NTPC was set up in the central sector in the
1975.
NTPC has installed capacity of 29,394 MW. It
plans to be a 75,000 MW company by 2017.
NTPC Badarpur station has also bagged ISO
9001/ ISO 14001 certification.
Today NTPC contributes more than 3 / 5th of
the total power generation in India
4. Overview of NTPC
Click to edit the outline
text format
Second Outline
Level
− Third Outline
Level
Fourth
Outline Level
− Fifth
Outline
Level
6. Overview of BTPS
BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY
CONSUMPTION
INSTALLED CAPACITY
720 MW
DERATED CAPACITY
705 MW
(3x95 + 2x210MW)
OWNED BY GOVT. OF INDIA, MINISTRY OF POWER
BEING MANAGED BY NTPC FOR THE LAST 26 YEARS
SINCE 1st APRIL 1978
7. NTPC Badarpur
BTPS was conceived in 1965 to meet
the growing electricity demand of
Northern Region.
The site construction activities started
in 1968.
The plant became operational with the
commissioning of its first unit on 26th
July 1973, 2nd unit in ;74 , 3rd unit in
’75 , 4th unit in ’78 & 5th unit in ’81.
8. Basic Principle
There are basically three main units of a thermal power plant:
1. Steam Generator or Boiler
2. Steam Turbine
3. Electric Generator
10. C&I LABS
Control and Instrumentation Department has
following labs:
1.
2.
3.
4.
5.
6.
Manometry Lab
Protection and Interlocks Lab
Automation Lab
Electronics Lab
Water Treatment Plant
Furnaces Safety Supervisory System Lab
11. OPERATION AND MAINTAINANCE
This control & instrumentation is the brain of the plant because from the
relays to transmitters followed by the electronic computation chipsets and
recorders and lastly the controlling circuitry, all fall under this.
A View of Control Room at BTPS
15. • Why IT ?
Materials : 30,000 + items
Transaction data.
Master data Material and Service
Plant : 15,000 equipments
•
Equipment master. Task list.
Employees : 1100 + Personal and payroll data.
Finance : Accounting data.
Operation : Plant parameters history data
Vendors: 5000 + vendors.
16.
17.
18.
19. Satellite Communication Network
4/6 GHZ
RHQ:ERHQ, NRHQ,SRHQ,WRHQ
Engg.Office, NOIDA
Rihand,
8 MBPS M/W Link
PMI,NOIDA
2 GHZ/ 8 MBPS
4/6 GHZ
( 512 kbps aggreagate )
2 mbps
leased line
CC, SCOPE
New Delhi
DADRI PROJECT
NTPC Hub Station
At CSES, Noida
Tapovan Loharinagpala
( ORDERED )
Singrauli
OFC
LINK
Vindhyachal
THERMAL: Farakka,Unchahar,Kahalgaon,
Korba, Ramagundam, Sipat, Simhadri,
Talcher (S), Talcher (T), Tanda, Barh
GAS/HYDRO:Anta,Auriya,Faridabad,
Gandhar, Kawas, Kayamkulam, Koldam,
20. Awards
MOP’s Meritorious Productivity Award:
For calendar years 1987, 1988, 1990.
For financial years 92-93, 94-95 and 97-98
Received Bronze medal in 1998-99 and
Received Silver shield and certificate of
Meritorious performance for 2000-01.
Received Gold shield and Certificate for
outstanding performance three consecutive years
01-02 & 02-03 , 03-04. the awards were
presented by Hon’ble President of India and
Hon’ble power Minister on 24 August 2004.
23. Awards
o British safety award for 1988, 1994 and
1999.
o
One employee bagged the Vishwakarma
Rashtriya Puraskar in 1994 from Ministry
of Labour. Six employees have been given
the same award for 1998.
o
6 BTPS employees were awarded under
Delhi Shramik Sujhao Yojna Puraskar’97 .
24. BTPS awarded Silver shield in Thermal Power Sector
for Outstanding Achievement in Safety management
by Greentech foundation for 2003-04
– BTPS awarded Greentech Environment
excellence Gold Award in Thermal Power sector
for 2002-03
– BTPS awarded Greentech Environment
excellence Gold Award in Thermal Power sector
for 2003-04
– BTPS received golden peacock award for IT
Innovations for 2003-04
26. Conclusion
The BTPS IT has come a long way from lagging
to leading in IT enablement among NTPC
power stations. IT Vision realized, making BTPS
highly information enabled plant.
10/31/11