence on imported coal, one of their primary resources for electricity production, by 2015. Additionally, hydroelectric energy is quite abundant in Vietnam but poses certain underlying risks. Therefore, Vietnam will have no choice for power development other than renewable energy in general and wind energy in particular. Government’s Policy On Development Of Renewable Energy The important role of renewable energy in general and wind energy in particular is recognized by Vietnamese government and reflected in the Master plan VII about energy development in Vietnam. The renewable energy is increasingly accounting for power sources (4.5% in 2020 and 6.0% in 2030 of the total power supply). The Master plan VII sets the renewable energy target rate at 5.6 pct. of total primary energy consumption by 2020 and 9.4 pct. by 2030. The Government‟s target is to increase the wind power to 1,000 MW (0.7 pct. of electricity production) by 2020 and 6,200 MW (2.4 pct.) by 2030. Moreover, as the energy prices in Vietnam are not very high, there are many incentives and preferential treatment offered by the Vietnamese Government to the wind power industry. Decision 37 offers the following incentives and preferential treatment in terms of funding, tax and fee to wind energy project as follows: i. Funding: The investor can raise funds in different forms permitted by relevant lawsfrom individuals and organizations in and out of the country and may have access to State credit for investment pursuant to the laws. ii. Tariff: The investor is exempted from tariff on goods imported to create fixed assets and goods used as raw materials, input or semi-finished products that are not available at home for the project‟s operation in line with the Law on Import and Export Duties2 , Law on Tax Mangagement3 and other relevant regulations on export and import duties. 1 http://www.adb.org/sites/default/files/linked-documents/42039-033-vie-ea.pdf 2 Law on Export and Import Duties No. 45/2005/QH11 dated 14 June 2005 as amended 3 Law on Tax Mangagement No. 78/2006/QH11 dated 29 November 2006 as amended
  • 2. iii. Corporate income tax: Wind power projects enjoy the same preferential treatment in investment in terms of exemption and reduction of corporate income tax as for other projects in line with the Law on Investment4 , Law on Corporate Income Tax5 and other documents guiding the enforcement of these laws : Perferential corporate income tax rate of 10% applies to newly- established enterprises for 15 years. If the given project is classified as a large scale project, a project using high or new technology and in special need of investment, the above preferential tax rate may be extended to less than 30 years following a decision of the Prime Minister. In addition, other preferential treatments in infrastructure for wind energy projects are available as follows: i. Projects on installing wind powers, lines and transformer stations connected to the national grids enjoy the same exemptions and reductions in land rental as projects being entitled to special investment treatment. ii. In line with the approved power development plan, the provincial people‟s committee allocates land to the investor to implement wind power projects. The compensation for existing land users and support for site clearance complies with the provisions of land law in force. In addition, in accordance with Decision 37, Electricity of Vietnam (“EVN”) is to buy all of the plant‟s wind energy outputand the Vietnam Environment Protect Fund will accordingly subsidize to EVN with the current subsidized tariff of 204 VND/kWh (about 01 UScent). Market Access Of Foreign Investor Currently, there is no foreign ownership restriction in energy sector in Vietnam. The foreign investor may choose among permitted investment forms: 100% foreign invested company, joint venture or public private partnership (“PPP”) in the form of BOT contract. Wind energy projects require high investment rates, while the electricity production costs are always high. Though the Government agrees to buy wind energy at high price, the investors still do not dare to pour their money into the sector for fear of the risks resulting from unstable policies. In such circumstances, PPP is the most reasonable solution. Recently on 14 February 2015, the Government issued a long-awaited Decree on PPP models, Decree 15/2015/ND-CP which will replace previous legal regulations on PPP or BOT with the intention of promoting private investment in infrastructure to boost economic growth in Vietnam. The PPP model can help ease the burden on capital arrangement, share and minimize risks, take full advantage of the management resources and improve the policies‟ transparency, thus bringing the highest possible effectiveness of the projects. For its great advantages, PPP has been applied in many countries in the world. In Vietnam, BOT is the best investment form for energy projects since it is easier to negotiate more favorable electricity rates and obtain more government guarantees, especially in the context that EVN – a state-owned electricity company, is obliged to purchase all electricity from the projects. Moreover, the investor can receive more fiscal and financial incentives. Wind energy will be an interesting sector in Vietnam for a foreign investor in the middle and long term, especially at the stage of fully competitive retail market. Despite the main obstacles to foreign investors such as high production cost, time taken for investors for investment capital recovery, and the lack of a 4 Law on Investment No. 59/2005/QH11 dated 29 November 2005 5 Law on Corporate Income Tax No, 14/2008/QH12 dated 03 June 2006 as amended
  • 3. competitive sale price, foreign investors still receive many preferential policies and incentives. When Vietnam energy market becomes a fully competitive retail market, the wind energy project will play a more important role and the investor will gain higher actual profits. Starting Up A Wind Energy Project Generally speaking, the start-up process in Vietnam is now still pretty complicated with the involvement of many licensing authorities and state agencies that make time-consuming and costly for developers. However, with the recent promulgation of new Investment Law and Enterprises Law which will take effect from 01 July 2015, the Government of Vietnam has showed the sign on improvement of bussiness and investment enviroment and both new laws are aimed at reducing licensing complexity and granting easier market access. Currently there has yet been any national plan for wind energy and consequently, there is no specific procedure for investment in wind energy project. Thus, until such a plan is finalized, the investment procedure remains uncertain. Wind energy projects must be in alignment with the national energy sector‟s development and priorities will be given to those with high economic and financial efficiency, as well as plans to connect with national or regional grids. Acording to Decision 376 , until the planning is completed and approved, the Prime Minister will have to decide on any wind energy project. Moreover, under Circular 327 , the investor can only invest in the wind energy project included in the list of wind energy projects approved by the Ministry of Industry and Trade (“MOIT”). The MOIT requires project owners follow its guidelines and stipulates that capital investment from a project owner must exceed 20 percent of the project total investment capital. The provincial people‟s committees will be the sole authorities to grant licenses after getting approval from the MOIT. In order to commence the construction, the investor must satisfy many requirements, including but not limited to obtaining the investment certificate, having signed the power purchase agreement and electricity integration agreement. Gerally speaking, the start-up process involve many state authorities from local level to the central level. For reference, according to the GIZ/MOIT Wind Energy Project8 , to set up a wind energy project, the developer must take the following steps: Step 1: Site selection – Due to the absence of a national wind power plan, site selection is based on relevant past data such as wind data, wind energy atlas, etc. Permission from the provincial people‟s committee (PPC) and provincial Department of Industry and Trade (DoIT) is needed for site surveying and resource assessment is needed for a feasibility study. Step 2: Assessment of wind resources at the selected site – Wind measuring poles are installed (if not available at the selected site) and wind is measured for at least 1 year. Step 3: Pre-feasibility study and request for inclusion in the power development plan – If the project area has wind resources, a pre-feasibility study for investment in the area is prepared and submitted to the MOIT together with a request to include the project in the power development plan. The MOIT shall consider and submit it to the Prime Minister for approval (as wind power is still new in Vietnam and there is a missing protocol for it, all wind power projects larger than 50 6 Decision 37/2011/QD-TTg of the Prime Minister dated 29 June 2011 on the mechanism supporting the development of wind power project in Vietnam (“Decision 37”) 7 Circular No. 32/2012/TT-BCT of the Ministry of Industry and Trade dated 12 November 2012 regulating the implementation of wind power project development and power purchase and sale contract form for wind power projects (“Circular No. 32/2012/TT-BCT”) 8 GIZ/MoIT (2011) Information on wind energy in Vietnam. Prepared by Khanh NQ. Website: http://www.renewableenergy.org.vn/. In practice, the state authorities may require further steps or documents.
  • 4. MW need approval by the Prime Minister. After the Prime Minister approval, the project documents are to be submitted to the DoIT for approval. Step 4: Investment report (Feasibility study) – After the DoIT approval of the pre-feasibility study, an investment report (feasibility study) is prepared and submitted to the MOIT for appraisal. Step 5: Signing of power sale contract with the EVN – In accordance with Decision 37, EVN is to buy all of the plant‟s wind power output. Contracts on power sale, grid connection and electric measurement system design must be signed. Step 6: Project implementation – The project will not start until the approval of the technical design and investment report by the related agencies such as DoIT, Department of Construction, Department of Natural Resources and Environment and others. Step 7: Building – Building starts. Above steps are the technical approval process that a wind power developer needs to comply with to be approved for project implementation. However, the developer needs also to work with the licensing authorities (i.e. the Department of Planning and Investment of the province where the project is located and the Ministry of Planning and Investment) in line with the investment procedure under the Investment Law. In Vietnam, the investment certificate is an official legal document issued by the State authority to certify the rights and obligations of the project developer and also the incentives that the developer may enjoy from the project implementation. The developer needs to perform the procedures for obtaining investment certificate in parallel with the technical approval since the beginning of the site selection steps . The current Investment Law provides for a 45-day time frame for issuance of an investment certificate (while the New Investment Law which takes effect from 01 July 2015 shortens this time frame to 15 days), starting from the date of receipt of a „complete‟ application dossier. Our experience in dealing with typical investment projects indicates that you should anticipate this process to take longer than the statutory time limit, even from 6 to 8 months at least. Vietnam - Future International Competitor In Wind Energy? Theoritically speaking, Vietnam can be seen as an international competitor in wind energy because it has a significant potential for wind energy, an increase of electricity demand and Government‟s preferential policies and incentives to facilitate renewable energy in general and wind energy in particular. According to World Bank research to build wind power potential map for Vietnam, Thailand, Laos and Cambodia, Vietnam has higher wind power than other South East Asia countries with 8.6 percent of Vietnam‟s territory having wind energy development potential (in comparison with 2.9% in Laos, and just 0.2% in Cambodia and Thailand). In practice, there are increasing interest and new projects in wind energy from Vietnamese and foreign investors. According to the website of GIZ Wind Energy Project: http://www.renewableenergy.org.vn/, until May 2012, there are 67 wind energy projects in Vietnam which are developing at different stages and this number is expected to increase in the upcoming time. Although Vietnam possesses considerable potential for the development of wind power, an energy sector which has attracted strong interest from domestic and foreign investors, the current wind energy project development has only tapped into a small portion of Vietnam‟s wind potential, and there are still many things Vietnam needs to change and take stronger action. Otherwise, Vietnam can hardly become an international competitor in wind energy. Up to now, the total potential of wind energy in Vietnam is only an estimate while a final issue for the bankability of a wind energy project is the wind speed feasibilty studies for that the investors need
  • 5. reliable wind speed studies and wind speed towers to measure. In practice, the standard requirements of foreign banks are such feasibility studies involve about 2 years of measurement. However, the "reliable" studies in Vietnam‟s wind energy are still lacking to our best knowledge. At present, Vietnam still features the “Single Buyer Model” with EVN who is the only offtaker, except for power generation projects under 3 MW. The EVN monopoly in power sector should be removed and EVN must be restructured by splitting up into many corporations with separate powers and duties (i.e, operation, transmion, distribution). In the meantime, Vietnam needs to highly prioritie the application of more transparent policies and mechanisms. Under Circular No. 32/2012/TT-BCT, Vietnam provides a standard power purpose agreement (“PPA”) form for all wind energy projects on power sale, grid connection and electric measurement system design. This standard PPA is a good start but still needs to be improved to make wind energy projects bankable. However, the negotiation process of the PPA signing with EVN is very time consuming and it is almost impossible to predict how long it will take to negotiate the relevant PPA with EVN, even it has taken up to 6 years in some cases to negotiate a PPA for a coal fired power plant with EVN in the past. That is a deterrent for foreign investors if they cannot calculate that into the development costs. Meanwhile with such red-tape hurdle, the operation costs for wind energy projects in Vietnam are still much more an overal “estimate” than a “real and realistic calculation”. The low power purchasing price is also a big barrier to wind energy projects. The Government should also adopt a feed-in tariff (“FIT”) for wind energy in particular and renewable energy in general. The basics of a FIT mechanism is that additional costs for production of energy will be divided among electricity users to assure a stable cash flow for renewable energy developers. Under Decision 37, EVN has the responsibility for buying the whole electric output from wind power projects with the electric buying price at the point of electricity receipt is 1,614 dong/kwh (excluding VAT, equivalent to 7.8 UScents/kwh). This current subsidized tariff is too low in comparison with that in other ASEAN countries (19 UScents/kWh in Thailand9 and 21.8 UScents/kWh in Philippines10 ). In practice, the wind energy producers in Vietnam keep complaing about very low purchasing price while the current cost of electricity generated from wind power plants is still quite high due to large technical investment. Recently, Vietnam‟s Prime Minister issued Decision 31/2014/QD-TTg on solid waste-to-energy projects to provide a ground-breaking feed-in tariff for power suppliers of up to “VND 2,114/kWh (equivalent to 10.05 US cents/kWh)”, whichis more than 25 percent higher than the 7.8 cent applicable to wind energy projects. From the internet, we have also been told that the MOIT proposed to the Government to approve for an FIT increase of up to 12 UScents/kwh to make the wind energy projects become more financially feasible. With this trend of development, the Goverment showsan effort to pave the way for the development of more wind power projects in Vietnam. If the FIT is not increased to region levels and until there is no clear roadmap for negotiating the PPA, it will be very difficult to attract foreign investors. The foreign investors have the choice in which country they will invest and if the FIT, for example, in the Phillipines is about TRIPLE more than that in Vietnam, then the investors will not think twice whether to come to Vietnam or invest in the Phillipines ---o0o--- Please do not hesitate to contact Mr. Oliver Massmann under omassmann@duanemorris.com if you have any questions on the above. Oliver Massmann is the General Director of Duane Morris Vietnam LLC. INTERESTED IN DOING BUSINESS IN VIETNAM? VISIT: www.vietnamlaws.xyz 9 http://www.renewableenergy-asia.com/portals/0/seminar/2_rea14_wind_power_in_thailand.pdf 10 http://www.renewableenergyworld.com/rea/blog/post/2012/07/fit-now-out-in-the-philippines