Processing
 Ideal denture base material:
   No trial packing needed
   Good shade match with surrounding tissues
   Dimensionally stable
   Complete polymerization
   Easily polished
Processing
 Note:  Master cast must be recovered from
  flasking for laboratory remount.
 Techniques
   Compression
   Microwave
   Injection
Processing Technique
 Compression molding
   Conventional method
      More than 60 years
      Time consuming
Master cast
Mounting (with casts already
 indexed on the bases)



* Trim base of cast to the dimension
  that will fit in the processing flask
  prior to indexing
2
             1                            3




Split mold


  Denture flask (ejector-type, three piece)
  1. The drag (bottom)
  2. The cope (middle)
  3. The cap (thin top)
Split mold
STIPLE WAX ON FLANGES.




TINFOIL
BASE OF
 CAST.

 CHECK CLEARANCE
   WITH FLASK.
CHECK PERIPHERAL
                CLEARANCE.



LOWER HALF
 OF FLASK
  POURED.

   POURING STONE FOR
     THE UPPER HALF.
 Maxillary denture  with the index in place
 and embedded in the flask Soap, or a
 gypsum separator, is used between the two
 pours of dental stone in the lower and
 upper portions of the flask.
CLEAR THE
                   LINGUAL TROUGH.




CLEAR THE TEETH.
•The surface of the third layer is left slightly rough to hold the fourth investment layer in
 position.
•Tinfoil separating medium is painted on the third layer.
•The fourth investment layer is used to fill the remainder of the flask. The lid of the flask
 is pressed into place while the investing stone is still soft. The flask is set aside for
 min. 1 hr. before the wax elimination.
Second pour (upper half of flask)
STONE CAP


          UPPER
        HALF STONE



        STONE CAST

     LOWER HALF STONE




COMPLETED FLASKING.
STONE CAP




           UPPER
         HALF STONE

         STONE CAST
       LOWER HALF STONE




COMPLETED FLASKING FOR
   THE MANDIBULAR
  COMPLETE DENTURE.
Boil-out
When the wax and shellac record base are
  completely warmed, the flasks can be opened.
  The teeth remain in the lower portion of the flask
  (left).
The record base is soft and can be easily removed in
  one piece, along with any remaining wax (right).
Both flask halves are thoroughly cleaned by rinsing
  with boiling water. The teeth are removed and
  also cleaned with boiling water. Ensure that the
  wax is completely removed by using a detergent.
Placed in boiling water for 5 mins
to soften the wax




• Stiff, bladed instrument is used to open the flask. Upper portion of the flask is lifted as
  vertically as possible to avoid fracturing the investment layers.
• The softened wax is removed from the mold. Remaining wax is flushed from the mold
  with a stream of boiling water. The mold is then cleaned with a soft brush and a
  powdered detergent. Detergent is removed by flushing the mold with clean boiling water.
Smooth all sharp edges and create an escape
  groove
Feathered stone edges must be removed because
  they break off easily and can become embedded
  in the acrylic resin base material. A groove is
  made completely around the master cast for the
  purpose of allowing excess acrylic resin to escape
  (right).
The surface of the dental stone in both halves of the
  flask is coated with a gypsum separating medium.
  Each tooth is carefully placed in its original
  position. Make under cuts in the acrylic resin
  teeth similar to the diatorics in porcelain teeth.
Packing
Mixing the acrylic resin I and packing the dough
The autopolymerizing acrylic resin is mixed to a
  kneadable dough according to the manufacturer’s
  instructions (powder to liquid volume ratio usually
  3:1) and placed in the cold flask halves in which the
  denture teeth are positioned.
•Trial packing (3000-4500 lbs over the entire flask area)
•Use two sheets of cellophane between
 two layers of resin dough to allow
 opening of the flask without pulling
 acrylic resin.
•Trim excess acrylic and flash
•Repeat until no excess is visible
•Final closure of the flask halves is
 accomplished without the intervening
 sheets of cellophane
•Heat cure in water bath with temp. set at
 160-165°F for at least 8 hrs. with constant
 pressure
8 hrs 160-165 F
Occlusal correction
Laboratory Remount
   to eliminate the processing error
   depends on
       Jaw relation technique
       instrumentation
Processing Technique
   Microwave System
           (GC America Inc.3737 W. 127th Street, Alsip, IL 60803)

     Use the split mold technique to form molds
     ACRON MC microwave cured acrylic
     Need special flask

     (resin + small metal screws)
     One minute microwaved to soften wax
     Eliminate wax from mold
     Three minute curing in microwave
     Leave 15-20 mins before opening flask
     Less VDO increase??
     Easy to use
     Low water absorption
Microwave system
 Three minute curing in microwave
   Fast, easy to use
   Allows more efficient use of time
   Produces denture in short processing time
   Denture repair
   Interim partial
Processing Technique
3. Injection
3.1 Ivocap injection system, Ivoclar, Vivadent, Inc, Amherst, NY)
     In Mid 1970
     VDO is more stable compare with conventional
     Flask is closed during the procedure
Processing Technique
3. Injection
3.2 Success System (Dentsply, International, Inc, York, PA)
    PMMA    Lucitone 199
    90 PSI, use heat-polymerized resin
Success
                                   Flasking or Investing




                  After Boil out



                                      Divesting
Flask is closed
Insert plastic nozzle           Flask in injecting unit




   De-flasking          Master cast Recovery
Master cast removed from invest material




Finished denture
Eclipse™ Prosthetic Resin System
(Dentsply)
•Light-cured composite resin
•New indirect build-up method for making dentures
•Flask-free and monomer-free
•Conditioning Oven to warm models and materials
•Melting Pot to prepare and melt Contour Resin
•Electric Spatula to apply Contour Resin
•Hot Air Gun to replace flaming
•Eclipse Processing Unit to polymerize materials
•Resin materials and supplies
•Eclipse Bonding Agent
Dimensional change in CD fabricated by injected molding and microwave processing.
Keenan, Radford, and Clark. J Prosthet Dent 2003;89:37-44.



    1

   0.9
   0.8

   0.7
   0.6
   0.5

   0.4

   0.3
   0.2

   0.1
    0
          Compression        Success               Acron MC     Microbase

                                   VDO   After storage
Deflasking
Remove the flasking stone
The denture can be deflasked as shown
 without damage. The silicone index can
 be easily removed.
Denture after deflasking
Because the denture was carefully waxed
 and a silicone index was used, finishing
 around the teeth can be readily
 accomplished.
Remounting and Occlusal Equilibration
After the dentures have been deflasked they are
  mount ed in the articulator without removing
  them from their casts. Small errors can now be
  seen that occurred during the flasking and
  polymerization procedures. Although there is
  very little shrinkage during autopolymerization,
  occlusal contacts may have been slightly
  altered. For this reason, the first occlusal
  equilibration is performed so that a clear cusp-
  to-fossa relation can be obtained
After all centric contacts are established,
 the eccentric excursions are equilibrated
 and the protrusive and retrusive
 movements are ground free from
 interferences. The occlusion is then
 refined with carborundum paste. Only
 now should the dentures be separated
 from the casts.
Post-processing remount
The dentures are not yet separated.
 Dentures and master casts are remounted
 in the articulator.
Checking the condylar guidances
The condylar guidances are still set at the
 patient’s individual condylar path angle.
Equilibrating the occlusion in centric relation
Premature centric contacts
Polymerization shrinkage has caused a slight shift in the original
  cusp-to-fossa relations. Initial contacts are now premature or
  deflective, and must be selectively eliminated in order to
  restore proper intercuspation.
Below left: The occlusion is corrected with a round diamond
  stone. Avoid grinding the centric supporting cusps, which in
  complete dentures are primarily the maxillary palatal cusps
  and the mandibular buccal cusps.
Master Cast Recovery and Occlusal Correction After Flasking

More Related Content

What's hot

The posterior palatal seal
The posterior palatal sealThe posterior palatal seal
The posterior palatal sealakanksha arya
 
Clinical and laboratory remoutning
Clinical and laboratory remoutningClinical and laboratory remoutning
Clinical and laboratory remoutningDr.Pallavi Chavan
 
Bevels in Dental Restorations
Bevels in Dental RestorationsBevels in Dental Restorations
Bevels in Dental RestorationsHaritha RK
 
Bevels and flares in dental restoration
Bevels and flares in dental restorationBevels and flares in dental restoration
Bevels and flares in dental restorationDr. Mayank Nahta
 
Maxillary major connectors
Maxillary major connectorsMaxillary major connectors
Maxillary major connectorsAmal Kaddah
 
House classification
House classificationHouse classification
House classificationRosy shah
 
Border Moulding in Complete Denture Prosthesis
Border Moulding in Complete Denture ProsthesisBorder Moulding in Complete Denture Prosthesis
Border Moulding in Complete Denture ProsthesisDr. Alim Al Razi
 
impression techniques in Removable Partial Denture
impression techniques in Removable Partial Denture impression techniques in Removable Partial Denture
impression techniques in Removable Partial Denture Dr.Richa Sahai
 
Acrylic partial denture
Acrylic partial dentureAcrylic partial denture
Acrylic partial dentureCing Sian Dal
 
Provisional restorations
Provisional restorationsProvisional restorations
Provisional restorationsroodkood
 
Neutral zone in complete dentures
Neutral zone in complete denturesNeutral zone in complete dentures
Neutral zone in complete denturesDR PAAVANA
 
Selective grinding
Selective grindingSelective grinding
Selective grindingshari kurup
 
Types of Dental bridges (FPD) / dental implant courses
Types of Dental bridges (FPD) / dental implant coursesTypes of Dental bridges (FPD) / dental implant courses
Types of Dental bridges (FPD) / dental implant coursesIndian dental academy
 
Distal extension removable partial denture prosthesis /certified fixed orthod...
Distal extension removable partial denture prosthesis /certified fixed orthod...Distal extension removable partial denture prosthesis /certified fixed orthod...
Distal extension removable partial denture prosthesis /certified fixed orthod...Indian dental academy
 
8 - setting of teeth for class I, II and II arch relation ship (Edited)
8 - setting of teeth for  class I, II and II arch relation ship (Edited)8 - setting of teeth for  class I, II and II arch relation ship (Edited)
8 - setting of teeth for class I, II and II arch relation ship (Edited)Amal Kaddah
 
Complete Denture Try In
Complete Denture Try In Complete Denture Try In
Complete Denture Try In Self employed
 

What's hot (20)

The posterior palatal seal
The posterior palatal sealThe posterior palatal seal
The posterior palatal seal
 
Clinical and laboratory remoutning
Clinical and laboratory remoutningClinical and laboratory remoutning
Clinical and laboratory remoutning
 
Bevels in Dental Restorations
Bevels in Dental RestorationsBevels in Dental Restorations
Bevels in Dental Restorations
 
Jaw relation in complete dentures
Jaw relation in complete denturesJaw relation in complete dentures
Jaw relation in complete dentures
 
Bevels and flares in dental restoration
Bevels and flares in dental restorationBevels and flares in dental restoration
Bevels and flares in dental restoration
 
Maxillary major connectors
Maxillary major connectorsMaxillary major connectors
Maxillary major connectors
 
House classification
House classificationHouse classification
House classification
 
Border Moulding in Complete Denture Prosthesis
Border Moulding in Complete Denture ProsthesisBorder Moulding in Complete Denture Prosthesis
Border Moulding in Complete Denture Prosthesis
 
impression techniques in Removable Partial Denture
impression techniques in Removable Partial Denture impression techniques in Removable Partial Denture
impression techniques in Removable Partial Denture
 
Acrylic partial denture
Acrylic partial dentureAcrylic partial denture
Acrylic partial denture
 
Provisional restorations
Provisional restorationsProvisional restorations
Provisional restorations
 
Neutral zone in complete dentures
Neutral zone in complete denturesNeutral zone in complete dentures
Neutral zone in complete dentures
 
Selective grinding
Selective grindingSelective grinding
Selective grinding
 
Types of Dental bridges (FPD) / dental implant courses
Types of Dental bridges (FPD) / dental implant coursesTypes of Dental bridges (FPD) / dental implant courses
Types of Dental bridges (FPD) / dental implant courses
 
Dentinogenic concept
Dentinogenic conceptDentinogenic concept
Dentinogenic concept
 
Face bow
Face bowFace bow
Face bow
 
Complete dentures 7. final impressions
Complete dentures 7. final impressionsComplete dentures 7. final impressions
Complete dentures 7. final impressions
 
Distal extension removable partial denture prosthesis /certified fixed orthod...
Distal extension removable partial denture prosthesis /certified fixed orthod...Distal extension removable partial denture prosthesis /certified fixed orthod...
Distal extension removable partial denture prosthesis /certified fixed orthod...
 
8 - setting of teeth for class I, II and II arch relation ship (Edited)
8 - setting of teeth for  class I, II and II arch relation ship (Edited)8 - setting of teeth for  class I, II and II arch relation ship (Edited)
8 - setting of teeth for class I, II and II arch relation ship (Edited)
 
Complete Denture Try In
Complete Denture Try In Complete Denture Try In
Complete Denture Try In
 

Similar to Master Cast Recovery and Occlusal Correction After Flasking

Complete denture processing & errors
Complete denture processing & errorsComplete denture processing & errors
Complete denture processing & errorsAli Alarasy
 
5.Lab procedures for cd after try-in.pptx
5.Lab procedures for cd after try-in.pptx5.Lab procedures for cd after try-in.pptx
5.Lab procedures for cd after try-in.pptxSusovanGiri6
 
steps of processing of complete denture (2).pptx
steps of processing of complete denture (2).pptxsteps of processing of complete denture (2).pptx
steps of processing of complete denture (2).pptxmohamedalloush8
 
Lab procedures for cast partial dentures. /certified fixed orthodontic cours...
Lab procedures for cast partial dentures.  /certified fixed orthodontic cours...Lab procedures for cast partial dentures.  /certified fixed orthodontic cours...
Lab procedures for cast partial dentures. /certified fixed orthodontic cours...Indian dental academy
 
13- Relining, rebasing and repair of removable dentures.pptx
13- Relining, rebasing and repair of removable dentures.pptx13- Relining, rebasing and repair of removable dentures.pptx
13- Relining, rebasing and repair of removable dentures.pptxAmalKaddah1
 
laboratory procedures in make of complete denture
laboratory procedures in make of complete denturelaboratory procedures in make of complete denture
laboratory procedures in make of complete dentureddert
 
Lab procedures ( part 1 ) / dental courses
Lab procedures  ( part 1 ) / dental coursesLab procedures  ( part 1 ) / dental courses
Lab procedures ( part 1 ) / dental coursesIndian dental academy
 
Lab procedures in conventional cast partial dentures / dental lab courses
Lab procedures in conventional cast partial dentures / dental lab coursesLab procedures in conventional cast partial dentures / dental lab courses
Lab procedures in conventional cast partial dentures / dental lab coursesIndian dental academy
 
Lab procedures in cast partial dentures / dental lab courses
Lab procedures in cast partial dentures / dental lab coursesLab procedures in cast partial dentures / dental lab courses
Lab procedures in cast partial dentures / dental lab coursesIndian dental academy
 
Vibhor impression in rpd
Vibhor impression in rpdVibhor impression in rpd
Vibhor impression in rpdVibhor Tyagi
 
clinical & laboratory step in complete denture
clinical & laboratory step in complete dentureclinical & laboratory step in complete denture
clinical & laboratory step in complete dentureAmirah Mohd Nor Rizan
 

Similar to Master Cast Recovery and Occlusal Correction After Flasking (20)

ppt(1).pptx
ppt(1).pptxppt(1).pptx
ppt(1).pptx
 
Complete denture processing & errors
Complete denture processing & errorsComplete denture processing & errors
Complete denture processing & errors
 
27.denture processing
27.denture processing27.denture processing
27.denture processing
 
27.denture processing
27.denture processing27.denture processing
27.denture processing
 
laminates
 laminates laminates
laminates
 
indirect bonding
indirect bondingindirect bonding
indirect bonding
 
5.Lab procedures for cd after try-in.pptx
5.Lab procedures for cd after try-in.pptx5.Lab procedures for cd after try-in.pptx
5.Lab procedures for cd after try-in.pptx
 
steps of processing of complete denture (2).pptx
steps of processing of complete denture (2).pptxsteps of processing of complete denture (2).pptx
steps of processing of complete denture (2).pptx
 
Lab procedures for cast partial dentures. /certified fixed orthodontic cours...
Lab procedures for cast partial dentures.  /certified fixed orthodontic cours...Lab procedures for cast partial dentures.  /certified fixed orthodontic cours...
Lab procedures for cast partial dentures. /certified fixed orthodontic cours...
 
13- Relining, rebasing and repair of removable dentures.pptx
13- Relining, rebasing and repair of removable dentures.pptx13- Relining, rebasing and repair of removable dentures.pptx
13- Relining, rebasing and repair of removable dentures.pptx
 
laboratory procedures in make of complete denture
laboratory procedures in make of complete denturelaboratory procedures in make of complete denture
laboratory procedures in make of complete denture
 
27.denture processing
27.denture processing27.denture processing
27.denture processing
 
Lab procedures ( part 1 ) / dental courses
Lab procedures  ( part 1 ) / dental coursesLab procedures  ( part 1 ) / dental courses
Lab procedures ( part 1 ) / dental courses
 
Complete denture 1.ppt
Complete denture 1.pptComplete denture 1.ppt
Complete denture 1.ppt
 
Lab procedures in conventional cast partial dentures / dental lab courses
Lab procedures in conventional cast partial dentures / dental lab coursesLab procedures in conventional cast partial dentures / dental lab courses
Lab procedures in conventional cast partial dentures / dental lab courses
 
Lab procedures in cast partial dentures / dental lab courses
Lab procedures in cast partial dentures / dental lab coursesLab procedures in cast partial dentures / dental lab courses
Lab procedures in cast partial dentures / dental lab courses
 
Inter occlusal records
Inter occlusal recordsInter occlusal records
Inter occlusal records
 
Vibhor impression in rpd
Vibhor impression in rpdVibhor impression in rpd
Vibhor impression in rpd
 
clinical & laboratory step in complete denture
clinical & laboratory step in complete dentureclinical & laboratory step in complete denture
clinical & laboratory step in complete denture
 
6. secondary imp materials
6. secondary imp materials6. secondary imp materials
6. secondary imp materials
 

Recently uploaded

Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandSharisaBethune
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 

Recently uploaded (20)

Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal Brand
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 

Master Cast Recovery and Occlusal Correction After Flasking

  • 1. Flasking D.SIRAG AL-HAMADI CLINICAL DEMONSTARATOR PROSTODONTIC DEPARTMENT TRIPOLI UNIVERSITY DENTAL FACUALTY
  • 2. Processing  Ideal denture base material:  No trial packing needed  Good shade match with surrounding tissues  Dimensionally stable  Complete polymerization  Easily polished
  • 3. Processing  Note: Master cast must be recovered from flasking for laboratory remount.  Techniques  Compression  Microwave  Injection
  • 4. Processing Technique  Compression molding  Conventional method  More than 60 years  Time consuming
  • 5.
  • 6.
  • 7.
  • 8. Master cast Mounting (with casts already indexed on the bases) * Trim base of cast to the dimension that will fit in the processing flask prior to indexing
  • 9. 2 1 3 Split mold Denture flask (ejector-type, three piece) 1. The drag (bottom) 2. The cope (middle) 3. The cap (thin top)
  • 11. STIPLE WAX ON FLANGES. TINFOIL BASE OF CAST. CHECK CLEARANCE WITH FLASK.
  • 12. CHECK PERIPHERAL CLEARANCE. LOWER HALF OF FLASK POURED. POURING STONE FOR THE UPPER HALF.
  • 13.
  • 14.  Maxillary denture with the index in place and embedded in the flask Soap, or a gypsum separator, is used between the two pours of dental stone in the lower and upper portions of the flask.
  • 15. CLEAR THE LINGUAL TROUGH. CLEAR THE TEETH.
  • 16. •The surface of the third layer is left slightly rough to hold the fourth investment layer in position. •Tinfoil separating medium is painted on the third layer. •The fourth investment layer is used to fill the remainder of the flask. The lid of the flask is pressed into place while the investing stone is still soft. The flask is set aside for min. 1 hr. before the wax elimination.
  • 17. Second pour (upper half of flask)
  • 18. STONE CAP UPPER HALF STONE STONE CAST LOWER HALF STONE COMPLETED FLASKING.
  • 19. STONE CAP UPPER HALF STONE STONE CAST LOWER HALF STONE COMPLETED FLASKING FOR THE MANDIBULAR COMPLETE DENTURE.
  • 20.
  • 21.
  • 22.
  • 23. Boil-out When the wax and shellac record base are completely warmed, the flasks can be opened. The teeth remain in the lower portion of the flask (left). The record base is soft and can be easily removed in one piece, along with any remaining wax (right). Both flask halves are thoroughly cleaned by rinsing with boiling water. The teeth are removed and also cleaned with boiling water. Ensure that the wax is completely removed by using a detergent.
  • 24.
  • 25. Placed in boiling water for 5 mins to soften the wax • Stiff, bladed instrument is used to open the flask. Upper portion of the flask is lifted as vertically as possible to avoid fracturing the investment layers. • The softened wax is removed from the mold. Remaining wax is flushed from the mold with a stream of boiling water. The mold is then cleaned with a soft brush and a powdered detergent. Detergent is removed by flushing the mold with clean boiling water.
  • 26.
  • 27.
  • 28. Smooth all sharp edges and create an escape groove Feathered stone edges must be removed because they break off easily and can become embedded in the acrylic resin base material. A groove is made completely around the master cast for the purpose of allowing excess acrylic resin to escape (right). The surface of the dental stone in both halves of the flask is coated with a gypsum separating medium. Each tooth is carefully placed in its original position. Make under cuts in the acrylic resin teeth similar to the diatorics in porcelain teeth.
  • 29.
  • 30.
  • 31.
  • 32. Packing Mixing the acrylic resin I and packing the dough The autopolymerizing acrylic resin is mixed to a kneadable dough according to the manufacturer’s instructions (powder to liquid volume ratio usually 3:1) and placed in the cold flask halves in which the denture teeth are positioned.
  • 33.
  • 34.
  • 35.
  • 36. •Trial packing (3000-4500 lbs over the entire flask area) •Use two sheets of cellophane between two layers of resin dough to allow opening of the flask without pulling acrylic resin. •Trim excess acrylic and flash •Repeat until no excess is visible •Final closure of the flask halves is accomplished without the intervening sheets of cellophane •Heat cure in water bath with temp. set at 160-165°F for at least 8 hrs. with constant pressure
  • 37.
  • 39. Occlusal correction Laboratory Remount to eliminate the processing error depends on Jaw relation technique instrumentation
  • 40. Processing Technique  Microwave System  (GC America Inc.3737 W. 127th Street, Alsip, IL 60803)  Use the split mold technique to form molds  ACRON MC microwave cured acrylic  Need special flask (resin + small metal screws)  One minute microwaved to soften wax  Eliminate wax from mold  Three minute curing in microwave  Leave 15-20 mins before opening flask  Less VDO increase??  Easy to use  Low water absorption
  • 41. Microwave system  Three minute curing in microwave  Fast, easy to use  Allows more efficient use of time  Produces denture in short processing time  Denture repair  Interim partial
  • 42. Processing Technique 3. Injection 3.1 Ivocap injection system, Ivoclar, Vivadent, Inc, Amherst, NY)  In Mid 1970  VDO is more stable compare with conventional  Flask is closed during the procedure
  • 43. Processing Technique 3. Injection 3.2 Success System (Dentsply, International, Inc, York, PA)  PMMA Lucitone 199  90 PSI, use heat-polymerized resin
  • 44. Success Flasking or Investing After Boil out Divesting Flask is closed
  • 45. Insert plastic nozzle Flask in injecting unit De-flasking Master cast Recovery
  • 46. Master cast removed from invest material Finished denture
  • 47. Eclipse™ Prosthetic Resin System (Dentsply) •Light-cured composite resin •New indirect build-up method for making dentures •Flask-free and monomer-free •Conditioning Oven to warm models and materials •Melting Pot to prepare and melt Contour Resin •Electric Spatula to apply Contour Resin •Hot Air Gun to replace flaming •Eclipse Processing Unit to polymerize materials •Resin materials and supplies •Eclipse Bonding Agent
  • 48. Dimensional change in CD fabricated by injected molding and microwave processing. Keenan, Radford, and Clark. J Prosthet Dent 2003;89:37-44. 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Compression Success Acron MC Microbase VDO After storage
  • 49. Deflasking Remove the flasking stone The denture can be deflasked as shown without damage. The silicone index can be easily removed. Denture after deflasking Because the denture was carefully waxed and a silicone index was used, finishing around the teeth can be readily accomplished.
  • 50.
  • 51. Remounting and Occlusal Equilibration After the dentures have been deflasked they are mount ed in the articulator without removing them from their casts. Small errors can now be seen that occurred during the flasking and polymerization procedures. Although there is very little shrinkage during autopolymerization, occlusal contacts may have been slightly altered. For this reason, the first occlusal equilibration is performed so that a clear cusp- to-fossa relation can be obtained
  • 52. After all centric contacts are established, the eccentric excursions are equilibrated and the protrusive and retrusive movements are ground free from interferences. The occlusion is then refined with carborundum paste. Only now should the dentures be separated from the casts. Post-processing remount The dentures are not yet separated. Dentures and master casts are remounted in the articulator.
  • 53.
  • 54. Checking the condylar guidances The condylar guidances are still set at the patient’s individual condylar path angle.
  • 55. Equilibrating the occlusion in centric relation Premature centric contacts Polymerization shrinkage has caused a slight shift in the original cusp-to-fossa relations. Initial contacts are now premature or deflective, and must be selectively eliminated in order to restore proper intercuspation. Below left: The occlusion is corrected with a round diamond stone. Avoid grinding the centric supporting cusps, which in complete dentures are primarily the maxillary palatal cusps and the mandibular buccal cusps.