This is an excerpt from the presentation made by BWSSB (Bangalore Water Supply and Sewerage Board) detailing the Water Supply situation in Bangalore. The presentation was made in The Water Workshop conducted on 6-Dec-2009, by ApartmentAdda.com for RWAs.
More resources from the workshop at:
http://apartmentadda.com/blog/dec-6-2009-water-workshop/
33. Total Estimated Cost of Project Items Amount (Rs. Crores) Water Supply Component 1415 Sewerage Component 667 Distribution Improvement Component 249 Management Improvement 25 Slum Development 49 Price Escalation 184 Physical Contingencies 123 Interest During Construction 119 Sub-Total – JBIC Financed Portion 2831 Land Acquisition 61 Administration 202 Taxes and Duties 290 Total Project Cost 3384
34.
35.
36. About Bangalore sanitary system 1920-1950 Sewerage system existed 1950-1960 Major sewerage system constructed 1970-1980 K & C Valley wastewater treatment plant ( Primary) & V- Valley STP (Primary) 1980-2000 K & C and V Valley and Hebbal upgraded to secondary 2000-2010 CWSS Stage IV Phase I – 7 treatment plants & sewerage system
37.
38. Abstract of sewer statistics >400mm Core Area Sewers less than 400 mm dia Length – 3367 KMs Number of Manholes – 1,21,364 Zones Total Length in Km Existing inside SWD in Km No of manholes in Nos Hebbal 45 9 1650 K&C 113 35 2857 V Valley 85 18 1746 Total 243 62 6253
39. Locations of existing STP`s Yelahanka TTP Jakkur STP Hebbal STP KR Puram STP Kadabeesanahalli STP K & C Valley STP Madiwala STP Kempambudhi STP Mylasandra STP V Valley STP & TTP Nagasandra STP Rajacanal STP
40. Wastewater Treatment Plants Sl. No. Location Capacity in MLD Treatment Facility Under CWSS I, II, III stages 1. Vrishabhavathi Valley 180 Secondary – Trickling filters 2. K & C Valley I 163 Secondary: Activated sludge process 3. Hebbal Valley 60 Secondary: Activated sludge process 4. Madivala 04 Secondary: UASB + oxidation ponds+ constructed wetlands 5. Kempambudhi 01 Secondary: extended Aeration 6. Yelahanka 10 Activated sludge process + filtration+ chlorination (Tertiary)
41. Wastewater Treatment Plants Note : V. Valley 60 MLD Tertiary treatment plant is fed by 180 MLD STP Under CWSS Stage IV Phase I Sl. No. Location Capacity in MLD Treatment Facility 1. Mylasandra 75 Secondary – Extended aeration 2. Nagasandra 20 Secondary -Extended aeration 3. Jakkur 10 Secondary – UASB +Extended aeration 4. K. R. Puram 20 Secondary – UASB +Extended aeration 5. Kadabeesanahalli 50 Secondary-Extended aeration 6. K & C Valley II 30 Secondary - Extended aeration 7. K & C Valley III 55 Secondary – CMAS 8. Rajacanal 40 Secondary- Extended aeration Grand Total 718
42. Wastewater Treatment Plants Raw sewage characteristics Raw sewage BOD : Average 350 mg/lit Raw sewage suspended solids: Average 400-500 mg/lit Treated effluent standards ( Secondary) Treated effluent BOD : < 20 mg/lit Treated effluent suspended solids : < 30 mg/lit Tertiary standards Treated effluent BOD : < 5 mg/lit Treated effluent suspended solids : < 5 mg/lit Coliforms : < 2.2/100ml
57. Population in BBMP Area Year Population in Lakhs Water Demand in MLD Water supply in MLD Short fall in MLD 2001 53.79 870 540 330 2007 75.00 1219 870 349 2015 88.00 1720 1470 250 2021 100.00 2125 1470 655 2036 125.00 2550 1470 1080