Preparing a WBS ,[object Object]
Preparing a WBS ,[object Object]
Building a WBS ,[object Object]
WBS: Structure ,[object Object],[object Object],Level 1   ,[object Object],[object Object],[object Object],[object Object],[object Object]
WBS: Structure ,[object Object],[object Object],[object Object],Level 1   Level 2  
WBS: Structure ,[object Object],[object Object],Level 1   Level 2   Level 3  
WBS: Structure ,[object Object],Level 4 of the WBS will enable us to manage the project as desired.  All of our contractors fit into specific elements at level 4, and so do all specific departments. As with the previous Levels, note the WBS codes that have been assigned to the tasks and their relationship to the previous Level .  Level 4   Level 3      Level 1    Level 2
WBS: Structure ,[object Object],[object Object]
Work Breakdown Structure (WBS) Tree ,[object Object],[object Object],1 ACME Housing Corporation  1.1 New Home Construction   1.1.1 Concrete  1.1.1.1 Pour Foundation 1.1.1.2 Install Patio 1.1.1.3 Pour Stairway 1.1.2 Framing 1.1.2.1 Frame Exterior Walls 1.1.2.2 Frame Interior Walls 1.1.2.3 Install Roofing Trusses 1.1.3 Plumbing 1.1.3.1 Install Water Lines 1.1.3.2 Install Gas Lines 1.1.3.3 Install B/K Fixtures 1.1.4 Electrical 1.1.4.1 Install Wiring 1.1.4.2 Install Outlets/Switches 1.1.4.3 Install Fixtures 1.1.5 Interior 1.1.5.1 Install Drywall 1.1.5.2 Install Carpets 1.1.5.3 Install Painting 1.1.6 Roofing 1.1.6.1 Install Felt 1.1.6.2 Install Shingles 1.1.6.3 Install Vents
WBS and Earned Value ,[object Object],[object Object],[object Object],[object Object]
WBS Dictionary ,[object Object],[object Object],[object Object],[object Object],[object Object]
Organization Breakdown Structure (OBS) ,[object Object],With the relationships and responsibilities defined, the second and final step is to merge the WBS and OBS. Take a look on the next page. CONCRETE PERF DEPT 6010 M. Manning MASONRY PERF DEPT 6020 T. Greams TEST PERF DEPT 6030 K. Neumann CIVIL RESP DEPT R. Kelly CARPENTRY PERF DEPT 5010 R. Sites ROOFING PERF DEPT 5020 Y. Taylor DRYWALL PERF DEPT 5030 D. Smith STRUCTURAL RESP DEPT P. Tate PERF DEPT 4010 S. Johnson HOOKUP/TIE-IN PERF DEPT 4020 P. Ottis ELECTICAL RESP DEPT J. Sims WATER/SEWER PERF DEPT 3010 K. Wells GAS PERF DEPT 3020 R. Oriely PLUMBING RESP DEPT R. Lee PROJECT OFFICE RESP DEPT B. Smithers WIRING
Responsibility Assignment Matrix (RAM) ,[object Object],Responsibility  Assignment Matrix Responsibility  Assignment Matrix specific project tasks.  It is at this point that the project manager develops control accounts or work package.  Control accounts and work packages will be discussed in Module 4.  Lets look at what the RAM may look like on the ACME house construction project on the next page.
Responsibility Assignment Matrix (RAM) ,[object Object],[object Object],[object Object],[object Object]
Responsibility Assignment Matrix (RAM) ,[object Object],[object Object]
Responsibility Assignment Matrix (RAM) ,[object Object]

More Related Content

What's hot

PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project ManagementAravind Samala
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager ProofHub
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and schedulingAditi Garg
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management FundamentalsNishant Munjal
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniquesTata Dinyuy
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Managementsrinivas2036
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management A Makwana
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniquesShivangi Saini
 
Construction Project management
Construction Project management Construction Project management
Construction Project management Anupama holla
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration ManagementBhuWan Khadka
 

What's hot (20)

Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager
 
Wbs For Building Project
Wbs For Building ProjectWbs For Building Project
Wbs For Building Project
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and scheduling
 
Project Management Fundamentals
Project Management FundamentalsProject Management Fundamentals
Project Management Fundamentals
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Work Breakdown Structure
Work Breakdown StructureWork Breakdown Structure
Work Breakdown Structure
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniques
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
07. Project Integration Management
07. Project Integration Management07. Project Integration Management
07. Project Integration Management
 
S curves
S curvesS curves
S curves
 

Viewers also liked

Work Breakdown Structure Use This
Work Breakdown Structure Use ThisWork Breakdown Structure Use This
Work Breakdown Structure Use Thisproject management
 
work breakdown structure
work breakdown structurework breakdown structure
work breakdown structureStefan Csosz
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown StructureNicola2903
 
Project control. Management
Project control. ManagementProject control. Management
Project control. ManagementMarius Miron
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.Hagi Sahib
 

Viewers also liked (6)

Work Breakdown Structure Use This
Work Breakdown Structure Use ThisWork Breakdown Structure Use This
Work Breakdown Structure Use This
 
Project termination
Project terminationProject termination
Project termination
 
work breakdown structure
work breakdown structurework breakdown structure
work breakdown structure
 
Work breakdown Structure
Work breakdown StructureWork breakdown Structure
Work breakdown Structure
 
Project control. Management
Project control. ManagementProject control. Management
Project control. Management
 
project on construction of house report.
project on construction of house report.project on construction of house report.
project on construction of house report.
 

Similar to Work Breakdown Structure

Lec 05 wbs & obs 1
Lec 05 wbs & obs 1Lec 05 wbs & obs 1
Lec 05 wbs & obs 1SAJID ALI RUK
 
1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docx1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docxSONU61709
 
Copyright © 2000 Artemis Management SystemsCreating The Wo.docx
Copyright © 2000 Artemis Management SystemsCreating The Wo.docxCopyright © 2000 Artemis Management SystemsCreating The Wo.docx
Copyright © 2000 Artemis Management SystemsCreating The Wo.docxvanesaburnand
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectNirtiSingla
 
Untitled document (24).pdf
Untitled document (24).pdfUntitled document (24).pdf
Untitled document (24).pdfAsadUllah174251
 
Top 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers MakeTop 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers Makejoshnankivel
 
WBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxWBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxFillHackjack
 
WORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCE
WORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCEWORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCE
WORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCEAditi Garg
 
Work Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxWork Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxARITRYAKUMAR
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jIIT delhi
 
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...Ed Kozak
 
Describe different ways to develop a WBS and explain why it is often s.docx
Describe different ways to develop a WBS and explain why it is often s.docxDescribe different ways to develop a WBS and explain why it is often s.docx
Describe different ways to develop a WBS and explain why it is often s.docxcliftonl1
 
Vb tutorial
Vb tutorialVb tutorial
Vb tutorialjayguyab
 
Project management with ms project 2007
Project management with ms project 2007Project management with ms project 2007
Project management with ms project 2007Fasil Ayele
 

Similar to Work Breakdown Structure (20)

WBS and OBS
WBS and OBSWBS and OBS
WBS and OBS
 
Lec 05 wbs & obs 1
Lec 05 wbs & obs 1Lec 05 wbs & obs 1
Lec 05 wbs & obs 1
 
1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docx1 Work Breakdown Structures (WBS) 2 WBS .docx
1 Work Breakdown Structures (WBS) 2 WBS .docx
 
Copyright © 2000 Artemis Management SystemsCreating The Wo.docx
Copyright © 2000 Artemis Management SystemsCreating The Wo.docxCopyright © 2000 Artemis Management SystemsCreating The Wo.docx
Copyright © 2000 Artemis Management SystemsCreating The Wo.docx
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft project
 
Untitled document (24).pdf
Untitled document (24).pdfUntitled document (24).pdf
Untitled document (24).pdf
 
Top 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers MakeTop 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers Make
 
WBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptxWBS-final-1.Project Management and Ethics.pptx
WBS-final-1.Project Management and Ethics.pptx
 
WORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCE
WORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCEWORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCE
WORK BREAKDOWN STRUCTURE, JOB LAYOUT & LINE OF BALANCE
 
1
11
1
 
Work Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptxWork Breakdown Structure Aritrya Kumar.pptx
Work Breakdown Structure Aritrya Kumar.pptx
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran j
 
Chapter 4 slides
Chapter 4 slidesChapter 4 slides
Chapter 4 slides
 
Final_Module_2.ppt
Final_Module_2.pptFinal_Module_2.ppt
Final_Module_2.ppt
 
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
 
Describe different ways to develop a WBS and explain why it is often s.docx
Describe different ways to develop a WBS and explain why it is often s.docxDescribe different ways to develop a WBS and explain why it is often s.docx
Describe different ways to develop a WBS and explain why it is often s.docx
 
Lect 3 wbs&obs
Lect 3 wbs&obs Lect 3 wbs&obs
Lect 3 wbs&obs
 
Vb tutorial
Vb tutorialVb tutorial
Vb tutorial
 
Vb tutorial
Vb tutorialVb tutorial
Vb tutorial
 
Project management with ms project 2007
Project management with ms project 2007Project management with ms project 2007
Project management with ms project 2007
 

More from project management

More from project management (10)

Wbs Building Use This
Wbs Building Use ThisWbs Building Use This
Wbs Building Use This
 
Excel Project Management
Excel Project ManagementExcel Project Management
Excel Project Management
 
Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Plan
 
Chap 5 Estimating Project Times
Chap 5 Estimating Project TimesChap 5 Estimating Project Times
Chap 5 Estimating Project Times
 
Chap 4 Defining A Project
Chap 4 Defining A ProjectChap 4 Defining A Project
Chap 4 Defining A Project
 
Chap 3 Organization Structure
Chap 3 Organization StructureChap 3 Organization Structure
Chap 3 Organization Structure
 
Project Initiation Process
Project Initiation ProcessProject Initiation Process
Project Initiation Process
 
Project Management Techniques
Project Management TechniquesProject Management Techniques
Project Management Techniques
 
Chap 1 Modern Project Management
Chap 1 Modern Project ManagementChap 1 Modern Project Management
Chap 1 Modern Project Management
 
Chap 2 Organization Strategy
Chap 2 Organization StrategyChap 2 Organization Strategy
Chap 2 Organization Strategy
 

Recently uploaded

Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 

Recently uploaded (20)

Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 

Work Breakdown Structure

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.

Editor's Notes

  1. Same graphic from previous page.
  2. Same graphic from previous page.
  3. Picture of people building a house.
  4. Picture of a house with the name ACME House WBS to the right. There is a box with the ACME Housing Corporation in it with the WBS code number 1. This is relating to the Level 1 of the WBS.
  5. This graphic builds on the graphic from the previous page. There is a box with the ACME Housing Corporation in it with the WBS code number 1. This is relating to the Level 1 of the WBS. There is a box below that one with the title of house and the WBS code number 1.1. This is relating to the Level 2 of the WBS.
  6. This graphic builds on the graphic from the previous page. Beneath the house box are six boxes with Concrete 1.1.1, Framing 1.1.2, Plumbing 1.1.3, Electrical 1.1.4, Interior 1.1.5 and Roofing 1.1.6. These boxes represent Level 3 of our WBS.
  7. This graphic builds on the graphic from the previous page. Beneath the Level 3 boxes are Level 4 boxes which represent the task for this project. The Level 4 task are: Under Concrete, Pour Foundation 1.1.1.1, Install Patio 1.1.1.2, Pour Stairway 1.1.1.3. Under Framing, Frame Exterior Walls 1.1.2.1, Frame Interior Walls 1.1.2.2, Install Roofing Trusses 1.1.2.3. Under Plumbing, Install Water Lines 1.1.3.1, Install Gas Lines 1.1.3.2, Install B/K Fixtures 1.1.3.3. Under Electrical Install Wiring 1.1.4.1, Install Outlets/Switches 1.1.4.2, Install Fixtures 1.1.4.3. Under Interior, Install Drywall 1.1.5.1, Install Carpets 1.1.5.2, Painting 1.1.5.3. Under Roofing, Install Felt 1.1.6.1, Install Shingles 1.1.6.2, Install Vents 1.1.6.3.
  8. Same graphic from the previous page showing the WBS
  9. This is a picture of the organization chart for ACME Housing Corporation. The top of the Organizational chart starts with the project office. The next level down is the Civil, Structural, Electrical, and Plumbing departments. Beneath the Civil is the Concrete, Masonry and Testing departments. Beneath the Structural is the Carpentry, Roofing and Drywall departments. Beneath the Electrical is the Wiring and Hookup/Tie-in departments. Beneath the Plumbing is the Water/Sewer and Gas departments.
  10. This graphic is showing that the intersection of the WBS and OBS is the Responsibility Assignment Matrix. It shows the WBS from the previous pages and the OBS from the previous page. The OBS is sideways and to the left and below the WBS. This are arrows coming out of the bottom of both the WBS and OBS. Where the arrows from the WBS and OBS cross, there is the words Responsibility Assignment Matrix.
  11. This graphic represents a RAM. The lowest level of the WBS appears across the top. The lowest level of the OBS appears on the vertical axis. The vertical axis also lists the responsible manager. There is an x underneath WBS element and across from the OBS responsible for a given task.
  12. Same graphic from the previous page showing the RAM.
  13. This graphic is the same as the RAM on the previous page except that the x’s have been replaced with hours need for a given task