Introduction
 The construction of Diyala weir commenced in 1966 and was
  completed in 1969.

 The structure includes a road bridge and new canal head works.

 This structure is located 7km downstream from the Hamren
  dam, approximately 130 Km northeast of Baghdad, near the town
  of Sidor.

 The main purpose of this Weir is to divert outflow of the Hamren
  dam to the Khalis and Sadr Al-Mushtarak canals for irrigation.
Section of Diyala Weir
The Problem
 Seepage of water is one of the major problems, which has an effect
  upon hydraulic structures.

 Diyala weir structure is suffering from such engineering problems.
  It was taken as a case study and it had been checked against piping
  and uplift pressure by using numerical model.

 The effect of removing one of the three sheet piles rows was
  studied and evaluated to investigate the quantity of seepage, uplift
  pressure and expected exit hydraulic gradient for these cases.
Input Data for Seepage Analysis
 Total length of a weir foundation equals 24.5 m.

 Depth of 1st row of sheet piles (upstream sheet pile) equals 4.5 m.

 Depth of 2nd row of sheet piles (middle sheet pile) equals 2.5 m.

 Depth of 3rd row of sheet piles (downstream sheet pile) equals 3.5 m.

 Unit weight of the soil underneath Diyala weir equals 18 kN/m2.

 Permeability for clay soil underneath Diyala weir equals 1e-5 m/s.

 Depth of impervious layer below Diyala weir foundation equals 11m
  from the bed level (B.L).

 Soil foundation underneath the weir is saturated, isotropic and
  homogenous.
Seepage Analysis by FEA
Seepage Analysis by FEA (Contd.)
FEM Model Properties

 The Eight noded quadrilateral elements were used to idealize the
  vertical cross section of permeable soil underneath Diyala weir
  with the following Mesh Properties,

  Mesh type: graded          Analysis Type: Plane Strain

  Number of elements: 1278   Solver Type: Gaussian Elimination
                             Maximum Number of Iterations: 500
  Number of nodes: 3989
                             Tolerance: 1e-006
Diyala Weir Model in Phase2 with all Cutoff
Seepage Results from Phase2 with all cutoff
6.00



5.00



4.00



3.00
   15.00   16.00   17.00   18.00   19.00   20.00   21.00   22.00   23.00   24.00
Uplift Pressure (Contd.)

 The thickness of weir impervious floor at any point should not

  be less than 2/3 of uplift pressure.

 The required floor thickness for points below downstream floor

  and the provided floor thickness are tabulated below,
Uplift Pressure along Base Slab
     0.00   4.00   8.00   12.00   16.00   20.00   24.00
62.00


63.00


64.00


65.00


66.00


67.00


68.00
Floor Thickness
  Distance    Floor Elevation   Total Pressure at                         Required Floor                     Provided Floor
                                                    Uplift Pressure (m)                     Calculated by                     Diff
along D/s (m)       (m)             Base (m)                              Thickness (m)                      Thickness (m)
                                                                                               Authors


    0.00           61.50             68.00                 6.50                4.33               -               6.00        1.67
    1.00           60.50             66.05                 5.55                3.70               -               5.92        2.22
    2.00           60.50             66.03                 5.53                3.69               -               5.58        1.90
    3.00           60.50             66.01                 5.51                3.67               -               5.24        1.57
    4.00           61.50             65.51                 4.01                2.67               -               3.91        1.24
    5.00           61.50             65.50                 4.00                2.66               -               3.58        0.91
    6.00           61.33             65.47                 4.14                2.76               -               3.41        0.65
    7.00           61.00             65.43                 4.43                2.95               -               3.41        0.45
    8.00           60.67             65.36                 4.69                3.13               -               3.40        0.28
    9.00           60.33             65.27                 4.94                3.29               -               3.40        0.11
   10.00           60.00             65.17                 5.17                3.45               -               3.40        -0.05
   11.00           59.67             65.05                 5.39                3.59               -               3.40        -0.19
   12.00           59.33             64.92                 5.59                3.73               -               3.40        -0.33
   13.00           59.00             64.76                 5.76                3.84               -               3.40        -0.45
   14.00           59.00             64.61                 5.61                3.74               -               3.06        -0.68
   15.00           59.00             64.46                 5.46                3.64             2.49              2.73        -0.92
   16.00           59.00             64.33                 5.33                3.55             2.41              2.50        -1.05
   17.00           59.00             64.19                 5.19                3.46             2.34              2.50        -0.96
   18.00           59.00             64.06                 5.06                3.37             2.26              2.50        -0.87
   19.00           59.00             63.91                 4.91                3.27             2.22              2.50        -0.77
   20.00           59.50             63.81                 4.31                2.87             1.93              2.00        -0.87
   21.00           59.50             63.73                 4.23                2.82             1.89              2.00        -0.82
   22.00           59.50             63.66                 4.16                2.77             1.85              2.00        -0.77
   23.00           59.50             63.61                 4.11                2.74             1.83              2.00        -0.74
   24.00           59.50             62.05                 2.55                1.70             1.00              2.00        0.30
Exit Gradient (Contd.)
 The critical hydraulic gradient (icr ) was calculated from,



 The unit weight of saturated soil underneath the weir structure is
  18 kN/m2 and unit weight of water 9.807 kN/m2. The calculated
  value of the critical hydraulic gradient is 0.835.

 This lead to factor of Safety against piping equals;



 The exit gradient from the Analysis is 0.17, lead to Fs = 4.9. A factor
  of safety (Fs) of 4.9 is considered adequate for the safe performance
  of the Diyala weir structure against piping
Exit Gradient Plot from Phase2 with all cutoff
                  The Exit Gradient Value from SEEP / W is 0.17
                  The Exit Gradient from Phase 2 is 0.18
Pressure Plot with No U/S cutoff
Exit Gradient Plot with No U/S cutoff
                 The Exit Gradient Value from SEEP / W is 0.19
                 The Exit Gradient from Phase 2 is 0.24
Pressure Plot with No U/S cutoff
Pressure Plot with No Middle cutoff
Exit Gradient Plot with No Middle cutoff
                 The Exit Gradient Value from SEEP / W is 0.17
                 The Exit Gradient from Phase 2 is 0.20
Pressure Plot with No End cutoff
Exit Gradient Plot with No End cutoff
                 The Exit Gradient Value from SEEP / W is 0.21
                 The Exit Gradient from Phase 2 is 0.25
Seepage and Exit Gradient
     The below results of quantity of seepage and exit gradient for each
        case as one sheet pile assumed to be removed.
                        Without Ist Sheet Pile      Without IInd Sheet Pile      Without IIIrd Sheet Pile
    Description
                      Author's           Ours     Author's            Ours     Author's             Ours


Quantity of Seepage
                      1.10E-05         1.33E-05   9.62E-06          1.19E-05   1.05E-05           1.31E-05
       (m3/s)


   Exit Gradient        0.19              0.24      0.17               0.2       0.21               0.25



  Factor of Safety      4.4               3.5       4.9                4.2       3.9                3.34



     It is noted from the results of removing the first sheet pile is more
        effective on increasing of seepage while removing the third sheet
        pile is more effective on increasing of exit gradient values but the
        factor of safety against piping (Fs) for all values represent safe
        situation.
Summary of Results
The following results are obtained by using 2-D finite element
model of Diyala Weir,

 Foundation of Diyala weir is safe against piping and any excessive
  uplift pressures.

 The defect in one or more of the three sheet piles has caused
  displacement of the downstream floor (apron slab), cracking in
  weir foundation and scour of soil underneath the weir, due to
  increasing the quantity of seepage, uplift pressure and exit
  gradient.
Summary of Results (Contd.)
 Investigation of failure leads to suspect that the sheet piles in
  upstream is exposing, and could be corroded and defected.

 The defects in the first row of sheet piles are more effective on
  increasing uplift pressure and quantity of seepage than the other
  two rows of sheet piles while defects in the last rows of sheet piles
  are the most effective on increasing the exit hydraulic gradient.
Conclusion
 This research suggests solutions for preventing expected weir
  foundation failure problems by:

 Improving the seal between elements of the sheet piles and
  repairing any defects.

 Sealing any cracks in the weir foundation by injection of chemical
  materials or cement grout.

 The Same Problem also validated with another FEM software
  (Phase2) successfully.
Diyala Weir Model in SEEP/W
Seepage Results from SEEP/W

More Related Content

What's hot

types of canals
types of canals types of canals
types of canals number113
 
Silt excluders
Silt excludersSilt excluders
Silt excludersRaees Shah
 
Permeability of Soil
Permeability of SoilPermeability of Soil
Permeability of SoilArbaz Kazi
 
Lecture 07 permeability and seepage (11-dec-2021)
Lecture 07 permeability and seepage (11-dec-2021)Lecture 07 permeability and seepage (11-dec-2021)
Lecture 07 permeability and seepage (11-dec-2021)HusiShah
 
Rigid pavement distress
Rigid pavement distress Rigid pavement distress
Rigid pavement distress Ankit Sarkar
 
economic channel section
economic channel sectioneconomic channel section
economic channel sectionVaibhav Pathak
 
Canal alignment
Canal alignmentCanal alignment
Canal alignmentNaveenaa
 
weir & barrage
weir & barrageweir & barrage
weir & barrageRaj Daxini
 
Energy dissipators
Energy dissipatorsEnergy dissipators
Energy dissipatorsRahul Gupta
 
Geophysical methods of soil/Foundation testing
Geophysical methods of soil/Foundation testing Geophysical methods of soil/Foundation testing
Geophysical methods of soil/Foundation testing Pirpasha Ujede
 
Principles of groundwater flow
Principles of groundwater flowPrinciples of groundwater flow
Principles of groundwater flowFritz Lejarso
 

What's hot (20)

types of canals
types of canals types of canals
types of canals
 
Silt excluders
Silt excludersSilt excluders
Silt excluders
 
Basics of soil mechanics
Basics of soil mechanics   Basics of soil mechanics
Basics of soil mechanics
 
Permeability of Soil
Permeability of SoilPermeability of Soil
Permeability of Soil
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
Soil mechanics notes
Soil mechanics notesSoil mechanics notes
Soil mechanics notes
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Embankment lecture 1
Embankment lecture 1Embankment lecture 1
Embankment lecture 1
 
Lecture 07 permeability and seepage (11-dec-2021)
Lecture 07 permeability and seepage (11-dec-2021)Lecture 07 permeability and seepage (11-dec-2021)
Lecture 07 permeability and seepage (11-dec-2021)
 
Pile foundation
Pile  foundation Pile  foundation
Pile foundation
 
Rigid pavement distress
Rigid pavement distress Rigid pavement distress
Rigid pavement distress
 
economic channel section
economic channel sectioneconomic channel section
economic channel section
 
Permeability
PermeabilityPermeability
Permeability
 
Canal alignment
Canal alignmentCanal alignment
Canal alignment
 
weir & barrage
weir & barrageweir & barrage
weir & barrage
 
Dams
DamsDams
Dams
 
Energy dissipators
Energy dissipatorsEnergy dissipators
Energy dissipators
 
Geophysical methods of soil/Foundation testing
Geophysical methods of soil/Foundation testing Geophysical methods of soil/Foundation testing
Geophysical methods of soil/Foundation testing
 
Principles of groundwater flow
Principles of groundwater flowPrinciples of groundwater flow
Principles of groundwater flow
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 

Viewers also liked (6)

Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Week1 ie l
Week1 ie lWeek1 ie l
Week1 ie l
 
Dams and barrages
Dams and barragesDams and barrages
Dams and barrages
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
Weir and barrage lecture
Weir and barrage lectureWeir and barrage lecture
Weir and barrage lecture
 
Design of barrages
Design of barragesDesign of barrages
Design of barrages
 

Similar to Seepage analysis final

Semia1 segunda prueva
Semia1   segunda pruevaSemia1   segunda prueva
Semia1 segunda pruevateamfg
 
Semia210209
Semia210209Semia210209
Semia210209teamfg
 
Final de tercera prueva
Final  de tercera pruevaFinal  de tercera prueva
Final de tercera pruevateamfg
 
club-asteria income plan
club-asteria income planclub-asteria income plan
club-asteria income plansmartatul
 
Semib segnda preuva
Semib   segnda preuvaSemib   segnda preuva
Semib segnda preuvateamfg
 
Equations cheat sheet
Equations cheat sheetEquations cheat sheet
Equations cheat sheetgenegeek
 
FreakonomicsOfScrum spreadsheet
FreakonomicsOfScrum spreadsheetFreakonomicsOfScrum spreadsheet
FreakonomicsOfScrum spreadsheetguest4ed39d
 
Weight & thickness
Weight & thicknessWeight & thickness
Weight & thicknesspoonmaram
 
FreakonomicsOfScrum spreadsheet
FreakonomicsOfScrum spreadsheetFreakonomicsOfScrum spreadsheet
FreakonomicsOfScrum spreadsheetMaxim Dorofeev
 
Triangulation Sample
Triangulation  SampleTriangulation  Sample
Triangulation SampleChattichai
 
Standard resistor and_capaciter_values
Standard resistor and_capaciter_valuesStandard resistor and_capaciter_values
Standard resistor and_capaciter_valuesVishwanada
 

Similar to Seepage analysis final (20)

7
77
7
 
7
77
7
 
Semia1 segunda prueva
Semia1   segunda pruevaSemia1   segunda prueva
Semia1 segunda prueva
 
6
66
6
 
6
66
6
 
Semia210209
Semia210209Semia210209
Semia210209
 
Results Det 3
Results   Det 3Results   Det 3
Results Det 3
 
Final de tercera prueva
Final  de tercera pruevaFinal  de tercera prueva
Final de tercera prueva
 
Bolt details
Bolt detailsBolt details
Bolt details
 
club-asteria income plan
club-asteria income planclub-asteria income plan
club-asteria income plan
 
Semib segnda preuva
Semib   segnda preuvaSemib   segnda preuva
Semib segnda preuva
 
Equations cheat sheet
Equations cheat sheetEquations cheat sheet
Equations cheat sheet
 
Useful engineering data
Useful engineering dataUseful engineering data
Useful engineering data
 
Msrdc case study
Msrdc case studyMsrdc case study
Msrdc case study
 
FreakonomicsOfScrum spreadsheet
FreakonomicsOfScrum spreadsheetFreakonomicsOfScrum spreadsheet
FreakonomicsOfScrum spreadsheet
 
Weight & thickness
Weight & thicknessWeight & thickness
Weight & thickness
 
FreakonomicsOfScrum spreadsheet
FreakonomicsOfScrum spreadsheetFreakonomicsOfScrum spreadsheet
FreakonomicsOfScrum spreadsheet
 
Not123
Not123Not123
Not123
 
Triangulation Sample
Triangulation  SampleTriangulation  Sample
Triangulation Sample
 
Standard resistor and_capaciter_values
Standard resistor and_capaciter_valuesStandard resistor and_capaciter_values
Standard resistor and_capaciter_values
 

Recently uploaded

PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdfvaibhavkanaujia
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back17lcow074
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
cda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptcda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptMaryamAfzal41
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10uasjlagroup
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...Rishabh Aryan
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfShivakumar Viswanathan
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作7tz4rjpd
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Servicejennyeacort
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 

Recently uploaded (20)

PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdf
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
cda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis pptcda.pptx critical discourse analysis ppt
cda.pptx critical discourse analysis ppt
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
 
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
DAKSHIN BIHAR GRAMIN BANK: REDEFINING THE DIGITAL BANKING EXPERIENCE WITH A U...
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdf
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 
韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作韩国SKKU学位证,成均馆大学毕业证书1:1制作
韩国SKKU学位证,成均馆大学毕业证书1:1制作
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 

Seepage analysis final

  • 1. Presented by: Saravanan Winfred George
  • 2. Introduction  The construction of Diyala weir commenced in 1966 and was completed in 1969.  The structure includes a road bridge and new canal head works.  This structure is located 7km downstream from the Hamren dam, approximately 130 Km northeast of Baghdad, near the town of Sidor.  The main purpose of this Weir is to divert outflow of the Hamren dam to the Khalis and Sadr Al-Mushtarak canals for irrigation.
  • 3.
  • 4.
  • 6. The Problem  Seepage of water is one of the major problems, which has an effect upon hydraulic structures.  Diyala weir structure is suffering from such engineering problems. It was taken as a case study and it had been checked against piping and uplift pressure by using numerical model.  The effect of removing one of the three sheet piles rows was studied and evaluated to investigate the quantity of seepage, uplift pressure and expected exit hydraulic gradient for these cases.
  • 7. Input Data for Seepage Analysis  Total length of a weir foundation equals 24.5 m.  Depth of 1st row of sheet piles (upstream sheet pile) equals 4.5 m.  Depth of 2nd row of sheet piles (middle sheet pile) equals 2.5 m.  Depth of 3rd row of sheet piles (downstream sheet pile) equals 3.5 m.  Unit weight of the soil underneath Diyala weir equals 18 kN/m2.  Permeability for clay soil underneath Diyala weir equals 1e-5 m/s.  Depth of impervious layer below Diyala weir foundation equals 11m from the bed level (B.L).  Soil foundation underneath the weir is saturated, isotropic and homogenous.
  • 9. Seepage Analysis by FEA (Contd.)
  • 10. FEM Model Properties  The Eight noded quadrilateral elements were used to idealize the vertical cross section of permeable soil underneath Diyala weir with the following Mesh Properties, Mesh type: graded Analysis Type: Plane Strain Number of elements: 1278 Solver Type: Gaussian Elimination Maximum Number of Iterations: 500 Number of nodes: 3989 Tolerance: 1e-006
  • 11. Diyala Weir Model in Phase2 with all Cutoff
  • 12. Seepage Results from Phase2 with all cutoff
  • 13. 6.00 5.00 4.00 3.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00
  • 14. Uplift Pressure (Contd.)  The thickness of weir impervious floor at any point should not be less than 2/3 of uplift pressure.  The required floor thickness for points below downstream floor and the provided floor thickness are tabulated below,
  • 15. Uplift Pressure along Base Slab 0.00 4.00 8.00 12.00 16.00 20.00 24.00 62.00 63.00 64.00 65.00 66.00 67.00 68.00
  • 16. Floor Thickness Distance Floor Elevation Total Pressure at Required Floor Provided Floor Uplift Pressure (m) Calculated by Diff along D/s (m) (m) Base (m) Thickness (m) Thickness (m) Authors 0.00 61.50 68.00 6.50 4.33 - 6.00 1.67 1.00 60.50 66.05 5.55 3.70 - 5.92 2.22 2.00 60.50 66.03 5.53 3.69 - 5.58 1.90 3.00 60.50 66.01 5.51 3.67 - 5.24 1.57 4.00 61.50 65.51 4.01 2.67 - 3.91 1.24 5.00 61.50 65.50 4.00 2.66 - 3.58 0.91 6.00 61.33 65.47 4.14 2.76 - 3.41 0.65 7.00 61.00 65.43 4.43 2.95 - 3.41 0.45 8.00 60.67 65.36 4.69 3.13 - 3.40 0.28 9.00 60.33 65.27 4.94 3.29 - 3.40 0.11 10.00 60.00 65.17 5.17 3.45 - 3.40 -0.05 11.00 59.67 65.05 5.39 3.59 - 3.40 -0.19 12.00 59.33 64.92 5.59 3.73 - 3.40 -0.33 13.00 59.00 64.76 5.76 3.84 - 3.40 -0.45 14.00 59.00 64.61 5.61 3.74 - 3.06 -0.68 15.00 59.00 64.46 5.46 3.64 2.49 2.73 -0.92 16.00 59.00 64.33 5.33 3.55 2.41 2.50 -1.05 17.00 59.00 64.19 5.19 3.46 2.34 2.50 -0.96 18.00 59.00 64.06 5.06 3.37 2.26 2.50 -0.87 19.00 59.00 63.91 4.91 3.27 2.22 2.50 -0.77 20.00 59.50 63.81 4.31 2.87 1.93 2.00 -0.87 21.00 59.50 63.73 4.23 2.82 1.89 2.00 -0.82 22.00 59.50 63.66 4.16 2.77 1.85 2.00 -0.77 23.00 59.50 63.61 4.11 2.74 1.83 2.00 -0.74 24.00 59.50 62.05 2.55 1.70 1.00 2.00 0.30
  • 17. Exit Gradient (Contd.)  The critical hydraulic gradient (icr ) was calculated from,  The unit weight of saturated soil underneath the weir structure is 18 kN/m2 and unit weight of water 9.807 kN/m2. The calculated value of the critical hydraulic gradient is 0.835.  This lead to factor of Safety against piping equals;  The exit gradient from the Analysis is 0.17, lead to Fs = 4.9. A factor of safety (Fs) of 4.9 is considered adequate for the safe performance of the Diyala weir structure against piping
  • 18. Exit Gradient Plot from Phase2 with all cutoff The Exit Gradient Value from SEEP / W is 0.17 The Exit Gradient from Phase 2 is 0.18
  • 19. Pressure Plot with No U/S cutoff
  • 20. Exit Gradient Plot with No U/S cutoff The Exit Gradient Value from SEEP / W is 0.19 The Exit Gradient from Phase 2 is 0.24
  • 21. Pressure Plot with No U/S cutoff
  • 22. Pressure Plot with No Middle cutoff
  • 23. Exit Gradient Plot with No Middle cutoff The Exit Gradient Value from SEEP / W is 0.17 The Exit Gradient from Phase 2 is 0.20
  • 24. Pressure Plot with No End cutoff
  • 25. Exit Gradient Plot with No End cutoff The Exit Gradient Value from SEEP / W is 0.21 The Exit Gradient from Phase 2 is 0.25
  • 26. Seepage and Exit Gradient  The below results of quantity of seepage and exit gradient for each case as one sheet pile assumed to be removed. Without Ist Sheet Pile Without IInd Sheet Pile Without IIIrd Sheet Pile Description Author's Ours Author's Ours Author's Ours Quantity of Seepage 1.10E-05 1.33E-05 9.62E-06 1.19E-05 1.05E-05 1.31E-05 (m3/s) Exit Gradient 0.19 0.24 0.17 0.2 0.21 0.25 Factor of Safety 4.4 3.5 4.9 4.2 3.9 3.34  It is noted from the results of removing the first sheet pile is more effective on increasing of seepage while removing the third sheet pile is more effective on increasing of exit gradient values but the factor of safety against piping (Fs) for all values represent safe situation.
  • 27. Summary of Results The following results are obtained by using 2-D finite element model of Diyala Weir,  Foundation of Diyala weir is safe against piping and any excessive uplift pressures.  The defect in one or more of the three sheet piles has caused displacement of the downstream floor (apron slab), cracking in weir foundation and scour of soil underneath the weir, due to increasing the quantity of seepage, uplift pressure and exit gradient.
  • 28. Summary of Results (Contd.)  Investigation of failure leads to suspect that the sheet piles in upstream is exposing, and could be corroded and defected.  The defects in the first row of sheet piles are more effective on increasing uplift pressure and quantity of seepage than the other two rows of sheet piles while defects in the last rows of sheet piles are the most effective on increasing the exit hydraulic gradient.
  • 29. Conclusion  This research suggests solutions for preventing expected weir foundation failure problems by:  Improving the seal between elements of the sheet piles and repairing any defects.  Sealing any cracks in the weir foundation by injection of chemical materials or cement grout.  The Same Problem also validated with another FEM software (Phase2) successfully.