A checklist as the
"desired operating-pattern"
By: Sameh Zeid
sameh.zeid@gmail.com
Wednesday Sep 29, 2021
Agenda
1. Creating checklist in a complex system
2. Checklist as an operating-pattern
3. Experiment to deliver, have a system view
9-10 %
Cost of disengaged
employees globally is:
$7 trillion.
Gallup
Global GDP
References
1. Toyota Kata Practice Guide, by Mike Rother
2. The Checklist Manifesto, by Atul Gawande
3. It’s the Manager, by Jim Clifton and Jim Harter
4. The Fifth Discipline: The Art & Practice of The Learning Organization, by Peter Senge
5. The High-Velocity Edge, by Steven Spear
Aspects of a complex system
Each
requirement
is unique
Technology
is ever-
changing
Volatile
requirements
Things can
easily go
wrong
Value delivery
needs multiple
teams
People are
non-fungible Customer
cannot
specify
requirements
Business
conditions
are rapidly
changing
Customer’s
needs evolve
daily
A checklist
changes
behaviors
Discipline
Admit our
fallibility
Teamwork
The cycle of a checklist
Do the work for ‘n’
requests based on
the checklist
Analyze data and
measure
outcomes
Redesign
Checklist,
processes, org
change, and may
be strategic change
Reflection and
Learning
Collect data
Analysis of
existing data and
process, science,
and expert advice
Modified
operating-pattern
Starting
checklist
Challenge: How Might We reduce customer reported
issues per quarter to only 10% of the current level
Design
Accept &
Deploy
Build &
Test
Production
Issues
Production
Support
Team 1
Team 2
Team 3
Info 1
I
n
f
o
2
Info
3
Info 4
Info 1-4 are not just information from the respective
teams to give us. Driving info 1-4 needs study of the
request at hand, understand how it relates to various
systems, whether these systems can support this
request, what modification they might need to do,
what decisions affect our team, how data will flow, ….
New Customer
Request
The current value stream:
A target-condition
“A target condition is a description of a goal point on the
way to the more distant challenge. It describes in some
detail where you want to be next, but not how to get there.”
Mike Rother
1. Outcome performance metric and value
2. Achieve-by-date
3. Desired operating-pattern with a process metric
The overarching goal, or challenge, comes from the manager. But
the series of target conditions for getting there are designed by
teams and proposed to their manager.
This ensures goal alignment while simultaneously enabling team
self organization.
Process Analysis
Root Cause Analysis of 100 production issues showed that
80% of the problems are related to design phase. Our
team depends on team-1, team-2 and team-3 for
figuring-out information that the design needs. Frequently
our team could not glean this information and had to make
assumptions in-order to complete Design phase. These
assumptions fail the live test by the end customer causing
excessive production issues.
Desired
operating pattern
Design
New Customer
Request
Team 1
Team 2
Team 3
Info 1
Info 2
Info 3
Info 4
Decisions to continue or
stop
“The fear people have about the idea of adherence to protocol is rigidity. They imagine mindless automatons,
heads down in a checklist, incapable of looking out their windshield and coping with the real world in front of
them. But what you find, when a checklist is well made, is exactly the opposite.” Atul Gawande
Checklist Design
Condition: Customer reported issues caused by missing information
required to complete the Design
Objective: Reduce Design flaws due to missed requirements
Issue Severity ======> Medium Medium Medium
Information the team needs to
create better design
Root
Cause 1
Root
Cause 2
Root
Cause 3
Future
Capability 1
Info 1
Info 2
Info 3
Info 4
Checklist
Categories
of root
causes
We should not
allow having
critical
production
issues
Actual Requests
Req 1 Req 2 Req 3 Req 4 Req 5 Req 6 Req 7 Req 8 Req 9 Req 10
Info 1
Info 2
Info 3
Info 4
Info 2 and Info 3 are simultaneously needed to
proceed with a new customer request.
We need to establish a modified work relationship
with team 2 and team 3 that would allow our team to
drive info 2 and info 3.
Options to change how we work with
team-2 and team-3
1. Merge team-2 and team-3 with our team.
2. Keep team-2 and team-3 separate from us, but have a
predefined capacity allocated to our team.
3. Other
Actual Requests
Req 1 Req 2 Req 3 Req 4 Req 5 Req 6 Req 7 Req 8 Req 9 Req 10
Info 1
Info 2
Info 3
Info 4
The team chose option-2
Actual Requests
Req 1 Req 2 Req 3 Req 4 Req 5 Req 6 Req 7 Req 8 Req 9 Req 10
Info 1
Info 2
Info 3
Info 4
Implementing Req 1 and Req 7 require significant changes in team-2 and team-3 systems. The
investment in this effort was postponed.
This was the team's first target condition.
The story will be continuing for a while.
Based on the new working model with team-2 and
team-3, our team established next target-condition
to maintain the checklist for three more weeks. It is
estimated to have 10 requests received by the
achieve-by-date of the target-condition. The
outcome-metric is the percentage of ‘Go’ requests.
The team collects data to track progress of applying
the checklist to various requests, this data is used
for the process-metric.
Actual Requests
Req 11 Req 12 Req 13 Req 14 Req 15 Req 16 Req 17 Req 18 Req 19 Req 20
Info 1
Info 2
Info 3
Info 4
What caused this apparent setback?
Our customer has outgrown us
Now, our customers can
do advanced functions
Advancing their business
practices created the
need for new classes of
requirements
Our product capabilities
are not designed for
such new classes of
requirements
Our ability to satisfy
customer requests
+
+
+
-
Threshold
of
Knowledge
Conduct Experiments
to get there
Grasp the
Current
Condition
Establish
your Next
Target
Condition
Get the
Direction or
Challenge
1
2
3
4
Coach
Learning Zone
Daily Coaching Cycles
Learner
Story-board
5 Coaching
Questions
Vision
Obstacles
Focus
Process
“If leaders were to
prioritize one action,
Gallup recommends
that they equip their
managers to become
coaches.”
High-Velocity vs Low-Velocity Organizations
1. Cope with complexity by constantly
experimenting and learning about the
work they do
2. Understand and solve problems, not put
up with them. Getting rid of a problem
once and for all.
3. Try to find problems and areas to
improve in each activity they do.
4. Realize that solving a problem will often
reveal another that had been masked
by the first one.
5. Functional Integration is at the core of
work at all levels of management
everyday.
1. Lock into an approach that seems good
at the time, and – even when it proves
inadequate – stick with it and muddle
through.
2. Siloization- You do your part, I do mine.
3. Endless workarounds and firefighting
4. Rather than continual improvement,
“This will do for now”
High Velocity Low Velocity
The High-Velocity Edge, by Steven Spear
Plan
Do
Check
Act
● What will you try?
● What do you expect
to happen?
● When can we see the
results?
● Try it
● What actually
happened?
● What did you learn?
● Get yourself to
plan the next
step
Rapid Plan-Do-Check-Act (PDCA) Cycles
What we discussed
“I hope you learn about using a checklist as the desired
operating pattern. Then, by experimenting with this
operating pattern, we can generate new knowledge to
improve our system and products.”
This can happen when teams experiment daily while coached by their manager-
using Kata Thinking as a fractal process at various levels.
Thank you!

More Related Content

What's hot

Toyota Kata 5 key Factors for Successful Advance Groups
Toyota Kata 5 key Factors for Successful Advance GroupsToyota Kata 5 key Factors for Successful Advance Groups
Toyota Kata 5 key Factors for Successful Advance GroupsBeth Carrington
 
Starter Kata for Scientific Thinking
Starter Kata for Scientific ThinkingStarter Kata for Scientific Thinking
Starter Kata for Scientific ThinkingMike Rother
 
Developing Scientific Thinking in Your Team
Developing Scientific Thinking in Your TeamDeveloping Scientific Thinking in Your Team
Developing Scientific Thinking in Your TeamMike Rother
 
Kata Slides & Graphics v4.1
Kata Slides & Graphics v4.1Kata Slides & Graphics v4.1
Kata Slides & Graphics v4.1Mike Rother
 
259000828 toyota-kata-presentation-from-keith-deibert
259000828 toyota-kata-presentation-from-keith-deibert259000828 toyota-kata-presentation-from-keith-deibert
259000828 toyota-kata-presentation-from-keith-deibertMario Charlin
 
Why Your A3 Needs the IK
Why Your A3 Needs the IKWhy Your A3 Needs the IK
Why Your A3 Needs the IKMike Rother
 
Toyota kata for continuous improvement
Toyota kata for continuous improvementToyota kata for continuous improvement
Toyota kata for continuous improvementSudipta Lahiri
 
Toyota KATA Overview Presentation
Toyota KATA Overview PresentationToyota KATA Overview Presentation
Toyota KATA Overview PresentationUTCIS
 
The Improvement Kata Pattern
The Improvement Kata PatternThe Improvement Kata Pattern
The Improvement Kata PatternMike Rother
 
May The Kata Be With You
May The Kata Be With YouMay The Kata Be With You
May The Kata Be With Youwathomasongtuw
 
Improvement Kata Reference Guide
Improvement Kata Reference GuideImprovement Kata Reference Guide
Improvement Kata Reference GuideMike Rother
 
Toyota Kata Presentation for ITSM.fi TOP 10 Conference
Toyota Kata Presentation for ITSM.fi TOP 10 ConferenceToyota Kata Presentation for ITSM.fi TOP 10 Conference
Toyota Kata Presentation for ITSM.fi TOP 10 ConferenceTeemu Toivonen
 
Toyota Kata at University
Toyota Kata at UniversityToyota Kata at University
Toyota Kata at UniversityMike Rother
 
Wissenspool.318.vortrag nr _1__the_challenge_of_developing_lean_management.54...
Wissenspool.318.vortrag nr _1__the_challenge_of_developing_lean_management.54...Wissenspool.318.vortrag nr _1__the_challenge_of_developing_lean_management.54...
Wissenspool.318.vortrag nr _1__the_challenge_of_developing_lean_management.54...Mario Charlin
 
Portable kata storyboard
Portable kata storyboardPortable kata storyboard
Portable kata storyboardBeth Carrington
 
How to Deploy the Improvement Kata v7.0
How to Deploy the Improvement Kata v7.0How to Deploy the Improvement Kata v7.0
How to Deploy the Improvement Kata v7.0Mike Rother
 
A Definition of "Lean" - Part 1
A Definition of "Lean" - Part 1A Definition of "Lean" - Part 1
A Definition of "Lean" - Part 1Mike Rother
 
European Lean Educator Conference 2014 - Closing Remarks
European Lean Educator Conference 2014 - Closing RemarksEuropean Lean Educator Conference 2014 - Closing Remarks
European Lean Educator Conference 2014 - Closing RemarksMike Rother
 

What's hot (20)

Toyota Kata Im
Toyota Kata ImToyota Kata Im
Toyota Kata Im
 
Kata Presentation
Kata PresentationKata Presentation
Kata Presentation
 
Toyota Kata 5 key Factors for Successful Advance Groups
Toyota Kata 5 key Factors for Successful Advance GroupsToyota Kata 5 key Factors for Successful Advance Groups
Toyota Kata 5 key Factors for Successful Advance Groups
 
Starter Kata for Scientific Thinking
Starter Kata for Scientific ThinkingStarter Kata for Scientific Thinking
Starter Kata for Scientific Thinking
 
Developing Scientific Thinking in Your Team
Developing Scientific Thinking in Your TeamDeveloping Scientific Thinking in Your Team
Developing Scientific Thinking in Your Team
 
Kata Slides & Graphics v4.1
Kata Slides & Graphics v4.1Kata Slides & Graphics v4.1
Kata Slides & Graphics v4.1
 
259000828 toyota-kata-presentation-from-keith-deibert
259000828 toyota-kata-presentation-from-keith-deibert259000828 toyota-kata-presentation-from-keith-deibert
259000828 toyota-kata-presentation-from-keith-deibert
 
Why Your A3 Needs the IK
Why Your A3 Needs the IKWhy Your A3 Needs the IK
Why Your A3 Needs the IK
 
Toyota kata for continuous improvement
Toyota kata for continuous improvementToyota kata for continuous improvement
Toyota kata for continuous improvement
 
Toyota KATA Overview Presentation
Toyota KATA Overview PresentationToyota KATA Overview Presentation
Toyota KATA Overview Presentation
 
The Improvement Kata Pattern
The Improvement Kata PatternThe Improvement Kata Pattern
The Improvement Kata Pattern
 
May The Kata Be With You
May The Kata Be With YouMay The Kata Be With You
May The Kata Be With You
 
Improvement Kata Reference Guide
Improvement Kata Reference GuideImprovement Kata Reference Guide
Improvement Kata Reference Guide
 
Toyota Kata Presentation for ITSM.fi TOP 10 Conference
Toyota Kata Presentation for ITSM.fi TOP 10 ConferenceToyota Kata Presentation for ITSM.fi TOP 10 Conference
Toyota Kata Presentation for ITSM.fi TOP 10 Conference
 
Toyota Kata at University
Toyota Kata at UniversityToyota Kata at University
Toyota Kata at University
 
Wissenspool.318.vortrag nr _1__the_challenge_of_developing_lean_management.54...
Wissenspool.318.vortrag nr _1__the_challenge_of_developing_lean_management.54...Wissenspool.318.vortrag nr _1__the_challenge_of_developing_lean_management.54...
Wissenspool.318.vortrag nr _1__the_challenge_of_developing_lean_management.54...
 
Portable kata storyboard
Portable kata storyboardPortable kata storyboard
Portable kata storyboard
 
How to Deploy the Improvement Kata v7.0
How to Deploy the Improvement Kata v7.0How to Deploy the Improvement Kata v7.0
How to Deploy the Improvement Kata v7.0
 
A Definition of "Lean" - Part 1
A Definition of "Lean" - Part 1A Definition of "Lean" - Part 1
A Definition of "Lean" - Part 1
 
European Lean Educator Conference 2014 - Closing Remarks
European Lean Educator Conference 2014 - Closing RemarksEuropean Lean Educator Conference 2014 - Closing Remarks
European Lean Educator Conference 2014 - Closing Remarks
 

Similar to A checklist as the "desired operating-pattern"

OKRs - What Are They and Why Should I Care?
OKRs - What Are They and Why Should I Care?OKRs - What Are They and Why Should I Care?
OKRs - What Are They and Why Should I Care?Benjamin Gordon
 
Getting Started With CMMi level 3
Getting Started With CMMi level 3Getting Started With CMMi level 3
Getting Started With CMMi level 3Manas Das
 
Relationship Business-Projects-Operations
Relationship Business-Projects-OperationsRelationship Business-Projects-Operations
Relationship Business-Projects-OperationsHari Thapliyal
 
Project Managment Good Practices
Project Managment Good PracticesProject Managment Good Practices
Project Managment Good PracticesHari Thapliyal
 
Doing Analytics Right - Designing and Automating Analytics
Doing Analytics Right - Designing and Automating AnalyticsDoing Analytics Right - Designing and Automating Analytics
Doing Analytics Right - Designing and Automating AnalyticsTasktop
 
Moneyball as a LEAN tool
Moneyball as a LEAN toolMoneyball as a LEAN tool
Moneyball as a LEAN toolTomerAshkenazy1
 
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and AlignmentStrategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and AlignmentTKMG, Inc.
 
What it takes to Change
What it takes to ChangeWhat it takes to Change
What it takes to Changepahatem
 
Creating the Performance Culture
Creating the Performance CultureCreating the Performance Culture
Creating the Performance CultureScott Staunton
 
3 Tips to Improve Your Scheduling Process
3 Tips to Improve Your Scheduling Process3 Tips to Improve Your Scheduling Process
3 Tips to Improve Your Scheduling ProcessLean Systems
 
Devry hrm 592 all weeks dqs – course projects and final exam
Devry hrm 592 all weeks dqs – course projects and final examDevry hrm 592 all weeks dqs – course projects and final exam
Devry hrm 592 all weeks dqs – course projects and final examMelissaHarrington321
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement BprRoy Antony Arnold G
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizenGopala P.
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizenpgopala
 
ch03-Design Project.ppt
ch03-Design Project.pptch03-Design Project.ppt
ch03-Design Project.pptLuckySaigon1
 
six sigma & 7 qc tools
six sigma  &  7 qc tools six sigma  &  7 qc tools
six sigma & 7 qc tools Varmahk
 
Robert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls AgileRobert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls AgileRobert McGeachy
 

Similar to A checklist as the "desired operating-pattern" (20)

OKRs - What Are They and Why Should I Care?
OKRs - What Are They and Why Should I Care?OKRs - What Are They and Why Should I Care?
OKRs - What Are They and Why Should I Care?
 
Getting Started With CMMi level 3
Getting Started With CMMi level 3Getting Started With CMMi level 3
Getting Started With CMMi level 3
 
Relationship Business-Projects-Operations
Relationship Business-Projects-OperationsRelationship Business-Projects-Operations
Relationship Business-Projects-Operations
 
Project Managment Good Practices
Project Managment Good PracticesProject Managment Good Practices
Project Managment Good Practices
 
Doing Analytics Right - Designing and Automating Analytics
Doing Analytics Right - Designing and Automating AnalyticsDoing Analytics Right - Designing and Automating Analytics
Doing Analytics Right - Designing and Automating Analytics
 
Moneyball as a LEAN tool
Moneyball as a LEAN toolMoneyball as a LEAN tool
Moneyball as a LEAN tool
 
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and AlignmentStrategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
 
171 Red beads The company as a system - Essential Lean 2014 01
171 Red beads   The company as a system - Essential Lean 2014 01171 Red beads   The company as a system - Essential Lean 2014 01
171 Red beads The company as a system - Essential Lean 2014 01
 
What it takes to Change
What it takes to ChangeWhat it takes to Change
What it takes to Change
 
How to get things done in a dental practice: Execution Strategies
How to get things done in a dental practice:  Execution StrategiesHow to get things done in a dental practice:  Execution Strategies
How to get things done in a dental practice: Execution Strategies
 
Process mapping
Process mappingProcess mapping
Process mapping
 
Creating the Performance Culture
Creating the Performance CultureCreating the Performance Culture
Creating the Performance Culture
 
3 Tips to Improve Your Scheduling Process
3 Tips to Improve Your Scheduling Process3 Tips to Improve Your Scheduling Process
3 Tips to Improve Your Scheduling Process
 
Devry hrm 592 all weeks dqs – course projects and final exam
Devry hrm 592 all weeks dqs – course projects and final examDevry hrm 592 all weeks dqs – course projects and final exam
Devry hrm 592 all weeks dqs – course projects and final exam
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement Bpr
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizen
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizen
 
ch03-Design Project.ppt
ch03-Design Project.pptch03-Design Project.ppt
ch03-Design Project.ppt
 
six sigma & 7 qc tools
six sigma  &  7 qc tools six sigma  &  7 qc tools
six sigma & 7 qc tools
 
Robert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls AgileRobert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls Agile
 

Recently uploaded

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 

Recently uploaded (20)

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 

A checklist as the "desired operating-pattern"

  • 1. A checklist as the "desired operating-pattern" By: Sameh Zeid sameh.zeid@gmail.com Wednesday Sep 29, 2021
  • 2. Agenda 1. Creating checklist in a complex system 2. Checklist as an operating-pattern 3. Experiment to deliver, have a system view
  • 3. 9-10 % Cost of disengaged employees globally is: $7 trillion. Gallup Global GDP
  • 4. References 1. Toyota Kata Practice Guide, by Mike Rother 2. The Checklist Manifesto, by Atul Gawande 3. It’s the Manager, by Jim Clifton and Jim Harter 4. The Fifth Discipline: The Art & Practice of The Learning Organization, by Peter Senge 5. The High-Velocity Edge, by Steven Spear
  • 5. Aspects of a complex system Each requirement is unique Technology is ever- changing Volatile requirements Things can easily go wrong Value delivery needs multiple teams People are non-fungible Customer cannot specify requirements Business conditions are rapidly changing Customer’s needs evolve daily
  • 7. The cycle of a checklist Do the work for ‘n’ requests based on the checklist Analyze data and measure outcomes Redesign Checklist, processes, org change, and may be strategic change Reflection and Learning Collect data Analysis of existing data and process, science, and expert advice Modified operating-pattern Starting checklist
  • 8. Challenge: How Might We reduce customer reported issues per quarter to only 10% of the current level Design Accept & Deploy Build & Test Production Issues Production Support Team 1 Team 2 Team 3 Info 1 I n f o 2 Info 3 Info 4 Info 1-4 are not just information from the respective teams to give us. Driving info 1-4 needs study of the request at hand, understand how it relates to various systems, whether these systems can support this request, what modification they might need to do, what decisions affect our team, how data will flow, …. New Customer Request The current value stream:
  • 9. A target-condition “A target condition is a description of a goal point on the way to the more distant challenge. It describes in some detail where you want to be next, but not how to get there.” Mike Rother 1. Outcome performance metric and value 2. Achieve-by-date 3. Desired operating-pattern with a process metric
  • 10. The overarching goal, or challenge, comes from the manager. But the series of target conditions for getting there are designed by teams and proposed to their manager. This ensures goal alignment while simultaneously enabling team self organization.
  • 11. Process Analysis Root Cause Analysis of 100 production issues showed that 80% of the problems are related to design phase. Our team depends on team-1, team-2 and team-3 for figuring-out information that the design needs. Frequently our team could not glean this information and had to make assumptions in-order to complete Design phase. These assumptions fail the live test by the end customer causing excessive production issues.
  • 12. Desired operating pattern Design New Customer Request Team 1 Team 2 Team 3 Info 1 Info 2 Info 3 Info 4 Decisions to continue or stop “The fear people have about the idea of adherence to protocol is rigidity. They imagine mindless automatons, heads down in a checklist, incapable of looking out their windshield and coping with the real world in front of them. But what you find, when a checklist is well made, is exactly the opposite.” Atul Gawande
  • 13. Checklist Design Condition: Customer reported issues caused by missing information required to complete the Design Objective: Reduce Design flaws due to missed requirements
  • 14. Issue Severity ======> Medium Medium Medium Information the team needs to create better design Root Cause 1 Root Cause 2 Root Cause 3 Future Capability 1 Info 1 Info 2 Info 3 Info 4 Checklist Categories of root causes We should not allow having critical production issues
  • 15. Actual Requests Req 1 Req 2 Req 3 Req 4 Req 5 Req 6 Req 7 Req 8 Req 9 Req 10 Info 1 Info 2 Info 3 Info 4
  • 16. Info 2 and Info 3 are simultaneously needed to proceed with a new customer request. We need to establish a modified work relationship with team 2 and team 3 that would allow our team to drive info 2 and info 3.
  • 17. Options to change how we work with team-2 and team-3 1. Merge team-2 and team-3 with our team. 2. Keep team-2 and team-3 separate from us, but have a predefined capacity allocated to our team. 3. Other
  • 18. Actual Requests Req 1 Req 2 Req 3 Req 4 Req 5 Req 6 Req 7 Req 8 Req 9 Req 10 Info 1 Info 2 Info 3 Info 4 The team chose option-2
  • 19. Actual Requests Req 1 Req 2 Req 3 Req 4 Req 5 Req 6 Req 7 Req 8 Req 9 Req 10 Info 1 Info 2 Info 3 Info 4 Implementing Req 1 and Req 7 require significant changes in team-2 and team-3 systems. The investment in this effort was postponed.
  • 20. This was the team's first target condition. The story will be continuing for a while.
  • 21. Based on the new working model with team-2 and team-3, our team established next target-condition to maintain the checklist for three more weeks. It is estimated to have 10 requests received by the achieve-by-date of the target-condition. The outcome-metric is the percentage of ‘Go’ requests. The team collects data to track progress of applying the checklist to various requests, this data is used for the process-metric.
  • 22. Actual Requests Req 11 Req 12 Req 13 Req 14 Req 15 Req 16 Req 17 Req 18 Req 19 Req 20 Info 1 Info 2 Info 3 Info 4 What caused this apparent setback?
  • 23. Our customer has outgrown us Now, our customers can do advanced functions Advancing their business practices created the need for new classes of requirements Our product capabilities are not designed for such new classes of requirements Our ability to satisfy customer requests + + + -
  • 24. Threshold of Knowledge Conduct Experiments to get there Grasp the Current Condition Establish your Next Target Condition Get the Direction or Challenge 1 2 3 4 Coach Learning Zone Daily Coaching Cycles Learner Story-board 5 Coaching Questions Vision Obstacles Focus Process “If leaders were to prioritize one action, Gallup recommends that they equip their managers to become coaches.”
  • 25. High-Velocity vs Low-Velocity Organizations 1. Cope with complexity by constantly experimenting and learning about the work they do 2. Understand and solve problems, not put up with them. Getting rid of a problem once and for all. 3. Try to find problems and areas to improve in each activity they do. 4. Realize that solving a problem will often reveal another that had been masked by the first one. 5. Functional Integration is at the core of work at all levels of management everyday. 1. Lock into an approach that seems good at the time, and – even when it proves inadequate – stick with it and muddle through. 2. Siloization- You do your part, I do mine. 3. Endless workarounds and firefighting 4. Rather than continual improvement, “This will do for now” High Velocity Low Velocity The High-Velocity Edge, by Steven Spear
  • 26. Plan Do Check Act ● What will you try? ● What do you expect to happen? ● When can we see the results? ● Try it ● What actually happened? ● What did you learn? ● Get yourself to plan the next step Rapid Plan-Do-Check-Act (PDCA) Cycles
  • 27. What we discussed “I hope you learn about using a checklist as the desired operating pattern. Then, by experimenting with this operating pattern, we can generate new knowledge to improve our system and products.” This can happen when teams experiment daily while coached by their manager- using Kata Thinking as a fractal process at various levels.