Maintenance may be defined as the upkeep
of the sub station’s electrical equipments in
proper working condition and efficient to
derive the following :
#
#
#
#
#
#

Reliable and efficient operation
Optimum utilisation
Availability
Reduced down time
Detection of premature faults
Minimizing revenue loss etc.

To meet the above requirement, the equipment has
to be checked, attended, to trouble-shot and
operated under specified conditions.
The need for maintenance
During the operational life of the electrical equipment,
ageing occurs due to various stresses which is incident
on the equipment both under normal and fault conditions
and result in deterioration of physical and chemical
properties of components making up the electrical
equipment.

The expected performance can not be obtained from the
equipment once it is aged.
The electrical equipment in service are subject to
the following stresses :
• Electrical stresses
• Thermal stresses
• Mechanical stresses
• Environmental stresses
• Combined stresses
Electrical Stress:
The Insulation of electrical equipment experience the
following voltages :
• Continuous normal power frequency rated voltage
• Temporary power frequency over voltages due to voltage
regulation, Ferranti effect, and long duration power
frequency over voltages.
• Lightning Impulse Voltage Waves (Surges)
• Switching Impulse Waves (Surges)
Thermal Stress
Elevated temperatures may be reached during
operation due to dielectric losses, increased I2R loss
or by heat absorption from surroundings.
Temperature may increase abnormally due to
sustained short circuit current.
The cooling system failure in power transformers
also stress the windings thermally.
Mechanical Stress
There may be permanent mechanical stress due
to improper installation
Circuit breakers may experience vibration stress
during normal closing/opening and during making /
breaking under fault
The bus bar vibration in rigid bus bar stresses the
bus bar support mechanically
Environmental stress
Environmental factors include pollution, Radiation,
Humidity, dust particles, moisture etc,.
Proximity to chemical industry, sea coast and
intentional damage caused by humans contribute to
ageing and deterioration
Combined stress
In most of the electrical equipment, normally
some of the stress factors as above will be present
Maintenance Schedules for Power Transformers
1.

2.
3.
4.

Checking the Color of silica gel in the breather and also oil level of the oil seal. If silica
gel Color changes from blue to pink by 50% the silica gel is to be reconditioned or
replaced.
Observation of oil levels in (a) main conservator tank (b) OLTC conservator (c)
bushings and examining for oil leaks if any from the transformer

Daily

Visual check for overheating if any at terminal connections (Red hots) and observation
for any unusual internal noises.
Checking for noice, vibration or any abnormality in cooling fans & oil pumps of power
transformers standby pumps & fans are also to be run condition to be observed.

Daily in each shift

Daily

Daily

5.
6.
7.

Observation of oil & winding temperatures & recording
Visual check of explosion vent diaphragm for any cracks
Checking for any water leakage into cooler in case of forced cooling system.

Hourly
Daily
Daily

8.

Physical examination of diaphragm of vent pipe for any cracks

Monthly

9.

Cleaning of bushings, inspect for any cracks or chippings of the porcelain and
checking of tightness of clamps and jumpers

Monthly

10.

Measurement of IR values of transformer with 2.5 KV megger upto 33KV rating and 5.0
KV megger above 33KV rating. Recording of the values specifying the temperature
which measurements are taken.

Monthly

11.
12.

Cleaning of Silicagel breather
Checking of temperature alarms by shorting contacts by operating the knob.

Monthly
Monthly

13.
14.
15.

Testing of main tank oil for BDV and moisture content
Testing OLTC oil for BDV & moisture content
Testing of Bucholtz surge relays & low oil level trips for correct operation

Quarterly
Quarterly
Quarterly

16.

Checking auto start of cooling fans and pumps

Quarterly
17.

Checking of Bucholtz relay for any gas collection and testing the gas collected

18.

Checking of operation of Bucholtz relay by air injection ensuring actuation
alaram & trip
Noting the oil level in the inspection glass of Bucholtz relay and arresting of oil
leakages if any.
Checking of all connections on the transformer for tightness such as bushings,
tank earth connection
Lubricating / Greasing all moving parts of OLTC mechanism

Half yearly or during
shutdown
Monthly

Testing of oil for dissolved gas analysis of EHV transformers upto 100KVA
capacity
Overhauling of oil pumps and their motors also cooling fans & their motors.

Once in a year

Once in a year

29.
30.
31.

Testing of oil in main tank for acidity, tan delta, interface tension specific
resisitivity
Bushing testing for tan delta
Calibration of oil & winding temperature indicators
Measurement of magnetizing current at normal tap and extreme taps

32.
33.
34.

Measurement of DC winding resistance
Turns ratio test at all taps
Inspection of OLTC mechanism and contacts its diverter switch

19.
20.
21.
22.
23.
24.
25.
26
27.
28.

Quarterly or during fault

Quarterly

Quarterly or as given in
the manufacturers manual
Checking of control circuitry, interlocks of oil pumps and cooling fans for auto
Half yearly or during
start and stop operation at correct temperatures and also for manual operation
shutdown
Testing of motors, pumps and calibrating pressure gauge
Half yearly
Pressure testing of oil coolers
Half yearly
Testing of oil samples for dissolved gas analysis (for 100MVA transformers)
Half yearly

Once in a year

Once in a year
Repeats
One in a year
Once in a year
Once in a year
Once in a year or number
of operation as
recommended by
manufacturers are
completed whichever is
35.
36.

Overhaul of tap changer and mechanism
Replacement of oil in OLTC

37.

40.

Calibration of thermometers (temperature indicators) and tap position
indicator.
Remaining old oil in thermometer pockets, cleaning the pockets and
filing with new oil.
Checking oil in the air cell (for transformers of 100 MVA & above
capacity)
Bushings partial discharge test and capacitance (EHV transformers)

41

Filtration of oil / replacement of oil and filtration

38.
39.

42.

One in a year
Once in year or
whenever number of
operations as
recommended by
manufacturer are
completed whichever
is earlier.
Yearly
Yearly
Yearly
Yearly

Whenever the IR
values of transformer
are below permissible
limits and oil test
results require
filtration / replacement
of oil
One in 10 years
General overhaul (consisting 1) Inspection of core & winding (2) Through
washing of windings (3) Core tightening (4) Check-up of core bolt
insulation (5) Replacement of gaskets (6) Overhaul of OLTC
Maintenance Schedule of Distribution Transformers
1.

Cleaning of bushings and external surface of tank cooling pipes

Monthly

2.

Checking of oil levels in the conservator and gauge glass

Monthly

3.

Checking of silicased in the breather and replacement is necessary

Monthly

4.

Checking of oil level in the oil seal of breather & top up if necessary

Monthly

5.

Checking of HG fuse & LT fuse and renew if necessary (correct
guage shall maintained)
Checking of vent pipe diaphragm
Checking of terminal loose connections is any and tightening the
same
Checking for any oil leaks & rectification (including replacement of
oil seals if required)
Taking long tester reading during peak load hours and remedial
action
Noting down neutral currents and load balancing in all the three
phase
Measurement of IR Values
Testing of oil for BDV, activity
Checking of lightening arrestors and replacement is required once
before monsoon)
Measurement of earth resistance checking of earthing system and
rectification if required.
Overhaul of transformer

Monthly

6.
7.
8.
9.
10.
11.
12.
13.
14.
15.

Monthly
Monthly
Monthly
Quarterly
Quarterly
Half yearly
Half yearly
Half yearly
Half yearly
Once in 5 years
Common Defects noticed and the cause
Sl.No

Part

1.

Tank

2.

Radiators

3.

Conservator

4.
5.
6.

Breather
Explosion
Core

7.

Winding

8.

Oil

9.

Terminal
Bushing
Tap Switch

10

a.
b.
c.
a.
b.
c.
d.
a.
b.
c.
d.
a.
b.

Defects
Leakage of oil
Deformation
Overheating
Leakage of Oil
Deformation
Overheating
Leakage of Oil
Deformation
Overheating
Ineffective
Glass broken
Loose
Increased Losses
Excess Noise
Short Circuited
Loosening
Insulation Brittle
Open circuited
Discoloration
High Acidity
Low BDV
Sludge
Breakage
Leakage of Oil

a.
b.
c.

Inoperative Broken lever Maloperation – Insulation failure–Failure
Burnt Contact
operation mechanism – overheating
Short Circuit

a.
b.
c.
a.
b.
c.
a.
b.
c.

Causes
Corrosion / mechanical damage – Gaskets worn out
excessive internal pressure – Improper circulation
of cooling oil and / or inadequate ventilation.
Corrosion / mechanical damage – Gaskets worn out
excessive internal pressure – Improper circulation
of cooling oil and / or inadequate ventilation.
Corrosion / mechanical damage – Gaskets worn out
excessive internal pressure – Improper circulation
of cooling oil and / or inadequate ventilation.
Inlet choked – Silica gel saturated
Mechanical
Bolts loosening up – change in characteristics due
to heating vibration of stampings
Overloading – Air bubbles – loss of insulation –
shrinkage
displacement
Overheating
decomposition burn out.
Contamination
–
Increased
moisture
Decomposition chemical action with other parts.

–

Strain – Gasket Worn out – Loose fit.
of
MAINTENANCE
Approach Strategies
Run to failure Maintenance
( Corrective Actions Only )

Time directive maintenance
( Preventive Maintenance )

Repair and restoration of equipment/component
that have failed or malfunctioning and are not
performing their intended function
Periodic and Planned maintenance actions
taken to maintain a piece of equipment within
the expected operating conditions. It extends
the equipment life and is performed prior to
equipment failure to prevent it. This includes
technical specification surveillance, in service
inspection and other regulatory forms of
equipment maintenance.

The continuous or periodic monitoring and
diagnosis in order to forecast component
Condition Directive Maintenance degradation so that as needed planned
maintenance can be performed prior to
( Predictive )
equipment failure. Not all equipment conditions
and failure modes can be monitored therefore,
predictive maintenance must be selectively
applied.
Time directive maintenance
( Preventive Maintenance )
Inspection of Transformer
O/H of OLTC
Checking of Protection Circuit
DGA
Earth Test
BDV of Oil
Cleaning
Working of Fire Protection Equipment
Painting
Transformer Testing
Run to failure Maintenance
( Corrective Actions Only )
Failure of gasket
 Failure of Bushing
 Failure of PT / CT
 Oil Leakage
Burning of Jumpers
Winding / insulation Failed
OLTC Problem
Condition Directive maintenance
( Predictive )

Based on DGA / Transformer Testing

Filtration of Oil
Drying of Transformer
During Inspection
Unwanted materials

Oil Level

Silica Jell degraded
All indicating lamps

Oil Leakage from any Parts of
Transformer

Painting/Cleaning Required
All Doors &
inspection
window glass

Condition of
Radiator
Hot/Cold
Major Failures
 Core

Over heating breakdown in core plate insulation leads
to circulating currents & usually sparking at fault.

 Winding

Overheating due to poor joints is common fault in any parts
of the electrical circuit. Breakdown of inter-strand insulation
results in circulating current causing overheating of
insulation and hot spots at point of fault

Poor joints
Most common problem observed in OLTC
OLTC

1. Mechanical Problem
1. Failure of AC Supply
Tripping Motor MOCB
LT Cable Fault
Motor Failure
Failure of declutching switch
2. Mechanical Problem
Braking of shear Pin
Failure in friction device
2. Electrical Problem
Wear & Tear on Fixed/Moving contact
Resistance Open
Tracking on phase board
Jumper burnt
Braking of Barrier board
The OLTC provides uninterrupted
voltage regulation of transformers
under load.
The voltage is regulated by changing
the voltage ratio. This is done in steps.
The transformer is equipped with a tap
winding whose tapping are connected
with the tap selector of the OLTC
Changing Voltage Ratio
a. Linear Voltage Regulation
c. Coarse & fine Voltage regulation
Step Voltage
is 200 Volt/tap

b. Reversing Voltage Regulation
Normal Taping from Winding
Linear Voltage Regulation

We have two different make OLTC
1. Crompton
1. F33
2. AT

2 CTR
Reversing Voltage Regulation
We have different makes OLTC

Flange Mounted OLTC
Crompton AT

In Tank
(A) With Pre-Selector Switch
(B) Without Pre-Selector Switch

Easun
NGEF
Diverter switch

BHEL

(A)
(B)

Pre-Selector Switch
Compartment in OLTC
Flange Mounted OLTC
Driving Mechanism

High Speed Selector switch

Selector switch is capable of making &
Breaking load in addition to selecting tap
A chamber houses the motor
and driving mechanism
Compartment in OLTC
Top Plate

In Tank V type
Selector Switch

Inside the
Main Tank

Transmission Shaft

Driving Mechanism
Compartment in OLTC
In Tank D type
Top Plate

Diverter switch inner

OSR

Diverter switch Oil Vessel
Pre-Selector Switch

Main Tank
Operation in OLTC
Pennant Cycle

Tap is changing from No.1 to No.2
Operation in OLTC
Flag Cycle

Normal

Main moving contact
left fixed contact. Load
is carried by resistor R1

R1 leave fixed contact 3,
R2 contact fixed contact 4
Load is carried by resistor R2

R2 contact fixed contact 4.
R1 contact fixed contact 3
Main moving is floating

Tap change is completed
OLTC with Pre-selected switch (NGEF, Esson)
Flag Cycle
Parts in OLTC

Current Plate

Main Shaft
Phase Board Resistance

Jumpers
connected
to Tapping

Roller Contact

Fixed Contact
Barrier Plate Jumper coming
from Xmer
Resistance

Phase Board

Fixed Contac
Main Moving Contact

Roller Contact
Driving Mechanism

DSS

Counter
Raise Lower Contactor
Motor Protection Relay
Tap indicator

Motor
AVR mounted on RTCC
Automatic Voltage Regulating Relay (AVR):
AVR is used to maintain secondary voltage (11KV) of power
transformer by operating primary side (22/33KV) OLTC Tap.
Input to AVR is secondary side of 11000/110V Potential
transformer directly connected on secondary side of Power
Transformer (Circuit PT or Transformer PT).
EMCO, NMC, Pradeep and accord make AVRs are in service.
Typical settings of AVRs –
Auxiliary supply = 110V AC
Nominal Voltage = 110V AC (From 11000/110V PT)
Raise Operation : V <108V
Lower Operation : V >112V
Time Delay = 120 Sec.
Directional Sequence Switch (DSS):
DSS is cam operated multiple contact switch used to maintain OLTC motor supply to
during operation and cut-off after completion of OLTC operation.
Switron, Shirke Electricals, Recom make
DSS are in service.
Typical DSS contacts and their application
is as follows.
Electrical Interlocks And Protection:
Directional Raise Limit switch – Blocks
electrical raise operation when tap at
maximum position (Tap15 or 16).
Directional Lower Limit switch – Blocks
electrical lower operation when tap at
minimum position (Tap1).
Motor Protection Relay
(MPR) – Driving motor is
protected for overload by
MPR which isolates it
under fault condition.

Hand Interlock Switch (HIS) –
HIS isolates electrical supply
during manual crank handle is
in. Ensures safety to operating
personal.

OLTC Timer Scheme – Timer scheme will
operate if motor supply is continuous for more
than set time (Set time=2*time for one operation)
and avoids high/lower voltages during DSS and
contactor mal-operation .
Protection for OLTC
• OSR
• Motor Stuck up Alarm
• Motor Supply Failed Alarm
OLTC PRV

On RTCC
Over hauling of OLTC
Washing
Over-hauling of OLTC
Cleaning
CONDITION MONITORING OF
TRANSFORMER OIL
Parameters for condition monitoring of oil service
Two ways are available to an operating engineer
1.To make periodic oil tests to establish trends and classify
them.
2.To conduct dissolved gas analysis to assess the internal
condition of transformers
PARAMETERS TO BE CHECKED ARE:
1. FLASH POINT
2.DIELECTRIC DISSIPATION FACTOR
3.SPECIFIC RESISTANCE
4.NEUTRALISATION.
5.MOISTURE CONTENT
6.SLUDGE %
7.BREAK DOWN VOLTAGE
8.D.G.A.
PHYSICAL CONTAMINATION
1.Dust, fiber, metallic, particles, other solid impurities.
2.Dissolution of varnish.
3.Free and dissolved water.
CHEMICAL DETERIORATION
Oxidation resulting in acids sludge and polar
impurities.
CONTAMINATION OF GASES
a) Dissolved air from atm. Nitrogen, co2
b) Generated in oil, methane, ethane, acetylene,
ethylene etc. Before the oil is put in the
transformer, its properties should be fully
ensured.
Sample of
transformer
oil illustrating
seven color
classification

Interpreting Transformer Oil Test Data
There is classic relationship between the transformer
insulating oil tests neutralization or acid number (NN) and
interfacial tension (IFT). Several independent studies
have shown that an increase in NN should normal be
followed by a characteristic drop in IFT. When test results
for a given oil sample do not fall between the range shown
on either side of median line, further investigation is
necessary.
CHEMICAL DECOMPOSITION OF HYDROCARBONS
SERVICE OIL TESTS
The service oil tests to be conducted are furnished below:
Service oil tests as per IS: 1866 –2000
Sr. No.

TESTS

INFORMATION PROVIDED BY TESTS

1

Interfacial Tension

Sludge present in the oil.

2

Neutralisation Number

Acid present in the oil .

3

Moisture content (ppm)

Reveals total water content or cellulosic deterioration.

4

Flash point

Sudden drop in flash point indicates of unsatisfactory
working condition of transformer.

5

Sludge

Indicated deterioration.

6

Dielectric Dissipation

Reveals presence of moisture, resins, varnishes or
their products of oxidation in oil.

7

Dielectric strength

Conductive contaminants and moisture present in the
oil.

8

Resistivity

Indicative of conducting impurities.

9

Dissolved Gas Analysis Reveals ppm of combustible gases dissolved in the oil
to assess the internal condition of the transformer.
GROUP III OILS:
To categorize under group III, the parameters should be
well beyond the limits proposed in table IV. Such oils
should be initially filtered under vacuum and
temperature to verify whether the properties improve or
not. If properties like Dielectric Dissipation Factor,
Interfacial Tension do not improve on filtration, then
there is a case for oil to be replaced.
Transformer Oil Filtration
Transformer oil filtration is carried out with
oil filter machine of adequate capacity.
The oil filtration plant is designed to remove
dissolved moisture, dirt, air and other gases
from the transformer oil.
This two stage plant operates on the principle
of Low Temperature and High Vacuum.
This term contains in general: the heatup of oil, removal
of solid particles of more than 3 µm size from the oil,
vacuum degasification and drying of oil.
Unfiltered oil is taken in to the system through the inlet valve. Then the oil is
pumped to the system through positive displacement pump. Preliminary filters
protect the pump by entering solid and magnetic particles up to 1 mm size. The oil
is heated up to 60°C. After heating the oil passes through the cartridge filters
where the particles up to 5 microns are filtered. Then the oil is passed through a
specially designed vacuum chamber, where the moisture, air and other gases are
extracted from the oil. The vacuum chamber is designed in such a way that the oil
is spread out and is allowed to fall by gravity over the media inside, forming a thin
film of oil providing a large surface area exposed to vacuum. With this exposure,
the dissolved moisture and gases are evacuated to improve the insulating
properties of transformer oil.
In the course of oil filtration clean oil in the transformer
vessel becomes mixed with the original filling and,
consequently, a few cycles are necessary for the oil filling to
achieve the performance required.
The filtration, however, is carried through for a period until it
achieves the parameters necessary (which happens already
after four circulations, but sometimes 10 circulations are
necessary).
During the filtration solid particles are removed from the
transformer oil which entered it as a consequence of wear,
chemical and heat decomposition of solid particles, but also by
loosened rust and suspended sludges.
 During the oil drying it is to reckon with water contained in

fixed insulation material. It is known that of the total volume of
water in the transformer up to 97 per cent is stored in the wood
pulp.
When drying a water affected transformer with the help of oil
the curve of water removal from the oil is a significantly different
one.
Heater

Vacuum Chamber

Compressor

After Filtrations

Before Filtrations
Drying of Transformer
 This includes reconditioning of transformer
windings, insulation, gasket sealing and removal
of moisture.
 Such overhauling is carried out at site with adequate
lifting and handling facility.
Dehydration of Core Coil assembly of the transformer.
Active part of the transformer is heated and then evacuated for
removal of moisture from the insulation.
Core coil assembly is heated by hot oil circulation or induction heating
system.
Drying of transformers
Transformers are dried using the oil-spray method. The principle consists in
heating up the transformer by spraying hot transformer oil on the internal
parts of the transformer structure. As soon as the required temperature of
the active part of transformer is achieved the vacuum degassing follows.
Vapours of water are sucked off from the machine at the operating pressure
of 5 -10 mbar and the temperature of 60 - 80 °C. Normally the capacity of
vacuum pumps is 100 - 500 m3 of gases and vapours per hour, which for
the initial efficiency of 30 per cent means that up to 2 liters of water are
removed from the transformer in one hour. The efficiency, however, drops
gradually down to approx. one tenth of the value, depending on the
moisture degree. The process is then stabilized by hot oil which continues
to be sprayed into the internal area of the transformer. Since the
temperature at the point of spraying decreases considerably due to the
evaporation of water, and the propagation of heat in vacuum is heavily
constrained, it is necessary to heat up the internal parts of the transformer.
This is done by ventilating of the transformer interior and heating up the
same with hot oil mist. In such a way about 50 to 100 litres of water are
removed from the transformer during the drying. The time necessary to dry
out a transformer is about 10 days.
Transformers are dried using the oil-spray method.
Dissolved Gas Analysis
Dissolved Gas Analysis is widely accepted as the most reliable tool
for the earliest detection of incipient faults in transformers and tap
selector units. Hydrocarbon (mineral-based) oils and silicones are
used as insulation fluids in transformers because of their high
dielectric strength, heat transfer properties and chemical stability.
Under normal operating conditions very little decomposition of the
dielectric fluid occurs. However, when a thermal or electrical fault
develops, dielectric fluid and solid insulation will partially
decompose. The low molecular weight decomposition gases include
hydrogen, methane, ethane, ethane, acetylene, carbon monoxide
and carbon dioxide. These fault gases are soluble in the dielectric
fluid. Analysis of the quantity of each of the fault gases present in
the fluid allows identification of fault processes such as corona,
sparking, overheating and arcing.
DGA
ANALYSIS
Structure of insulating oil & fault gases

Relative Solubility as a function of Temperature
Flag Point ( Key Gas) Method
Gas

Normal(<)

Abnormal(>)

Interpretation

H2

150ppm

1500ppm

Corona, Arcing

CH4

25ppm

80ppm

Sparking

C2H6

10ppm

35ppm

Local Overheating

C2H4

20ppm

150ppm

Severe Overheating

C2H2

15ppm

70ppm

Arcing

CO

500ppm

1000ppm

Severe Overheating

CO2

10,000ppm

15,000ppm

Severe Overheating
Rogers Ratios
Duval Triangle
Diagnostic results using
Duval Triangle Method

Area

Diagnosis

PD
D1

Partial Discharges

D2
T1
T2

High Energy Discharge.

T3

Thermal fault greater than
700 deg.C.

DT

low energy dischargingsparking

Thermal Fault (< 300deg.C)
Thermal Fault ( 300deg.C –
700deg.C)

Indeterminate-thermal fault or
electrical discharge
The accuracy of the methods used has been evaluated
% Correct
Diagnoses

% Unresolved
Diagnoses

% Wrong
Diagnoses

IEEE Key Gas
Method

42

0

58

IEEE Rogers
Ratios

62

33

5

Doernenburg Ratios

71

26

3

IEC Basic Gas
Ratios

77

15

8

IEC Duval Triangle

96

0

4
CH4/H2

1092/95

11.4

1

C2H6/C
H4

576/1092

0.527

0

C2H4/C
2/H6

2033/576

3.526

1

C2H2/C
2H4

0.21/2033

0.0001

0

1 0 1 0 Circulating /
Overheated Joint
C2H2/C2H4

33.04/750.76

0.044

0

CH4/H2

530.22/99.6

5.323

2

C2H4/C2H6

750.76/253.24

2.965

1

0 2 1 indicate thermal fault(>700*C);Over heating of Copper
Rogers Ratio
10 1 0

CH4/H2

844.58/482.92

1.75

1

C2H6/CH4

219.3/844.58

0.26

0

C2H4/C2H6

1528.31/219.3

6.97

1

C2H2/C2H4

66.53/1528.31

0.044

0

Circulating currents and /
or overheating joints.
Bucholz gas analysis (IS 3638)
Colour of gas

Identification

Colorless

Air

White

Gas of decomposed paper and cloth insulation

Yellow

Gas of decomposed Wood insulation

Grey

Gas of overheated oil due to burning of iron

Black

Gas of decomposed oil due dielectric arc

Combustibility
Combustible gas indicates decomposed insulation and oil vapour
Chemical test
Method 1

Method 2

Solution 1

5 g AgNO3 dissolved in 100 ml
of distilled water

Aqueous solution of
Ammonia

Solution 2

A weak solution of Ammonia in
water is slowly added to 100 ml
of solution 1 until a white ppt
which forms first, disappears in
mixture

100 mg Palladous
chloride (PdCl) dissolved
in 100 ml of distilled
water

Method 1

Observation

Identification

Both solution clear.
No PPT

The Gas is Air

Solution 1

White ppt turning brown
on exposed to sunlight

Gas of Oil Dissociation

Solution 2

Dark brown ppt

Gas of decomposed paper,
cotton or wood insulation

Both solution

Method 2

Observation

Identification

Both solution clear.
No PPT

The Gas is Air

Solution 1

Brick red ppt

Gas of Oil Dissociation

Solution 2

Black ppt in 2 to 3
minutes

Gas of decomposed paper,
cotton or wood insulation

Mere darkening

Small concentration but
positive presence of gas of
decomposed solid insulation.

Both solution

More Related Content

What's hot

Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsSumeet Ratnawat
 
Transformer vector group_test_conditions
Transformer vector group_test_conditionsTransformer vector group_test_conditions
Transformer vector group_test_conditionsSARAVANAN A
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer ProtectionAng Sovann
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level CalculationDinesh Sarda
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relaysRoberto Costa
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.Sheikh Nazmul Islam
 
Testing of Transformers.
Testing of Transformers.Testing of Transformers.
Testing of Transformers.Geetesh Verma
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance Molla Morshad
 
Presentation_Power_Transformers-1
Presentation_Power_Transformers-1Presentation_Power_Transformers-1
Presentation_Power_Transformers-1Nageswar Rao
 
Transformer testing
Transformer testingTransformer testing
Transformer testingajayknows
 
Transformer protection
Transformer protectionTransformer protection
Transformer protectionjawaharramaya
 
Generator Protection
Generator ProtectionGenerator Protection
Generator ProtectionPriten Vasa
 
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)J. FR
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rAshish Patel
 
Protection Of Generator
Protection Of GeneratorProtection Of Generator
Protection Of GeneratorRahuldey1991
 
Power Transformer in DPL
Power Transformer in DPLPower Transformer in DPL
Power Transformer in DPLAbhishek Roy
 

What's hot (20)

Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
Transformer vector group_test_conditions
Transformer vector group_test_conditionsTransformer vector group_test_conditions
Transformer vector group_test_conditions
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Power Transformer Protection
Power Transformer ProtectionPower Transformer Protection
Power Transformer Protection
 
Fault Level Calculation
Fault Level CalculationFault Level Calculation
Fault Level Calculation
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relays
 
Maintenance schedule of Substation.
Maintenance schedule of Substation.Maintenance schedule of Substation.
Maintenance schedule of Substation.
 
Testing of Transformers.
Testing of Transformers.Testing of Transformers.
Testing of Transformers.
 
Transformer maintenance
Transformer maintenance Transformer maintenance
Transformer maintenance
 
Insulation Resistance Test
Insulation Resistance TestInsulation Resistance Test
Insulation Resistance Test
 
Presentation_Power_Transformers-1
Presentation_Power_Transformers-1Presentation_Power_Transformers-1
Presentation_Power_Transformers-1
 
Transformer testing
Transformer testingTransformer testing
Transformer testing
 
Transformer protection
Transformer protectionTransformer protection
Transformer protection
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
 
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines r
 
Protection Of Generator
Protection Of GeneratorProtection Of Generator
Protection Of Generator
 
Power Transformer in DPL
Power Transformer in DPLPower Transformer in DPL
Power Transformer in DPL
 
Protection and Switchgear
Protection and SwitchgearProtection and Switchgear
Protection and Switchgear
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 

Viewers also liked

Report on oltc by Ankit
Report on oltc by AnkitReport on oltc by Ankit
Report on oltc by AnkitAnkit Sisodiya
 
OLTC Function Selection, Operation
OLTC Function Selection, OperationOLTC Function Selection, Operation
OLTC Function Selection, OperationMax Philipp
 
PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit
PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv JimitPRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit
PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv JimitJimit Dhruv
 
Transformer oil-specifications new
Transformer oil-specifications newTransformer oil-specifications new
Transformer oil-specifications newMolla Morshad
 
Presentation about transformer and its types
Presentation about transformer and its types Presentation about transformer and its types
Presentation about transformer and its types M Tahir Shaheen
 
Dissolved gas analysis of power transformer oil
Dissolved gas analysis of power transformer oilDissolved gas analysis of power transformer oil
Dissolved gas analysis of power transformer oilSHIVAJI CHOUDHURY
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protectionashwin fcc
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protectionBinit Das
 
Furan Testing of Transformers Oil
Furan Testing of Transformers OilFuran Testing of Transformers Oil
Furan Testing of Transformers OilNitish Kumar
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformerRitesh Verma
 
NikhilYadav ( Training ppt)
NikhilYadav ( Training ppt)NikhilYadav ( Training ppt)
NikhilYadav ( Training ppt)Nikhil Yadav
 
Active Shunt Diverter for OLTC
Active Shunt Diverter for OLTCActive Shunt Diverter for OLTC
Active Shunt Diverter for OLTCdipinsanand
 

Viewers also liked (20)

Tap changer
Tap changerTap changer
Tap changer
 
Report on oltc by Ankit
Report on oltc by AnkitReport on oltc by Ankit
Report on oltc by Ankit
 
OLTC Function Selection, Operation
OLTC Function Selection, OperationOLTC Function Selection, Operation
OLTC Function Selection, Operation
 
Tap Changer
Tap ChangerTap Changer
Tap Changer
 
Transformer construction,types and working
Transformer construction,types and workingTransformer construction,types and working
Transformer construction,types and working
 
Transformer
TransformerTransformer
Transformer
 
transformer ppt
transformer ppttransformer ppt
transformer ppt
 
PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit
PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv JimitPRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit
PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit
 
Transformer
TransformerTransformer
Transformer
 
Transformer oil-specifications new
Transformer oil-specifications newTransformer oil-specifications new
Transformer oil-specifications new
 
Presentation about transformer and its types
Presentation about transformer and its types Presentation about transformer and its types
Presentation about transformer and its types
 
Dissolved gas analysis of power transformer oil
Dissolved gas analysis of power transformer oilDissolved gas analysis of power transformer oil
Dissolved gas analysis of power transformer oil
 
Transformer design and protection
Transformer design and protectionTransformer design and protection
Transformer design and protection
 
Relay and switchgear protection
Relay and switchgear protectionRelay and switchgear protection
Relay and switchgear protection
 
POH seminar bhusawal
POH seminar bhusawal POH seminar bhusawal
POH seminar bhusawal
 
Furan Testing of Transformers Oil
Furan Testing of Transformers OilFuran Testing of Transformers Oil
Furan Testing of Transformers Oil
 
Protection of power transformer
Protection of power transformerProtection of power transformer
Protection of power transformer
 
NikhilYadav ( Training ppt)
NikhilYadav ( Training ppt)NikhilYadav ( Training ppt)
NikhilYadav ( Training ppt)
 
transformers
transformerstransformers
transformers
 
Active Shunt Diverter for OLTC
Active Shunt Diverter for OLTCActive Shunt Diverter for OLTC
Active Shunt Diverter for OLTC
 

Similar to Transformer & OLTC

IRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET Journal
 
01 Overview of Power transformers - Remedial Measures.ppt
01 Overview of Power transformers - Remedial Measures.ppt01 Overview of Power transformers - Remedial Measures.ppt
01 Overview of Power transformers - Remedial Measures.pptvikram desai
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaUdhayakumar Venkataraman
 
Fox Commercial Services PMA Presentation
Fox Commercial Services PMA PresentationFox Commercial Services PMA Presentation
Fox Commercial Services PMA PresentationFox Commercial Services
 
Maintenance plan
Maintenance planMaintenance plan
Maintenance planNauman khan
 
Transformer Maintenance
Transformer Maintenance Transformer Maintenance
Transformer Maintenance Molla Morshad
 
PROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.pptPROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.pptQwer401863
 
Transfomer diagnostics/sanjeet-1308143
Transfomer diagnostics/sanjeet-1308143Transfomer diagnostics/sanjeet-1308143
Transfomer diagnostics/sanjeet-1308143sanjeet kumar
 
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...BharathwajanTS
 
Installation Operation & Maintenance of 33kV & 11kV Switchgear
Installation   Operation & Maintenance of 33kV & 11kV SwitchgearInstallation   Operation & Maintenance of 33kV & 11kV Switchgear
Installation Operation & Maintenance of 33kV & 11kV SwitchgearSheikh Nazmul Islam
 
Zabatt compressor-maintenance
Zabatt compressor-maintenanceZabatt compressor-maintenance
Zabatt compressor-maintenanceLungisani Miya
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfchintanraval24
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.pptssuser9e9be71
 

Similar to Transformer & OLTC (20)

IRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a TransformerIRJET- Systematic Steps in Overhauling of a Transformer
IRJET- Systematic Steps in Overhauling of a Transformer
 
transformers.ppt
transformers.ppttransformers.ppt
transformers.ppt
 
TR OverHauling PPT
TR OverHauling PPTTR OverHauling PPT
TR OverHauling PPT
 
01 Overview of Power transformers - Remedial Measures.ppt
01 Overview of Power transformers - Remedial Measures.ppt01 Overview of Power transformers - Remedial Measures.ppt
01 Overview of Power transformers - Remedial Measures.ppt
 
H010514852
H010514852H010514852
H010514852
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performa
 
Fox Commercial Services PMA Presentation
Fox Commercial Services PMA PresentationFox Commercial Services PMA Presentation
Fox Commercial Services PMA Presentation
 
Maintenance plan
Maintenance planMaintenance plan
Maintenance plan
 
Transformer Maintenance
Transformer Maintenance Transformer Maintenance
Transformer Maintenance
 
PROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.pptPROTECTIVE DEVICES & MAINTENANCE.ppt
PROTECTIVE DEVICES & MAINTENANCE.ppt
 
SD.pptx
SD.pptxSD.pptx
SD.pptx
 
Transfomer diagnostics/sanjeet-1308143
Transfomer diagnostics/sanjeet-1308143Transfomer diagnostics/sanjeet-1308143
Transfomer diagnostics/sanjeet-1308143
 
tcee-161003100321.pptx
tcee-161003100321.pptxtcee-161003100321.pptx
tcee-161003100321.pptx
 
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
 
SVL-Singapore
SVL-SingaporeSVL-Singapore
SVL-Singapore
 
Installation Operation & Maintenance of 33kV & 11kV Switchgear
Installation   Operation & Maintenance of 33kV & 11kV SwitchgearInstallation   Operation & Maintenance of 33kV & 11kV Switchgear
Installation Operation & Maintenance of 33kV & 11kV Switchgear
 
3 condition monitoring of oil
3 condition monitoring of oil3 condition monitoring of oil
3 condition monitoring of oil
 
Zabatt compressor-maintenance
Zabatt compressor-maintenanceZabatt compressor-maintenance
Zabatt compressor-maintenance
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdf
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt
 

Recently uploaded

Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 

Recently uploaded (20)

Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 

Transformer & OLTC

  • 1. Wednesday, February 17, 2010 Rohit Dave
  • 2. Maintenance may be defined as the upkeep of the sub station’s electrical equipments in proper working condition and efficient to derive the following : # # # # # # Reliable and efficient operation Optimum utilisation Availability Reduced down time Detection of premature faults Minimizing revenue loss etc. To meet the above requirement, the equipment has to be checked, attended, to trouble-shot and operated under specified conditions.
  • 3. The need for maintenance During the operational life of the electrical equipment, ageing occurs due to various stresses which is incident on the equipment both under normal and fault conditions and result in deterioration of physical and chemical properties of components making up the electrical equipment. The expected performance can not be obtained from the equipment once it is aged.
  • 4. The electrical equipment in service are subject to the following stresses : • Electrical stresses • Thermal stresses • Mechanical stresses • Environmental stresses • Combined stresses
  • 5. Electrical Stress: The Insulation of electrical equipment experience the following voltages : • Continuous normal power frequency rated voltage • Temporary power frequency over voltages due to voltage regulation, Ferranti effect, and long duration power frequency over voltages. • Lightning Impulse Voltage Waves (Surges) • Switching Impulse Waves (Surges)
  • 6. Thermal Stress Elevated temperatures may be reached during operation due to dielectric losses, increased I2R loss or by heat absorption from surroundings. Temperature may increase abnormally due to sustained short circuit current. The cooling system failure in power transformers also stress the windings thermally.
  • 7. Mechanical Stress There may be permanent mechanical stress due to improper installation Circuit breakers may experience vibration stress during normal closing/opening and during making / breaking under fault The bus bar vibration in rigid bus bar stresses the bus bar support mechanically
  • 8. Environmental stress Environmental factors include pollution, Radiation, Humidity, dust particles, moisture etc,. Proximity to chemical industry, sea coast and intentional damage caused by humans contribute to ageing and deterioration Combined stress In most of the electrical equipment, normally some of the stress factors as above will be present
  • 9.
  • 10. Maintenance Schedules for Power Transformers 1. 2. 3. 4. Checking the Color of silica gel in the breather and also oil level of the oil seal. If silica gel Color changes from blue to pink by 50% the silica gel is to be reconditioned or replaced. Observation of oil levels in (a) main conservator tank (b) OLTC conservator (c) bushings and examining for oil leaks if any from the transformer Daily Visual check for overheating if any at terminal connections (Red hots) and observation for any unusual internal noises. Checking for noice, vibration or any abnormality in cooling fans & oil pumps of power transformers standby pumps & fans are also to be run condition to be observed. Daily in each shift Daily Daily 5. 6. 7. Observation of oil & winding temperatures & recording Visual check of explosion vent diaphragm for any cracks Checking for any water leakage into cooler in case of forced cooling system. Hourly Daily Daily 8. Physical examination of diaphragm of vent pipe for any cracks Monthly 9. Cleaning of bushings, inspect for any cracks or chippings of the porcelain and checking of tightness of clamps and jumpers Monthly 10. Measurement of IR values of transformer with 2.5 KV megger upto 33KV rating and 5.0 KV megger above 33KV rating. Recording of the values specifying the temperature which measurements are taken. Monthly 11. 12. Cleaning of Silicagel breather Checking of temperature alarms by shorting contacts by operating the knob. Monthly Monthly 13. 14. 15. Testing of main tank oil for BDV and moisture content Testing OLTC oil for BDV & moisture content Testing of Bucholtz surge relays & low oil level trips for correct operation Quarterly Quarterly Quarterly 16. Checking auto start of cooling fans and pumps Quarterly
  • 11. 17. Checking of Bucholtz relay for any gas collection and testing the gas collected 18. Checking of operation of Bucholtz relay by air injection ensuring actuation alaram & trip Noting the oil level in the inspection glass of Bucholtz relay and arresting of oil leakages if any. Checking of all connections on the transformer for tightness such as bushings, tank earth connection Lubricating / Greasing all moving parts of OLTC mechanism Half yearly or during shutdown Monthly Testing of oil for dissolved gas analysis of EHV transformers upto 100KVA capacity Overhauling of oil pumps and their motors also cooling fans & their motors. Once in a year Once in a year 29. 30. 31. Testing of oil in main tank for acidity, tan delta, interface tension specific resisitivity Bushing testing for tan delta Calibration of oil & winding temperature indicators Measurement of magnetizing current at normal tap and extreme taps 32. 33. 34. Measurement of DC winding resistance Turns ratio test at all taps Inspection of OLTC mechanism and contacts its diverter switch 19. 20. 21. 22. 23. 24. 25. 26 27. 28. Quarterly or during fault Quarterly Quarterly or as given in the manufacturers manual Checking of control circuitry, interlocks of oil pumps and cooling fans for auto Half yearly or during start and stop operation at correct temperatures and also for manual operation shutdown Testing of motors, pumps and calibrating pressure gauge Half yearly Pressure testing of oil coolers Half yearly Testing of oil samples for dissolved gas analysis (for 100MVA transformers) Half yearly Once in a year Once in a year Repeats One in a year Once in a year Once in a year Once in a year or number of operation as recommended by manufacturers are completed whichever is
  • 12. 35. 36. Overhaul of tap changer and mechanism Replacement of oil in OLTC 37. 40. Calibration of thermometers (temperature indicators) and tap position indicator. Remaining old oil in thermometer pockets, cleaning the pockets and filing with new oil. Checking oil in the air cell (for transformers of 100 MVA & above capacity) Bushings partial discharge test and capacitance (EHV transformers) 41 Filtration of oil / replacement of oil and filtration 38. 39. 42. One in a year Once in year or whenever number of operations as recommended by manufacturer are completed whichever is earlier. Yearly Yearly Yearly Yearly Whenever the IR values of transformer are below permissible limits and oil test results require filtration / replacement of oil One in 10 years General overhaul (consisting 1) Inspection of core & winding (2) Through washing of windings (3) Core tightening (4) Check-up of core bolt insulation (5) Replacement of gaskets (6) Overhaul of OLTC
  • 13. Maintenance Schedule of Distribution Transformers 1. Cleaning of bushings and external surface of tank cooling pipes Monthly 2. Checking of oil levels in the conservator and gauge glass Monthly 3. Checking of silicased in the breather and replacement is necessary Monthly 4. Checking of oil level in the oil seal of breather & top up if necessary Monthly 5. Checking of HG fuse & LT fuse and renew if necessary (correct guage shall maintained) Checking of vent pipe diaphragm Checking of terminal loose connections is any and tightening the same Checking for any oil leaks & rectification (including replacement of oil seals if required) Taking long tester reading during peak load hours and remedial action Noting down neutral currents and load balancing in all the three phase Measurement of IR Values Testing of oil for BDV, activity Checking of lightening arrestors and replacement is required once before monsoon) Measurement of earth resistance checking of earthing system and rectification if required. Overhaul of transformer Monthly 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Monthly Monthly Monthly Quarterly Quarterly Half yearly Half yearly Half yearly Half yearly Once in 5 years
  • 14. Common Defects noticed and the cause Sl.No Part 1. Tank 2. Radiators 3. Conservator 4. 5. 6. Breather Explosion Core 7. Winding 8. Oil 9. Terminal Bushing Tap Switch 10 a. b. c. a. b. c. d. a. b. c. d. a. b. Defects Leakage of oil Deformation Overheating Leakage of Oil Deformation Overheating Leakage of Oil Deformation Overheating Ineffective Glass broken Loose Increased Losses Excess Noise Short Circuited Loosening Insulation Brittle Open circuited Discoloration High Acidity Low BDV Sludge Breakage Leakage of Oil a. b. c. Inoperative Broken lever Maloperation – Insulation failure–Failure Burnt Contact operation mechanism – overheating Short Circuit a. b. c. a. b. c. a. b. c. Causes Corrosion / mechanical damage – Gaskets worn out excessive internal pressure – Improper circulation of cooling oil and / or inadequate ventilation. Corrosion / mechanical damage – Gaskets worn out excessive internal pressure – Improper circulation of cooling oil and / or inadequate ventilation. Corrosion / mechanical damage – Gaskets worn out excessive internal pressure – Improper circulation of cooling oil and / or inadequate ventilation. Inlet choked – Silica gel saturated Mechanical Bolts loosening up – change in characteristics due to heating vibration of stampings Overloading – Air bubbles – loss of insulation – shrinkage displacement Overheating decomposition burn out. Contamination – Increased moisture Decomposition chemical action with other parts. – Strain – Gasket Worn out – Loose fit. of
  • 15. MAINTENANCE Approach Strategies Run to failure Maintenance ( Corrective Actions Only ) Time directive maintenance ( Preventive Maintenance ) Repair and restoration of equipment/component that have failed or malfunctioning and are not performing their intended function Periodic and Planned maintenance actions taken to maintain a piece of equipment within the expected operating conditions. It extends the equipment life and is performed prior to equipment failure to prevent it. This includes technical specification surveillance, in service inspection and other regulatory forms of equipment maintenance. The continuous or periodic monitoring and diagnosis in order to forecast component Condition Directive Maintenance degradation so that as needed planned maintenance can be performed prior to ( Predictive ) equipment failure. Not all equipment conditions and failure modes can be monitored therefore, predictive maintenance must be selectively applied.
  • 16. Time directive maintenance ( Preventive Maintenance ) Inspection of Transformer O/H of OLTC Checking of Protection Circuit DGA Earth Test BDV of Oil Cleaning Working of Fire Protection Equipment Painting Transformer Testing
  • 17. Run to failure Maintenance ( Corrective Actions Only ) Failure of gasket  Failure of Bushing  Failure of PT / CT  Oil Leakage Burning of Jumpers Winding / insulation Failed OLTC Problem
  • 18. Condition Directive maintenance ( Predictive ) Based on DGA / Transformer Testing Filtration of Oil Drying of Transformer
  • 19. During Inspection Unwanted materials Oil Level Silica Jell degraded All indicating lamps Oil Leakage from any Parts of Transformer Painting/Cleaning Required All Doors & inspection window glass Condition of Radiator Hot/Cold
  • 20. Major Failures  Core Over heating breakdown in core plate insulation leads to circulating currents & usually sparking at fault.  Winding Overheating due to poor joints is common fault in any parts of the electrical circuit. Breakdown of inter-strand insulation results in circulating current causing overheating of insulation and hot spots at point of fault Poor joints
  • 21. Most common problem observed in OLTC OLTC 1. Mechanical Problem 1. Failure of AC Supply Tripping Motor MOCB LT Cable Fault Motor Failure Failure of declutching switch 2. Mechanical Problem Braking of shear Pin Failure in friction device 2. Electrical Problem Wear & Tear on Fixed/Moving contact Resistance Open Tracking on phase board Jumper burnt Braking of Barrier board
  • 22. The OLTC provides uninterrupted voltage regulation of transformers under load. The voltage is regulated by changing the voltage ratio. This is done in steps. The transformer is equipped with a tap winding whose tapping are connected with the tap selector of the OLTC
  • 23. Changing Voltage Ratio a. Linear Voltage Regulation c. Coarse & fine Voltage regulation Step Voltage is 200 Volt/tap b. Reversing Voltage Regulation
  • 25. Linear Voltage Regulation We have two different make OLTC 1. Crompton 1. F33 2. AT 2 CTR
  • 26. Reversing Voltage Regulation We have different makes OLTC Flange Mounted OLTC Crompton AT In Tank (A) With Pre-Selector Switch (B) Without Pre-Selector Switch Easun NGEF Diverter switch BHEL (A) (B) Pre-Selector Switch
  • 27. Compartment in OLTC Flange Mounted OLTC Driving Mechanism High Speed Selector switch Selector switch is capable of making & Breaking load in addition to selecting tap A chamber houses the motor and driving mechanism
  • 28. Compartment in OLTC Top Plate In Tank V type Selector Switch Inside the Main Tank Transmission Shaft Driving Mechanism
  • 29. Compartment in OLTC In Tank D type Top Plate Diverter switch inner OSR Diverter switch Oil Vessel Pre-Selector Switch Main Tank
  • 30. Operation in OLTC Pennant Cycle Tap is changing from No.1 to No.2
  • 31. Operation in OLTC Flag Cycle Normal Main moving contact left fixed contact. Load is carried by resistor R1 R1 leave fixed contact 3, R2 contact fixed contact 4 Load is carried by resistor R2 R2 contact fixed contact 4. R1 contact fixed contact 3 Main moving is floating Tap change is completed
  • 32. OLTC with Pre-selected switch (NGEF, Esson) Flag Cycle
  • 33. Parts in OLTC Current Plate Main Shaft Phase Board Resistance Jumpers connected to Tapping Roller Contact Fixed Contact
  • 34. Barrier Plate Jumper coming from Xmer Resistance Phase Board Fixed Contac Main Moving Contact Roller Contact
  • 35. Driving Mechanism DSS Counter Raise Lower Contactor Motor Protection Relay Tap indicator Motor
  • 36. AVR mounted on RTCC Automatic Voltage Regulating Relay (AVR): AVR is used to maintain secondary voltage (11KV) of power transformer by operating primary side (22/33KV) OLTC Tap. Input to AVR is secondary side of 11000/110V Potential transformer directly connected on secondary side of Power Transformer (Circuit PT or Transformer PT). EMCO, NMC, Pradeep and accord make AVRs are in service. Typical settings of AVRs – Auxiliary supply = 110V AC Nominal Voltage = 110V AC (From 11000/110V PT) Raise Operation : V <108V Lower Operation : V >112V Time Delay = 120 Sec.
  • 37. Directional Sequence Switch (DSS): DSS is cam operated multiple contact switch used to maintain OLTC motor supply to during operation and cut-off after completion of OLTC operation. Switron, Shirke Electricals, Recom make DSS are in service. Typical DSS contacts and their application is as follows.
  • 38. Electrical Interlocks And Protection: Directional Raise Limit switch – Blocks electrical raise operation when tap at maximum position (Tap15 or 16). Directional Lower Limit switch – Blocks electrical lower operation when tap at minimum position (Tap1). Motor Protection Relay (MPR) – Driving motor is protected for overload by MPR which isolates it under fault condition. Hand Interlock Switch (HIS) – HIS isolates electrical supply during manual crank handle is in. Ensures safety to operating personal. OLTC Timer Scheme – Timer scheme will operate if motor supply is continuous for more than set time (Set time=2*time for one operation) and avoids high/lower voltages during DSS and contactor mal-operation .
  • 39. Protection for OLTC • OSR • Motor Stuck up Alarm • Motor Supply Failed Alarm OLTC PRV On RTCC
  • 40. Over hauling of OLTC Washing
  • 42. CONDITION MONITORING OF TRANSFORMER OIL Parameters for condition monitoring of oil service Two ways are available to an operating engineer 1.To make periodic oil tests to establish trends and classify them. 2.To conduct dissolved gas analysis to assess the internal condition of transformers
  • 43. PARAMETERS TO BE CHECKED ARE: 1. FLASH POINT 2.DIELECTRIC DISSIPATION FACTOR 3.SPECIFIC RESISTANCE 4.NEUTRALISATION. 5.MOISTURE CONTENT 6.SLUDGE % 7.BREAK DOWN VOLTAGE 8.D.G.A.
  • 44. PHYSICAL CONTAMINATION 1.Dust, fiber, metallic, particles, other solid impurities. 2.Dissolution of varnish. 3.Free and dissolved water. CHEMICAL DETERIORATION Oxidation resulting in acids sludge and polar impurities. CONTAMINATION OF GASES a) Dissolved air from atm. Nitrogen, co2 b) Generated in oil, methane, ethane, acetylene, ethylene etc. Before the oil is put in the transformer, its properties should be fully ensured.
  • 45. Sample of transformer oil illustrating seven color classification Interpreting Transformer Oil Test Data There is classic relationship between the transformer insulating oil tests neutralization or acid number (NN) and interfacial tension (IFT). Several independent studies have shown that an increase in NN should normal be followed by a characteristic drop in IFT. When test results for a given oil sample do not fall between the range shown on either side of median line, further investigation is necessary.
  • 47.
  • 48. SERVICE OIL TESTS The service oil tests to be conducted are furnished below: Service oil tests as per IS: 1866 –2000 Sr. No. TESTS INFORMATION PROVIDED BY TESTS 1 Interfacial Tension Sludge present in the oil. 2 Neutralisation Number Acid present in the oil . 3 Moisture content (ppm) Reveals total water content or cellulosic deterioration. 4 Flash point Sudden drop in flash point indicates of unsatisfactory working condition of transformer. 5 Sludge Indicated deterioration. 6 Dielectric Dissipation Reveals presence of moisture, resins, varnishes or their products of oxidation in oil. 7 Dielectric strength Conductive contaminants and moisture present in the oil. 8 Resistivity Indicative of conducting impurities. 9 Dissolved Gas Analysis Reveals ppm of combustible gases dissolved in the oil to assess the internal condition of the transformer.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58. GROUP III OILS: To categorize under group III, the parameters should be well beyond the limits proposed in table IV. Such oils should be initially filtered under vacuum and temperature to verify whether the properties improve or not. If properties like Dielectric Dissipation Factor, Interfacial Tension do not improve on filtration, then there is a case for oil to be replaced.
  • 59. Transformer Oil Filtration Transformer oil filtration is carried out with oil filter machine of adequate capacity. The oil filtration plant is designed to remove dissolved moisture, dirt, air and other gases from the transformer oil. This two stage plant operates on the principle of Low Temperature and High Vacuum. This term contains in general: the heatup of oil, removal of solid particles of more than 3 µm size from the oil, vacuum degasification and drying of oil.
  • 60. Unfiltered oil is taken in to the system through the inlet valve. Then the oil is pumped to the system through positive displacement pump. Preliminary filters protect the pump by entering solid and magnetic particles up to 1 mm size. The oil is heated up to 60°C. After heating the oil passes through the cartridge filters where the particles up to 5 microns are filtered. Then the oil is passed through a specially designed vacuum chamber, where the moisture, air and other gases are extracted from the oil. The vacuum chamber is designed in such a way that the oil is spread out and is allowed to fall by gravity over the media inside, forming a thin film of oil providing a large surface area exposed to vacuum. With this exposure, the dissolved moisture and gases are evacuated to improve the insulating properties of transformer oil.
  • 61. In the course of oil filtration clean oil in the transformer vessel becomes mixed with the original filling and, consequently, a few cycles are necessary for the oil filling to achieve the performance required. The filtration, however, is carried through for a period until it achieves the parameters necessary (which happens already after four circulations, but sometimes 10 circulations are necessary).
  • 62. During the filtration solid particles are removed from the transformer oil which entered it as a consequence of wear, chemical and heat decomposition of solid particles, but also by loosened rust and suspended sludges.  During the oil drying it is to reckon with water contained in fixed insulation material. It is known that of the total volume of water in the transformer up to 97 per cent is stored in the wood pulp. When drying a water affected transformer with the help of oil the curve of water removal from the oil is a significantly different one.
  • 64. Drying of Transformer  This includes reconditioning of transformer windings, insulation, gasket sealing and removal of moisture.  Such overhauling is carried out at site with adequate lifting and handling facility. Dehydration of Core Coil assembly of the transformer. Active part of the transformer is heated and then evacuated for removal of moisture from the insulation. Core coil assembly is heated by hot oil circulation or induction heating system.
  • 65. Drying of transformers Transformers are dried using the oil-spray method. The principle consists in heating up the transformer by spraying hot transformer oil on the internal parts of the transformer structure. As soon as the required temperature of the active part of transformer is achieved the vacuum degassing follows. Vapours of water are sucked off from the machine at the operating pressure of 5 -10 mbar and the temperature of 60 - 80 °C. Normally the capacity of vacuum pumps is 100 - 500 m3 of gases and vapours per hour, which for the initial efficiency of 30 per cent means that up to 2 liters of water are removed from the transformer in one hour. The efficiency, however, drops gradually down to approx. one tenth of the value, depending on the moisture degree. The process is then stabilized by hot oil which continues to be sprayed into the internal area of the transformer. Since the temperature at the point of spraying decreases considerably due to the evaporation of water, and the propagation of heat in vacuum is heavily constrained, it is necessary to heat up the internal parts of the transformer. This is done by ventilating of the transformer interior and heating up the same with hot oil mist. In such a way about 50 to 100 litres of water are removed from the transformer during the drying. The time necessary to dry out a transformer is about 10 days.
  • 66. Transformers are dried using the oil-spray method.
  • 67. Dissolved Gas Analysis Dissolved Gas Analysis is widely accepted as the most reliable tool for the earliest detection of incipient faults in transformers and tap selector units. Hydrocarbon (mineral-based) oils and silicones are used as insulation fluids in transformers because of their high dielectric strength, heat transfer properties and chemical stability. Under normal operating conditions very little decomposition of the dielectric fluid occurs. However, when a thermal or electrical fault develops, dielectric fluid and solid insulation will partially decompose. The low molecular weight decomposition gases include hydrogen, methane, ethane, ethane, acetylene, carbon monoxide and carbon dioxide. These fault gases are soluble in the dielectric fluid. Analysis of the quantity of each of the fault gases present in the fluid allows identification of fault processes such as corona, sparking, overheating and arcing.
  • 69. Structure of insulating oil & fault gases Relative Solubility as a function of Temperature
  • 70. Flag Point ( Key Gas) Method Gas Normal(<) Abnormal(>) Interpretation H2 150ppm 1500ppm Corona, Arcing CH4 25ppm 80ppm Sparking C2H6 10ppm 35ppm Local Overheating C2H4 20ppm 150ppm Severe Overheating C2H2 15ppm 70ppm Arcing CO 500ppm 1000ppm Severe Overheating CO2 10,000ppm 15,000ppm Severe Overheating
  • 72. Duval Triangle Diagnostic results using Duval Triangle Method Area Diagnosis PD D1 Partial Discharges D2 T1 T2 High Energy Discharge. T3 Thermal fault greater than 700 deg.C. DT low energy dischargingsparking Thermal Fault (< 300deg.C) Thermal Fault ( 300deg.C – 700deg.C) Indeterminate-thermal fault or electrical discharge
  • 73. The accuracy of the methods used has been evaluated % Correct Diagnoses % Unresolved Diagnoses % Wrong Diagnoses IEEE Key Gas Method 42 0 58 IEEE Rogers Ratios 62 33 5 Doernenburg Ratios 71 26 3 IEC Basic Gas Ratios 77 15 8 IEC Duval Triangle 96 0 4
  • 76. Rogers Ratio 10 1 0 CH4/H2 844.58/482.92 1.75 1 C2H6/CH4 219.3/844.58 0.26 0 C2H4/C2H6 1528.31/219.3 6.97 1 C2H2/C2H4 66.53/1528.31 0.044 0 Circulating currents and / or overheating joints.
  • 77. Bucholz gas analysis (IS 3638) Colour of gas Identification Colorless Air White Gas of decomposed paper and cloth insulation Yellow Gas of decomposed Wood insulation Grey Gas of overheated oil due to burning of iron Black Gas of decomposed oil due dielectric arc Combustibility Combustible gas indicates decomposed insulation and oil vapour
  • 78. Chemical test Method 1 Method 2 Solution 1 5 g AgNO3 dissolved in 100 ml of distilled water Aqueous solution of Ammonia Solution 2 A weak solution of Ammonia in water is slowly added to 100 ml of solution 1 until a white ppt which forms first, disappears in mixture 100 mg Palladous chloride (PdCl) dissolved in 100 ml of distilled water Method 1 Observation Identification Both solution clear. No PPT The Gas is Air Solution 1 White ppt turning brown on exposed to sunlight Gas of Oil Dissociation Solution 2 Dark brown ppt Gas of decomposed paper, cotton or wood insulation Both solution Method 2 Observation Identification Both solution clear. No PPT The Gas is Air Solution 1 Brick red ppt Gas of Oil Dissociation Solution 2 Black ppt in 2 to 3 minutes Gas of decomposed paper, cotton or wood insulation Mere darkening Small concentration but positive presence of gas of decomposed solid insulation. Both solution