SlideShare a Scribd company logo
1 of 26
Download to read offline
Kanban Pizza Game

experience Kanban for yourself




agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Games give experience




agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Kanban starts where you are
                    ... normally with an existing process




Try to produce
as many as you can                                                 No fixed iterations
& avoid wasted materials                                           & we play till I clap my hands

agile42 | We advise, train and coach companies building software                 www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Let’s play!




agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
The Core of Kanban - 6 Practices



                                                                   Commonly Lead time

                                                                   We use a point system
                                                                   that rewards finished products
                                                                   and punishes unfinished inventory




agile42 | We advise, train and coach companies building software     www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Point-system to measure and optimize the flow

             Pizza base (with
             or without sauce)
             = -4 points



                                      Toppings                                               ive e
                                                                                           at on
                                      = -1 pt/each                                     n eg d
                                                                                   t s 0 0%
                                                                                 un 1
                                                                              co is
                                                                           ce lice
    Finished slice                                                      pie e s
                                                                     c h th
    = +10 points                                                   Ea til
                                                                    un
agile42 | We advise, train and coach companies building software      www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
The Core of Kanban - 6 Practices

                Visualize the                                        Limit Work In
                                                                                                     Manage the Flow
                  Workflow                                           Progress (WIP)


                                                 Where was unfinished work piling up?

                                                 Select a WIP limit
                                                 Mark your stations with the WiP Limit


                                                                                        Normally Lead time
Do you have a workflow?
                                                                                        We use a point system
Make a station for each step                                                            that rewards finished products
                                                                                        and punishes unfinished


 agile42 | We advise, train and coach companies building software                    www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
The Core of Kanban - 6 Practices

        Implement Feedback                                           Make Process                              Improve
              Loops                                                 Policies Explicit                       Collaboratively


                                                    Make it easy for people to do the
                                                    right things, and do them right




Are you regularly reviewing your
work and processes?                                                                             Use metrics and models
                                                                                                to continuously improve
Hold standups and retrospectives



 agile42 | We advise, train and coach companies building software                  www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Visualize your workflow
                       & limit your work in progress




      Make your workflow explicit
      Limit the WiP for each station

      5 min time-box




agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Ok, let’s play again!




agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Stop!!! - Let’s measure the points

             Pizza base (with
             or without sauce)
             = -4 points



                                      Toppings                                               ive e
                                                                                           at on
                                      = -1 pt/each                                     n eg d
                                                                                   t s 0 0%
                                                                                 un 1
                                                                              co is
                                                                           ce lice
    Finished slice                                                      pie e s
                                                                     c h th
    = +10 points                                                   Ea til
                                                                    un
agile42 | We advise, train and coach companies building software      www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Like in the real world,
                         Let’s extend the game                     some things change!

agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
New! New!! New!!!
“Pizza Speciale”

Slim green post-its as rucola
(rocket salad)

Each piece has 7 of them

Rucola burns in the oven
(Pieces have to be put on a baked pizza)




agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Now, we produce
based on orders
Cash on Delivery: Points are given
only for fully delivered orders

Orders can be picked up
from a central defined location

Finished orders must be delivered
to another central location




agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Ok, let’s play again!




agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Stop!!! - Let’s measure the points

             Pizza base (with
             or without sauce)
             = -4 points



                                      Toppings                                               ive e
                                                                                           at on
                                      = -1 pt/each                                     n eg d
                                                                                   t s 0 0%
                                                                                 un 1
                                                                              co is
                                                                           ce lice
    Finished slice                                                      pie e s
                                                                     c h th
    = +10 points                                                   Ea til
                                                                    un
agile42 | We advise, train and coach companies building software      www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Ok, let’s play again!




agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Stop!!! - Let’s measure the points

             Pizza base (with
             or without sauce)
             = -4 points



                                      Toppings                                               ive e
                                                                                           at on
                                      = -1 pt/each                                     n eg d
                                                                                   t s 0 0%
                                                                                 un 1
                                                                              co is
                                                                           ce lice
    Finished slice                                                      pie e s
                                                                     c h th
    = +10 points                                                   Ea til
                                                                    un
agile42 | We advise, train and coach companies building software      www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Draw your workflow

              Look back                                               Draw the flow                         Use your materials
             to the game                                           including WIP limits                   to make it look nice




agile42 | We advise, train and coach companies building software                      www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
agile42 | We advise, train and coach companies building software        www.agile42.com |   All rights reserved. Copyright © 2007 - 2009.

Tuesday, August 2, 2011
agile42 | We advise, train and coach companies building software          www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
The Core of Kanban - 6 Practices




agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Prerequisites of Kanban as a working system


                                                                   Kaizen




                                       Board                                Pull


agile42 | We advise, train and coach companies building software            www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
There are many more things to talk about




agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Kanban Pizza Game                                                            www.agile42.com



                                        Kanban Pizza Rules—Game Master
                                                       Kanban Pizza Game by agile42 is licensed under 
by agile42 is licensed under                           Creative Commons Attribution-Share Alike 3.0 Germany License.

Creative Commons Attribution-Share Alike 3.0 Germany License.
                                        Rounds
                                        Ok, here is the deal: You are the sponsor of a Pizza Bakery Shop! Motivate
                                        people to produce the highest value.

                                        Round 1 Let them bake Pizza Hawaii as fast as possible and see what happens.
                                        Tell them that on the first day, all pizza is handed out for free and you expect a
                                        lot of customers. Do not give further instructions for the set up.
                                        Round 2 Introduce orders (and explain the impact on the score), introduce
                                        stations, introduce WIP limits
Further information:                    Round 3 Introduce the „Pizza Speciale“—attention, Ruccola burns in the oven!
                                        Round 4 Let them self-organize
www.agile42.com/training/kanban-pizza-game
info@agile42.com           Flow of the Game
                                          - Explain them that you want to run a Pizza Shop. Read Preparations and follow
                                            the instructions
                                          - Ask them how many points they think that they will score, note that number.
                                          - Tell them that the rounds will symbolize slices of the day and will not have a
                                            fixed length
                                          - Do about 6 mins rounds but do not tell them how long it will be
                                          - Count the score after each round
                                          - Do a 2 min retrospective after each round. 1 min to focus on what impeded
agile42 | We advise, train and coach companies building software                                        www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
                                            them most and another 1 min to discuss how to improve that or get around
Ralf Kruse

Agile Coach
ralf.kruse@agile42.com




agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.
Photos by
agile42:
Ralf Kruse
Martin von Weissenberg

Agile Finland:
Tampere Goes Agile 2011

Flickr:
wheels3217
quinnanya
el_floz
TANAKA Juuyoh (田中十洋)




agile42 | We advise, train and coach companies building software   www.agile42.com |   All rights reserved. Copyright © 2007 - 2012.

More Related Content

What's hot

Intro to Kanban - AgileDayChile2011 Keynote
Intro to Kanban - AgileDayChile2011 KeynoteIntro to Kanban - AgileDayChile2011 Keynote
Intro to Kanban - AgileDayChile2011 KeynoteChileAgil
 
Lean Paper Airplane Folding Game
Lean Paper Airplane Folding GameLean Paper Airplane Folding Game
Lean Paper Airplane Folding Gameleansimulations
 
Batch v Lean 1 piece flow training
Batch v Lean 1 piece flow trainingBatch v Lean 1 piece flow training
Batch v Lean 1 piece flow trainingJulian Kalac P.Eng
 
Kaizen ~ Continuous Process Improvement (Cpi)
Kaizen ~  Continuous Process Improvement (Cpi)Kaizen ~  Continuous Process Improvement (Cpi)
Kaizen ~ Continuous Process Improvement (Cpi)Anand Subramaniam
 
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results TKMG, Inc.
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesTKMG, Inc.
 
Agile and Lean Games
Agile and Lean GamesAgile and Lean Games
Agile and Lean GamesAdrian Smith
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training TipsTKMG, Inc.
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
Conducting Kaizen Events
Conducting Kaizen EventsConducting Kaizen Events
Conducting Kaizen EventsStephen Depoe
 
Intro to Lean Software Development
Intro to Lean Software DevelopmentIntro to Lean Software Development
Intro to Lean Software Developmentgcaprio
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...TKMG, Inc.
 
How to Team Break Out in a PI-Planning
How to Team Break Out in a PI-PlanningHow to Team Break Out in a PI-Planning
How to Team Break Out in a PI-PlanningJoël Krapf
 
Lean game air plane
Lean game air planeLean game air plane
Lean game air plane인성 김
 

What's hot (20)

Intro to Kanban - AgileDayChile2011 Keynote
Intro to Kanban - AgileDayChile2011 KeynoteIntro to Kanban - AgileDayChile2011 Keynote
Intro to Kanban - AgileDayChile2011 Keynote
 
Lean Paper Airplane Folding Game
Lean Paper Airplane Folding GameLean Paper Airplane Folding Game
Lean Paper Airplane Folding Game
 
Batch v Lean 1 piece flow training
Batch v Lean 1 piece flow trainingBatch v Lean 1 piece flow training
Batch v Lean 1 piece flow training
 
Kaizen ~ Continuous Process Improvement (Cpi)
Kaizen ~  Continuous Process Improvement (Cpi)Kaizen ~  Continuous Process Improvement (Cpi)
Kaizen ~ Continuous Process Improvement (Cpi)
 
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and Priorities
 
Agile and Lean Games
Agile and Lean GamesAgile and Lean Games
Agile and Lean Games
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training Tips
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
Kanban Pizza Game
Kanban Pizza GameKanban Pizza Game
Kanban Pizza Game
 
Lean Office by Operational Excellence Consulting
Lean Office by Operational Excellence ConsultingLean Office by Operational Excellence Consulting
Lean Office by Operational Excellence Consulting
 
Leading using the Oobeya Room
Leading using the Oobeya RoomLeading using the Oobeya Room
Leading using the Oobeya Room
 
Conducting Kaizen Events
Conducting Kaizen EventsConducting Kaizen Events
Conducting Kaizen Events
 
Intro to Lean Software Development
Intro to Lean Software DevelopmentIntro to Lean Software Development
Intro to Lean Software Development
 
Introducing Lean Six Sigma 2014...
Introducing Lean Six Sigma 2014...Introducing Lean Six Sigma 2014...
Introducing Lean Six Sigma 2014...
 
Lean Road Map
Lean Road MapLean Road Map
Lean Road Map
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
 
How to Team Break Out in a PI-Planning
How to Team Break Out in a PI-PlanningHow to Team Break Out in a PI-Planning
How to Team Break Out in a PI-Planning
 
Lean game air plane
Lean game air planeLean game air plane
Lean game air plane
 
Depth of a Kanban Implementation
Depth of a Kanban ImplementationDepth of a Kanban Implementation
Depth of a Kanban Implementation
 

Similar to Kanban pizza game

Giving Teams the Roots to Grow and Wings to Fly
Giving Teams the Roots to Grow and Wings to FlyGiving Teams the Roots to Grow and Wings to Fly
Giving Teams the Roots to Grow and Wings to FlyDave Sharrock
 
The Power of Why
The Power of WhyThe Power of Why
The Power of WhyGeir Amsjø
 
Lessons from the Cornish Software Mines
Lessons from the Cornish Software MinesLessons from the Cornish Software Mines
Lessons from the Cornish Software Minesallan kelly
 
Empirical proces control
Empirical proces controlEmpirical proces control
Empirical proces controlNiels Verdonk
 
Breakfast for agile champions workshop-sgsea2011
Breakfast for agile champions workshop-sgsea2011Breakfast for agile champions workshop-sgsea2011
Breakfast for agile champions workshop-sgsea2011Dave Sharrock
 
SME Lean Presentation
SME Lean PresentationSME Lean Presentation
SME Lean PresentationSLKisling
 
Business Design Game: Action Plan Template
Business Design Game: Action Plan TemplateBusiness Design Game: Action Plan Template
Business Design Game: Action Plan TemplateMarcin Kokott
 
@Richard dolman backlog refinement-the rodney dangerfield of scrum ceremonies
@Richard dolman   backlog refinement-the rodney dangerfield of scrum ceremonies@Richard dolman   backlog refinement-the rodney dangerfield of scrum ceremonies
@Richard dolman backlog refinement-the rodney dangerfield of scrum ceremoniesRichard Dolman
 
Agile & Lean & Kanban in the Real World - A Case Study
Agile & Lean & Kanban in the Real World - A Case StudyAgile & Lean & Kanban in the Real World - A Case Study
Agile & Lean & Kanban in the Real World - A Case StudyRussell Pannone
 
Transitioning to Kanban: Theory and Practice - Project Summit Boston 2011
Transitioning to Kanban: Theory and Practice - Project Summit Boston 2011Transitioning to Kanban: Theory and Practice - Project Summit Boston 2011
Transitioning to Kanban: Theory and Practice - Project Summit Boston 2011Gil Irizarry
 
ERE Webinar Recalibrate Recruiting Technology
ERE Webinar Recalibrate Recruiting TechnologyERE Webinar Recalibrate Recruiting Technology
ERE Webinar Recalibrate Recruiting TechnologyAndrew Sutherland
 
Think Beyond the Kanban Board
Think Beyond the Kanban BoardThink Beyond the Kanban Board
Think Beyond the Kanban BoardDigite, Inc.
 
QA is dead long live the new QA - Agile Dev and QA Conference Israel
QA is dead long live the new QA - Agile Dev and QA Conference IsraelQA is dead long live the new QA - Agile Dev and QA Conference Israel
QA is dead long live the new QA - Agile Dev and QA Conference IsraelYuval Yeret
 
Earned Value Management and Agile Tips for Success
Earned Value Management and Agile Tips for Success Earned Value Management and Agile Tips for Success
Earned Value Management and Agile Tips for Success Brent Barton
 
at ADAPT: AgileEVM Delivering Value within Constrained Systems
at ADAPT: AgileEVM Delivering Value within Constrained Systemsat ADAPT: AgileEVM Delivering Value within Constrained Systems
at ADAPT: AgileEVM Delivering Value within Constrained SystemsBrent Barton
 
Chasingwindmills agile success
Chasingwindmills agile successChasingwindmills agile success
Chasingwindmills agile successPaul Boos
 
Using lean startup model to foster Agile adoption in multinational organizations
Using lean startup model to foster Agile adoption in multinational organizationsUsing lean startup model to foster Agile adoption in multinational organizations
Using lean startup model to foster Agile adoption in multinational organizationsAngel Diaz-Maroto
 

Similar to Kanban pizza game (20)

Giving Teams the Roots to Grow and Wings to Fly
Giving Teams the Roots to Grow and Wings to FlyGiving Teams the Roots to Grow and Wings to Fly
Giving Teams the Roots to Grow and Wings to Fly
 
The Power of Why
The Power of WhyThe Power of Why
The Power of Why
 
Lessons from the Cornish Software Mines
Lessons from the Cornish Software MinesLessons from the Cornish Software Mines
Lessons from the Cornish Software Mines
 
Empirical proces control
Empirical proces controlEmpirical proces control
Empirical proces control
 
Breakfast for agile champions workshop-sgsea2011
Breakfast for agile champions workshop-sgsea2011Breakfast for agile champions workshop-sgsea2011
Breakfast for agile champions workshop-sgsea2011
 
20100220 Sit Bonn V1 0
20100220 Sit Bonn V1 020100220 Sit Bonn V1 0
20100220 Sit Bonn V1 0
 
SME Lean Presentation
SME Lean PresentationSME Lean Presentation
SME Lean Presentation
 
Iqnite keynote
Iqnite keynoteIqnite keynote
Iqnite keynote
 
Business Design Game: Action Plan Template
Business Design Game: Action Plan TemplateBusiness Design Game: Action Plan Template
Business Design Game: Action Plan Template
 
Advanced Scrum
Advanced ScrumAdvanced Scrum
Advanced Scrum
 
@Richard dolman backlog refinement-the rodney dangerfield of scrum ceremonies
@Richard dolman   backlog refinement-the rodney dangerfield of scrum ceremonies@Richard dolman   backlog refinement-the rodney dangerfield of scrum ceremonies
@Richard dolman backlog refinement-the rodney dangerfield of scrum ceremonies
 
Agile & Lean & Kanban in the Real World - A Case Study
Agile & Lean & Kanban in the Real World - A Case StudyAgile & Lean & Kanban in the Real World - A Case Study
Agile & Lean & Kanban in the Real World - A Case Study
 
Transitioning to Kanban: Theory and Practice - Project Summit Boston 2011
Transitioning to Kanban: Theory and Practice - Project Summit Boston 2011Transitioning to Kanban: Theory and Practice - Project Summit Boston 2011
Transitioning to Kanban: Theory and Practice - Project Summit Boston 2011
 
ERE Webinar Recalibrate Recruiting Technology
ERE Webinar Recalibrate Recruiting TechnologyERE Webinar Recalibrate Recruiting Technology
ERE Webinar Recalibrate Recruiting Technology
 
Think Beyond the Kanban Board
Think Beyond the Kanban BoardThink Beyond the Kanban Board
Think Beyond the Kanban Board
 
QA is dead long live the new QA - Agile Dev and QA Conference Israel
QA is dead long live the new QA - Agile Dev and QA Conference IsraelQA is dead long live the new QA - Agile Dev and QA Conference Israel
QA is dead long live the new QA - Agile Dev and QA Conference Israel
 
Earned Value Management and Agile Tips for Success
Earned Value Management and Agile Tips for Success Earned Value Management and Agile Tips for Success
Earned Value Management and Agile Tips for Success
 
at ADAPT: AgileEVM Delivering Value within Constrained Systems
at ADAPT: AgileEVM Delivering Value within Constrained Systemsat ADAPT: AgileEVM Delivering Value within Constrained Systems
at ADAPT: AgileEVM Delivering Value within Constrained Systems
 
Chasingwindmills agile success
Chasingwindmills agile successChasingwindmills agile success
Chasingwindmills agile success
 
Using lean startup model to foster Agile adoption in multinational organizations
Using lean startup model to foster Agile adoption in multinational organizationsUsing lean startup model to foster Agile adoption in multinational organizations
Using lean startup model to foster Agile adoption in multinational organizations
 

More from Ralf Kruse

Kanban einführen und reflektieren
Kanban einführen und reflektierenKanban einführen und reflektieren
Kanban einführen und reflektierenRalf Kruse
 
OOP2017 - Von optimaler Nutzung unserer Zeit, wirklichen Erkenntnissen und Hypes
OOP2017 - Von optimaler Nutzung unserer Zeit, wirklichen Erkenntnissen und HypesOOP2017 - Von optimaler Nutzung unserer Zeit, wirklichen Erkenntnissen und Hypes
OOP2017 - Von optimaler Nutzung unserer Zeit, wirklichen Erkenntnissen und HypesRalf Kruse
 
OOP 2017 - Von Experimenten zu sprechen ist nicht schwer, sie effektiv zu nut...
OOP 2017 - Von Experimenten zu sprechen ist nicht schwer, sie effektiv zu nut...OOP 2017 - Von Experimenten zu sprechen ist nicht schwer, sie effektiv zu nut...
OOP 2017 - Von Experimenten zu sprechen ist nicht schwer, sie effektiv zu nut...Ralf Kruse
 
OOP 2017 - Durchdenken oder einfach mal machen?
OOP 2017 - Durchdenken oder einfach mal machen?OOP 2017 - Durchdenken oder einfach mal machen?
OOP 2017 - Durchdenken oder einfach mal machen?Ralf Kruse
 
Scrum Master Dojo @ Scrum Gathering Munich
Scrum Master Dojo @ Scrum Gathering MunichScrum Master Dojo @ Scrum Gathering Munich
Scrum Master Dojo @ Scrum Gathering MunichRalf Kruse
 
Disruptus Spiel - AUG Bremen Oldenburg von Kai Hermanns & Christian Beck
Disruptus Spiel - AUG Bremen Oldenburg von Kai Hermanns & Christian BeckDisruptus Spiel - AUG Bremen Oldenburg von Kai Hermanns & Christian Beck
Disruptus Spiel - AUG Bremen Oldenburg von Kai Hermanns & Christian BeckRalf Kruse
 
Der Kampf gegen Windmühlen - OOP 2016
Der Kampf gegen Windmühlen - OOP 2016Der Kampf gegen Windmühlen - OOP 2016
Der Kampf gegen Windmühlen - OOP 2016Ralf Kruse
 
Von der Idee zum Backlog - OOP 2016
Von der Idee zum Backlog - OOP 2016Von der Idee zum Backlog - OOP 2016
Von der Idee zum Backlog - OOP 2016Ralf Kruse
 
Kanban: No Answers, Just Questions
Kanban: No Answers, Just Questions  Kanban: No Answers, Just Questions
Kanban: No Answers, Just Questions Ralf Kruse
 
Is your organisation reaping the possible benefits of scaling agile?
Is your organisation reaping the possible benefits of scaling agile? Is your organisation reaping the possible benefits of scaling agile?
Is your organisation reaping the possible benefits of scaling agile? Ralf Kruse
 
On agile games and how to develop one
On agile games and how to develop oneOn agile games and how to develop one
On agile games and how to develop oneRalf Kruse
 
Scrum day two kinds of scrum
Scrum day   two kinds of scrumScrum day   two kinds of scrum
Scrum day two kinds of scrumRalf Kruse
 

More from Ralf Kruse (12)

Kanban einführen und reflektieren
Kanban einführen und reflektierenKanban einführen und reflektieren
Kanban einführen und reflektieren
 
OOP2017 - Von optimaler Nutzung unserer Zeit, wirklichen Erkenntnissen und Hypes
OOP2017 - Von optimaler Nutzung unserer Zeit, wirklichen Erkenntnissen und HypesOOP2017 - Von optimaler Nutzung unserer Zeit, wirklichen Erkenntnissen und Hypes
OOP2017 - Von optimaler Nutzung unserer Zeit, wirklichen Erkenntnissen und Hypes
 
OOP 2017 - Von Experimenten zu sprechen ist nicht schwer, sie effektiv zu nut...
OOP 2017 - Von Experimenten zu sprechen ist nicht schwer, sie effektiv zu nut...OOP 2017 - Von Experimenten zu sprechen ist nicht schwer, sie effektiv zu nut...
OOP 2017 - Von Experimenten zu sprechen ist nicht schwer, sie effektiv zu nut...
 
OOP 2017 - Durchdenken oder einfach mal machen?
OOP 2017 - Durchdenken oder einfach mal machen?OOP 2017 - Durchdenken oder einfach mal machen?
OOP 2017 - Durchdenken oder einfach mal machen?
 
Scrum Master Dojo @ Scrum Gathering Munich
Scrum Master Dojo @ Scrum Gathering MunichScrum Master Dojo @ Scrum Gathering Munich
Scrum Master Dojo @ Scrum Gathering Munich
 
Disruptus Spiel - AUG Bremen Oldenburg von Kai Hermanns & Christian Beck
Disruptus Spiel - AUG Bremen Oldenburg von Kai Hermanns & Christian BeckDisruptus Spiel - AUG Bremen Oldenburg von Kai Hermanns & Christian Beck
Disruptus Spiel - AUG Bremen Oldenburg von Kai Hermanns & Christian Beck
 
Der Kampf gegen Windmühlen - OOP 2016
Der Kampf gegen Windmühlen - OOP 2016Der Kampf gegen Windmühlen - OOP 2016
Der Kampf gegen Windmühlen - OOP 2016
 
Von der Idee zum Backlog - OOP 2016
Von der Idee zum Backlog - OOP 2016Von der Idee zum Backlog - OOP 2016
Von der Idee zum Backlog - OOP 2016
 
Kanban: No Answers, Just Questions
Kanban: No Answers, Just Questions  Kanban: No Answers, Just Questions
Kanban: No Answers, Just Questions
 
Is your organisation reaping the possible benefits of scaling agile?
Is your organisation reaping the possible benefits of scaling agile? Is your organisation reaping the possible benefits of scaling agile?
Is your organisation reaping the possible benefits of scaling agile?
 
On agile games and how to develop one
On agile games and how to develop oneOn agile games and how to develop one
On agile games and how to develop one
 
Scrum day two kinds of scrum
Scrum day   two kinds of scrumScrum day   two kinds of scrum
Scrum day two kinds of scrum
 

Recently uploaded

UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1DianaGray10
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPathCommunity
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioChristian Posta
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding TeamAdam Moalla
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostMatt Ray
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxGDSC PJATK
 
AI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarAI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarPrecisely
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1DianaGray10
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IES VE
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024SkyPlanner
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?IES VE
 
Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.YounusS2
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfinfogdgmi
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfDaniel Santiago Silva Capera
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsSafe Software
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Adtran
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemAsko Soukka
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureEric D. Schabell
 

Recently uploaded (20)

UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation Developers
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and Istio
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptx
 
AI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarAI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity Webinar
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024
 
How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?
 
Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.Basic Building Blocks of Internet of Things.
Basic Building Blocks of Internet of Things.
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdf
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™
 
Bird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystemBird eye's view on Camunda open source ecosystem
Bird eye's view on Camunda open source ecosystem
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability Adventure
 

Kanban pizza game

  • 1. Kanban Pizza Game experience Kanban for yourself agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 2. Games give experience agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 3. Kanban starts where you are ... normally with an existing process Try to produce as many as you can No fixed iterations & avoid wasted materials & we play till I clap my hands agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 4. Let’s play! agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 5. The Core of Kanban - 6 Practices Commonly Lead time We use a point system that rewards finished products and punishes unfinished inventory agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 6. Point-system to measure and optimize the flow Pizza base (with or without sauce) = -4 points Toppings ive e at on = -1 pt/each n eg d t s 0 0% un 1 co is ce lice Finished slice pie e s c h th = +10 points Ea til un agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 7. The Core of Kanban - 6 Practices Visualize the Limit Work In Manage the Flow Workflow Progress (WIP) Where was unfinished work piling up? Select a WIP limit Mark your stations with the WiP Limit Normally Lead time Do you have a workflow? We use a point system Make a station for each step that rewards finished products and punishes unfinished agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 8. The Core of Kanban - 6 Practices Implement Feedback Make Process Improve Loops Policies Explicit Collaboratively Make it easy for people to do the right things, and do them right Are you regularly reviewing your work and processes? Use metrics and models to continuously improve Hold standups and retrospectives agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 9. Visualize your workflow & limit your work in progress Make your workflow explicit Limit the WiP for each station 5 min time-box agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 10. Ok, let’s play again! agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 11. Stop!!! - Let’s measure the points Pizza base (with or without sauce) = -4 points Toppings ive e at on = -1 pt/each n eg d t s 0 0% un 1 co is ce lice Finished slice pie e s c h th = +10 points Ea til un agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 12. Like in the real world, Let’s extend the game some things change! agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 13. New! New!! New!!! “Pizza Speciale” Slim green post-its as rucola (rocket salad) Each piece has 7 of them Rucola burns in the oven (Pieces have to be put on a baked pizza) agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 14. Now, we produce based on orders Cash on Delivery: Points are given only for fully delivered orders Orders can be picked up from a central defined location Finished orders must be delivered to another central location agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 15. Ok, let’s play again! agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 16. Stop!!! - Let’s measure the points Pizza base (with or without sauce) = -4 points Toppings ive e at on = -1 pt/each n eg d t s 0 0% un 1 co is ce lice Finished slice pie e s c h th = +10 points Ea til un agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 17. Ok, let’s play again! agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 18. Stop!!! - Let’s measure the points Pizza base (with or without sauce) = -4 points Toppings ive e at on = -1 pt/each n eg d t s 0 0% un 1 co is ce lice Finished slice pie e s c h th = +10 points Ea til un agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 19. Draw your workflow Look back Draw the flow Use your materials to the game including WIP limits to make it look nice agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 20. agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2009. Tuesday, August 2, 2011 agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 21. The Core of Kanban - 6 Practices agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 22. Prerequisites of Kanban as a working system Kaizen Board Pull agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 23. There are many more things to talk about agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 24. Kanban Pizza Game www.agile42.com Kanban Pizza Rules—Game Master Kanban Pizza Game by agile42 is licensed under  by agile42 is licensed under Creative Commons Attribution-Share Alike 3.0 Germany License. Creative Commons Attribution-Share Alike 3.0 Germany License. Rounds Ok, here is the deal: You are the sponsor of a Pizza Bakery Shop! Motivate people to produce the highest value. Round 1 Let them bake Pizza Hawaii as fast as possible and see what happens. Tell them that on the first day, all pizza is handed out for free and you expect a lot of customers. Do not give further instructions for the set up. Round 2 Introduce orders (and explain the impact on the score), introduce stations, introduce WIP limits Further information: Round 3 Introduce the „Pizza Speciale“—attention, Ruccola burns in the oven! Round 4 Let them self-organize www.agile42.com/training/kanban-pizza-game info@agile42.com Flow of the Game - Explain them that you want to run a Pizza Shop. Read Preparations and follow the instructions - Ask them how many points they think that they will score, note that number. - Tell them that the rounds will symbolize slices of the day and will not have a fixed length - Do about 6 mins rounds but do not tell them how long it will be - Count the score after each round - Do a 2 min retrospective after each round. 1 min to focus on what impeded agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012. them most and another 1 min to discuss how to improve that or get around
  • 25. Ralf Kruse Agile Coach ralf.kruse@agile42.com agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.
  • 26. Photos by agile42: Ralf Kruse Martin von Weissenberg Agile Finland: Tampere Goes Agile 2011 Flickr: wheels3217 quinnanya el_floz TANAKA Juuyoh (田中十洋) agile42 | We advise, train and coach companies building software www.agile42.com | All rights reserved. Copyright © 2007 - 2012.