From Allocation to Execution:
Best Practices
- Gensol Consultants Pvt Ltd
Project Allocations & Status
                                                              950 MW



                                    750 MW




           110 MW




  Rooftop and other small
                                Phase I of JNNSM
     solar power plants                                    Phase I & phase II of
                             covering plants of capacity
  connected of capacity up                                 Gujarat Solar Policy
                                 more than 5 MW
          to 2 MW
Project Allocations & Status
                                                             950 MW



                                   750 MW




          110 MW




  Rooftop and other small
                  of the total projects JNNSM Financial Closures II of
                                 Phase I of have
                                                          Phase I & phase in
  1/3rd
     solar power plants

          to 2 MW
                  place
                              covering plants of capacity
  connected of capacity up and EPC Contractors finalized. Solar Policy
                                  more than 5 MW
                                                          Gujarat
The Process Flow



                         Detailed           Vetting of           Plant
                      Project Report        Drawings          Commissioning




 Allocation                                                              Execution




                 Land             Contractor              Onsite
              Finalization        Finalization           Monitoring
Land Finalization

                       Parameter                                 Purpose
  IMPORTANT




              Metrological Resource Assessment                Energy Generation
                                                             Capacity of substation
                     Nearest Substation                       Availability of feeder
                                                             Transmission Losses
                     Accessibility to site                Ease of Delivery of materials
                      Water Availability             Water requirement during construction
                       Nearby Terrain                           Shadow Effects
                      Site Topography             To analyze the water blockage problems and
                                                       placement of mounting structures
                   Availability of Manpower         For Construction and subsequent O&M
                         GPS Survey                               Site Layout
                        Storm History                            Dust Losses
                                                         Mounting Structure Strength
                         Type of Soil              To analyze the resistivity and load bearing
                                                                capacity of soil
                Construction power availability     Power Requirement during construction
Detailed Project Report

      Why is it
      Contents required?



       •    Site Analysis and Solar radiation resource assessment
       •    Prefeasibility Analysis
       •    Technology Selection : Solar PV modules and BoS
       •    Acts as a Reference / Guidance Document
       •    Plant and Machinery (Solar PV array and Electrical System)
       •    As an instrument for Financial Closure
       •    Civil and Architectural requirement for the project
       •    Necessary for claiming Carbon Credits
       •    Annual energy generation from power plant
       •    System Schematics
       •    Power plant operation and maintenance
       •    Project implementation and schedule
       •    Project Financials
       •    Risk Analysis
Detailed Project Report

      Contents



       •    Site Analysis and Solar radiation resource assessment
       •    Technology Selection : Solar PV modules and BoS
       •    Plant and Machinery (Solar PV array and Electrical System)
       •    Civil and Architectural requirement for the project
       •    Annual energy generation from power plant
       •    System Schematics
       •    Power plant operation and maintenance
       •    Project implementation and schedule
       •    Project Financials
       •    Risk Analysis
EPC Contractor Finalization

            Release                   Shortlisting &                   Contract
             of RfP                    Finalization                    Design


   •  Defining Exhaustive Scope of Work with well defined Quality Criteria
       •     Designing – Engineering Calculations, Site Layout and System Sizing
       •     Civil – Leveling, Foundations, Mounting Structures, Control Room etc.
       •     Electrical – Solar Panels, Inverters, Switchyard, Monitoring etc.
       •     Testing – Performance Acceptance/Guarantee Test
       •     Operation & Maintenance – Comprehensive Maintenance & Guarantees



   •  Arranging and coordinating pre/post bid meetings for clarification to the
      queries of bidders.
EPC Contractor Finalization

          Release                Shortlisting &               Contract
           of RfP                 Finalization                Design



   •    Defining Criteria for Comparison
   •    Determination of Minimum Qualification Criteria
   •    Assigning Weightage to Parameters
   •    Preparing Comprehensive Scoring Sheet
   •    Arriving at Final Scores for Responses from EPC Contractors
   •    Drawing Project Implementation & Drawdown Schedule
   •    Conducting Background Checks on Tie-ups for Equipment Supply
   •    Conducting Rounds of Negotiation
EPC Contractor Finalization

         Release                     Shortlisting &                     Contract
          of RfP                      Finalization                      Design

                               Parameters for Judgment

   Equipment
   Type | Market Presence | Efficiency | Adherence to Standards | Rate of Degradation


   EPC Contractor
   Experience in India and abroad | EPC & O&M Cost | Manpower Experience &
   Availability | Type & Extent of Guarantees Offered


   Other Parameters
   Office in India | Collaboration with International EPC Company
EPC Contractor Finalization

           Release                     Shortlisting &                   Contract
            of RfP                      Finalization                     Design

  Format

  3 separate contracts are typically drawn to reduce tax burden:

  1.  Supplies Contract
  2.  Services Contract
  3.  Operation & Maintenance Contract

  Further, Supplies Contract can be broken down into Import Supplies for Inverters and
  modules and Domestic Supplies for the rest of the BoS.
EPC Contractor Finalization

          Release                 Shortlisting &                 Contract
           of RfP                  Finalization                   Design
  Contents Snapshot

  •  General Terms of Agreement         •  Variations & Adjustments

  •  Special Terms of Agreement         •  Termination

  •  Payment Milestones                 •  Warranties

  •  Liquidated Damages                 •  Force Majeure

  •  Insurance                          •  Guarantees
                                            •  Performance Bank Guarantee
  •  Defects Liability                      •  Advance Bank Guarantee
                                            •  Minimum Energy Generation –
                                               Bank Guarantee
Vetting of Drawings & Design

                        Drawing                                      Purpose
                        Site Layout                             Avoid Shading Losses
                 Module Mounting Structure         Strength to withstand mechanical and wind loads
                                                      Zinc Coating for 25 year corrosion free life
                                                    Control Panel, Living Accommodation, Pantry,
  CIVIL




                Main Control Room Building                          Bathrooms etc.
                                                     To ensure proper strength of foundations for
                        Switchyard                        transformers and other equipment
               Water Pipes & Drainage Layout                    To avoid water logging
               Approach Roads & Pathways           To ensure proper access to all parts of the plant
                     Equipment Layout                         To minimize system losses
  ELECTRICAL




                       System Sizing
               (Cables, Inverters, Switchyard)     For efficient working while ensuring redundancy
                          Earthing                     To ensure safety of man and equipment
                    Single Line Diagram          To comprehend the fundamental structure of the plant
Onsite Monitoring

                              Quality
                              Control




              Claims &                      Reporting
                Bills                      Methodology




                            Monitoring



              Document
              control and                     Factory
                                            Inspection
             management



                            Compliance
                            to standards
Commissioning of Plant

              Commissioning                                    Evacuation



  •  Validating actual generation against guaranteed generation
  •  Validating the technical parameters of equipment
  •  Preparation of final acceptance tests
  •  Conducting performance tests after successful commissioning
  •  Schedule for periodic checks
  •  Preparation of annual maintenance contract along with final list of spares and tools
Commissioning of Plant

               Commissioning                                  Evacuation

  •  Liasoning and approvals from authorized government bodies


  •  The following need to be communicated and finalized with the state utlities:
       •  Laying of transmission lines
       •  ABT meters
       •  Evacuation infrastructure
       •  Grid availability
       •  Dedicated feeder
       •  Evacuation point
Ideal Timeline
           Project Activities                 1   2   3   4   5   6   7   8

 Completion of site visit and due diligence

 Bid Management

 EPC contractor finalization

 Vettings of designs and drawings

 Contract drafting

 Commissioning of 25% of Project

 Commissioning of 50% of Project

 Commissioning of 75% of Project

 Commissioning of 100% of Project

 Testing and Handing Over

 Evacuation arrangement
Take Away


   It takes only 2% change in PLF to take a project from state of art to
  disastrous and vice versa, please make sure you are on the right side
                             of this change.




                         THANK YOU
Contact Us:
      Gensol Consultants Pvt Ltd
      14 - 15, 2nd Floor, Camps Corner – 2,
      Opp. Auda Garden, Prahladnagar,
      Ahmedabad – 380015, GUJARAT

       W: www.gensolsolar.com
       E: solar@gensolconsultants.com
       Ph: +91-79-39122200

More Related Content

What's hot

Drawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsDrawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsGensol Engineering Limited
 
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Gensol Engineering Limited
 
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Engineering Limited
 
Solar Project Financing
Solar Project FinancingSolar Project Financing
Solar Project Financingfirstgreen
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantVignesh Sekar
 
Solar Panel Installation Proposal PowerPoint Presentation Slides
Solar Panel Installation Proposal PowerPoint Presentation SlidesSolar Panel Installation Proposal PowerPoint Presentation Slides
Solar Panel Installation Proposal PowerPoint Presentation SlidesSlideTeam
 
Solar Power Project Development
Solar Power Project DevelopmentSolar Power Project Development
Solar Power Project Developmentfirstgreen
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantShahbaz Makandar A.
 
SOLAR SITE SURVEY ROOFTOP
SOLAR SITE SURVEY ROOFTOPSOLAR SITE SURVEY ROOFTOP
SOLAR SITE SURVEY ROOFTOPMurugappa Group
 
Rooftop PV System Shubham Gaurav
Rooftop PV System Shubham GauravRooftop PV System Shubham Gaurav
Rooftop PV System Shubham GauravShubham Gaurav
 
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Gensol Engineering Limited
 
1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and TrackingATUL RAJ
 
Attracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PVAttracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PVEversheds Sutherland
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Ashish Verma
 

What's hot (20)

Drawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsDrawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar Projects
 
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects
 
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
 
Solar Project Financing
Solar Project FinancingSolar Project Financing
Solar Project Financing
 
MS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation ScheduleMS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation Schedule
 
Gensol Permits Procurement Services
Gensol Permits Procurement ServicesGensol Permits Procurement Services
Gensol Permits Procurement Services
 
Gensol - EPC Services
Gensol - EPC ServicesGensol - EPC Services
Gensol - EPC Services
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
 
Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
 
Solar Panel Installation Proposal PowerPoint Presentation Slides
Solar Panel Installation Proposal PowerPoint Presentation SlidesSolar Panel Installation Proposal PowerPoint Presentation Slides
Solar Panel Installation Proposal PowerPoint Presentation Slides
 
Phases of Construction - Solar Project
Phases of Construction - Solar ProjectPhases of Construction - Solar Project
Phases of Construction - Solar Project
 
Solar Power Project Development
Solar Power Project DevelopmentSolar Power Project Development
Solar Power Project Development
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
 
Study of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plantStudy of Large Scale Grid interactive Solar PV power plant
Study of Large Scale Grid interactive Solar PV power plant
 
SOLAR SITE SURVEY ROOFTOP
SOLAR SITE SURVEY ROOFTOPSOLAR SITE SURVEY ROOFTOP
SOLAR SITE SURVEY ROOFTOP
 
Rooftop PV System Shubham Gaurav
Rooftop PV System Shubham GauravRooftop PV System Shubham Gaurav
Rooftop PV System Shubham Gaurav
 
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
 
1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking
 
Attracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PVAttracting and Maintaining Institutional Investment: Solar PV
Attracting and Maintaining Institutional Investment: Solar PV
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
 

Similar to Solar Photovoltaic Power Plant: Best Practices

Kenergy Infrapresentation(Aravind Format) (1)
Kenergy Infrapresentation(Aravind Format) (1)Kenergy Infrapresentation(Aravind Format) (1)
Kenergy Infrapresentation(Aravind Format) (1)anjumehrotra
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limitedHimanshu9974
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBShiva Y Cmath
 
Owner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilitiesOwner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilitiesGensol Engineering Limited
 
Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Kiran Singh
 
Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02jitendra kumar biswas
 
Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Exergy
 
Hyperion Power Ans 18 Nov09
Hyperion Power Ans 18 Nov09Hyperion Power Ans 18 Nov09
Hyperion Power Ans 18 Nov09myatom
 
Rajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesRajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesExergy
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstaramol bakane
 
Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010Ngy Ea
 
Standard Solar - Corporate Overview
Standard Solar - Corporate OverviewStandard Solar - Corporate Overview
Standard Solar - Corporate OverviewAndrew Maus
 
Suryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects SpecialistSuryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects SpecialistRatnakar Sortur
 
Ozone - Solar Business
Ozone - Solar BusinessOzone - Solar Business
Ozone - Solar BusinessSetu Goyal
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineernomanqudrat
 

Similar to Solar Photovoltaic Power Plant: Best Practices (20)

Presentation 1
Presentation 1Presentation 1
Presentation 1
 
Kenergy Infrapresentation(Aravind Format) (1)
Kenergy Infrapresentation(Aravind Format) (1)Kenergy Infrapresentation(Aravind Format) (1)
Kenergy Infrapresentation(Aravind Format) (1)
 
Cymi Ecourja
Cymi EcourjaCymi Ecourja
Cymi Ecourja
 
EPC Services Capability Tra International limited
EPC Services Capability  Tra International limitedEPC Services Capability  Tra International limited
EPC Services Capability Tra International limited
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
Owner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilitiesOwner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilities
 
Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01
 
Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02
 
Chas spradbery wgk bilbao
Chas spradbery  wgk bilbaoChas spradbery  wgk bilbao
Chas spradbery wgk bilbao
 
Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011
 
Hyperion Power Ans 18 Nov09
Hyperion Power Ans 18 Nov09Hyperion Power Ans 18 Nov09
Hyperion Power Ans 18 Nov09
 
Rajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesRajasthan Solar Policy PV Services
Rajasthan Solar Policy PV Services
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstar
 
Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010
 
Standard Solar - Corporate Overview
Standard Solar - Corporate OverviewStandard Solar - Corporate Overview
Standard Solar - Corporate Overview
 
Suryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects SpecialistSuryakiran Engineers - Solar Projects Specialist
Suryakiran Engineers - Solar Projects Specialist
 
Overview of Clean Energy Community resources
Overview of Clean Energy Community resourcesOverview of Clean Energy Community resources
Overview of Clean Energy Community resources
 
Ozone - Solar Business
Ozone - Solar BusinessOzone - Solar Business
Ozone - Solar Business
 
Irfan-Mohammad
Irfan-MohammadIrfan-Mohammad
Irfan-Mohammad
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 

Recently uploaded

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 

Recently uploaded (20)

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 

Solar Photovoltaic Power Plant: Best Practices

  • 1. From Allocation to Execution: Best Practices - Gensol Consultants Pvt Ltd
  • 2. Project Allocations & Status 950 MW 750 MW 110 MW Rooftop and other small Phase I of JNNSM solar power plants Phase I & phase II of covering plants of capacity connected of capacity up Gujarat Solar Policy more than 5 MW to 2 MW
  • 3. Project Allocations & Status 950 MW 750 MW 110 MW Rooftop and other small of the total projects JNNSM Financial Closures II of Phase I of have Phase I & phase in 1/3rd solar power plants to 2 MW place covering plants of capacity connected of capacity up and EPC Contractors finalized. Solar Policy more than 5 MW Gujarat
  • 4. The Process Flow Detailed Vetting of Plant Project Report Drawings Commissioning Allocation Execution Land Contractor Onsite Finalization Finalization Monitoring
  • 5. Land Finalization Parameter Purpose IMPORTANT Metrological Resource Assessment Energy Generation Capacity of substation Nearest Substation Availability of feeder Transmission Losses Accessibility to site Ease of Delivery of materials Water Availability Water requirement during construction Nearby Terrain Shadow Effects Site Topography To analyze the water blockage problems and placement of mounting structures Availability of Manpower For Construction and subsequent O&M GPS Survey Site Layout Storm History Dust Losses Mounting Structure Strength Type of Soil To analyze the resistivity and load bearing capacity of soil Construction power availability Power Requirement during construction
  • 6. Detailed Project Report Why is it Contents required? •  Site Analysis and Solar radiation resource assessment •  Prefeasibility Analysis •  Technology Selection : Solar PV modules and BoS •  Acts as a Reference / Guidance Document •  Plant and Machinery (Solar PV array and Electrical System) •  As an instrument for Financial Closure •  Civil and Architectural requirement for the project •  Necessary for claiming Carbon Credits •  Annual energy generation from power plant •  System Schematics •  Power plant operation and maintenance •  Project implementation and schedule •  Project Financials •  Risk Analysis
  • 7. Detailed Project Report Contents •  Site Analysis and Solar radiation resource assessment •  Technology Selection : Solar PV modules and BoS •  Plant and Machinery (Solar PV array and Electrical System) •  Civil and Architectural requirement for the project •  Annual energy generation from power plant •  System Schematics •  Power plant operation and maintenance •  Project implementation and schedule •  Project Financials •  Risk Analysis
  • 8. EPC Contractor Finalization Release Shortlisting & Contract of RfP Finalization Design •  Defining Exhaustive Scope of Work with well defined Quality Criteria •  Designing – Engineering Calculations, Site Layout and System Sizing •  Civil – Leveling, Foundations, Mounting Structures, Control Room etc. •  Electrical – Solar Panels, Inverters, Switchyard, Monitoring etc. •  Testing – Performance Acceptance/Guarantee Test •  Operation & Maintenance – Comprehensive Maintenance & Guarantees •  Arranging and coordinating pre/post bid meetings for clarification to the queries of bidders.
  • 9. EPC Contractor Finalization Release Shortlisting & Contract of RfP Finalization Design •  Defining Criteria for Comparison •  Determination of Minimum Qualification Criteria •  Assigning Weightage to Parameters •  Preparing Comprehensive Scoring Sheet •  Arriving at Final Scores for Responses from EPC Contractors •  Drawing Project Implementation & Drawdown Schedule •  Conducting Background Checks on Tie-ups for Equipment Supply •  Conducting Rounds of Negotiation
  • 10. EPC Contractor Finalization Release Shortlisting & Contract of RfP Finalization Design Parameters for Judgment Equipment Type | Market Presence | Efficiency | Adherence to Standards | Rate of Degradation EPC Contractor Experience in India and abroad | EPC & O&M Cost | Manpower Experience & Availability | Type & Extent of Guarantees Offered Other Parameters Office in India | Collaboration with International EPC Company
  • 11. EPC Contractor Finalization Release Shortlisting & Contract of RfP Finalization Design Format 3 separate contracts are typically drawn to reduce tax burden: 1.  Supplies Contract 2.  Services Contract 3.  Operation & Maintenance Contract Further, Supplies Contract can be broken down into Import Supplies for Inverters and modules and Domestic Supplies for the rest of the BoS.
  • 12. EPC Contractor Finalization Release Shortlisting & Contract of RfP Finalization Design Contents Snapshot •  General Terms of Agreement •  Variations & Adjustments •  Special Terms of Agreement •  Termination •  Payment Milestones •  Warranties •  Liquidated Damages •  Force Majeure •  Insurance •  Guarantees •  Performance Bank Guarantee •  Defects Liability •  Advance Bank Guarantee •  Minimum Energy Generation – Bank Guarantee
  • 13. Vetting of Drawings & Design Drawing Purpose Site Layout Avoid Shading Losses Module Mounting Structure Strength to withstand mechanical and wind loads Zinc Coating for 25 year corrosion free life Control Panel, Living Accommodation, Pantry, CIVIL Main Control Room Building Bathrooms etc. To ensure proper strength of foundations for Switchyard transformers and other equipment Water Pipes & Drainage Layout To avoid water logging Approach Roads & Pathways To ensure proper access to all parts of the plant Equipment Layout To minimize system losses ELECTRICAL System Sizing (Cables, Inverters, Switchyard) For efficient working while ensuring redundancy Earthing To ensure safety of man and equipment Single Line Diagram To comprehend the fundamental structure of the plant
  • 14. Onsite Monitoring Quality Control Claims & Reporting Bills Methodology Monitoring Document control and Factory Inspection management Compliance to standards
  • 15. Commissioning of Plant Commissioning Evacuation •  Validating actual generation against guaranteed generation •  Validating the technical parameters of equipment •  Preparation of final acceptance tests •  Conducting performance tests after successful commissioning •  Schedule for periodic checks •  Preparation of annual maintenance contract along with final list of spares and tools
  • 16. Commissioning of Plant Commissioning Evacuation •  Liasoning and approvals from authorized government bodies •  The following need to be communicated and finalized with the state utlities: •  Laying of transmission lines •  ABT meters •  Evacuation infrastructure •  Grid availability •  Dedicated feeder •  Evacuation point
  • 17. Ideal Timeline Project Activities 1 2 3 4 5 6 7 8 Completion of site visit and due diligence Bid Management EPC contractor finalization Vettings of designs and drawings Contract drafting Commissioning of 25% of Project Commissioning of 50% of Project Commissioning of 75% of Project Commissioning of 100% of Project Testing and Handing Over Evacuation arrangement
  • 18. Take Away It takes only 2% change in PLF to take a project from state of art to disastrous and vice versa, please make sure you are on the right side of this change. THANK YOU