Clark Mulhern Construction is a Midlands-based contractor that specializes in formwork, reinforcement, concrete placement, and associated ground works. With over 30 years of experience in construction, they provide cost-effective solutions for domestic and commercial projects. They emphasize health and safety, environmental protection, and quality management. Recent project examples include construction of retaining walls, slabs, and a 5 million liter water tank.
1. Clark Mulhern Construction Limited
Formwork, Reinforcement & Concrete Specialists
T : 07743 843475 E : info@clark-mulhern.co.uk
Formwork, Reinforcement & Concrete Specialists
Clark Mulhern Construction is a Midlands based contractor that carries
out formwork, reinforcement fixing, concrete placement & associated
ground works and super structure works through out the midlands and
surrounding counties.
With our combined experience of over 30 years in the construction
industry on a wide variety of projects, we can provide cost effective
solutions for a vast range of construction services, for domestic and
commercial structures.
Health & Safety
Site safety is our highest priority, we take pride in the health and safety of our workforce to
ensure all our projects are carried out to the highest standards.
All our operatives hold a current valid CSCS or CPCS card. All our supervisors have a SSSTS as
a minimum.
Environmental
Clark Mulhern Construction recognises that its activities have an impact on the environment and
is committed to improve its environmental performance and minimise the harmful effects through
caring policies and effective management.
Quality
Our quality management system is designed to give clients confidence that the business
is managed on a professional footing and is in line with many of our clients quality objectives.
2. Clark Mulhern Construction Limited
Formwork, Reinforcement & Concrete Specialists
T : 07743 843475 E : info@clark-mulhern.co.uk
Project : Bromsgrove Street, Birmingham
Company : Shaylor Group
Location : Birmingham City Centre
Ground floor Slab for Retail Units with Powerfloat Finish
Insitu Concrete Columns and Shear Walls up to 5m High
Complex Insitu Concrete Lift Shaft & Stair Core
First Floor 450mm Thick Transfer Slab for 6 Story Steel
Structure, Including Falsework, Steel Fixing, Back
Propping & Temporary Works Designs.
Project : DIRFT Zone 2 — Sainsburys Warehouse
Company : VolkerFitzpatrick
Location : DIRFT, Daventry
Dock Leveller Slabs, Foundations & Holding Down bolts
for 1M Sq ft Warehouse
FRC Works for Drawpits, Plant Plinths & Slabs
2500 Sq M of Composite metal decking concrete and
mesh placement inc Access bridge (See Right)
Project : Jaguar Land Rover, Castle Bromwich
Company : Lawfield Contracts / Jaguar Land Rover
Location : Castle Bromwich, Birmingham
Two FRC Pits in block A1/A2 while the factory was in
full operation
Supply and Placement of all Waterproofing,
Reinforcement, Concrete and Formwork
Formwork singled sided to both Pits, one up to 3m in
depth.
Factory Floor reinstatement.
Recent Project Examples
Project : Barby Domestic Supply Reservoir
Company : J N Bentley / Seven Trent Water
Location : Barby, Rugby
Construction of a 5 Million litre domestic water tank for
Seven Trent Water.
Concrete, Steelfixing, Formwork for Base Slab, Walls
up to 6m high, Columns and Roof Slab.
Specialist Radial column formwork with conical head
Falsework Deck 6m high for 1,100 sq M of roof slab.
3. Clark Mulhern Construction Limited
Formwork, Reinforcement & Concrete Specialists
T : 07743 843475 E : info@clark-mulhern.co.uk
100% CSCS & CPCS Workforce
SMSTS & SSSTS Supervisors &
Managers
External Safety Advisors &
Auditors
Inspection & Test plan production
Fully managed quality assurance
system
Formwork Construction
Concrete Supply & Placement
Reinforcement Supply & Fixing
Associated Ground Works
All Classes of Formwork Finish
All Classes of Unformed concrete
finishes
Water tight & radius construction
Concrete Pumping
Concrete Testing
CARES Suppliers
UKAS approved testing
Temporary Works Construction
Temporary Works design &
Inspection
Safe System of Works production
Capabilities Statement
4. Clark Mulhern Construction Limited
Formwork, Reinforcement & Concrete Specialists
T : 07743 843475 E : info@clark-mulhern.co.uk
Normal Operating Area
http://twitter.com/ClarkMulhern
http://www.linkedin.com/company/clark-mulhern-construction-limited
http://www.facebook.com/ClarkMulhern
Follow the Latest News and Updates From Clark Mulhern