1. Axle Driven System
2. Mid On Generation(MOD) System
3. End Of Generation(EOD) System
4. ALTERNATORS USED IN COACHES
5. BATTERIES USED IN TRAIN
COACHES
AXLE DRIVEN SYSTEM
 In this system 4.5 KW brushless alternators
are driven through V-belts from axle.
 Lead acid batteries 11O V, 120 Ah arranged
from 3 cell Mono Block units.
 Four numbers of emergency feed terminals
boxes for B.G. and one number for M.G.
coach are provided on each end wall for
interconnecting the coach to adjacent coach
to receive power, in the case generation fails.
 For BG AC coaches, 18 KW / 25 KW brushless
alternators are used.
 Two such alternators are used in AC-2T /AC-
3T /Chair Cars and only an alternator is used
in First AC coach.
 Batteries of 800 / 11 00 AH capacity at 10 hr
rating are used in I AC / AC-2T / AC-3T
/chair car of B.G. Coaches.
 Output from alternator mounted on the bogie of coach is fed to the
regulator cum rectifier for rectifying the AC output to DC and
regulating the output voltage at different speeds and loads.
 The output from rectifier cum regulator on the under frame is brought
through cables on the coach.
 The load is fed through four rotary switches (RSW) and fuses
connecting circuits LI, L2, F and SPM.
 LI feeds the essential lighting load like lavatories,
gangways, doorways and up to 50% of light in each
compartment/bays corridor lights and night lights, L2
feeds remaining lighting loads, F feeds the fan load
and SPM feeds emergency feed terminals (EFT).
 An external battery charging terminal (BCT) is provided to charge the
battery from external charger, if battery is in rundown condition due to
failure of alternator.
BASI C CIRCUIT DIAGRAM FOR AXLE DRIVEN
SYSTEM
MID ON GENERATION(MOD)
SYSTEM In this system a power car housing
DG sets is used in middle of rake.
 It is chosen for small branch line
slow trains having long halts
where batteries are likely to
remain undercharged if
conventional axle driven system is
adopted.
 Capacity of DG set will depend on
composition of rake (usually 30
KVA) and generation is at 415 V, 3
phase, 50 cycle and is stepped
down to 110 V, 3 Phase, 50 cycles.
END OF GENERATION(EOD)
SYSTEM Rakes of Rajdhani / Shatabdi express trains having
heavy load of air-conditioned coaches, pantry cars
with electrically operated cooking appliances, use
Diesel Generating Sets housed in coaches known as
Power cars to meet the load.
 Normally 2 power cars, one on either side of rake,
generate power at 750 V AC or 415 V AC, 3 phase, 50
cycles.
 All the coaches of power cars are interconnected
with each other through couplers consisting of
switchgear flexible cables.
GLIMPSES INSIDE POWER CARS
ALTERNATORS USED IN COACHES
(1) 4.5 KW, 120V BG non-
AC coaches
(2) 3.0 KW, 120 V for MG
non-AC coaches
(3) 12.0 KW, 120 V for MG
AC coaches / Jan Shatabdi
Non AC Coaches.
(4) 18.0 KW, 130 V for BG
AC coaches (old)
(5) 25 KW,130V, alternator
for BG AC coaches (new)
Approved manufacturers for the alternators are:
 KEL (Kerala Electrical & Allied Engineering Industries)
 BEACON ( Best & Crompton)
 SIL ( Stone India Limited)
 HMTD Engineering
 CGL (Crompton Greaves Limited)
 Some new makes are also coming up like PIPL, STESALITE, IEC etc
BATTERIES USED IN TRAIN
COACHES
 Conventional Lead Acid Cells .
 Valve Regulated Lead Acid(VRLA) Batteries / SMF
Batteries.
CHARGING OF BATTERIES
1. Initial Filling:-
 Remove the vent / filler plugs and fill the cells, with the
previously prepared and cooled electrolyte, till the lower
marking on the float indicator stem just appears above the
float plug.
 The approximate quantity and gravity of the electrolyte for
initial fillings are given in the reference table.
 After filling, allow the cells to rest for a period of around 16
- 24 hours.
 During the rest period there will be some fall in the level of
electrolyte. Restore this with some more electrolyte, before
putting the cells on first charge.
 Now the cells are ready for first charge.
2. First Charge:-
 Select a D.C. source of 50% higher voltage and current capacities as compared to
the battery voltage and maximum current requirement. Connect the positive of
the source to the positive of the cell battery as marked on the terminals and
negative of the source to the negative of the cell / battery also as marked on the
terminals.
 Now charge the cells at the specified rate for 80/100 hours as indicated in Table
II.
 During the charging it is not advisable to allow the temperature of the
electrolyte to exceed 50 degree C. So, should it cross 45 degree C, reduce the
charging rate to half the value and increase time proportionately. If the
temperature continues to rise towards 50 degree C, stop charging immediately,
and recommence only after the electrolyte has cooled down below 50 degree C.
The total charge input should equal Time x I (where I is the specified charging
current).
 While charging, there will be some fall in the level of electrolyte due to loss of
water by gassing. Restore this at intervals, say 24 hrs. by adding required
quantity of approved quality of water into the cells.
 It is necessary to start adjusting the sp. gravity of electrolyte to 1.215 ± 0.005
(with RPg-800, 1.250 ± 0.005) corrected to 27 degree C, at about 10-hours prior
to the completion of charge; so that the adjustment is complete before the
completion of charge.
Alternators and Batteries Used in Indian Railways Coach Power Systems

More Related Content

What's hot

Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiPrabjeet Singh
 
Indian railway final report
Indian railway  final reportIndian railway  final report
Indian railway final reportashwani kumar
 
Indian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportIndian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportaman1312
 
Electric locomotive ppt
Electric locomotive pptElectric locomotive ppt
Electric locomotive pptSubhash kumar
 
Air conditioning in indian railways PEE
Air conditioning in indian railways PEEAir conditioning in indian railways PEE
Air conditioning in indian railways PEEirkportal
 
Electrical HT/LT Motor protection
Electrical HT/LT Motor protectionElectrical HT/LT Motor protection
Electrical HT/LT Motor protectionNischal Popat
 
Training report on NWR,jaipur
Training report on NWR,jaipurTraining report on NWR,jaipur
Training report on NWR,jaipurLokesh Judani
 
POWER SUPPLY SYSTEM IN TRAIN COACHES
POWER SUPPLY SYSTEM IN TRAIN COACHESPOWER SUPPLY SYSTEM IN TRAIN COACHES
POWER SUPPLY SYSTEM IN TRAIN COACHESmhjit
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railwayssuresh shindhe
 
Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)shovandey07
 
locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.Mukesh Maurya
 
Electric traction system
Electric traction systemElectric traction system
Electric traction systemAmitKumar6931
 
NWR summer training report
NWR summer training reportNWR summer training report
NWR summer training reportKaushu Deshwal
 
Module 3 electric propulsion electric vehicle technology ppt
Module 3 electric propulsion   electric vehicle technology pptModule 3 electric propulsion   electric vehicle technology ppt
Module 3 electric propulsion electric vehicle technology pptDrCVMOHAN
 
Project report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshopProject report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshopSagardwip das
 
REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION Ravi Phadtare
 

What's hot (20)

Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 
Indian railway final report
Indian railway  final reportIndian railway  final report
Indian railway final report
 
Railway training
Railway trainingRailway training
Railway training
 
Indian Railway Diesel shed Training report
Indian Railway Diesel shed Training reportIndian Railway Diesel shed Training report
Indian Railway Diesel shed Training report
 
Electric locomotive ppt
Electric locomotive pptElectric locomotive ppt
Electric locomotive ppt
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Traction motor
Traction motorTraction motor
Traction motor
 
Air conditioning in indian railways PEE
Air conditioning in indian railways PEEAir conditioning in indian railways PEE
Air conditioning in indian railways PEE
 
Electrical HT/LT Motor protection
Electrical HT/LT Motor protectionElectrical HT/LT Motor protection
Electrical HT/LT Motor protection
 
Training report on NWR,jaipur
Training report on NWR,jaipurTraining report on NWR,jaipur
Training report on NWR,jaipur
 
POWER SUPPLY SYSTEM IN TRAIN COACHES
POWER SUPPLY SYSTEM IN TRAIN COACHESPOWER SUPPLY SYSTEM IN TRAIN COACHES
POWER SUPPLY SYSTEM IN TRAIN COACHES
 
Electric traction in railways
Electric traction in railwaysElectric traction in railways
Electric traction in railways
 
Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)
 
locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.locomotive training report charbagh,lucknow for electrical engg.
locomotive training report charbagh,lucknow for electrical engg.
 
Electric traction system
Electric traction systemElectric traction system
Electric traction system
 
NWR summer training report
NWR summer training reportNWR summer training report
NWR summer training report
 
Module 3 electric propulsion electric vehicle technology ppt
Module 3 electric propulsion   electric vehicle technology pptModule 3 electric propulsion   electric vehicle technology ppt
Module 3 electric propulsion electric vehicle technology ppt
 
Project report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshopProject report of vocational training at Chittaranjan locomotive workshop
Project report of vocational training at Chittaranjan locomotive workshop
 
REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION REPORT ON 33/11KV SUBSTATION
REPORT ON 33/11KV SUBSTATION
 

Similar to Alternators and Batteries Used in Indian Railways Coach Power Systems

hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhiyoy18481
 
High voltage batteries
High voltage batteriesHigh voltage batteries
High voltage batteriesCraig Kielb
 
Railway coaches
Railway coachesRailway coaches
Railway coachesnoor patel
 
Summer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfSummer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfAbhisheksamal22
 
APPROACH FOR ELECTRIC BIKES USING BATTERY AND SUPER CAPACITOR FOR PERFORMA...
APPROACH FOR ELECTRIC BIKES USING   BATTERY AND SUPER CAPACITOR FOR  PERFORMA...APPROACH FOR ELECTRIC BIKES USING   BATTERY AND SUPER CAPACITOR FOR  PERFORMA...
APPROACH FOR ELECTRIC BIKES USING BATTERY AND SUPER CAPACITOR FOR PERFORMA...MATHEW JOSEPH
 
Regenerative braking energy recovery (diesel trucks) details v2
Regenerative braking energy recovery (diesel trucks) details v2Regenerative braking energy recovery (diesel trucks) details v2
Regenerative braking energy recovery (diesel trucks) details v2Surojit Mukerji
 
Split Phase Induction Motors - Principle and Types
Split Phase Induction Motors - Principle and TypesSplit Phase Induction Motors - Principle and Types
Split Phase Induction Motors - Principle and Typeskkk212
 
Ppt on Kharagpur railway
Ppt on Kharagpur railwayPpt on Kharagpur railway
Ppt on Kharagpur railwaySURAJBHAKTA4
 
Railway workshop jodhpur
Railway workshop jodhpurRailway workshop jodhpur
Railway workshop jodhpurMAHESH SONI
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
Inverter for Fuel Cell Based On PWM Cycloconverter
Inverter for Fuel Cell Based On PWM CycloconverterInverter for Fuel Cell Based On PWM Cycloconverter
Inverter for Fuel Cell Based On PWM Cycloconverterpaperpublications3
 
A hybrid cascaded multilevel converter for battery 2
A hybrid cascaded multilevel converter for battery 2A hybrid cascaded multilevel converter for battery 2
A hybrid cascaded multilevel converter for battery 2Ki Tu
 

Similar to Alternators and Batteries Used in Indian Railways Coach Power Systems (20)

J DJ
J DJJ DJ
J DJ
 
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
 
6 train lighting
6 train lighting6 train lighting
6 train lighting
 
High voltage batteries
High voltage batteriesHigh voltage batteries
High voltage batteries
 
Railway coaches
Railway coachesRailway coaches
Railway coaches
 
REU_report_paper
REU_report_paperREU_report_paper
REU_report_paper
 
Summer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfSummer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdf
 
APPROACH FOR ELECTRIC BIKES USING BATTERY AND SUPER CAPACITOR FOR PERFORMA...
APPROACH FOR ELECTRIC BIKES USING   BATTERY AND SUPER CAPACITOR FOR  PERFORMA...APPROACH FOR ELECTRIC BIKES USING   BATTERY AND SUPER CAPACITOR FOR  PERFORMA...
APPROACH FOR ELECTRIC BIKES USING BATTERY AND SUPER CAPACITOR FOR PERFORMA...
 
Regenerative braking energy recovery (diesel trucks) details v2
Regenerative braking energy recovery (diesel trucks) details v2Regenerative braking energy recovery (diesel trucks) details v2
Regenerative braking energy recovery (diesel trucks) details v2
 
Split Phase Induction Motors - Principle and Types
Split Phase Induction Motors - Principle and TypesSplit Phase Induction Motors - Principle and Types
Split Phase Induction Motors - Principle and Types
 
Ppt on Kharagpur railway
Ppt on Kharagpur railwayPpt on Kharagpur railway
Ppt on Kharagpur railway
 
Northern western raiways ppt
Northern western raiways pptNorthern western raiways ppt
Northern western raiways ppt
 
Railway workshop jodhpur
Railway workshop jodhpurRailway workshop jodhpur
Railway workshop jodhpur
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Electrical vehicle
Electrical vehicleElectrical vehicle
Electrical vehicle
 
Electric scooter
Electric scooterElectric scooter
Electric scooter
 
POWER CAR.pptx
POWER CAR.pptxPOWER CAR.pptx
POWER CAR.pptx
 
Inverter for Fuel Cell Based On PWM Cycloconverter
Inverter for Fuel Cell Based On PWM CycloconverterInverter for Fuel Cell Based On PWM Cycloconverter
Inverter for Fuel Cell Based On PWM Cycloconverter
 
sectors of electricity use.pdf
sectors of electricity use.pdfsectors of electricity use.pdf
sectors of electricity use.pdf
 
A hybrid cascaded multilevel converter for battery 2
A hybrid cascaded multilevel converter for battery 2A hybrid cascaded multilevel converter for battery 2
A hybrid cascaded multilevel converter for battery 2
 

Recently uploaded

Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 

Recently uploaded (20)

Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 

Alternators and Batteries Used in Indian Railways Coach Power Systems

  • 1. SIDDHARTHA SHUKLA EN-B (4th year) ROLL NO.-1203221103
  • 2. 1. Axle Driven System 2. Mid On Generation(MOD) System 3. End Of Generation(EOD) System 4. ALTERNATORS USED IN COACHES 5. BATTERIES USED IN TRAIN COACHES
  • 3. AXLE DRIVEN SYSTEM  In this system 4.5 KW brushless alternators are driven through V-belts from axle.  Lead acid batteries 11O V, 120 Ah arranged from 3 cell Mono Block units.  Four numbers of emergency feed terminals boxes for B.G. and one number for M.G. coach are provided on each end wall for interconnecting the coach to adjacent coach to receive power, in the case generation fails.  For BG AC coaches, 18 KW / 25 KW brushless alternators are used.  Two such alternators are used in AC-2T /AC- 3T /Chair Cars and only an alternator is used in First AC coach.  Batteries of 800 / 11 00 AH capacity at 10 hr rating are used in I AC / AC-2T / AC-3T /chair car of B.G. Coaches.
  • 4.  Output from alternator mounted on the bogie of coach is fed to the regulator cum rectifier for rectifying the AC output to DC and regulating the output voltage at different speeds and loads.  The output from rectifier cum regulator on the under frame is brought through cables on the coach.  The load is fed through four rotary switches (RSW) and fuses connecting circuits LI, L2, F and SPM.  LI feeds the essential lighting load like lavatories, gangways, doorways and up to 50% of light in each compartment/bays corridor lights and night lights, L2 feeds remaining lighting loads, F feeds the fan load and SPM feeds emergency feed terminals (EFT).  An external battery charging terminal (BCT) is provided to charge the battery from external charger, if battery is in rundown condition due to failure of alternator.
  • 5. BASI C CIRCUIT DIAGRAM FOR AXLE DRIVEN SYSTEM
  • 6. MID ON GENERATION(MOD) SYSTEM In this system a power car housing DG sets is used in middle of rake.  It is chosen for small branch line slow trains having long halts where batteries are likely to remain undercharged if conventional axle driven system is adopted.  Capacity of DG set will depend on composition of rake (usually 30 KVA) and generation is at 415 V, 3 phase, 50 cycle and is stepped down to 110 V, 3 Phase, 50 cycles.
  • 7. END OF GENERATION(EOD) SYSTEM Rakes of Rajdhani / Shatabdi express trains having heavy load of air-conditioned coaches, pantry cars with electrically operated cooking appliances, use Diesel Generating Sets housed in coaches known as Power cars to meet the load.  Normally 2 power cars, one on either side of rake, generate power at 750 V AC or 415 V AC, 3 phase, 50 cycles.  All the coaches of power cars are interconnected with each other through couplers consisting of switchgear flexible cables.
  • 9.
  • 10. ALTERNATORS USED IN COACHES (1) 4.5 KW, 120V BG non- AC coaches (2) 3.0 KW, 120 V for MG non-AC coaches (3) 12.0 KW, 120 V for MG AC coaches / Jan Shatabdi Non AC Coaches. (4) 18.0 KW, 130 V for BG AC coaches (old) (5) 25 KW,130V, alternator for BG AC coaches (new)
  • 11. Approved manufacturers for the alternators are:  KEL (Kerala Electrical & Allied Engineering Industries)  BEACON ( Best & Crompton)  SIL ( Stone India Limited)  HMTD Engineering  CGL (Crompton Greaves Limited)  Some new makes are also coming up like PIPL, STESALITE, IEC etc
  • 12. BATTERIES USED IN TRAIN COACHES  Conventional Lead Acid Cells .  Valve Regulated Lead Acid(VRLA) Batteries / SMF Batteries.
  • 13. CHARGING OF BATTERIES 1. Initial Filling:-  Remove the vent / filler plugs and fill the cells, with the previously prepared and cooled electrolyte, till the lower marking on the float indicator stem just appears above the float plug.  The approximate quantity and gravity of the electrolyte for initial fillings are given in the reference table.  After filling, allow the cells to rest for a period of around 16 - 24 hours.  During the rest period there will be some fall in the level of electrolyte. Restore this with some more electrolyte, before putting the cells on first charge.  Now the cells are ready for first charge.
  • 14. 2. First Charge:-  Select a D.C. source of 50% higher voltage and current capacities as compared to the battery voltage and maximum current requirement. Connect the positive of the source to the positive of the cell battery as marked on the terminals and negative of the source to the negative of the cell / battery also as marked on the terminals.  Now charge the cells at the specified rate for 80/100 hours as indicated in Table II.  During the charging it is not advisable to allow the temperature of the electrolyte to exceed 50 degree C. So, should it cross 45 degree C, reduce the charging rate to half the value and increase time proportionately. If the temperature continues to rise towards 50 degree C, stop charging immediately, and recommence only after the electrolyte has cooled down below 50 degree C. The total charge input should equal Time x I (where I is the specified charging current).  While charging, there will be some fall in the level of electrolyte due to loss of water by gassing. Restore this at intervals, say 24 hrs. by adding required quantity of approved quality of water into the cells.  It is necessary to start adjusting the sp. gravity of electrolyte to 1.215 ± 0.005 (with RPg-800, 1.250 ± 0.005) corrected to 27 degree C, at about 10-hours prior to the completion of charge; so that the adjustment is complete before the completion of charge.