Selecting the current
rating
of an RCD
1 Revision 01
AS/NZS 3000:2007 (Amendment 2)
3 Revision 01
To Calculate the loading for the lighting portion of the installation use
Load group A (i) - lighting
• A lighting point is where the
fixed wiring terminates
• E.g. a twin Fluorescent light
fitting is counted as one
point ClipsalClipsal
4 Revision 01
Load group A - lighting
Loading is calculated on the basis of:
–Average size lamp
–Not all lights will be on at the same
time
–As part of the overall diversity of the
installation
Lighting
For example if a domestic installation has 46 lights this equals 46 points
Using the above table A(i) allows:
3 A for the first 20 points (1 to 20)
2 A for the next 20 points (21 to 40
2 A for the remaining 6 points (41 to 60)
7 A total maximum demand for A(i)
Load group A – lighting
Particular attention must be paid to the footnotes when
using table C1
To Calculate the loading for the lighting portion of the
installation use
Load group B – socket outlets
• Load group B covers All
socket outlets for
general purpose use
• Permanently connected
equipment not covered
in other load groups
• One point represents
one outlet
• E.g. a 4 gang outlet is
equal to 4 points
ClipsalClipsal
8 Revision 01
If an installation has 10 double and 12 single socket outlets the
maximum demand would be
10 x double outlets = 20 point + 12 single outlets = 32 points
B(i) allows
10A for first 20 outlets (1 to 20)
5A for next 12 outlets (21 to 40)
Total demand = 15A for this portion of the installation.
Example 2.1
To calculate the
current rating of
this RCD the
maximum demand
of this portion of
the installation
must be calculated
using Table C1
From the switchboard schedule in example 2.1
CCT 4 has 12 points (socket outlets)
CCT 5 has 13 points (socket outlets)
CCT 6 has 20 lighting points
Note: Individual final sub circuit loadings calculated
using table C8 are not used to calculate the maximum
demand of a portion of an installation.
Maximum demand for this portion of the installation
Step 1; calculate the socket outlets maximum demand using Table C1
Total points = (CCT 4),12 points + (CCT 5),13 points = 25 points for this portion of the
installation
Maximum demand calculation
10A for first 20 points (1 to 20)
5A for next 5 points (21 to 40)
15A is the maximum demand for the sockets outlets in this portion of the
installation
12 Revision 01
Step 2; calculate the lighting maximum demand using Table C1
CCT 6 = 20 points
Maximum demand calculation A(i)
3A for first 20 points therefore maximum demand for the lighting of this portion of
the installation = 3A
Step 3 add the socket outlet max demand 15A to the lighting max demand 3A the total
maximum demand of this portion of this installation is 18 Amps
AS/NZS:3000:2007 Clause 2.6.2.1 General
Any device for the provision of additional protection shall be capable of interrupting the part
of the circuit protected by the device when an earth leakage current is above a
predetermined value.
The load current rating of an RCD shall be not less than the greater of the following—
(a) the maximum demand of the portion of the electrical installation being protected by the
device; or
(b) the highest current rating of any overload protective device on the portion of the electrical
installation being protected.
As the calculated maximum demand for the portion of the installation
being protected by the first RCD has been calculated to be 18A and the
highest rated circuit breaker being protected by the RCD is 20A the RCD
must have a minimum current rating of 20A
If the maximum demand was calculated to be above 20A then the
maximum demand value would be the minimum RCD rating

More Related Content

What's hot

Protection against overvoltage
Protection against overvoltageProtection against overvoltage
Protection against overvoltagevishalgohel12195
 
Unsymmetrical fault in transmission line
Unsymmetrical fault in transmission lineUnsymmetrical fault in transmission line
Unsymmetrical fault in transmission linevishalgohel12195
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvementharshal567
 
Power system fault analysis ppt
Power system fault analysis pptPower system fault analysis ppt
Power system fault analysis pptkarikalan123
 
Symmetrical components
Symmetrical componentsSymmetrical components
Symmetrical componentsSirat Mahmood
 
Earthing Arrangements 17th
Earthing  Arrangements 17thEarthing  Arrangements 17th
Earthing Arrangements 17thPaul Holden
 
Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment Pritesh Priyadarshi
 
importance of reactive power in power system
importance of reactive power in power systemimportance of reactive power in power system
importance of reactive power in power systemsneh pratap singh
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CTParth Patel
 
Power System Operation and Control
Power System Operation and ControlPower System Operation and Control
Power System Operation and ControlBiswajit Pratihari
 
Power Factor
Power FactorPower Factor
Power FactorTim Cohen
 
Sag in overhead transmission line, sag calculation & string chart
Sag in overhead transmission line, sag   calculation & string chartSag in overhead transmission line, sag   calculation & string chart
Sag in overhead transmission line, sag calculation & string chartvishalgohel12195
 
Equivalent Circuit, Phasor Diagram, Power Factor Control , V & Inverted V Cur...
Equivalent Circuit, Phasor Diagram, Power Factor Control , V & Inverted V Cur...Equivalent Circuit, Phasor Diagram, Power Factor Control , V & Inverted V Cur...
Equivalent Circuit, Phasor Diagram, Power Factor Control , V & Inverted V Cur...Citharthan Durairaj
 
Instrument transformer CT & PT
Instrument transformer CT & PTInstrument transformer CT & PT
Instrument transformer CT & PTChandan Singh
 

What's hot (20)

Protection against overvoltage
Protection against overvoltageProtection against overvoltage
Protection against overvoltage
 
Two area system
Two area systemTwo area system
Two area system
 
Energy management by maximum demand controller
Energy management by maximum demand controllerEnergy management by maximum demand controller
Energy management by maximum demand controller
 
Load flow study
Load flow studyLoad flow study
Load flow study
 
Unsymmetrical fault in transmission line
Unsymmetrical fault in transmission lineUnsymmetrical fault in transmission line
Unsymmetrical fault in transmission line
 
Inductance and capacitance
Inductance and capacitanceInductance and capacitance
Inductance and capacitance
 
Neutral grounding
Neutral groundingNeutral grounding
Neutral grounding
 
How capacitor bank works
How capacitor bank worksHow capacitor bank works
How capacitor bank works
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
Power system fault analysis ppt
Power system fault analysis pptPower system fault analysis ppt
Power system fault analysis ppt
 
Symmetrical components
Symmetrical componentsSymmetrical components
Symmetrical components
 
Earthing Arrangements 17th
Earthing  Arrangements 17thEarthing  Arrangements 17th
Earthing Arrangements 17th
 
Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment Economic operation of Power systems by Unit commitment
Economic operation of Power systems by Unit commitment
 
importance of reactive power in power system
importance of reactive power in power systemimportance of reactive power in power system
importance of reactive power in power system
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CT
 
Power System Operation and Control
Power System Operation and ControlPower System Operation and Control
Power System Operation and Control
 
Power Factor
Power FactorPower Factor
Power Factor
 
Sag in overhead transmission line, sag calculation & string chart
Sag in overhead transmission line, sag   calculation & string chartSag in overhead transmission line, sag   calculation & string chart
Sag in overhead transmission line, sag calculation & string chart
 
Equivalent Circuit, Phasor Diagram, Power Factor Control , V & Inverted V Cur...
Equivalent Circuit, Phasor Diagram, Power Factor Control , V & Inverted V Cur...Equivalent Circuit, Phasor Diagram, Power Factor Control , V & Inverted V Cur...
Equivalent Circuit, Phasor Diagram, Power Factor Control , V & Inverted V Cur...
 
Instrument transformer CT & PT
Instrument transformer CT & PTInstrument transformer CT & PT
Instrument transformer CT & PT
 

Similar to Max demand

L08 power amplifier (class a)
L08 power amplifier (class a)L08 power amplifier (class a)
L08 power amplifier (class a)hasanen22
 
cable sizing.ppt
cable sizing.pptcable sizing.ppt
cable sizing.pptChadWood16
 
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDEsolpowerpeople
 
Tibre table of contents
Tibre table of contentsTibre table of contents
Tibre table of contentsxquitah
 
RF Module Design - [Chapter 6] Power Amplifier
RF Module Design - [Chapter 6]  Power AmplifierRF Module Design - [Chapter 6]  Power Amplifier
RF Module Design - [Chapter 6] Power AmplifierSimen Li
 
Designing an Uninterruptible Power Supply
Designing an Uninterruptible Power SupplyDesigning an Uninterruptible Power Supply
Designing an Uninterruptible Power SupplyLeonardo ENERGY
 
امتحان جهد عالي 2016
امتحان  جهد عالي  2016امتحان  جهد عالي  2016
امتحان جهد عالي 2016Eslam Elfayoumy
 
امتحان جهد عالي 2015-2016
امتحان جهد عالي 2015-2016امتحان جهد عالي 2015-2016
امتحان جهد عالي 2015-2016eslam elfayoumy
 
finAL 4TH PRESENATION 2
finAL 4TH PRESENATION 2finAL 4TH PRESENATION 2
finAL 4TH PRESENATION 2Hamza Ahmad
 
Standalone PV plant sizing guide
Standalone PV plant sizing guideStandalone PV plant sizing guide
Standalone PV plant sizing guideHashim Hasnain Hadi
 
Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...
Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...
Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...IRJET Journal
 
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...IRJET Journal
 
H09 Building Level Design
H09 Building Level DesignH09 Building Level Design
H09 Building Level Designphase3-120A
 
Solar power mppt controller
Solar power mppt controllerSolar power mppt controller
Solar power mppt controllerTung Huynh
 
Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004michaeljmack
 
Poweramplifiers 170726051202
Poweramplifiers 170726051202Poweramplifiers 170726051202
Poweramplifiers 170726051202raju reddy
 
Igbt gate driver power supply flyback converter
Igbt gate driver power supply flyback converterIgbt gate driver power supply flyback converter
Igbt gate driver power supply flyback converterKunwar Aditya
 

Similar to Max demand (20)

L08 power amplifier (class a)
L08 power amplifier (class a)L08 power amplifier (class a)
L08 power amplifier (class a)
 
cable sizing.ppt
cable sizing.pptcable sizing.ppt
cable sizing.ppt
 
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
#SolarMOOC Random Problems from 2009 NABCEP STUDY GUIDE
 
Tibre table of contents
Tibre table of contentsTibre table of contents
Tibre table of contents
 
RF Module Design - [Chapter 6] Power Amplifier
RF Module Design - [Chapter 6]  Power AmplifierRF Module Design - [Chapter 6]  Power Amplifier
RF Module Design - [Chapter 6] Power Amplifier
 
Designing an Uninterruptible Power Supply
Designing an Uninterruptible Power SupplyDesigning an Uninterruptible Power Supply
Designing an Uninterruptible Power Supply
 
امتحان جهد عالي 2016
امتحان  جهد عالي  2016امتحان  جهد عالي  2016
امتحان جهد عالي 2016
 
امتحان جهد عالي 2015-2016
امتحان جهد عالي 2015-2016امتحان جهد عالي 2015-2016
امتحان جهد عالي 2015-2016
 
finAL 4TH PRESENATION 2
finAL 4TH PRESENATION 2finAL 4TH PRESENATION 2
finAL 4TH PRESENATION 2
 
Standalone PV plant sizing guide
Standalone PV plant sizing guideStandalone PV plant sizing guide
Standalone PV plant sizing guide
 
K2917.pptx
K2917.pptxK2917.pptx
K2917.pptx
 
Olano
OlanoOlano
Olano
 
Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...
Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...
Series Voltage Compensator Modeling and Design for Reduction of Grid-Tie Sola...
 
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...
IRJET-Comparative Analysis of Rectangular and Square Column for Axial loading...
 
H09 Building Level Design
H09 Building Level DesignH09 Building Level Design
H09 Building Level Design
 
Solar power mppt controller
Solar power mppt controllerSolar power mppt controller
Solar power mppt controller
 
Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004
 
Poweramplifiers 170726051202
Poweramplifiers 170726051202Poweramplifiers 170726051202
Poweramplifiers 170726051202
 
Power amplifiers
Power amplifiersPower amplifiers
Power amplifiers
 
Igbt gate driver power supply flyback converter
Igbt gate driver power supply flyback converterIgbt gate driver power supply flyback converter
Igbt gate driver power supply flyback converter
 

More from popet

Start stop circuit
Start stop circuitStart stop circuit
Start stop circuitpopet
 
3 phase motors 1
3 phase motors 13 phase motors 1
3 phase motors 1popet
 
Earth fault loop
Earth fault loopEarth fault loop
Earth fault looppopet
 
E104 B Topic 1
E104 B Topic 1E104 B Topic 1
E104 B Topic 1popet
 
E104 B Topic 1
E104 B Topic 1E104 B Topic 1
E104 B Topic 1popet
 
Transducers
TransducersTransducers
Transducerspopet
 
Inverters
InvertersInverters
Inverterspopet
 
Power control devices
Power control devicesPower control devices
Power control devicespopet
 
Voltage regulation
Voltage regulationVoltage regulation
Voltage regulationpopet
 
Filter circuits
Filter circuitsFilter circuits
Filter circuitspopet
 
Session 2 & 3 rectifiers
Session 2 & 3 rectifiersSession 2 & 3 rectifiers
Session 2 & 3 rectifierspopet
 
Session1semiconductors
Session1semiconductorsSession1semiconductors
Session1semiconductorspopet
 
Electrical Heating
Electrical HeatingElectrical Heating
Electrical Heatingpopet
 
E004B Topic 1
E004B Topic 1E004B Topic 1
E004B Topic 1popet
 
E003B multiples & si units
E003B multiples & si unitsE003B multiples & si units
E003B multiples & si unitspopet
 
E003B sources
E003B sourcesE003B sources
E003B sourcespopet
 
E003B current effects
E003B current effectsE003B current effects
E003B current effectspopet
 
E003B power
E003B powerE003B power
E003B powerpopet
 
E003B resistors
E003B  resistorsE003B  resistors
E003B resistorspopet
 
E003B protection devices
E003B protection devicesE003B protection devices
E003B protection devicespopet
 

More from popet (20)

Start stop circuit
Start stop circuitStart stop circuit
Start stop circuit
 
3 phase motors 1
3 phase motors 13 phase motors 1
3 phase motors 1
 
Earth fault loop
Earth fault loopEarth fault loop
Earth fault loop
 
E104 B Topic 1
E104 B Topic 1E104 B Topic 1
E104 B Topic 1
 
E104 B Topic 1
E104 B Topic 1E104 B Topic 1
E104 B Topic 1
 
Transducers
TransducersTransducers
Transducers
 
Inverters
InvertersInverters
Inverters
 
Power control devices
Power control devicesPower control devices
Power control devices
 
Voltage regulation
Voltage regulationVoltage regulation
Voltage regulation
 
Filter circuits
Filter circuitsFilter circuits
Filter circuits
 
Session 2 & 3 rectifiers
Session 2 & 3 rectifiersSession 2 & 3 rectifiers
Session 2 & 3 rectifiers
 
Session1semiconductors
Session1semiconductorsSession1semiconductors
Session1semiconductors
 
Electrical Heating
Electrical HeatingElectrical Heating
Electrical Heating
 
E004B Topic 1
E004B Topic 1E004B Topic 1
E004B Topic 1
 
E003B multiples & si units
E003B multiples & si unitsE003B multiples & si units
E003B multiples & si units
 
E003B sources
E003B sourcesE003B sources
E003B sources
 
E003B current effects
E003B current effectsE003B current effects
E003B current effects
 
E003B power
E003B powerE003B power
E003B power
 
E003B resistors
E003B  resistorsE003B  resistors
E003B resistors
 
E003B protection devices
E003B protection devicesE003B protection devices
E003B protection devices
 

Recently uploaded

Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateCannaBusinessPlans
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...NadhimTaha
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSpanmisemningshen123
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfbelieveminhh
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingNauman Safdar
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareWorkforce Group
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030tarushabhavsar
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified Binance Account
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 

Recently uploaded (20)

Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 

Max demand

  • 1. Selecting the current rating of an RCD 1 Revision 01
  • 3. 3 Revision 01 To Calculate the loading for the lighting portion of the installation use Load group A (i) - lighting • A lighting point is where the fixed wiring terminates • E.g. a twin Fluorescent light fitting is counted as one point ClipsalClipsal
  • 4. 4 Revision 01 Load group A - lighting Loading is calculated on the basis of: –Average size lamp –Not all lights will be on at the same time –As part of the overall diversity of the installation
  • 5. Lighting For example if a domestic installation has 46 lights this equals 46 points Using the above table A(i) allows: 3 A for the first 20 points (1 to 20) 2 A for the next 20 points (21 to 40 2 A for the remaining 6 points (41 to 60) 7 A total maximum demand for A(i)
  • 6. Load group A – lighting Particular attention must be paid to the footnotes when using table C1
  • 7. To Calculate the loading for the lighting portion of the installation use Load group B – socket outlets • Load group B covers All socket outlets for general purpose use • Permanently connected equipment not covered in other load groups • One point represents one outlet • E.g. a 4 gang outlet is equal to 4 points ClipsalClipsal
  • 8. 8 Revision 01 If an installation has 10 double and 12 single socket outlets the maximum demand would be 10 x double outlets = 20 point + 12 single outlets = 32 points B(i) allows 10A for first 20 outlets (1 to 20) 5A for next 12 outlets (21 to 40) Total demand = 15A for this portion of the installation.
  • 9.
  • 10. Example 2.1 To calculate the current rating of this RCD the maximum demand of this portion of the installation must be calculated using Table C1 From the switchboard schedule in example 2.1 CCT 4 has 12 points (socket outlets) CCT 5 has 13 points (socket outlets) CCT 6 has 20 lighting points Note: Individual final sub circuit loadings calculated using table C8 are not used to calculate the maximum demand of a portion of an installation.
  • 11. Maximum demand for this portion of the installation Step 1; calculate the socket outlets maximum demand using Table C1 Total points = (CCT 4),12 points + (CCT 5),13 points = 25 points for this portion of the installation Maximum demand calculation 10A for first 20 points (1 to 20) 5A for next 5 points (21 to 40) 15A is the maximum demand for the sockets outlets in this portion of the installation
  • 12. 12 Revision 01 Step 2; calculate the lighting maximum demand using Table C1 CCT 6 = 20 points Maximum demand calculation A(i) 3A for first 20 points therefore maximum demand for the lighting of this portion of the installation = 3A Step 3 add the socket outlet max demand 15A to the lighting max demand 3A the total maximum demand of this portion of this installation is 18 Amps
  • 13. AS/NZS:3000:2007 Clause 2.6.2.1 General Any device for the provision of additional protection shall be capable of interrupting the part of the circuit protected by the device when an earth leakage current is above a predetermined value. The load current rating of an RCD shall be not less than the greater of the following— (a) the maximum demand of the portion of the electrical installation being protected by the device; or (b) the highest current rating of any overload protective device on the portion of the electrical installation being protected. As the calculated maximum demand for the portion of the installation being protected by the first RCD has been calculated to be 18A and the highest rated circuit breaker being protected by the RCD is 20A the RCD must have a minimum current rating of 20A If the maximum demand was calculated to be above 20A then the maximum demand value would be the minimum RCD rating