What is FRACAS - Failure Reporting Made Simple
1. reliability
What’s the FRACAS?
upload
Failure Elimination Made Simple
by Ricky Smith, CPMM, CMRP and Bill Keeter, CMRP
“Your system is perfectly designed to give you the results that you get.”
W. Edwards Deming PhD
H ow good is your organization at identifying failures? Of course you see failures when they occur, but
can you identify when recurring failures are creating serious equipment reliability issues? Most compa-
nies begin applying RCA or RCFA to “high value failures”. While this is not wrong, I prefer to either not
see the failure in the first place, or at the least, to reduce the failures to a controllable level.
Failure Reporting Analysis and Corrective Action System role in unreliability. Here are a few examples of those
(FRACAS) is an excellent process that can be used to con- losses:
trol or eliminate failures. This is a process in which you
identify any reports from your CMMS/EAM or a special- 1. Equipment Breakdown (total functional failure)
ized Reliability Software that can help you to eliminate, A. Causes of Equipment Breakdown
mitigate or control failures. These reports could include 1. No Repeatable Effective Repair, Preventive
cost variance, Mean Time Between Failure, Mean Time Be- Maintenance, Lubrication, or Predictive
tween Repair, dominant failure patterns in your operation, Maintenance Procedure
common threads between failures such as “lack of lubrica- 2. No one following effective procedures
tion” (perhaps due to lubricator not using known industry 2 Equipment not running to rate (partial
standards). One poll was conducted recently covering 80 functional failure)
large companies. Shockingly, none of these companies A. Causes of Equipment not Running to Rate
were capturing the data required to understand and con- 1. Operator not having an effective
trol equipment failures. procedure to follow
2. Operator not trained to operate or
Answer the following questions honestly before you go troubleshoot equipment
any further to see if you have any problems with identify- 3. Management thinking this is the best rate
ing failures and effectively eliminating or mitigating their at which the equipment can operate because
effects on total process and asset reliability. of age or condition
3. Off-Quality Product that is identified as “first pass
1. Can you identify the top 10 assets which had the quality” (could be a partial or total functional failure)
most losses due to a partial or total functional A. Causes of Quality Issues
failure by running a report on your maintenance 1. Acceptance by management that “first pass
software? quality” is not a loss because the product can
2. Can you identify the total losses in your organization be recycled
and separate them into process and asset losses for 4. Premature Equipment Breakdown
the past 365 days? A. Ineffective or no commissioning procedures. We
3. Can you identify components with a common thread are talking about maintenance replacement of
due to a specific failure pattern, such as the one parts or equipment and engineering/contractor
shown in Figure 1? that fails prematurely because no one has iden-
tified if a defect is present after the equipment
has been installed, repaired, serviced, etc. See
Infant Mortality
Figures 2 and 3.
(If you have ever seen equipment break down or not run-
ning to rate immediately after a shutdown, you know
what we are talking about.)
Figure 1 - Failure Pattern from Nowlan
and Heap Study
The Proactive Workflow Model – Eliminating unreliability
Many times, the cost of unreliability remains unknown be- is a continuous improvement process much like the Proac-
cause the causes of unreliability are so many. Whether tive Work Flow Model in Figure 4. The Proactive Work-
you want to point the finger at maintenance, production flow Model illustrates the steps required in order to move
(operations) or engineering, each functional area plays a from a reactive to a proactive maintenance program.
44 june/july 2010
2. the FRACAS provides con-
tinuous improvement for Failure Modes
your maintenance strate- Analysis
gies. There are fundamen-
tal items you must have in
place to insure that you Strategy Failure Codes
Adjustments Creation
receive the results you ex- F.R.A.C.A.S.
pect. Kaizen Loop
Figures 2 and 3 – Defects Identified
Think of FRACAS this way.
As you have failures, you Root Cause Work Order
What the Proactive Work Flow Model really use your CMMS/EAMS failure codes to record Analysis History
Analysis
means to your organization – Implementing the part-defect-cause of each failure. Analyz-
the Proactive Work Flow Model is the key to ing part-defect-cause on critical assets helps
eliminating failures. The built-in continuous you begin to make serious improvement in Figure 5 – FRACAS Loop
improvement processes of Job Plan Improve- your operation’s reliability. Looking at the
ment and the Failure Reporting, Analysis, and FRACAS Model in Figure 5, we begin with ments of an effective FRACAS are an effective
Corrective Action System (FRACAS) help ensure Work Order History Analysis, and from this validated equipment hierarchy, criticality anal-
that maintainability and reliability are always analysis we decide whether we need to apply ysis, failure modes analysis, and equipment
improving. All of the steps and processes have Root Cause Analysis (RCA), Reliability Centered maintenance plans.
to be implemented in a well managed and Maintenance, or Failure Modes and Effect
controlled fashion to get full value out of the Analysis to eliminate or reduce the failures we FRACAS Checklist:
model. discover. From the RCA, we determine mainte-
nance strategy adjustments needed to predict Equipment Hierarchy should be built and vali-
The foundational elements of Asset Health As- or prevent failures. Even the most thorough dated so that similar failures on like equipment
surance are keys because they ensure that all of analysis doesn’t uncover every failure mode. can be identified across an organization.
the organization’s assets are covered by a com- Performance monitoring after we make the
plete and correct Equipment Maintenance Plan strategy adjustments may find that new failure Criticality Analysis is developed and validated
(EM). These are requirements (not options) to modes not covered by your strategy occur. You so that equipment criticality is ranked based
ensure that you have a sustainable proactive can now make a new failure code to track the on Production Throughput, Asset Utilization,
workflow model. new failure mode so additional failures can be Cost, Environment, and Safety.
tracked and managed when you review work
You cannot have continuous improvement Failure Modes Analysis is completed on all criti-
order history. You can see this is a continuous
until you have a repeatable, disciplined cal equipment using FMA, FMEA, or RCM.
improvement loop which never ends.
process. Equipment Maintenance Plans are developed
Steps to Implementing an Effective on all critical equipment to prevent or predict
The objective of the Proactive Work Flow Mod- FRACAS
el is to provide discipline and repeatability to a failure.
your maintenance process. The inclusion of Let’s back up a little. The foundational ele- Effective Equipment Hierarchy – Asset Catalog
or Equipment Hierarchy must be developed to
provide the data required to manage a proac-
tive maintenance program which includes fail-
Asset Health Assurance
Asset Catalog
ProActive Work Flow Model ure reporting or FRACAS (Failure Reporting,
Analysis and Corrective Action System). In
Asset Criticality Analysis
order to eliminate failures, one needs to en-
sure this is a successful first step. Figure 6 (on
Failure Modes Analysis Predictive & Preventative Work
80% of Total Work M.O.C. Procedures the following page) displays the findings from
C.A.S. LOOP
F.R.A. a plant with 32 total “Part – Bearing” failures
Equipment Maintenance from different size electric motors (“Part” is
Plan (EMP) PdM/PM Inspections Results of PdM/PM Equipment Reliability
Improvements identified from a CMMS/EAM Codes drop down
screen). One type “Defect – Wear” occurred
Proactive Work Flow
M.O.C. Procedures Planning M.O.C. Procedures in 85% of the failures (“Defect” is identified
Failure Modes
Analysis
N LOOP from a CMMS/EAM Codes drop down screen).
Requested Work Scheduling PLA
In 98% of the cases, “Cause” was found to be
Strategy Failure Codes
B
JO
Adjustments Creation
20% of Total Work F.R.A.C.A.S.
Kaizen Loop
Job Plan
Daily Coordination Improvements Work Order
”Inadequate Lubrication”. Now it is time to
perform a Root Cause Failure Analysis on this
Root Cause
History
Figure 1 - Risk Scorecard
Analysis
Analysis
Failures Breakdowns Work Performed
common thread of failures. (“Cause” as identi-
fied on CMMS/EAM Codes drop down screen).
Once the hierarchy is established you can find
similar failures in one area of an operation or
Figure 4 - ProActive Work Flow Model
www.uptimemagazine.com 45
3. The purpose of the Asset Criticality Analysis
32 Bearing Failures Accross the Plant is to identify which equipment has the most
Wear Defect for 85% of Bearing Failures serious potential consequences on business
98% of Defects Caused by Lack of Lubrication performance, if it fails. Consequences on the
business can include:
Cause • Production Throughput or Equipment /
Part Defect Common
+ + =
Facility Utilization
Wear Lack of
Bearing Failure • Cost due to lost or reduced output
85% Lubrication
32 Failures Thread • Environmental Issues
98%
• Safety Issues
• Other
What is the Solution to Defect Elimination? The resulting Equipment Criticality Number is
Resolve the Lack of Lubrication Problem used to prioritize resources performing main-
tenance work. The Intercept Ranking Model
Figure 6 – Reason for Equipment Hierarchy Validated illustrates this process (Figure 7). On the “Y”
axis you see the asset criticality is listed from
across the total operation. Validation of the After a thorough analysis you will find that most none to high. I like using a scale of 0-1000
equipment hierarchy is required against the or- failures come from a small amount of equip- because all assets are not necessarily equal.
ganization’s established equipment hierarchy ment. The question is, “Which equipment?”. Using the Intercept line which is struck down
standard. We are looking for “Part” – “Defect” the middle, a planner or scheduler can define
– “Cause”. Maintenance personnel may not Asset Criticality Analysis – Everyone says they which job should be planned or scheduled first,
have the training or ability to determine the have identified their critical equipment. But, in or at least get close to the best answer, because
“Defect” (Predictive Maintenance Technician many cases, equipment criticality could change management has already been involved in de-
could identify Defect) and “Cause” can be typi- based on how upset people are about an equip- termining the most critical asset and the equip-
cally identified by a maintenance technician, ment problem or because people are confused ment has told you (on the “X” axis) which one
maintenance engineer, reliability engineer, or about what consequences associate to failure has the highest defect severity (in the worst
predictive maintenance technician. and the probability it will occur if we manage condition).
equipment reliability effectively.
Lots of people talk about doing “Root Cause
Failure Analysis”. With hundreds of hands-on
examples, we show you how to do it!
Practical Plant Failure Analysis is a three-
day, reasonably-priced, practical seminar for
engineers and skilled plant personnel. In it we
use hundreds of failed shafts, bearings, gears,
belts, chains, and corrosion examples. As part
of the class, small groups do hands-on analysis
of a series of pieces, diagnosing how and why
they failed, and how to prevent another.
The next public session will be on September
28th –30th in Syracuse, NY. Private plant
sessions range from two to five days and can be
held at your site.
Training from the Reliability
Professionals who “wrote the book on
practical failure analysis.”
For more details about failure analysis
or training sessions, contact Dale Gamba
at 315-487-4390 or email us at
reliable@twcny.rr.com
Sachs, Salvaterra & Associates, Inc
6171 Airport Road
Syracuse, NY 13209
46 june/july 2010
5. pect about Asset Health. Once this change is
Asset Health Summary underway, Asset Health, as a metric, becomes
From: Jun 2006 To: June 2007
View: Overall
what most maintenance managers and plant
managers have wanted for a long time — a
1,400 leading indicator of maintenance costs and
Plot Legend
Asset Count Green business risk.
Yellow
Red
0 2. Mean Time Between Failures and Mean Time
Between Repairs – reported by maintenance
Jun 2006
Jul 2006
Aug 2006
Sep 2006
Oct 2006
Nov 2006
Dec 2006
Jan 2007
Feb 2007
Mar 2007
Apr 2007
May 2007
Jun 2007
or reliability engineers on a monthly basis on
Month
the top 5-20% of critical equipment. The report
to management should include recommenda-
Figure 9 – Percent of Assets with No Identifiable Defect tions to improve both metrics and should be
measured and posted on a line graph for all to
in an existing condition, or to keep, preserve, Strategy, Maintenance Planning consisting of see.
protect, while Strategy is development of a repeatable procedures, work scheduled based
prescriptive plan toward a specific goal. on equipment criticality, work executed using 3. Cost Variance by area of the plant – report-
precision techniques, proper commissioning of ed by maintenance and production supervisor
So, a Maintenance Strategy is a prescriptive equipment when a new part or equipment is area of responsibility. Cost variance must be
plan to keep, preserve, or protect an asset or installed, and quality control using Predictive reported to maintenance and production man-
assets. Keep in mind that one specific type of Maintenance Technologies to ensure no de- agement on a monthly basis. The report should
maintenance strategy is “run to failure” (RTF). fects are present after this event occurs. The not be acceptable without a known cause of
However, RTF is used only if, based on thor- very last part of your maintenance strategy is the variance and a plan to bring it in compli-
ough analysis, it is identified as the best solu- FRACAS, because it drives the continuous im- ance.
tion for specific equipment to optimize reliabil- provement portion of this strategy.
ity at optimal cost. Less invasive maintenance 4. Most Frequent Part-Defect-Cause Report –
is preferred to more invasive maintenance. Failure Reporting reported monthly by maintenance or reliability
This is one of the fundamental concepts of any engineers. If you do not have maintenance or
well-defined maintenance strategy. Specific Failure reporting can come in many forms. reliability engineers, you may need to appoint
maintenance strategies are designed to miti- The key is to have a disciplined plan to review a couple of your best maintenance technicians
gate the consequences of each failure mode. failure reports over a specific time period, and as “Reliability Engineering” Technicians, even if
As a result, maintenance is viewed as a reliabil- then to develop actions to eliminate failure. unofficially, and train them to be a key player
ity function instead of a repair function. Saying Following are a few Failure Report examples, in this failure elimination process. This one re-
this means Predictive Maintenance or Condi- which should be included as part of your FRA- port can identify common failure threads with-
tion Monitoring is the best solution because it CAS Continuous Improvement and Defect Elim- in your operation which, when resolved, can
is mainly noninvasive. ination Process. make a quick impact to failure elimination.
Knowing that both systemic problems and op- 1. Asset Health or Percent of Assets with No There are many more reports that can be used
erating envelope problems produce the same Identifiable Defect – reported by maintenance effectively, but will not fit in the space of this
type of defects, a maintenance strategy that management to plant and production manage- article. You will be able to find more reports
merely attempts to discover the defects and ment on a monthly basis at least (see Figure 9). in the book on “FRACAS” written by Ricky and
correct them will never be able to reach a pro- An asset that has an identifiable defect is said Bill, which will be published by mid July.
active state. Technicians will be too busy fixing to be in a condition RED. An asset that does
the symptoms of problems instead of address- not have an identifiable defect is said to be in Bill Keeter is currently a Senior Techni-
ing the root cause. To reach a truly proactive condition GREEN. That is it. It is that simple. cal Advisor for Allied Reliability. Bill joined
state, the root cause of the defects will need There are no other “but ifs”, “what ifs” or “if Allied in 2006 after serving as President
to be identified and eliminated. Maintenance then”. If there is an identifiable defect the asset of BK Reliability Engineers, Inc. where he
strategies that accomplish this are able to is in condition RED. If there is no identifiable provided training and facilitation services
achieve a step change in performance and defect, it is GREEN. The percentage of ma- to help facilities improve asset performance
achieve incredible cost savings. Maintenance chines that are in condition GREEN is the Asset using Weibull Analysis, Reliability Centered
strategies that do not attempt to address the Health (as a percentage) for that plant or area. Maintenance, Availability Simulation, and Life
root cause of defects will continue to see lack- Cycle Cost Analysis. Bill has over 30 years of
luster results and struggle with financial per- The definition for defect is: an abnormality in a experience in Maintenance Engineering and
formance. part which leads to equipment or asset failure Management. He has successfully imple-
if not corrected in time. mented maintenance improvement programs
A Maintenance Strategy involves all elements in a variety of manufacturing and production
that aim the prescriptive plan toward a com- Example: the plant has 1,000 pieces of equip- facilities. Bill’s experience includes mainte-
mon goal. Key parts of a maintenance strategy ment. Of that number, 750 of them have no nance leadership positions in the US Military,
include Preventive and Predictive Maintenance identifiable defects. The plant is said to have the nuclear industry, chemicals, paper con-
based on a solid Failure Mode Elimination 75% Asset Health. There is an interesting as- verting, and plastic film manufacturing. He
48 june/july 2010