OMER ALSAYED OMER| PMP, MBA, B. SC. (CIVIL ENGINEERING)
OMERALSAYED@YAHOO.COM – KHARTOUM – SUDAN +249123494587
Course Description
 Type brief course summary  Location
 Lectures: Mon-Wed-Fri at 00:00 am
 Labs: Tues-Thurs at 00:00 am
 Prerequisites:
 Credits:
risk
management
planning,
identification, analysis, responses,
monitoring
and control
on a project.
by conducting
Defining Planning Executing Delivering
Chances of risks
occurring
• defining HOW to
conduct risk
management activities
for a project.
11.1 Plan Risk
Management
• DETERMINING which
risks may affect the
project and
documenting their
characteristics.
11.2 Identify
Risks
• PRIORITIZING risks for
further analysis or
action (assessing and
combining probability
and impact).
11.3 Perform
Qualitative
Risk Analysis
• NUMERICALLY
analyzing the effect of
identified risks on
overall project
objectives.
11.4 Perform
Quantitative
Risk Analysis
• developing OPTIONS
and actions to enhance
opportunities and to
reduce threats to project
objectives.
11.5 Plan Risk
Responses
• IMPLEMENTING
response plans,
tracking identified risks,
monitoring residual
risks, identifying new
risks, and evaluating
risk process
effectiveness
11.6 Control
Risks
Risk appetite,
•the degree
of
uncertainty
an entity is
willing to
take on in
anticipation
of a reward.
Risk tolerance
•the degree,
amount, or
volume of
risk that an
organization
will
withstand.
Risk threshold
•the level of
uncertainty
or impact at
which a
stakeholder
may have a
specific
interest.
Below >> acceptable …
Above >> not tolerate.
Inputs
Project
management plan
Project charter
Stakeholder
register
Enterprise
environmental
factors
Organizational
process assets
Tools&Techniques
Analytical
techniques
Expert judgment
Meetings
Outputs
Risk management
plan
Project
Management Plan
• all approved subsidiary management plans and baselines
• provides baseline or current state of risk-affected areas
including scope, schedule, and cost.
Project Charter
• high-level risks, high-level project descriptions, and high-
level requirements.
Stakeholder
Register
• contains all details related to the project’s stakeholders,
provides an overview of their roles.
Enterprise
Environmental
Factors
• risk attitudes, thresholds, and tolerances
Organizational
Process Assets
• Risk categories, concepts and terms, Risk statement
formats, Standard templates, Roles and responsibilities,
Authority levels for decision making, and Lessons learned.
understand and define the overall risk management context of the
project.
stakeholder
risk attitudes
the strategic
risk
exposure.
Risk
management
context
stakeholder risk
profile analysis
performed to
grade and qualify:
the project
stakeholder risk
appetite and
tolerance.
Depending on these assessments, the project team can allocate appropriate
resources and focus on the risk management activities
strategic risk
scoring sheets
provide a high-
level assessment
of the risk
exposure
based on the
overall project
context.
define High-level plans -
RISK ACTIVITIES.
develop Risk
management COST and
SCHEDULE activities
review Risk
CONTINGENCY reserve
approaches.
Assign Risk management
RESPONSIBILITIES.
General organizational
templates for risk
CATEGORIES,
the PROBABILITY and
IMPACT matrix will be
tailored to the specific
project.
project
manager
team
members
stakeholders
others, as
needed
 Methodology.
 Defines the approaches, tools, and data
 Roles and responsibilities.
 lead, support, and risk management team members for each type of
activity in the risk management plan, and clarifies their responsibilities.
 Budgeting.
 Estimates funds needed for inclusion in the cost baseline and establishes
protocols for application of contingency and management reserves.
 Timing.
 when and how often the risk management processes will be performed
 schedule contingency reserves protocols
 establishes risk management activities.
 grouping potential causes of risk.
 Several approaches can be used, (structure based on project
objectives by category. A risk breakdown structure (RBS)
RBS BCSP
Technical
Unproven
Technology
Quality of
Technology
Performance
Risks
Complex
Technology
Project
Management
Schedule
Planning
Project
Disciplines
Resource
Planning
Organizational
Project
Schedules
Unrealistic
Objectives
Funding
External
Weather
Labor Issues
Catastrophic
Risk
Cost Estimates
BUDGETING
 For quality and credibility requires that different levels of risk probability
and impact be defined that are specific to the project context.
Defined Conditions for Impact Scales of a Risk on Major Project Objectives (Examples are shown for negative impacts only)
Relative or numerical scales are shown
Project
Objective
Very low /0.05 Low /0.10 Moderate /0.20 High /0.40 Very high /0.80
Cost Insignificant
cost increase
< 10% cost
increase
10% - 20% cost
increase
20% - 40% cost
increase
>40% cost
increase
Time Insignificant
time increase
< 5% time
increase
5% - 10% time
increase
10% - 20% time
increase
>20% time
increase
Scope Scope
decrease
barely
noticeable
Minor areas of
scope affected
Major areas of
scope affected
Scope
reduction
unacceptable
to
sponsor
Project end
item
is effectively
useless
Quality Quality
degradation
barely
noticeable
Only very
demanding
applications
are affected
Quality
reduction
requires
sponsor
approval
Quality
reduction
unacceptable
to
sponsor
Project end
item
is effectively
useless
 Probability and impact matrix.
 a grid for mapping the probability of each risk occurrence and its impact on
project objectives if that risk occurs.
 Revised stakeholders’ tolerances.
 Stakeholders’ tolerances, as they apply to the specific project, may be
revised in the Plan Risk Management process.
 Reporting formats.
 how the outcomes of the risk management process will be documented,
analyzed, and communicated(content/format of the risk register - reports).
 Tracking.
 how risk activities will be recorded for the benefit of the current project and
how risk management processes will be audited.
Sample of RMP
Ex.
Make a sample of RMP for your
project
Inputs
Risk management plan
Cost management plan
Schedule management plan
Quality management plan
Human resource management
plan
Scope baseline
Activity cost estimates
Activity duration estimates
Stakeholder register
Project documents
Procurement documents
Enterprise environmental
factors
Organizational process assets
Tools&Techniques
Documentation reviews
Information gathering
techniques
Checklist analysis
Assumptions analysis
Diagramming techniques
SWOT analysis
Expert judgment
Outputs
Risk register
• assignments of roles and responsibilities, provision for risk management activities
in the budget and schedule, and categories of risk
11.2.1.1 Risk Management Plan
• provides processes and controls that can be used to help identify risks across the
project.
11.2.1.2 Cost Management Plan
• provides insight to project time/schedule objectives and expectations which
may be impacted by risks (known and unknown).
11.2.1.3 Schedule Management Plan
• provides a baseline of quality measures and metrics for use in identifying risks.
11.2.1.4 Quality Management Plan
11.2.1.5 Human
Resource Management
Plan
•how project human resources should be defined, staffed,
managed, and released. ,roles and responsibilities,
•project organization charts, and the staffing management plan.
•how project human resources should be defined, staffed,
managed, and released. ,roles and responsibilities,
•project organization charts, and the staffing management plan.
11.2.1.6 Scope Baseline
•Uncertainty in project assumptions.
•The WBS (potential risks at both the micro and macro levels).
•Risks can be identified and tracked at summary, control account,
and/or work package levels.
•Uncertainty in project assumptions.
•The WBS (potential risks at both the micro and macro levels).
•Risks can be identified and tracked at summary, control account,
and/or work package levels.
11.2.1.7 Activity Cost
Estimates
•provide a quantitative assessment of the likely cost to complete
scheduled activities (D + r).
•result in projections indicating sufficient or insufficient to complete
the activity
•provide a quantitative assessment of the likely cost to complete
scheduled activities (D + r).
•result in projections indicating sufficient or insufficient to complete
the activity
11.2.1.8 Activity
Duration Estimates
•useful in identifying risks related to the time allowances for the
activities or project as a whole, again with the width of the range of
such estimates indicating the relative degree(s) of risk.
•useful in identifying risks related to the time allowances for the
activities or project as a whole, again with the width of the range of
such estimates indicating the relative degree(s) of risk.
11.2.1.9 Stakeholder
Register
•Information about the stakeholders is useful for soliciting inputs to
identify risks, as this will ensure that key stakeholders, especially the
stakeholder, sponsor, and customer are interviewed or otherwise
participate during the Identify Risks process.
•Information about the stakeholders is useful for soliciting inputs to
identify risks, as this will ensure that key stakeholders, especially the
stakeholder, sponsor, and customer are interviewed or otherwise
participate during the Identify Risks process.
11.2.1.10 Project
Documents
•Project charter, Project schedule, Schedule network diagrams, Issue
log, Quality checklist, and Other information proven to be valuable
in identifying risks.
•Project charter, Project schedule, Schedule network diagrams, Issue
log, Quality checklist, and Other information proven to be valuable
in identifying risks.
11.2.1.11 Procurement
Documents
•The complexity and the level of detail of the procurement
documents should be consistent with the value of, and risks
associated with, planned procurement.
•The complexity and the level of detail of the procurement
documents should be consistent with the value of, and risks
associated with, planned procurement.
11.2.1.12 Enterprise
Environmental Factors
•Published information, including commercial databases, Academic
studies, Published checklists, Benchmarking, Industry studies, and Risk
attitudes.
•Published information, including commercial databases, Academic
studies, Published checklists, Benchmarking, Industry studies, and Risk
attitudes.
11.2.1.13
Organizational Process
Assets
•Project files, including actual data, Organizational and project
process controls, Risk statement formats or templates, and Lessons
learned.
•Project files, including actual data, Organizational and project
process controls, Risk statement formats or templates, and Lessons
learned.
 11.2.2.1 Documentation Reviews
 A structured review of the project documentation may be performed,
including plans, assumptions, previous
 project files, agreements, and other information. The quality of the
plans, as well as consistency between those
 plans and the project requirements and assumptions, may be indicators
of risk in the project.
 11.2.2.2 Information Gathering Techniques
 Brainstorming.
 Delphi technique.
 P-352
Integration
•Inadequate planning;
•poor resource allocation;
•poor integration management;
•lack of post-project review
Scope
•Poor definition of scope or work
packages;
•incomplete definition of quality
requirements
•inadequate scope control
Time
•Errors in estimating time or resource
availability;
•poor allocation and management of
float;
•early release of competitive products
Cost
•Estimating errors;
•inadequate productivity, cost,
•change, or contingency control;
•poor maintenance, security,
purchasing, etc.
Quality
•Poor attitude toward quality;
•substandard
design/materials/workmanship;
•inadequate quality assurance
program
Human Resources
•Poor conflict management;
•poor project organization
•Poor definition of responsibilities;
•absence of leadership
Communications
•Carelessness in planning
•Carelessness in communicating;
•lack of consultation with key
stakeholders
Risk register
Our project risk register
Risk ID Risk Statement Probability
Impact
Scope Quality Schedule Cost Score
Respons
e
100
Materials Price
change
0.7 - 0.7 - 0.50
110
Labor wages
change
0.5 - 0.5 - 0.25
120
Soil bearing
capacity
assumption not
match
0.2 - 0.5 - 0.30
130
Manpower not
easily available
0.5 + 0.5 + 0.25
140 Engineers available 0.8 + 0.5 + 0.40
150 On-time funding 0.7 + 0.5 + 0.35
Probability & Impact assessment
Probability & Impact matrix
Risk data sheet
c
‫وآﻞ‬ ‫اﻟﻤﻮﺳﻢ‬ ‫ﻣﻔﺎﺟﺎة‬
‫اﻟﻤﻮاﺳﻢ‬!!
Course Objectives
Course Objectives
Results/Outcome
Expected
Skills Developed
Objective 1 Result 1 Skills Developed
Objective 2 Result 2 Skills Developed
Objective 3 Result 3 Skills Developed
Objective 4 Result 4 Skills Developed
Required Materials
•Books
•Articles
•Web
•Other
Reading
•Supplies
•Equipment
•Other project materials
Project
•Software and hardwareTechnology/Tools
Instructional Methods
 Briefly describe instructional methods
 Lectures
 Demonstrations
 Class discussion/Virtual discussions
 Individual/group projects
 Labs
Schedule
Week Topic Assignment/Project Objective
Week 1 Topic 1 Brief description Objective
Week 2
Topic 2 Brief description Objective
Week 3
Topic 3 Brief description Objective
Week 4
Topic 4 Brief description Objective
Week 5 Topic 5 Brief description Objective
Assessment Criteria
 Weekly assignments
 Projects
 Quizzes
 Final Exam
10
30
20
40
Percent of Grade
Weekly assignments Projects
Quizzes Final exam
Resources
Web &
Software Tools
Class web site
Collaboration
tools
Mobile/Other
apps
Social Media
Twitter
Facebook
Other
Labs, Study
Groups
Labs
Study groups
Instructor Contact Information
Email
Office
phone
Office
hours
Instructor
web page
Opportunity Threat
Questions?

More Related Content

What's hot

PMP Training - 05 project scope management
PMP Training - 05 project scope managementPMP Training - 05 project scope management
PMP Training - 05 project scope managementejlp12
 
A brief on project time management
A brief on project time managementA brief on project time management
A brief on project time managementImran Jamil
 
PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2ejlp12
 
Introduction to risk management
Introduction to risk managementIntroduction to risk management
Introduction to risk managements. Akhlaque
 
PMBoK V5 changes
PMBoK V5 changesPMBoK V5 changes
PMBoK V5 changesPeg Duggan
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication managementejlp12
 
PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OnePMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OneHossam Maghrabi
 
PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -Hossam Maghrabi
 
08 projectqualitymanagement
08 projectqualitymanagement08 projectqualitymanagement
08 projectqualitymanagementDhamo daran
 
Risk management overview
Risk management overviewRisk management overview
Risk management overviewHossam Maghrabi
 
Project managemenet knowledge areas
Project managemenet knowledge areasProject managemenet knowledge areas
Project managemenet knowledge areaslinajarruti
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 
PMP-Integration Management area
PMP-Integration Management  areaPMP-Integration Management  area
PMP-Integration Management areaZaur Ahmadov, PMP
 
Project risk management
Project risk managementProject risk management
Project risk managementBarnatuCoffee
 
PMP - Risk Management plan & template
PMP - Risk Management plan & templatePMP - Risk Management plan & template
PMP - Risk Management plan & templateAllie Gentry
 
Project Risk Management PMBOK
Project Risk Management PMBOKProject Risk Management PMBOK
Project Risk Management PMBOKGeoDiga
 

What's hot (20)

PMP Training - 05 project scope management
PMP Training - 05 project scope managementPMP Training - 05 project scope management
PMP Training - 05 project scope management
 
A brief on project time management
A brief on project time managementA brief on project time management
A brief on project time management
 
Pmp risk chapter 11
Pmp risk chapter 11Pmp risk chapter 11
Pmp risk chapter 11
 
PMP Training - 06 project time management2
PMP Training - 06 project time management2PMP Training - 06 project time management2
PMP Training - 06 project time management2
 
Introduction to risk management
Introduction to risk managementIntroduction to risk management
Introduction to risk management
 
PMBoK V5 changes
PMBoK V5 changesPMBoK V5 changes
PMBoK V5 changes
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication management
 
PMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part OnePMBOK 5th Planning Process Group Part One
PMBOK 5th Planning Process Group Part One
 
PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -PMBOK_5th_Initiating Process Group -
PMBOK_5th_Initiating Process Group -
 
08 projectqualitymanagement
08 projectqualitymanagement08 projectqualitymanagement
08 projectqualitymanagement
 
Risk management overview
Risk management overviewRisk management overview
Risk management overview
 
Project managemenet knowledge areas
Project managemenet knowledge areasProject managemenet knowledge areas
Project managemenet knowledge areas
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
PMP-Integration Management area
PMP-Integration Management  areaPMP-Integration Management  area
PMP-Integration Management area
 
7- PMP Training - Quality Management
7- PMP Training - Quality Management7- PMP Training - Quality Management
7- PMP Training - Quality Management
 
Project risk management
Project risk managementProject risk management
Project risk management
 
PMP - Risk Management plan & template
PMP - Risk Management plan & templatePMP - Risk Management plan & template
PMP - Risk Management plan & template
 
Project Risk Management PMBOK
Project Risk Management PMBOKProject Risk Management PMBOK
Project Risk Management PMBOK
 
9- PMP Training - Communication Management
9- PMP Training - Communication Management9- PMP Training - Communication Management
9- PMP Training - Communication Management
 

Similar to 11 project risk management

R I S K M A N A G E M E N T
R I S K  M A N A G E M E N TR I S K  M A N A G E M E N T
R I S K M A N A G E M E N Tmadhav shirur
 
PROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfPROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfMUST
 
Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Dhamo daran
 
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docxTemplates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docxmattinsonjanel
 
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge AreaOnline PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge AreaGlobalSkillup
 
112 risk- metrics for risk reduction
112 risk- metrics for risk reduction112 risk- metrics for risk reduction
112 risk- metrics for risk reductionDr Fereidoun Dejahang
 
Episode 25 : Project Risk Management
Episode 25 :  Project Risk ManagementEpisode 25 :  Project Risk Management
Episode 25 : Project Risk ManagementSAJJAD KHUDHUR ABBAS
 
Project Risk Management ( With :Decision tree analysi,Simulation,Sensitivity ...
Project Risk Management ( With :Decision tree analysi,Simulation,Sensitivity ...Project Risk Management ( With :Decision tree analysi,Simulation,Sensitivity ...
Project Risk Management ( With :Decision tree analysi,Simulation,Sensitivity ...IndraYu2
 
Chapitulo 5
Chapitulo 5Chapitulo 5
Chapitulo 5ITSP
 
Ch5 - Project Management
Ch5 - Project ManagementCh5 - Project Management
Ch5 - Project ManagementJomel Penalba
 
Perform quantitative risk analysis
Perform quantitative risk analysis Perform quantitative risk analysis
Perform quantitative risk analysis Shereef Sabri
 
Risk project management - Notes for the CAMP exam
Risk project management - Notes for the CAMP examRisk project management - Notes for the CAMP exam
Risk project management - Notes for the CAMP examMaria Kirk
 
Plan risk management
Plan risk management Plan risk management
Plan risk management Shereef Sabri
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementNandi Sudheer
 

Similar to 11 project risk management (20)

R I S K M A N A G E M E N T
R I S K  M A N A G E M E N TR I S K  M A N A G E M E N T
R I S K M A N A G E M E N T
 
Session 18 4th edition PMP
Session 18 4th edition PMPSession 18 4th edition PMP
Session 18 4th edition PMP
 
PROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdfPROJECT RISK MANAGEMENT.pdf
PROJECT RISK MANAGEMENT.pdf
 
Projectriskmanagement pmbok5
Projectriskmanagement pmbok5Projectriskmanagement pmbok5
Projectriskmanagement pmbok5
 
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docxTemplates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
 
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge AreaOnline PMP Training Material for PMP Exam - Risk Management Knowledge Area
Online PMP Training Material for PMP Exam - Risk Management Knowledge Area
 
112 risk- metrics for risk reduction
112 risk- metrics for risk reduction112 risk- metrics for risk reduction
112 risk- metrics for risk reduction
 
Episode 25 : Project Risk Management
Episode 25 :  Project Risk ManagementEpisode 25 :  Project Risk Management
Episode 25 : Project Risk Management
 
Project Risk Management ( With :Decision tree analysi,Simulation,Sensitivity ...
Project Risk Management ( With :Decision tree analysi,Simulation,Sensitivity ...Project Risk Management ( With :Decision tree analysi,Simulation,Sensitivity ...
Project Risk Management ( With :Decision tree analysi,Simulation,Sensitivity ...
 
Risk Management Assignment
Risk Management AssignmentRisk Management Assignment
Risk Management Assignment
 
Chapitulo 5
Chapitulo 5Chapitulo 5
Chapitulo 5
 
Ch5
Ch5Ch5
Ch5
 
Ch5
Ch5Ch5
Ch5
 
Ch5 - Project Management
Ch5 - Project ManagementCh5 - Project Management
Ch5 - Project Management
 
Ch5
Ch5Ch5
Ch5
 
Ch5
Ch5Ch5
Ch5
 
Perform quantitative risk analysis
Perform quantitative risk analysis Perform quantitative risk analysis
Perform quantitative risk analysis
 
Risk project management - Notes for the CAMP exam
Risk project management - Notes for the CAMP examRisk project management - Notes for the CAMP exam
Risk project management - Notes for the CAMP exam
 
Plan risk management
Plan risk management Plan risk management
Plan risk management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 

More from Omer Alsayed PhD,MBA, PMP®

Project stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروعProject stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروعOmer Alsayed PhD,MBA, PMP®
 
برنامج حصاد المياه خطوة نحو تنمية الموارد الطبيعية
برنامج حصاد المياه  خطوة نحو تنمية الموارد الطبيعيةبرنامج حصاد المياه  خطوة نحو تنمية الموارد الطبيعية
برنامج حصاد المياه خطوة نحو تنمية الموارد الطبيعيةOmer Alsayed PhD,MBA, PMP®
 
09 PMP Project Human Resources Management PMBOK 5th edittion
09 PMP Project Human Resources Management PMBOK 5th edittion09 PMP Project Human Resources Management PMBOK 5th edittion
09 PMP Project Human Resources Management PMBOK 5th edittionOmer Alsayed PhD,MBA, PMP®
 
09 Project Human Resources management based on PMBOK5
09 Project Human Resources management based on PMBOK5 09 Project Human Resources management based on PMBOK5
09 Project Human Resources management based on PMBOK5 Omer Alsayed PhD,MBA, PMP®
 
وأحسن الناس من بين الورى رجل
وأحسن الناس من بين الورى رجلوأحسن الناس من بين الورى رجل
وأحسن الناس من بين الورى رجلOmer Alsayed PhD,MBA, PMP®
 

More from Omer Alsayed PhD,MBA, PMP® (20)

Project stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروعProject stakeholders management arabic ادارة المعنيين في المشروع
Project stakeholders management arabic ادارة المعنيين في المشروع
 
04 project integration management
04 project integration management04 project integration management
04 project integration management
 
برنامج حصاد المياه خطوة نحو تنمية الموارد الطبيعية
برنامج حصاد المياه  خطوة نحو تنمية الموارد الطبيعيةبرنامج حصاد المياه  خطوة نحو تنمية الموارد الطبيعية
برنامج حصاد المياه خطوة نحو تنمية الموارد الطبيعية
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
04 project integration management
04 project integration management04 project integration management
04 project integration management
 
07 project cost management
07 project cost management07 project cost management
07 project cost management
 
06 project time management m
06 project time management m06 project time management m
06 project time management m
 
08 project quality management
08 project quality management08 project quality management
08 project quality management
 
10 project communications
10 project communications10 project communications
10 project communications
 
09 project human res 2014
09 project human res 201409 project human res 2014
09 project human res 2014
 
13 project stakeholders management
13 project stakeholders management13 project stakeholders management
13 project stakeholders management
 
12 project procurement management
12 project procurement management12 project procurement management
12 project procurement management
 
09 project human res 2014
09 project human res 201409 project human res 2014
09 project human res 2014
 
Practical project management 12 feb 2014
Practical project management 12 feb 2014Practical project management 12 feb 2014
Practical project management 12 feb 2014
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
Practical project management based on PMBOK5
Practical project management based on PMBOK5Practical project management based on PMBOK5
Practical project management based on PMBOK5
 
09 PMP Project Human Resources Management PMBOK 5th edittion
09 PMP Project Human Resources Management PMBOK 5th edittion09 PMP Project Human Resources Management PMBOK 5th edittion
09 PMP Project Human Resources Management PMBOK 5th edittion
 
09 project human resources management pmbok 5th
09 project human resources management pmbok 5th09 project human resources management pmbok 5th
09 project human resources management pmbok 5th
 
09 Project Human Resources management based on PMBOK5
09 Project Human Resources management based on PMBOK5 09 Project Human Resources management based on PMBOK5
09 Project Human Resources management based on PMBOK5
 
وأحسن الناس من بين الورى رجل
وأحسن الناس من بين الورى رجلوأحسن الناس من بين الورى رجل
وأحسن الناس من بين الورى رجل
 

Recently uploaded

International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 

Recently uploaded (20)

International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 

11 project risk management

  • 1. OMER ALSAYED OMER| PMP, MBA, B. SC. (CIVIL ENGINEERING) OMERALSAYED@YAHOO.COM – KHARTOUM – SUDAN +249123494587
  • 2. Course Description  Type brief course summary  Location  Lectures: Mon-Wed-Fri at 00:00 am  Labs: Tues-Thurs at 00:00 am  Prerequisites:  Credits:
  • 3.
  • 5. Defining Planning Executing Delivering Chances of risks occurring
  • 6. • defining HOW to conduct risk management activities for a project. 11.1 Plan Risk Management • DETERMINING which risks may affect the project and documenting their characteristics. 11.2 Identify Risks • PRIORITIZING risks for further analysis or action (assessing and combining probability and impact). 11.3 Perform Qualitative Risk Analysis • NUMERICALLY analyzing the effect of identified risks on overall project objectives. 11.4 Perform Quantitative Risk Analysis • developing OPTIONS and actions to enhance opportunities and to reduce threats to project objectives. 11.5 Plan Risk Responses • IMPLEMENTING response plans, tracking identified risks, monitoring residual risks, identifying new risks, and evaluating risk process effectiveness 11.6 Control Risks
  • 7. Risk appetite, •the degree of uncertainty an entity is willing to take on in anticipation of a reward. Risk tolerance •the degree, amount, or volume of risk that an organization will withstand. Risk threshold •the level of uncertainty or impact at which a stakeholder may have a specific interest. Below >> acceptable … Above >> not tolerate.
  • 8. Inputs Project management plan Project charter Stakeholder register Enterprise environmental factors Organizational process assets Tools&Techniques Analytical techniques Expert judgment Meetings Outputs Risk management plan
  • 9.
  • 10. Project Management Plan • all approved subsidiary management plans and baselines • provides baseline or current state of risk-affected areas including scope, schedule, and cost. Project Charter • high-level risks, high-level project descriptions, and high- level requirements. Stakeholder Register • contains all details related to the project’s stakeholders, provides an overview of their roles. Enterprise Environmental Factors • risk attitudes, thresholds, and tolerances Organizational Process Assets • Risk categories, concepts and terms, Risk statement formats, Standard templates, Roles and responsibilities, Authority levels for decision making, and Lessons learned.
  • 11. understand and define the overall risk management context of the project. stakeholder risk attitudes the strategic risk exposure. Risk management context stakeholder risk profile analysis performed to grade and qualify: the project stakeholder risk appetite and tolerance. Depending on these assessments, the project team can allocate appropriate resources and focus on the risk management activities strategic risk scoring sheets provide a high- level assessment of the risk exposure based on the overall project context.
  • 12. define High-level plans - RISK ACTIVITIES. develop Risk management COST and SCHEDULE activities review Risk CONTINGENCY reserve approaches. Assign Risk management RESPONSIBILITIES. General organizational templates for risk CATEGORIES, the PROBABILITY and IMPACT matrix will be tailored to the specific project. project manager team members stakeholders others, as needed
  • 13.  Methodology.  Defines the approaches, tools, and data  Roles and responsibilities.  lead, support, and risk management team members for each type of activity in the risk management plan, and clarifies their responsibilities.  Budgeting.  Estimates funds needed for inclusion in the cost baseline and establishes protocols for application of contingency and management reserves.  Timing.  when and how often the risk management processes will be performed  schedule contingency reserves protocols  establishes risk management activities.
  • 14.  grouping potential causes of risk.  Several approaches can be used, (structure based on project objectives by category. A risk breakdown structure (RBS)
  • 16.  For quality and credibility requires that different levels of risk probability and impact be defined that are specific to the project context. Defined Conditions for Impact Scales of a Risk on Major Project Objectives (Examples are shown for negative impacts only) Relative or numerical scales are shown Project Objective Very low /0.05 Low /0.10 Moderate /0.20 High /0.40 Very high /0.80 Cost Insignificant cost increase < 10% cost increase 10% - 20% cost increase 20% - 40% cost increase >40% cost increase Time Insignificant time increase < 5% time increase 5% - 10% time increase 10% - 20% time increase >20% time increase Scope Scope decrease barely noticeable Minor areas of scope affected Major areas of scope affected Scope reduction unacceptable to sponsor Project end item is effectively useless Quality Quality degradation barely noticeable Only very demanding applications are affected Quality reduction requires sponsor approval Quality reduction unacceptable to sponsor Project end item is effectively useless
  • 17.  Probability and impact matrix.  a grid for mapping the probability of each risk occurrence and its impact on project objectives if that risk occurs.  Revised stakeholders’ tolerances.  Stakeholders’ tolerances, as they apply to the specific project, may be revised in the Plan Risk Management process.  Reporting formats.  how the outcomes of the risk management process will be documented, analyzed, and communicated(content/format of the risk register - reports).  Tracking.  how risk activities will be recorded for the benefit of the current project and how risk management processes will be audited.
  • 18. Sample of RMP Ex. Make a sample of RMP for your project
  • 19. Inputs Risk management plan Cost management plan Schedule management plan Quality management plan Human resource management plan Scope baseline Activity cost estimates Activity duration estimates Stakeholder register Project documents Procurement documents Enterprise environmental factors Organizational process assets Tools&Techniques Documentation reviews Information gathering techniques Checklist analysis Assumptions analysis Diagramming techniques SWOT analysis Expert judgment Outputs Risk register
  • 20.
  • 21. • assignments of roles and responsibilities, provision for risk management activities in the budget and schedule, and categories of risk 11.2.1.1 Risk Management Plan • provides processes and controls that can be used to help identify risks across the project. 11.2.1.2 Cost Management Plan • provides insight to project time/schedule objectives and expectations which may be impacted by risks (known and unknown). 11.2.1.3 Schedule Management Plan • provides a baseline of quality measures and metrics for use in identifying risks. 11.2.1.4 Quality Management Plan
  • 22. 11.2.1.5 Human Resource Management Plan •how project human resources should be defined, staffed, managed, and released. ,roles and responsibilities, •project organization charts, and the staffing management plan. •how project human resources should be defined, staffed, managed, and released. ,roles and responsibilities, •project organization charts, and the staffing management plan. 11.2.1.6 Scope Baseline •Uncertainty in project assumptions. •The WBS (potential risks at both the micro and macro levels). •Risks can be identified and tracked at summary, control account, and/or work package levels. •Uncertainty in project assumptions. •The WBS (potential risks at both the micro and macro levels). •Risks can be identified and tracked at summary, control account, and/or work package levels. 11.2.1.7 Activity Cost Estimates •provide a quantitative assessment of the likely cost to complete scheduled activities (D + r). •result in projections indicating sufficient or insufficient to complete the activity •provide a quantitative assessment of the likely cost to complete scheduled activities (D + r). •result in projections indicating sufficient or insufficient to complete the activity 11.2.1.8 Activity Duration Estimates •useful in identifying risks related to the time allowances for the activities or project as a whole, again with the width of the range of such estimates indicating the relative degree(s) of risk. •useful in identifying risks related to the time allowances for the activities or project as a whole, again with the width of the range of such estimates indicating the relative degree(s) of risk.
  • 23. 11.2.1.9 Stakeholder Register •Information about the stakeholders is useful for soliciting inputs to identify risks, as this will ensure that key stakeholders, especially the stakeholder, sponsor, and customer are interviewed or otherwise participate during the Identify Risks process. •Information about the stakeholders is useful for soliciting inputs to identify risks, as this will ensure that key stakeholders, especially the stakeholder, sponsor, and customer are interviewed or otherwise participate during the Identify Risks process. 11.2.1.10 Project Documents •Project charter, Project schedule, Schedule network diagrams, Issue log, Quality checklist, and Other information proven to be valuable in identifying risks. •Project charter, Project schedule, Schedule network diagrams, Issue log, Quality checklist, and Other information proven to be valuable in identifying risks. 11.2.1.11 Procurement Documents •The complexity and the level of detail of the procurement documents should be consistent with the value of, and risks associated with, planned procurement. •The complexity and the level of detail of the procurement documents should be consistent with the value of, and risks associated with, planned procurement. 11.2.1.12 Enterprise Environmental Factors •Published information, including commercial databases, Academic studies, Published checklists, Benchmarking, Industry studies, and Risk attitudes. •Published information, including commercial databases, Academic studies, Published checklists, Benchmarking, Industry studies, and Risk attitudes. 11.2.1.13 Organizational Process Assets •Project files, including actual data, Organizational and project process controls, Risk statement formats or templates, and Lessons learned. •Project files, including actual data, Organizational and project process controls, Risk statement formats or templates, and Lessons learned.
  • 24.  11.2.2.1 Documentation Reviews  A structured review of the project documentation may be performed, including plans, assumptions, previous  project files, agreements, and other information. The quality of the plans, as well as consistency between those  plans and the project requirements and assumptions, may be indicators of risk in the project.  11.2.2.2 Information Gathering Techniques  Brainstorming.  Delphi technique.  P-352
  • 25.
  • 26. Integration •Inadequate planning; •poor resource allocation; •poor integration management; •lack of post-project review Scope •Poor definition of scope or work packages; •incomplete definition of quality requirements •inadequate scope control Time •Errors in estimating time or resource availability; •poor allocation and management of float; •early release of competitive products Cost •Estimating errors; •inadequate productivity, cost, •change, or contingency control; •poor maintenance, security, purchasing, etc. Quality •Poor attitude toward quality; •substandard design/materials/workmanship; •inadequate quality assurance program Human Resources •Poor conflict management; •poor project organization •Poor definition of responsibilities; •absence of leadership Communications •Carelessness in planning •Carelessness in communicating; •lack of consultation with key stakeholders
  • 28. Our project risk register Risk ID Risk Statement Probability Impact Scope Quality Schedule Cost Score Respons e 100 Materials Price change 0.7 - 0.7 - 0.50 110 Labor wages change 0.5 - 0.5 - 0.25 120 Soil bearing capacity assumption not match 0.2 - 0.5 - 0.30 130 Manpower not easily available 0.5 + 0.5 + 0.25 140 Engineers available 0.8 + 0.5 + 0.40 150 On-time funding 0.7 + 0.5 + 0.35
  • 29. Probability & Impact assessment Probability & Impact matrix
  • 32. Course Objectives Course Objectives Results/Outcome Expected Skills Developed Objective 1 Result 1 Skills Developed Objective 2 Result 2 Skills Developed Objective 3 Result 3 Skills Developed Objective 4 Result 4 Skills Developed
  • 34. Instructional Methods  Briefly describe instructional methods  Lectures  Demonstrations  Class discussion/Virtual discussions  Individual/group projects  Labs
  • 35. Schedule Week Topic Assignment/Project Objective Week 1 Topic 1 Brief description Objective Week 2 Topic 2 Brief description Objective Week 3 Topic 3 Brief description Objective Week 4 Topic 4 Brief description Objective Week 5 Topic 5 Brief description Objective
  • 36. Assessment Criteria  Weekly assignments  Projects  Quizzes  Final Exam 10 30 20 40 Percent of Grade Weekly assignments Projects Quizzes Final exam
  • 37. Resources Web & Software Tools Class web site Collaboration tools Mobile/Other apps Social Media Twitter Facebook Other Labs, Study Groups Labs Study groups