Ayele Nigussie
 Accurate electric load forecasting is crucial for
power system planning and operation.
 The forecasted load should be close to the load
demand on the power system.
 Load forecasting is always associated with some
uncertainty.
 Power systems, however, are to be planned in
such a way that changing load developments can
be accommodated by the expansion of the system
.
 load forecasting helps a company to decide
◦ Purchasing electric power
◦ Generating electric power
◦ Load switching
◦ Infrastructure development
 Three types of forecasts:
1. short-term forecasts- which are usually from one hour
to one week
2. Medium-term forecasts- which are usually from a
week to a year
3. long-term forecasts- which are longer than a year
 Some load forecasting methods are:
1. Load forecast with load increase factors
2. Load forecast based on economic characteristic
data
3. Load forecast with estimated values
4. Load forecast with standardized load curves.
5. Regression
6. Modern forecasting methods
 The precise application of the different methods
cannot be determined exactly.
 And combinations of the methods are usually
applied.
 This method is based on the existing load and the
increase in the previous years and estimates the
future load increase by means of exponential
increase:
 s=rate of increase per year
 P0 = previous load
 Pn=load at the nth year
 n=year
 This method is simple but cannot consider
externally measured variables and is hardly
suitable to provide reliable load and energy
predictions.
Example:
 Assume the pick load on Haramaya substation is 5
MW and the annual growth rate is 7%. What will
be the pick load after 10 solid years?
 Ans: P10=9.84 MW
 An increase in accuracy is obtained if the load
forecast is carried out separately for the individual
consumption sectors, such as households,
commercial, public supply and industrial sectors.
 Then the individual results are summed for each
year to obtain the total system load.
 Another model for load forecasting is based on the
phenomenological description of the growth of
electrical energy consumption as shown next:
 With this model, adjustments can be combined with
the process of load development of the past with
different increases and saturation effects for the future.
 Load forecast calculated with the load
development model (curves for various values of k
and l ).
 As the economy of a country grows, so does the
power demand.
 Load forecast with economic characteristic data
obtained from energy statistics assumes different
relations between economic growth, availability of
energy resources, energy consumption and
requirements in general, such as the increase in
energy consumption due to growth of population, and
in special applications, such as energy requirements
of industry.
 The requirement for electrical energy per capita of the
population is determined to a large extent by the standard of
living and the degree of industrialization of a country.
 However, high consumption of energy can be also an
indicator of high waste of energy.
 The increase of electrical energy consumption in
industrialized countries is less affected by the growth of
population and predominantly by the growth of the gross
domestic product ( GDP ) and/or the gross national product (
GNP ).
Example:
 In the GTP, the GDP of Ethiopia is supposed to grow at 15%.
Before the GTP period, the power demand was growing at a
rate of 23% (GDP growth=11%). Assuming a direct relationship
between the economy and the power demand,
a. What is the rate of power demand growth in the GTP period?
b. In 2002 E.C, the national power demand was approximately
1500 MW. What will be the expected power demand in 2007
E.C?
 In power system expansion, development plan is
vital in forecasting the power requirement.
 For instance, we can use the table on the next
slide in power system planning.
Example:
 Near Addis, a business area of 10km-squared is to be
electrified. Forecast the power demand.
 Land development plans contain general information
about the area development and use of land, and the
size, location and types of residential, industrial and
commercial areas, without allowing one to be able to
derive detailed individual measures from them.
 Another way of load forecasting is based on the
annual energy consumption of individual consumer or
consumer groups, which can be taken from the annual
electricity bill.
 The system load can be determined by means of
standardized load curves for different consumer
groups such as
◦ Residential
◦ Commercial
◦ Public sectors
◦ industrial
 As consumption profiles of the particular customer
groups not only change with time of day but also show
day - of - week and seasonal changes, characteristic
days are defined, such as working - day, Saturday,
Sunday (or Friday in Islamic countries) and holiday as
well as seasonal differences in winter, summer and
transition periods.
 Based on the load curves we can forecast the future load
for a particular hour, a particular day and a particular
year.
 Summer sunday
 Summer working day
 Regression is also used in forecasting loads.
 Read this at your home.
 Nowadays, fuzy logic, ANN, and other algorithms
are used in power system planning to forecast
load.
 These algorithms have artificial learning
capabilities.
 And thus, by taking the past into consideration,
they can predict the future.
Planning and Design of hydro generation
stations
Ayele Nigussie
1. Introduction
2. Layout
3. Environmental Effects of HPPs
4. Economic Aspects of HPPs
5. Designing HPPs
6. Summary
 Hydroelectric power captures the energy released
from falling water.
 Potential Energy  Kinetic energy  Electrical
Energy
 Hydroelectric power plants are categorized as
◦ Micro hydropower plants [<100 kW)
◦ Mini Hydropower Plants [100 kW – 1 MW]
◦ Small Hydropower Plants [1 MW – 30 MW]
◦ Large Hydropower Plants [>30 MW]
 In Ethiopia, more than 96% of the electricity is hydro.
 The effects are:
 Physical -
◦ change the ecosystem,
◦ effect on downstream,
◦ Loss of habitat
◦ Loss of farms
◦ Deforestation
◦ Effect on micro-climate level
 Biological-
◦ Flora
◦ Fauna
◦ Humans
 High initial cost of construction.
 Electricity is cheap.
 Energy is green.
 In an HPP construction, costs to be considered:
◦ land/land rights,
◦ structures and improvements,
◦ equipment, reservoirs, dams, waterways, roads, railroads, and
bridges.
◦ protecting fish and wildlife.
◦ Operation and maintenance costs
◦ hydraulic expenses, electric expenses, and rents.
 When designing a hydroelectric power plant a number of
elements and equipment need to be taken into
consideration.
 Dam size, retention basin size and depth, inlet valves,
weir and control gates, penstock length and diameter,
turbines, generators, transformers and excitation
equipment, and efficiency all have to be examined.
 Elevation or head and stream flow have to be
established as well.

 Firm power:
 Based on the firm power:
◦ Mechanical Engineers design the hydraulic
turbines.
◦ Electrical engineers design the generators,
transformers, the switch yards and the
protection system.
◦ Dams, canals, intakes, penstocks, tailraces and
power houses are designed by civil engineers.
 Firm power is also one of the main factors that
decides the feasibility of an HPP.
 Feasibility study contains:
◦ Site visit and selection
◦ Capacity analysis
◦ Economic analysis
◦ Environmental impact analysis
 Feasibility study is the first step in HPP construction.
 In planning an HHP, the general
requirements are:
◦ Determining location of the powerhouse , location of
switchyard ,
◦ Laying out the highway and railroad access, other site
features,
◦ Determining types of powerhouse, structures,
◦ selection of type of powerhouse,
◦ location of main transformers, powerhouse and
switchyard, equipment, powerhouse Auxiliary Equipment
 Architectural design requirements are:
◦ Exterior Design
◦ Exterior Details
◦ Interior Design
◦ Interior Details
◦ Schedule of Finishes
◦ Painting
◦ Design memorandum
◦ Drawings
 The structural requirements are:
◦ All the civil works are under this category.
Ayele Nigussie
3.1 Introduction
3.2 What is a substation?
3.3 Important points
3.4 Classification of substations
3.5 Substation equipments
3.6 Substation Configurations
3.7 Substation design
3.8 Planning of substations
3.9 Conclusion
 A substation is a nodal point in a power
system.
 Internationally standardized voltage level
for substations:
 66 kV, 110 kV, 132 kV, 150 kV, 220
kV, 380 kV,
 For very long transmission distances : 500
kV, 800 kV
Tasks of substation:
 Distribution of power towards load circuit
 Separation of different network groups (reduction
of short circuit power)
 Coupling of different voltage level via power
transformers
 Measuring, signaling and monitoring of network
data (e.g. U, I, P, Q, f)
3.2 What is a
Substation ?The assembly of
apparatus used to
change some
characteristics (e.g.
voltage, a.c. to d.c. ,freq,
p.f. etc..) of electrical
supply is called a
substation.
 It should be located at a proper site(i.e. at
the center of gravity of load).
 It should provide safe and reliable
arrangement.
 It should be easily operated and
maintained.
 It should involve minimum capital costs.
Substation
According to service requirement According to constructional feature
According to Service requirement:
 Transformer Substation: Transformers are installed to
transform voltage from one level to another as per needs.
 Switching Substations: This substations mean for switching
operation of powerlines with out transforming the voltage.
 Power factor correction Substation: This substations are
installed to increase the power factor to minimise losses.
 Frequency Changer Substation: This substations are installed
where speed control of motors is required.
 Converting Substation: This substations convert a.c to d.c or
vice versa.
 Industrial Substation: This substations are installed to supply
power only to an industries.
According To Constructional Features:
 Indoor SubstationsIndoor Substations: In this substations, the apparatus are
installed with in the substation building. Till 66 kV.
 Outdoor SubstationsOutdoor Substations: this substations are installed in open land.
This substations are employed for voltage levels beyond 66k.v.
 Underground SubstationsUnderground Substations: This: This substations are installed under
ground in densely populated cities where cost of the land is
more.
 Pole-Mounted SubstationsPole-Mounted Substations: This substations are erected for
distribution of power in localities. This is employed for
transformers up to 250 kVA.).
 Foundation Mounted SubstationsFoundation Mounted Substations: This substations are installed
3.4 Classification of
Substation …
 Busbar: is a conductor connecting
power line to substation equipment.
 Insulators & fittings: fix and isolate the
busbar system.
 Isolating Switch: is used for
disconnecting equipment for
maintenance and repair.
 Relays & Circuit Breaker: open and
close a circuit under normal and fault
conditions.
 Power Transformers: are used in
substations to step up or step down
the voltages.
 Instrument Transformers: used for
measuring .
 Metering & Indicating Instruments:
used to watch over the circuit
quantities.
 Power line carrier communication
systems: used for SCADA.
 Coupling capacitors and wave traps
AC/DC supply: is used for auxillaries and DC supply for
relay operation.
Oil handling system: used for purifying oil from
moisture.
Illumination: should be properly illuminated for safety.
Compressed air system: for functioning of CB.
Service bay: to carry the equipments to installation side.
Fire extinguishers
Lightning/Surge Arresters
 Isolating switches:
• Circuit Breakers
3.5 Substation equipments
…
3.5 Substation equipments
…
3.5 Substation equipments
…
3.5 Substation equipments
…
Piezoelectric motorsPiezoelectric motors
Piezo GeneratorsPiezo Generators
ActuatorsActuators
Ultrasonic TransducersUltrasonic Transducers
And many more…And many more…
What are to be considered?
 Site selection
 Design of structures
 Design of foundation for transformers &
structures(IE Rules 64)
 Control room building
 Cable trench & drainage
 Design of earthing
 Protection schemes & interlocks
Conventional substations (AIS):
 Construction according to standardized minimal
distances (clearance) between phase and earth
 Normally used for outdoor substations, just in very few
cases used for indoor substations
 Based on single power system equipments
◦ Replacement of single equipment by equipments from other
manufacturers is possible.
 Simple to expand (in case that space is not an issue)
 Excellent overview, simple handling and easy access
 Minimum clearance in air according to IEC 61936-
1
 Minimum clearance in air according to IEC 61936-
1
Basis requirements for new substations:
 Optimal location of substations within power system (load flow, short
circuit, customer requirements, long term planning, land space)
 Selection of substation design
 Calculation of short-circuit currents and long term development
(ratings)
 Selection of power system requirements
 Adaption of design according to available space, fixing of busbar
configuration (e.g. using wire conductor or tubular conductor)
 Detailed planning of: primary and secondary equipment, auxiliary
equipment, basement, steel structure, building, earthing system
 You can find important standards for power system
installations:
 Planning and Design of a substation normally starts
with the development of the electrical single line
diagram.
 A single line diagram shows number of busbars and
substation bays including the relevant equipment.
 Selection of substation layout depends on
◦ Its importance within the power system
(power system reliability in case of
failures and maintenance activities)
◦ Power system operation
Substation is the heart of a
power system. Hence, its
design should be such that it
will provide continuous ,
quality & desired power with
safety.
 Read further on substations.
THANK YOU
Electrical Considerations for T.L. Design:
 Low voltage drop
 Minimum power loss for high efficiency of
power transmission.
 The line should have sufficient current
carrying capacity so that the power can be
transmitted without excessive voltage
drop or overheating.
 Conductivity of Conductor:
R = ρ.L/A , or
R = L/Ϭ. A
Where:
L: Conductor length.
A: Conductor cross sectional area.
ρ: resistivity
Ϭ: Conductivity (Ϭ= 1/ρ)
 The conductor conductivity must be very
high
to reduce Conductor resistance R and
hence reduce losses
PL= 3 I2
.R
Mechanical Considerations for T.L.
Design:
 The conductors and line supports should
have sufficient mechanical strength:
- to withstand conductor weight, Conductor
Tension and weather conditions (wind,
ice).
- The Spans between the towers can be
long.
- Sag will be small.
- Reducing the number and height of towers
and the number of insulators.
• Heat expansion coefficient must be very
small.
Rt = R0. (1 + α0 .t)
αt = α0/(1+ α0.t)
α t is the heat expansion coefficient at t.
TYPES OF
CONDUCTORS
MATERIALS
lowest cost – low mechanical
strength
Used for small span
1- Steel strands
2- Aluminum strands
ACSR (26/7)
• High mechanical strength can be utilized
by using spans of larger lengths.
• A reduction in the number of supports also
include reduction in insulators and the risk
of lines outage due to flash over or faults
is reduced.
• losses are reduced due to larger diameter
of conductor.
• High current carrying capacity.
 Wooden Poles
 Reinforced Concrete Poles
 Steel Poles
 Lattice Structure Steel Towers
Wooden Poles
Reinforced Concrete Poles
Steel Poles
1- Suspension Tower
2- Tension Tower
3- Angle Tower
4- End Tower
This type of towers exist in the beginning
and at the end of the line which exposed
to tension in one side.
Sag of T.L depends on:
- Conductor weight.
- Span length,
- Tension in the conductor, T
- Weather conditions (wind , ice).
- Temperature.
kV C (m)
0.4 5.5
11 5.5
33 6.0
66 6.2
132 6.2
220 7.0
400 8.4
Spacing = (S )0.5
+ V/150
Where:
S: Sag in meters.
V: Line voltage in kV.
Electrical Considerations for T.L. Design:
 Low voltage drop
 Minimum power loss for high efficiency of
power transmission.
 The line should have sufficient current
carrying capacity so that the power can be
transmitted without excessive voltage
drop or overheating.
 Conductivity of Conductor:
R = ρ.L/A , or
R = L/Ϭ. A
Where:
L: Conductor length.
A: Conductor cross sectional area.
ρ: resistivity
Ϭ: Conductivity (Ϭ= 1/ρ)
 The conductor conductivity must be very
high
to reduce Conductor resistance R and
hence reduce losses
PL= 3 I2
.R
Mechanical Considerations for T.L. Design:
 The conductors and line supports should have
sufficient mechanical strength:
- to withstand conductor weight, Conductor
Tension and weather conditions (wind, ice).
- The Spans between the towers can be long.
- Sag will be small.
- Reducing the number and height of towers and
the number of insulators.
• Heat expansion coefficient must be very
small.
Rt = R0. (1 + α0 .t)
αt = α0/(1+ α0.t)
α t is the heat expansion coefficient at t.
TYPES OF
CONDUCTORS
MATERIALS
lowest cost – low mechanical
strength
Used for small span
1- Steel strands
2- Aluminum strands
ACSR (26/7)
• High mechanical strength can be utilized
by using spans of larger lengths.
• A reduction in the number of supports also
include reduction in insulators and the risk
of lines outage due to flash over or faults
is reduced.
• losses are reduced due to larger diameter
of conductor.
• High current carrying capacity.
 Wooden Poles
 Reinforced Concrete Poles
 Steel Poles
 Lattice Structure Steel Towers
Wooden Poles
Reinforced Concrete Poles
Steel Poles
1- Suspension Tower
2- Tension Tower
3- Angle Tower
4- End Tower
This type of towers exist in the beginning
and at the end of the line which exposed
to tension in one side.
Sag of T.L depends on:
- Conductor weight.
- Span length,
- Tension in the conductor, T
- Weather conditions (wind , ice).
- Temperature.
kV C (m)
0.4 5.5
11 5.5
33 6.0
66 6.2
132 6.2
220 7.0
400 8.4
Spacing = (S )0.5
+ V/150
Where:
S: Sag in meters.
V: Line voltage in kV.
Planning and Design of Hydro Power Plants
Planning and Design of Hydro Power Plants
Planning and Design of Hydro Power Plants

More Related Content

What's hot

Group 7 load forecasting&harmonics final ppt
Group   7 load forecasting&harmonics final pptGroup   7 load forecasting&harmonics final ppt
Group 7 load forecasting&harmonics final pptRahul Sharma
 
POWER SYSTEM OPERATION AND CONTROL. load forecasting - introduction, methodo...
POWER SYSTEM OPERATION AND CONTROL. load forecasting -  introduction, methodo...POWER SYSTEM OPERATION AND CONTROL. load forecasting -  introduction, methodo...
POWER SYSTEM OPERATION AND CONTROL. load forecasting - introduction, methodo...Jobin Abraham
 
POWER SYSTEM PLANNING
POWER SYSTEM PLANNINGPOWER SYSTEM PLANNING
POWER SYSTEM PLANNINGNishaDangi99
 
Load Forecasting
Load ForecastingLoad Forecasting
Load Forecastinglinsstalex
 
Intelligent methods in load forecasting
Intelligent methods in load forecastingIntelligent methods in load forecasting
Intelligent methods in load forecastingprj_publication
 
POWER SYSTEM PLANNING AND DESIGN
POWER SYSTEM PLANNING AND DESIGNPOWER SYSTEM PLANNING AND DESIGN
POWER SYSTEM PLANNING AND DESIGNHardik Pandya
 
Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]Sifan Welisa
 
Forecasting & Planning
Forecasting & PlanningForecasting & Planning
Forecasting & Planninglinsstalex
 
Short-term Load Forecasting based on Neural network and Local Regression
Short-term Load Forecasting based on Neural network and Local RegressionShort-term Load Forecasting based on Neural network and Local Regression
Short-term Load Forecasting based on Neural network and Local RegressionJie Bao
 
Load Forecasting
Load ForecastingLoad Forecasting
Load ForecastingPowerEDGE
 
Short-Term Load Forecasting of Australian National Electricity Market by Hier...
Short-Term Load Forecasting of Australian National Electricity Market by Hier...Short-Term Load Forecasting of Australian National Electricity Market by Hier...
Short-Term Load Forecasting of Australian National Electricity Market by Hier...JEE HYUN PARK
 
Power System Planning
Power System PlanningPower System Planning
Power System Planninglinsstalex
 
Power system planning and trends relevance to renewables
Power system planning and trends relevance to renewablesPower system planning and trends relevance to renewables
Power system planning and trends relevance to renewablesPower System Operation
 
An overview of electricity demand forecasting techniques
An overview of electricity demand forecasting techniquesAn overview of electricity demand forecasting techniques
An overview of electricity demand forecasting techniquesAlexander Decker
 
Load types, estimation, grwoth, forecasting and duration curves
Load types, estimation, grwoth, forecasting and duration curvesLoad types, estimation, grwoth, forecasting and duration curves
Load types, estimation, grwoth, forecasting and duration curvesAzfar Rasool
 
PhD defence: Self-Forecasting EneRgy load Stakeholders (SFERS) for Smart Grids
PhD defence: Self-Forecasting EneRgy load Stakeholders (SFERS) for Smart GridsPhD defence: Self-Forecasting EneRgy load Stakeholders (SFERS) for Smart Grids
PhD defence: Self-Forecasting EneRgy load Stakeholders (SFERS) for Smart GridsDejan Ilic
 
Preliminary electrical load calculation course share
Preliminary electrical load calculation course sharePreliminary electrical load calculation course share
Preliminary electrical load calculation course shareAli Hassan
 

What's hot (20)

Group 7 load forecasting&harmonics final ppt
Group   7 load forecasting&harmonics final pptGroup   7 load forecasting&harmonics final ppt
Group 7 load forecasting&harmonics final ppt
 
POWER SYSTEM OPERATION AND CONTROL. load forecasting - introduction, methodo...
POWER SYSTEM OPERATION AND CONTROL. load forecasting -  introduction, methodo...POWER SYSTEM OPERATION AND CONTROL. load forecasting -  introduction, methodo...
POWER SYSTEM OPERATION AND CONTROL. load forecasting - introduction, methodo...
 
POWER SYSTEM PLANNING
POWER SYSTEM PLANNINGPOWER SYSTEM PLANNING
POWER SYSTEM PLANNING
 
Load Forecasting
Load ForecastingLoad Forecasting
Load Forecasting
 
Intelligent methods in load forecasting
Intelligent methods in load forecastingIntelligent methods in load forecasting
Intelligent methods in load forecasting
 
POWER SYSTEM PLANNING AND DESIGN
POWER SYSTEM PLANNING AND DESIGNPOWER SYSTEM PLANNING AND DESIGN
POWER SYSTEM PLANNING AND DESIGN
 
Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]Power system planning & operation [eceg 4410]
Power system planning & operation [eceg 4410]
 
Forecasting & Planning
Forecasting & PlanningForecasting & Planning
Forecasting & Planning
 
Short-term Load Forecasting based on Neural network and Local Regression
Short-term Load Forecasting based on Neural network and Local RegressionShort-term Load Forecasting based on Neural network and Local Regression
Short-term Load Forecasting based on Neural network and Local Regression
 
Load Forecasting
Load ForecastingLoad Forecasting
Load Forecasting
 
Short-Term Load Forecasting of Australian National Electricity Market by Hier...
Short-Term Load Forecasting of Australian National Electricity Market by Hier...Short-Term Load Forecasting of Australian National Electricity Market by Hier...
Short-Term Load Forecasting of Australian National Electricity Market by Hier...
 
Power System Planning
Power System PlanningPower System Planning
Power System Planning
 
Power system planning and trends relevance to renewables
Power system planning and trends relevance to renewablesPower system planning and trends relevance to renewables
Power system planning and trends relevance to renewables
 
An overview of electricity demand forecasting techniques
An overview of electricity demand forecasting techniquesAn overview of electricity demand forecasting techniques
An overview of electricity demand forecasting techniques
 
Load types, estimation, grwoth, forecasting and duration curves
Load types, estimation, grwoth, forecasting and duration curvesLoad types, estimation, grwoth, forecasting and duration curves
Load types, estimation, grwoth, forecasting and duration curves
 
Electric Utility Solutions: Basics of Load Allocation
Electric Utility Solutions: Basics of Load AllocationElectric Utility Solutions: Basics of Load Allocation
Electric Utility Solutions: Basics of Load Allocation
 
PhD defence: Self-Forecasting EneRgy load Stakeholders (SFERS) for Smart Grids
PhD defence: Self-Forecasting EneRgy load Stakeholders (SFERS) for Smart GridsPhD defence: Self-Forecasting EneRgy load Stakeholders (SFERS) for Smart Grids
PhD defence: Self-Forecasting EneRgy load Stakeholders (SFERS) for Smart Grids
 
Power system planing and operation (pce5312) chapter one
Power system planing and operation (pce5312) chapter onePower system planing and operation (pce5312) chapter one
Power system planing and operation (pce5312) chapter one
 
Power system planing and operation (pce5312) chapter three
Power system planing and operation (pce5312) chapter threePower system planing and operation (pce5312) chapter three
Power system planing and operation (pce5312) chapter three
 
Preliminary electrical load calculation course share
Preliminary electrical load calculation course sharePreliminary electrical load calculation course share
Preliminary electrical load calculation course share
 

Similar to Planning and Design of Hydro Power Plants

Load forecasting,Megger,Earthing ELCB
Load forecasting,Megger,Earthing ELCBLoad forecasting,Megger,Earthing ELCB
Load forecasting,Megger,Earthing ELCBSuryakant Morey
 
0ea1cdf161957c644e8c0b524c973c7e7b2c.pdf
0ea1cdf161957c644e8c0b524c973c7e7b2c.pdf0ea1cdf161957c644e8c0b524c973c7e7b2c.pdf
0ea1cdf161957c644e8c0b524c973c7e7b2c.pdfLucasMogaka
 
0ea1cdf161957c644e8c0b524c973c7e7b2c - Copy.pdf
0ea1cdf161957c644e8c0b524c973c7e7b2c - Copy.pdf0ea1cdf161957c644e8c0b524c973c7e7b2c - Copy.pdf
0ea1cdf161957c644e8c0b524c973c7e7b2c - Copy.pdfLucasMogaka
 
The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...arvindsinghrathore6
 
Reviewing the factors of the Renewable Energy systems for Improving the Energ...
Reviewing the factors of the Renewable Energy systems for Improving the Energ...Reviewing the factors of the Renewable Energy systems for Improving the Energ...
Reviewing the factors of the Renewable Energy systems for Improving the Energ...IJERA Editor
 
Impacts of Demand Side Management on System Reliability Evaluation
Impacts of Demand Side Management on System Reliability EvaluationImpacts of Demand Side Management on System Reliability Evaluation
Impacts of Demand Side Management on System Reliability Evaluationinventy
 
AI Battery Power Management
AI Battery Power ManagementAI Battery Power Management
AI Battery Power Managementvishnu746522
 
C. d. engin, a. yesildirek, designing and modeling of a point absorber wave e...
C. d. engin, a. yesildirek, designing and modeling of a point absorber wave e...C. d. engin, a. yesildirek, designing and modeling of a point absorber wave e...
C. d. engin, a. yesildirek, designing and modeling of a point absorber wave e...Dogukan Engin
 
Economic viability and profitability assessments of WECS
Economic viability and profitability assessments of WECS Economic viability and profitability assessments of WECS
Economic viability and profitability assessments of WECS IJECEIAES
 
Ieeepro techno solutions 2012 ieee embedded project - design &amp; impleme...
Ieeepro techno solutions   2012 ieee embedded project  - design &amp; impleme...Ieeepro techno solutions   2012 ieee embedded project  - design &amp; impleme...
Ieeepro techno solutions 2012 ieee embedded project - design &amp; impleme...srinivasanece7
 
Lecture 1_Introduction to power system planning.pdf
Lecture 1_Introduction to power system planning.pdfLecture 1_Introduction to power system planning.pdf
Lecture 1_Introduction to power system planning.pdfssuser5feb82
 
ghods-A-10-257-2-f90978829
ghods-A-10-257-2-f90978829ghods-A-10-257-2-f90978829
ghods-A-10-257-2-f90978829ladan ghods
 
Initial presentation on techno economic analysis of 3kWp stand alone solar ho...
Initial presentation on techno economic analysis of 3kWp stand alone solar ho...Initial presentation on techno economic analysis of 3kWp stand alone solar ho...
Initial presentation on techno economic analysis of 3kWp stand alone solar ho...Himasree Viswanadhapalli
 
Stochastic control for optimal power flow in islanded microgrid
Stochastic control for optimal power flow in islanded microgridStochastic control for optimal power flow in islanded microgrid
Stochastic control for optimal power flow in islanded microgridIJECEIAES
 
Renewable energy allocation based on maximum flow modelling within a microgrid
Renewable energy allocation based on maximum flow modelling within a microgridRenewable energy allocation based on maximum flow modelling within a microgrid
Renewable energy allocation based on maximum flow modelling within a microgridIJECEIAES
 
Study of using solar energy system to supply a data center
Study of using solar energy system to supply a data centerStudy of using solar energy system to supply a data center
Study of using solar energy system to supply a data centerIRJET Journal
 
when a coil is rotated or turned under a magnetic field, there occurs a force...
when a coil is rotated or turned under a magnetic field, there occurs a force...when a coil is rotated or turned under a magnetic field, there occurs a force...
when a coil is rotated or turned under a magnetic field, there occurs a force...theijes
 
Integrating Renewable Energy into the Electricity Grid
Integrating Renewable Energy into the Electricity GridIntegrating Renewable Energy into the Electricity Grid
Integrating Renewable Energy into the Electricity GridPower System Operation
 
Power system Planning - Basic Techniques
Power system Planning - Basic TechniquesPower system Planning - Basic Techniques
Power system Planning - Basic TechniquesChithraM26
 

Similar to Planning and Design of Hydro Power Plants (20)

Load forecasting,Megger,Earthing ELCB
Load forecasting,Megger,Earthing ELCBLoad forecasting,Megger,Earthing ELCB
Load forecasting,Megger,Earthing ELCB
 
EE6603 - Power System Operation & Control
EE6603 - Power System Operation & ControlEE6603 - Power System Operation & Control
EE6603 - Power System Operation & Control
 
0ea1cdf161957c644e8c0b524c973c7e7b2c.pdf
0ea1cdf161957c644e8c0b524c973c7e7b2c.pdf0ea1cdf161957c644e8c0b524c973c7e7b2c.pdf
0ea1cdf161957c644e8c0b524c973c7e7b2c.pdf
 
0ea1cdf161957c644e8c0b524c973c7e7b2c - Copy.pdf
0ea1cdf161957c644e8c0b524c973c7e7b2c - Copy.pdf0ea1cdf161957c644e8c0b524c973c7e7b2c - Copy.pdf
0ea1cdf161957c644e8c0b524c973c7e7b2c - Copy.pdf
 
The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...
 
Reviewing the factors of the Renewable Energy systems for Improving the Energ...
Reviewing the factors of the Renewable Energy systems for Improving the Energ...Reviewing the factors of the Renewable Energy systems for Improving the Energ...
Reviewing the factors of the Renewable Energy systems for Improving the Energ...
 
Impacts of Demand Side Management on System Reliability Evaluation
Impacts of Demand Side Management on System Reliability EvaluationImpacts of Demand Side Management on System Reliability Evaluation
Impacts of Demand Side Management on System Reliability Evaluation
 
AI Battery Power Management
AI Battery Power ManagementAI Battery Power Management
AI Battery Power Management
 
C. d. engin, a. yesildirek, designing and modeling of a point absorber wave e...
C. d. engin, a. yesildirek, designing and modeling of a point absorber wave e...C. d. engin, a. yesildirek, designing and modeling of a point absorber wave e...
C. d. engin, a. yesildirek, designing and modeling of a point absorber wave e...
 
Economic viability and profitability assessments of WECS
Economic viability and profitability assessments of WECS Economic viability and profitability assessments of WECS
Economic viability and profitability assessments of WECS
 
Ieeepro techno solutions 2012 ieee embedded project - design &amp; impleme...
Ieeepro techno solutions   2012 ieee embedded project  - design &amp; impleme...Ieeepro techno solutions   2012 ieee embedded project  - design &amp; impleme...
Ieeepro techno solutions 2012 ieee embedded project - design &amp; impleme...
 
Lecture 1_Introduction to power system planning.pdf
Lecture 1_Introduction to power system planning.pdfLecture 1_Introduction to power system planning.pdf
Lecture 1_Introduction to power system planning.pdf
 
ghods-A-10-257-2-f90978829
ghods-A-10-257-2-f90978829ghods-A-10-257-2-f90978829
ghods-A-10-257-2-f90978829
 
Initial presentation on techno economic analysis of 3kWp stand alone solar ho...
Initial presentation on techno economic analysis of 3kWp stand alone solar ho...Initial presentation on techno economic analysis of 3kWp stand alone solar ho...
Initial presentation on techno economic analysis of 3kWp stand alone solar ho...
 
Stochastic control for optimal power flow in islanded microgrid
Stochastic control for optimal power flow in islanded microgridStochastic control for optimal power flow in islanded microgrid
Stochastic control for optimal power flow in islanded microgrid
 
Renewable energy allocation based on maximum flow modelling within a microgrid
Renewable energy allocation based on maximum flow modelling within a microgridRenewable energy allocation based on maximum flow modelling within a microgrid
Renewable energy allocation based on maximum flow modelling within a microgrid
 
Study of using solar energy system to supply a data center
Study of using solar energy system to supply a data centerStudy of using solar energy system to supply a data center
Study of using solar energy system to supply a data center
 
when a coil is rotated or turned under a magnetic field, there occurs a force...
when a coil is rotated or turned under a magnetic field, there occurs a force...when a coil is rotated or turned under a magnetic field, there occurs a force...
when a coil is rotated or turned under a magnetic field, there occurs a force...
 
Integrating Renewable Energy into the Electricity Grid
Integrating Renewable Energy into the Electricity GridIntegrating Renewable Energy into the Electricity Grid
Integrating Renewable Energy into the Electricity Grid
 
Power system Planning - Basic Techniques
Power system Planning - Basic TechniquesPower system Planning - Basic Techniques
Power system Planning - Basic Techniques
 

Recently uploaded

ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 

Recently uploaded (20)

ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 

Planning and Design of Hydro Power Plants

  • 2.  Accurate electric load forecasting is crucial for power system planning and operation.  The forecasted load should be close to the load demand on the power system.  Load forecasting is always associated with some uncertainty.  Power systems, however, are to be planned in such a way that changing load developments can be accommodated by the expansion of the system .
  • 3.  load forecasting helps a company to decide ◦ Purchasing electric power ◦ Generating electric power ◦ Load switching ◦ Infrastructure development  Three types of forecasts: 1. short-term forecasts- which are usually from one hour to one week 2. Medium-term forecasts- which are usually from a week to a year 3. long-term forecasts- which are longer than a year
  • 4.  Some load forecasting methods are: 1. Load forecast with load increase factors 2. Load forecast based on economic characteristic data 3. Load forecast with estimated values 4. Load forecast with standardized load curves. 5. Regression 6. Modern forecasting methods
  • 5.  The precise application of the different methods cannot be determined exactly.  And combinations of the methods are usually applied.
  • 6.  This method is based on the existing load and the increase in the previous years and estimates the future load increase by means of exponential increase:  s=rate of increase per year  P0 = previous load  Pn=load at the nth year  n=year
  • 7.  This method is simple but cannot consider externally measured variables and is hardly suitable to provide reliable load and energy predictions. Example:  Assume the pick load on Haramaya substation is 5 MW and the annual growth rate is 7%. What will be the pick load after 10 solid years?  Ans: P10=9.84 MW
  • 8.  An increase in accuracy is obtained if the load forecast is carried out separately for the individual consumption sectors, such as households, commercial, public supply and industrial sectors.  Then the individual results are summed for each year to obtain the total system load.  Another model for load forecasting is based on the phenomenological description of the growth of electrical energy consumption as shown next:
  • 9.  With this model, adjustments can be combined with the process of load development of the past with different increases and saturation effects for the future.
  • 10.  Load forecast calculated with the load development model (curves for various values of k and l ).
  • 11.  As the economy of a country grows, so does the power demand.  Load forecast with economic characteristic data obtained from energy statistics assumes different relations between economic growth, availability of energy resources, energy consumption and requirements in general, such as the increase in energy consumption due to growth of population, and in special applications, such as energy requirements of industry.
  • 12.  The requirement for electrical energy per capita of the population is determined to a large extent by the standard of living and the degree of industrialization of a country.  However, high consumption of energy can be also an indicator of high waste of energy.  The increase of electrical energy consumption in industrialized countries is less affected by the growth of population and predominantly by the growth of the gross domestic product ( GDP ) and/or the gross national product ( GNP ).
  • 13. Example:  In the GTP, the GDP of Ethiopia is supposed to grow at 15%. Before the GTP period, the power demand was growing at a rate of 23% (GDP growth=11%). Assuming a direct relationship between the economy and the power demand, a. What is the rate of power demand growth in the GTP period? b. In 2002 E.C, the national power demand was approximately 1500 MW. What will be the expected power demand in 2007 E.C?
  • 14.  In power system expansion, development plan is vital in forecasting the power requirement.  For instance, we can use the table on the next slide in power system planning.
  • 15.
  • 16. Example:  Near Addis, a business area of 10km-squared is to be electrified. Forecast the power demand.  Land development plans contain general information about the area development and use of land, and the size, location and types of residential, industrial and commercial areas, without allowing one to be able to derive detailed individual measures from them.
  • 17.  Another way of load forecasting is based on the annual energy consumption of individual consumer or consumer groups, which can be taken from the annual electricity bill.  The system load can be determined by means of standardized load curves for different consumer groups such as ◦ Residential ◦ Commercial ◦ Public sectors ◦ industrial
  • 18.  As consumption profiles of the particular customer groups not only change with time of day but also show day - of - week and seasonal changes, characteristic days are defined, such as working - day, Saturday, Sunday (or Friday in Islamic countries) and holiday as well as seasonal differences in winter, summer and transition periods.  Based on the load curves we can forecast the future load for a particular hour, a particular day and a particular year.
  • 21.  Regression is also used in forecasting loads.  Read this at your home.
  • 22.  Nowadays, fuzy logic, ANN, and other algorithms are used in power system planning to forecast load.  These algorithms have artificial learning capabilities.  And thus, by taking the past into consideration, they can predict the future.
  • 23.
  • 24. Planning and Design of hydro generation stations Ayele Nigussie
  • 25. 1. Introduction 2. Layout 3. Environmental Effects of HPPs 4. Economic Aspects of HPPs 5. Designing HPPs 6. Summary
  • 26.  Hydroelectric power captures the energy released from falling water.  Potential Energy  Kinetic energy  Electrical Energy  Hydroelectric power plants are categorized as ◦ Micro hydropower plants [<100 kW) ◦ Mini Hydropower Plants [100 kW – 1 MW] ◦ Small Hydropower Plants [1 MW – 30 MW] ◦ Large Hydropower Plants [>30 MW]  In Ethiopia, more than 96% of the electricity is hydro.
  • 27.
  • 28.  The effects are:  Physical - ◦ change the ecosystem, ◦ effect on downstream, ◦ Loss of habitat ◦ Loss of farms ◦ Deforestation ◦ Effect on micro-climate level  Biological- ◦ Flora ◦ Fauna ◦ Humans
  • 29.  High initial cost of construction.  Electricity is cheap.  Energy is green.  In an HPP construction, costs to be considered: ◦ land/land rights, ◦ structures and improvements, ◦ equipment, reservoirs, dams, waterways, roads, railroads, and bridges. ◦ protecting fish and wildlife. ◦ Operation and maintenance costs ◦ hydraulic expenses, electric expenses, and rents.
  • 30.  When designing a hydroelectric power plant a number of elements and equipment need to be taken into consideration.  Dam size, retention basin size and depth, inlet valves, weir and control gates, penstock length and diameter, turbines, generators, transformers and excitation equipment, and efficiency all have to be examined.  Elevation or head and stream flow have to be established as well. 
  • 32.  Based on the firm power: ◦ Mechanical Engineers design the hydraulic turbines. ◦ Electrical engineers design the generators, transformers, the switch yards and the protection system. ◦ Dams, canals, intakes, penstocks, tailraces and power houses are designed by civil engineers.  Firm power is also one of the main factors that decides the feasibility of an HPP.
  • 33.  Feasibility study contains: ◦ Site visit and selection ◦ Capacity analysis ◦ Economic analysis ◦ Environmental impact analysis  Feasibility study is the first step in HPP construction.
  • 34.  In planning an HHP, the general requirements are: ◦ Determining location of the powerhouse , location of switchyard , ◦ Laying out the highway and railroad access, other site features, ◦ Determining types of powerhouse, structures, ◦ selection of type of powerhouse, ◦ location of main transformers, powerhouse and switchyard, equipment, powerhouse Auxiliary Equipment
  • 35.  Architectural design requirements are: ◦ Exterior Design ◦ Exterior Details ◦ Interior Design ◦ Interior Details ◦ Schedule of Finishes ◦ Painting ◦ Design memorandum ◦ Drawings
  • 36.  The structural requirements are: ◦ All the civil works are under this category.
  • 37.
  • 39. 3.1 Introduction 3.2 What is a substation? 3.3 Important points 3.4 Classification of substations 3.5 Substation equipments 3.6 Substation Configurations 3.7 Substation design 3.8 Planning of substations 3.9 Conclusion
  • 40.  A substation is a nodal point in a power system.  Internationally standardized voltage level for substations:  66 kV, 110 kV, 132 kV, 150 kV, 220 kV, 380 kV,  For very long transmission distances : 500 kV, 800 kV
  • 41.
  • 42. Tasks of substation:  Distribution of power towards load circuit  Separation of different network groups (reduction of short circuit power)  Coupling of different voltage level via power transformers  Measuring, signaling and monitoring of network data (e.g. U, I, P, Q, f)
  • 43. 3.2 What is a Substation ?The assembly of apparatus used to change some characteristics (e.g. voltage, a.c. to d.c. ,freq, p.f. etc..) of electrical supply is called a substation.
  • 44.  It should be located at a proper site(i.e. at the center of gravity of load).  It should provide safe and reliable arrangement.  It should be easily operated and maintained.  It should involve minimum capital costs.
  • 45. Substation According to service requirement According to constructional feature
  • 46. According to Service requirement:  Transformer Substation: Transformers are installed to transform voltage from one level to another as per needs.  Switching Substations: This substations mean for switching operation of powerlines with out transforming the voltage.  Power factor correction Substation: This substations are installed to increase the power factor to minimise losses.  Frequency Changer Substation: This substations are installed where speed control of motors is required.  Converting Substation: This substations convert a.c to d.c or vice versa.  Industrial Substation: This substations are installed to supply power only to an industries.
  • 47. According To Constructional Features:  Indoor SubstationsIndoor Substations: In this substations, the apparatus are installed with in the substation building. Till 66 kV.  Outdoor SubstationsOutdoor Substations: this substations are installed in open land. This substations are employed for voltage levels beyond 66k.v.  Underground SubstationsUnderground Substations: This: This substations are installed under ground in densely populated cities where cost of the land is more.  Pole-Mounted SubstationsPole-Mounted Substations: This substations are erected for distribution of power in localities. This is employed for transformers up to 250 kVA.).  Foundation Mounted SubstationsFoundation Mounted Substations: This substations are installed 3.4 Classification of Substation …
  • 48.  Busbar: is a conductor connecting power line to substation equipment.  Insulators & fittings: fix and isolate the busbar system.  Isolating Switch: is used for disconnecting equipment for maintenance and repair.
  • 49.  Relays & Circuit Breaker: open and close a circuit under normal and fault conditions.  Power Transformers: are used in substations to step up or step down the voltages.  Instrument Transformers: used for measuring .
  • 50.  Metering & Indicating Instruments: used to watch over the circuit quantities.  Power line carrier communication systems: used for SCADA.  Coupling capacitors and wave traps
  • 51.
  • 52. AC/DC supply: is used for auxillaries and DC supply for relay operation. Oil handling system: used for purifying oil from moisture. Illumination: should be properly illuminated for safety. Compressed air system: for functioning of CB. Service bay: to carry the equipments to installation side. Fire extinguishers
  • 55. • Circuit Breakers 3.5 Substation equipments …
  • 59. Piezoelectric motorsPiezoelectric motors Piezo GeneratorsPiezo Generators ActuatorsActuators Ultrasonic TransducersUltrasonic Transducers And many more…And many more…
  • 60. What are to be considered?  Site selection  Design of structures  Design of foundation for transformers & structures(IE Rules 64)  Control room building  Cable trench & drainage  Design of earthing  Protection schemes & interlocks
  • 61. Conventional substations (AIS):  Construction according to standardized minimal distances (clearance) between phase and earth  Normally used for outdoor substations, just in very few cases used for indoor substations  Based on single power system equipments ◦ Replacement of single equipment by equipments from other manufacturers is possible.  Simple to expand (in case that space is not an issue)  Excellent overview, simple handling and easy access
  • 62.  Minimum clearance in air according to IEC 61936- 1
  • 63.  Minimum clearance in air according to IEC 61936- 1
  • 64. Basis requirements for new substations:  Optimal location of substations within power system (load flow, short circuit, customer requirements, long term planning, land space)  Selection of substation design  Calculation of short-circuit currents and long term development (ratings)  Selection of power system requirements  Adaption of design according to available space, fixing of busbar configuration (e.g. using wire conductor or tubular conductor)  Detailed planning of: primary and secondary equipment, auxiliary equipment, basement, steel structure, building, earthing system
  • 65.  You can find important standards for power system installations:  Planning and Design of a substation normally starts with the development of the electrical single line diagram.  A single line diagram shows number of busbars and substation bays including the relevant equipment.
  • 66.  Selection of substation layout depends on ◦ Its importance within the power system (power system reliability in case of failures and maintenance activities) ◦ Power system operation
  • 67. Substation is the heart of a power system. Hence, its design should be such that it will provide continuous , quality & desired power with safety.
  • 68.  Read further on substations.
  • 70.
  • 71. Electrical Considerations for T.L. Design:  Low voltage drop  Minimum power loss for high efficiency of power transmission.  The line should have sufficient current carrying capacity so that the power can be transmitted without excessive voltage drop or overheating.
  • 72.  Conductivity of Conductor: R = ρ.L/A , or R = L/Ϭ. A Where: L: Conductor length. A: Conductor cross sectional area. ρ: resistivity Ϭ: Conductivity (Ϭ= 1/ρ)
  • 73.  The conductor conductivity must be very high to reduce Conductor resistance R and hence reduce losses PL= 3 I2 .R
  • 74. Mechanical Considerations for T.L. Design:  The conductors and line supports should have sufficient mechanical strength: - to withstand conductor weight, Conductor Tension and weather conditions (wind, ice). - The Spans between the towers can be long. - Sag will be small. - Reducing the number and height of towers and the number of insulators.
  • 75.
  • 76. • Heat expansion coefficient must be very small. Rt = R0. (1 + α0 .t) αt = α0/(1+ α0.t) α t is the heat expansion coefficient at t.
  • 78. lowest cost – low mechanical strength Used for small span
  • 79.
  • 80.
  • 81. 1- Steel strands 2- Aluminum strands ACSR (26/7)
  • 82.
  • 83.
  • 84.
  • 85.
  • 86. • High mechanical strength can be utilized by using spans of larger lengths. • A reduction in the number of supports also include reduction in insulators and the risk of lines outage due to flash over or faults is reduced. • losses are reduced due to larger diameter of conductor. • High current carrying capacity.
  • 87.  Wooden Poles  Reinforced Concrete Poles  Steel Poles  Lattice Structure Steel Towers
  • 89.
  • 90.
  • 91.
  • 92.
  • 94.
  • 95.
  • 97.
  • 98. 1- Suspension Tower 2- Tension Tower 3- Angle Tower 4- End Tower
  • 99.
  • 100.
  • 101.
  • 102.
  • 103.
  • 104. This type of towers exist in the beginning and at the end of the line which exposed to tension in one side.
  • 105.
  • 106. Sag of T.L depends on: - Conductor weight. - Span length, - Tension in the conductor, T - Weather conditions (wind , ice). - Temperature.
  • 107. kV C (m) 0.4 5.5 11 5.5 33 6.0 66 6.2 132 6.2 220 7.0 400 8.4
  • 108. Spacing = (S )0.5 + V/150 Where: S: Sag in meters. V: Line voltage in kV.
  • 109.
  • 110.
  • 111.
  • 112.
  • 113. Electrical Considerations for T.L. Design:  Low voltage drop  Minimum power loss for high efficiency of power transmission.  The line should have sufficient current carrying capacity so that the power can be transmitted without excessive voltage drop or overheating.
  • 114.  Conductivity of Conductor: R = ρ.L/A , or R = L/Ϭ. A Where: L: Conductor length. A: Conductor cross sectional area. ρ: resistivity Ϭ: Conductivity (Ϭ= 1/ρ)
  • 115.  The conductor conductivity must be very high to reduce Conductor resistance R and hence reduce losses PL= 3 I2 .R
  • 116. Mechanical Considerations for T.L. Design:  The conductors and line supports should have sufficient mechanical strength: - to withstand conductor weight, Conductor Tension and weather conditions (wind, ice). - The Spans between the towers can be long. - Sag will be small. - Reducing the number and height of towers and the number of insulators.
  • 117.
  • 118. • Heat expansion coefficient must be very small. Rt = R0. (1 + α0 .t) αt = α0/(1+ α0.t) α t is the heat expansion coefficient at t.
  • 120. lowest cost – low mechanical strength Used for small span
  • 121.
  • 122.
  • 123. 1- Steel strands 2- Aluminum strands ACSR (26/7)
  • 124.
  • 125.
  • 126.
  • 127.
  • 128. • High mechanical strength can be utilized by using spans of larger lengths. • A reduction in the number of supports also include reduction in insulators and the risk of lines outage due to flash over or faults is reduced. • losses are reduced due to larger diameter of conductor. • High current carrying capacity.
  • 129.  Wooden Poles  Reinforced Concrete Poles  Steel Poles  Lattice Structure Steel Towers
  • 131.
  • 132.
  • 133.
  • 134.
  • 136.
  • 137.
  • 139.
  • 140. 1- Suspension Tower 2- Tension Tower 3- Angle Tower 4- End Tower
  • 141.
  • 142.
  • 143.
  • 144.
  • 145.
  • 146. This type of towers exist in the beginning and at the end of the line which exposed to tension in one side.
  • 147.
  • 148. Sag of T.L depends on: - Conductor weight. - Span length, - Tension in the conductor, T - Weather conditions (wind , ice). - Temperature.
  • 149. kV C (m) 0.4 5.5 11 5.5 33 6.0 66 6.2 132 6.2 220 7.0 400 8.4
  • 150. Spacing = (S )0.5 + V/150 Where: S: Sag in meters. V: Line voltage in kV.