SlideShare a Scribd company logo
1 of 26
Download to read offline
CORPORATE PRESENTATION
APRIL 2013




                         WWW .R O MA R C O .C O M
Cautionary Statement
	
  
The	
  informa-on	
  in	
  this	
  document	
  has	
  been	
  prepared	
  as	
  of	
  March	
  13,	
  2012.	
  Certain	
  statements	
  contained	
  in	
  this	
  document	
  cons-tute	
  “forward-­‐looking	
  statements”	
  
within	
  the	
  meaning	
  of	
  the	
  United	
  States	
  Private	
  Securi-es	
  Li-ga-on	
  Reform	
  Act	
  of	
  1995	
  and	
  forward	
  looking	
  informa-on	
  under	
  the	
  provisions	
  of	
  Canadian	
  provincial	
  
securi-es	
  laws.	
  When	
  used	
  in	
  this	
  document,	
  the	
  words	
  “an-cipate”,	
  “expect”,	
  “es-mate”,	
  “forecast”,	
  “will”,	
  “planned”,	
  and	
  similar	
  expressions	
  are	
  intended	
  to	
  
iden-fy	
  forward-­‐looking	
  statements	
  or	
  informa-on.	
  
	
  
Specifically,	
  this	
  presenta-on	
  contains	
  forward	
  looking	
  statements	
  regarding	
  the	
  results	
  and	
  projec-ons	
  contained	
  in	
  the	
  March	
  13,	
  2012	
  technical	
  report	
  of	
  the	
  	
  




                                                                                                                                                                                                                                                                        TSX : R
Haile	
  Gold	
  project,	
  including	
  the	
  expected	
  mine	
  life,	
  recovery,	
  capital	
  costs,	
  cash	
  opera-ng	
  costs	
  and	
  other	
  costs	
  and	
  an-cipated	
  produc-on	
  of	
  the	
  described	
  open	
  
pit	
  mine,	
  the	
  projected	
  internal	
  rate	
  of	
  return,	
  the	
  projected	
  payback	
  period,	
  the	
  availability	
  of	
  capital	
  for	
  development,	
  sensi-vity	
  to	
  metal	
  prices,	
  ore	
  grade,	
  the	
  
reserve	
  and	
  resource	
  es-mates	
  on	
  the	
  project,	
  the	
  financial	
  analysis,	
  the	
  -ming	
  for	
  comple-on	
  of	
  the	
  revised	
  feasibility	
  study	
  on	
  the	
  	
  Haile	
  Gold	
  	
  project,	
  	
  the	
  -ming	
  
and	
  amount	
  of	
  future	
  produc-on,	
  the	
  -ming	
  of	
  construc-on	
  of	
  the	
  proposed	
  mine	
  and	
  process	
  facili-es,	
  capital	
  and	
  opera-ng	
  expenditures,	
  the	
  -ming	
  of	
  the	
  
receipt	
  	
  of	
  permits,	
  rights	
  and	
  authoriza-ons,	
  communica-ons	
  with	
  local	
  stakeholders	
  and	
  community	
  rela-ons,	
  availability	
  of	
  financing	
  and	
  any	
  and	
  all	
  other	
  -ming,	
  
development,	
  opera-onal,	
  financial,	
  economic,	
  legal,	
  regulatory	
  and	
  poli-cal	
  factors	
  that	
  may	
  influence	
  future	
  events	
  or	
  condi-ons	
  and	
  expected	
  drilling	
  ac-vi-es.	
  	
  




                                                                                                                                                                                                                                                                        WWW .R O MA R C O .C O M
In	
  addi-on,	
  this	
  presenta-on	
  also	
  contains	
  updated	
  resource	
  es-mates	
  contained	
  in	
  the	
  March	
  13,	
  2012	
  technical	
  reports.	
  
	
  
Scien-fic	
  and	
  technical	
  informa-on	
  referred	
  herein	
  has	
  been	
  extracted	
  from	
  and	
  are	
  hereby	
  qualified	
  in	
  their	
  en-rety	
  by	
  reference	
  to	
  the	
  aforemen-oned	
  technical	
  
reports	
  (“Technical	
  Reports”).	
  	
  Joshua	
  Snider,	
  P.E.,	
  Thomas	
  L.	
  Drielick,	
  P.E.,	
  Lee	
  “Pat”	
  Gochnour,	
  M.M.S.A.,	
  John	
  Marek,	
  P.E.	
  and	
  Derek	
  Wiwer,	
  P.E.	
  are	
  responsible	
  
for	
  preparing	
  the	
  Technical	
  Reports.	
  	
  Each	
  of	
  the	
  above	
  referenced	
  persons	
  is	
  a	
  “qualified	
  person”	
  as	
  defined	
  in	
  Na-onal	
  Instrument	
  43-­‐101	
  —	
  Standards	
  of	
  
Disclosure	
  for	
  Mineral	
  Projects.	
  
	
  
Such	
  forward-­‐looking	
  statements	
  are	
  based	
  on	
  a	
  number	
  of	
  material	
  factors	
  and	
  assump-ons,	
  including,	
  but	
  not	
  limited	
  in	
  any	
  manner,	
  those	
  disclosed	
  in	
  any	
  
another	
  of	
  Romarco’s	
  public	
  filings,	
  and	
  include	
  the	
  ul-mate	
  determina-on	
  of	
  mineral	
  reserves	
  and	
  resources,	
  availability	
  and	
  final	
  receipt	
  of	
  required	
  approvals,	
  
licenses	
  and	
  permits,	
  sufficient	
  working	
  capital	
  to	
  develop	
  and	
  operate	
  the	
  proposed	
  mine,	
  access	
  to	
  adequate	
  services	
  and	
  supplies,	
  economic	
  condi-ons,	
  
commodity	
  prices,	
  foreign	
  currency	
  exchange	
  rates,	
  interest	
  rates,	
  access	
  to	
  capital	
  and	
  debt	
  markets	
  and	
  associated	
  cost	
  of	
  funds,	
  availability	
  of	
  a	
  qualified	
  work	
  
force,	
  lack	
  of	
  social	
  opposi-on	
  and	
  legal	
  challenges,	
  and	
  the	
  ul-mate	
  ability	
  to	
  mine,	
  process	
  and	
  sell	
  mineral	
  products	
  on	
  economically	
  favorable	
  terms.	
  While	
  
Romarco	
  considers	
  these	
  assump-ons	
  to	
  be	
  reasonable	
  based	
  on	
  informa-on	
  currently	
  available	
  to	
  it,	
  they	
  may	
  prove	
  to	
  be	
  incorrect.	
  Actual	
  results	
  may	
  vary	
  from	
  
such	
  forward-­‐looking	
  informa-on	
  for	
  a	
  variety	
  of	
  reasons,	
  including	
  but	
  not	
  limited	
  to	
  risks	
  and	
  uncertain-es	
  disclosed	
  in	
  other	
  Romarco	
  filings	
  at	
  www.sedar.com.	
  
Forward-­‐looking	
  statements	
  are	
  based	
  upon	
  management’s	
  beliefs,	
  es-mate	
  and	
  opinions	
  on	
  the	
  date	
  the	
  statements	
  are	
  made	
  and,	
  other	
  than	
  as	
  required	
  by	
  law,	
  
Romarco	
  does	
  not	
  intend,	
  and	
  undertakes	
  no	
  obliga-on	
  to	
  update	
  any	
  forward-­‐looking	
  informa-on	
  to	
  reflect,	
  among	
  other	
  things,	
  new	
  informa-on	
  or	
  future	
  events	
  
	
  	
  
Cau-onary	
  Note	
  to	
  United	
  States	
  Investors	
  Concerning	
  Es-mates	
  of	
  Measured,	
  Indicated	
  and	
  Inferred	
  Resources:	
  
Certain	
  tables	
  may	
  use	
  the	
  terms	
  “Measured”,	
  “Indicated”	
  and	
  “Inferred”	
  Resources.	
  United	
  States	
  investors	
  are	
  advised	
  that	
  while	
  such	
  terms	
  are	
  recognized	
  and	
  
required	
  by	
  Canadian	
  regula-ons,	
  however,	
  the	
  United	
  States	
  Securi-es	
  and	
  Exchange	
  Commission	
  does	
  not	
  recognize	
  them.	
  “Inferred	
  Mineral	
  Resources”	
  have	
  a	
  
great	
  amount	
  of	
  uncertainty	
  as	
  to	
  their	
  existence,	
  and	
  as	
  to	
  their	
  economic	
  and	
  legal	
  feasibility.	
  It	
  cannot	
  be	
  assumed	
  that	
  all	
  or	
  any	
  part	
  of	
  an	
  Inferred	
  Mineral	
  
Resource	
  will	
  ever	
  be	
  upgraded	
  to	
  a	
  higher	
  category.	
  Under	
  Canadian	
  rules,	
  es-mates	
  of	
  Inferred	
  Mineral	
  Resources	
  may	
  not	
  form	
  the	
  basis	
  of	
  feasibility	
  or	
  other	
  
economic	
  studies.	
  United	
  States	
  investors	
  are	
  cau-oned	
  not	
  to	
  assume	
  that	
  all	
  or	
  any	
  part	
  of	
  Measured	
  or	
  Indicated	
  Mineral	
  Resources	
  will	
  ever	
  be	
  converted	
  into	
  
Mineral	
  Reserves.	
  United	
  States	
  investors	
  are	
  also	
  cau-oned	
  not	
  to	
  assume	
  that	
  all	
  or	
  any	
  part	
  of	
  a	
  Mineral	
  Resource	
  is	
  economically	
  or	
  legally	
  mineable.	
  
	
  
All	
  figures	
  are	
  US$	
  unless	
  otherwise	
  indicated	
  
 	

                                                                                                                                                                                                                                                                2	
  
 
Introduction Haile Gold Mine
u  Currently in EIS Permitting process

u  2012 detailed engineering goal met




                                                                               TSX : R
     •  Over 75% complete

u  Continuous review of mine plan, alternatives, expansion studies,




                                                                               WWW .R O MA R C O .C O M
    underground review

u  Exploration reduced in current economic environment
     •  3 rigs operating at Haile and regional targets

u  $53M in cash (at February 25, 2013)

u  Strong institutional support

u  Permitted, built and accredited assay lab on schedule and under
    budget                                                             3	
  
What makes Haile a unique asset?
u    Location – Location – Location
u    Low capex ($320mm)                                                                           CAROLINA SLATE BELT




                                                                                                                                                      TSX : R
u    Low operating costs ($379 / oz LOM)(1)                                    Kentucky           West Virginia
u    High grade (2.06 g/t)
u    District potential




                                                                                                                                                      WWW .R O MA R C O .C O M
                                                                                Tennessee
u    Experienced development team in
                                                                                                                    Russell Mine
      place                                                                                                        Hickory
                                                                                                               Reed Mine
                                                                                                                                   Ironwood
u    Key long-lead equipment ordered and                                                                Howie Mine
                                                                                                           Locust                    North Carolina
      secured                                                                                    Haile Mine                Brewer Mine

                                                                                                    Bayberry               Buzzard
         •     Mobile mine fleet                                                            Dorn Mine
                                                                                                                    Ridgeway Mine
                                                                                                                   Elm
         •     SAG / Ball mills                                                    Magruder Mine    Bante Mine
                                                                                                   Tathom Mine
                                                                                 Columbia Mine
                                                                                                                 South Carolina
         •     Hitachi Shovel
u    Rated #6 out of 76 new mines starting                                             Georgia

      in 2012 to 2020 by BMO
      (May 7, 2012)
                                                                                                                                              4	
  
(1) As per February 2011 Feasibility Study results included in March 13, 2012
Technical Report filed on March 19, 2012 on sedar.com
Capital Costs to Market Capitalization (%)




Source:
                                                                          500%
                                                                                  1000%
                                                                                              1500%
                                                                                                          2000%
                                                                                                                       2500%
                                                                                                                               3000%
                                                                                                                                       3500%




                                                                     0%
                                                    Golden Queen
                                                          Pretium
                                                          Sulliden
                                                 Guyana Goldfields
                                                        Paramount
                                                        Romarco
                                                      ROMARCO
                                                               PMI




National Bank Financial, April 8, 2013
                                                           Aureus
                                                            Lydian
                                                        Esperanza
                                                            Sabina
                                                           Asanko
                                                          Belo Sun
                                                         Dalradian
                                                                                                                                               CAPITAL COSTS TO




                                                       Rainy River
                                                        Goldgroup
                                                        True Gold
                                                          Amarillo
                                                          Orezone
                                                          Azumah
                                                         Goldrock
                                                                                                                                               MARKET CAPITALIZATION




                                                           Oromin
                                                             Vista
                                                         Brazilian
                                                          Victoria
                                                         Mungana
                                                             Midas
                                                          Eco Oro
                                                             Astur
                                                   Atacama Pacific
                                                      Gold Canyon
                                                        Seabridge
                                                             Volta
                                                        Sandspring
                                                           Moneta
                                                 Spanish Mountain
                                         5	
  




                                                                          WWW .R O MA R C O .C O M                   TSX : R
Reserve Grade (g/t Au)




                                                                        0.0
                                                                              0.5
                                                                                    1.0
                                                                                             1.5
                                                                                                          2.0
                                                                                                                    2.5
                                                                                                                             3.0
                                                                                                                                   3.5
                                                            Seabridge




                                                         Golden Queen




Source: National Bank Financial, April, 5 2013
                                                                Cerro




                                                               Lydian
                                                                                                                                         RESERVE GRADE




                                                              Victoria




                                                              Sulliden




                                                                Volta




                                                            Romarco
                                                          ROMARCO




                                                              Oromin




                                                                Torex




                                                              Guyana




                                                               Aureus
                                                 6	
  




                                                                              WWW .R O MA R C O .C O M             TSX : R
LOW CASH COST




                                                                                                                                                                          TSX : R
                         $800!                        $753!                                                                            LOWEST QUARTILE AVERAGE CASH
                                                                                                                                       COST IN Q3 2012
                         $700!

                         $600!




                                                                                                                                                                          WWW .R O MA R C O .C O M
                                                                                                                                           $550!

                         $500!

                         $400!
                                                                                                  $379!

                         $300!

                         $200!

                         $100!

                            $0!
                                         Industry Average (1)                                 ROMARCO                                   Lowest Quartile (1)
                                                                                             LOM Average (2)




(1)  Thomson Reuters GFMS Q3 2012 averages                                                                                                                        7	
  
(2)  As per February 2011 Feasibility Study results included in March 13, 2012 Technical Report filed on March 19, 2012 on sedar.com
NPV & IRR SENSITIVITY
TO GOLD PRICE

                                                                    Pre-tax NPV and IRR Sensitivity to Gold Price (1)




                                                                                                                                                                                                                TSX : R
                                                                                             ($ Millions, except gold price)

                                         Gold
                                                                                                                                                                       PAYBACK	

                                         Price	

           NPV @0%	

                NPV @ 5%	

               NPV @ 10%	

                   IRR %	

                                                                                                                                                                        YEARS	

                                        Per oz.	





                                                                                                                                                                                                                WWW .R O MA R C O .C O M
                                          $1500	

              $1,426	

                   $930	

                   $621	

                   47.0%	

                     2.0	


                                          $1400	

              $1,259	

                   $811	

                   $534	

                   42.3%	

                     2.2	


                                          $1300	

              $1,092	

                   $693	

                   $447	

                   37.6%	

                     2.4	


                                          $1200	

               $925	

                    $575	

                   $359	

                   32.7%	

                     2.7	


                                          $1100	

               $758	

                    $457	

                   $272	

                   27.6%	

                     3.1	


                                          $1000	

               $591	

                    $339	

                   $185	

                   22.3%	

                     3.8	


              BASE CASE                  $950	

               $507	

                   $279	

                    $141	

                   19.6%	

                      4.2	

                                           $800	

               $257	

                    $102	

                    $10	

                   10.7%	

                     7.6	


                                           $700	

                $90	

                   ($16)	

                   ($77)	

                   4.0%	

                     9.4	





                                                                                                                                                                                                        8	
  
(1) As per February 2011 Feasibility Study included in March 13, 2012 Technical Report filed on March 19, 2012 on sedar.com - based on capital costs of $275 million not updated capital cost of $320
million from December 31, 2011 MD&A
HGM PERMITTING




                                                                                                               TSX : R
                  Federal – USACE*                                                State – DHEC**
     •    404 Wetlands Permit only                                    •    401 Water Quality Certification
             USACE is sole deciding                                   •    Mine Operating Permit




                                                                                                               WWW .R O MA R C O .C O M
          • 
             regulatory body                                          •    Air Quality Permit
          •  All other agencies are
                                                                      •    NPDES Permit
             cooperating or commenting
             agencies only – EPA, US Fish                             •    Others
             and Wildlife, Catawba Nation,
             DHEC, SCDNR etc.




* US Army Corps of Engineers
** South Carolina Department of Health and Environmental Control	

                                    9	
  
ENVIRONMENTAL IMPACT
STATEMENT PROCESS
                        þ Contractor	
  (3rd	
  Party)	
  SelecCon	
  –	
  Sept.	
  2,	
  2011	
  (announced	
  Sept.	
  26,	
  2011)

                        þ                     NoCce	
  of	
  Intent	
  Federal	
  Register	
  –	
  Sept.	
  23,	
  2011	
  




                                                                                                                                                                            TSX : R
                        þ                                              30	
  day	
  noCce	
  period	
  

                        þ                              Public	
  Scoping	
  MeeCng	
  –	
  Oct.	
  27,	
  2011	
  




                                                                                                                                                                            WWW .R O MA R C O .C O M
                        þ                      Scoping	
  Comment	
  Period	
  Closed	
  –	
  Nov.	
  28,	
  2011	
  
CURRENT
 STAGE                                                             PreparaCon	
  of	
  Dra=	
  EIS	
  

                                                      Dra=	
  EIS	
  filed	
  and	
  comment	
  period	
  opens	
  
                                                                                                                         45 DAY NOTICE PERIOD
                                                                      Dra=	
  EIS	
  Public	
  Hearing	
  
                                                                                                                   30 DAY COMMENT PERIOD
                                                              Dra=	
  EIS	
  comment	
  period	
  closes	
  

                                                                               Final	
  EIS	
  filed	
  

                                              Record	
  of	
  Decision	
  (ROD)	
  on	
  404	
  Wetlands	
  permit	
  
                                                                                                                                                                   10	
  
*Note: On May 23, 2012, the Company announced a schedule pertaining to the EIS for its Haile Gold Mine project as provided by the US Army Corps of Engineers 	

       (Corps'). Adjustments to this schedule, as appropriate, will be posted on the Corps' EIS website: www.hailegoldmineeis.com
AERIAL OF HAILE	





11	
  




         WWW .R O MA R C O .C O M   TSX : R
HAILE GOLD MINE
FEASIBILITY STUDY HIGHLIGHTS
u  Feasibility Study does not include deep mineralization:
   Ø  Horseshoe, Mustang, Palomino and Snake Deep deposits




                                                                                                     TSX : R
                       3.5 km




                                                                                                     WWW .R O MA R C O .C O M
  CHAMPION    SMALL         SOUTH PIT   LEDBETTER         SNAKE




                                                                              274 m




                                                                                         DEPTH (m)
                                                                  HORSESHOE
                          MUSTANG
                                                    PALOMINO

                                                                              610 m




                                                                                12	
  
RESOURCES  RESERVES
                        OPEN PIT  UNDERGROUND
      2011              MEASURED + INDICATED RESOURCES AT US$1,200 GOLD (1)
                                                         METRIC TONNES                 g/t    CONTAINED oz




                                                                                                                       TSX : R
                                                             (000s)                             Au (000s)
   MEASURED                                                                   36,894   1.79           2,125
   INDICATED                                                                  34,277   1.74           1,914




                                                                                                                       WWW .R O MA R C O .C O M
   MEASURED + INDICATED                                                       71,171   1.77           4,039


   INFERRED                                                                   20,125   1.24             801

      2010              RESERVES AT US$950 GOLD (1)

                                                         METRIC TONNES                 g/t    CONTAINED oz
                                                             (000s)                             Au (000s)
   PROVEN RESERVE                                                             19,592   2.19           1,382
   PROBABLE RESERVE                                                           10,917   1.82             636
   PROVEN  PROBABLE                                                          30,509   2.06           2,018
   RESERVE
  (1)  From March 13, 2012 Technical Report filed on www.sedar.com on March 19, 2012
                                                                                                              13	
  
PLANT SITE –
HAILE GOLD MINE




                                                                       TSX : R
                                       MINE SHOP

   CRUSHER
                                     MILL SHOP




                                                                       WWW .R O MA R C O .C O M
                                                          ADMIN
             SAG BALL                        REAGENT
             MILL
                        FLOT
                        FINE GRIND
                                                         WATER
                         CARBON                          TREATMENT
                         STRIP              CIL
                                REFINERY
                                                   CN
                                                   DESTRUCT
                                                              14	
  
CAPITAL COSTS BREAKDOWN




                                                                       TSX : R
    Component of CAPEX           $320 million Capital Costs

 EQUIPMENT        ~ 1/3   •  +75% of equipment is locked in
                          •  Mills, haul trucks, shovels, loaders




                                                                       WWW .R O MA R C O .C O M
 CONSTRUCTION     ~ 1/3
                             delivered in SC
 OTHER            ~ 1/3   •  Updated commodity pricing
 TOTAL PROJECT $320M      •  $30 million in contingency
                          •  $17 million for inflation




                                                              15	
  
EQUIPMENT	





16	
  




         WWW .R O MA R C O .C O M   TSX : R
LOW CAPITAL COSTS
u    Excellent existing infrastructure at Haile
       u  Not building local/regional




                                                                     TSX : R
            Ø  Power plant

            Ø  Dams for water supplies




                                                                     WWW .R O MA R C O .C O M
            Ø  Many kilometers of roads

            Ø  Employee camp



u    Constructing plant, buildings, tailings dam only
u    Engaged Barclays Bank as advisor – in advanced
      discussions with several banks on project financing

                                                            17	
  
FINANCING ALTERNATIVES
u    Funding sources                 u    Engagement with Barclays
       u  Debt – targeting ~40-60%         Bank PLC




                                                                                 TSX : R
            Ø  Project Financing            u  Barclays engaged as

            Ø  Leasing                          financial advisor for
            Ø  Convertible                      potential debt financing




                                                                                 WWW .R O MA R C O .C O M
            Ø  High yield                   u  Independent review

       u  Equipment lease                       complete (Pincock, Allen 
       u  Other :                               Holt)
            Ø  Equity

            Ø  Royalty stream

            Ø  Forward sale

            Ø  Strategic Investor




                                                                        18	
  
70% Institutional Ownership
                         BlackRock

                         Sun Valley Gold




                                                                                        TSX : R
                         Van Eck
   TOP 15 SHAREHOLDERS


                         Franklin Templeton Investments

                         Oppenheimer Funds




                                                                                        WWW .R O MA R C O .C O M
                         Norges Bank

                         Tocqueville

                         Colonial First State

                         Fidelity Investments

                         J.P. Morgan
                                                                 OF OUR SHARES ARE
                         TD                                       INSTITUTIONALLY
                         Baker Steel Capital Managers / Ruffer        OWNED
                         URAM

                         Quantex

                         CPP Investment Board                                  19	
  
P/NAVPS
      1.4




      1.2
                                                                                                                                                           1.15x




                                                                                                                                                                             TSX : R
      1.0




                                                                                                                                                                             WWW .R O MA R C O .C O M
      0.8




                                                                                                                                                   0.60x
      0.6

                                                                                                                                          0.49x
                                                                                                                                  0.45x
                                                                                                          0.40x   0.40x   0.41x
      0.4                                                                      0.36x   0.37x   0.37x
                                                               0.33x   0.34x
                                                       0.32x
                                               0.30x
                                     0.24x
                          0.19x
      0.2
               0.14x




      0.0
                           VIT-V


                                     ORE-T




                                                                R-T




                                                                                                          LYD-T




                                                                                                                                  DGC-T
                                                                                                                          SUE-T
                                                                                                                  EPZ-V
                                                                                        NG-T
                VTR-T




                                                                                                AVERAGE




                                                                                                                                                   PLG-T
                                                                       MNM-V
                                               DNA-T




                                                                                                                                                            SBB-T
                                                       RR-T




                                                                               BSX-T




                                                                                                                                           VGZ-T
Source: NBF Financial Markets, April 5, 2013
                                                                                                                                                                    20	
  
NBF Preferred Development Names




                                                                                                                           TSX : R
        Filter #1                      Filter #2       Filter #3        Filter #4     Filter #5   Filter #6   Summary
      Low Capex                  Low All-In Cash   Short Timeline to   Favourable
                                                                                      P/NAV        Scale      In Order
       Intensity                     Costs              Prod’n         Jurisdiction

         DGC-T                           R-T           DGC-T             DGC-T        VTR-T        NG-T       DGC-T
           R-T                         EPZ-V            SUE-T             R-T          VIT-V      DGC-T         R-T




                                                                                                                           WWW .R O MA R C O .C O M
         SUE-T                         LYD-T            LYD-T            NG-T         ORE-T       VGZ-T        LYD-T
         ORE-T                         BSX-T            VIT-V            SBB-T        LYD-T       BSX-T        SUE-T
         EPZ-V                         SUE-T            VGZ-T             VIT-V       MNM-V       ORE-T        BSX-T
        MNM-V                          SBB-T            EPZ-V            SUE-T          R-T       VTR-T        EPZ-V
         LYD-T                          NG-T            ORE-T            BSX-T         NG-T         R-T        VIT-V
         BSX-T                         MNM-V            VTR-T            EPZ-V        VGZ-T       SBB-T       ORE-T
         VTR-T                         DGC-T            BSX-T           MNM-V         SUE-T       LYD-T        VTR-T
          VIT-V                         VIT-V            R-T             VGZ-T        BSX-T        VIT-V      VGZ-T
         VGZ-T                         ORE-T           MNM-V             ORE-T        DGC-T       SUE-T        NG-T
          SBB-T                        VGZ-T            SBB-T            VTR-T        EPZ-V       EPZ-V        SBB-T
          NG-T                         VTR-T            NG-T             LYD-T        SBB-T       MNM-V       MNM-V




Source: NBF Estimates, Feb. 10, 2013
                                                                                                                  21	
  
ANALYST COVERAGE




                                                 TSX : R
                 TARGET PRICE
  NBF                           $2.00




                                                 WWW .R O MA R C O .C O M
  Paradigm                      $2.00
  Cormark                       $1.60
  Euro Pacific                  $1.50
  RBC                           $1.25
  BMO                           $1.10

                                        22	
  
CAPITAL STRUCTURE

                                                                      Capitalization Summary




                                                                                                                                TSX : R
          Exchange/ Symbol                                                                           TSX:R
          Share Price(1)                                                                             C$0.65




                                                                                                                                WWW .R O MA R C O .C O M
          Shares Outstanding (Basic)                                                                 585.4M
          FD Shares Outstanding (TSM)(2)                                                             596.1M
          Market Capitalization(1)                                                                   C$381M
          52 Week High / Low(1)                                                                      C$1.40 / C$0.49
          Cash Balance (Feb. 25, 2013)                                                               US$53M




(1) As at close on April 5, 2013                                                                                       23	
  
(2) Includes 10.7M “in-the-money” options at an average strike price of C$0.70 as of April 5, 2013
STRONG BOARD, MANAGEMENT
  TECHNICAL TEAM
 Proven gold mine development, finance, permitting and operations experience	

                              Romarco has the team in place to bring Haile into production	





                                                                                                                                  TSX : R
 Experienced Board of Directors                                   Strong Management  Technical Team
Leendert Krol, Chairman                                    Diane R. Garrett, Ph.D., President  CEO
§  Former Newmont                                         §  Former Dayton Mining, US Global Investors
                                                           James R. Arnold, Sr. VP, COO
Diane R. Garrett                                           §  Former Freeport, Gold Fields – Richards Award Winner




                                                                                                                                  WWW .R O MA R C O .C O M
§  Former Dayton Mining, US Global Investors
                                                           Stan Rideout, Sr. VP, CFO
James R. Arnold                                            §  Former Phelps Dodge
§  Former Freeport, Gold Fields – Richards Award Winner
                                                           David Thomas, VP, General Manager
Don MacDonald                                              James Berry, Chief Geologist  Regional Exploration Manager
§  CFO KGHM International (formerly QuadraFNX), former    §  Former Barrick
    NovaGold, DeBeers, Dayton Mining
                                                           Brent Anderson, Mine Manager
John Marsden                                               §  Former Quadra, Freeport
§  Consultant, former Freeport – Richards Award Winner
                                                           Mike Gleason, Construction Manager
Patrick Michaels                                           §  Former Freeport
§  Portfolio Manager – Zuri-invest, Switzerland           Jim Wickens, Process Manager
                                                           §  Former Barrick
Gary A. Sugar
§  Former RBC Capital Markets                             Johnny Pappas, Director of Environmental Affairs
                                                           §  Former Freeport
Robert van Doorn
§  Former Mundoro, Rio Narcea, Morgan Stanley             Ramona Schneider, Environmental Manager
                                                           §  Former Kinross
                                                           Dan Symons, Vice President, Investor Relations
                                                           §  Former Renmark Financial                                  24	
  
FUTURE CATALYSTS / EVENTS
u  Revised permit schedule posted by Army Corps
u  Draft EIS document filed




                                                                                TSX : R
     u  State then proceeds to issue all permits relating to mining

         operations – air, construction, mining, water, etc.




                                                                                WWW .R O MA R C O .C O M
u  Final EIS document filed

u  Drill results

u  Resource update

u  Reserve update

u  Expansion studies, underground studies




                                                                       25	
  
CONTACT INFORMATION

Dan Symons
Vice President, Investor Relations
dsymons@romarco.com




70 University Avenue
Suite 1410
Toronto, Ontario M5J 2M4
Tel: 416.367.5500
Fax: 416.367.5505
Email: info@romarco.com




               WWW .R O MA R C O .C O M

More Related Content

What's hot

ROMARCO Corporate Presentation - July 2012
ROMARCO Corporate Presentation - July 2012ROMARCO Corporate Presentation - July 2012
ROMARCO Corporate Presentation - July 2012Romarco Minerals Inc.
 
ROMARCO Corporate Presentation - AUGUST 2012
ROMARCO Corporate Presentation - AUGUST 2012ROMARCO Corporate Presentation - AUGUST 2012
ROMARCO Corporate Presentation - AUGUST 2012Romarco Minerals Inc.
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceNOVAGOLD
 
PDAC 2013 - Prospectors & Developers Association of Canada
PDAC 2013 - Prospectors & Developers Association of Canada PDAC 2013 - Prospectors & Developers Association of Canada
PDAC 2013 - Prospectors & Developers Association of Canada NOVAGOLD
 
21st Annual BMO Capital Markets Global Metals & Mining Conference
21st Annual BMO Capital Markets Global Metals & Mining Conference21st Annual BMO Capital Markets Global Metals & Mining Conference
21st Annual BMO Capital Markets Global Metals & Mining ConferenceHudbayMinerals
 
Rubicon Minerals 2017 AGM Presentation - June 2017
Rubicon Minerals 2017 AGM Presentation - June 2017Rubicon Minerals 2017 AGM Presentation - June 2017
Rubicon Minerals 2017 AGM Presentation - June 2017Rubicon Minerals Corporation
 
Rubicon Minerals September 2017 Corporate Presentation
Rubicon Minerals September 2017 Corporate PresentationRubicon Minerals September 2017 Corporate Presentation
Rubicon Minerals September 2017 Corporate PresentationRubicon Minerals Corporation
 
Rubicon Minerals November 2017 Corporate Presentation
Rubicon Minerals November 2017 Corporate PresentationRubicon Minerals November 2017 Corporate Presentation
Rubicon Minerals November 2017 Corporate PresentationRubicon Minerals Corporation
 
Rubicon Minerals August 2017 Corporate Presentation
Rubicon Minerals August 2017 Corporate PresentationRubicon Minerals August 2017 Corporate Presentation
Rubicon Minerals August 2017 Corporate PresentationRubicon Minerals Corporation
 
Rubicon Minerals October 2017 Corporate Presentation
Rubicon Minerals October 2017 Corporate PresentationRubicon Minerals October 2017 Corporate Presentation
Rubicon Minerals October 2017 Corporate PresentationRubicon Minerals Corporation
 
Rubicon Minerals January 2018 Corporate Presentation
Rubicon Minerals January 2018 Corporate PresentationRubicon Minerals January 2018 Corporate Presentation
Rubicon Minerals January 2018 Corporate PresentationRubicon Minerals Corporation
 
2013 First Quarter and Project Update
2013 First Quarter and Project Update2013 First Quarter and Project Update
2013 First Quarter and Project UpdateNOVAGOLD
 
Rainy River Resources Ltd. Corporate Presentation - February 2013
Rainy River Resources Ltd. Corporate Presentation -  February 2013Rainy River Resources Ltd. Corporate Presentation -  February 2013
Rainy River Resources Ltd. Corporate Presentation - February 2013RainyRiver
 
Vancouver Resource Investment Conference 2013
Vancouver Resource Investment Conference 2013Vancouver Resource Investment Conference 2013
Vancouver Resource Investment Conference 2013NOVAGOLD
 

What's hot (16)

ROMARCO Corporate Presentation - July 2012
ROMARCO Corporate Presentation - July 2012ROMARCO Corporate Presentation - July 2012
ROMARCO Corporate Presentation - July 2012
 
ROMARCO Corporate Presentation - AUGUST 2012
ROMARCO Corporate Presentation - AUGUST 2012ROMARCO Corporate Presentation - AUGUST 2012
ROMARCO Corporate Presentation - AUGUST 2012
 
BMO Global Metals & Mining Conference
BMO Global Metals & Mining ConferenceBMO Global Metals & Mining Conference
BMO Global Metals & Mining Conference
 
PDAC 2013 - Prospectors & Developers Association of Canada
PDAC 2013 - Prospectors & Developers Association of Canada PDAC 2013 - Prospectors & Developers Association of Canada
PDAC 2013 - Prospectors & Developers Association of Canada
 
21st Annual BMO Capital Markets Global Metals & Mining Conference
21st Annual BMO Capital Markets Global Metals & Mining Conference21st Annual BMO Capital Markets Global Metals & Mining Conference
21st Annual BMO Capital Markets Global Metals & Mining Conference
 
Rubicon Minerals 2017 AGM Presentation - June 2017
Rubicon Minerals 2017 AGM Presentation - June 2017Rubicon Minerals 2017 AGM Presentation - June 2017
Rubicon Minerals 2017 AGM Presentation - June 2017
 
Rubicon Minerals September 2017 Corporate Presentation
Rubicon Minerals September 2017 Corporate PresentationRubicon Minerals September 2017 Corporate Presentation
Rubicon Minerals September 2017 Corporate Presentation
 
Rubicon Minerals November 2017 Corporate Presentation
Rubicon Minerals November 2017 Corporate PresentationRubicon Minerals November 2017 Corporate Presentation
Rubicon Minerals November 2017 Corporate Presentation
 
Rubicon Minerals August 2017 Corporate Presentation
Rubicon Minerals August 2017 Corporate PresentationRubicon Minerals August 2017 Corporate Presentation
Rubicon Minerals August 2017 Corporate Presentation
 
Rubicon Minerals October 2017 Corporate Presentation
Rubicon Minerals October 2017 Corporate PresentationRubicon Minerals October 2017 Corporate Presentation
Rubicon Minerals October 2017 Corporate Presentation
 
Rubicon Minerals January 2018 Corporate Presentation
Rubicon Minerals January 2018 Corporate PresentationRubicon Minerals January 2018 Corporate Presentation
Rubicon Minerals January 2018 Corporate Presentation
 
2013 First Quarter and Project Update
2013 First Quarter and Project Update2013 First Quarter and Project Update
2013 First Quarter and Project Update
 
Corporate presentation
Corporate presentationCorporate presentation
Corporate presentation
 
Rainy River Resources Ltd. Corporate Presentation - February 2013
Rainy River Resources Ltd. Corporate Presentation -  February 2013Rainy River Resources Ltd. Corporate Presentation -  February 2013
Rainy River Resources Ltd. Corporate Presentation - February 2013
 
Vancouver Resource Investment Conference 2013
Vancouver Resource Investment Conference 2013Vancouver Resource Investment Conference 2013
Vancouver Resource Investment Conference 2013
 
EIS Schedule Presentation
EIS Schedule PresentationEIS Schedule Presentation
EIS Schedule Presentation
 

Viewers also liked

Bumperite Sales Brochure
Bumperite Sales BrochureBumperite Sales Brochure
Bumperite Sales Brochurestrama3
 
Dalradian corporate presentation april 2012 final
Dalradian corporate presentation april 2012 finalDalradian corporate presentation april 2012 final
Dalradian corporate presentation april 2012 finalDalradianResource
 
External Flow Example by Optimal Solutions
External Flow Example by Optimal SolutionsExternal Flow Example by Optimal Solutions
External Flow Example by Optimal SolutionsRyan Jenkins
 

Viewers also liked (7)

Solar Ready Northwest Indiana
Solar Ready Northwest IndianaSolar Ready Northwest Indiana
Solar Ready Northwest Indiana
 
What Is Recession
What Is RecessionWhat Is Recession
What Is Recession
 
Bumperite Sales Brochure
Bumperite Sales BrochureBumperite Sales Brochure
Bumperite Sales Brochure
 
How to write
How to writeHow to write
How to write
 
Dalradian corporate presentation april 2012 final
Dalradian corporate presentation april 2012 finalDalradian corporate presentation april 2012 final
Dalradian corporate presentation april 2012 final
 
trends in online publishing
trends in online publishingtrends in online publishing
trends in online publishing
 
External Flow Example by Optimal Solutions
External Flow Example by Optimal SolutionsExternal Flow Example by Optimal Solutions
External Flow Example by Optimal Solutions
 

Similar to ROMARCO Corporate Presentation - April 2013

ROMARCO Corporate Presentation - May 2013
ROMARCO Corporate Presentation - May 2013ROMARCO Corporate Presentation - May 2013
ROMARCO Corporate Presentation - May 2013Romarco Minerals Inc.
 
December 2014 Corporate Presentation
December 2014 Corporate PresentationDecember 2014 Corporate Presentation
December 2014 Corporate PresentationRomarco Minerals Inc.
 
December 2014 Corporate Presentation
December 2014 Corporate PresentationDecember 2014 Corporate Presentation
December 2014 Corporate PresentationRomarco Minerals Inc.
 
Rockwell Diamonds Mining Indaba 2012 Presentation
Rockwell Diamonds Mining Indaba 2012 PresentationRockwell Diamonds Mining Indaba 2012 Presentation
Rockwell Diamonds Mining Indaba 2012 PresentationJames AH Campbell
 
2016 09-16 prb corporate presentation final
2016 09-16 prb corporate presentation final2016 09-16 prb corporate presentation final
2016 09-16 prb corporate presentation finalKaren Willoughby
 
Romarco Minerals March 2015 Corporate Presentation
Romarco Minerals March 2015 Corporate PresentationRomarco Minerals March 2015 Corporate Presentation
Romarco Minerals March 2015 Corporate PresentationRomarco Minerals Inc.
 
Guy december 2017 ir presentation
Guy december 2017 ir presentationGuy december 2017 ir presentation
Guy december 2017 ir presentationguygold2016
 
Rainy River Resources Ltd. Corporate Presentation - March 2013 PDAC
Rainy River Resources Ltd. Corporate Presentation - March 2013 PDACRainy River Resources Ltd. Corporate Presentation - March 2013 PDAC
Rainy River Resources Ltd. Corporate Presentation - March 2013 PDACRainyRiver
 
ROMARCO - Corporate Presentation JANUARY 2012
ROMARCO - Corporate Presentation JANUARY 2012ROMARCO - Corporate Presentation JANUARY 2012
ROMARCO - Corporate Presentation JANUARY 2012Romarco Minerals Inc.
 
Silverton Metals Investor Presentation V_4.pdf
Silverton Metals Investor Presentation V_4.pdfSilverton Metals Investor Presentation V_4.pdf
Silverton Metals Investor Presentation V_4.pdfAdnet Communications
 
Guyana Goldfields February 2017 IR Presentation
Guyana Goldfields February  2017 IR Presentation Guyana Goldfields February  2017 IR Presentation
Guyana Goldfields February 2017 IR Presentation guygold2016
 
2014 Annual & Special Meeting of Shareholders
2014 Annual & Special Meeting of Shareholders2014 Annual & Special Meeting of Shareholders
2014 Annual & Special Meeting of ShareholdersNOVAGOLD
 

Similar to ROMARCO Corporate Presentation - April 2013 (20)

July 2013 corporate ppt
July 2013  corporate pptJuly 2013  corporate ppt
July 2013 corporate ppt
 
ROMARCO Corporate Presentation - May 2013
ROMARCO Corporate Presentation - May 2013ROMARCO Corporate Presentation - May 2013
ROMARCO Corporate Presentation - May 2013
 
Corporate presentation agm-show
Corporate presentation agm-showCorporate presentation agm-show
Corporate presentation agm-show
 
November Presentation 2014
November Presentation 2014November Presentation 2014
November Presentation 2014
 
August 2015 Corporate Presentation
August 2015 Corporate PresentationAugust 2015 Corporate Presentation
August 2015 Corporate Presentation
 
May Corporate Presentation
May Corporate PresentationMay Corporate Presentation
May Corporate Presentation
 
December 2014 Corporate Presentation
December 2014 Corporate PresentationDecember 2014 Corporate Presentation
December 2014 Corporate Presentation
 
December 2014 Corporate Presentation
December 2014 Corporate PresentationDecember 2014 Corporate Presentation
December 2014 Corporate Presentation
 
Rockwell Diamonds Mining Indaba 2012 Presentation
Rockwell Diamonds Mining Indaba 2012 PresentationRockwell Diamonds Mining Indaba 2012 Presentation
Rockwell Diamonds Mining Indaba 2012 Presentation
 
February Corporate Presentation
February Corporate PresentationFebruary Corporate Presentation
February Corporate Presentation
 
2016 09-16 prb corporate presentation final
2016 09-16 prb corporate presentation final2016 09-16 prb corporate presentation final
2016 09-16 prb corporate presentation final
 
Romarco Minerals March 2015 Corporate Presentation
Romarco Minerals March 2015 Corporate PresentationRomarco Minerals March 2015 Corporate Presentation
Romarco Minerals March 2015 Corporate Presentation
 
Guy december 2017 ir presentation
Guy december 2017 ir presentationGuy december 2017 ir presentation
Guy december 2017 ir presentation
 
March Corporate Presentation
March Corporate PresentationMarch Corporate Presentation
March Corporate Presentation
 
Rainy River Resources Ltd. Corporate Presentation - March 2013 PDAC
Rainy River Resources Ltd. Corporate Presentation - March 2013 PDACRainy River Resources Ltd. Corporate Presentation - March 2013 PDAC
Rainy River Resources Ltd. Corporate Presentation - March 2013 PDAC
 
April Corporate Presentation
April Corporate PresentationApril Corporate Presentation
April Corporate Presentation
 
ROMARCO - Corporate Presentation JANUARY 2012
ROMARCO - Corporate Presentation JANUARY 2012ROMARCO - Corporate Presentation JANUARY 2012
ROMARCO - Corporate Presentation JANUARY 2012
 
Silverton Metals Investor Presentation V_4.pdf
Silverton Metals Investor Presentation V_4.pdfSilverton Metals Investor Presentation V_4.pdf
Silverton Metals Investor Presentation V_4.pdf
 
Guyana Goldfields February 2017 IR Presentation
Guyana Goldfields February  2017 IR Presentation Guyana Goldfields February  2017 IR Presentation
Guyana Goldfields February 2017 IR Presentation
 
2014 Annual & Special Meeting of Shareholders
2014 Annual & Special Meeting of Shareholders2014 Annual & Special Meeting of Shareholders
2014 Annual & Special Meeting of Shareholders
 

More from Romarco Minerals Inc.

ROMARCO Corporate Presentation - March 2013
ROMARCO Corporate Presentation - March 2013ROMARCO Corporate Presentation - March 2013
ROMARCO Corporate Presentation - March 2013Romarco Minerals Inc.
 
ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012
ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012
ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012Romarco Minerals Inc.
 
Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011Romarco Minerals Inc.
 
Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011Romarco Minerals Inc.
 
Romarco Corporate Presentation - AUGUST 2011
Romarco Corporate Presentation - AUGUST 2011Romarco Corporate Presentation - AUGUST 2011
Romarco Corporate Presentation - AUGUST 2011Romarco Minerals Inc.
 
ROMARCO AGM Presentation - June 8, 2011
ROMARCO AGM Presentation - June 8, 2011ROMARCO AGM Presentation - June 8, 2011
ROMARCO AGM Presentation - June 8, 2011Romarco Minerals Inc.
 
Romarco Minerals - Corporate Presentation MAY 2011
Romarco Minerals - Corporate Presentation MAY 2011Romarco Minerals - Corporate Presentation MAY 2011
Romarco Minerals - Corporate Presentation MAY 2011Romarco Minerals Inc.
 

More from Romarco Minerals Inc. (7)

ROMARCO Corporate Presentation - March 2013
ROMARCO Corporate Presentation - March 2013ROMARCO Corporate Presentation - March 2013
ROMARCO Corporate Presentation - March 2013
 
ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012
ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012
ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012
 
Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011
 
Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011
 
Romarco Corporate Presentation - AUGUST 2011
Romarco Corporate Presentation - AUGUST 2011Romarco Corporate Presentation - AUGUST 2011
Romarco Corporate Presentation - AUGUST 2011
 
ROMARCO AGM Presentation - June 8, 2011
ROMARCO AGM Presentation - June 8, 2011ROMARCO AGM Presentation - June 8, 2011
ROMARCO AGM Presentation - June 8, 2011
 
Romarco Minerals - Corporate Presentation MAY 2011
Romarco Minerals - Corporate Presentation MAY 2011Romarco Minerals - Corporate Presentation MAY 2011
Romarco Minerals - Corporate Presentation MAY 2011
 

Recently uploaded

Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...ssifa0344
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfGale Pooley
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfMichael Silva
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptxFinTech Belgium
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfGale Pooley
 
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...ssifa0344
 
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...Call Girls in Nagpur High Profile
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdfAdnet Communications
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfGale Pooley
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdf
 
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdf
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
The Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdfThe Economic History of the U.S. Lecture 19.pdf
The Economic History of the U.S. Lecture 19.pdf
 
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Wadgaon Sheri  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Wadgaon Sheri 6297143586 Call Hot Ind...
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
 
Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024
 
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdf
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 

ROMARCO Corporate Presentation - April 2013

  • 1. CORPORATE PRESENTATION APRIL 2013 WWW .R O MA R C O .C O M
  • 2. Cautionary Statement   The  informa-on  in  this  document  has  been  prepared  as  of  March  13,  2012.  Certain  statements  contained  in  this  document  cons-tute  “forward-­‐looking  statements”   within  the  meaning  of  the  United  States  Private  Securi-es  Li-ga-on  Reform  Act  of  1995  and  forward  looking  informa-on  under  the  provisions  of  Canadian  provincial   securi-es  laws.  When  used  in  this  document,  the  words  “an-cipate”,  “expect”,  “es-mate”,  “forecast”,  “will”,  “planned”,  and  similar  expressions  are  intended  to   iden-fy  forward-­‐looking  statements  or  informa-on.     Specifically,  this  presenta-on  contains  forward  looking  statements  regarding  the  results  and  projec-ons  contained  in  the  March  13,  2012  technical  report  of  the     TSX : R Haile  Gold  project,  including  the  expected  mine  life,  recovery,  capital  costs,  cash  opera-ng  costs  and  other  costs  and  an-cipated  produc-on  of  the  described  open   pit  mine,  the  projected  internal  rate  of  return,  the  projected  payback  period,  the  availability  of  capital  for  development,  sensi-vity  to  metal  prices,  ore  grade,  the   reserve  and  resource  es-mates  on  the  project,  the  financial  analysis,  the  -ming  for  comple-on  of  the  revised  feasibility  study  on  the    Haile  Gold    project,    the  -ming   and  amount  of  future  produc-on,  the  -ming  of  construc-on  of  the  proposed  mine  and  process  facili-es,  capital  and  opera-ng  expenditures,  the  -ming  of  the   receipt    of  permits,  rights  and  authoriza-ons,  communica-ons  with  local  stakeholders  and  community  rela-ons,  availability  of  financing  and  any  and  all  other  -ming,   development,  opera-onal,  financial,  economic,  legal,  regulatory  and  poli-cal  factors  that  may  influence  future  events  or  condi-ons  and  expected  drilling  ac-vi-es.     WWW .R O MA R C O .C O M In  addi-on,  this  presenta-on  also  contains  updated  resource  es-mates  contained  in  the  March  13,  2012  technical  reports.     Scien-fic  and  technical  informa-on  referred  herein  has  been  extracted  from  and  are  hereby  qualified  in  their  en-rety  by  reference  to  the  aforemen-oned  technical   reports  (“Technical  Reports”).    Joshua  Snider,  P.E.,  Thomas  L.  Drielick,  P.E.,  Lee  “Pat”  Gochnour,  M.M.S.A.,  John  Marek,  P.E.  and  Derek  Wiwer,  P.E.  are  responsible   for  preparing  the  Technical  Reports.    Each  of  the  above  referenced  persons  is  a  “qualified  person”  as  defined  in  Na-onal  Instrument  43-­‐101  —  Standards  of   Disclosure  for  Mineral  Projects.     Such  forward-­‐looking  statements  are  based  on  a  number  of  material  factors  and  assump-ons,  including,  but  not  limited  in  any  manner,  those  disclosed  in  any   another  of  Romarco’s  public  filings,  and  include  the  ul-mate  determina-on  of  mineral  reserves  and  resources,  availability  and  final  receipt  of  required  approvals,   licenses  and  permits,  sufficient  working  capital  to  develop  and  operate  the  proposed  mine,  access  to  adequate  services  and  supplies,  economic  condi-ons,   commodity  prices,  foreign  currency  exchange  rates,  interest  rates,  access  to  capital  and  debt  markets  and  associated  cost  of  funds,  availability  of  a  qualified  work   force,  lack  of  social  opposi-on  and  legal  challenges,  and  the  ul-mate  ability  to  mine,  process  and  sell  mineral  products  on  economically  favorable  terms.  While   Romarco  considers  these  assump-ons  to  be  reasonable  based  on  informa-on  currently  available  to  it,  they  may  prove  to  be  incorrect.  Actual  results  may  vary  from   such  forward-­‐looking  informa-on  for  a  variety  of  reasons,  including  but  not  limited  to  risks  and  uncertain-es  disclosed  in  other  Romarco  filings  at  www.sedar.com.   Forward-­‐looking  statements  are  based  upon  management’s  beliefs,  es-mate  and  opinions  on  the  date  the  statements  are  made  and,  other  than  as  required  by  law,   Romarco  does  not  intend,  and  undertakes  no  obliga-on  to  update  any  forward-­‐looking  informa-on  to  reflect,  among  other  things,  new  informa-on  or  future  events       Cau-onary  Note  to  United  States  Investors  Concerning  Es-mates  of  Measured,  Indicated  and  Inferred  Resources:   Certain  tables  may  use  the  terms  “Measured”,  “Indicated”  and  “Inferred”  Resources.  United  States  investors  are  advised  that  while  such  terms  are  recognized  and   required  by  Canadian  regula-ons,  however,  the  United  States  Securi-es  and  Exchange  Commission  does  not  recognize  them.  “Inferred  Mineral  Resources”  have  a   great  amount  of  uncertainty  as  to  their  existence,  and  as  to  their  economic  and  legal  feasibility.  It  cannot  be  assumed  that  all  or  any  part  of  an  Inferred  Mineral   Resource  will  ever  be  upgraded  to  a  higher  category.  Under  Canadian  rules,  es-mates  of  Inferred  Mineral  Resources  may  not  form  the  basis  of  feasibility  or  other   economic  studies.  United  States  investors  are  cau-oned  not  to  assume  that  all  or  any  part  of  Measured  or  Indicated  Mineral  Resources  will  ever  be  converted  into   Mineral  Reserves.  United  States  investors  are  also  cau-oned  not  to  assume  that  all  or  any  part  of  a  Mineral  Resource  is  economically  or  legally  mineable.     All  figures  are  US$  unless  otherwise  indicated     2    
  • 3. Introduction Haile Gold Mine u  Currently in EIS Permitting process u  2012 detailed engineering goal met TSX : R •  Over 75% complete u  Continuous review of mine plan, alternatives, expansion studies, WWW .R O MA R C O .C O M underground review u  Exploration reduced in current economic environment •  3 rigs operating at Haile and regional targets u  $53M in cash (at February 25, 2013) u  Strong institutional support u  Permitted, built and accredited assay lab on schedule and under budget 3  
  • 4. What makes Haile a unique asset? u  Location – Location – Location u  Low capex ($320mm) CAROLINA SLATE BELT TSX : R u  Low operating costs ($379 / oz LOM)(1) Kentucky West Virginia u  High grade (2.06 g/t) u  District potential WWW .R O MA R C O .C O M Tennessee u  Experienced development team in Russell Mine place Hickory Reed Mine Ironwood u  Key long-lead equipment ordered and Howie Mine Locust North Carolina secured Haile Mine Brewer Mine Bayberry Buzzard •  Mobile mine fleet Dorn Mine Ridgeway Mine Elm •  SAG / Ball mills Magruder Mine Bante Mine Tathom Mine Columbia Mine South Carolina •  Hitachi Shovel u  Rated #6 out of 76 new mines starting Georgia in 2012 to 2020 by BMO (May 7, 2012) 4   (1) As per February 2011 Feasibility Study results included in March 13, 2012 Technical Report filed on March 19, 2012 on sedar.com
  • 5. Capital Costs to Market Capitalization (%) Source: 500% 1000% 1500% 2000% 2500% 3000% 3500% 0% Golden Queen Pretium Sulliden Guyana Goldfields Paramount Romarco ROMARCO PMI National Bank Financial, April 8, 2013 Aureus Lydian Esperanza Sabina Asanko Belo Sun Dalradian CAPITAL COSTS TO Rainy River Goldgroup True Gold Amarillo Orezone Azumah Goldrock MARKET CAPITALIZATION Oromin Vista Brazilian Victoria Mungana Midas Eco Oro Astur Atacama Pacific Gold Canyon Seabridge Volta Sandspring Moneta Spanish Mountain 5   WWW .R O MA R C O .C O M TSX : R
  • 6. Reserve Grade (g/t Au) 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Seabridge Golden Queen Source: National Bank Financial, April, 5 2013 Cerro Lydian RESERVE GRADE Victoria Sulliden Volta Romarco ROMARCO Oromin Torex Guyana Aureus 6   WWW .R O MA R C O .C O M TSX : R
  • 7. LOW CASH COST TSX : R $800! $753! LOWEST QUARTILE AVERAGE CASH COST IN Q3 2012 $700! $600! WWW .R O MA R C O .C O M $550! $500! $400! $379! $300! $200! $100! $0! Industry Average (1) ROMARCO Lowest Quartile (1) LOM Average (2) (1)  Thomson Reuters GFMS Q3 2012 averages 7   (2)  As per February 2011 Feasibility Study results included in March 13, 2012 Technical Report filed on March 19, 2012 on sedar.com
  • 8. NPV & IRR SENSITIVITY TO GOLD PRICE Pre-tax NPV and IRR Sensitivity to Gold Price (1) TSX : R ($ Millions, except gold price) Gold PAYBACK Price NPV @0% NPV @ 5% NPV @ 10% IRR % YEARS Per oz. WWW .R O MA R C O .C O M $1500 $1,426 $930 $621 47.0% 2.0 $1400 $1,259 $811 $534 42.3% 2.2 $1300 $1,092 $693 $447 37.6% 2.4 $1200 $925 $575 $359 32.7% 2.7 $1100 $758 $457 $272 27.6% 3.1 $1000 $591 $339 $185 22.3% 3.8 BASE CASE $950 $507 $279 $141 19.6% 4.2 $800 $257 $102 $10 10.7% 7.6 $700 $90 ($16) ($77) 4.0% 9.4 8   (1) As per February 2011 Feasibility Study included in March 13, 2012 Technical Report filed on March 19, 2012 on sedar.com - based on capital costs of $275 million not updated capital cost of $320 million from December 31, 2011 MD&A
  • 9. HGM PERMITTING TSX : R Federal – USACE* State – DHEC** •  404 Wetlands Permit only •  401 Water Quality Certification USACE is sole deciding •  Mine Operating Permit WWW .R O MA R C O .C O M •  regulatory body •  Air Quality Permit •  All other agencies are •  NPDES Permit cooperating or commenting agencies only – EPA, US Fish •  Others and Wildlife, Catawba Nation, DHEC, SCDNR etc. * US Army Corps of Engineers ** South Carolina Department of Health and Environmental Control 9  
  • 10. ENVIRONMENTAL IMPACT STATEMENT PROCESS þ Contractor  (3rd  Party)  SelecCon  –  Sept.  2,  2011  (announced  Sept.  26,  2011) þ NoCce  of  Intent  Federal  Register  –  Sept.  23,  2011   TSX : R þ 30  day  noCce  period   þ Public  Scoping  MeeCng  –  Oct.  27,  2011   WWW .R O MA R C O .C O M þ Scoping  Comment  Period  Closed  –  Nov.  28,  2011   CURRENT STAGE PreparaCon  of  Dra=  EIS   Dra=  EIS  filed  and  comment  period  opens   45 DAY NOTICE PERIOD Dra=  EIS  Public  Hearing   30 DAY COMMENT PERIOD Dra=  EIS  comment  period  closes   Final  EIS  filed   Record  of  Decision  (ROD)  on  404  Wetlands  permit   10   *Note: On May 23, 2012, the Company announced a schedule pertaining to the EIS for its Haile Gold Mine project as provided by the US Army Corps of Engineers (Corps'). Adjustments to this schedule, as appropriate, will be posted on the Corps' EIS website: www.hailegoldmineeis.com
  • 11. AERIAL OF HAILE 11   WWW .R O MA R C O .C O M TSX : R
  • 12. HAILE GOLD MINE FEASIBILITY STUDY HIGHLIGHTS u  Feasibility Study does not include deep mineralization: Ø  Horseshoe, Mustang, Palomino and Snake Deep deposits TSX : R 3.5 km WWW .R O MA R C O .C O M CHAMPION SMALL SOUTH PIT LEDBETTER SNAKE 274 m DEPTH (m) HORSESHOE MUSTANG PALOMINO 610 m 12  
  • 13. RESOURCES RESERVES OPEN PIT UNDERGROUND 2011 MEASURED + INDICATED RESOURCES AT US$1,200 GOLD (1) METRIC TONNES g/t CONTAINED oz TSX : R (000s) Au (000s) MEASURED 36,894 1.79 2,125 INDICATED 34,277 1.74 1,914 WWW .R O MA R C O .C O M MEASURED + INDICATED 71,171 1.77 4,039 INFERRED 20,125 1.24 801 2010 RESERVES AT US$950 GOLD (1) METRIC TONNES g/t CONTAINED oz (000s) Au (000s) PROVEN RESERVE 19,592 2.19 1,382 PROBABLE RESERVE 10,917 1.82 636 PROVEN PROBABLE 30,509 2.06 2,018 RESERVE (1)  From March 13, 2012 Technical Report filed on www.sedar.com on March 19, 2012 13  
  • 14. PLANT SITE – HAILE GOLD MINE TSX : R MINE SHOP CRUSHER MILL SHOP WWW .R O MA R C O .C O M ADMIN SAG BALL REAGENT MILL FLOT FINE GRIND WATER CARBON TREATMENT STRIP CIL REFINERY CN DESTRUCT 14  
  • 15. CAPITAL COSTS BREAKDOWN TSX : R Component of CAPEX $320 million Capital Costs EQUIPMENT ~ 1/3 •  +75% of equipment is locked in •  Mills, haul trucks, shovels, loaders WWW .R O MA R C O .C O M CONSTRUCTION ~ 1/3 delivered in SC OTHER ~ 1/3 •  Updated commodity pricing TOTAL PROJECT $320M •  $30 million in contingency •  $17 million for inflation 15  
  • 16. EQUIPMENT 16   WWW .R O MA R C O .C O M TSX : R
  • 17. LOW CAPITAL COSTS u  Excellent existing infrastructure at Haile u  Not building local/regional TSX : R Ø  Power plant Ø  Dams for water supplies WWW .R O MA R C O .C O M Ø  Many kilometers of roads Ø  Employee camp u  Constructing plant, buildings, tailings dam only u  Engaged Barclays Bank as advisor – in advanced discussions with several banks on project financing 17  
  • 18. FINANCING ALTERNATIVES u  Funding sources u  Engagement with Barclays u  Debt – targeting ~40-60% Bank PLC TSX : R Ø  Project Financing u  Barclays engaged as Ø  Leasing financial advisor for Ø  Convertible potential debt financing WWW .R O MA R C O .C O M Ø  High yield u  Independent review u  Equipment lease complete (Pincock, Allen u  Other : Holt) Ø  Equity Ø  Royalty stream Ø  Forward sale Ø  Strategic Investor 18  
  • 19. 70% Institutional Ownership BlackRock Sun Valley Gold TSX : R Van Eck TOP 15 SHAREHOLDERS Franklin Templeton Investments Oppenheimer Funds WWW .R O MA R C O .C O M Norges Bank Tocqueville Colonial First State Fidelity Investments J.P. Morgan OF OUR SHARES ARE TD INSTITUTIONALLY Baker Steel Capital Managers / Ruffer OWNED URAM Quantex CPP Investment Board 19  
  • 20. P/NAVPS 1.4 1.2 1.15x TSX : R 1.0 WWW .R O MA R C O .C O M 0.8 0.60x 0.6 0.49x 0.45x 0.40x 0.40x 0.41x 0.4 0.36x 0.37x 0.37x 0.33x 0.34x 0.32x 0.30x 0.24x 0.19x 0.2 0.14x 0.0 VIT-V ORE-T R-T LYD-T DGC-T SUE-T EPZ-V NG-T VTR-T AVERAGE PLG-T MNM-V DNA-T SBB-T RR-T BSX-T VGZ-T Source: NBF Financial Markets, April 5, 2013 20  
  • 21. NBF Preferred Development Names TSX : R Filter #1 Filter #2 Filter #3 Filter #4 Filter #5 Filter #6 Summary Low Capex Low All-In Cash Short Timeline to Favourable P/NAV Scale In Order Intensity Costs Prod’n Jurisdiction DGC-T R-T DGC-T DGC-T VTR-T NG-T DGC-T R-T EPZ-V SUE-T R-T VIT-V DGC-T R-T WWW .R O MA R C O .C O M SUE-T LYD-T LYD-T NG-T ORE-T VGZ-T LYD-T ORE-T BSX-T VIT-V SBB-T LYD-T BSX-T SUE-T EPZ-V SUE-T VGZ-T VIT-V MNM-V ORE-T BSX-T MNM-V SBB-T EPZ-V SUE-T R-T VTR-T EPZ-V LYD-T NG-T ORE-T BSX-T NG-T R-T VIT-V BSX-T MNM-V VTR-T EPZ-V VGZ-T SBB-T ORE-T VTR-T DGC-T BSX-T MNM-V SUE-T LYD-T VTR-T VIT-V VIT-V R-T VGZ-T BSX-T VIT-V VGZ-T VGZ-T ORE-T MNM-V ORE-T DGC-T SUE-T NG-T SBB-T VGZ-T SBB-T VTR-T EPZ-V EPZ-V SBB-T NG-T VTR-T NG-T LYD-T SBB-T MNM-V MNM-V Source: NBF Estimates, Feb. 10, 2013 21  
  • 22. ANALYST COVERAGE TSX : R TARGET PRICE NBF $2.00 WWW .R O MA R C O .C O M Paradigm $2.00 Cormark $1.60 Euro Pacific $1.50 RBC $1.25 BMO $1.10 22  
  • 23. CAPITAL STRUCTURE Capitalization Summary TSX : R Exchange/ Symbol TSX:R Share Price(1) C$0.65 WWW .R O MA R C O .C O M Shares Outstanding (Basic) 585.4M FD Shares Outstanding (TSM)(2) 596.1M Market Capitalization(1) C$381M 52 Week High / Low(1) C$1.40 / C$0.49 Cash Balance (Feb. 25, 2013) US$53M (1) As at close on April 5, 2013 23   (2) Includes 10.7M “in-the-money” options at an average strike price of C$0.70 as of April 5, 2013
  • 24. STRONG BOARD, MANAGEMENT TECHNICAL TEAM Proven gold mine development, finance, permitting and operations experience Romarco has the team in place to bring Haile into production TSX : R Experienced Board of Directors Strong Management Technical Team Leendert Krol, Chairman Diane R. Garrett, Ph.D., President CEO §  Former Newmont §  Former Dayton Mining, US Global Investors James R. Arnold, Sr. VP, COO Diane R. Garrett §  Former Freeport, Gold Fields – Richards Award Winner WWW .R O MA R C O .C O M §  Former Dayton Mining, US Global Investors Stan Rideout, Sr. VP, CFO James R. Arnold §  Former Phelps Dodge §  Former Freeport, Gold Fields – Richards Award Winner David Thomas, VP, General Manager Don MacDonald James Berry, Chief Geologist Regional Exploration Manager §  CFO KGHM International (formerly QuadraFNX), former §  Former Barrick NovaGold, DeBeers, Dayton Mining Brent Anderson, Mine Manager John Marsden §  Former Quadra, Freeport §  Consultant, former Freeport – Richards Award Winner Mike Gleason, Construction Manager Patrick Michaels §  Former Freeport §  Portfolio Manager – Zuri-invest, Switzerland Jim Wickens, Process Manager §  Former Barrick Gary A. Sugar §  Former RBC Capital Markets Johnny Pappas, Director of Environmental Affairs §  Former Freeport Robert van Doorn §  Former Mundoro, Rio Narcea, Morgan Stanley Ramona Schneider, Environmental Manager §  Former Kinross Dan Symons, Vice President, Investor Relations §  Former Renmark Financial 24  
  • 25. FUTURE CATALYSTS / EVENTS u  Revised permit schedule posted by Army Corps u  Draft EIS document filed TSX : R u  State then proceeds to issue all permits relating to mining operations – air, construction, mining, water, etc. WWW .R O MA R C O .C O M u  Final EIS document filed u  Drill results u  Resource update u  Reserve update u  Expansion studies, underground studies 25  
  • 26. CONTACT INFORMATION Dan Symons Vice President, Investor Relations dsymons@romarco.com 70 University Avenue Suite 1410 Toronto, Ontario M5J 2M4 Tel: 416.367.5500 Fax: 416.367.5505 Email: info@romarco.com WWW .R O MA R C O .C O M