SlideShare a Scribd company logo
1 of 34
 
Chapter 17 Operations Scheduling
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],OBJECTIVES
Work Center ,[object Object],[object Object]
Capacity and Scheduling ,[object Object],[object Object],[object Object],[object Object]
Types of Manufacturing Scheduling Processes and Scheduling Approaches Continuous  process Type of Process Typical Scheduling Approach High-volume manufacturing Med-volume manufacturing Low-volume manufacturing Finite forward  of process, machine limited Finite forward  of line, machined limited Infinite forward  of process, labor and machined limited Infinite forward  of jobs, labor and some machine limited
Typical Scheduling and Control Functions ,[object Object],[object Object],[object Object],[object Object]
Work-Center Scheduling Objectives ,[object Object],[object Object],[object Object],[object Object],[object Object]
Priority Rules for Job Sequencing   ,[object Object],[object Object],[object Object],[object Object],[object Object]
Priority Rules for Job Sequencing (Continued) ,[object Object],[object Object],[object Object]
Example of Job Sequencing: First-Come First-Served Suppose you have the four jobs to the right arrive for processing on one machine What is the FCFS schedule? No, Jobs B, C, and D are going to be late Do all the jobs get done on time? Answer: FCFS Schedule
Example of Job Sequencing: Shortest Operating Time Suppose you have the four jobs to the right arrive for processing on one machine What is the SOT schedule? No, Jobs A and B are going to be late Do all the jobs get done on time? Answer: Shortest Operating Time Schedule
Example of Job Sequencing: Earliest Due Date First Suppose you have the four jobs to the right arrive for processing on one machine What is the earliest due date first schedule? No, Jobs C and B are going to be late Do all the jobs get done on time? Answer: Earliest Due Date First
Example of Job Sequencing: Critical Ratio Method Suppose you have the four jobs to the right arrive for processing on one machine What is the CR schedule? No, but since there is a three-way tie, only the first job or two will be on time In order to do this schedule the CR’s have be calculated for each job. If we let today be Day 1 and allow a total of 15 days to do the work.  The resulting CR’s and order schedule are: CR(A)=(5-4)/15=0.06 (Do this job last) CR(B)=(10-7)/15=0.20 (Do this job first, tied with C and D) CR(C)=(6-3)/15=0.20 (Do this job first, tied with B and D) CR(D)=(4-1)/15=0.20 (Do this job first, tied with B and C) Do all the jobs get done on time?
Example of Job Sequencing: Last-Come First-Served Answer: Last-Come First-Served Schedule No, Jobs B and A are going to be late Suppose you have the four jobs to the right arrive for processing on one machine What is the LCFS schedule? Do all the jobs get done on time?
Example of Job Sequencing: Johnson’s Rule (Part 1) Suppose you have the following five jobs with time requirements in two stages of production.  What is the job sequence using Johnson’s Rule?   Time in Hours Jobs   Stage 1 Stage 2 A   1.50   1.25 B   2.00   3.00 C   2.50   2.00 D   1.00   2.00
Example of Job Sequencing: Johnson’s Rule  (Part 2) First, select the job with the smallest time in either stage. That is Job D with the smallest time in the first stage.  Place that job as early as possible in the unfilled job sequence below. Drop D out, select the next smallest time (Job A), and place it 4th in the job sequence. Drop A out, select the next smallest time.  There is a tie in two stages for two different jobs.  In this case, place the job with the smallest time in the first stage as early as possible in the unfilled job sequence.  Then place the job with the smallest time in the second stage as late as possible in the unfilled sequence. Job Sequence 1  2  3   4 Job Assigned D A B C   Time in Hours Jobs   Stage 1 Stage 2 A   1.50   1.25 B   2.00   3.00 C   2.50   2.00 D   1.00   2.00
Shop-Floor Control: Major Functions ,[object Object],[object Object],[object Object]
Shop-Floor Control: Major Functions (Continued) ,[object Object],[object Object],[object Object]
Input/Output Control ,[object Object],[object Object],Work Center Input Output
Principles of Work Center Scheduling ,[object Object],[object Object],[object Object],[object Object]
Principles of Job Shop Scheduling (Continued) ,[object Object],[object Object],[object Object],[object Object]
Principles of Job Shop Scheduling (Continued) ,[object Object],[object Object]
Personnel Scheduling in Services ,[object Object],[object Object],[object Object]
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer : d. All of the above
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: b. An infinite loading of work
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: d. All of the above
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: d. All of the above
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: a. Meeting due dates (Correct answer can also include minimizing WIP inventory, idle time, and job flow time.)
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: e. None of the above (Correct answer can is CR or critical ratio.)
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: e. All of the above (Correct answer can also include providing quantity by location and actual output data.)
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: d. All of the above (Correct answer can also include all status and exception reports and input/output control reports.)
Question Bowl ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Answer: a.  There is a direct equivalence between work flow and cash flow (There are nine other principles.)
End of Chapter 17

More Related Content

What's hot

Ch11 strg.capacity mgt
Ch11 strg.capacity mgtCh11 strg.capacity mgt
Ch11 strg.capacity mgt
videoaakash15
 
Ch15 inventory+control
Ch15 inventory+controlCh15 inventory+control
Ch15 inventory+control
videoaakash15
 
heizer jay operations management Supp10pp
heizer jay operations management Supp10ppheizer jay operations management Supp10pp
heizer jay operations management Supp10pp
Taliya Hemanth
 
Waiting Line Management
Waiting Line ManagementWaiting Line Management
Waiting Line Management
Raman Kumar
 

What's hot (20)

Unit 3-inventory control
Unit 3-inventory controlUnit 3-inventory control
Unit 3-inventory control
 
Pqm bottlenecks
Pqm   bottlenecksPqm   bottlenecks
Pqm bottlenecks
 
Ch11 strg.capacity mgt
Ch11 strg.capacity mgtCh11 strg.capacity mgt
Ch11 strg.capacity mgt
 
Ch15 inventory+control
Ch15 inventory+controlCh15 inventory+control
Ch15 inventory+control
 
Stores Management
Stores  ManagementStores  Management
Stores Management
 
Capacity Management
Capacity ManagementCapacity Management
Capacity Management
 
Scheduling ppt @ DOMS
Scheduling ppt @ DOMSScheduling ppt @ DOMS
Scheduling ppt @ DOMS
 
Inventory models
Inventory modelsInventory models
Inventory models
 
Value stream mapping (future state)
Value stream mapping (future state)Value stream mapping (future state)
Value stream mapping (future state)
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Simulation Modeling on Campus Starbucks Coffee Center
Simulation Modeling on Campus Starbucks Coffee CenterSimulation Modeling on Campus Starbucks Coffee Center
Simulation Modeling on Campus Starbucks Coffee Center
 
Ch16 mrp
Ch16 mrpCh16 mrp
Ch16 mrp
 
systematic layout planning - case study
systematic layout planning - case study systematic layout planning - case study
systematic layout planning - case study
 
heizer jay operations management Supp10pp
heizer jay operations management Supp10ppheizer jay operations management Supp10pp
heizer jay operations management Supp10pp
 
Waiting Line Management
Waiting Line ManagementWaiting Line Management
Waiting Line Management
 
Job shop scheduling
Job shop schedulingJob shop scheduling
Job shop scheduling
 
Work Study
Work StudyWork Study
Work Study
 
79971255 assembly-line-balancing
79971255 assembly-line-balancing79971255 assembly-line-balancing
79971255 assembly-line-balancing
 
Assembly Line Balancing -Example
Assembly Line Balancing -ExampleAssembly Line Balancing -Example
Assembly Line Balancing -Example
 
Queuing theory
Queuing theoryQueuing theory
Queuing theory
 

Viewers also liked

Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
Akanksha Gupta
 
Example Solutions for Scheduling and Work Planning
Example Solutions for Scheduling and Work PlanningExample Solutions for Scheduling and Work Planning
Example Solutions for Scheduling and Work Planning
SIS Group International
 
Thriller Opening Sequence Evaluation
Thriller Opening Sequence EvaluationThriller Opening Sequence Evaluation
Thriller Opening Sequence Evaluation
LaurenHunt17
 
Production control presentation
Production control presentationProduction control presentation
Production control presentation
kieran122
 
Computer integrated production planning system
Computer integrated production planning systemComputer integrated production planning system
Computer integrated production planning system
Trony Tron
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
senthil.G
 
Production control
Production controlProduction control
Production control
sadia saeed
 
Mrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationMrp MRPII Erp Implementation
Mrp MRPII Erp Implementation
Anand Subramaniam
 

Viewers also liked (20)

Scheduling process in production planning
Scheduling process in production planningScheduling process in production planning
Scheduling process in production planning
 
Sequencing and Scheduling With MS Project
Sequencing and Scheduling With MS ProjectSequencing and Scheduling With MS Project
Sequencing and Scheduling With MS Project
 
operations scheduling
operations schedulingoperations scheduling
operations scheduling
 
Production scheduling
Production schedulingProduction scheduling
Production scheduling
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Scheduling
SchedulingScheduling
Scheduling
 
Example Solutions for Scheduling and Work Planning
Example Solutions for Scheduling and Work PlanningExample Solutions for Scheduling and Work Planning
Example Solutions for Scheduling and Work Planning
 
Thriller Opening Sequence Evaluation
Thriller Opening Sequence EvaluationThriller Opening Sequence Evaluation
Thriller Opening Sequence Evaluation
 
Introduction to Pre Production - Sequence 2
Introduction to Pre Production - Sequence 2Introduction to Pre Production - Sequence 2
Introduction to Pre Production - Sequence 2
 
Production control presentation
Production control presentationProduction control presentation
Production control presentation
 
Ch17
Ch17Ch17
Ch17
 
The production sequence module 5
The production sequence module 5The production sequence module 5
The production sequence module 5
 
Computer integrated production planning system
Computer integrated production planning systemComputer integrated production planning system
Computer integrated production planning system
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planning
 
Ch17 scheduling
Ch17 schedulingCh17 scheduling
Ch17 scheduling
 
Production control
Production controlProduction control
Production control
 
Sequencing problems in Operations Research
Sequencing problems in Operations ResearchSequencing problems in Operations Research
Sequencing problems in Operations Research
 
Sequencing
SequencingSequencing
Sequencing
 
Mrp MRPII Erp Implementation
Mrp MRPII Erp ImplementationMrp MRPII Erp Implementation
Mrp MRPII Erp Implementation
 

Similar to Chap017 Scheduling Edit

Scheduling
SchedulingScheduling
Scheduling
jaya_22
 

Similar to Chap017 Scheduling Edit (20)

Scheduling
SchedulingScheduling
Scheduling
 
Chapter 6-Scheduling in Industrial of Engineering
Chapter 6-Scheduling in Industrial of EngineeringChapter 6-Scheduling in Industrial of Engineering
Chapter 6-Scheduling in Industrial of Engineering
 
Operations scheduling
Operations schedulingOperations scheduling
Operations scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations scheduling
 
scheduling2.ppt
scheduling2.pptscheduling2.ppt
scheduling2.ppt
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of Capacity
 
Om chapter 14
Om chapter 14Om chapter 14
Om chapter 14
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
 
Tn6 facility+layout
Tn6 facility+layoutTn6 facility+layout
Tn6 facility+layout
 
scheduling-sequencing-rules.pptx
scheduling-sequencing-rules.pptxscheduling-sequencing-rules.pptx
scheduling-sequencing-rules.pptx
 
OPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.comOPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.com
 
Topic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.pptTopic 5 Production Sequencing and Scheduling.ppt
Topic 5 Production Sequencing and Scheduling.ppt
 
Production Management and Scheduling
Production Management and SchedulingProduction Management and Scheduling
Production Management and Scheduling
 
OPS 571 HELP Education for Service--ops571help.com
 OPS 571 HELP Education for Service--ops571help.com OPS 571 HELP Education for Service--ops571help.com
OPS 571 HELP Education for Service--ops571help.com
 
UOP OPS 571 Inspiring Innovation--uopops571.com
UOP OPS 571 Inspiring Innovation--uopops571.comUOP OPS 571 Inspiring Innovation--uopops571.com
UOP OPS 571 Inspiring Innovation--uopops571.com
 
OPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.comOPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.com
 
Scheduling
SchedulingScheduling
Scheduling
 
Scheduling
SchedulingScheduling
Scheduling
 
chapter16.ppt
chapter16.pptchapter16.ppt
chapter16.ppt
 

More from Ricky Muchtar (8)

In Memoriam, Dasril Muchtar 18-12-1953 - 13-07-2014
In Memoriam, Dasril Muchtar 18-12-1953  -  13-07-2014In Memoriam, Dasril Muchtar 18-12-1953  -  13-07-2014
In Memoriam, Dasril Muchtar 18-12-1953 - 13-07-2014
 
Somethingbotheringyou
SomethingbotheringyouSomethingbotheringyou
Somethingbotheringyou
 
Doors Of Success
Doors Of SuccessDoors Of Success
Doors Of Success
 
Rakorbinpres Litbang
Rakorbinpres LitbangRakorbinpres Litbang
Rakorbinpres Litbang
 
Leadership And Entrepreneur
Leadership And EntrepreneurLeadership And Entrepreneur
Leadership And Entrepreneur
 
Strategi marketing dalam mengembangkan potensi pasar
Strategi marketing dalam mengembangkan potensi pasarStrategi marketing dalam mengembangkan potensi pasar
Strategi marketing dalam mengembangkan potensi pasar
 
Prospek pengembangan bisnis pariwisata di Kota Bandung
Prospek pengembangan bisnis pariwisata di Kota BandungProspek pengembangan bisnis pariwisata di Kota Bandung
Prospek pengembangan bisnis pariwisata di Kota Bandung
 
Final Exam Topics
Final Exam TopicsFinal Exam Topics
Final Exam Topics
 

Recently uploaded

Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Recently uploaded (20)

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

Chap017 Scheduling Edit

  • 1.  
  • 3.
  • 4.
  • 5.
  • 6. Types of Manufacturing Scheduling Processes and Scheduling Approaches Continuous process Type of Process Typical Scheduling Approach High-volume manufacturing Med-volume manufacturing Low-volume manufacturing Finite forward of process, machine limited Finite forward of line, machined limited Infinite forward of process, labor and machined limited Infinite forward of jobs, labor and some machine limited
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. Example of Job Sequencing: First-Come First-Served Suppose you have the four jobs to the right arrive for processing on one machine What is the FCFS schedule? No, Jobs B, C, and D are going to be late Do all the jobs get done on time? Answer: FCFS Schedule
  • 12. Example of Job Sequencing: Shortest Operating Time Suppose you have the four jobs to the right arrive for processing on one machine What is the SOT schedule? No, Jobs A and B are going to be late Do all the jobs get done on time? Answer: Shortest Operating Time Schedule
  • 13. Example of Job Sequencing: Earliest Due Date First Suppose you have the four jobs to the right arrive for processing on one machine What is the earliest due date first schedule? No, Jobs C and B are going to be late Do all the jobs get done on time? Answer: Earliest Due Date First
  • 14. Example of Job Sequencing: Critical Ratio Method Suppose you have the four jobs to the right arrive for processing on one machine What is the CR schedule? No, but since there is a three-way tie, only the first job or two will be on time In order to do this schedule the CR’s have be calculated for each job. If we let today be Day 1 and allow a total of 15 days to do the work. The resulting CR’s and order schedule are: CR(A)=(5-4)/15=0.06 (Do this job last) CR(B)=(10-7)/15=0.20 (Do this job first, tied with C and D) CR(C)=(6-3)/15=0.20 (Do this job first, tied with B and D) CR(D)=(4-1)/15=0.20 (Do this job first, tied with B and C) Do all the jobs get done on time?
  • 15. Example of Job Sequencing: Last-Come First-Served Answer: Last-Come First-Served Schedule No, Jobs B and A are going to be late Suppose you have the four jobs to the right arrive for processing on one machine What is the LCFS schedule? Do all the jobs get done on time?
  • 16. Example of Job Sequencing: Johnson’s Rule (Part 1) Suppose you have the following five jobs with time requirements in two stages of production. What is the job sequence using Johnson’s Rule? Time in Hours Jobs Stage 1 Stage 2 A 1.50 1.25 B 2.00 3.00 C 2.50 2.00 D 1.00 2.00
  • 17. Example of Job Sequencing: Johnson’s Rule (Part 2) First, select the job with the smallest time in either stage. That is Job D with the smallest time in the first stage. Place that job as early as possible in the unfilled job sequence below. Drop D out, select the next smallest time (Job A), and place it 4th in the job sequence. Drop A out, select the next smallest time. There is a tie in two stages for two different jobs. In this case, place the job with the smallest time in the first stage as early as possible in the unfilled job sequence. Then place the job with the smallest time in the second stage as late as possible in the unfilled sequence. Job Sequence 1 2 3 4 Job Assigned D A B C Time in Hours Jobs Stage 1 Stage 2 A 1.50 1.25 B 2.00 3.00 C 2.50 2.00 D 1.00 2.00
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.