“An inventory strategy
companies employ to
increase efficiency and
decrease waste by receiving
goods only as they are
needed in the production
process, thereby reducing
inventory costs.”
Pull (demand) driven inventory system in which
materials, parts, sub-assemblies, and support items
are delivered just when needed and neither sooner
nor later. Its objective is to eliminate product
inventories from the supply chain.
Origin : JAPAN.
Initially known as : Toyota Production System.
Taiichi Ohno : father/originator of JIT.
Scenario After Second world war.
Taiichi Ohno Examined American
Industry.
Devised a new system based
on elimination of waste.
Just-in-time
Taiichi Ohno
• Flexible resources
• Cellular layouts
• Pull production system
• Small-lot production
• Quick setups
• Uniform production
• Quality at the source
• Supplier networks
Flexible Resources
•Multifunctional Workers
•General Purpose Machines
•Study Operators & Improve Operations
•Standard Operating Routine
Cellular Layouts
•They Group Dissimilar Machines In Manufacturing Cell
To Produce Family Of Parts
•Work Flows In One Direction Through Cell
•Cycle Time Adjusted By Changing Worker Paths
•Cells Operated By Worker Teams Who Are Cross-trained
Pull Production System:
•A Pull System Where The Production Or Movement Of
The Next Batch Of Material Is Not Started Until The
User Signals A Need For It
•The User Comes To The Producer To Withdraw
Materials In The Quantity Needed At The Time Needed
•The Producer Produces Only The Exact Quantity
Withdrawn By The User
Small-Lot Production.
•Requires less space & capital investment
•Moves processes closer together
•Makes quality problems easier to detect
•Makes processes more dependent on each other
•Inventory Hides Problems - Lower Levels Of
Inventory To Expose Problems
Quick Setup
•Preset Desired Settings
•Use Quick Fasteners
•Use Locator Pins
•Prevent Misalignments
•Eliminate Tools
•Make Movements Easier
Uniform Production
•Results From Smoothing Production Requirements
•Kanban Systems Can Handle +/- 10% Demand Changes
•Smooths Demand Across Planning Horizon
•Mixed-model Assembly Steadies Component Production
SUPPLIERS NETWORK:
• Locate near to the customer.
• Use small, side loaded trucks and ship mixed loads.
• Consider establishing small warehouses near to the
customer or consolidating warehouses with other
suppliers.
• Use standardized containers and make deliveries
according to a precise delivery schedule.
•Become a certified supplier and accept payment at
regular intervals rather than upon delivery.
•The philosophy of JIT is simple: the storage of unused
inventory is a waste of resources. JIT inventory systems
expose hidden cost of keeping inventory, and are
therefore not a simple solution for a company to adopt
it. The company must follow an array of new methods
to manage the consequences of the change. The ideas
in this way of working come from many different
disciplines including statistics, industrial engineering,
production management, and behavioral science. The
JIT inventory philosophy defines how inventory is
viewed and how it relates to management.
•In short, the Just-in-Time inventory system focus is
having the right material, at the right time, at the right
place, and in the exact amount without the safety net
of inventory. The JIT system has broad implications for
implementers.
TRANSACTION COST APPROACH
•JIT helps in keeping inventory to minimum in a
firm. However, a firm may simply be outsourcing
their input inventory to suppliers, even if those
suppliers don't use Just-in-Time (Naj 1993).
Newman (1994) investigated this effect and found
that suppliers in Japan charged JIT customers, on
average, a 5% price premium.
• Worker Compliance
• Automatic
Inspection
• Quality Measures
• Fail-Safe Methods
• Worker Participation
• Reduce Lead Time
• Frequent Deliveries
• Project Usage
Requirements
• Quality Expectations
• Level Schedule
• Establish Freeze
Windows
• Underutilized Capacity
• Demand pull
• Backflush
• Reduce lot sizes
• Stores
• Transit
• Implement Carousel To
Reduce Motion Waste
• Implement Conveyor
Belt To Lower Motion
Waste
• Standard Production
Configuration
• Standardize And
Reduce The Number
Of Parts
• Process Design With
Product Design
• Quality Expectations
The service industry has recognized that the JIT system
can be adapted successfully in their processes and add
value to the end product. JIT lays emphasis on the
process and not on the end product.
Guidelines ;
Synchronization And Balance Of Work Flow
Flexibility In The Use Of Resources
Respect For People
Continuous Improvement Of The Process
Who doesn’t recognize the Big Yellow ‘M’?
McDonald’s is the best example of JIT in Services !
What used to be the case was McDonald's would pre-cook a
batch of hamburgers and let them sit under heat lamps. They
would keep them for as long as possible and eventually discard
what couldn't be sold. The only way to get a fresh hamburger
under the old system was to make a special order.
McDonald's now doesn't begin to cook until a customer has
placed a specific order.
The major benefits are better food at a lower cost.
Wastage is reduced along with an improvised taste that makes
you want to scream out I’m Lovin’ It !
Is It Time For Just In Time ?
Just-in-time manufacturing involves the sophisticated
coordination of suppliers, delivering component parts at just the
moment they’re needed in the manufacturing process ; dynamic
manufacturing.
For Marketing with JIT, inventory is essentially the content. The
marketing campaign process is step-wise assembly of content
that’s delivered to the buyer through any number of channels to
a prospect database. Traditionally, marketing would build an
inventory of marketing messages to deliver in batches to
prospective buyers and customers.
This Inventory is virtual, there aren’t holding costs, but it comes
with an opportunity cost. There may be some branding and
awareness benefits, but there’s probably as much risk that your
email is viewed as junk to-be-deleted.
With India it’s most essentially Not Time For Just In Time.
CHENNAI: The earthquake and tsunami that flattened Japan's
north eastern industrial hubs in March this year could have a
more long-term impact on the way Japanese companies do
business across the world. Honda and Toyota suffered huge
production losses worldwide as parts supplies from Japan were
held up due to the twin disaster.
Now the two Japanese biggies may be taking a relook not only at
their famed management mantra—just-in-time (JIT)—but also at
the concept of sourcing critical components only from Japan. JIT
—a production philosophy born on the factory floors of Japanese
car companies—is now a global management practice and has
saved companies billions of dollars. The idea behind JIT, or lean
manufacturing , is to have the supplies a firm needs at the exact
moment that they are needed. But even Toyota, which put in
place the Toyota Production System based on just-in-time
inventory management, understands keeping minimum
inventory has its risks.
• JIT eliminates organizational barriers and
improves communication.
• Accounting changes or relies on activity-
based costing.
• Marketing by interfacing with the customers.
• Finance approves and evaluates financial
investments
• Information systems create the network of
information necessary for JIT to function
• A surprising effect was that factory response
time fell to about a day. This improved
customer satisfaction by providing vehicles
within a day or two of the minimum economic
shipping delay.
• Also, the factory began building many vehicles
to order, eliminating the risk they would not
be sold. This improved the company's return
on equity
• Since assemblers no longer had a choice of
which part to use, every part had to fit
perfectly. This caused a quality assurance
crisis, which led to a dramatic improvement in
product quality.
• When a process or parts quality problem
surfaced on the production line, the entire
production line had to be slowed or even
stopped. No inventory meant a line could not
operate from in-process inventory while a
production problem was fixed.
• The just-in-time philosophy was also applied
to other segments of the supply chain in
several types of industries. In the commercial
sector, it meant eliminating one or all of the
warehouses in the link between a factory and
a retail establishment. Examples in sales,
marketing, and customer service involve
applying information systems and mobile
hardware to deliver customer information as
needed, and reducing waste by video
conferencing to cut travel time.
• Like all other production strategies , Just In Time
systems have their own benefits and drawbacks.
• Maintaining sub-normal inventories can be beneficial
or harmful to an organization , depending on how
efficiently it is applied.
• Reduced Setup time , also known as
‘Changeover’ time.
• Funds tied up in inventories can be
used elsewhere.
• Storage area used up can be utilized.
• Throughput Time is reduced
resulting in greater output
• Production scheduling and work
hour consistency is synchronized with
• Supplies come in regular intervals throughout the
production day
• The risk of inventory breaking/expiring is reduced
largely.
• Inventory flow becomes simpler and easier to
manage due to smaller lot sizes.
• Cuts the risk of supply system problems.
• JIT operation leaves suppliers and
downstream consumers open to
Supply Shocks.
• The organization will not be able to
cater to large orders on time.
• Just-in-time operation leaves suppliers and
downstream consumers open to supply shocks and
large supply or demand changes.
• Very low stock levels means shipments of the same
part can come in several times per day. This means
Toyota is especially susceptible to flow interruption.
For that reason, Toyota uses two suppliers for most
assemblies.
• As noted by Liker (2003) and Womack and Jones
(2003), it ultimately would be desirable to introduce
synchronized flow and link JIT through the entire
supply stream. However, none followed this in detail
all the way back through the processes to the raw
materials.
• . It is for the reasons stated raw materials companies
decouple their supply chain from their clients'
demand by carrying large 'finished goods' stocks.
• The JIT delivery is critical for
success
• When the material does not
arrive on time, the station will
starve and fail
• When the material arrives ahead of time Inventory
takes space and creates problem.
• Flow in time is the name of the game in JIT.
Toyota is considered by many to be the
poster child for JIT success.
The Toyota Production Strategy is
highlighted by the fact that raw materials
are not brought to the production floor until
an order is received and this product is
ready to be built.
No parts are allowed at a node unless they
are required for the next node, or they are
part of an assembly for the next node.
This philosophy has allowed Toyota to keep
a minimum amount of inventory which
means lower costs
– Small amounts of raw material inventory must be kept at
each node in production, so that production can take
place for any product. These parts are then replenished
when they are used.
– Accuracy of forecasting is important so the correct
amount of raw materials can be stocked.
• The history of Harley-Davidson started way back in 1903
in Milwaukee when William S. Harley and Arthur
Davidson developed a one cylinder motorcycle in a shed
bearing the name board ‘Harley-Davidson Motor
Company...
• Faced with tough competition from Japanese companies,
Harley-Davidson decided it would make more sense to
join the competition rather than beat it
• Harley-Davidson successfully adopted
Japanese manufacturing principles which
many considered were impossible for US
manufacturers to achieve because of
cultural and political reasons.
• After implementing these Japanese
techniques, Harley-Davidson succeeded in
manufacturing high quality motorcycles at
lower cost.It witnessed the success of JIT in
the late 1980s.
• Achieved inventory turnover from 5 to 20,
reduced the inventory by 75%
• Dell has also leveraged JIT principles to make its
manufacturing process a success.
• Dell’s approach to JIT is different in that they
leverage their suppliers to achieve the JIT goal.
• They are also unique in that Dell is able to provide
exceptionally short lead times to their customers, by
forcing their suppliers to carry inventory instead of
carrying it themselves and then demanding (and
receiving) short lead times on components so that
products can be simply assembled by Dell quickly
and then shipped to the customer.
• Dependable suppliers with the ability to meet Dell’s
demanding lead time requirements.
• A seamless system that allows Dell to transmit its
component requirements so that they will arrive at Dell in
time to fulfill its lead times.
• A willingness of suppliers to keep inventory on hand
allowing Dell to be free of this responsibility.
• Top Management
Commitment.
• Development Of A JIT
Policy Manual.
• Development Of A JIT
Procedure Manual.
• Develop And Implement A
Continuous JIT Training
Program For Employees At
All Level.
• (5) Develop and maintain a JIT
circle involving key employee
group representatives,
• (6) Redesign the organization
to make it flexible and dynamic
for allowing JIT permeate
through the system
• (7) Develop and maintaining an
effective communication and
control system in order to
provide feed backs and control
at all levels of the organization.

More Related Content

What's hot

Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing pptSwati Luthra
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarMichael E. Parker
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation pptbwu.nl
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing Marico Ltd.
 
TOYOTA PRODUCTION SYSTEM (TPS) PRESENTATION
TOYOTA PRODUCTION SYSTEM (TPS) PRESENTATIONTOYOTA PRODUCTION SYSTEM (TPS) PRESENTATION
TOYOTA PRODUCTION SYSTEM (TPS) PRESENTATIONInter Alliance Werardt
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_previewJaroslaw Gadek, MBA
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyotaaneela yousaf
 
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)Inter Alliance Werardt
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)Prasanna3804
 
Toyota Production System
 Toyota Production System Toyota Production System
Toyota Production SystemAmol Shah
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalSumon Kumar Kundu
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comNareshChawla
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturingAdeel Javaid
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basicssarah bridge
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturingskchawla4
 

What's hot (20)

Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
TOYOTA PRODUCTION SYSTEM (TPS) PRESENTATION
TOYOTA PRODUCTION SYSTEM (TPS) PRESENTATIONTOYOTA PRODUCTION SYSTEM (TPS) PRESENTATION
TOYOTA PRODUCTION SYSTEM (TPS) PRESENTATION
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_preview
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyota
 
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
 
JIT for manufacturing ppt
JIT for manufacturing pptJIT for manufacturing ppt
JIT for manufacturing ppt
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
 
Toyota Production System
 Toyota Production System Toyota Production System
Toyota Production System
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
 
JIT inventory
JIT inventoryJIT inventory
JIT inventory
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturing
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 
Just-In-Time
Just-In-TimeJust-In-Time
Just-In-Time
 

Similar to Just in time (20)

Chapter.1 just in time
Chapter.1 just in timeChapter.1 just in time
Chapter.1 just in time
 
Week6.pptx
Week6.pptxWeek6.pptx
Week6.pptx
 
Inventory mgmt n jit
Inventory mgmt n jitInventory mgmt n jit
Inventory mgmt n jit
 
Just in time
Just in timeJust in time
Just in time
 
Just in time
Just in timeJust in time
Just in time
 
JUST IN TIME
JUST IN TIMEJUST IN TIME
JUST IN TIME
 
Production methods
Production methodsProduction methods
Production methods
 
Just in Time (JIT)
Just in Time (JIT)Just in Time (JIT)
Just in Time (JIT)
 
Lean production and jit
Lean production and jitLean production and jit
Lean production and jit
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Just in time
Just in timeJust in time
Just in time
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Just In Time Production (JIT)
Just In Time Production (JIT)Just In Time Production (JIT)
Just In Time Production (JIT)
 
Just in Time
Just in Time Just in Time
Just in Time
 
Managerial Accounting Presentation - Inventory Management
Managerial Accounting Presentation - Inventory ManagementManagerial Accounting Presentation - Inventory Management
Managerial Accounting Presentation - Inventory Management
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturing
 
10. just in-time
10. just in-time10. just in-time
10. just in-time
 
JIT and lean operations
JIT and lean operationsJIT and lean operations
JIT and lean operations
 
Wcm 2
Wcm 2Wcm 2
Wcm 2
 
Just in-time
Just in-timeJust in-time
Just in-time
 

More from Avish Shah

Types of purchasing system
Types of purchasing systemTypes of purchasing system
Types of purchasing systemAvish Shah
 
Industrial policy from 1948 1991
Industrial policy from 1948 1991Industrial policy from 1948 1991
Industrial policy from 1948 1991Avish Shah
 
General insurance
General insuranceGeneral insurance
General insuranceAvish Shah
 

More from Avish Shah (6)

Types of purchasing system
Types of purchasing systemTypes of purchasing system
Types of purchasing system
 
Gestures
GesturesGestures
Gestures
 
Computer
ComputerComputer
Computer
 
Industrial policy from 1948 1991
Industrial policy from 1948 1991Industrial policy from 1948 1991
Industrial policy from 1948 1991
 
General insurance
General insuranceGeneral insurance
General insurance
 
Google
GoogleGoogle
Google
 

Recently uploaded

Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 

Recently uploaded (20)

Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 

Just in time

  • 1.
  • 2.
  • 3. “An inventory strategy companies employ to increase efficiency and decrease waste by receiving goods only as they are needed in the production process, thereby reducing inventory costs.”
  • 4. Pull (demand) driven inventory system in which materials, parts, sub-assemblies, and support items are delivered just when needed and neither sooner nor later. Its objective is to eliminate product inventories from the supply chain.
  • 5. Origin : JAPAN. Initially known as : Toyota Production System. Taiichi Ohno : father/originator of JIT. Scenario After Second world war. Taiichi Ohno Examined American Industry. Devised a new system based on elimination of waste. Just-in-time Taiichi Ohno
  • 6. • Flexible resources • Cellular layouts • Pull production system • Small-lot production • Quick setups • Uniform production • Quality at the source • Supplier networks
  • 7. Flexible Resources •Multifunctional Workers •General Purpose Machines •Study Operators & Improve Operations •Standard Operating Routine Cellular Layouts •They Group Dissimilar Machines In Manufacturing Cell To Produce Family Of Parts •Work Flows In One Direction Through Cell •Cycle Time Adjusted By Changing Worker Paths •Cells Operated By Worker Teams Who Are Cross-trained
  • 8. Pull Production System: •A Pull System Where The Production Or Movement Of The Next Batch Of Material Is Not Started Until The User Signals A Need For It •The User Comes To The Producer To Withdraw Materials In The Quantity Needed At The Time Needed •The Producer Produces Only The Exact Quantity Withdrawn By The User
  • 9. Small-Lot Production. •Requires less space & capital investment •Moves processes closer together •Makes quality problems easier to detect •Makes processes more dependent on each other •Inventory Hides Problems - Lower Levels Of Inventory To Expose Problems
  • 10. Quick Setup •Preset Desired Settings •Use Quick Fasteners •Use Locator Pins •Prevent Misalignments •Eliminate Tools •Make Movements Easier Uniform Production •Results From Smoothing Production Requirements •Kanban Systems Can Handle +/- 10% Demand Changes •Smooths Demand Across Planning Horizon •Mixed-model Assembly Steadies Component Production
  • 11. SUPPLIERS NETWORK: • Locate near to the customer. • Use small, side loaded trucks and ship mixed loads. • Consider establishing small warehouses near to the customer or consolidating warehouses with other suppliers. • Use standardized containers and make deliveries according to a precise delivery schedule. •Become a certified supplier and accept payment at regular intervals rather than upon delivery.
  • 12.
  • 13. •The philosophy of JIT is simple: the storage of unused inventory is a waste of resources. JIT inventory systems expose hidden cost of keeping inventory, and are therefore not a simple solution for a company to adopt it. The company must follow an array of new methods to manage the consequences of the change. The ideas in this way of working come from many different disciplines including statistics, industrial engineering, production management, and behavioral science. The JIT inventory philosophy defines how inventory is viewed and how it relates to management. •In short, the Just-in-Time inventory system focus is having the right material, at the right time, at the right place, and in the exact amount without the safety net of inventory. The JIT system has broad implications for implementers.
  • 14. TRANSACTION COST APPROACH •JIT helps in keeping inventory to minimum in a firm. However, a firm may simply be outsourcing their input inventory to suppliers, even if those suppliers don't use Just-in-Time (Naj 1993). Newman (1994) investigated this effect and found that suppliers in Japan charged JIT customers, on average, a 5% price premium.
  • 15.
  • 16. • Worker Compliance • Automatic Inspection • Quality Measures • Fail-Safe Methods • Worker Participation • Reduce Lead Time • Frequent Deliveries • Project Usage Requirements • Quality Expectations
  • 17. • Level Schedule • Establish Freeze Windows • Underutilized Capacity • Demand pull • Backflush • Reduce lot sizes
  • 18. • Stores • Transit • Implement Carousel To Reduce Motion Waste • Implement Conveyor Belt To Lower Motion Waste • Standard Production Configuration • Standardize And Reduce The Number Of Parts • Process Design With Product Design • Quality Expectations
  • 19.
  • 20. The service industry has recognized that the JIT system can be adapted successfully in their processes and add value to the end product. JIT lays emphasis on the process and not on the end product. Guidelines ; Synchronization And Balance Of Work Flow Flexibility In The Use Of Resources Respect For People Continuous Improvement Of The Process
  • 21. Who doesn’t recognize the Big Yellow ‘M’? McDonald’s is the best example of JIT in Services !
  • 22. What used to be the case was McDonald's would pre-cook a batch of hamburgers and let them sit under heat lamps. They would keep them for as long as possible and eventually discard what couldn't be sold. The only way to get a fresh hamburger under the old system was to make a special order. McDonald's now doesn't begin to cook until a customer has placed a specific order. The major benefits are better food at a lower cost. Wastage is reduced along with an improvised taste that makes you want to scream out I’m Lovin’ It !
  • 23. Is It Time For Just In Time ?
  • 24. Just-in-time manufacturing involves the sophisticated coordination of suppliers, delivering component parts at just the moment they’re needed in the manufacturing process ; dynamic manufacturing. For Marketing with JIT, inventory is essentially the content. The marketing campaign process is step-wise assembly of content that’s delivered to the buyer through any number of channels to a prospect database. Traditionally, marketing would build an inventory of marketing messages to deliver in batches to prospective buyers and customers. This Inventory is virtual, there aren’t holding costs, but it comes with an opportunity cost. There may be some branding and awareness benefits, but there’s probably as much risk that your email is viewed as junk to-be-deleted. With India it’s most essentially Not Time For Just In Time.
  • 25.
  • 26. CHENNAI: The earthquake and tsunami that flattened Japan's north eastern industrial hubs in March this year could have a more long-term impact on the way Japanese companies do business across the world. Honda and Toyota suffered huge production losses worldwide as parts supplies from Japan were held up due to the twin disaster. Now the two Japanese biggies may be taking a relook not only at their famed management mantra—just-in-time (JIT)—but also at the concept of sourcing critical components only from Japan. JIT —a production philosophy born on the factory floors of Japanese car companies—is now a global management practice and has saved companies billions of dollars. The idea behind JIT, or lean manufacturing , is to have the supplies a firm needs at the exact moment that they are needed. But even Toyota, which put in place the Toyota Production System based on just-in-time inventory management, understands keeping minimum inventory has its risks.
  • 27. • JIT eliminates organizational barriers and improves communication. • Accounting changes or relies on activity- based costing. • Marketing by interfacing with the customers. • Finance approves and evaluates financial investments • Information systems create the network of information necessary for JIT to function
  • 28. • A surprising effect was that factory response time fell to about a day. This improved customer satisfaction by providing vehicles within a day or two of the minimum economic shipping delay. • Also, the factory began building many vehicles to order, eliminating the risk they would not be sold. This improved the company's return on equity
  • 29. • Since assemblers no longer had a choice of which part to use, every part had to fit perfectly. This caused a quality assurance crisis, which led to a dramatic improvement in product quality. • When a process or parts quality problem surfaced on the production line, the entire production line had to be slowed or even stopped. No inventory meant a line could not operate from in-process inventory while a production problem was fixed.
  • 30. • The just-in-time philosophy was also applied to other segments of the supply chain in several types of industries. In the commercial sector, it meant eliminating one or all of the warehouses in the link between a factory and a retail establishment. Examples in sales, marketing, and customer service involve applying information systems and mobile hardware to deliver customer information as needed, and reducing waste by video conferencing to cut travel time.
  • 31. • Like all other production strategies , Just In Time systems have their own benefits and drawbacks. • Maintaining sub-normal inventories can be beneficial or harmful to an organization , depending on how efficiently it is applied.
  • 32. • Reduced Setup time , also known as ‘Changeover’ time. • Funds tied up in inventories can be used elsewhere. • Storage area used up can be utilized. • Throughput Time is reduced resulting in greater output • Production scheduling and work hour consistency is synchronized with
  • 33. • Supplies come in regular intervals throughout the production day • The risk of inventory breaking/expiring is reduced largely. • Inventory flow becomes simpler and easier to manage due to smaller lot sizes. • Cuts the risk of supply system problems.
  • 34. • JIT operation leaves suppliers and downstream consumers open to Supply Shocks. • The organization will not be able to cater to large orders on time.
  • 35.
  • 36. • Just-in-time operation leaves suppliers and downstream consumers open to supply shocks and large supply or demand changes. • Very low stock levels means shipments of the same part can come in several times per day. This means Toyota is especially susceptible to flow interruption. For that reason, Toyota uses two suppliers for most assemblies.
  • 37. • As noted by Liker (2003) and Womack and Jones (2003), it ultimately would be desirable to introduce synchronized flow and link JIT through the entire supply stream. However, none followed this in detail all the way back through the processes to the raw materials. • . It is for the reasons stated raw materials companies decouple their supply chain from their clients' demand by carrying large 'finished goods' stocks.
  • 38. • The JIT delivery is critical for success • When the material does not arrive on time, the station will starve and fail • When the material arrives ahead of time Inventory takes space and creates problem. • Flow in time is the name of the game in JIT.
  • 39. Toyota is considered by many to be the poster child for JIT success. The Toyota Production Strategy is highlighted by the fact that raw materials are not brought to the production floor until an order is received and this product is ready to be built. No parts are allowed at a node unless they are required for the next node, or they are part of an assembly for the next node. This philosophy has allowed Toyota to keep a minimum amount of inventory which means lower costs
  • 40. – Small amounts of raw material inventory must be kept at each node in production, so that production can take place for any product. These parts are then replenished when they are used. – Accuracy of forecasting is important so the correct amount of raw materials can be stocked.
  • 41. • The history of Harley-Davidson started way back in 1903 in Milwaukee when William S. Harley and Arthur Davidson developed a one cylinder motorcycle in a shed bearing the name board ‘Harley-Davidson Motor Company... • Faced with tough competition from Japanese companies, Harley-Davidson decided it would make more sense to join the competition rather than beat it
  • 42. • Harley-Davidson successfully adopted Japanese manufacturing principles which many considered were impossible for US manufacturers to achieve because of cultural and political reasons. • After implementing these Japanese techniques, Harley-Davidson succeeded in manufacturing high quality motorcycles at lower cost.It witnessed the success of JIT in the late 1980s. • Achieved inventory turnover from 5 to 20, reduced the inventory by 75%
  • 43. • Dell has also leveraged JIT principles to make its manufacturing process a success. • Dell’s approach to JIT is different in that they leverage their suppliers to achieve the JIT goal. • They are also unique in that Dell is able to provide exceptionally short lead times to their customers, by forcing their suppliers to carry inventory instead of carrying it themselves and then demanding (and receiving) short lead times on components so that products can be simply assembled by Dell quickly and then shipped to the customer.
  • 44. • Dependable suppliers with the ability to meet Dell’s demanding lead time requirements. • A seamless system that allows Dell to transmit its component requirements so that they will arrive at Dell in time to fulfill its lead times. • A willingness of suppliers to keep inventory on hand allowing Dell to be free of this responsibility.
  • 45. • Top Management Commitment. • Development Of A JIT Policy Manual. • Development Of A JIT Procedure Manual. • Develop And Implement A Continuous JIT Training Program For Employees At All Level.
  • 46. • (5) Develop and maintain a JIT circle involving key employee group representatives, • (6) Redesign the organization to make it flexible and dynamic for allowing JIT permeate through the system • (7) Develop and maintaining an effective communication and control system in order to provide feed backs and control at all levels of the organization.