Test Plan
IEEE TEST PLAN TEMPLATE:-
 Test plan identifier:-
A unique name by which the test plan may be identified and may
include version information.
 Introduction:-
Summary of the test plan, including type of testing, level of testing
any references to other documents, scope of testing and so on.
 Test items :-
The artifacts that will be tested.
 Features to be tested :-
The features or items of the specification that will be tested.
 Features not to be tested:-
The features or items part of the specification that will not
be tested.
 Item pass/fail criteria:-
This could be viewed as the criteria for completion of
testing per this plan.
 Suspension criteria and resumption requirements:-List the
criterion for pausing or resumption of testing.
 Test deliverables :-The artifacts created by the testing team that
will be delivered as per this plan.
 Testing tasks :-
The testing tasks involved, their dependencies if any, time
they will take and resource requirements.
 Environmental needs :-
List needs such as hardware, software and other
environmental requirements for testing.
 Responsibilities :- List the people responsible for the
various parts of the plan.
 Staffing and training needs :-
The people & skill sets needed to carry out the test
activities
Schedule:-
List the schedule dates when testing will take place.
Risks and contingencies:-
Identify the risks, likelihood and impact as well as
possible mitigation steps.
Approvals:-Sign-off by the stakeholders denoting
agreement
Test Plan For Mobile Application
 Introduction :
o The document is to test the operating characteristics of an
application that runs on mobile.
 Test Plan and Strategy :
o Following tests will be conducted in the process :
 Unit Testing
 System Testing
 Regression Testing
 Pass/Fail Conditions
 Test Report
 Schedule :
o Schedule will be decided in consultation with the
project manager.
 Risk :
The following may impact the test cycle
o Device Availability
o Any new feature addition/modification to the
application which is not communicated in advance.
Entry/Exit Criteria :
Entry Criteria :
o Development of the application is complete.
o Resources are allocated.
o Test environment is up and working.
Exit Criteria :
o All test results have been evaluated and accepted.
o There are no high criticality defects unresolved or
outstanding.
Deliverables :
 Test Plan
 Test Cases Document – Description and expected
result for each test case.
 Test Results – The Pass/Fail status of each test cases
and the list of issues.
test plan

More Related Content

What's hot

Test Plan Template
Test Plan TemplateTest Plan Template
Test Plan TemplateH2Kinfosys
 
03 software test-plan-template
03 software test-plan-template03 software test-plan-template
03 software test-plan-templateAndrei Hortúa
 
Software Test Planning and Design
Software Test Planning and DesignSoftware Test Planning and Design
Software Test Planning and DesignEffOne_Technologies
 
Fundamental test process
Fundamental test processFundamental test process
Fundamental test processmuhammad afif
 
Software test management
Software test managementSoftware test management
Software test managementVishad Garg
 
Software testing
Software testingSoftware testing
Software testingAshu Bansal
 
Software Testing Life Cycle (STLC) | Software Testing Tutorial | Edureka
Software Testing Life Cycle (STLC) | Software Testing Tutorial | EdurekaSoftware Testing Life Cycle (STLC) | Software Testing Tutorial | Edureka
Software Testing Life Cycle (STLC) | Software Testing Tutorial | EdurekaEdureka!
 
Introduction to testing2
Introduction to testing2Introduction to testing2
Introduction to testing2khaerul azmi
 
Software test management overview for managers
Software test management overview for managersSoftware test management overview for managers
Software test management overview for managersTJamesLeDoux
 
Unit 1 defects classes
Unit 1 defects classesUnit 1 defects classes
Unit 1 defects classesRoselin Mary S
 

What's hot (20)

Test Plan Template
Test Plan TemplateTest Plan Template
Test Plan Template
 
Ieee829mtp
Ieee829mtpIeee829mtp
Ieee829mtp
 
03 software test-plan-template
03 software test-plan-template03 software test-plan-template
03 software test-plan-template
 
Software Test Planning and Design
Software Test Planning and DesignSoftware Test Planning and Design
Software Test Planning and Design
 
06 template test plan
06 template test plan06 template test plan
06 template test plan
 
Qa documentation pp
Qa documentation ppQa documentation pp
Qa documentation pp
 
Fundamental test process
Fundamental test processFundamental test process
Fundamental test process
 
TestPlan for IIT website
TestPlan for IIT websiteTestPlan for IIT website
TestPlan for IIT website
 
Test process
Test processTest process
Test process
 
Test Planning_Arsala
Test Planning_ArsalaTest Planning_Arsala
Test Planning_Arsala
 
Testing Standards List
Testing Standards ListTesting Standards List
Testing Standards List
 
Test planning
Test planningTest planning
Test planning
 
Software test management
Software test managementSoftware test management
Software test management
 
Software testing
Software testingSoftware testing
Software testing
 
Software Testing Life Cycle (STLC) | Software Testing Tutorial | Edureka
Software Testing Life Cycle (STLC) | Software Testing Tutorial | EdurekaSoftware Testing Life Cycle (STLC) | Software Testing Tutorial | Edureka
Software Testing Life Cycle (STLC) | Software Testing Tutorial | Edureka
 
Introduction to testing2
Introduction to testing2Introduction to testing2
Introduction to testing2
 
SOFTWARE TESTING
SOFTWARE TESTINGSOFTWARE TESTING
SOFTWARE TESTING
 
Istqb ctal tm
Istqb ctal tmIstqb ctal tm
Istqb ctal tm
 
Software test management overview for managers
Software test management overview for managersSoftware test management overview for managers
Software test management overview for managers
 
Unit 1 defects classes
Unit 1 defects classesUnit 1 defects classes
Unit 1 defects classes
 

Viewers also liked

Intro To Educational Assessment
Intro To Educational AssessmentIntro To Educational Assessment
Intro To Educational Assessmentguevarra_2000
 
Assessment Assumptions
Assessment AssumptionsAssessment Assumptions
Assessment AssumptionsJason Rhode
 
Session 12 Activités à venir de la CoP PSS : projet Mobilisation 2.0
Session 12 Activités à venir de la CoP PSS : projet Mobilisation 2.0Session 12 Activités à venir de la CoP PSS : projet Mobilisation 2.0
Session 12 Activités à venir de la CoP PSS : projet Mobilisation 2.0COP_HHA
 
Implementing Test Automation: What a Manager Should Know
Implementing Test Automation: What a Manager Should KnowImplementing Test Automation: What a Manager Should Know
Implementing Test Automation: What a Manager Should KnowSoftServe
 
End 2-end testing of mean applications
End 2-end testing of mean applicationsEnd 2-end testing of mean applications
End 2-end testing of mean applicationsMihai-Cristian Fratila
 
Complex End-to-End Testing
Complex End-to-End TestingComplex End-to-End Testing
Complex End-to-End TestingErika Barron
 
QA Fes 2016. Gerlof Hoekstra. E2E Testing the Ministry Of Justice Biometric I...
QA Fes 2016. Gerlof Hoekstra. E2E Testing the Ministry Of Justice Biometric I...QA Fes 2016. Gerlof Hoekstra. E2E Testing the Ministry Of Justice Biometric I...
QA Fes 2016. Gerlof Hoekstra. E2E Testing the Ministry Of Justice Biometric I...QAFest
 
E2E-тестирование мобильных приложений
E2E-тестирование мобильных приложенийE2E-тестирование мобильных приложений
E2E-тестирование мобильных приложенийMoscowJS
 
Strategic Testing (CodeMash 2016)
Strategic Testing (CodeMash 2016)Strategic Testing (CodeMash 2016)
Strategic Testing (CodeMash 2016)Dmitry Sharkov
 
End-to-End Quality Approach: 14 Levels of Testing
End-to-End Quality Approach: 14 Levels of TestingEnd-to-End Quality Approach: 14 Levels of Testing
End-to-End Quality Approach: 14 Levels of TestingJosiah Renaudin
 
End to End Test Management Test Strategy Estimation and Metrics Workshop
End to End Test Management Test Strategy Estimation and Metrics WorkshopEnd to End Test Management Test Strategy Estimation and Metrics Workshop
End to End Test Management Test Strategy Estimation and Metrics WorkshopQAAgility Technologies
 
Saksham Sarode - Building Effective test Data Management in Distributed Envir...
Saksham Sarode - Building Effective test Data Management in Distributed Envir...Saksham Sarode - Building Effective test Data Management in Distributed Envir...
Saksham Sarode - Building Effective test Data Management in Distributed Envir...TEST Huddle
 
E2E Life Cycle Intelligence & Channel Strategy @ TPC
E2E Life Cycle Intelligence & Channel Strategy @ TPCE2E Life Cycle Intelligence & Channel Strategy @ TPC
E2E Life Cycle Intelligence & Channel Strategy @ TPCDavid Porter
 
Preparing and Implementing a Comprehensive ICD-10 Testing Strategy
Preparing and Implementing a Comprehensive ICD-10 Testing StrategyPreparing and Implementing a Comprehensive ICD-10 Testing Strategy
Preparing and Implementing a Comprehensive ICD-10 Testing StrategyCognizant
 
e2e frameworks - czyli kij ma dwa końce
e2e frameworks - czyli kij ma dwa końcee2e frameworks - czyli kij ma dwa końce
e2e frameworks - czyli kij ma dwa końceThe Software House
 
Testing strategies for micro services - Ketan Soni, Jesal Mistry, ThoughtWorks
Testing strategies for micro services - Ketan Soni, Jesal Mistry, ThoughtWorksTesting strategies for micro services - Ketan Soni, Jesal Mistry, ThoughtWorks
Testing strategies for micro services - Ketan Soni, Jesal Mistry, ThoughtWorksThoughtworks
 
Configuration Management
Configuration ManagementConfiguration Management
Configuration ManagementRajesh Kumar
 
End-to-End Test Automation for Both Horizontal and Vertical Scale
End-to-End Test Automation for Both Horizontal and Vertical ScaleEnd-to-End Test Automation for Both Horizontal and Vertical Scale
End-to-End Test Automation for Both Horizontal and Vertical ScaleErdem YILDIRIM
 

Viewers also liked (20)

Intro To Educational Assessment
Intro To Educational AssessmentIntro To Educational Assessment
Intro To Educational Assessment
 
Assessment Assumptions
Assessment AssumptionsAssessment Assumptions
Assessment Assumptions
 
Session 12 Activités à venir de la CoP PSS : projet Mobilisation 2.0
Session 12 Activités à venir de la CoP PSS : projet Mobilisation 2.0Session 12 Activités à venir de la CoP PSS : projet Mobilisation 2.0
Session 12 Activités à venir de la CoP PSS : projet Mobilisation 2.0
 
Implementing Test Automation: What a Manager Should Know
Implementing Test Automation: What a Manager Should KnowImplementing Test Automation: What a Manager Should Know
Implementing Test Automation: What a Manager Should Know
 
End 2-end testing of mean applications
End 2-end testing of mean applicationsEnd 2-end testing of mean applications
End 2-end testing of mean applications
 
Complex End-to-End Testing
Complex End-to-End TestingComplex End-to-End Testing
Complex End-to-End Testing
 
QA Fes 2016. Gerlof Hoekstra. E2E Testing the Ministry Of Justice Biometric I...
QA Fes 2016. Gerlof Hoekstra. E2E Testing the Ministry Of Justice Biometric I...QA Fes 2016. Gerlof Hoekstra. E2E Testing the Ministry Of Justice Biometric I...
QA Fes 2016. Gerlof Hoekstra. E2E Testing the Ministry Of Justice Biometric I...
 
E2E-тестирование мобильных приложений
E2E-тестирование мобильных приложенийE2E-тестирование мобильных приложений
E2E-тестирование мобильных приложений
 
Strategic Testing (CodeMash 2016)
Strategic Testing (CodeMash 2016)Strategic Testing (CodeMash 2016)
Strategic Testing (CodeMash 2016)
 
End-to-End Quality Approach: 14 Levels of Testing
End-to-End Quality Approach: 14 Levels of TestingEnd-to-End Quality Approach: 14 Levels of Testing
End-to-End Quality Approach: 14 Levels of Testing
 
End to End Test Management Test Strategy Estimation and Metrics Workshop
End to End Test Management Test Strategy Estimation and Metrics WorkshopEnd to End Test Management Test Strategy Estimation and Metrics Workshop
End to End Test Management Test Strategy Estimation and Metrics Workshop
 
Saksham Sarode - Building Effective test Data Management in Distributed Envir...
Saksham Sarode - Building Effective test Data Management in Distributed Envir...Saksham Sarode - Building Effective test Data Management in Distributed Envir...
Saksham Sarode - Building Effective test Data Management in Distributed Envir...
 
E2E Life Cycle Intelligence & Channel Strategy @ TPC
E2E Life Cycle Intelligence & Channel Strategy @ TPCE2E Life Cycle Intelligence & Channel Strategy @ TPC
E2E Life Cycle Intelligence & Channel Strategy @ TPC
 
Workshop - E2e tests with protractor
Workshop - E2e tests with protractorWorkshop - E2e tests with protractor
Workshop - E2e tests with protractor
 
Preparing and Implementing a Comprehensive ICD-10 Testing Strategy
Preparing and Implementing a Comprehensive ICD-10 Testing StrategyPreparing and Implementing a Comprehensive ICD-10 Testing Strategy
Preparing and Implementing a Comprehensive ICD-10 Testing Strategy
 
e2e frameworks - czyli kij ma dwa końce
e2e frameworks - czyli kij ma dwa końcee2e frameworks - czyli kij ma dwa końce
e2e frameworks - czyli kij ma dwa końce
 
11 software testing_strategy
11 software testing_strategy11 software testing_strategy
11 software testing_strategy
 
Testing strategies for micro services - Ketan Soni, Jesal Mistry, ThoughtWorks
Testing strategies for micro services - Ketan Soni, Jesal Mistry, ThoughtWorksTesting strategies for micro services - Ketan Soni, Jesal Mistry, ThoughtWorks
Testing strategies for micro services - Ketan Soni, Jesal Mistry, ThoughtWorks
 
Configuration Management
Configuration ManagementConfiguration Management
Configuration Management
 
End-to-End Test Automation for Both Horizontal and Vertical Scale
End-to-End Test Automation for Both Horizontal and Vertical ScaleEnd-to-End Test Automation for Both Horizontal and Vertical Scale
End-to-End Test Automation for Both Horizontal and Vertical Scale
 

Similar to test plan

Bab i fundamental of testing
Bab i fundamental of testingBab i fundamental of testing
Bab i fundamental of testingRiauly Putra
 
Testing documents
Testing documentsTesting documents
Testing documentsHari Tiru
 
Testing documents
Testing documentsTesting documents
Testing documentssuhasreddy1
 
Test planning AND concepts planning Test planning AND concepts planning
Test planning AND concepts planning Test planning AND concepts planningTest planning AND concepts planning Test planning AND concepts planning
Test planning AND concepts planning Test planning AND concepts planningpushpait
 
Fundamentaltestprocess windirohmaheny11453205427 kelase
Fundamentaltestprocess windirohmaheny11453205427 kelaseFundamentaltestprocess windirohmaheny11453205427 kelase
Fundamentaltestprocess windirohmaheny11453205427 kelasewindi rohmaheny
 
Mt s10 stlc&test_plan
Mt s10 stlc&test_planMt s10 stlc&test_plan
Mt s10 stlc&test_planTestingGeeks
 
Test planning & estimation
Test planning & estimationTest planning & estimation
Test planning & estimationLeslie Smart
 
Bab i fundamental of testing (yoga)
Bab i fundamental of testing (yoga)Bab i fundamental of testing (yoga)
Bab i fundamental of testing (yoga)sidjdhdjsks
 
Chapter 1 Fundamental of Testing
Chapter 1 Fundamental of TestingChapter 1 Fundamental of Testing
Chapter 1 Fundamental of TestingSiti Deny Nadiroha
 
Bab i fundamental of testing
Bab i fundamental of testingBab i fundamental of testing
Bab i fundamental of testingSyakir Arsalan
 
Effective Test Estimation
Effective Test EstimationEffective Test Estimation
Effective Test EstimationTechWell
 

Similar to test plan (20)

Bab i fundamental of testing
Bab i fundamental of testingBab i fundamental of testing
Bab i fundamental of testing
 
Test planning
Test planningTest planning
Test planning
 
Testing
TestingTesting
Testing
 
stlc
stlcstlc
stlc
 
Testing documents
Testing documentsTesting documents
Testing documents
 
Testing documents
Testing documentsTesting documents
Testing documents
 
stlc
stlcstlc
stlc
 
Test Plan.pptx
Test Plan.pptxTest Plan.pptx
Test Plan.pptx
 
Fundamental Test Process
Fundamental Test ProcessFundamental Test Process
Fundamental Test Process
 
Test plan
Test planTest plan
Test plan
 
Test planning AND concepts planning Test planning AND concepts planning
Test planning AND concepts planning Test planning AND concepts planningTest planning AND concepts planning Test planning AND concepts planning
Test planning AND concepts planning Test planning AND concepts planning
 
Fundamentaltestprocess windirohmaheny11453205427 kelase
Fundamentaltestprocess windirohmaheny11453205427 kelaseFundamentaltestprocess windirohmaheny11453205427 kelase
Fundamentaltestprocess windirohmaheny11453205427 kelase
 
Mt s10 stlc&test_plan
Mt s10 stlc&test_planMt s10 stlc&test_plan
Mt s10 stlc&test_plan
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
 
Test planning & estimation
Test planning & estimationTest planning & estimation
Test planning & estimation
 
Bab i fundamental of testing (yoga)
Bab i fundamental of testing (yoga)Bab i fundamental of testing (yoga)
Bab i fundamental of testing (yoga)
 
Chapter 1 Fundamental of Testing
Chapter 1 Fundamental of TestingChapter 1 Fundamental of Testing
Chapter 1 Fundamental of Testing
 
Bab i fundamental of testing
Bab i fundamental of testingBab i fundamental of testing
Bab i fundamental of testing
 
Effective Test Estimation
Effective Test EstimationEffective Test Estimation
Effective Test Estimation
 
Fundamental test process
Fundamental test processFundamental test process
Fundamental test process
 

test plan

  • 1.
  • 3. IEEE TEST PLAN TEMPLATE:-  Test plan identifier:- A unique name by which the test plan may be identified and may include version information.  Introduction:- Summary of the test plan, including type of testing, level of testing any references to other documents, scope of testing and so on.  Test items :- The artifacts that will be tested.  Features to be tested :- The features or items of the specification that will be tested.
  • 4.  Features not to be tested:- The features or items part of the specification that will not be tested.  Item pass/fail criteria:- This could be viewed as the criteria for completion of testing per this plan.  Suspension criteria and resumption requirements:-List the criterion for pausing or resumption of testing.  Test deliverables :-The artifacts created by the testing team that will be delivered as per this plan.
  • 5.  Testing tasks :- The testing tasks involved, their dependencies if any, time they will take and resource requirements.  Environmental needs :- List needs such as hardware, software and other environmental requirements for testing.  Responsibilities :- List the people responsible for the various parts of the plan.  Staffing and training needs :- The people & skill sets needed to carry out the test activities
  • 6. Schedule:- List the schedule dates when testing will take place. Risks and contingencies:- Identify the risks, likelihood and impact as well as possible mitigation steps. Approvals:-Sign-off by the stakeholders denoting agreement
  • 7. Test Plan For Mobile Application  Introduction : o The document is to test the operating characteristics of an application that runs on mobile.  Test Plan and Strategy : o Following tests will be conducted in the process :  Unit Testing  System Testing  Regression Testing  Pass/Fail Conditions  Test Report
  • 8.  Schedule : o Schedule will be decided in consultation with the project manager.  Risk : The following may impact the test cycle o Device Availability o Any new feature addition/modification to the application which is not communicated in advance.
  • 9. Entry/Exit Criteria : Entry Criteria : o Development of the application is complete. o Resources are allocated. o Test environment is up and working. Exit Criteria : o All test results have been evaluated and accepted. o There are no high criticality defects unresolved or outstanding.
  • 10. Deliverables :  Test Plan  Test Cases Document – Description and expected result for each test case.  Test Results – The Pass/Fail status of each test cases and the list of issues.