COMPANY PROFILE
• Denim jeans manufacturing industryTYPE OF INDUSTRY
• 2000 pieces/ dayCAPACITY
• 60 metres*40 metresAREA
• Assembly lineMANUFACTURING
SYSTEMS
• Ahmedabad, GujaratLOCATION
• 1FSI
• 35%GROUND COVERAGE
OPERATING
ASSUMPTIONS
• 1
• 8
• 300
• 60%
CAPACITY PLANNING:
Average consumption:
1.4 mts per jeans
Shelf size= 4.5 feet * 4.5
feet * 6 feet
Number of racks
required = 34
Considering the average
spreading and cutting
time for 50 plies of
denim and a 2 way
marker as 2 hours, in
one day from 1 table,
yield= 400 pieces
Number of tables = 5
Total = 400*6= 2000
pieces
According to the SAM
value of each machine,
for 2000 pieces per
day,the total machines
required are 86
For reference:reference
sheet
Average machine
dimensions considered
while doing the planning
is 1.2*0.8 metres
FLOOR WISE LAYOUT
DESIGNING
• BASIC:
• Our industry is facing the north direction.
• According to ground coverage, the building dimensions
are 35 metres * 24 metres
• Number of floors= 3
• Margins= 8 metres from 3 sides and 17 from one side
• Maximum material flow movement: Using trolleys
• Manpower: 300 ( approximately)
GROUND FLOOR :
MATERIAL FLOW FOR BULK PRODUCTION
Approved fabric is sent to the cutting room.
There are 6 cutting/spreading tables, 1 fusing/recutting
table,1 inspection table,1 band knife, 1 fusing machine,
ticketing and bundling table
Unchecked material is stored as rolls in
a zigzag manner on the floor
After inspection, approved material is
stored in the racks; rejected is stored
on the floor near the exit
There is an overlock machine to
convert thaans to rolls
Material (denim fabric in the form of rolls) enters the industry,
checked and recorded here.
It includes the guards at the gate
GROUND FLOOR :
OTHER DEPARTMENTS
• Entry door is from the outside to
provide easy accessibility from the
staircase and lift
• It is large enough to accommodate
2 stretchers, 2 permanent doctors,
1 attendant and first aid boxes
• To make it convenient to send and
receive couriers
FIRST FLOOR :
MATERIAL FLOW FOR BULK PRODUCTION
The stitched garments are sent to the transport department to be sent to a denim washing unit
(Outsourced due to space constraint)through a ramp connecting the first floor to the ground floor
Material (cut pieces from the
cutting room) goes to the sewing
room through the lift
According to the SAM of each
automatic machine, the total
machines are 86
The manufacturing system is
assembly line
Materials like threads and lining are issued from the trim store and sent to the sewing room
FIRST FLOOR :
MATERIAL FLOW FOR BULK PRODUCTION
From packing, the polythene packed jeans are transferred to the packaging department
,are put into the cartons , the cartons are marked and dispatched via the transport
department
After being received from
the outsourced unit, the
stitched jeans are brought to
the finishing room.
They are inspected, buttons
and rivets are attached,
finishing and checking is
done.
Material flow in the finishing
room is done using
overhead hangers.
FIRST FLOOR :
OTHER DEPARTMENTS
SECOND FLOOR :
MERCHANDISING AND SAMPLING
DEPARTMENTS
• 29 Cubicles for the merchandising department
• 39 machines in sampling
• 2 cutting tables ; 1 inspection table and 1 finishing
table
• CAD Department
SECOND FLOOR : ADMIN
BLOCK
• HR AND ADMIN DEPARTMENT
• CONFERENCE ROOMS- 4
• RECEPTION
TERRACE
• Capacity: seating for 108 people
• Separate wash basins
• To conserve water
• 4 solar panels and space for
solar panel maintenance
OTHER AREAS COMMON
TO ALL FLOORS
• 3 washrooms each for men and women
• 3 seats/urinals per washroom
• Enough to provide 4.5L/person/day
• 1 on each pillar
• 1 on each floor. It is one way and is used only in case of
a fire or fire drill ( It’s 1 metre above the ground level)
• 2 material lifts per floor and 1 people lift (for the admin
people)
• 1 staircase per floor 1.5 wide
SPECIAL FEATURES OF
THE INDUSTRY
• The industry we have set up, a
fully automatic denim
manufacturing unit, is
environmental friendly,
ergonomically appropriate and
fully optimized and efficient in
every way.
SPECIAL FEATURES OF
THE INDUSTRY
• Greenery and plantation
• Optimum use of natural lighting
• Shades on the windows facing the south, since the sun is
strongest towards the south direction.
• Solar panels
• 5 solar panels generating 200 W/hour save127.5*10=
Rs1275/day
• Efficient use of the glare free north light
• Rain water harvesting on the roof-top
• Parking of trucks is done at a tilted angel to save space as
well as allow easy parking
• Every area in the plant has been accounted for.
• Planning and placement of each department is done in a
symmetrical way so as to allow easy passage between
departments. Also, when a person stands in an aisle, his
view on both sides till the end is unrestricted.
SPECIAL FEATURES OF
THE INDUSTRY
• Because of outsourcing denim washing, there is going to be
a lot of material transfer from the 1st floor (Sewing room) to
the ground (Transport) and vice versa (Transport to
Finishing room).
• To save time and effort, we have installed a ramp, which
goes from the first floor to the ground.
• Apart from work, workers spend most of their time in the
cafeteria. The rooftop cafeteria has a shade on top and is
large enough to accommodate at least 1/3rd of the total
workers.
• Air sucking vents on the floor of the ground floor help in
maintaining a lower temperature.
• Fire Safety: Fire extinguishers on every pillar, Appropriate
amount of Fire exits
• Number of washrooms and water coolers
• Size of departments like crèche and canteen
• A lot of aisle space
THANK YOU

More Related Content

What's hot

My Internship Report
My Internship ReportMy Internship Report
My Internship Report
Rajib Sadiq
 
Apparel internship
Apparel internshipApparel internship
Apparel internship
Anurag Singh
 

What's hot (20)

PL JURY PRESENTATION
PL JURY PRESENTATIONPL JURY PRESENTATION
PL JURY PRESENTATION
 
Presetation on factory visit
Presetation on factory visitPresetation on factory visit
Presetation on factory visit
 
Tejas krishna_apparel_internship_report
Tejas krishna_apparel_internship_reportTejas krishna_apparel_internship_report
Tejas krishna_apparel_internship_report
 
Garment manufacturing process from fabric to poduct
Garment manufacturing process from fabric to poductGarment manufacturing process from fabric to poduct
Garment manufacturing process from fabric to poduct
 
Apparel Merchandising and Lean Manufacturing
Apparel Merchandising and Lean Manufacturing Apparel Merchandising and Lean Manufacturing
Apparel Merchandising and Lean Manufacturing
 
Apparel/Garments costing Methods for export order
Apparel/Garments costing Methods for export orderApparel/Garments costing Methods for export order
Apparel/Garments costing Methods for export order
 
Fabric relaxation procedure
Fabric relaxation procedureFabric relaxation procedure
Fabric relaxation procedure
 
Garments manufacturing
Garments manufacturingGarments manufacturing
Garments manufacturing
 
Production Planning & Merchandising
Production Planning & MerchandisingProduction Planning & Merchandising
Production Planning & Merchandising
 
Garment denim washing process
Garment denim washing processGarment denim washing process
Garment denim washing process
 
Textile1
Textile1Textile1
Textile1
 
T-Shirt Manufacturing - Plant Layout
T-Shirt Manufacturing - Plant LayoutT-Shirt Manufacturing - Plant Layout
T-Shirt Manufacturing - Plant Layout
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Cutting department
Cutting departmentCutting department
Cutting department
 
fabric spreading
fabric spreading fabric spreading
fabric spreading
 
Apparel manufacturing process
Apparel manufacturing processApparel manufacturing process
Apparel manufacturing process
 
Finishing defects
Finishing defectsFinishing defects
Finishing defects
 
My Internship Report
My Internship ReportMy Internship Report
My Internship Report
 
Apparel internship
Apparel internshipApparel internship
Apparel internship
 
Value stream mapping in ethiopian garemnt industry
Value stream mapping in ethiopian garemnt industryValue stream mapping in ethiopian garemnt industry
Value stream mapping in ethiopian garemnt industry
 

Viewers also liked (8)

Tanim'S Presentation
Tanim'S PresentationTanim'S Presentation
Tanim'S Presentation
 
Development of Denim effect on knitted fabric
Development of Denim effect on knitted fabricDevelopment of Denim effect on knitted fabric
Development of Denim effect on knitted fabric
 
Nandan Denim Limited
Nandan Denim LimitedNandan Denim Limited
Nandan Denim Limited
 
Major defects of woven fabric.
Major defects of woven fabric.Major defects of woven fabric.
Major defects of woven fabric.
 
Indigo or slasher dyeing
Indigo or slasher dyeingIndigo or slasher dyeing
Indigo or slasher dyeing
 
Denim garments quaity control
Denim garments quaity controlDenim garments quaity control
Denim garments quaity control
 
Business Plan - Setup A Jeans Factory
Business Plan - Setup A Jeans FactoryBusiness Plan - Setup A Jeans Factory
Business Plan - Setup A Jeans Factory
 
Fastness testing of fabric
Fastness testing  of fabric Fastness testing  of fabric
Fastness testing of fabric
 

Similar to Plant layout of denim jeans manufacturing unit

The technology of ironing for knitting garments
The technology of ironing for knitting garmentsThe technology of ironing for knitting garments
The technology of ironing for knitting garments
kibrom G
 
Finishing Complete
Finishing CompleteFinishing Complete
Finishing Complete
Nabeel Shan
 
UNIT-3 1U18TXE0007 GARMENT PROCESSINGPPT.pptx
UNIT-3 1U18TXE0007 GARMENT PROCESSINGPPT.pptxUNIT-3 1U18TXE0007 GARMENT PROCESSINGPPT.pptx
UNIT-3 1U18TXE0007 GARMENT PROCESSINGPPT.pptx
ArunSrinivasan40
 
Parameter of finishing process in knit dyeing
Parameter of finishing process in knit dyeingParameter of finishing process in knit dyeing
Parameter of finishing process in knit dyeing
Md. Mazadul Hasan Shishir
 

Similar to Plant layout of denim jeans manufacturing unit (20)

IFT Presentation
IFT PresentationIFT Presentation
IFT Presentation
 
Clothing in nepal national case study
Clothing in nepal national case studyClothing in nepal national case study
Clothing in nepal national case study
 
Tumble dryer and launder machine
Tumble dryer and launder  machineTumble dryer and launder  machine
Tumble dryer and launder machine
 
The technology of ironing for knitting garments
The technology of ironing for knitting garmentsThe technology of ironing for knitting garments
The technology of ironing for knitting garments
 
Presentation on process control study in spinning dpt.
Presentation on process control study in spinning dpt.Presentation on process control study in spinning dpt.
Presentation on process control study in spinning dpt.
 
Finihing machine
Finihing  machineFinihing  machine
Finihing machine
 
Service analysis
Service analysisService analysis
Service analysis
 
Eurocar_en
Eurocar_enEurocar_en
Eurocar_en
 
Data
DataData
Data
 
Finishing Complete
Finishing CompleteFinishing Complete
Finishing Complete
 
UNIT-3 1U18TXE0007 GARMENT PROCESSINGPPT.pptx
UNIT-3 1U18TXE0007 GARMENT PROCESSINGPPT.pptxUNIT-3 1U18TXE0007 GARMENT PROCESSINGPPT.pptx
UNIT-3 1U18TXE0007 GARMENT PROCESSINGPPT.pptx
 
MANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNC
MANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNCMANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNC
MANUFACTURING OF CNC MACHINES- TRAINING REPORT AT JYOTI CNC
 
Lecture on Production management- Plant layout
Lecture on Production management- Plant layoutLecture on Production management- Plant layout
Lecture on Production management- Plant layout
 
Fire safety system of Building.
Fire safety system of Building.Fire safety system of Building.
Fire safety system of Building.
 
bs slides
bs slidesbs slides
bs slides
 
Dyeing machine by emran
Dyeing machine by emranDyeing machine by emran
Dyeing machine by emran
 
Spinning With Technical Acess
Spinning With Technical AcessSpinning With Technical Acess
Spinning With Technical Acess
 
study on Blowroom line and its machineries .pdf
study on Blowroom line and its machineries .pdfstudy on Blowroom line and its machineries .pdf
study on Blowroom line and its machineries .pdf
 
textile finishing
textile finishingtextile finishing
textile finishing
 
Parameter of finishing process in knit dyeing
Parameter of finishing process in knit dyeingParameter of finishing process in knit dyeing
Parameter of finishing process in knit dyeing
 

More from University of Southern California

More from University of Southern California (17)

LEAN MANUFACTURING : QUALITY CIRCLE FOR GARMENT CONSTRUCTION LABORATORY
LEAN MANUFACTURING : QUALITY CIRCLE FOR GARMENT CONSTRUCTION LABORATORYLEAN MANUFACTURING : QUALITY CIRCLE FOR GARMENT CONSTRUCTION LABORATORY
LEAN MANUFACTURING : QUALITY CIRCLE FOR GARMENT CONSTRUCTION LABORATORY
 
Report on apparel internship at orient craft limited
Report on apparel internship at orient craft limitedReport on apparel internship at orient craft limited
Report on apparel internship at orient craft limited
 
Report on apparel internship at orient craft limited
Report on apparel internship at orient craft limitedReport on apparel internship at orient craft limited
Report on apparel internship at orient craft limited
 
ERGONOMICS IN THE SEWING ROOM
ERGONOMICS IN THE SEWING ROOMERGONOMICS IN THE SEWING ROOM
ERGONOMICS IN THE SEWING ROOM
 
E commerce final
E commerce finalE commerce final
E commerce final
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Stitches and seam analysis of a polo t shirt
Stitches and seam analysis of a polo t shirtStitches and seam analysis of a polo t shirt
Stitches and seam analysis of a polo t shirt
 
Fashion merchandising
Fashion merchandisingFashion merchandising
Fashion merchandising
 
Auxiliary motion of a loom
Auxiliary motion of a loomAuxiliary motion of a loom
Auxiliary motion of a loom
 
Assumption busting : Creative thinking skills
Assumption busting : Creative thinking skillsAssumption busting : Creative thinking skills
Assumption busting : Creative thinking skills
 
Fashion subcultures
Fashion subculturesFashion subcultures
Fashion subcultures
 
Flax
FlaxFlax
Flax
 
Automatic Spreading Machine (fabric spreading)
Automatic Spreading Machine (fabric spreading)Automatic Spreading Machine (fabric spreading)
Automatic Spreading Machine (fabric spreading)
 
Fashion footwear
Fashion footwear Fashion footwear
Fashion footwear
 
Breakfast at tiffany's Movie review
Breakfast at tiffany's  Movie reviewBreakfast at tiffany's  Movie review
Breakfast at tiffany's Movie review
 
Self renewal system
Self renewal system Self renewal system
Self renewal system
 
Evaluation of finishes
Evaluation of finishesEvaluation of finishes
Evaluation of finishes
 

Recently uploaded

Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 

Recently uploaded (20)

PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 

Plant layout of denim jeans manufacturing unit

  • 1. PLANT LAYOUT SUBMITTED BY AMIT ONKAR ASHMITA JAIN MANSI JAIN RIDDHI MALVIYA SUNANDA GHORAI DFT VII MENTORED BY: PROFESSOR PAVAN GODIADVALA
  • 2. COMPANY PROFILE • Denim jeans manufacturing industryTYPE OF INDUSTRY • 2000 pieces/ dayCAPACITY • 60 metres*40 metresAREA • Assembly lineMANUFACTURING SYSTEMS • Ahmedabad, GujaratLOCATION • 1FSI • 35%GROUND COVERAGE
  • 4. CAPACITY PLANNING: Average consumption: 1.4 mts per jeans Shelf size= 4.5 feet * 4.5 feet * 6 feet Number of racks required = 34 Considering the average spreading and cutting time for 50 plies of denim and a 2 way marker as 2 hours, in one day from 1 table, yield= 400 pieces Number of tables = 5 Total = 400*6= 2000 pieces According to the SAM value of each machine, for 2000 pieces per day,the total machines required are 86 For reference:reference sheet Average machine dimensions considered while doing the planning is 1.2*0.8 metres
  • 5. FLOOR WISE LAYOUT DESIGNING • BASIC: • Our industry is facing the north direction. • According to ground coverage, the building dimensions are 35 metres * 24 metres • Number of floors= 3 • Margins= 8 metres from 3 sides and 17 from one side • Maximum material flow movement: Using trolleys • Manpower: 300 ( approximately)
  • 6. GROUND FLOOR : MATERIAL FLOW FOR BULK PRODUCTION Approved fabric is sent to the cutting room. There are 6 cutting/spreading tables, 1 fusing/recutting table,1 inspection table,1 band knife, 1 fusing machine, ticketing and bundling table Unchecked material is stored as rolls in a zigzag manner on the floor After inspection, approved material is stored in the racks; rejected is stored on the floor near the exit There is an overlock machine to convert thaans to rolls Material (denim fabric in the form of rolls) enters the industry, checked and recorded here. It includes the guards at the gate
  • 7. GROUND FLOOR : OTHER DEPARTMENTS • Entry door is from the outside to provide easy accessibility from the staircase and lift • It is large enough to accommodate 2 stretchers, 2 permanent doctors, 1 attendant and first aid boxes • To make it convenient to send and receive couriers
  • 8. FIRST FLOOR : MATERIAL FLOW FOR BULK PRODUCTION The stitched garments are sent to the transport department to be sent to a denim washing unit (Outsourced due to space constraint)through a ramp connecting the first floor to the ground floor Material (cut pieces from the cutting room) goes to the sewing room through the lift According to the SAM of each automatic machine, the total machines are 86 The manufacturing system is assembly line Materials like threads and lining are issued from the trim store and sent to the sewing room
  • 9. FIRST FLOOR : MATERIAL FLOW FOR BULK PRODUCTION From packing, the polythene packed jeans are transferred to the packaging department ,are put into the cartons , the cartons are marked and dispatched via the transport department After being received from the outsourced unit, the stitched jeans are brought to the finishing room. They are inspected, buttons and rivets are attached, finishing and checking is done. Material flow in the finishing room is done using overhead hangers.
  • 10. FIRST FLOOR : OTHER DEPARTMENTS
  • 11. SECOND FLOOR : MERCHANDISING AND SAMPLING DEPARTMENTS • 29 Cubicles for the merchandising department • 39 machines in sampling • 2 cutting tables ; 1 inspection table and 1 finishing table • CAD Department
  • 12. SECOND FLOOR : ADMIN BLOCK • HR AND ADMIN DEPARTMENT • CONFERENCE ROOMS- 4 • RECEPTION
  • 13. TERRACE • Capacity: seating for 108 people • Separate wash basins • To conserve water • 4 solar panels and space for solar panel maintenance
  • 14. OTHER AREAS COMMON TO ALL FLOORS • 3 washrooms each for men and women • 3 seats/urinals per washroom • Enough to provide 4.5L/person/day • 1 on each pillar • 1 on each floor. It is one way and is used only in case of a fire or fire drill ( It’s 1 metre above the ground level) • 2 material lifts per floor and 1 people lift (for the admin people) • 1 staircase per floor 1.5 wide
  • 15. SPECIAL FEATURES OF THE INDUSTRY • The industry we have set up, a fully automatic denim manufacturing unit, is environmental friendly, ergonomically appropriate and fully optimized and efficient in every way.
  • 16. SPECIAL FEATURES OF THE INDUSTRY • Greenery and plantation • Optimum use of natural lighting • Shades on the windows facing the south, since the sun is strongest towards the south direction. • Solar panels • 5 solar panels generating 200 W/hour save127.5*10= Rs1275/day • Efficient use of the glare free north light • Rain water harvesting on the roof-top • Parking of trucks is done at a tilted angel to save space as well as allow easy parking • Every area in the plant has been accounted for. • Planning and placement of each department is done in a symmetrical way so as to allow easy passage between departments. Also, when a person stands in an aisle, his view on both sides till the end is unrestricted.
  • 17. SPECIAL FEATURES OF THE INDUSTRY • Because of outsourcing denim washing, there is going to be a lot of material transfer from the 1st floor (Sewing room) to the ground (Transport) and vice versa (Transport to Finishing room). • To save time and effort, we have installed a ramp, which goes from the first floor to the ground. • Apart from work, workers spend most of their time in the cafeteria. The rooftop cafeteria has a shade on top and is large enough to accommodate at least 1/3rd of the total workers. • Air sucking vents on the floor of the ground floor help in maintaining a lower temperature. • Fire Safety: Fire extinguishers on every pillar, Appropriate amount of Fire exits • Number of washrooms and water coolers • Size of departments like crèche and canteen • A lot of aisle space

Editor's Notes

  1. MENTORED BY: