IMPLEMENTATION OF MIS
&
It’s METHOD
Why MIS ?
• During the growth of a competitive global environment, there is
considerable pressure on most organisations to make their operational,
tactical, and strategic process more efficient and effective.
• An information system (IS) is a group of components which can increase
the competitiveness and gain better information for decision making.
Consequently, many organisations decide to implement IS in order to
improve the effectiveness and efficiency of their organisations
• Information systems have become a major function area of business
administration. The systems, nowadays, plays a vital role in the e-business
and e-commerce operations, enterprise collaboration and management,
and strategic success of the business
MIS Implementation
• The implementation of new information systems is a significant
investment for organisations. Since information systems are
sociotechnical systems, development involves the joint design of
activity systems and ICT systems .
• This information system implementation process concept is similar to
a five-step process called the information systems development cycle
which includes the steps of:
(1) investigation; (2) analysis; (3) design;
(4) implementation; and (5) maintenance
WHAT is SDLC
Mainly used in Systems Engineering, Information Systems & Software
Engineering.
• A process of creating, or altering information systems, and the models
& methodologies used to develop the systems.
Stages/Phases in SDLC
• Systems Investigation
• Systems Analysis
• Systems Design
• Systems Development
• Systems Implementation
• Systems Maintenance
Model of SDLC
System Investigation
• Assesses feasibility and practicality of system
• Determine if a new system is needed
• Five primary tasks:
• 1. List problems, opportunities and directives
• 2. Negotiate preliminary scope
• 3. Assess project worth
• 4. Plan the project
• 5. Present the project and plan
System Analysis
• In depth study of old system and identifying
new system requirements
• Defines system from user's view
• Forms of analysis
• 1. Organisational Analysis
• 2. Analysis of Present System
• 3. Functional Requirements Analysis
System Design
• Design new/alternative system
• Specifies how the system will accomplish the objectives.
• Consists of design activities to be implemented
that was done earlier in the systems analysis stage
• Systems design consists of 4 major activities:
• 1.User Interface Design
• 2. Data Design
• 3. Process Design
• 4. System Specifications
System Development
• Build the system to the design specifications
• Develop the software
• 1. Purchase off-the-shelf software OR
• 2. Write custom software
• Acquire the hardware
• Test the new system
• 1. Module (unit) test - tests each part of system
• 2. Integration testing - tests system as one unit
• Create manuals for users and operators
System Implementation
• Installing the system
• Convert from old system to new system
• Train end users
• Compile final documentation
• Testing & Evaluating the new system
• Direct Approach
Direct installation of the new system with immediate discontinuance of
the old existing system is reffered as “cold turnkey” approach. This
approach becomes useful when these factors are considered.
1. The new system does no replace the existing system.
2. Old system is regarded absolutely of no value
3. New system is compact and simple.
4. The design of the new system is inexpensive with more advantages
and less risk involved.
• Parallel Approach
The selected new system is installed and operated with current system.
This method is expensive because of duplicating facilities and personal
to maintain both the systems. In this approach a target date must be
fixed when the operations of old system cease and new one will
operate on its own.
• Modular Approach
This is generally recognized as “Pilot approach”, means the
implementation of a system in the Organization on a piece-meal basis.
This has few advantages / merits
1. The risk of systems failure is localized
2. The major problem can be easily identified and corrected before
further implementation.
3. Operating personal can be trained before system is installed in a
location.
• Phase-in-Implementation
This approach is similar to modular method but it differs because of
segmentation of system, however, not the organization. It has
advantages that the rate of changes in a given Organization can be
totally minimized and the data processing resource can be acquired
gradually over a period of time. System exhibits certain disadvantages
such as limited applicability, more costs incurred to develop interface
with old system and a feeling in the Organization that system is never
completed.
Thank you

More Related Content

What's hot

Characteristic of management information system
Characteristic of management information systemCharacteristic of management information system
Characteristic of management information systemManoj Kumar
 
Business information system with explaination
Business information system with explainationBusiness information system with explaination
Business information system with explainationAlana Abraham
 
Functional information system
Functional  information systemFunctional  information system
Functional information systemamazing19
 
System development
System developmentSystem development
System developmentPraveen Minz
 
Management information systems
Management information systemsManagement information systems
Management information systemsnavin1
 
introduction to management information systems (MIS)
introduction to management information systems (MIS)introduction to management information systems (MIS)
introduction to management information systems (MIS)Sujan Oli
 
Sub systems of information system - MIS
Sub systems of information system - MISSub systems of information system - MIS
Sub systems of information system - MISSanaRiaz789
 
Unit 3 Management Information System
Unit 3 Management Information SystemUnit 3 Management Information System
Unit 3 Management Information SystemAbhishek Iyer
 
Executive information system ( eis )
Executive information system ( eis )Executive information system ( eis )
Executive information system ( eis )Puja Dhakal
 
Information system for strategic advantage
Information system for strategic advantageInformation system for strategic advantage
Information system for strategic advantageHarmanjeet Kaur
 
Transaction processing system
Transaction processing systemTransaction processing system
Transaction processing systemanjana1994
 
Decision Making and Information Systems
Decision Making and  Information SystemsDecision Making and  Information Systems
Decision Making and Information SystemsAriful Saimon
 
Development and Implementation of MIS and Information requirement
Development and Implementation of MIS and Information requirementDevelopment and Implementation of MIS and Information requirement
Development and Implementation of MIS and Information requirementMd Humayun Kobir
 

What's hot (20)

Characteristic of management information system
Characteristic of management information systemCharacteristic of management information system
Characteristic of management information system
 
Business information system with explaination
Business information system with explainationBusiness information system with explaination
Business information system with explaination
 
System concept in MIS
System concept in MISSystem concept in MIS
System concept in MIS
 
Functional information system
Functional  information systemFunctional  information system
Functional information system
 
Decision support system
Decision support systemDecision support system
Decision support system
 
System development
System developmentSystem development
System development
 
Management information systems
Management information systemsManagement information systems
Management information systems
 
introduction to management information systems (MIS)
introduction to management information systems (MIS)introduction to management information systems (MIS)
introduction to management information systems (MIS)
 
Executive Information System
Executive Information SystemExecutive Information System
Executive Information System
 
Sub systems of information system - MIS
Sub systems of information system - MISSub systems of information system - MIS
Sub systems of information system - MIS
 
Unit 3 Management Information System
Unit 3 Management Information SystemUnit 3 Management Information System
Unit 3 Management Information System
 
Executive information system ( eis )
Executive information system ( eis )Executive information system ( eis )
Executive information system ( eis )
 
Information system for strategic advantage
Information system for strategic advantageInformation system for strategic advantage
Information system for strategic advantage
 
Transaction processing system
Transaction processing systemTransaction processing system
Transaction processing system
 
Decision Making and Information Systems
Decision Making and  Information SystemsDecision Making and  Information Systems
Decision Making and Information Systems
 
Mis planning
Mis planningMis planning
Mis planning
 
Expert system (mis)
Expert system (mis)Expert system (mis)
Expert system (mis)
 
Transaction Processing System
Transaction Processing SystemTransaction Processing System
Transaction Processing System
 
Development and Implementation of MIS and Information requirement
Development and Implementation of MIS and Information requirementDevelopment and Implementation of MIS and Information requirement
Development and Implementation of MIS and Information requirement
 
Mis model
Mis modelMis model
Mis model
 

Similar to Implementation of MIS and its methods

Lesson 9 system develpment life cycle
Lesson 9 system develpment life cycleLesson 9 system develpment life cycle
Lesson 9 system develpment life cycleOneil Powers
 
management system development and planning
management system development and planningmanagement system development and planning
management system development and planningmilkesa13
 
Information Systems For Management Strategies
Information Systems For Management StrategiesInformation Systems For Management Strategies
Information Systems For Management StrategiesSindhuKB
 
System Analysis And Design 2011
System Analysis And Design  2011System Analysis And Design  2011
System Analysis And Design 2011tgushi12
 
Planning, design and implementation of information systems
Planning, design and implementation of information systemsPlanning, design and implementation of information systems
Planning, design and implementation of information systemsOnline
 
2015-HNDIT1212 Lecture 3.pptx
2015-HNDIT1212  Lecture 3.pptx2015-HNDIT1212  Lecture 3.pptx
2015-HNDIT1212 Lecture 3.pptxusama537223
 
Part7-updated.pptx descrription of lectures
Part7-updated.pptx descrription of lecturesPart7-updated.pptx descrription of lectures
Part7-updated.pptx descrription of lecturesmohammedderriche2
 
PLANNING PHASE(1).pdf and designing phases
PLANNING PHASE(1).pdf and designing phasesPLANNING PHASE(1).pdf and designing phases
PLANNING PHASE(1).pdf and designing phaseshamdiabdrhman
 
2 approaches to system development
2 approaches to system development2 approaches to system development
2 approaches to system developmentcymark09
 
System development life cycle and Implementation of IS
System development life cycle and Implementation of ISSystem development life cycle and Implementation of IS
System development life cycle and Implementation of ISAbdullah Khosa
 
2 System development life cycle has six stages of creating a sys.docx
2 System development life cycle has six stages of creating a sys.docx2 System development life cycle has six stages of creating a sys.docx
2 System development life cycle has six stages of creating a sys.docxtamicawaysmith
 

Similar to Implementation of MIS and its methods (20)

Lesson 9 system develpment life cycle
Lesson 9 system develpment life cycleLesson 9 system develpment life cycle
Lesson 9 system develpment life cycle
 
Mis chapter 8
Mis chapter 8Mis chapter 8
Mis chapter 8
 
SDLC
SDLCSDLC
SDLC
 
management system development and planning
management system development and planningmanagement system development and planning
management system development and planning
 
Presentation2
Presentation2Presentation2
Presentation2
 
Information Systems For Management Strategies
Information Systems For Management StrategiesInformation Systems For Management Strategies
Information Systems For Management Strategies
 
System Analysis And Design 2011
System Analysis And Design  2011System Analysis And Design  2011
System Analysis And Design 2011
 
SDLC
SDLCSDLC
SDLC
 
system development life cycle
system development life cyclesystem development life cycle
system development life cycle
 
Planning, design and implementation of information systems
Planning, design and implementation of information systemsPlanning, design and implementation of information systems
Planning, design and implementation of information systems
 
2015-HNDIT1212 Lecture 3.pptx
2015-HNDIT1212  Lecture 3.pptx2015-HNDIT1212  Lecture 3.pptx
2015-HNDIT1212 Lecture 3.pptx
 
Part7-updated.pptx descrription of lectures
Part7-updated.pptx descrription of lecturesPart7-updated.pptx descrription of lectures
Part7-updated.pptx descrription of lectures
 
System analysis 1
System analysis 1System analysis 1
System analysis 1
 
PLANNING PHASE(1).pdf and designing phases
PLANNING PHASE(1).pdf and designing phasesPLANNING PHASE(1).pdf and designing phases
PLANNING PHASE(1).pdf and designing phases
 
Sad1
Sad1Sad1
Sad1
 
2 approaches to system development
2 approaches to system development2 approaches to system development
2 approaches to system development
 
SAD_SDLC.pptx
SAD_SDLC.pptxSAD_SDLC.pptx
SAD_SDLC.pptx
 
System development life cycle and Implementation of IS
System development life cycle and Implementation of ISSystem development life cycle and Implementation of IS
System development life cycle and Implementation of IS
 
Building information systems
Building information systemsBuilding information systems
Building information systems
 
2 System development life cycle has six stages of creating a sys.docx
2 System development life cycle has six stages of creating a sys.docx2 System development life cycle has six stages of creating a sys.docx
2 System development life cycle has six stages of creating a sys.docx
 

More from Poojith Chowdhary (20)

Voltage multiplier
Voltage multiplierVoltage multiplier
Voltage multiplier
 
THE LIGHT EMITTING DIODE
THE LIGHT EMITTING DIODETHE LIGHT EMITTING DIODE
THE LIGHT EMITTING DIODE
 
High k dielectric
High k dielectricHigh k dielectric
High k dielectric
 
The science of thought
The science of thoughtThe science of thought
The science of thought
 
Child prodigy,savant and late boomers
Child prodigy,savant and late boomersChild prodigy,savant and late boomers
Child prodigy,savant and late boomers
 
Us wireless cable television
Us wireless cable televisionUs wireless cable television
Us wireless cable television
 
1116297 634468886714442500
1116297 6344688867144425001116297 634468886714442500
1116297 634468886714442500
 
Photo transistors
Photo transistorsPhoto transistors
Photo transistors
 
8086 micro processor
8086 micro processor8086 micro processor
8086 micro processor
 
8051 micro controller
8051 micro controller8051 micro controller
8051 micro controller
 
8085 micro processor
8085 micro processor8085 micro processor
8085 micro processor
 
Quantum mechanics
Quantum mechanicsQuantum mechanics
Quantum mechanics
 
Function generator
Function generatorFunction generator
Function generator
 
Resistors
ResistorsResistors
Resistors
 
The new seven wonders of the world
The new seven wonders of the worldThe new seven wonders of the world
The new seven wonders of the world
 
Data structures & algorithms lecture 3
Data structures & algorithms lecture 3Data structures & algorithms lecture 3
Data structures & algorithms lecture 3
 
Abstract data types
Abstract data typesAbstract data types
Abstract data types
 
The new seven wonders of the world
The new seven wonders of the worldThe new seven wonders of the world
The new seven wonders of the world
 
Animal lifecycles
Animal lifecyclesAnimal lifecycles
Animal lifecycles
 
Resistors
ResistorsResistors
Resistors
 

Recently uploaded

VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Alex Marques
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningCIToolkit
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 

Recently uploaded (20)

Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 

Implementation of MIS and its methods

  • 2. Why MIS ? • During the growth of a competitive global environment, there is considerable pressure on most organisations to make their operational, tactical, and strategic process more efficient and effective. • An information system (IS) is a group of components which can increase the competitiveness and gain better information for decision making. Consequently, many organisations decide to implement IS in order to improve the effectiveness and efficiency of their organisations • Information systems have become a major function area of business administration. The systems, nowadays, plays a vital role in the e-business and e-commerce operations, enterprise collaboration and management, and strategic success of the business
  • 3. MIS Implementation • The implementation of new information systems is a significant investment for organisations. Since information systems are sociotechnical systems, development involves the joint design of activity systems and ICT systems . • This information system implementation process concept is similar to a five-step process called the information systems development cycle which includes the steps of: (1) investigation; (2) analysis; (3) design; (4) implementation; and (5) maintenance
  • 4. WHAT is SDLC Mainly used in Systems Engineering, Information Systems & Software Engineering. • A process of creating, or altering information systems, and the models & methodologies used to develop the systems.
  • 5. Stages/Phases in SDLC • Systems Investigation • Systems Analysis • Systems Design • Systems Development • Systems Implementation • Systems Maintenance
  • 7. System Investigation • Assesses feasibility and practicality of system • Determine if a new system is needed • Five primary tasks: • 1. List problems, opportunities and directives • 2. Negotiate preliminary scope • 3. Assess project worth • 4. Plan the project • 5. Present the project and plan
  • 8. System Analysis • In depth study of old system and identifying new system requirements • Defines system from user's view • Forms of analysis • 1. Organisational Analysis • 2. Analysis of Present System • 3. Functional Requirements Analysis
  • 9. System Design • Design new/alternative system • Specifies how the system will accomplish the objectives. • Consists of design activities to be implemented that was done earlier in the systems analysis stage • Systems design consists of 4 major activities: • 1.User Interface Design • 2. Data Design • 3. Process Design • 4. System Specifications
  • 10. System Development • Build the system to the design specifications • Develop the software • 1. Purchase off-the-shelf software OR • 2. Write custom software • Acquire the hardware • Test the new system • 1. Module (unit) test - tests each part of system • 2. Integration testing - tests system as one unit • Create manuals for users and operators
  • 11. System Implementation • Installing the system • Convert from old system to new system • Train end users • Compile final documentation • Testing & Evaluating the new system
  • 12.
  • 13. • Direct Approach Direct installation of the new system with immediate discontinuance of the old existing system is reffered as “cold turnkey” approach. This approach becomes useful when these factors are considered. 1. The new system does no replace the existing system. 2. Old system is regarded absolutely of no value 3. New system is compact and simple. 4. The design of the new system is inexpensive with more advantages and less risk involved.
  • 14. • Parallel Approach The selected new system is installed and operated with current system. This method is expensive because of duplicating facilities and personal to maintain both the systems. In this approach a target date must be fixed when the operations of old system cease and new one will operate on its own.
  • 15. • Modular Approach This is generally recognized as “Pilot approach”, means the implementation of a system in the Organization on a piece-meal basis. This has few advantages / merits 1. The risk of systems failure is localized 2. The major problem can be easily identified and corrected before further implementation. 3. Operating personal can be trained before system is installed in a location.
  • 16. • Phase-in-Implementation This approach is similar to modular method but it differs because of segmentation of system, however, not the organization. It has advantages that the rate of changes in a given Organization can be totally minimized and the data processing resource can be acquired gradually over a period of time. System exhibits certain disadvantages such as limited applicability, more costs incurred to develop interface with old system and a feeling in the Organization that system is never completed.
  • 17.