A REPORT OF THE VOCATIONAL
TRAINING
FOR THE PERIOD OF THREE WEEKS FROM
16.06.13 TO 07.07.13
at
MEJIA THERMAL POWER STATION
P.O. MEJIA, DIST. BANKURA
WEST BENGAL-722183
OF
DAMODAR VALLEY CORPORATION
(D.V.C.)
by
SAGNIK CHOUDHURY
GURU NANAK INSTITUTE OF TECHNOLOGY
157/F, Nilgunj Road, Sodepur, Kolkata 700114
1
PREFACE
Economic growth in India, being dependent on the power sector, has necessiated an
enormous growth in electricity demand over the last two decades. Electricity in bulk
quantities is produced in power plants, which can be of the following types: (a)
Thermal (b) Nuclear (c) Hydraulic, (d) Gas turbine and (e) Geothermal.
I have done my vocational training in MEJIA THERMAL POWER STATION under
DAMODAR VALLEY CORPORATION (D.V.C.) comprising 4 units of 210 MW
each, 2 units of 250 MW each and 2 units of 500 MW each. It is a modern thermal
power station having tilting burner corner fired combustion engineering USA design
boiler and KWU West Germany Design Reaction Turbine. Both these main
equipments have been designed, manufactured and supplied by Bharat Heavy
Electricals Limited, India. MTPS units have many special features such as Turbo
mill, DIPC (Direct Ignition of Pulverised Coal) system, HPLP bypass system,
Automatic Turbine Run up system, and Furnace Safeguard Supervisory System.
2
ACKNOWLEDGEMENT
The dissertation has been prepared based on the vocational training
undergone in a highly esteemed organisation of Eastern region, a pioneer in
Generation Transmission & Distribution of power, one of the most technically
advanced & largest thermal power stations in West Bengal, the Mejia Thermal
Power Station (M.T.P.S), under DVC.
I would like to express my heartfelt gratitude to the authorities of Mejia
Thermal Power Station and Techno India for providing me such an
opportunity to undergo training in the thermal power plant of DVC, MTPS.
I would also like to thank the Engineers, highly experienced without whom
such type of concept building in respect of thermal power plant would not
have been possible. Some of them are:
1) Mr. Parimal Kumar Dubey
2) Mr. Rupak Kumar Nag
3) Mr. Malay Bal
4) Mr. Bhaskar Dey
3
CONTENTS
Page No
1. Introduction ................................................................................................5
2.Technical Specification of Mejia thermal power plant.................................6
3.Overview of a Thermal power plant.............................................................7
4.Mechanical operation
a.Coal handling Plant....................................................................................8
b.Water Treatment Plant................................................................................9
c.Water De-mineralization Plant...................................................................9
d.Boiler System.............................................................................................10
e.Ash handling plant......................................................................................13
f.ESP...............................................................................................................13
g.Boiler auxilliaries........................................................................................15
h.Steam Turbine..............................................................................................17
i.Cooling tower................................................................................................19
j.Chimney........................................................................................................19
5.Electrical operation
a.Generator.......................................................................................................20
b.transformers..................................................................................................22
c.control room..................................................................................................26
d.Excitation system..........................................................................................27
e.Switchyard Section & its Components.........................................................27
f.Switchgear.....................................................................................................32
g.Switching Schemes.......................................................................................33
h.Protection......................................................................................35
i.Motors for thermal power plant.....................................................................38
j.Battery bank..................................................................................................38
6.Conclusion......................................................................................................39
7.Bibliography...................................................................................................40
4
INTRODUCTION
Damodar Valley Corporation was established on 7th July 1948.It is the most reputed
company in the eastern zone of India. DVC in established on the Damodar River. It also
consists of the Durgapur Thermal Power Plant in Durgapur. The MTPS under the DVC is
the second largest thermal plant in West Bengal. It has the capacity of 2340MW with 4
units of 210MW each, 2 units of 250MW each & 2 units of 500 MW each. With the
introduction of another two units of 500MW that is in construction it will be the largest in
West Bengal. Mejia Thermal Power Station also known as MTPS is located in the outskirts
of Raniganj in Bankura District. It is one of the 5 Thermal Power Stations of Damodar
Valley Corporation in the state of West Bengal. The total power plant campus area is
surrounded by boundary walls and is basically divided into two major parts, first the Power
Plant area itself and the second is the Colony area for the residence and other facilities for
MTPSs͛ employees.
5
TECHNICAL SPECIFICATION OF MTPS:
INSTALLED CAPACITY: -
1) Total number of Units : - 4 X 210 MW(unit 1 to 4) with Brush Type Generators, 2 X 250
MW(unit 5 and 6) with Brush less Type Generators, 2*500 MW(unit 7 and 8) Generators.
2) Total Energy Generation: - 2340 MW
3) Source of Water: - Damodar River
4) Sources of Coal: - B.C.C.L and E.C.L, also imported from Indonesia
In a Thermal Power generating unit, combustion of fossil fuel (coal, oil or natural
gas) in Boiler or fissile element (uranium,plutonium) in Nuclear Reactor
generates heat energy. This heat energy transforms water into steam at high
pressure and temperature. This steam is utilised to generate mechanical energy
in a Turbine. This mechanical energy, in turn is converted into electrical
energy with thehelp of an Alternator coupled with the Turbine. The production
of electric energy utilising heat energy is known as thermal power generation.
The heat energy changes into mechanical energy following the principle of
Rankine reheat-regenerative cycle and this mechanical energy transforms into
electrical energy based on Faraday’s laws of electromagnetic induction. The
generated output of Alternator is electrical power of three-phase alternating current
(A.C.). A.C. supply has several advantages over direct current (D.C.) system and
hence , it is preferred in modern days. The voltage generated is of low
magnitude (14 to 21 KV for different generator rating) and is stepped up
suitably with the help of transformer for efficient and economical transmission
of electric power from generating stations to different load centres at distant
locations.
6
OVERVIEW OF A THERMAL POWER PLANT
A thermal power plant continuously converts the energy stored in the fossil
fuels(coal, oil, natural gas) into shaft work and ultimately into electricity. The
working fluid is water which is sometimes in liquid phase and sometimes in vapour
phase during its cycle of operation. Energy released by the burning of fuel is
transferred to water in the boiler to generate steam at high pressure and temperature,
which then expands in the turbine to a low pressure to produce shaft work. The steam
leaving the turbine is condensed into water in the condenser where cooling water
from a river or sea circulates carrying away the heat released during condensation.
The water is then fed back to the boiler by the pump and the cycle continues. The
figure below illustrates the basic components of a thermal power plant where
mechanical power of the turbine is utilised by the electric generator to produce
electricity and ultimately transmitted via the transmission lines.
1. Cooling tower. 2. Cooling water pump. 3. Transmission line (3-phase). 4. Unit transformer (3-
phase). 5. Electric generator (3-phase). 6. Low pressure turbine. 7. Condensate extraction pump.
8. Condenser. 9. Intermediate pressure turbine. 10. Steam governor valve. 11. High pressure
turbine. 12. De-aerator. 13. Feed heater. 14. Coal conveyor. 15. Coal hopper. 16. Pulverised fuel
mill. 17. Boiler drums. 18. Ash hopper. 19. Super heater. 20. Forced draught fan. 21. Re-heater.
22. Air intake. 23. Economiser. 24. Air pre heater. 25. Precipitator. 26. Induced draught fan. 27.
Chimney Stack.
7
MECHANICAL OPERATION
COAL HANDLING PLANT
Generally most of the thermal power plants uses low grades bituminous coal. The
conveyer belt system transports the coal from the coal storage area to the coal mill.
Now the FHP(Fuel Handling Plant) department is responsible for converting the coal
converting it into fine granular dust by grinding process. The coal from the coal
bunkers.Coal is the principal energy source because of its large deposits and
availability. Coal can be recovered from different mining techniques like
• shallow seams by removing the over burnt expose the coal seam
• underground mining.
The coal handling plant is used to store, transport and distribute coal which comes
from the mine. The coal is delivered either through a conveyor belt system or by rail
or road transport. The bulk storage of coal at the power station is important for the
continues supply of fuel. Usually the stockpiles are divided into three main
categories.
• live storage
• emergency storage
• long term compacted stockpile.
The figure below shows the schematic representation of the coal handling plant.
Firstly the coal gets deposited into the track hopper from the wagon and then via the
paddle feeder it goes to the conveyer belt#1A. Secondly via the transfer port the coal
goes to another conveyer belt#2B and then to the crusher house. The coal after being
crushed goes to the stacker via the conveyer belt#3 for being stacked or reclaimed
and finally to the desired unit. ILMS is the inline magnetic separator where all the
magnetic particles associated with coal get separated.
COAL HANDLING PLANT PROCEDURE
8
WATER TREATMENT PLANT
Raw water supply:
Raw water received at the thermal power plant is passed through Water Treatment Plant
to separate suspended impurities and dissolved gases including organic substance and then
through De-mineralised Plant to separate soluble impurities.
Deaeration:
In this process, the raw water
is sprayed over cascade
aerator in which water flows
downwards over many steps
in the form of thin waterfalls.
Cascading increases surface
area of water to facilitate
easy separation of dissolved
undesirable gases (like
hydrogen sulphide, ammonia,
volatile organic compound etc.) or to help in oxygenation of mainly ferrous ions in
presence of atmospheri oxygen to ferric ions. These ferric ions promote to some extent
in coagulation process.
Coagulation:
Coagulation takes place in clariflocculator. Coagulant destabilises suspended
solids and agglomerates them into heavier floc, which is separated out through
sedimentation. Prime chemicals used for coagulation are alum, poly-aluminium chloride
(PAC).
Filtration:
Filters remove coarse suspended matter and remaining floc or sludge after
coagulation and also reduce the chlorine demand of the water. Filter beds are developed
by placing gravel or coarse anthracite and sand in layers. These filter beds are regenerated by
backwashing and air blowing through it.
Chlorination:
Neutral organic matter is very heterogeneous i.e. it contains many classes of high
molecular weight organic compounds. Humic substances constitute a major portion of
the dissolved organic carbon from surface waters. They are complex mixtures of organic
compounds with relatively unknown structures and chemical composition.
DM (Demineralised Water) Plant
In De-mineralised Plant, the filter water of Water Treatment Plant is passed
through the pressure sand filter (PSF) to reduce turbidity and then through
activated charcoal filter (ACF) to adsorb the residual chlorine and iron in filter water.
9
BOILER SYSTEM
BOILER:
Working principle of Boiler (Steam Generator):
In Boiler, steam is generated from de-
mineralized water by the addition of heat.
The heat added has two parts: sensible heat
and latent heat. The sensible heat raises the
temperature and pressure of water as well as
steam. The latent heat converts water into
steam (phase change). This conversion is also
known as boiling of water, which is dependent
on pressure and corresponding temperature.
Thermodynamically, boiling is a process of
heat addition to water at constant pressure &
temperature.
The quantity of latent heat decreases with
increase in pressure of water and it becomes
zero at 221.06 bars. This pressure is termed
as critical pressure. The steam generators are
designated as sub-critical or super critical
based on its working pressure as below critical
or above critical pressure. The steam, thus
formed is dry & saturated. Further, addition
of heat raises the temperature and pressure of
steam, which is known as superheated steam.
The differential specific weight between
steam and water provides the driving force
for natural circulation during the steam generation process. This driving force
considerably reduces at pressure around 175 Kg/cm2
and is not able to overcome the
frictional resistance of its flow path. For this, forced or assisted circulation is
employed at higher sub-critical pressure range due to the reason of economy.
But, at supercritical pressures and above, circulation is forced one (such boiler is
called once through boiler).
Important parts of Boiler & their functions:
 Economizer:
Feed water enters into the boiler through economizer. Its function is to recover
residual heat of flue gas before leaving boiler to preheat feed water prior to its entry
into boiler drum. The drum water is passed through down-comers for
circulation
through the water wall for absorbing heat from furnace. The economizer
10
recirculation line connects down-comer with the economizer inlet header
through
an isolating valve and a non-return valve to protect economizer tubes from
overheating caused by steam entrapment and starvation. This is done to ensure
circulation of water through the tubes during initial lighting up of boiler, when
there is no feed water flow through economizer.
 Drum:
Boiler drum is located outside the furnace region or flue gas path. This stores
certain amount of water and separates steam from steam-water mixture. The
minimum drum water level is always maintained so as to prevent formation of
vortex and to protect water wall tubes (especially its corner tubes) from steam
entrapment / starvation due to higher circulation ratio of boiler.
The secondary stage consists of two opposite bank of closely spaced thin
corrugated sheets which direct the steam through a tortuous path and force the
remaining entrained water against the corrugated plates. Since, the velocity is
relatively low, this water does not get picked up again but runs down the
plates and off the second stage lips at the two steam outlets.
From the secondary separators, steam flows uniformly and with relatively low
velocity upward to the series of screen dryers (scrubbers), extending in layers
across the length of the drum. These screens perform the final stage of separation.
 Superheater:
Superheaters (SH) are meant for elevating the steam temperature above the
saturation temperature in phases; so that maximum work can be extracted from
high energy (enthalpy) steam and after expansion in Turbine, the dryness fraction
does not reach below 80%, for avoiding Turbine blade erosion/damage and
attaining maximum Turbine internal efficiency. Steam from Boiler Drum passes
through primary superheater placed in the convective zone of the furnace, then
through platen superheater placed in the radiant zone of furnace and thereafter,
through final superheater placed in the convective zone. The superheated steam at
requisite pressure and temperature is taken out of boiler to rotate turbo-generator.
 Reheater:
In order to improve the cycle efficiency, HP turbine exhaust steam is taken back to
boiler to increase temperature by reheating process. The steam is passed through
Reheater, placed in between final superheater bank of tubes & platen SH and
finally taken out of boiler to extract work out of it in the IP and LP turbine.
 De-superheater (Attemperator):
Though superheaters are designed to maintain requisite steam temperature, it is
necessary to use de-superheater to control steam temperature. Feed water,
generally taken before feed water control station, is used for de-superheating steam
to control its temperature at desired level.
 Drain & Vent:
Major drains and vents of boiler are (i) Boiler bottom ring header drains, (ii)
11
Boiler drum drains & vents, (iii) Superheater & Reheater headers drains & vents,
(iv) Desuperheater header drains & vents etc. Drains facilitate draining or hot
blow down
of boiler, as and when required; while vents ensure blowing out of air from
boiler during initial lighting up as well as facilitate depressurizing of boiler.
The continuous blow down (CBD) valve facilitates reduction in contaminant
concentration in drum water and also complete draining of drum water. The
intermittent blow down (IBD) / emergency blow down (EBD) valve helps to
normalize the excess drum water level during emergency situation.
Technical data of the Boiler
Type Radiant, Reheat, Natural circulation, Single
Drum, Balanced drift, Dry bottom, Tilting
tangential, Coal and oil fired with DIPC (Direct
Ignition of Pulverized Coal) system.
Furnace
Width 13868 mm.
Depth 10592 mm.
Volume 5240 m3
Fuel heat input per hour 106 kcal
Designed pressure 175.8 kg/cm2
Superheater Outlet pressure 155 kg/cm2
Low temperature SH (horizontally spaced) 2849 m2
(total heating surface area)
Platen SH (Pendant platen) 1097 m2
(total heating surface area)
Final superheater (vertically spaced) 1543 m2
(total heating surface area)
Attemperator
Type Spray
No. of stages One
Spray medium Feed water from boiler feed pump (BFP)
Reheater
Type Vertical spaced
Total H.S. area 2819 m2
Control Burner tilt & excess air
Economiser
Type Plain tube
Total H.S. area 6152 m2
12
ASH HANDLING PLANT
A large quantity of ash is, produced in steam power plants using coal.
Ash produced in about 10 to 20% of the total coal burnt in the furnace. Handling of
ash is a problem because ash coming out of the furnace is too hot, it is dusty and
irritating to handle and is accompanied by some poisonous gases. It is desirable to
quench the ash before handling due to following reasons:
1. Quenching reduces the temperature of ash.
2. It reduces the corrosive action of ash.
3. Ash forms clinkers by fusing in large lumps and by quenching clinkers will
disintegrate.
4. Quenching reduces the dust accompanying the ash.
Flyash is collected with an electrostatic precipitator(ESP)
ELECTROSTAIC PRECIPITATOR
The principal components of an ESP are 2 sets of electrodes insulated from each
other. First set of rows are electrically grounded vertical plates called collecting
electrodes while the second set consists of wires called discharge electrodes.
The above figure shows the operation of an ESP. the negatively charged fly ash
particles are driven towards the collecting plate and the positive ions travel to the
negatively charged wire electrodes. Collected particulate matter is removed from the
collecting plates by a mechanical hammer scrapping system.
Technical data of the ESP (Electrostatic Precipitator)
Gas flow rate 339 m3
/s
Temperature 142°C
Dust concentration 62.95 gms/N-cubic meter
Collecting electrodes
No. of rows of collecting electrode per field 49
13
No. of collecting electrode plate 294
Total no. of collecting plates per boiler 3528
Nominal height of collecting plate 13.5 m.
Nominal length of collecting electrodes per field
in the direction of gas field
4.5 m.
Nominal width of collecting plate 750 mm.
Specific collecting area 206.4 m2
/cubic meter. sec-1
Emitting electrodes
Type Spiral with hooks
Size Diameter—2.7 mm.
No. of electrodes in the frame forming one row 54 fields
No. of electrodes in the field 2592
Total no. of electrodes per boiler 31104
Total length of electrodes per field 14541 m.
Plate/wire spacing 150 mm.
Electrical items
Rectifier Rating 70 kV (peak), 80 mA (mean)
Number 24
Type Silicon diode full wave bridge
connection
located Mounted on the top of the
precipitator
Rectifier control
panel
Type of control SCR (Silicon Controlled
Rectifier)
Number 24
Location In the control room at ground
level
Auxiliary control
panel
Number 2
Equipment controlled Geared motors of rapping
mechanism of collecting &
emitting electrodes.
Location In the control room at the ground
level.
Motors Quantity 24
Rating Geared motor 0.33 HP, 3 phase,
415 V, 50 Hz.
Location On root panels of the casing
14
BOILER AUXILIARIES
 Induced draft fan (ID fan):
Induced draft represents the system where air or products of combustion are
driven out after combustion at boiler furnace by maintaining them at a progressively
increasing sub atmospheric pressure. This is achieved with the help of induced draft fan and
stack. Induced draft fan is forward curved centrifugal (radial) fan and sucks the fly-ash laden
gas of temperature around 125°C out of the furnace to throw it into stack (chimney). The fan
is connected with driving motor through hydro-coupling or with variable frequency drive
(VFD) motor to keep desired fan speed.
Technical data of the I.D.Fan (Induced Draught Fan) at Unit #1
No. of boiler 3
Type Radial, NDZV 31 Sidor
Medium handled Flue gas
Location Ground floor
Orientation Suction—Vertical/45 degree to Horizontal
Delivery—Bottom Horizontal.
 Forced draft fan (FD fan):
Forced draft represents flow of air or products of combustion at a pressure above
atmosphere. The air for combustion is carried under forced draft conditions and
the fan used for this purpose is called Forced Draft (FD) fan. It is axial type fan and
is used to take air from atmosphere at ambient temperature to supply air for
combustion, which takes entry to boiler through wind box. In all units except
Durgapur TPS Unit #4, this fan also supplies hot /cold air to the coal mills. The
output of fan is controlled by inlet vane / blade pitch control system.
Technical data of the F.D.Fan (Forced Draught Fan) at Unit #1
No. of boiler 2
Type Radial, NDZV 28/Sidor
Medium handled Clean air
Location Ground floor
Orientation 45° horizontal, delivery-bottom horizontal.
 Primary air fan (PA fan) or Exhauster fan:
The function of primary air is to transport pulverized coal from coal mill to the
furnace, to dry coal in coal mill and also to attain requisite pulverized coal
temperature for ready combustion at furnace. In some units like Chandrapura TPS
unit 1, 2 & 3, the exhauster fan sucks pulverized coal and air mixture from coal
mill and sends it to the furnace.
Technical data of the P.A.Fan (Primary Air Fan) at Unit #1
No. of boilers 3
Type Radial, NDZV 20 Herakles
Medium handled Hot air
Location Ground floor
Orientation Suction—Vertical/45 degrees to Horizontal Delivery—Bottom Horizontal.
15
 Coal mill or pulveriser:
Most efficient way of utilizing coal for steam generation is to burn it in pulverised
form. The coal is pulverized in coal mill or pulveriser to fineness such that 70-80%
passes through a 200 mesh sieve. The factors that affect the operation of the mill or
reduce the mill output are:
Grindability of coal: Harder coal (i.e. coal having lower hard-grove index (H.G.I.))
reduces mill output and vice versa.
Moisture content of coal: More the moisture content in coal, lesser will be the
mill output & vice versa.
Fineness of output: Higher fineness of coal output reduces mill capacity.
Size of coal input: Larger size of raw coal fed to the mill reduces mill output.
Wear of grinding elements: More wear and tear of grinding elements reduces the
output from mill.
 Fuel oil system:
In a coal fired boiler, oil firing is adopted for the purpose of warming up of the boiler
or assisting initial ignition of coal during introduction of coal mill or imparting
stability to the coal flame during low boiler load condition. Efficient or complete
combustion of the fuel oil is best achieved by atomizing oil by compressed air for
light oi l (LDO) or by steam for heavy oil (HFO) in order to have proper turbulent
mixing of oil with combustion air. Use of HFO is beneficial with respect to LDO in
view of its lower cost and saving in foreign exchange.
The oil burners and igniters are the basic elements of oil system. Oil is supplied by
light oil pump or by heavy oil pump through oil heater. Steam heater reduces the
viscosity of heavy oil and aids flow ability as well as better atomization. The oil
burners are located in the compartmented corner of wind boxes, in the different
elevation of auxiliary air compartments, sandwiched between the coal burner nozzles. Each oil
burner is associated with an igniter, arranged at the side.
16
STEAM TURBINE
A steam turbine is a prime mover which continuously converts the energy of high
pressure, high temperature steam supplied by the boiler into shaft work with low
pressure, low temperature steam exhausted to a condenser.
17
500 MW(KWU) Steam turbine (Mejia TPS U #7&8)
Maker Bharat Heavy Electricals Limited
Type Reaction turbine
Type of governing Throttling
Number of cylinders 3
Speed (RPM) 3000
Rated output (kW) 210000(for unit1,2,3,4)
250000(for unit 5 & 6)
Steam pressure before emergency stop valve
(abs)
150 kg/cm2
Steam temperature before emergency stop valve 535°C (for unit1,2,3,4)
537°C (for unit 5 & 6)
Reheat temperature 535°C (for unit 1,2,3 &4)
537°C (for unit 5 & 6)
18
Cooling tower
Cooling towers cool the warm water discharged from the condenser and feed the cooled water back
to the condenser. They thus reduce the cooling water demand in the power plants. Wet cooling
towers could be mechanically draught or natural draught. In M.T.P.S the cooling towers are I.D.
type for units 1-6 and natural draught for units 7&8.
Cooling towers
for units 7 and 8 natural draught
CHIMNEY
A chimney may be considered as a cylindrical hollow tower made of bricks or steel. In MTPS the
chimneys of eight units are made of bricks. Chimneys are used to release the exhaust gases(coming
from the furnace of the boiler)high up in the atmosphere. So, the height of the chimneys are made
high.
19
ELECTRICAL OPERATION
The electrical operation of a power plant comprises of generation, transmission and
distribution of electrical energy. In a power station both distribution and transmission
operation can take place. When power is sent from power station to all other power
station in the grid, it is known as distribution of power. When power plant is driving
power from other power station it is known as transmission of power/electrical
energy.
ELECTRIC GENERATOR
In M.T.P.S. there are 6 electric generators for units 1 to 6. These are 3 phase turbo
generators, 2 pole cylindrical rotor type synchronous machines which are directly
coupled to the steam turbine. The generator consist of 2 parts mainly the stator and
the rotor.
Stator: The stator body is designed to withstand internal pressure of hydrogen-air
mixture without any residual deformation. The stator core is built up of segmental
punching of high permeability, low loss CRGOS steel and are in interleaved manner
on spring core bars to reduce heating and eddy current loss. The stator winding has 3
phase double layer short corded bar type lap winding having 2 parallel paths. The
winding bars are insulated with mica thermosetting insulation tape which consists of
flexible mica foil, fully saturated with a synthetic resin having excellent electrical
properties. Water cooled terminal bushings are housed in the lower part of the stator
on the slip ring side.
Rotor: Rotor is of cylindrical type shaft and body forged in one piece from chromium
nickel molybdenum and vanadium steel. Slots are machined on the outer surface to
incorporate windings. Winding consists of coil made from hand drawn silver copper
with bonded insulation. Generator casing is filled up with H2 gas with required
pressure, purity of gas is always maintained>97%. Propeller type fans are mounted
on either side of the rotor shaft for circulating the cooling gas inside the generators.
Turbogenerator
20
Technical Data of Turbogenerator
Main parameters
Rated kW capacity 210000 kW
Rated kVA capacity 247000 kVA
Rated terminal voltage 15750 V
Rated power factor 0.85 lag
Rated stator current 9050 amps
Rated speed 3000 RPM
Rated frequency 50 Hz
Efficiency at rated power output & power factor 98.55%
Power factor short circuit ratio 0.49
Temperature rating
Class of insulation of generator windings Class 'B'
Temperature of cooling water (maximum) 37°C
Temperature of cooling Hydrogen (maximum) 44°C
Temperature of cooling distilate (maximum) 45°C
Maximum temperature of stator core 105°C
Maximum temperature of stator winding 75°C
Maximum temperature of rotor winding 115°C
Other particulars
Critical speed of rotor (calculated) 1370/3400 RPM
Fly wheel moment of rotor 21.1 T-M
Ratio of short circuit torque to full load torque 8
Quantity of oil required for cooling per bearing 300 litre/min.
Oil pressure for lubrication of bearings 0.3-0.5 kg/cm2
Quantity of oil required for both the shaft seals 7.7 litres/min.
Rated pressure of the shaft seal oil (gauge) 5 kg/cm2
Quantity of water required for gas coolers 350 m3
/hr.
Maximum allowable water pressure in gas
coolers
3 kg/cm2
Quantity of distillate for cooling stator winding 27 m3
/hr.
Max. distillate pressure at inlet to stator winding 3.3 kg/cm2
Average qty of Hydrogen required for makeup 15 m3
per day
% Purity of Hydrogen inside the machine 97% min
Max allowable moisture content inside the body 1.5 g/m3
21
Weights of different parts
Heaviest weight (weight of stator) (kg.) 170000
Bearing with brush rocker & foundation plate
(kg)
9300
Rotor (kg.) 42000
Gas cooler (kg.) 1415
Terminal bushing (kg.) 85
Total weight of generator (kg.) 239000
TRANSFORMERS
The electricity thus produced by the
generator then goes to the generating
transformer where the voltage is increased
for transmission of electricity with
minimized copper losses.
In general a transformer consists of
primary and secondary windings which are
insulated from each other by varnish. In
M.T.P.S. all are either oil cooled or air
cooled. Some of the transformer
accessories are: 1. Conservator tank 2.
Buccholz relay 3. Fans for cooling 4.
Lightning arrestors 5. Transformer
bushings 6. Breather and silica gel.
Generating transformer #1, 2,
3,4
MVA: 150/200/250 (H.V.) MVA: 150/200/250 (L.V.)
Volts at no load: 240000 (H.V.) Volts at no load: 15750 (L.V.)
Ampere line value: 361/482/602 (H.V.)
Ampere line value: 5505/7340/9175 (L.V.)
Phase-3 frequency: 50 Hz.
Mass of core and windings: 139000 kg.
Mass of oil: 38070 kg. Mass of heaviest package: 164000 kg.
Connection: YNd1 connection.
Generating transformer#5 and 6
MVA: 189/252/315 (H.V.) MVA: 189/252/315 (L.V.)
Volts at no load: 16.5kV (L.V.) Volts at no load: 240kV (H.V.)
Ampere line value: 757.57 (H.V.)
Ampere line value: 11022.14 (L.V.)
Phase-3 frequency: 50 Hz.
Mass of core and windings: 155000 kg.
Mass of oil: 53070 kg. Mass of heaviest package: 18000 kg.
Connection: YNd1 connection.
22
Specifications of Generator Transformer (GT) at Unit #7
Type of cooling ONAN/ONAF/OFAF
Rating HV (MVA) 120/160/200
Rating LV (MVA) 120/160/200
No load voltage HV (kV) 242.494
No load voltage LV (kV) 21
Line current HV (amps) 824.79
Line current LV (amps) 9523.8
Temperature rise oil (°C) 40 (Over ambient of 50°C)
Temperature rise winding (°C) 45 (Over ambient of 50°C)
Phase 3
Frequency (Hz) 50
Connection symbol YNd11
Impedance volt at 200 MVA Base
HV Position on 5/LV (nor tap) – 12% to 15%
HV Position on 1/LV (max tap) – 12% to 15%
HV Position on 9/LV (min tap) – 12% to 15%
Insulation level (HV) SL 1050 LI 1300 – AC 38
Insulation level (LV) LI 125 – AC 50
Core & Winding (kg) 153530
Weight of oil (kg) 48910
Total weight (kg) 257500
Oil quantity (litre) 56220
Transport weight (kg) 174900
Untanking weight (kg) 13790
Vector Diagram
AUXILIARY TRANSFORMRERS
Station Service Transformers
Normal source to the station auxiliaries and standby source to the unit auxiliaries during start up
and after tripping of the unit is station auxiliary transformer. Quantity of station service
transformers and their capacity depends upon the unit sizes and nos. Each station supply
transformer shall be one hundred percent standby of the other. Station service transformers
shall cater to the simultaneous load demand due to start up power requirements for the largest unit,
power requirement for the station auxiliaries required for running the station and power
23
requirement for the unit auxiliaries of a running unit in the event of outage of the unit
source of supply. The no. and approximate capacity of the SST depending upon the no. and
MW rating of the TG sets are indicated below.
Specifications of Station Service Transformer (SST) at Unit 7 and 8
Type of cooling ONAF/ONAN
Rating HV (MVA) 16/12.50
Rating LV (MVA) 16/12.50
No load voltage HV (kV) 11
No load voltage LV (kV) 3.45
Line current HV (amps) 839.78/656.08
Line current LV (amps) 2677.57/2091.85
Temperature rise oil (°C) 40
Temperature rise winding (°C) 45
Phase 3
Frequency (Hz) 50
Connection symbol Dyn1
Impedance volts % HV-LV 25%
Unit Auxiliary Transformer
The normal source of HV Power to unit auxiliaries is unit auxiliary transformer. The sizing of the
UAT is usually based on the total connected capacity of running unit auxiliaries i.e., excluding the
stand by drives. It is safe anddesirable to provide about 20% excess capacity than calculated. The
no. and recommended MVA rating of unit auxiliary transformers are as shown in the above
table: The UATs shall have Ddo(ungrounded system) or Dy1 (for grounded system) connection
with on load tap changer to provide +10 % variation in steps of 1.25 %. Usual cooling
arrangement to unit auxiliary transformers are ONAN. Radiators are usually divided in two
equal halves.
Specification
Unit auxiliary transformer #1,2,3
MVA: 12.5/16 Manufacturer: Atlanta Electricals
Volts at no load: 15750 (H.V.) Volts at no load: 6900 (L.V.)
Ampere line value: 458.2/586.5 (H.V.)
Ampere line value: 1045.9/1338.8 (L.V.)
Phase-3 frequency: 50 Hz.
Mass of core and windings: 14300kg.
Mass of oil: 8600kg. Mass of heaviest package: 25000kg.
Total weight: 30,500 kg.
24
Unit auxiliary transformer #5 & 6
Type of cooling: ONAN/ONAF (oil natural/ oil natural air force)
Rating (H.V.): 20/16 MVA Rating (L.V.): 20/16 MVA
No load voltage: 13.5 kV (H.V.) No load voltage: 6.9 kV (L.V.)
Line current: 1673.479/1336.783 amp.
Temperature rise of winding: 55*C
Insulation level: 931 KVI 38kV r.m.s (H.V.) 60kVI 20kV r.m.s (L.V.)
Specifications of Unit Auxiliary Transformer (UAT) at Unit #7
Type of cooling ONAN/ONAF
Rating HV (MVA) 45/36
Rating LV (MVA) 45/36
No load voltage HV (kV) 21
No load voltage LV (kV) 11.5
Line current HV (amps) 1238.64
Line current LV (amps) 2261.87
Temperature rise oil (°C) 40 (Over ambient of 50°C)
Temperature rise winding (°C) 45 (Over ambient of 50°C)
Phase 3
Frequency (Hz) 50
Connection symbol Dyn1
Impedance volt at 45 MVA Base
HV Position on 7/LV (nor tap) – 11.5%
HV Position on 1/LV (max tap) – 10% to 13%
HV Position on 17/LV (min tap) – 10% to 13%
Insulation level (high voltage) L1 125 – AC 50
Insulation level (low voltage) L1 75 – AC 28
Core & winding (kg) 40065
Weight of Oil (kg) 25765
Total weight (kg) 85265
Transport weight (kg) 50000
Untanking weight (kg) 41000
25
CONTROL ROOM UNIT:
The above figure shows the power line diagram in the control room. It clearly shows how the
electric power generated by the generator is transmitted through the generating transformers into the
bus and the distribution of power by the unit auxiliary transformers.
EXCITATION SYSTEM
The purpose of excitation system is to continuously provide the appropriate amount of D.C. field
current to the generator field winding. The excitation system is required to function reliably under
the following conditions of the generator and the system to which it is connected.
Functional components of an excitation system :
A good excitation system consists of properly co-ordinated functional components
which are
a) Excitation Power source
b) Semiconductor Rectifier
c) Voltage controller
d) Protective, limiting and switching equipments
e) Monitoring, Metering and indicating equipments and
f) Cooling system
Types of Excitation System :
In earlier days DC excitation system was in use. Increase in generator capacity in turn
raised the demand of excitation power which was notachievable by the DC exciters.
This led to the accelerated development of AC excitation system in pace with
generator capacity. With the maturing of solid state semiconductor technology AC
26
excitation system found to be superior technically as well as economically.
Excitation system can be categorized and subdividedinto the following :
a) D.C. excitation system
i) Pilot Main Exciter excitation system
ii) Rotating Amplifier excitation system.
b) A.C. excitation system
i) Rotating High Frequency excitation system
ii) Static excitation system
iii) Brushless excitation system
SWITCHYARD SECTION
A switchyard is essentially a hub for electrical power sources. For instance, a switchyard
will exist at a generating station to coordinate the exchange of power between the generators and
the transmission lines in the area. A switchyard will also exist when high voltage lines need to be
converted to lower voltage for distribution to consumers. Here in MTPS there is a big switch yard
section for the units one to six, and also for seven & eight there also a switch yard. Some of the
operation of the components of the switch yard is sometimes done from the control rooms of
respective units. That is the switch yard under each unit is sometimes control from the control
rooms of each unit respectively
.
Circuit Diagram: 220kV switchyard of M.T.P.S
A switchyard may be considered as a junction point where electrical power is comingin from
one or more sources and is going out through one or more circuits. Thisjunction point is in the form
of a high capacity conductor spread from one end to theother end of the yard. As the switchyard
handles large amount of power, it is necessarythat it remains secure and serviceable to supply the
outgoing transmission feederseven under conditions of major equipment or bus failure.
There are differentschemes available for bus bar and associated equipment connection to facilitate
switching operation. The important points which dictate the choice of bus switching
scheme are –
a. Operational flexibility, b. Ease of maintenance,
c. System security, d. Ease of sectionalizing,
e. Simplicity of protection scheme, f. Installation cost and land requirement.
g. Ease of extension in future.
27
Circuit
Diagram:
220kV
switchyard of
M.T.P.S
28
The basic components of a switchyard are as follows:
1.Circuit breaker: A circuit breaker is an equipment that breaks a circuit either manually or
automatically under all conditions at no load, full load or short circuit. Oil circuit breakers, vacuum
circuit breakers and SF6 circuit breakers are a few types of circuit breakers.
2.Isolator: Isolators are switches which isolate the circuit at times and thus serve the purpose of
protection during off load operation.
3.Current Transformer: These transformers used serve the
purpose of protection and metering. Generallythe same transformer
can be used as a current or potential transformer depending on the
type of connection with the main circuit that is series or parallel
respectively.
In electrical system it is necessary to
a) Read current and power factor
b) Meter power consumption.
c) Detect abnormalities and feed impulse to protectivedevices.
4.Potential transformers :
In any electrical power system it is
necessary to - Fig. C.T.
a) Monitor voltage and power factor,
b) Meter power consumption,
c) Feed power to control and indication circuit and
d) Detect abnormalities (i.e. under/over voltage, direction of
power flow etc) and feed impulse to protective device/alarm
circuit. Standard relay and metering equipments does not permit
them to be connected directly to the high voltage system.Potential
transformers therefore play a key role by performing the
following functions.
a) Electrically isolating the instruments and relays from HV side.
b) By transferring voltage from higher values to proportional standardized lower values.
5.POWER TRANSFORMER:
The use of power transformer in
a switchyard is to change the
voltage level. At the sending and
usually step up transformers
are used to evacuate power at
transmission voltage level. On
the other hand at the receiving
end step down transformers are
installed to match the voltage
to sub transmission or
distribution level. In many
switchyards autotransformers
are used widely for
interconnecting two switchyards
with different voltage level
(such as 132 and 220 KV)
33/11 KV Power Transformer in a switchyard
29
( 1-Main tank 2-Radiator 3-Reservoir tank 4-Bushing 5-WTI & OTI Index 6-Breather 7-Buccholz relay)
6.Insulator :
The live equipments are mounted over the steel structures or suspended from
gantries with sufficient insulation in between them. In outdoor use electrical porcelain
insulators are most widely used. Following two types of insulators are used in
switchyard.
a. Pedestal type b. Disc type
Pedestal type insulators are used on steel structures for rigid supporting of the pipe bus bars,
for holding the blade and the fixed contacts of theisolators.
The above figure shows a complete bay for 220kV switchyard.
Electric power is generated by the generator which is circulated to the main bus 1 or
2 and accordingly the respective isolator is closed. In case of any fault in the circuit
breaker the power from the generator goes via the transfer bus into the main bus by
means of the bus coupler. A bus tie represents the connection between the two main
buses. Two 80MVA transformers draw power from the main buses and transfer the
voltage to 33kV and the power goes to 33kV switchyard. A station service
transformer supplies power to the auxiliary load.
30
The above figure shows the power flow diagram of 33kV switchyard.
The electric power after voltage transformation to 33kV by 80MVA transformers goes to the main
bus of the 33kV switchyard from where power is fed to various industries and other nearbystations.
There are two earthing transformers in the yard. From the bus the power is fed to two 5MVA
transformers which step down the voltage level to 11kV and is thus distributed to the locality.
THE TYPE OF RELAYS USED IN MTPS FOR PROTECTION OF POWER
SYSTEM COMPONENTS
• Auxiliary relay for isolations
• Fail accept relay
• Directional over current relay
• Master trip relay
• Multi relay for generator function
• Supervision relay
• Instantaneous relay
• Bus bar trip relay
• Lock out relay
• Numerical LBB protection relay
• Transformer differential protection relay
• Circulating differential protection relay
• Contact multi-relay
• Auxiliary relay
• Trip circuit R-Phase relay
• EUS section relay
• DC fail accept relay
• Trip circuit R-phase super relay Y-phase B-phase
• LBB protection relay.
31
SOME PUMP & MOTOR IS USED IN MTPS
 PUMP :-
• Service water pump -360Kw
• Primary air fan(PA fan) -800Kw
• Coal mill motor -2250Kw
• Condense extraction pump -500Kw
 MOTOR :-
 Boiler feed pump motor -3500Kw
 ID fan motor -1500Kw
 FD fan motor -1000Kw
 CW pump motor -1200Kw
SWITCHGEAR
HV Switchgears:
Indoor metal clad draw out type
switchgears with associated protective
and control equipments are employed
(fig. 2). Air break, Air Blast circuit
breakers and Minimum Oil circuit
breakers could still be found in some
very old stations. Present trend is to use
SF6or vacuum circuit breakers. SF6 and
vacuum circuit breakers requires
smaller size panels and thereby
reasonable amount of space is saved. Fig. 2: General arrangement of 6.6 KV
switchgearpanels The main bus bars of the switchgears are most commonly made
up of high conductivity aluminium or aluminium alloy with rectangular cross section
mounted in side the switchgear cubicle supported by moulded epoxy, fibre glass or
porcelain insulators. For higher current rating copper bus bars are sometimes used in
switchgears.
32
LV Switchgears:
LV switchgears feed power supply to motors above 110 KW and upto160
KW rating and to Motor Control Centers (M.C.C). LV system is also a grounded system
where the neutral of transformers are solidly connected to ground. The duty involves
momentary loading, total load throw off, direct on line starting of motors and under
certain emergency condition automatic transfer of loads from one source of supply to the
other. The switchgear consists of metal clad continuous line up of multi tier draw out type
cubicles of simple and robust construction.
Each feeder is provided with an individual
front access door. The main bus bars and
connections shall be of high grade
aluminium or aluminium alloy sized for
the specified current rating. The circuit
breakers used in the LV switchgear shall
be air break 3 pole with stored energy,
trip free shunt trip mechanism. These are draw out type with three distinct position
namely, Service, Test and Isolated. Each position shall have mechanical as well as
electrical indication. Provision shall be there for local and remote electrical operation of the
breakers. Mechanical trip push button shall be provided to trip manually in the event of
failure of electrical trip circuit. Safety interlocks shall be provided to prevent insertion
and removal of closed breaker from Service position to Test position and vice versa.
SWITCHING SCHEMES
One Main Bus and Transfer Bus scheme
This scheme is used in switchyards up to 132 KV. Under normal condition all feeders arefed
through their respective circuit breakers from the main bus bar. During shutdown or outage
of any feeder breaker, that feeder can be transferred to transfer bus and diverted through bus
coupler breaker. In that case the protection shall be transferred to the bus coupler circuit
breaker by changing the position of the trip transfer switch located at the switchyard control
panel. This diversion of the feeder from its own circuit breaker to bus coupler circuit breaker
and the vice versa is possible even in live condition without any interruption of supply to
that feeder. In case of any main bus fault the entire switchyard will collapse. To avoid such
total collapse of the switchyard a bus section circuit breaker is provided in the middle
33
position of the main bus.
Two Main Bus and One transfer Bus scheme
In this scheme there is an arrangement for a duplicate main bus (MB).
All the feeders in the yard may be connected to either MB # 1 or MB # 2 or may
be divided in two groups and distributed in two buses. In case of outage of any
circuit breaker that feeder can be diverted through bus coupler breaker. Bus tie breaker is
used to tie up MB #1 & MB # 2.
34
One and Half Breaker Scheme
In one and half breaker scheme (Fig. 4) under normal condition all the circuit breakers will
remain closed. At the time of maintenance of feeder breaker, only that breaker would be
kept open and isolated. During maintenance of bus, all the breakers connected to that bus
would remain open to isolate the bus. At that time, the power supply may be maintained
through other bus. All equipments in the switchyard except the line side isolators can be
maintained without taking shut down of any feeder. This scheme has gained popularity in many
400 KV switchyards in our country.
GENERATOR PROTECTION
The purpose of generator protection is to provide protectionagainst abnormal operating
condition and during fault condition. In the first case the machine and the associated circuit
may be in order but the operating parameters (load, frequency, temperature) and beyond
the specified limits. Such abnormal running condition would result in gradual
deterioration and ultimately lead to failure of the generator.
Protection under abnormal running conditions
a) Over current protection: The over current protection is used in generator
protection against external faults as back up protection. Normally external short
circuits are cleared by protection of the faulty section and are not dangerous to the
generator. If this protection fails the short circuit current contributed by the
generator is normally higher than the rated currentof the generator and cause over
heating of the stator, hence generators are provided with back up over current
protection which is usually definite time lag over current relay.
35
b) Over load protection: Persistent over load in rotor and stator circuit cause
heating of winding and temperature rise of the machine. Permissible duration of
the stator and rotor overload depends upon the class of insulation, thermal time
constant, cooling of the machine and is usually recommended by the
manufacturer. Beyond these limits the running of the machine is not
recommended and overload protection thermal relays fed by current transformer
or thermal sensors are provided.
c) Over voltage protection: The over voltage at the generator terminals may b e
caused by sudden drop of load and AVR malfunctioning. High voltage surges in the system
(switching surges or lightning) may also cause over voltage at the generator terminals.
Modern high speed voltage regulators adjust the excitation current to take care against
the high voltage due to load rejection. Lightning arresters connected across the
generator transformer terminals take care of the sudden high voltages due to external
surges. As such no special protection against generator high voltage may be needed. Further
protection provided against high magnetic flux takes care of dangerous increase of voltage.
e) Unbalance loading protection: Unbalance loading is caused by single phase
short circuit outside the generator, opening of oneof the contacts of the generator
circuit breaker, snapping of conductors in the switchyard or excessive single phase
load. Unbalance load produces –ve phase sequence current which cause
overheating of the rotor surface and mechanical vibration. Normally 10% of
unbalance is permitted provided phase currents do not exceed the rated values.
For –ve phase sequence currents above 5-10% of rated value dangerous over
heating of rotor is caused and protection against this is an essential requirement.
g) Loss of prime mover protection: In the event of loss of prime mover the
generator operates as a motor and drives the prime mover itself. In some cases
this condition could be very harmful as in the case of steam turbine sets where
steam acts as coolant, maintaining the turbine blades at a constant temperature and
the failure of steam results in overheating due to friction and windage loss with
subsequent distortion of the turbine blade. This can be sensed by a power relay
with a directional characteristic and the machine can be taken out of bar under this
condition. Because of the same reason a continuousvery low level of output from
thermal sets are not permissible.
36
Protection under fault condition
a) Differential protection: The protection is used for detection of internal faults in a
specified zone defined by the CTs supplying the differential relay. For an unit
connected system separate differential relays are provided for generator, generator
transformer and unit auxiliary transformer in addition to the overall differential
protection. In order to restrict damage very high differential relay sensitivity is
demanded but sensitivity is limited by C.T errors, high inrush current during
external fault and transformer tap changer variations.
b) Back up impedance protection:This protection is basically designed as back up
protection for the part of the installation situated between the generator and the
associated generator and unit auxiliary transformers. A back up protection in the
form of minimum impedance measurement is used, in which the current windings
are connected to the CTs in the neutral connection of the generator and its voltage
windings through a P.T to the phase to phase terminal voltage. The pick up
impedance is set to such a value that it is only energized by short circuits in the
zone specified above and does not respond to faultsbeyond the transformers.
c) Stator earth fault protection: The earth fault protection is the protection of the
generator against damages caused by the failure of insulation to earth. Present
practice of grounding the generator neutral is so designed that the earth fault
current is limited within 5 and 10 Amp. Fault current beyond this limit may cause
serious damage to the core laminations. This leadsto very high eddy current loss
with resultant heating and melting of the core.
d) 95% stator earth fault protection: Inverse time voltage relay connected across
the secondary of the high impedance neutral grounding transformer relay is used
for protection of around 95% of the stator winding against earth fault.
e) 100% stator earth fault protection: Earth fault in the entire stator circuits are
detected by a selective earth fault protection covering 100% of the stator
windings. This 100% E/f relay monitors the whole stator winding by means of a
coded signal current continuously injected in the generator winding through a
coupling. Under normal running condition the signal current flows only in the
stray capacitances of the directly connected system circuit. .
37
f) Rotor earth fault protection: Normally a single rotor earth fault is not so
dangerous as the rotor circuit is unearthed and current at fault point is zero. So only alarm is
provided on occurrence of 1st
rotor earth fault. On occurrence of the 2nd rotor earth fault
between the points of fault the field winding gets short circuited. The current in field
circuit increases, resulting in heating of the field circuit and the exciter. But the
more dangerous is disturbed symmetry of magnetic circuit due to partial short
circuited coils leading to mechanical unbalance.
MOTORS FOR THERMAL POWER PLANT
All the motors in Thermal Power Stations shall be of the 3-ph. A.C. squirrel cage type
except for some auxiliaries, which are emergent in nature,for which DC motors shall be
used. For some small valves, single phase motors may be used. All A.C. motors
shall be suitable for direct on line starting.
Battery Bank
Normally D.C. power is supplied by the float charger and the batteries are kept in float
condition at 2.15 V per cell to avoid discharging. The charger consists of silicon diode
or thyristor rectifiers preferably working on 3
ph. 415 V supply in conjunction with an
automatic voltage regulator. When there is a failure
in the A.C. supply the batteries will
come into operation and in this process the
batteries run down within few hours. After
normalization of A.C. power the batteries are
charged quickly by using the boost charger at 2.75
V per cell. During this time the float chargeris
isolated and load is connected through the tap off
point. After normalization of battery voltage these
are again put back into the float charging mode.
The output from the battery as well as the charger is connected to the D.C.
distribution board. From D.C. distribution board power supply is distributed to different
circuits. D.C. system being at the core of the protection and control mechanism very often
two 100% capacity boards with individual chargers and battery sets are used from
the consideration of the reliability and maintenance facility. These two boards are
interconnected by suitable tie lines.
38
CONCLUSION
The practical experience that I have gathered during the overview training of
large thermal power plant having a large capacity of 2340 MW for Unit# I to
VIII in three weeks will be very useful as a stepping stone in building bright
professional career in future life. It gave me large spectrum to utilize the
theoretical knowledge and to put it into practice. The trouble shooting
activities in operation and decision making in case of crisis made me more
confident to work in the industrial atmosphere.
Moreover, this overview training has also given a self realization & hands-on
experience in developing the personality, interpersonal relationship with the
professional executives, staffs and to develop the leadership ability in industry
dealing with workers of all categories.
I would like to thank everybody who has been a part of this project, without
whom this project would never be completed with such ease.
39
BIBLIOGRAPHY
➢ Power Plant Engineering by P.K.Nag
➢ Engineering Thermodynamics by P.K.Nag
➢ Mejia Thermal Power Station – Technical Data & Operation Guide
➢ THERMAL POWER ENGINEERING by R.K.RAJPUT.
➢ THEORY & PERFORMANCE of ELECTRICAL MACHINE by J.B.GUPTA
➢ AC & DC MACHINE by B.L.THERAJA & A.K.THERAJA.
➢ A COURSE IN ELECRICAL POWER by J.B.GUPTA.
➢ www.google.co.in
40

More Related Content

What's hot

Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Ajeet Chaurasia
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training ReportShani Kumar Singh
 
MEJIA THERMAL POWER STATION VT REPORT
MEJIA THERMAL POWER STATION VT REPORTMEJIA THERMAL POWER STATION VT REPORT
MEJIA THERMAL POWER STATION VT REPORTAbhinaw Rai
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)Rajan Kumar Choudhary
 
BHEL HARIDWAR TRAINING REPORT
BHEL HARIDWAR TRAINING REPORTBHEL HARIDWAR TRAINING REPORT
BHEL HARIDWAR TRAINING REPORTyash Natani
 
PPT on Manufacturing process of TG 800 MW, Stator Winding bar by ADARSH SI...
 PPT on Manufacturing process of TG 800 MW,  Stator Winding bar  by ADARSH SI... PPT on Manufacturing process of TG 800 MW,  Stator Winding bar  by ADARSH SI...
PPT on Manufacturing process of TG 800 MW, Stator Winding bar by ADARSH SI...Adarsh Singh
 
Industrial training report of thermal power plant
Industrial training report of thermal power plantIndustrial training report of thermal power plant
Industrial training report of thermal power plantRavinder Jangid
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Stationsagnikchoudhury
 
Electric traction ankit
Electric traction ankitElectric traction ankit
Electric traction ankitAnkit Verma
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant vishal patel
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training reportsanjeevps12345
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC SimhadriAshish Uppu
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plantravi kant
 
Air conditioning in indian railways PEE
Air conditioning in indian railways PEEAir conditioning in indian railways PEE
Air conditioning in indian railways PEEirkportal
 

What's hot (20)

Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)
 
GSECL TPS SIKKA
GSECL TPS SIKKAGSECL TPS SIKKA
GSECL TPS SIKKA
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
 
MEJIA THERMAL POWER STATION VT REPORT
MEJIA THERMAL POWER STATION VT REPORTMEJIA THERMAL POWER STATION VT REPORT
MEJIA THERMAL POWER STATION VT REPORT
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
 
BHEL HARIDWAR TRAINING REPORT
BHEL HARIDWAR TRAINING REPORTBHEL HARIDWAR TRAINING REPORT
BHEL HARIDWAR TRAINING REPORT
 
NTPC BARH, BIHAR
NTPC BARH, BIHARNTPC BARH, BIHAR
NTPC BARH, BIHAR
 
PPT on Manufacturing process of TG 800 MW, Stator Winding bar by ADARSH SI...
 PPT on Manufacturing process of TG 800 MW,  Stator Winding bar  by ADARSH SI... PPT on Manufacturing process of TG 800 MW,  Stator Winding bar  by ADARSH SI...
PPT on Manufacturing process of TG 800 MW, Stator Winding bar by ADARSH SI...
 
Industrial training report of thermal power plant
Industrial training report of thermal power plantIndustrial training report of thermal power plant
Industrial training report of thermal power plant
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
Electric traction ankit
Electric traction ankitElectric traction ankit
Electric traction ankit
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
DAMODAR VALLEY CORPORATION(THERMAL POWER STATION),DURGAPUR seminar
DAMODAR VALLEY CORPORATION(THERMAL POWER STATION),DURGAPUR seminarDAMODAR VALLEY CORPORATION(THERMAL POWER STATION),DURGAPUR seminar
DAMODAR VALLEY CORPORATION(THERMAL POWER STATION),DURGAPUR seminar
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
 
Air conditioning in indian railways PEE
Air conditioning in indian railways PEEAir conditioning in indian railways PEE
Air conditioning in indian railways PEE
 

Viewers also liked

A report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyA report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyShobhan Biswas
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plantsagar20jain
 
Chandrapura thermal power station (CTPS)--DVC_Industrial Training
Chandrapura thermal power station (CTPS)--DVC_Industrial TrainingChandrapura thermal power station (CTPS)--DVC_Industrial Training
Chandrapura thermal power station (CTPS)--DVC_Industrial TrainingPragya wan
 
Training Report
Training Report Training Report
Training Report Pintu Khan
 
Training report on DVC
Training report on DVCTraining report on DVC
Training report on DVCLinkon Khan
 
Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, AndalDurgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, AndalAbhishek Gorai
 
Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation ReportManish Kumar
 
Class 10 physical science question answer
Class 10 physical science question answerClass 10 physical science question answer
Class 10 physical science question answersagnikchoudhury
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station workingRonak Thakare
 
Instrumentation Limited (Summer Training report), Kota
Instrumentation Limited (Summer Training report), KotaInstrumentation Limited (Summer Training report), Kota
Instrumentation Limited (Summer Training report), KotaRam Swaroop Kushwah
 
Business line project by raushan singh
Business line project by raushan singhBusiness line project by raushan singh
Business line project by raushan singhRAUSHAN KUMAR
 
Projectf on POWER TRANSFOMER BHEL (SHIVAM DWIVEDI)
Projectf on POWER TRANSFOMER BHEL (SHIVAM DWIVEDI)Projectf on POWER TRANSFOMER BHEL (SHIVAM DWIVEDI)
Projectf on POWER TRANSFOMER BHEL (SHIVAM DWIVEDI)SHIVAM DWIVEDI
 
Modern thermal power plant
Modern thermal power plantModern thermal power plant
Modern thermal power plantTaral Soliya
 
Ppt on training
Ppt on trainingPpt on training
Ppt on training9982198262
 
Bokaro Thermal Power Plant
Bokaro Thermal Power PlantBokaro Thermal Power Plant
Bokaro Thermal Power PlantSourav Mahato
 
Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants Arnab Nandi
 
Report on oltc by Ankit
Report on oltc by AnkitReport on oltc by Ankit
Report on oltc by AnkitAnkit Sisodiya
 

Viewers also liked (20)

A report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyA report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical only
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
Chandrapura thermal power station (CTPS)--DVC_Industrial Training
Chandrapura thermal power station (CTPS)--DVC_Industrial TrainingChandrapura thermal power station (CTPS)--DVC_Industrial Training
Chandrapura thermal power station (CTPS)--DVC_Industrial Training
 
Training Report
Training Report Training Report
Training Report
 
Training report on DVC
Training report on DVCTraining report on DVC
Training report on DVC
 
Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, AndalDurgapur Steel Thermal Power Station (DSTPS), DVC, Andal
Durgapur Steel Thermal Power Station (DSTPS), DVC, Andal
 
Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation Report
 
Class 10 physical science question answer
Class 10 physical science question answerClass 10 physical science question answer
Class 10 physical science question answer
 
132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station working
 
Instrumentation Limited (Summer Training report), Kota
Instrumentation Limited (Summer Training report), KotaInstrumentation Limited (Summer Training report), Kota
Instrumentation Limited (Summer Training report), Kota
 
Business line project by raushan singh
Business line project by raushan singhBusiness line project by raushan singh
Business line project by raushan singh
 
Projectf on POWER TRANSFOMER BHEL (SHIVAM DWIVEDI)
Projectf on POWER TRANSFOMER BHEL (SHIVAM DWIVEDI)Projectf on POWER TRANSFOMER BHEL (SHIVAM DWIVEDI)
Projectf on POWER TRANSFOMER BHEL (SHIVAM DWIVEDI)
 
Modern thermal power plant
Modern thermal power plantModern thermal power plant
Modern thermal power plant
 
Thermal Or Steam powerplant
Thermal Or Steam powerplant Thermal Or Steam powerplant
Thermal Or Steam powerplant
 
Ppt on training
Ppt on trainingPpt on training
Ppt on training
 
Bokaro Thermal Power Plant
Bokaro Thermal Power PlantBokaro Thermal Power Plant
Bokaro Thermal Power Plant
 
Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants Coal Fired Thermal Power Plants
Coal Fired Thermal Power Plants
 
Report on oltc by Ankit
Report on oltc by AnkitReport on oltc by Ankit
Report on oltc by Ankit
 

Similar to training report on Mejia Thermal Power Station

Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...Navin Pathak
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantAbhishek Kumar
 
DPL Vocational Training Report
DPL Vocational Training ReportDPL Vocational Training Report
DPL Vocational Training ReportShivendra Bhushan
 
DVC industrial visit report
DVC industrial visit reportDVC industrial visit report
DVC industrial visit reportKunal Adhikari
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantCyber4Tech
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC KantiTarun Kumar
 
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharAbhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharABHINAV KUMAR
 
THERMAL POWER PLANT
THERMAL POWER PLANTTHERMAL POWER PLANT
THERMAL POWER PLANTCyber4Tech
 
Thermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurThermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurChandra veer singh
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportAditya Shekhar
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportAditya Shekhar
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 
Themal power plant NTPC
Themal power plant NTPCThemal power plant NTPC
Themal power plant NTPCRahul Kurapati
 
thermal training report
thermal training reportthermal training report
thermal training reportRakesh Kumar
 

Similar to training report on Mejia Thermal Power Station (20)

Gourab_Wbpdcl
Gourab_WbpdclGourab_Wbpdcl
Gourab_Wbpdcl
 
steam turbine presentations
steam turbine presentationssteam turbine presentations
steam turbine presentations
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
 
Internship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plantInternship Report on thermal power station in vizag steel plant
Internship Report on thermal power station in vizag steel plant
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
 
DPL Vocational Training Report
DPL Vocational Training ReportDPL Vocational Training Report
DPL Vocational Training Report
 
DVC industrial visit report
DVC industrial visit reportDVC industrial visit report
DVC industrial visit report
 
DPL Project
DPL ProjectDPL Project
DPL Project
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharAbhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
 
THERMAL POWER PLANT
THERMAL POWER PLANTTHERMAL POWER PLANT
THERMAL POWER PLANT
 
Thermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E JaipurThermal power plant from A.I.C.E Jaipur
Thermal power plant from A.I.C.E Jaipur
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 
NTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training ReportNTPC Badarpur Industrial Training Report
NTPC Badarpur Industrial Training Report
 
MTPS Bappa main
MTPS Bappa mainMTPS Bappa main
MTPS Bappa main
 
naps narora
naps naroranaps narora
naps narora
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
Themal power plant NTPC
Themal power plant NTPCThemal power plant NTPC
Themal power plant NTPC
 
thermal training report
thermal training reportthermal training report
thermal training report
 

Recently uploaded

AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinojohnmickonozaleda
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxPoojaSen20
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 

Recently uploaded (20)

AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipino
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 

training report on Mejia Thermal Power Station

  • 1. A REPORT OF THE VOCATIONAL TRAINING FOR THE PERIOD OF THREE WEEKS FROM 16.06.13 TO 07.07.13 at MEJIA THERMAL POWER STATION P.O. MEJIA, DIST. BANKURA WEST BENGAL-722183 OF DAMODAR VALLEY CORPORATION (D.V.C.) by SAGNIK CHOUDHURY GURU NANAK INSTITUTE OF TECHNOLOGY 157/F, Nilgunj Road, Sodepur, Kolkata 700114 1
  • 2. PREFACE Economic growth in India, being dependent on the power sector, has necessiated an enormous growth in electricity demand over the last two decades. Electricity in bulk quantities is produced in power plants, which can be of the following types: (a) Thermal (b) Nuclear (c) Hydraulic, (d) Gas turbine and (e) Geothermal. I have done my vocational training in MEJIA THERMAL POWER STATION under DAMODAR VALLEY CORPORATION (D.V.C.) comprising 4 units of 210 MW each, 2 units of 250 MW each and 2 units of 500 MW each. It is a modern thermal power station having tilting burner corner fired combustion engineering USA design boiler and KWU West Germany Design Reaction Turbine. Both these main equipments have been designed, manufactured and supplied by Bharat Heavy Electricals Limited, India. MTPS units have many special features such as Turbo mill, DIPC (Direct Ignition of Pulverised Coal) system, HPLP bypass system, Automatic Turbine Run up system, and Furnace Safeguard Supervisory System. 2
  • 3. ACKNOWLEDGEMENT The dissertation has been prepared based on the vocational training undergone in a highly esteemed organisation of Eastern region, a pioneer in Generation Transmission & Distribution of power, one of the most technically advanced & largest thermal power stations in West Bengal, the Mejia Thermal Power Station (M.T.P.S), under DVC. I would like to express my heartfelt gratitude to the authorities of Mejia Thermal Power Station and Techno India for providing me such an opportunity to undergo training in the thermal power plant of DVC, MTPS. I would also like to thank the Engineers, highly experienced without whom such type of concept building in respect of thermal power plant would not have been possible. Some of them are: 1) Mr. Parimal Kumar Dubey 2) Mr. Rupak Kumar Nag 3) Mr. Malay Bal 4) Mr. Bhaskar Dey 3
  • 4. CONTENTS Page No 1. Introduction ................................................................................................5 2.Technical Specification of Mejia thermal power plant.................................6 3.Overview of a Thermal power plant.............................................................7 4.Mechanical operation a.Coal handling Plant....................................................................................8 b.Water Treatment Plant................................................................................9 c.Water De-mineralization Plant...................................................................9 d.Boiler System.............................................................................................10 e.Ash handling plant......................................................................................13 f.ESP...............................................................................................................13 g.Boiler auxilliaries........................................................................................15 h.Steam Turbine..............................................................................................17 i.Cooling tower................................................................................................19 j.Chimney........................................................................................................19 5.Electrical operation a.Generator.......................................................................................................20 b.transformers..................................................................................................22 c.control room..................................................................................................26 d.Excitation system..........................................................................................27 e.Switchyard Section & its Components.........................................................27 f.Switchgear.....................................................................................................32 g.Switching Schemes.......................................................................................33 h.Protection......................................................................................35 i.Motors for thermal power plant.....................................................................38 j.Battery bank..................................................................................................38 6.Conclusion......................................................................................................39 7.Bibliography...................................................................................................40 4
  • 5. INTRODUCTION Damodar Valley Corporation was established on 7th July 1948.It is the most reputed company in the eastern zone of India. DVC in established on the Damodar River. It also consists of the Durgapur Thermal Power Plant in Durgapur. The MTPS under the DVC is the second largest thermal plant in West Bengal. It has the capacity of 2340MW with 4 units of 210MW each, 2 units of 250MW each & 2 units of 500 MW each. With the introduction of another two units of 500MW that is in construction it will be the largest in West Bengal. Mejia Thermal Power Station also known as MTPS is located in the outskirts of Raniganj in Bankura District. It is one of the 5 Thermal Power Stations of Damodar Valley Corporation in the state of West Bengal. The total power plant campus area is surrounded by boundary walls and is basically divided into two major parts, first the Power Plant area itself and the second is the Colony area for the residence and other facilities for MTPSs͛ employees. 5
  • 6. TECHNICAL SPECIFICATION OF MTPS: INSTALLED CAPACITY: - 1) Total number of Units : - 4 X 210 MW(unit 1 to 4) with Brush Type Generators, 2 X 250 MW(unit 5 and 6) with Brush less Type Generators, 2*500 MW(unit 7 and 8) Generators. 2) Total Energy Generation: - 2340 MW 3) Source of Water: - Damodar River 4) Sources of Coal: - B.C.C.L and E.C.L, also imported from Indonesia In a Thermal Power generating unit, combustion of fossil fuel (coal, oil or natural gas) in Boiler or fissile element (uranium,plutonium) in Nuclear Reactor generates heat energy. This heat energy transforms water into steam at high pressure and temperature. This steam is utilised to generate mechanical energy in a Turbine. This mechanical energy, in turn is converted into electrical energy with thehelp of an Alternator coupled with the Turbine. The production of electric energy utilising heat energy is known as thermal power generation. The heat energy changes into mechanical energy following the principle of Rankine reheat-regenerative cycle and this mechanical energy transforms into electrical energy based on Faraday’s laws of electromagnetic induction. The generated output of Alternator is electrical power of three-phase alternating current (A.C.). A.C. supply has several advantages over direct current (D.C.) system and hence , it is preferred in modern days. The voltage generated is of low magnitude (14 to 21 KV for different generator rating) and is stepped up suitably with the help of transformer for efficient and economical transmission of electric power from generating stations to different load centres at distant locations. 6
  • 7. OVERVIEW OF A THERMAL POWER PLANT A thermal power plant continuously converts the energy stored in the fossil fuels(coal, oil, natural gas) into shaft work and ultimately into electricity. The working fluid is water which is sometimes in liquid phase and sometimes in vapour phase during its cycle of operation. Energy released by the burning of fuel is transferred to water in the boiler to generate steam at high pressure and temperature, which then expands in the turbine to a low pressure to produce shaft work. The steam leaving the turbine is condensed into water in the condenser where cooling water from a river or sea circulates carrying away the heat released during condensation. The water is then fed back to the boiler by the pump and the cycle continues. The figure below illustrates the basic components of a thermal power plant where mechanical power of the turbine is utilised by the electric generator to produce electricity and ultimately transmitted via the transmission lines. 1. Cooling tower. 2. Cooling water pump. 3. Transmission line (3-phase). 4. Unit transformer (3- phase). 5. Electric generator (3-phase). 6. Low pressure turbine. 7. Condensate extraction pump. 8. Condenser. 9. Intermediate pressure turbine. 10. Steam governor valve. 11. High pressure turbine. 12. De-aerator. 13. Feed heater. 14. Coal conveyor. 15. Coal hopper. 16. Pulverised fuel mill. 17. Boiler drums. 18. Ash hopper. 19. Super heater. 20. Forced draught fan. 21. Re-heater. 22. Air intake. 23. Economiser. 24. Air pre heater. 25. Precipitator. 26. Induced draught fan. 27. Chimney Stack. 7
  • 8. MECHANICAL OPERATION COAL HANDLING PLANT Generally most of the thermal power plants uses low grades bituminous coal. The conveyer belt system transports the coal from the coal storage area to the coal mill. Now the FHP(Fuel Handling Plant) department is responsible for converting the coal converting it into fine granular dust by grinding process. The coal from the coal bunkers.Coal is the principal energy source because of its large deposits and availability. Coal can be recovered from different mining techniques like • shallow seams by removing the over burnt expose the coal seam • underground mining. The coal handling plant is used to store, transport and distribute coal which comes from the mine. The coal is delivered either through a conveyor belt system or by rail or road transport. The bulk storage of coal at the power station is important for the continues supply of fuel. Usually the stockpiles are divided into three main categories. • live storage • emergency storage • long term compacted stockpile. The figure below shows the schematic representation of the coal handling plant. Firstly the coal gets deposited into the track hopper from the wagon and then via the paddle feeder it goes to the conveyer belt#1A. Secondly via the transfer port the coal goes to another conveyer belt#2B and then to the crusher house. The coal after being crushed goes to the stacker via the conveyer belt#3 for being stacked or reclaimed and finally to the desired unit. ILMS is the inline magnetic separator where all the magnetic particles associated with coal get separated. COAL HANDLING PLANT PROCEDURE 8
  • 9. WATER TREATMENT PLANT Raw water supply: Raw water received at the thermal power plant is passed through Water Treatment Plant to separate suspended impurities and dissolved gases including organic substance and then through De-mineralised Plant to separate soluble impurities. Deaeration: In this process, the raw water is sprayed over cascade aerator in which water flows downwards over many steps in the form of thin waterfalls. Cascading increases surface area of water to facilitate easy separation of dissolved undesirable gases (like hydrogen sulphide, ammonia, volatile organic compound etc.) or to help in oxygenation of mainly ferrous ions in presence of atmospheri oxygen to ferric ions. These ferric ions promote to some extent in coagulation process. Coagulation: Coagulation takes place in clariflocculator. Coagulant destabilises suspended solids and agglomerates them into heavier floc, which is separated out through sedimentation. Prime chemicals used for coagulation are alum, poly-aluminium chloride (PAC). Filtration: Filters remove coarse suspended matter and remaining floc or sludge after coagulation and also reduce the chlorine demand of the water. Filter beds are developed by placing gravel or coarse anthracite and sand in layers. These filter beds are regenerated by backwashing and air blowing through it. Chlorination: Neutral organic matter is very heterogeneous i.e. it contains many classes of high molecular weight organic compounds. Humic substances constitute a major portion of the dissolved organic carbon from surface waters. They are complex mixtures of organic compounds with relatively unknown structures and chemical composition. DM (Demineralised Water) Plant In De-mineralised Plant, the filter water of Water Treatment Plant is passed through the pressure sand filter (PSF) to reduce turbidity and then through activated charcoal filter (ACF) to adsorb the residual chlorine and iron in filter water. 9
  • 10. BOILER SYSTEM BOILER: Working principle of Boiler (Steam Generator): In Boiler, steam is generated from de- mineralized water by the addition of heat. The heat added has two parts: sensible heat and latent heat. The sensible heat raises the temperature and pressure of water as well as steam. The latent heat converts water into steam (phase change). This conversion is also known as boiling of water, which is dependent on pressure and corresponding temperature. Thermodynamically, boiling is a process of heat addition to water at constant pressure & temperature. The quantity of latent heat decreases with increase in pressure of water and it becomes zero at 221.06 bars. This pressure is termed as critical pressure. The steam generators are designated as sub-critical or super critical based on its working pressure as below critical or above critical pressure. The steam, thus formed is dry & saturated. Further, addition of heat raises the temperature and pressure of steam, which is known as superheated steam. The differential specific weight between steam and water provides the driving force for natural circulation during the steam generation process. This driving force considerably reduces at pressure around 175 Kg/cm2 and is not able to overcome the frictional resistance of its flow path. For this, forced or assisted circulation is employed at higher sub-critical pressure range due to the reason of economy. But, at supercritical pressures and above, circulation is forced one (such boiler is called once through boiler). Important parts of Boiler & their functions:  Economizer: Feed water enters into the boiler through economizer. Its function is to recover residual heat of flue gas before leaving boiler to preheat feed water prior to its entry into boiler drum. The drum water is passed through down-comers for circulation through the water wall for absorbing heat from furnace. The economizer 10
  • 11. recirculation line connects down-comer with the economizer inlet header through an isolating valve and a non-return valve to protect economizer tubes from overheating caused by steam entrapment and starvation. This is done to ensure circulation of water through the tubes during initial lighting up of boiler, when there is no feed water flow through economizer.  Drum: Boiler drum is located outside the furnace region or flue gas path. This stores certain amount of water and separates steam from steam-water mixture. The minimum drum water level is always maintained so as to prevent formation of vortex and to protect water wall tubes (especially its corner tubes) from steam entrapment / starvation due to higher circulation ratio of boiler. The secondary stage consists of two opposite bank of closely spaced thin corrugated sheets which direct the steam through a tortuous path and force the remaining entrained water against the corrugated plates. Since, the velocity is relatively low, this water does not get picked up again but runs down the plates and off the second stage lips at the two steam outlets. From the secondary separators, steam flows uniformly and with relatively low velocity upward to the series of screen dryers (scrubbers), extending in layers across the length of the drum. These screens perform the final stage of separation.  Superheater: Superheaters (SH) are meant for elevating the steam temperature above the saturation temperature in phases; so that maximum work can be extracted from high energy (enthalpy) steam and after expansion in Turbine, the dryness fraction does not reach below 80%, for avoiding Turbine blade erosion/damage and attaining maximum Turbine internal efficiency. Steam from Boiler Drum passes through primary superheater placed in the convective zone of the furnace, then through platen superheater placed in the radiant zone of furnace and thereafter, through final superheater placed in the convective zone. The superheated steam at requisite pressure and temperature is taken out of boiler to rotate turbo-generator.  Reheater: In order to improve the cycle efficiency, HP turbine exhaust steam is taken back to boiler to increase temperature by reheating process. The steam is passed through Reheater, placed in between final superheater bank of tubes & platen SH and finally taken out of boiler to extract work out of it in the IP and LP turbine.  De-superheater (Attemperator): Though superheaters are designed to maintain requisite steam temperature, it is necessary to use de-superheater to control steam temperature. Feed water, generally taken before feed water control station, is used for de-superheating steam to control its temperature at desired level.  Drain & Vent: Major drains and vents of boiler are (i) Boiler bottom ring header drains, (ii) 11
  • 12. Boiler drum drains & vents, (iii) Superheater & Reheater headers drains & vents, (iv) Desuperheater header drains & vents etc. Drains facilitate draining or hot blow down of boiler, as and when required; while vents ensure blowing out of air from boiler during initial lighting up as well as facilitate depressurizing of boiler. The continuous blow down (CBD) valve facilitates reduction in contaminant concentration in drum water and also complete draining of drum water. The intermittent blow down (IBD) / emergency blow down (EBD) valve helps to normalize the excess drum water level during emergency situation. Technical data of the Boiler Type Radiant, Reheat, Natural circulation, Single Drum, Balanced drift, Dry bottom, Tilting tangential, Coal and oil fired with DIPC (Direct Ignition of Pulverized Coal) system. Furnace Width 13868 mm. Depth 10592 mm. Volume 5240 m3 Fuel heat input per hour 106 kcal Designed pressure 175.8 kg/cm2 Superheater Outlet pressure 155 kg/cm2 Low temperature SH (horizontally spaced) 2849 m2 (total heating surface area) Platen SH (Pendant platen) 1097 m2 (total heating surface area) Final superheater (vertically spaced) 1543 m2 (total heating surface area) Attemperator Type Spray No. of stages One Spray medium Feed water from boiler feed pump (BFP) Reheater Type Vertical spaced Total H.S. area 2819 m2 Control Burner tilt & excess air Economiser Type Plain tube Total H.S. area 6152 m2 12
  • 13. ASH HANDLING PLANT A large quantity of ash is, produced in steam power plants using coal. Ash produced in about 10 to 20% of the total coal burnt in the furnace. Handling of ash is a problem because ash coming out of the furnace is too hot, it is dusty and irritating to handle and is accompanied by some poisonous gases. It is desirable to quench the ash before handling due to following reasons: 1. Quenching reduces the temperature of ash. 2. It reduces the corrosive action of ash. 3. Ash forms clinkers by fusing in large lumps and by quenching clinkers will disintegrate. 4. Quenching reduces the dust accompanying the ash. Flyash is collected with an electrostatic precipitator(ESP) ELECTROSTAIC PRECIPITATOR The principal components of an ESP are 2 sets of electrodes insulated from each other. First set of rows are electrically grounded vertical plates called collecting electrodes while the second set consists of wires called discharge electrodes. The above figure shows the operation of an ESP. the negatively charged fly ash particles are driven towards the collecting plate and the positive ions travel to the negatively charged wire electrodes. Collected particulate matter is removed from the collecting plates by a mechanical hammer scrapping system. Technical data of the ESP (Electrostatic Precipitator) Gas flow rate 339 m3 /s Temperature 142°C Dust concentration 62.95 gms/N-cubic meter Collecting electrodes No. of rows of collecting electrode per field 49 13
  • 14. No. of collecting electrode plate 294 Total no. of collecting plates per boiler 3528 Nominal height of collecting plate 13.5 m. Nominal length of collecting electrodes per field in the direction of gas field 4.5 m. Nominal width of collecting plate 750 mm. Specific collecting area 206.4 m2 /cubic meter. sec-1 Emitting electrodes Type Spiral with hooks Size Diameter—2.7 mm. No. of electrodes in the frame forming one row 54 fields No. of electrodes in the field 2592 Total no. of electrodes per boiler 31104 Total length of electrodes per field 14541 m. Plate/wire spacing 150 mm. Electrical items Rectifier Rating 70 kV (peak), 80 mA (mean) Number 24 Type Silicon diode full wave bridge connection located Mounted on the top of the precipitator Rectifier control panel Type of control SCR (Silicon Controlled Rectifier) Number 24 Location In the control room at ground level Auxiliary control panel Number 2 Equipment controlled Geared motors of rapping mechanism of collecting & emitting electrodes. Location In the control room at the ground level. Motors Quantity 24 Rating Geared motor 0.33 HP, 3 phase, 415 V, 50 Hz. Location On root panels of the casing 14
  • 15. BOILER AUXILIARIES  Induced draft fan (ID fan): Induced draft represents the system where air or products of combustion are driven out after combustion at boiler furnace by maintaining them at a progressively increasing sub atmospheric pressure. This is achieved with the help of induced draft fan and stack. Induced draft fan is forward curved centrifugal (radial) fan and sucks the fly-ash laden gas of temperature around 125°C out of the furnace to throw it into stack (chimney). The fan is connected with driving motor through hydro-coupling or with variable frequency drive (VFD) motor to keep desired fan speed. Technical data of the I.D.Fan (Induced Draught Fan) at Unit #1 No. of boiler 3 Type Radial, NDZV 31 Sidor Medium handled Flue gas Location Ground floor Orientation Suction—Vertical/45 degree to Horizontal Delivery—Bottom Horizontal.  Forced draft fan (FD fan): Forced draft represents flow of air or products of combustion at a pressure above atmosphere. The air for combustion is carried under forced draft conditions and the fan used for this purpose is called Forced Draft (FD) fan. It is axial type fan and is used to take air from atmosphere at ambient temperature to supply air for combustion, which takes entry to boiler through wind box. In all units except Durgapur TPS Unit #4, this fan also supplies hot /cold air to the coal mills. The output of fan is controlled by inlet vane / blade pitch control system. Technical data of the F.D.Fan (Forced Draught Fan) at Unit #1 No. of boiler 2 Type Radial, NDZV 28/Sidor Medium handled Clean air Location Ground floor Orientation 45° horizontal, delivery-bottom horizontal.  Primary air fan (PA fan) or Exhauster fan: The function of primary air is to transport pulverized coal from coal mill to the furnace, to dry coal in coal mill and also to attain requisite pulverized coal temperature for ready combustion at furnace. In some units like Chandrapura TPS unit 1, 2 & 3, the exhauster fan sucks pulverized coal and air mixture from coal mill and sends it to the furnace. Technical data of the P.A.Fan (Primary Air Fan) at Unit #1 No. of boilers 3 Type Radial, NDZV 20 Herakles Medium handled Hot air Location Ground floor Orientation Suction—Vertical/45 degrees to Horizontal Delivery—Bottom Horizontal. 15
  • 16.  Coal mill or pulveriser: Most efficient way of utilizing coal for steam generation is to burn it in pulverised form. The coal is pulverized in coal mill or pulveriser to fineness such that 70-80% passes through a 200 mesh sieve. The factors that affect the operation of the mill or reduce the mill output are: Grindability of coal: Harder coal (i.e. coal having lower hard-grove index (H.G.I.)) reduces mill output and vice versa. Moisture content of coal: More the moisture content in coal, lesser will be the mill output & vice versa. Fineness of output: Higher fineness of coal output reduces mill capacity. Size of coal input: Larger size of raw coal fed to the mill reduces mill output. Wear of grinding elements: More wear and tear of grinding elements reduces the output from mill.  Fuel oil system: In a coal fired boiler, oil firing is adopted for the purpose of warming up of the boiler or assisting initial ignition of coal during introduction of coal mill or imparting stability to the coal flame during low boiler load condition. Efficient or complete combustion of the fuel oil is best achieved by atomizing oil by compressed air for light oi l (LDO) or by steam for heavy oil (HFO) in order to have proper turbulent mixing of oil with combustion air. Use of HFO is beneficial with respect to LDO in view of its lower cost and saving in foreign exchange. The oil burners and igniters are the basic elements of oil system. Oil is supplied by light oil pump or by heavy oil pump through oil heater. Steam heater reduces the viscosity of heavy oil and aids flow ability as well as better atomization. The oil burners are located in the compartmented corner of wind boxes, in the different elevation of auxiliary air compartments, sandwiched between the coal burner nozzles. Each oil burner is associated with an igniter, arranged at the side. 16
  • 17. STEAM TURBINE A steam turbine is a prime mover which continuously converts the energy of high pressure, high temperature steam supplied by the boiler into shaft work with low pressure, low temperature steam exhausted to a condenser. 17
  • 18. 500 MW(KWU) Steam turbine (Mejia TPS U #7&8) Maker Bharat Heavy Electricals Limited Type Reaction turbine Type of governing Throttling Number of cylinders 3 Speed (RPM) 3000 Rated output (kW) 210000(for unit1,2,3,4) 250000(for unit 5 & 6) Steam pressure before emergency stop valve (abs) 150 kg/cm2 Steam temperature before emergency stop valve 535°C (for unit1,2,3,4) 537°C (for unit 5 & 6) Reheat temperature 535°C (for unit 1,2,3 &4) 537°C (for unit 5 & 6) 18
  • 19. Cooling tower Cooling towers cool the warm water discharged from the condenser and feed the cooled water back to the condenser. They thus reduce the cooling water demand in the power plants. Wet cooling towers could be mechanically draught or natural draught. In M.T.P.S the cooling towers are I.D. type for units 1-6 and natural draught for units 7&8. Cooling towers for units 7 and 8 natural draught CHIMNEY A chimney may be considered as a cylindrical hollow tower made of bricks or steel. In MTPS the chimneys of eight units are made of bricks. Chimneys are used to release the exhaust gases(coming from the furnace of the boiler)high up in the atmosphere. So, the height of the chimneys are made high. 19
  • 20. ELECTRICAL OPERATION The electrical operation of a power plant comprises of generation, transmission and distribution of electrical energy. In a power station both distribution and transmission operation can take place. When power is sent from power station to all other power station in the grid, it is known as distribution of power. When power plant is driving power from other power station it is known as transmission of power/electrical energy. ELECTRIC GENERATOR In M.T.P.S. there are 6 electric generators for units 1 to 6. These are 3 phase turbo generators, 2 pole cylindrical rotor type synchronous machines which are directly coupled to the steam turbine. The generator consist of 2 parts mainly the stator and the rotor. Stator: The stator body is designed to withstand internal pressure of hydrogen-air mixture without any residual deformation. The stator core is built up of segmental punching of high permeability, low loss CRGOS steel and are in interleaved manner on spring core bars to reduce heating and eddy current loss. The stator winding has 3 phase double layer short corded bar type lap winding having 2 parallel paths. The winding bars are insulated with mica thermosetting insulation tape which consists of flexible mica foil, fully saturated with a synthetic resin having excellent electrical properties. Water cooled terminal bushings are housed in the lower part of the stator on the slip ring side. Rotor: Rotor is of cylindrical type shaft and body forged in one piece from chromium nickel molybdenum and vanadium steel. Slots are machined on the outer surface to incorporate windings. Winding consists of coil made from hand drawn silver copper with bonded insulation. Generator casing is filled up with H2 gas with required pressure, purity of gas is always maintained>97%. Propeller type fans are mounted on either side of the rotor shaft for circulating the cooling gas inside the generators. Turbogenerator 20
  • 21. Technical Data of Turbogenerator Main parameters Rated kW capacity 210000 kW Rated kVA capacity 247000 kVA Rated terminal voltage 15750 V Rated power factor 0.85 lag Rated stator current 9050 amps Rated speed 3000 RPM Rated frequency 50 Hz Efficiency at rated power output & power factor 98.55% Power factor short circuit ratio 0.49 Temperature rating Class of insulation of generator windings Class 'B' Temperature of cooling water (maximum) 37°C Temperature of cooling Hydrogen (maximum) 44°C Temperature of cooling distilate (maximum) 45°C Maximum temperature of stator core 105°C Maximum temperature of stator winding 75°C Maximum temperature of rotor winding 115°C Other particulars Critical speed of rotor (calculated) 1370/3400 RPM Fly wheel moment of rotor 21.1 T-M Ratio of short circuit torque to full load torque 8 Quantity of oil required for cooling per bearing 300 litre/min. Oil pressure for lubrication of bearings 0.3-0.5 kg/cm2 Quantity of oil required for both the shaft seals 7.7 litres/min. Rated pressure of the shaft seal oil (gauge) 5 kg/cm2 Quantity of water required for gas coolers 350 m3 /hr. Maximum allowable water pressure in gas coolers 3 kg/cm2 Quantity of distillate for cooling stator winding 27 m3 /hr. Max. distillate pressure at inlet to stator winding 3.3 kg/cm2 Average qty of Hydrogen required for makeup 15 m3 per day % Purity of Hydrogen inside the machine 97% min Max allowable moisture content inside the body 1.5 g/m3 21
  • 22. Weights of different parts Heaviest weight (weight of stator) (kg.) 170000 Bearing with brush rocker & foundation plate (kg) 9300 Rotor (kg.) 42000 Gas cooler (kg.) 1415 Terminal bushing (kg.) 85 Total weight of generator (kg.) 239000 TRANSFORMERS The electricity thus produced by the generator then goes to the generating transformer where the voltage is increased for transmission of electricity with minimized copper losses. In general a transformer consists of primary and secondary windings which are insulated from each other by varnish. In M.T.P.S. all are either oil cooled or air cooled. Some of the transformer accessories are: 1. Conservator tank 2. Buccholz relay 3. Fans for cooling 4. Lightning arrestors 5. Transformer bushings 6. Breather and silica gel. Generating transformer #1, 2, 3,4 MVA: 150/200/250 (H.V.) MVA: 150/200/250 (L.V.) Volts at no load: 240000 (H.V.) Volts at no load: 15750 (L.V.) Ampere line value: 361/482/602 (H.V.) Ampere line value: 5505/7340/9175 (L.V.) Phase-3 frequency: 50 Hz. Mass of core and windings: 139000 kg. Mass of oil: 38070 kg. Mass of heaviest package: 164000 kg. Connection: YNd1 connection. Generating transformer#5 and 6 MVA: 189/252/315 (H.V.) MVA: 189/252/315 (L.V.) Volts at no load: 16.5kV (L.V.) Volts at no load: 240kV (H.V.) Ampere line value: 757.57 (H.V.) Ampere line value: 11022.14 (L.V.) Phase-3 frequency: 50 Hz. Mass of core and windings: 155000 kg. Mass of oil: 53070 kg. Mass of heaviest package: 18000 kg. Connection: YNd1 connection. 22
  • 23. Specifications of Generator Transformer (GT) at Unit #7 Type of cooling ONAN/ONAF/OFAF Rating HV (MVA) 120/160/200 Rating LV (MVA) 120/160/200 No load voltage HV (kV) 242.494 No load voltage LV (kV) 21 Line current HV (amps) 824.79 Line current LV (amps) 9523.8 Temperature rise oil (°C) 40 (Over ambient of 50°C) Temperature rise winding (°C) 45 (Over ambient of 50°C) Phase 3 Frequency (Hz) 50 Connection symbol YNd11 Impedance volt at 200 MVA Base HV Position on 5/LV (nor tap) – 12% to 15% HV Position on 1/LV (max tap) – 12% to 15% HV Position on 9/LV (min tap) – 12% to 15% Insulation level (HV) SL 1050 LI 1300 – AC 38 Insulation level (LV) LI 125 – AC 50 Core & Winding (kg) 153530 Weight of oil (kg) 48910 Total weight (kg) 257500 Oil quantity (litre) 56220 Transport weight (kg) 174900 Untanking weight (kg) 13790 Vector Diagram AUXILIARY TRANSFORMRERS Station Service Transformers Normal source to the station auxiliaries and standby source to the unit auxiliaries during start up and after tripping of the unit is station auxiliary transformer. Quantity of station service transformers and their capacity depends upon the unit sizes and nos. Each station supply transformer shall be one hundred percent standby of the other. Station service transformers shall cater to the simultaneous load demand due to start up power requirements for the largest unit, power requirement for the station auxiliaries required for running the station and power 23
  • 24. requirement for the unit auxiliaries of a running unit in the event of outage of the unit source of supply. The no. and approximate capacity of the SST depending upon the no. and MW rating of the TG sets are indicated below. Specifications of Station Service Transformer (SST) at Unit 7 and 8 Type of cooling ONAF/ONAN Rating HV (MVA) 16/12.50 Rating LV (MVA) 16/12.50 No load voltage HV (kV) 11 No load voltage LV (kV) 3.45 Line current HV (amps) 839.78/656.08 Line current LV (amps) 2677.57/2091.85 Temperature rise oil (°C) 40 Temperature rise winding (°C) 45 Phase 3 Frequency (Hz) 50 Connection symbol Dyn1 Impedance volts % HV-LV 25% Unit Auxiliary Transformer The normal source of HV Power to unit auxiliaries is unit auxiliary transformer. The sizing of the UAT is usually based on the total connected capacity of running unit auxiliaries i.e., excluding the stand by drives. It is safe anddesirable to provide about 20% excess capacity than calculated. The no. and recommended MVA rating of unit auxiliary transformers are as shown in the above table: The UATs shall have Ddo(ungrounded system) or Dy1 (for grounded system) connection with on load tap changer to provide +10 % variation in steps of 1.25 %. Usual cooling arrangement to unit auxiliary transformers are ONAN. Radiators are usually divided in two equal halves. Specification Unit auxiliary transformer #1,2,3 MVA: 12.5/16 Manufacturer: Atlanta Electricals Volts at no load: 15750 (H.V.) Volts at no load: 6900 (L.V.) Ampere line value: 458.2/586.5 (H.V.) Ampere line value: 1045.9/1338.8 (L.V.) Phase-3 frequency: 50 Hz. Mass of core and windings: 14300kg. Mass of oil: 8600kg. Mass of heaviest package: 25000kg. Total weight: 30,500 kg. 24
  • 25. Unit auxiliary transformer #5 & 6 Type of cooling: ONAN/ONAF (oil natural/ oil natural air force) Rating (H.V.): 20/16 MVA Rating (L.V.): 20/16 MVA No load voltage: 13.5 kV (H.V.) No load voltage: 6.9 kV (L.V.) Line current: 1673.479/1336.783 amp. Temperature rise of winding: 55*C Insulation level: 931 KVI 38kV r.m.s (H.V.) 60kVI 20kV r.m.s (L.V.) Specifications of Unit Auxiliary Transformer (UAT) at Unit #7 Type of cooling ONAN/ONAF Rating HV (MVA) 45/36 Rating LV (MVA) 45/36 No load voltage HV (kV) 21 No load voltage LV (kV) 11.5 Line current HV (amps) 1238.64 Line current LV (amps) 2261.87 Temperature rise oil (°C) 40 (Over ambient of 50°C) Temperature rise winding (°C) 45 (Over ambient of 50°C) Phase 3 Frequency (Hz) 50 Connection symbol Dyn1 Impedance volt at 45 MVA Base HV Position on 7/LV (nor tap) – 11.5% HV Position on 1/LV (max tap) – 10% to 13% HV Position on 17/LV (min tap) – 10% to 13% Insulation level (high voltage) L1 125 – AC 50 Insulation level (low voltage) L1 75 – AC 28 Core & winding (kg) 40065 Weight of Oil (kg) 25765 Total weight (kg) 85265 Transport weight (kg) 50000 Untanking weight (kg) 41000 25
  • 26. CONTROL ROOM UNIT: The above figure shows the power line diagram in the control room. It clearly shows how the electric power generated by the generator is transmitted through the generating transformers into the bus and the distribution of power by the unit auxiliary transformers. EXCITATION SYSTEM The purpose of excitation system is to continuously provide the appropriate amount of D.C. field current to the generator field winding. The excitation system is required to function reliably under the following conditions of the generator and the system to which it is connected. Functional components of an excitation system : A good excitation system consists of properly co-ordinated functional components which are a) Excitation Power source b) Semiconductor Rectifier c) Voltage controller d) Protective, limiting and switching equipments e) Monitoring, Metering and indicating equipments and f) Cooling system Types of Excitation System : In earlier days DC excitation system was in use. Increase in generator capacity in turn raised the demand of excitation power which was notachievable by the DC exciters. This led to the accelerated development of AC excitation system in pace with generator capacity. With the maturing of solid state semiconductor technology AC 26
  • 27. excitation system found to be superior technically as well as economically. Excitation system can be categorized and subdividedinto the following : a) D.C. excitation system i) Pilot Main Exciter excitation system ii) Rotating Amplifier excitation system. b) A.C. excitation system i) Rotating High Frequency excitation system ii) Static excitation system iii) Brushless excitation system SWITCHYARD SECTION A switchyard is essentially a hub for electrical power sources. For instance, a switchyard will exist at a generating station to coordinate the exchange of power between the generators and the transmission lines in the area. A switchyard will also exist when high voltage lines need to be converted to lower voltage for distribution to consumers. Here in MTPS there is a big switch yard section for the units one to six, and also for seven & eight there also a switch yard. Some of the operation of the components of the switch yard is sometimes done from the control rooms of respective units. That is the switch yard under each unit is sometimes control from the control rooms of each unit respectively . Circuit Diagram: 220kV switchyard of M.T.P.S A switchyard may be considered as a junction point where electrical power is comingin from one or more sources and is going out through one or more circuits. Thisjunction point is in the form of a high capacity conductor spread from one end to theother end of the yard. As the switchyard handles large amount of power, it is necessarythat it remains secure and serviceable to supply the outgoing transmission feederseven under conditions of major equipment or bus failure. There are differentschemes available for bus bar and associated equipment connection to facilitate switching operation. The important points which dictate the choice of bus switching scheme are – a. Operational flexibility, b. Ease of maintenance, c. System security, d. Ease of sectionalizing, e. Simplicity of protection scheme, f. Installation cost and land requirement. g. Ease of extension in future. 27
  • 29. The basic components of a switchyard are as follows: 1.Circuit breaker: A circuit breaker is an equipment that breaks a circuit either manually or automatically under all conditions at no load, full load or short circuit. Oil circuit breakers, vacuum circuit breakers and SF6 circuit breakers are a few types of circuit breakers. 2.Isolator: Isolators are switches which isolate the circuit at times and thus serve the purpose of protection during off load operation. 3.Current Transformer: These transformers used serve the purpose of protection and metering. Generallythe same transformer can be used as a current or potential transformer depending on the type of connection with the main circuit that is series or parallel respectively. In electrical system it is necessary to a) Read current and power factor b) Meter power consumption. c) Detect abnormalities and feed impulse to protectivedevices. 4.Potential transformers : In any electrical power system it is necessary to - Fig. C.T. a) Monitor voltage and power factor, b) Meter power consumption, c) Feed power to control and indication circuit and d) Detect abnormalities (i.e. under/over voltage, direction of power flow etc) and feed impulse to protective device/alarm circuit. Standard relay and metering equipments does not permit them to be connected directly to the high voltage system.Potential transformers therefore play a key role by performing the following functions. a) Electrically isolating the instruments and relays from HV side. b) By transferring voltage from higher values to proportional standardized lower values. 5.POWER TRANSFORMER: The use of power transformer in a switchyard is to change the voltage level. At the sending and usually step up transformers are used to evacuate power at transmission voltage level. On the other hand at the receiving end step down transformers are installed to match the voltage to sub transmission or distribution level. In many switchyards autotransformers are used widely for interconnecting two switchyards with different voltage level (such as 132 and 220 KV) 33/11 KV Power Transformer in a switchyard 29
  • 30. ( 1-Main tank 2-Radiator 3-Reservoir tank 4-Bushing 5-WTI & OTI Index 6-Breather 7-Buccholz relay) 6.Insulator : The live equipments are mounted over the steel structures or suspended from gantries with sufficient insulation in between them. In outdoor use electrical porcelain insulators are most widely used. Following two types of insulators are used in switchyard. a. Pedestal type b. Disc type Pedestal type insulators are used on steel structures for rigid supporting of the pipe bus bars, for holding the blade and the fixed contacts of theisolators. The above figure shows a complete bay for 220kV switchyard. Electric power is generated by the generator which is circulated to the main bus 1 or 2 and accordingly the respective isolator is closed. In case of any fault in the circuit breaker the power from the generator goes via the transfer bus into the main bus by means of the bus coupler. A bus tie represents the connection between the two main buses. Two 80MVA transformers draw power from the main buses and transfer the voltage to 33kV and the power goes to 33kV switchyard. A station service transformer supplies power to the auxiliary load. 30
  • 31. The above figure shows the power flow diagram of 33kV switchyard. The electric power after voltage transformation to 33kV by 80MVA transformers goes to the main bus of the 33kV switchyard from where power is fed to various industries and other nearbystations. There are two earthing transformers in the yard. From the bus the power is fed to two 5MVA transformers which step down the voltage level to 11kV and is thus distributed to the locality. THE TYPE OF RELAYS USED IN MTPS FOR PROTECTION OF POWER SYSTEM COMPONENTS • Auxiliary relay for isolations • Fail accept relay • Directional over current relay • Master trip relay • Multi relay for generator function • Supervision relay • Instantaneous relay • Bus bar trip relay • Lock out relay • Numerical LBB protection relay • Transformer differential protection relay • Circulating differential protection relay • Contact multi-relay • Auxiliary relay • Trip circuit R-Phase relay • EUS section relay • DC fail accept relay • Trip circuit R-phase super relay Y-phase B-phase • LBB protection relay. 31
  • 32. SOME PUMP & MOTOR IS USED IN MTPS  PUMP :- • Service water pump -360Kw • Primary air fan(PA fan) -800Kw • Coal mill motor -2250Kw • Condense extraction pump -500Kw  MOTOR :-  Boiler feed pump motor -3500Kw  ID fan motor -1500Kw  FD fan motor -1000Kw  CW pump motor -1200Kw SWITCHGEAR HV Switchgears: Indoor metal clad draw out type switchgears with associated protective and control equipments are employed (fig. 2). Air break, Air Blast circuit breakers and Minimum Oil circuit breakers could still be found in some very old stations. Present trend is to use SF6or vacuum circuit breakers. SF6 and vacuum circuit breakers requires smaller size panels and thereby reasonable amount of space is saved. Fig. 2: General arrangement of 6.6 KV switchgearpanels The main bus bars of the switchgears are most commonly made up of high conductivity aluminium or aluminium alloy with rectangular cross section mounted in side the switchgear cubicle supported by moulded epoxy, fibre glass or porcelain insulators. For higher current rating copper bus bars are sometimes used in switchgears. 32
  • 33. LV Switchgears: LV switchgears feed power supply to motors above 110 KW and upto160 KW rating and to Motor Control Centers (M.C.C). LV system is also a grounded system where the neutral of transformers are solidly connected to ground. The duty involves momentary loading, total load throw off, direct on line starting of motors and under certain emergency condition automatic transfer of loads from one source of supply to the other. The switchgear consists of metal clad continuous line up of multi tier draw out type cubicles of simple and robust construction. Each feeder is provided with an individual front access door. The main bus bars and connections shall be of high grade aluminium or aluminium alloy sized for the specified current rating. The circuit breakers used in the LV switchgear shall be air break 3 pole with stored energy, trip free shunt trip mechanism. These are draw out type with three distinct position namely, Service, Test and Isolated. Each position shall have mechanical as well as electrical indication. Provision shall be there for local and remote electrical operation of the breakers. Mechanical trip push button shall be provided to trip manually in the event of failure of electrical trip circuit. Safety interlocks shall be provided to prevent insertion and removal of closed breaker from Service position to Test position and vice versa. SWITCHING SCHEMES One Main Bus and Transfer Bus scheme This scheme is used in switchyards up to 132 KV. Under normal condition all feeders arefed through their respective circuit breakers from the main bus bar. During shutdown or outage of any feeder breaker, that feeder can be transferred to transfer bus and diverted through bus coupler breaker. In that case the protection shall be transferred to the bus coupler circuit breaker by changing the position of the trip transfer switch located at the switchyard control panel. This diversion of the feeder from its own circuit breaker to bus coupler circuit breaker and the vice versa is possible even in live condition without any interruption of supply to that feeder. In case of any main bus fault the entire switchyard will collapse. To avoid such total collapse of the switchyard a bus section circuit breaker is provided in the middle 33
  • 34. position of the main bus. Two Main Bus and One transfer Bus scheme In this scheme there is an arrangement for a duplicate main bus (MB). All the feeders in the yard may be connected to either MB # 1 or MB # 2 or may be divided in two groups and distributed in two buses. In case of outage of any circuit breaker that feeder can be diverted through bus coupler breaker. Bus tie breaker is used to tie up MB #1 & MB # 2. 34
  • 35. One and Half Breaker Scheme In one and half breaker scheme (Fig. 4) under normal condition all the circuit breakers will remain closed. At the time of maintenance of feeder breaker, only that breaker would be kept open and isolated. During maintenance of bus, all the breakers connected to that bus would remain open to isolate the bus. At that time, the power supply may be maintained through other bus. All equipments in the switchyard except the line side isolators can be maintained without taking shut down of any feeder. This scheme has gained popularity in many 400 KV switchyards in our country. GENERATOR PROTECTION The purpose of generator protection is to provide protectionagainst abnormal operating condition and during fault condition. In the first case the machine and the associated circuit may be in order but the operating parameters (load, frequency, temperature) and beyond the specified limits. Such abnormal running condition would result in gradual deterioration and ultimately lead to failure of the generator. Protection under abnormal running conditions a) Over current protection: The over current protection is used in generator protection against external faults as back up protection. Normally external short circuits are cleared by protection of the faulty section and are not dangerous to the generator. If this protection fails the short circuit current contributed by the generator is normally higher than the rated currentof the generator and cause over heating of the stator, hence generators are provided with back up over current protection which is usually definite time lag over current relay. 35
  • 36. b) Over load protection: Persistent over load in rotor and stator circuit cause heating of winding and temperature rise of the machine. Permissible duration of the stator and rotor overload depends upon the class of insulation, thermal time constant, cooling of the machine and is usually recommended by the manufacturer. Beyond these limits the running of the machine is not recommended and overload protection thermal relays fed by current transformer or thermal sensors are provided. c) Over voltage protection: The over voltage at the generator terminals may b e caused by sudden drop of load and AVR malfunctioning. High voltage surges in the system (switching surges or lightning) may also cause over voltage at the generator terminals. Modern high speed voltage regulators adjust the excitation current to take care against the high voltage due to load rejection. Lightning arresters connected across the generator transformer terminals take care of the sudden high voltages due to external surges. As such no special protection against generator high voltage may be needed. Further protection provided against high magnetic flux takes care of dangerous increase of voltage. e) Unbalance loading protection: Unbalance loading is caused by single phase short circuit outside the generator, opening of oneof the contacts of the generator circuit breaker, snapping of conductors in the switchyard or excessive single phase load. Unbalance load produces –ve phase sequence current which cause overheating of the rotor surface and mechanical vibration. Normally 10% of unbalance is permitted provided phase currents do not exceed the rated values. For –ve phase sequence currents above 5-10% of rated value dangerous over heating of rotor is caused and protection against this is an essential requirement. g) Loss of prime mover protection: In the event of loss of prime mover the generator operates as a motor and drives the prime mover itself. In some cases this condition could be very harmful as in the case of steam turbine sets where steam acts as coolant, maintaining the turbine blades at a constant temperature and the failure of steam results in overheating due to friction and windage loss with subsequent distortion of the turbine blade. This can be sensed by a power relay with a directional characteristic and the machine can be taken out of bar under this condition. Because of the same reason a continuousvery low level of output from thermal sets are not permissible. 36
  • 37. Protection under fault condition a) Differential protection: The protection is used for detection of internal faults in a specified zone defined by the CTs supplying the differential relay. For an unit connected system separate differential relays are provided for generator, generator transformer and unit auxiliary transformer in addition to the overall differential protection. In order to restrict damage very high differential relay sensitivity is demanded but sensitivity is limited by C.T errors, high inrush current during external fault and transformer tap changer variations. b) Back up impedance protection:This protection is basically designed as back up protection for the part of the installation situated between the generator and the associated generator and unit auxiliary transformers. A back up protection in the form of minimum impedance measurement is used, in which the current windings are connected to the CTs in the neutral connection of the generator and its voltage windings through a P.T to the phase to phase terminal voltage. The pick up impedance is set to such a value that it is only energized by short circuits in the zone specified above and does not respond to faultsbeyond the transformers. c) Stator earth fault protection: The earth fault protection is the protection of the generator against damages caused by the failure of insulation to earth. Present practice of grounding the generator neutral is so designed that the earth fault current is limited within 5 and 10 Amp. Fault current beyond this limit may cause serious damage to the core laminations. This leadsto very high eddy current loss with resultant heating and melting of the core. d) 95% stator earth fault protection: Inverse time voltage relay connected across the secondary of the high impedance neutral grounding transformer relay is used for protection of around 95% of the stator winding against earth fault. e) 100% stator earth fault protection: Earth fault in the entire stator circuits are detected by a selective earth fault protection covering 100% of the stator windings. This 100% E/f relay monitors the whole stator winding by means of a coded signal current continuously injected in the generator winding through a coupling. Under normal running condition the signal current flows only in the stray capacitances of the directly connected system circuit. . 37
  • 38. f) Rotor earth fault protection: Normally a single rotor earth fault is not so dangerous as the rotor circuit is unearthed and current at fault point is zero. So only alarm is provided on occurrence of 1st rotor earth fault. On occurrence of the 2nd rotor earth fault between the points of fault the field winding gets short circuited. The current in field circuit increases, resulting in heating of the field circuit and the exciter. But the more dangerous is disturbed symmetry of magnetic circuit due to partial short circuited coils leading to mechanical unbalance. MOTORS FOR THERMAL POWER PLANT All the motors in Thermal Power Stations shall be of the 3-ph. A.C. squirrel cage type except for some auxiliaries, which are emergent in nature,for which DC motors shall be used. For some small valves, single phase motors may be used. All A.C. motors shall be suitable for direct on line starting. Battery Bank Normally D.C. power is supplied by the float charger and the batteries are kept in float condition at 2.15 V per cell to avoid discharging. The charger consists of silicon diode or thyristor rectifiers preferably working on 3 ph. 415 V supply in conjunction with an automatic voltage regulator. When there is a failure in the A.C. supply the batteries will come into operation and in this process the batteries run down within few hours. After normalization of A.C. power the batteries are charged quickly by using the boost charger at 2.75 V per cell. During this time the float chargeris isolated and load is connected through the tap off point. After normalization of battery voltage these are again put back into the float charging mode. The output from the battery as well as the charger is connected to the D.C. distribution board. From D.C. distribution board power supply is distributed to different circuits. D.C. system being at the core of the protection and control mechanism very often two 100% capacity boards with individual chargers and battery sets are used from the consideration of the reliability and maintenance facility. These two boards are interconnected by suitable tie lines. 38
  • 39. CONCLUSION The practical experience that I have gathered during the overview training of large thermal power plant having a large capacity of 2340 MW for Unit# I to VIII in three weeks will be very useful as a stepping stone in building bright professional career in future life. It gave me large spectrum to utilize the theoretical knowledge and to put it into practice. The trouble shooting activities in operation and decision making in case of crisis made me more confident to work in the industrial atmosphere. Moreover, this overview training has also given a self realization & hands-on experience in developing the personality, interpersonal relationship with the professional executives, staffs and to develop the leadership ability in industry dealing with workers of all categories. I would like to thank everybody who has been a part of this project, without whom this project would never be completed with such ease. 39
  • 40. BIBLIOGRAPHY ➢ Power Plant Engineering by P.K.Nag ➢ Engineering Thermodynamics by P.K.Nag ➢ Mejia Thermal Power Station – Technical Data & Operation Guide ➢ THERMAL POWER ENGINEERING by R.K.RAJPUT. ➢ THEORY & PERFORMANCE of ELECTRICAL MACHINE by J.B.GUPTA ➢ AC & DC MACHINE by B.L.THERAJA & A.K.THERAJA. ➢ A COURSE IN ELECRICAL POWER by J.B.GUPTA. ➢ www.google.co.in 40