SlideShare a Scribd company logo
1 of 11
A.4.1.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 1, 2, 3 Y 4:

1

3

2

Mu =

53.82 Ton.m

Vu =
0.55

20.37 Ton

A.4.2.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE IZQUIERDO TRAMO 1, 2, 3 Y 4:

4

1

Mu =

3

2

70.98 Ton.m

d = h-3-(5/8")/2
d=
51.206

Vu =
0.55

1

28.28 Ton

d = h-3-(5/8")/2
d=
51.206

1

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As = Mu/(o*fy*(d-a/2)
As =
0.00
31.109
5%
32.664
-5%
29.553
cantidad de fierros =

As *d-0.17647*As^2/2-Mu/(o*fy)
cm2
Paralelo al trafico se diseña este acero
16 fierros
5/8
@
0.10 cm

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
41.845
cm2
5%
43.9375
-5%
39.753
Paralelo al trafico se diseña este acero
cantidad de fierros =
21 fierros
5/8
@
0.10 cm

Cheque de cuantia maxima:

Cheque de cuantia maxima:

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

p=

0.00608

VERDADERO

7.- DI S EÑO DE ACERO TRANS VERS AL
SI h<= 600 mm

VERDADERO

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
8.608
Fierros =

8.-ACERO TRAS VERS AL S UPERI OR

0.4464

Fierros =

1

cm2
3/8"

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
45.4128

VERDADERO

VERDADERO

SI h<= 600 mm

VERDADERO

Fierros =

16
3/8"
@ 0.125 cm
acero perpendicuar al trafico

8.-ACERO TRAS VERS AL S UPERI OR

Analisis para un metro

As =

0.00817

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
11.58

12
3/8"
@ 0.125 cm
acero perpendicuar al trafico

As >= 0.75*Ag/fy

p=

7.- DI S EÑO DE ACERO TRANS VERS AL

@

As >= 0.75*Ag/fy

Analisis para un metro

As =
0.33 cm ambos sentidos

0.4464

Fierros =

1

cm2
3/8"

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
45.4128

VERDADERO

@

0.33 cm ambos sentidos

4
A.4.3.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE DERECHO TRAMO 1, 2, 3 Y 4:

1

Mu =

3

2

81.03 Ton.m

Vu =
0.55

31.76 Ton

d = h-3-(5/8")/2
d=
51.206

1
a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
48.355
cm2
5%
50.7723
-5%
45.937
Paralelo al trafico se diseña este acero
cantidad de fierros =
24 fierros
5/8
@
0.10 cm
Cheque de cuantia maxima:
Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214
p=

0.00944

VERDADERO

7.- DI S EÑO DE ACERO TRANS VERS AL
SI h<= 600 mm

VERDADERO

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
13.38
Fierros =

19
3/8"
@ 0.125 cm
acero perpendicuar al trafico

8.-ACERO TRAS VERS AL S UPERI OR
As >= 0.75*Ag/fy

Analisis para un metro

As =

0.4464

Fierros =

1

cm2
3/8"

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
45.4128

VERDADERO

@

0.33 cm ambos sentidos

4
B.3.1.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 1 Y 3 M (+):

1

Mu =

3

2

37.44 Ton.m

Vu =
0.45

27.03 Ton

B.3.1.2.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 2 Y 4 M (-):

4

1

3

2

Mu =

37.44 Ton.m

d = h-3-(5/8")/2
d=
41.206

Vu =
0.45

1

20.06 Ton

d = h-3-(5/8")/2
d=
41.206

1

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
27.0136 cm2
5%
28.3642
-5%
25.6629
Paralelo al trafico se diseña este acero
cantidad de fierros =
14 fierros
5/8
@
0.10 cm

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
27.0136 cm2
5%
28.3642
-5%
25.6629
Paralelo al trafico se diseña este acero
cantidad de fierros =
14 fierros
5/8
@
0.10 cm

Cheque de cuantia maxima:

Cheque de cuantia maxima:

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

p=

0.00656

VERDADERO

7.- DI S EÑO DE ACERO TRANS VERS AL
SI h<= 600 mm

8.-ACERO TRAS VERS AL S UPERI OR

0.4464

Fierros =

1

cm2
3/8"

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

SI h<= 600 mm

VERDADERO

Fierros =

11
3/8"
@ 0.125 cm
acero perpendicuar al trafico

8.-ACERO TRAS VERS AL S UPERI OR

Analisis para un metro

As =

VERDADERO

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
7.475

11
3/8"
@ 0.125 cm
acero perpendicuar al trafico

As >= 0.75*Ag/fy

0.00656

7.- DI S EÑO DE ACERO TRANS VERS AL

VERDADERO

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
7.475
Fierros =

p=

@

As >= 0.75*Ag/fy

Analisis para un metro

As =
0.33 cm ambos sentidos

0.4464

Fierros =

1

cm2
3/8"

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

@

0.33 cm ambos sentidos

4
B.3.1.3.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 1 Y 3 M (-):

1

3

2

Mu =

43.53 Ton.m

Vu =
0.45

30.82 Ton

B.3.1.4.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 2 Y 4 M (-):

4

1

3

2

Mu =

43.53 Ton.m

d = h-3-(5/8")/2
d=
41.206

Vu =
0.45

1

23.32 Ton

d = h-3-(5/8")/2
d=
41.206

1

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
31.7493 cm2
5%
33.3368
-5%
30.1619
Paralelo al trafico se diseña este acero
cantidad de fierros =
16 fierros
5/8
@
0.10 cm

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
31.7493 cm2
5%
33.3368
-5%
30.1619
Paralelo al trafico se diseña este acero
cantidad de fierros =
16 fierros
5/8
@
0.10 cm

Cheque de cuantia maxima:

Cheque de cuantia maxima:

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

p=

0.00770

VERDADERO

7.- DI S EÑO DE ACERO TRANS VERS AL
SI h<= 600 mm

p=

0.00770

VERDADERO

7.- DI S EÑO DE ACERO TRANS VERS AL

VERDADERO

SI h<= 600 mm

VERDADERO

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
8.785

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
8.785

Fierros =

Fierros =

12
3/8"
@ 0.125 cm
acero perpendicuar al trafico

8.-ACERO TRAS VERS AL S UPERI OR
As >= 0.75*Ag/fy

8.-ACERO TRAS VERS AL S UPERI OR

Analisis para un metro

As =

0.4464

Fierros =

1

cm2
3/8"

12
3/8"
@ 0.125 cm
acero perpendicuar al trafico

@

As >= 0.75*Ag/fy

Analisis para un metro

As =
0.33 cm ambos sentidos

0.4464

Fierros =

1

9.- CHEQUEO POR CORTE:

9.- CHEQUEO POR CORTE:

Vs + Vc >= Vu

cm2
3/8"

Vs + Vc >= Vu

0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

@

0.33 cm ambos sentidos

4
B.3.2.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE IZQUIERDO TRAMO 1 Y 3 M (+):

1

Mu =

3

2

84.90 Ton.m

Vu =
0.45

20.80 Ton

B.3.2.2.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE IZQUIERDO TRAMO 2 Y 4 M (+):

4

1

Mu =

3

2

84.90 Ton.m

d = h-3-(5/8")/2
d=
41.206

Vu =
0.45

18.10 Ton

d = h-3-(5/8")/2
d=
41.206

1

1
a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
67.457
cm2
5%
70.8303
-5%
64.085
Paralelo al trafico se diseña este acero
cantidad de fierros =
34 fierros
5/8
@
0.10 cm

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
67.457
cm2
5%
70.8303
-5%
64.085
Paralelo al trafico se diseña este acero
cantidad de fierros =
34 fierros
5/8
@
0.10 cm

Cheque de cuantia maxima:

Cheque de cuantia maxima:

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

p=

0.01637

VERDADERO

7.- DI S EÑO DE ACERO TRANS VERS AL
SI h<= 600 mm

VERDADERO

26
3/8"
@ 0.125 cm
acero perpendicuar al trafico

As =

Analisis para un metro

0.4464

Fierros =

1

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

SI h<= 600 mm

Fierros =

VERDADERO

26
3/8"
@ 0.125 cm
acero perpendicuar al trafico

@

As >= 0.75*Ag/fy

Analisis para un metro

As =

cm2
3/8"

VERDADERO

8.-ACERO TRAS VERS AL S UPERI OR

8.-ACERO TRAS VERS AL S UPERI OR
As >= 0.75*Ag/fy

0.01637

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
18.67

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
18.67
Fierros =

p=

7.- DI S EÑO DE ACERO TRANS VERS AL

0.33 cm ambos sentidos

0.4464

Fierros =

1

cm2
3/8"

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

@

0.33 cm ambos sentidos

4
B.3.2.3.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE DERECHO TRAMO 1 Y 3 M (+):

1

3

2

Mu =

54.54 Ton.m

Vu =

B.3.2.4.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE DERECHO TRAMO 2 Y 4 M (+):

4

34.98 Ton

1

Mu =

3

2

54.54 Ton.m

d = h-3-(5/8")/2
0.45
d=
41.206

Vu =

26.95 Ton

d = h-3-(5/8")/2
0.45
d=
41.206

1

1

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
40.606
cm2
5%
42.6362
-5%
38.576
Paralelo al trafico se diseña este acero
cantidad de fierros =
20 fierros
5/8
@
0.10 cm

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
40.606
cm2
5%
42.6362
-5%
38.576
Paralelo al trafico se diseña este acero
cantidad de fierros =
20 fierros
5/8
@
0.10 cm

Cheque de cuantia maxima:

Cheque de cuantia maxima:

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

p=

0.00985

VERDADERO

7.- DI S EÑO DE ACERO TRANS VERS AL
SI h<= 600 mm

8.-ACERO TRAS VERS AL S UPERI OR

0.4464

Fierros =

1

cm2
3/8"

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

SI h<= 600 mm

VERDADERO

Fierros =

16
3/8"
@ 0.125 cm
acero perpendicuar al trafico

8.-ACERO TRAS VERS AL S UPERI OR

Analisis para un metro

As =

VERDADERO

AST < 1750/(L^0.5) <= 50% > As
AST = 27.67 As
Ast =
11.24

16
3/8"
@ 0.125 cm
acero perpendicuar al trafico

As >= 0.75*Ag/fy

0.00985

7.- DI S EÑO DE ACERO TRANS VERS AL

VERDADERO

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
11.24
Fierros =

p=

@

As >= 0.75*Ag/fy

Analisis para un metro

As =
0.33 cm ambos sentidos

0.4464

Fierros =

1

cm2
3/8"

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

@

0.33 cm ambos sentidos

4
C.3.1.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 1 Y 4 M (+):

1

3

2

Mu =

38.69 Ton.m

Vu =
0.45

26.72 Ton

d = h-3-(5/8")/2
d=
41.206

1
a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
27.9767 cm2
5%
29.3755
-5%
26.5779
Paralelo al trafico se diseña este acero
cantidad de fierros =
14 fierros
5/8
@
0.10 cm
Cheque de cuantia maxima:
Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214
p=

0.00679

VERDADERO

7.- DI S EÑO DE ACERO TRANS VERS AL
SI h<= 600 mm

VERDADERO

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
7.741
Fierros =

11
3/8"
@ 0.125 cm
acero perpendicuar al trafico

8.-ACERO TRAS VERS AL S UPERI OR
As >= 0.75*Ag/fy

Analisis para un metro

As =

0.4464

Fierros =

1

cm2
3/8"

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

@

0.33 cm ambos sentidos

4
C.3.1.2.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 2 Y 3 M (+):

1

3

2

Mu =

26.36 Ton.m

Vu =
0.45

23.13 Ton

C.3.1.3.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 1 Y 4 M (-):

4

1

Mu =

44.38 Ton.m

d = h-3-(5/8")/2
d=
41.206

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214
0.00453

VERDADERO

7.- DI S EÑO DE ACERO TRANS VERS AL
SI h<= 600 mm

d = h-3-(5/8")/2
d=
41.206

8.-ACERO TRAS VERS AL S UPERI OR

Fierros =

1

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
VERDADERO

0.00787

@

VERDADERO

0.33 cm ambos sentidos

VERDADERO

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
8.97
13
3/8"
@ 0.125 cm
acero perpendicuar al trafico

8.-ACERO TRAS VERS AL S UPERI OR
Analisis para un metro

As =

0.4464

Fierros =

cm2
3/8"

p=

7.- DI S EÑO DE ACERO TRANS VERS AL

As >= 0.75*Ag/fy

Analisis para un metro

0.4464

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

Fierros =

7
3/8"
@ 0.125 cm
acero perpendicuar al trafico

As =

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
32.4192 cm2
5%
34.0401
-5%
30.7982
Paralelo al trafico se diseña este acero
cantidad de fierros =
16 fierros
5/8
@
0.10 cm

SI h<= 600 mm

VERDADERO

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
5.165

36.5442

Ton

Cheque de cuantia maxima:

Cheque de cuantia maxima:

As >= 0.75*Ag/fy

30.52

1

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
18.665
cm2
5%
19.5983
-5%
17.7318
Paralelo al trafico se diseña este acero
cantidad de fierros =
9
fierros
5/8
@
0.10 cm

Fierros =

Vu =
0.45

1

p=

3

2

1

cm2
3/8"

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

@

0.33 cm ambos sentidos

4
C.3.1.4.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 2 Y 3 M (-):

1

3

2

Mu =

35.66 Ton.m

Vu =
0.45

26.73 Ton

C.3.2.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE IZQUIERDO TRAMO 1 Y 4 M (-):

4

1

Mu =

3

2

49.90 Ton.m

d = h-3-(5/8")/2
d=
41.206

Vu =
0.45

1

30.35 Ton

d = h-3-(5/8")/2
d=
41.206

1

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
25.6498 cm2
5%
26.9322
-5%
24.3673
Paralelo al trafico se diseña este acero
cantidad de fierros =
13 fierros
5/8
@
0.10 cm

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As = Mu/(o*fy*(d-a/2)
As =
0.00
36.825
5%
38.666
-5%
34.984
cantidad de fierros =

As *d-0.17647*As^2/2-Mu/(o*fy)
cm2
Paralelo al trafico se diseña este acero
18 fierros
5/8
@
0.10 cm

Cheque de cuantia maxima:

Cheque de cuantia maxima:

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

p=

0.00622

VERDADERO

7.- DI S EÑO DE ACERO TRANS VERS AL
SI h<= 600 mm

p=

0.00894

VERDADERO

7.- DI S EÑO DE ACERO TRANS VERS AL

VERDADERO

SI h<= 600 mm

VERDADERO

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
7.097

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
10.19

Fierros =

Fierros =

10
3/8"
@ 0.125 cm
acero perpendicuar al trafico

8.-ACERO TRAS VERS AL S UPERI OR
As >= 0.75*Ag/fy

8.-ACERO TRAS VERS AL S UPERI OR

Analisis para un metro

As =

0.4464

Fierros =

1

cm2
3/8"

14
3/8"
@ 0.125 cm
acero perpendicuar al trafico

@

As >= 0.75*Ag/fy

Analisis para un metro

As =
0.33 cm ambos sentidos

0.4464

Fierros =

1

9.- CHEQUEO POR CORTE:

9.- CHEQUEO POR CORTE:

Vs + Vc >= Vu

cm2
3/8"

Vs + Vc >= Vu

0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

@

0.33 cm ambos sentidos

4
C.3.2.2.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE IZQUIERDO TRAMO 2 Y 3 M (-):

1

Mu =

3

2

36.17 Ton.m

Vu =

24.17 Ton

C.3.3.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE DERECHO TRAMO 1 Y 4 M (-):

4

1

Mu =

3

2

56.11 Ton.m

d = h-3-(5/8")/2
0.45
d=
41.206

Vu =

34.69 Ton

d = h-3-(5/8")/2
0.45
d=
41.206

1

1

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
26.040
cm2
5%
27.3416
-5%
24.738
Paralelo al trafico se diseña este acero
cantidad de fierros =
13 fierros
5/8
@
0.10 cm

a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
41.902
cm2
5%
43.9973
-5%
39.807
Paralelo al trafico se diseña este acero
cantidad de fierros =
21 fierros
5/8
@
0.10 cm

Cheque de cuantia maxima:

Cheque de cuantia maxima:

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214

p=

0.00632

VERDADERO

7.- DI S EÑO DE ACERO TRANS VERS AL
SI h<= 600 mm

VERDADERO

AST < 1750/(L^0.5) <= 50% > As
AST =
27.67 As
Ast =
7.205
Fierros =

8.-ACERO TRAS VERS AL S UPERI OR

0.4464

Fierros =

1

cm2
3/8"

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

VERDADERO

SI h<= 600 mm

VERDADERO

Fierros =

16
3/8"
@ 0.125 cm
acero perpendicuar al trafico

8.-ACERO TRAS VERS AL S UPERI OR

Analisis para un metro

As =

0.01017

AST < 1750/(L^0.5) <= 50% > As
AST = 27.67 As
Ast =
11.59

10
3/8"
@ 0.125 cm
acero perpendicuar al trafico

As >= 0.75*Ag/fy

p=

7.- DI S EÑO DE ACERO TRANS VERS AL

@

As >= 0.75*Ag/fy

Analisis para un metro

As =
0.33 cm ambos sentidos

0.4464

Fierros =

1

cm2
3/8"

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

@

0.33 cm ambos sentidos

4
C.3.3.2.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE DERECHO TRAMO 2 Y 3 M (-):

1

Mu =

3

2

39.08 Ton.m

Vu =

30.72 Ton

d = h-3-(5/8")/2
0.45
d=
41.206
1
a = As*fy/(0.85*f¨c*b)
a=
0.176 As
As *d-0.17647*As^2/2-Mu/(o*fy)
As = Mu/(o*fy*(d-a/2)
As =
0.00
28.278
cm2
5%
29.6921
-5%
26.864
Paralelo al trafico se diseña este acero
cantidad de fierros =
14 fierros
5/8
@
0.10 cm
Cheque de cuantia maxima:
Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy]
Pmax = 0.0214
p=

0.00686

VERDADERO

7.- DI S EÑO DE ACERO TRANS VERS AL
SI h<= 600 mm

VERDADERO

AST < 1750/(L^0.5) <= 50% > As
AST = 27.67 As
Ast =
7.825
Fierros =

11
3/8"
@ 0.125 cm
acero perpendicuar al trafico

8.-ACERO TRAS VERS AL S UPERI OR
As >= 0.75*Ag/fy

Analisis para un metro

As =

0.4464

Fierros =

1

cm2
3/8"

9.- CHEQUEO POR CORTE:
Vs + Vc >= Vu
0.53*(f´c^0.5)*bw*d>= Vu
36.5442

VERDADERO

@

0.33 cm ambos sentidos

4

More Related Content

What's hot

22-Design of Four Bolt Extended Endplate Connection (Steel Structural Design ...
22-Design of Four Bolt Extended Endplate Connection (Steel Structural Design ...22-Design of Four Bolt Extended Endplate Connection (Steel Structural Design ...
22-Design of Four Bolt Extended Endplate Connection (Steel Structural Design ...Hossam Shafiq II
 
Kites team l5
Kites team l5Kites team l5
Kites team l5aero103
 
INDUSTRIAL BUILDING GANTRY GIRDER
INDUSTRIAL BUILDING  GANTRY GIRDERINDUSTRIAL BUILDING  GANTRY GIRDER
INDUSTRIAL BUILDING GANTRY GIRDERHarsh Shani
 
Design of isolated footing by ACI code
Design of isolated footing by ACI codeDesign of isolated footing by ACI code
Design of isolated footing by ACI codeMahmoud Al-Sharawi
 
09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)
09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)
09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)Hossam Shafiq II
 
Form 1: Measurements
Form 1: MeasurementsForm 1: Measurements
Form 1: MeasurementsJulius Osanjo
 
Structural building by engineer abdikani farah ahmed(enggalaydh)
Structural building by engineer abdikani farah ahmed(enggalaydh)Structural building by engineer abdikani farah ahmed(enggalaydh)
Structural building by engineer abdikani farah ahmed(enggalaydh)EngGalaydh Farah Axmed
 
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...Hossam Shafiq II
 
Subok pang defense
Subok pang defenseSubok pang defense
Subok pang defenseLester Kun
 
Engineering example calculation
Engineering example calculationEngineering example calculation
Engineering example calculationMOSTAFA DAIF
 
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAPPERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAPSumarno Feriyal
 
21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...
21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...
21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...Hossam Shafiq II
 
Column sections Classification
Column sections ClassificationColumn sections Classification
Column sections ClassificationKingsley Aboagye
 
Design of Cantilever retaining wall
Design of Cantilever retaining wallDesign of Cantilever retaining wall
Design of Cantilever retaining wallAchuthan Karnnan
 
Masonry Shear Wall Design-Excel Sheet 2
Masonry Shear Wall Design-Excel Sheet 2Masonry Shear Wall Design-Excel Sheet 2
Masonry Shear Wall Design-Excel Sheet 2Yongsheng (Jack) Jiao
 
6. diseño de puente compuesto2
6. diseño de puente compuesto26. diseño de puente compuesto2
6. diseño de puente compuesto2ing_eliali4748
 

What's hot (20)

22-Design of Four Bolt Extended Endplate Connection (Steel Structural Design ...
22-Design of Four Bolt Extended Endplate Connection (Steel Structural Design ...22-Design of Four Bolt Extended Endplate Connection (Steel Structural Design ...
22-Design of Four Bolt Extended Endplate Connection (Steel Structural Design ...
 
Kites team l5
Kites team l5Kites team l5
Kites team l5
 
INDUSTRIAL BUILDING GANTRY GIRDER
INDUSTRIAL BUILDING  GANTRY GIRDERINDUSTRIAL BUILDING  GANTRY GIRDER
INDUSTRIAL BUILDING GANTRY GIRDER
 
Design of isolated footing by ACI code
Design of isolated footing by ACI codeDesign of isolated footing by ACI code
Design of isolated footing by ACI code
 
09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)
09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)
09-Strength of Gusset Plate (Steel Structural Design & Prof. Shehab Mourad)
 
Form 1: Measurements
Form 1: MeasurementsForm 1: Measurements
Form 1: Measurements
 
Structural building by engineer abdikani farah ahmed(enggalaydh)
Structural building by engineer abdikani farah ahmed(enggalaydh)Structural building by engineer abdikani farah ahmed(enggalaydh)
Structural building by engineer abdikani farah ahmed(enggalaydh)
 
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
12-Examples on Compression Members (Steel Structural Design & Prof. Shehab Mo...
 
Subok pang defense
Subok pang defenseSubok pang defense
Subok pang defense
 
Engineering example calculation
Engineering example calculationEngineering example calculation
Engineering example calculation
 
Undeterminate problems
Undeterminate problemsUndeterminate problems
Undeterminate problems
 
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAPPERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
PERHITUNGAN TULANGAN LONGITUDINAL BALOK BETON BERTULANG RANGKAP
 
21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...
21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...
21-Design of Simple Shear Connections (Steel Structural Design & Prof. Shehab...
 
Chapter 12
Chapter 12Chapter 12
Chapter 12
 
Doubly reinforced beam]
Doubly reinforced beam]Doubly reinforced beam]
Doubly reinforced beam]
 
MasonryShearWall Design-1 Sheet1
MasonryShearWall Design-1 Sheet1MasonryShearWall Design-1 Sheet1
MasonryShearWall Design-1 Sheet1
 
Column sections Classification
Column sections ClassificationColumn sections Classification
Column sections Classification
 
Design of Cantilever retaining wall
Design of Cantilever retaining wallDesign of Cantilever retaining wall
Design of Cantilever retaining wall
 
Masonry Shear Wall Design-Excel Sheet 2
Masonry Shear Wall Design-Excel Sheet 2Masonry Shear Wall Design-Excel Sheet 2
Masonry Shear Wall Design-Excel Sheet 2
 
6. diseño de puente compuesto2
6. diseño de puente compuesto26. diseño de puente compuesto2
6. diseño de puente compuesto2
 

Viewers also liked (20)

το κουτι της πανδωρας A
το κουτι της πανδωρας    Aτο κουτι της πανδωρας    A
το κουτι της πανδωρας A
 
4 soal ukk tkj xi istalasi os dasar 2013
4 soal ukk tkj xi istalasi os dasar 20134 soal ukk tkj xi istalasi os dasar 2013
4 soal ukk tkj xi istalasi os dasar 2013
 
Remote detection of illegal usage of electricity
Remote detection of illegal usage of electricityRemote detection of illegal usage of electricity
Remote detection of illegal usage of electricity
 
motoFANkowy tutorial odc. 1
motoFANkowy tutorial odc. 1motoFANkowy tutorial odc. 1
motoFANkowy tutorial odc. 1
 
Common Online Terminologies
Common Online TerminologiesCommon Online Terminologies
Common Online Terminologies
 
motoFANki_2014
motoFANki_2014motoFANki_2014
motoFANki_2014
 
Sarah colina principle 2
Sarah colina principle 2Sarah colina principle 2
Sarah colina principle 2
 
Jamaica accidents
Jamaica   accidentsJamaica   accidents
Jamaica accidents
 
Wena ganda chos!
Wena ganda chos!Wena ganda chos!
Wena ganda chos!
 
motoFANki_2014_coś więcej
motoFANki_2014_coś więcejmotoFANki_2014_coś więcej
motoFANki_2014_coś więcej
 
Presentation1 1
Presentation1 1Presentation1 1
Presentation1 1
 
Costs associated with production
Costs associated with productionCosts associated with production
Costs associated with production
 
Production and costs concepts
Production and costs  conceptsProduction and costs  concepts
Production and costs concepts
 
Step by Step - Reusing old features to build new ones
Step by Step - Reusing old features to build new onesStep by Step - Reusing old features to build new ones
Step by Step - Reusing old features to build new ones
 
E-Mode LNA
E-Mode LNAE-Mode LNA
E-Mode LNA
 
Chop - Shop Barbers, Crane Lane
Chop - Shop Barbers, Crane LaneChop - Shop Barbers, Crane Lane
Chop - Shop Barbers, Crane Lane
 
Edu carex core_module
Edu carex core_moduleEdu carex core_module
Edu carex core_module
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
áóôåéá óïâáñá
áóôåéá óïâáñááóôåéá óïâáñá
áóôåéá óïâáñá
 
Ex.arithmoi
Ex.arithmoiEx.arithmoi
Ex.arithmoi
 

Similar to Calculo 1

Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Hamza Waheed
 
Rcc Design Sheets
Rcc Design SheetsRcc Design Sheets
Rcc Design Sheetsklecivil
 
Rcc member design steps
Rcc member design stepsRcc member design steps
Rcc member design stepsDYPCET
 
Singly R.C. beam
Singly R.C. beam  Singly R.C. beam
Singly R.C. beam Yash Patel
 
Design calculations of raft foundation
Design calculations of raft foundationDesign calculations of raft foundation
Design calculations of raft foundationShahzad Ali
 
onw way slab design
onw way slab designonw way slab design
onw way slab designPalak Patel
 
Design of stairs
Design of stairsDesign of stairs
Design of stairsBahzad5
 
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxDESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxsubhashini214160
 
Design and analysis of school building
Design and analysis of school buildingDesign and analysis of school building
Design and analysis of school buildingRaghav Sankar
 
Perancangan Alat Proses Styrene Production
Perancangan Alat Proses Styrene ProductionPerancangan Alat Proses Styrene Production
Perancangan Alat Proses Styrene ProductionRicco Riyan Kurniawan
 
Design of footing
Design of footingDesign of footing
Design of footingNripeshJha
 
Power screw application
Power screw applicationPower screw application
Power screw applicationalsaid fathy
 
Foundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsFoundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsMagdel Kotze
 

Similar to Calculo 1 (20)

Ch 8.pdf
Ch 8.pdfCh 8.pdf
Ch 8.pdf
 
Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )Roof Truss Design (By Hamza Waheed UET Lahore )
Roof Truss Design (By Hamza Waheed UET Lahore )
 
Rcc Design Sheets
Rcc Design SheetsRcc Design Sheets
Rcc Design Sheets
 
Rcc member design steps
Rcc member design stepsRcc member design steps
Rcc member design steps
 
Calculo de acero en vigas ok
Calculo de acero en vigas okCalculo de acero en vigas ok
Calculo de acero en vigas ok
 
Singly R.C. beam
Singly R.C. beam  Singly R.C. beam
Singly R.C. beam
 
Harshal
HarshalHarshal
Harshal
 
طه
طهطه
طه
 
Design calculations of raft foundation
Design calculations of raft foundationDesign calculations of raft foundation
Design calculations of raft foundation
 
onw way slab design
onw way slab designonw way slab design
onw way slab design
 
Design of stairs
Design of stairsDesign of stairs
Design of stairs
 
Baseplate
BaseplateBaseplate
Baseplate
 
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxDESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
 
Design and analysis of school building
Design and analysis of school buildingDesign and analysis of school building
Design and analysis of school building
 
Doubly reinforced beam design
Doubly reinforced beam   designDoubly reinforced beam   design
Doubly reinforced beam design
 
Perancangan Alat Proses Styrene Production
Perancangan Alat Proses Styrene ProductionPerancangan Alat Proses Styrene Production
Perancangan Alat Proses Styrene Production
 
Design of footing
Design of footingDesign of footing
Design of footing
 
Power screw application
Power screw applicationPower screw application
Power screw application
 
Puentes
PuentesPuentes
Puentes
 
Foundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection CalcsFoundation Reinforcement Calcs & Connection Calcs
Foundation Reinforcement Calcs & Connection Calcs
 

Recently uploaded

Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 

Recently uploaded (20)

Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 

Calculo 1

  • 1. A.4.1.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 1, 2, 3 Y 4: 1 3 2 Mu = 53.82 Ton.m Vu = 0.55 20.37 Ton A.4.2.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE IZQUIERDO TRAMO 1, 2, 3 Y 4: 4 1 Mu = 3 2 70.98 Ton.m d = h-3-(5/8")/2 d= 51.206 Vu = 0.55 1 28.28 Ton d = h-3-(5/8")/2 d= 51.206 1 a = As*fy/(0.85*f¨c*b) a= 0.176 As As = Mu/(o*fy*(d-a/2) As = 0.00 31.109 5% 32.664 -5% 29.553 cantidad de fierros = As *d-0.17647*As^2/2-Mu/(o*fy) cm2 Paralelo al trafico se diseña este acero 16 fierros 5/8 @ 0.10 cm a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 41.845 cm2 5% 43.9375 -5% 39.753 Paralelo al trafico se diseña este acero cantidad de fierros = 21 fierros 5/8 @ 0.10 cm Cheque de cuantia maxima: Cheque de cuantia maxima: Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 p= 0.00608 VERDADERO 7.- DI S EÑO DE ACERO TRANS VERS AL SI h<= 600 mm VERDADERO AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 8.608 Fierros = 8.-ACERO TRAS VERS AL S UPERI OR 0.4464 Fierros = 1 cm2 3/8" 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 45.4128 VERDADERO VERDADERO SI h<= 600 mm VERDADERO Fierros = 16 3/8" @ 0.125 cm acero perpendicuar al trafico 8.-ACERO TRAS VERS AL S UPERI OR Analisis para un metro As = 0.00817 AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 11.58 12 3/8" @ 0.125 cm acero perpendicuar al trafico As >= 0.75*Ag/fy p= 7.- DI S EÑO DE ACERO TRANS VERS AL @ As >= 0.75*Ag/fy Analisis para un metro As = 0.33 cm ambos sentidos 0.4464 Fierros = 1 cm2 3/8" 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 45.4128 VERDADERO @ 0.33 cm ambos sentidos 4
  • 2. A.4.3.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE DERECHO TRAMO 1, 2, 3 Y 4: 1 Mu = 3 2 81.03 Ton.m Vu = 0.55 31.76 Ton d = h-3-(5/8")/2 d= 51.206 1 a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 48.355 cm2 5% 50.7723 -5% 45.937 Paralelo al trafico se diseña este acero cantidad de fierros = 24 fierros 5/8 @ 0.10 cm Cheque de cuantia maxima: Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 p= 0.00944 VERDADERO 7.- DI S EÑO DE ACERO TRANS VERS AL SI h<= 600 mm VERDADERO AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 13.38 Fierros = 19 3/8" @ 0.125 cm acero perpendicuar al trafico 8.-ACERO TRAS VERS AL S UPERI OR As >= 0.75*Ag/fy Analisis para un metro As = 0.4464 Fierros = 1 cm2 3/8" 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 45.4128 VERDADERO @ 0.33 cm ambos sentidos 4
  • 3. B.3.1.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 1 Y 3 M (+): 1 Mu = 3 2 37.44 Ton.m Vu = 0.45 27.03 Ton B.3.1.2.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 2 Y 4 M (-): 4 1 3 2 Mu = 37.44 Ton.m d = h-3-(5/8")/2 d= 41.206 Vu = 0.45 1 20.06 Ton d = h-3-(5/8")/2 d= 41.206 1 a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 27.0136 cm2 5% 28.3642 -5% 25.6629 Paralelo al trafico se diseña este acero cantidad de fierros = 14 fierros 5/8 @ 0.10 cm a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 27.0136 cm2 5% 28.3642 -5% 25.6629 Paralelo al trafico se diseña este acero cantidad de fierros = 14 fierros 5/8 @ 0.10 cm Cheque de cuantia maxima: Cheque de cuantia maxima: Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 p= 0.00656 VERDADERO 7.- DI S EÑO DE ACERO TRANS VERS AL SI h<= 600 mm 8.-ACERO TRAS VERS AL S UPERI OR 0.4464 Fierros = 1 cm2 3/8" 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO SI h<= 600 mm VERDADERO Fierros = 11 3/8" @ 0.125 cm acero perpendicuar al trafico 8.-ACERO TRAS VERS AL S UPERI OR Analisis para un metro As = VERDADERO AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 7.475 11 3/8" @ 0.125 cm acero perpendicuar al trafico As >= 0.75*Ag/fy 0.00656 7.- DI S EÑO DE ACERO TRANS VERS AL VERDADERO AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 7.475 Fierros = p= @ As >= 0.75*Ag/fy Analisis para un metro As = 0.33 cm ambos sentidos 0.4464 Fierros = 1 cm2 3/8" 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO @ 0.33 cm ambos sentidos 4
  • 4. B.3.1.3.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 1 Y 3 M (-): 1 3 2 Mu = 43.53 Ton.m Vu = 0.45 30.82 Ton B.3.1.4.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 2 Y 4 M (-): 4 1 3 2 Mu = 43.53 Ton.m d = h-3-(5/8")/2 d= 41.206 Vu = 0.45 1 23.32 Ton d = h-3-(5/8")/2 d= 41.206 1 a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 31.7493 cm2 5% 33.3368 -5% 30.1619 Paralelo al trafico se diseña este acero cantidad de fierros = 16 fierros 5/8 @ 0.10 cm a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 31.7493 cm2 5% 33.3368 -5% 30.1619 Paralelo al trafico se diseña este acero cantidad de fierros = 16 fierros 5/8 @ 0.10 cm Cheque de cuantia maxima: Cheque de cuantia maxima: Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 p= 0.00770 VERDADERO 7.- DI S EÑO DE ACERO TRANS VERS AL SI h<= 600 mm p= 0.00770 VERDADERO 7.- DI S EÑO DE ACERO TRANS VERS AL VERDADERO SI h<= 600 mm VERDADERO AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 8.785 AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 8.785 Fierros = Fierros = 12 3/8" @ 0.125 cm acero perpendicuar al trafico 8.-ACERO TRAS VERS AL S UPERI OR As >= 0.75*Ag/fy 8.-ACERO TRAS VERS AL S UPERI OR Analisis para un metro As = 0.4464 Fierros = 1 cm2 3/8" 12 3/8" @ 0.125 cm acero perpendicuar al trafico @ As >= 0.75*Ag/fy Analisis para un metro As = 0.33 cm ambos sentidos 0.4464 Fierros = 1 9.- CHEQUEO POR CORTE: 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu cm2 3/8" Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO @ 0.33 cm ambos sentidos 4
  • 5. B.3.2.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE IZQUIERDO TRAMO 1 Y 3 M (+): 1 Mu = 3 2 84.90 Ton.m Vu = 0.45 20.80 Ton B.3.2.2.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE IZQUIERDO TRAMO 2 Y 4 M (+): 4 1 Mu = 3 2 84.90 Ton.m d = h-3-(5/8")/2 d= 41.206 Vu = 0.45 18.10 Ton d = h-3-(5/8")/2 d= 41.206 1 1 a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 67.457 cm2 5% 70.8303 -5% 64.085 Paralelo al trafico se diseña este acero cantidad de fierros = 34 fierros 5/8 @ 0.10 cm a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 67.457 cm2 5% 70.8303 -5% 64.085 Paralelo al trafico se diseña este acero cantidad de fierros = 34 fierros 5/8 @ 0.10 cm Cheque de cuantia maxima: Cheque de cuantia maxima: Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 p= 0.01637 VERDADERO 7.- DI S EÑO DE ACERO TRANS VERS AL SI h<= 600 mm VERDADERO 26 3/8" @ 0.125 cm acero perpendicuar al trafico As = Analisis para un metro 0.4464 Fierros = 1 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO SI h<= 600 mm Fierros = VERDADERO 26 3/8" @ 0.125 cm acero perpendicuar al trafico @ As >= 0.75*Ag/fy Analisis para un metro As = cm2 3/8" VERDADERO 8.-ACERO TRAS VERS AL S UPERI OR 8.-ACERO TRAS VERS AL S UPERI OR As >= 0.75*Ag/fy 0.01637 AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 18.67 AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 18.67 Fierros = p= 7.- DI S EÑO DE ACERO TRANS VERS AL 0.33 cm ambos sentidos 0.4464 Fierros = 1 cm2 3/8" 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO @ 0.33 cm ambos sentidos 4
  • 6. B.3.2.3.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE DERECHO TRAMO 1 Y 3 M (+): 1 3 2 Mu = 54.54 Ton.m Vu = B.3.2.4.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE DERECHO TRAMO 2 Y 4 M (+): 4 34.98 Ton 1 Mu = 3 2 54.54 Ton.m d = h-3-(5/8")/2 0.45 d= 41.206 Vu = 26.95 Ton d = h-3-(5/8")/2 0.45 d= 41.206 1 1 a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 40.606 cm2 5% 42.6362 -5% 38.576 Paralelo al trafico se diseña este acero cantidad de fierros = 20 fierros 5/8 @ 0.10 cm a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 40.606 cm2 5% 42.6362 -5% 38.576 Paralelo al trafico se diseña este acero cantidad de fierros = 20 fierros 5/8 @ 0.10 cm Cheque de cuantia maxima: Cheque de cuantia maxima: Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 p= 0.00985 VERDADERO 7.- DI S EÑO DE ACERO TRANS VERS AL SI h<= 600 mm 8.-ACERO TRAS VERS AL S UPERI OR 0.4464 Fierros = 1 cm2 3/8" 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO SI h<= 600 mm VERDADERO Fierros = 16 3/8" @ 0.125 cm acero perpendicuar al trafico 8.-ACERO TRAS VERS AL S UPERI OR Analisis para un metro As = VERDADERO AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 11.24 16 3/8" @ 0.125 cm acero perpendicuar al trafico As >= 0.75*Ag/fy 0.00985 7.- DI S EÑO DE ACERO TRANS VERS AL VERDADERO AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 11.24 Fierros = p= @ As >= 0.75*Ag/fy Analisis para un metro As = 0.33 cm ambos sentidos 0.4464 Fierros = 1 cm2 3/8" 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO @ 0.33 cm ambos sentidos 4
  • 7. C.3.1.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 1 Y 4 M (+): 1 3 2 Mu = 38.69 Ton.m Vu = 0.45 26.72 Ton d = h-3-(5/8")/2 d= 41.206 1 a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 27.9767 cm2 5% 29.3755 -5% 26.5779 Paralelo al trafico se diseña este acero cantidad de fierros = 14 fierros 5/8 @ 0.10 cm Cheque de cuantia maxima: Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 p= 0.00679 VERDADERO 7.- DI S EÑO DE ACERO TRANS VERS AL SI h<= 600 mm VERDADERO AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 7.741 Fierros = 11 3/8" @ 0.125 cm acero perpendicuar al trafico 8.-ACERO TRAS VERS AL S UPERI OR As >= 0.75*Ag/fy Analisis para un metro As = 0.4464 Fierros = 1 cm2 3/8" 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO @ 0.33 cm ambos sentidos 4
  • 8. C.3.1.2.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 2 Y 3 M (+): 1 3 2 Mu = 26.36 Ton.m Vu = 0.45 23.13 Ton C.3.1.3.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 1 Y 4 M (-): 4 1 Mu = 44.38 Ton.m d = h-3-(5/8")/2 d= 41.206 Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 0.00453 VERDADERO 7.- DI S EÑO DE ACERO TRANS VERS AL SI h<= 600 mm d = h-3-(5/8")/2 d= 41.206 8.-ACERO TRAS VERS AL S UPERI OR Fierros = 1 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu VERDADERO 0.00787 @ VERDADERO 0.33 cm ambos sentidos VERDADERO AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 8.97 13 3/8" @ 0.125 cm acero perpendicuar al trafico 8.-ACERO TRAS VERS AL S UPERI OR Analisis para un metro As = 0.4464 Fierros = cm2 3/8" p= 7.- DI S EÑO DE ACERO TRANS VERS AL As >= 0.75*Ag/fy Analisis para un metro 0.4464 Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 Fierros = 7 3/8" @ 0.125 cm acero perpendicuar al trafico As = a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 32.4192 cm2 5% 34.0401 -5% 30.7982 Paralelo al trafico se diseña este acero cantidad de fierros = 16 fierros 5/8 @ 0.10 cm SI h<= 600 mm VERDADERO AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 5.165 36.5442 Ton Cheque de cuantia maxima: Cheque de cuantia maxima: As >= 0.75*Ag/fy 30.52 1 a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 18.665 cm2 5% 19.5983 -5% 17.7318 Paralelo al trafico se diseña este acero cantidad de fierros = 9 fierros 5/8 @ 0.10 cm Fierros = Vu = 0.45 1 p= 3 2 1 cm2 3/8" 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO @ 0.33 cm ambos sentidos 4
  • 9. C.3.1.4.- DISEÑO DE ACERO POR FLEXIÓN FRANJA INTERIOR TRAMO 2 Y 3 M (-): 1 3 2 Mu = 35.66 Ton.m Vu = 0.45 26.73 Ton C.3.2.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE IZQUIERDO TRAMO 1 Y 4 M (-): 4 1 Mu = 3 2 49.90 Ton.m d = h-3-(5/8")/2 d= 41.206 Vu = 0.45 1 30.35 Ton d = h-3-(5/8")/2 d= 41.206 1 a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 25.6498 cm2 5% 26.9322 -5% 24.3673 Paralelo al trafico se diseña este acero cantidad de fierros = 13 fierros 5/8 @ 0.10 cm a = As*fy/(0.85*f¨c*b) a= 0.176 As As = Mu/(o*fy*(d-a/2) As = 0.00 36.825 5% 38.666 -5% 34.984 cantidad de fierros = As *d-0.17647*As^2/2-Mu/(o*fy) cm2 Paralelo al trafico se diseña este acero 18 fierros 5/8 @ 0.10 cm Cheque de cuantia maxima: Cheque de cuantia maxima: Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 p= 0.00622 VERDADERO 7.- DI S EÑO DE ACERO TRANS VERS AL SI h<= 600 mm p= 0.00894 VERDADERO 7.- DI S EÑO DE ACERO TRANS VERS AL VERDADERO SI h<= 600 mm VERDADERO AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 7.097 AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 10.19 Fierros = Fierros = 10 3/8" @ 0.125 cm acero perpendicuar al trafico 8.-ACERO TRAS VERS AL S UPERI OR As >= 0.75*Ag/fy 8.-ACERO TRAS VERS AL S UPERI OR Analisis para un metro As = 0.4464 Fierros = 1 cm2 3/8" 14 3/8" @ 0.125 cm acero perpendicuar al trafico @ As >= 0.75*Ag/fy Analisis para un metro As = 0.33 cm ambos sentidos 0.4464 Fierros = 1 9.- CHEQUEO POR CORTE: 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu cm2 3/8" Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO @ 0.33 cm ambos sentidos 4
  • 10. C.3.2.2.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE IZQUIERDO TRAMO 2 Y 3 M (-): 1 Mu = 3 2 36.17 Ton.m Vu = 24.17 Ton C.3.3.1.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE DERECHO TRAMO 1 Y 4 M (-): 4 1 Mu = 3 2 56.11 Ton.m d = h-3-(5/8")/2 0.45 d= 41.206 Vu = 34.69 Ton d = h-3-(5/8")/2 0.45 d= 41.206 1 1 a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 26.040 cm2 5% 27.3416 -5% 24.738 Paralelo al trafico se diseña este acero cantidad de fierros = 13 fierros 5/8 @ 0.10 cm a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 41.902 cm2 5% 43.9973 -5% 39.807 Paralelo al trafico se diseña este acero cantidad de fierros = 21 fierros 5/8 @ 0.10 cm Cheque de cuantia maxima: Cheque de cuantia maxima: Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 p= 0.00632 VERDADERO 7.- DI S EÑO DE ACERO TRANS VERS AL SI h<= 600 mm VERDADERO AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 7.205 Fierros = 8.-ACERO TRAS VERS AL S UPERI OR 0.4464 Fierros = 1 cm2 3/8" 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO VERDADERO SI h<= 600 mm VERDADERO Fierros = 16 3/8" @ 0.125 cm acero perpendicuar al trafico 8.-ACERO TRAS VERS AL S UPERI OR Analisis para un metro As = 0.01017 AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 11.59 10 3/8" @ 0.125 cm acero perpendicuar al trafico As >= 0.75*Ag/fy p= 7.- DI S EÑO DE ACERO TRANS VERS AL @ As >= 0.75*Ag/fy Analisis para un metro As = 0.33 cm ambos sentidos 0.4464 Fierros = 1 cm2 3/8" 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO @ 0.33 cm ambos sentidos 4
  • 11. C.3.3.2.- DISEÑO DE ACERO POR FLEXIÓN FRANJA DE BORDE DERECHO TRAMO 2 Y 3 M (-): 1 Mu = 3 2 39.08 Ton.m Vu = 30.72 Ton d = h-3-(5/8")/2 0.45 d= 41.206 1 a = As*fy/(0.85*f¨c*b) a= 0.176 As As *d-0.17647*As^2/2-Mu/(o*fy) As = Mu/(o*fy*(d-a/2) As = 0.00 28.278 cm2 5% 29.6921 -5% 26.864 Paralelo al trafico se diseña este acero cantidad de fierros = 14 fierros 5/8 @ 0.10 cm Cheque de cuantia maxima: Pmax =0.75*[0.85*B1*f¨c*(6117/(6117+fy))/fy] Pmax = 0.0214 p= 0.00686 VERDADERO 7.- DI S EÑO DE ACERO TRANS VERS AL SI h<= 600 mm VERDADERO AST < 1750/(L^0.5) <= 50% > As AST = 27.67 As Ast = 7.825 Fierros = 11 3/8" @ 0.125 cm acero perpendicuar al trafico 8.-ACERO TRAS VERS AL S UPERI OR As >= 0.75*Ag/fy Analisis para un metro As = 0.4464 Fierros = 1 cm2 3/8" 9.- CHEQUEO POR CORTE: Vs + Vc >= Vu 0.53*(f´c^0.5)*bw*d>= Vu 36.5442 VERDADERO @ 0.33 cm ambos sentidos 4