Six Sigma in Action




                                      BMW Program


                                        Thomas Henning
                                        Program Manager
                                        8/19/02

Master Black Belt: Steven Bonacorsi
Six Sigma in Action
                                                                                      IMAC Process
Customer Profile – 3,000 seat Auto Manufacturing company                           Defect
                                                                                                     Before

                                                                                   10.8%         (Sigma = 3.4)
Business Problem & Impact
Installs Moves Adds and Changes process not affording consistent asset
tracking. Inconsistent database and time waited tracking down missing
equipment.

Measure & Analyze                                                                          Success
Data Collection: Installs Moves Adds and Changes completed and                              89.2%
entered into asset management data base
The existing process sigma was 3.4
Root Causes: 1. Technician did not think a blank field was critical.
2. IMAC request process not being followed by BMW customer.
3. Lack of Technician Experience/Training.
                                                                                                     After
Improve & Control                                                                Defects
Use the operational definitions to provide training to the technical staff on                    (Sigma = 3.9)
                                                                                   1%
how to properly complete the IMAC form. Set policy in place measuring
each employee on form completeness. Service Delivery Leader will
monitor employee conformity to this policy.

Results/Benefits                                                                      Success
Improved employee process knowledge and IMAC form accuracy.                             99%
Resulting in asset data base improvements which in turn save indirect
and direct dollars.




                                      A savings of US$6,048 in 2003!

More Related Content

What's hot

Zara Procurement strategy
Zara Procurement strategyZara Procurement strategy
Zara Procurement strategy
binotrisha
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
vivekissar
 
Cargills Food City Supply Chain
Cargills Food City Supply ChainCargills Food City Supply Chain
Cargills Food City Supply Chain
nilusha dilhani
 

What's hot (20)

Mango globalization
Mango globalizationMango globalization
Mango globalization
 
Toyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case StudyToyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case Study
 
Zara Procurement strategy
Zara Procurement strategyZara Procurement strategy
Zara Procurement strategy
 
Arrow electronics case b2 b
Arrow electronics case b2 bArrow electronics case b2 b
Arrow electronics case b2 b
 
Hubspot Case Analysis
Hubspot Case AnalysisHubspot Case Analysis
Hubspot Case Analysis
 
Global Wine War
Global Wine WarGlobal Wine War
Global Wine War
 
Levi's branding strategy
Levi's branding strategyLevi's branding strategy
Levi's branding strategy
 
Six sigma amazon case study
Six sigma amazon case studySix sigma amazon case study
Six sigma amazon case study
 
6 sigma basic best ppt
6 sigma basic best ppt6 sigma basic best ppt
6 sigma basic best ppt
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
Case Analysis: Martha Stewart Organization (MSO)
Case Analysis: Martha Stewart Organization (MSO)Case Analysis: Martha Stewart Organization (MSO)
Case Analysis: Martha Stewart Organization (MSO)
 
Pepe jeans case study report
Pepe jeans case study reportPepe jeans case study report
Pepe jeans case study report
 
Tru earth case study
Tru earth case studyTru earth case study
Tru earth case study
 
BMW Case Study Analysis
BMW Case Study AnalysisBMW Case Study Analysis
BMW Case Study Analysis
 
Cargills Food City Supply Chain
Cargills Food City Supply ChainCargills Food City Supply Chain
Cargills Food City Supply Chain
 
Brilla spa ( case study )
Brilla spa ( case study )Brilla spa ( case study )
Brilla spa ( case study )
 
Ontela PicDeck (B): Case Analysis
Ontela PicDeck (B): Case AnalysisOntela PicDeck (B): Case Analysis
Ontela PicDeck (B): Case Analysis
 
Voice wars
Voice warsVoice wars
Voice wars
 
Xylys case study solution
Xylys case study  solutionXylys case study  solution
Xylys case study solution
 
Patagonia: Case Analysis
Patagonia: Case AnalysisPatagonia: Case Analysis
Patagonia: Case Analysis
 

Similar to Bmw Imac Form Completeness Six Sigma Case Study

Six sigma
Six sigmaSix sigma
Six sigma
Home
 

Similar to Bmw Imac Form Completeness Six Sigma Case Study (20)

Optimize 2.7 Release Webinar
Optimize 2.7 Release WebinarOptimize 2.7 Release Webinar
Optimize 2.7 Release Webinar
 
Geae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case StudyGeae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case Study
 
Geae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case StudyGeae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case Study
 
Geae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case StudyGeae Tech Support Website Six Sigma Case Study
Geae Tech Support Website Six Sigma Case Study
 
Data Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyData Collection Six Sigma Case Study
Data Collection Six Sigma Case Study
 
Data Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyData Collection Six Sigma Case Study
Data Collection Six Sigma Case Study
 
Data Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyData Collection Six Sigma Case Study
Data Collection Six Sigma Case Study
 
Data Collection Six Sigma Case Study
Data Collection Six Sigma Case StudyData Collection Six Sigma Case Study
Data Collection Six Sigma Case Study
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
Camunda Day Amsterdam 2019: Case Study. The Three Pillars of Workflow Automat...
Camunda Day Amsterdam 2019: Case Study. The Three Pillars of Workflow Automat...Camunda Day Amsterdam 2019: Case Study. The Three Pillars of Workflow Automat...
Camunda Day Amsterdam 2019: Case Study. The Three Pillars of Workflow Automat...
 
Aufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPMAufait Technologies - Introduction to BPM
Aufait Technologies - Introduction to BPM
 
Ch-1_CIM-intro.pptx
Ch-1_CIM-intro.pptxCh-1_CIM-intro.pptx
Ch-1_CIM-intro.pptx
 
IRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET- Study and Analysis of Time Factor in the Utilization ProcessIRJET- Study and Analysis of Time Factor in the Utilization Process
IRJET- Study and Analysis of Time Factor in the Utilization Process
 
Six Sigma_DMAIC_Bharath Seminar
Six Sigma_DMAIC_Bharath SeminarSix Sigma_DMAIC_Bharath Seminar
Six Sigma_DMAIC_Bharath Seminar
 
AMB300: Lessons Learned from ITAM Customers
AMB300: Lessons Learned from ITAM CustomersAMB300: Lessons Learned from ITAM Customers
AMB300: Lessons Learned from ITAM Customers
 
6 sigma
6 sigma6 sigma
6 sigma
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Maximo Roadmap - September 2019
Maximo Roadmap - September 2019Maximo Roadmap - September 2019
Maximo Roadmap - September 2019
 
I B M ECM Roadmap
I B M  ECM RoadmapI B M  ECM Roadmap
I B M ECM Roadmap
 
X Ray Wiring Map Six Sigma Case Study
X Ray Wiring Map Six Sigma Case StudyX Ray Wiring Map Six Sigma Case Study
X Ray Wiring Map Six Sigma Case Study
 

More from Steven Bonacorsi

Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos only
Steven Bonacorsi
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
Steven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
Steven Bonacorsi
 

More from Steven Bonacorsi (20)

Benefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffingBenefits of lean six sigma contract staffing
Benefits of lean six sigma contract staffing
 
A proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goalsA proven way to maximize the achievement of strategic goals
A proven way to maximize the achievement of strategic goals
 
How and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 sHow and why to use strategy execution technology to deploy your 5 s
How and why to use strategy execution technology to deploy your 5 s
 
St John Case Study Promapp
St John Case Study PromappSt John Case Study Promapp
St John Case Study Promapp
 
Promapp Case Study Toyota
Promapp Case Study ToyotaPromapp Case Study Toyota
Promapp Case Study Toyota
 
Promapp Case Study Taupo District Council
Promapp Case Study Taupo District CouncilPromapp Case Study Taupo District Council
Promapp Case Study Taupo District Council
 
Promapp Case Study SAI Global
Promapp Case Study SAI GlobalPromapp Case Study SAI Global
Promapp Case Study SAI Global
 
Promapp Case Study McDonalds
Promapp Case Study McDonaldsPromapp Case Study McDonalds
Promapp Case Study McDonalds
 
Promapp Case Study Genesis Energy
Promapp Case Study Genesis EnergyPromapp Case Study Genesis Energy
Promapp Case Study Genesis Energy
 
Promapp Case Study Cial
Promapp Case Study CialPromapp Case Study Cial
Promapp Case Study Cial
 
Mildura Case Study Promapp
Mildura Case Study PromappMildura Case Study Promapp
Mildura Case Study Promapp
 
Colorpak Promapp Case Study
Colorpak Promapp Case StudyColorpak Promapp Case Study
Colorpak Promapp Case Study
 
Promapp Case Study Nexans Olex
Promapp Case Study Nexans OlexPromapp Case Study Nexans Olex
Promapp Case Study Nexans Olex
 
Lumo Case Study Promapp
Lumo Case Study PromappLumo Case Study Promapp
Lumo Case Study Promapp
 
Free Lean Six Sigma Templates
Free Lean Six Sigma TemplatesFree Lean Six Sigma Templates
Free Lean Six Sigma Templates
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studies
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Lean six sigma tollgate template videos only
Lean six sigma tollgate template videos onlyLean six sigma tollgate template videos only
Lean six sigma tollgate template videos only
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 

Bmw Imac Form Completeness Six Sigma Case Study

  • 1. Six Sigma in Action BMW Program Thomas Henning Program Manager 8/19/02 Master Black Belt: Steven Bonacorsi
  • 2. Six Sigma in Action IMAC Process Customer Profile – 3,000 seat Auto Manufacturing company Defect Before 10.8% (Sigma = 3.4) Business Problem & Impact Installs Moves Adds and Changes process not affording consistent asset tracking. Inconsistent database and time waited tracking down missing equipment. Measure & Analyze Success Data Collection: Installs Moves Adds and Changes completed and 89.2% entered into asset management data base The existing process sigma was 3.4 Root Causes: 1. Technician did not think a blank field was critical. 2. IMAC request process not being followed by BMW customer. 3. Lack of Technician Experience/Training. After Improve & Control Defects Use the operational definitions to provide training to the technical staff on (Sigma = 3.9) 1% how to properly complete the IMAC form. Set policy in place measuring each employee on form completeness. Service Delivery Leader will monitor employee conformity to this policy. Results/Benefits Success Improved employee process knowledge and IMAC form accuracy. 99% Resulting in asset data base improvements which in turn save indirect and direct dollars. A savings of US$6,048 in 2003!