SlideShare a Scribd company logo
1 of 27
Royal Institute of British Architecture
Introduction
Formed in 1834.
Various plans are proposed by the charter
Purpose of the charter is to promote and facilitate
the knowledge related to construction sector.
Used by internationally recognized contracting
firms to coordinate and plan the project
process.
Recent past,2002 charter was in use.
Later on2007 and currently revised 2013 is
been used.
Usage
 Crucial for proper project management.
 Taken place under several stages of 11.
1) Inception
2) Feasibility
3) Outline Proposals
4) Scheme Design
5) Detail Design
6) Production Information
7) Bill of Quantities
8) Tender Action
9) Project Planning
10)Operation On Site
11)Completion
Our case study
 Amawathura Asapuwa in malabe.
 5 storey building with a pagoda on the roof top.
Inception
 Starting point of the entire project.
 Client initiates the project having a rough idea in his mind.
 Amawathura building was the idea of the
board of the temple.
 More space for people was a necessity.
Feasibility
 Done under mainly 04 categories.
 Economic Financial
 Technical Environmental
Most of the client conducts the feasibility
study.
An economic review to know the value
for money of the project is essential.
For the selected building ,board took the
support of a consultant to do the feasibility
study.
Decision between floor area vs cost was
taken.
Finally a viable project was chosen within
the budget, to facilitate the required space.
QS does the realistic first estimates of the
entire project.
Cube method, as the preliminary estimating
method was used.
Outline proposals
Sketches for the project are provided.
Architects play major role.
Several designs are made.
5 storey building with a pagoda on roof
top was designed.
The pagoda is a cavity in which people
can worship and do rituals.
All the structural elements and other
finishes are decided.
Scheme design
Brief is completed at this stage.
Selected design is critically examined.
Former sketches are drawn in a proper
format.
Detail design
 Specific numbers are taken for the plan.
 Final decision are taken.
 For the site
 number of steps per Flight
 height, width of pillars and other structures
 type of lift
Production information
 Final working drawings are prepared.
 Use as document on site.
 QS prepare specification.
 Quotations are made.
Bill of Quantities
All the procurement details are included.
For the Amawathura building, BOQ was
prepared by ICC.
Tender action
 Suitable contractor was chosen.
 Prominence was given to quality rather than
lowest bid.
Project planning
 Sub contractors are chosen preferably.
 Mclloid Was selected for the Amawathura site.
A loop hole in planning was seen.
Capacity was increased in the midway of
the project.
Operation on site
Physical investigation is required.
Quality must be checked.
QS prepares payment details.
Completion and feedback
The building is get to be finished.
So comments on this stage cannot be made.
Conclusion
 RIBA was not practiced well, due to the
changes of plan in the midway.
 However need to check the actual progress
after the completion.
Recommendation
 Proper planning helps to get a quality work done.
Thank You

More Related Content

What's hot

Defects in buildings
Defects in buildingsDefects in buildings
Defects in buildingsAditya Sanyal
 
Site organization and networking techniques
Site organization and networking techniquesSite organization and networking techniques
Site organization and networking techniquestivar rose
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasSustainable Performance Institute
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remediesSOUMYA KHANDELWAL
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project ManagementAravind Samala
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice Ar. Mukunda K.S
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryAkshika Mahanama
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsGrace Henry
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsAarti Rani
 
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAHOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAFakhrul Afifi
 
Professional Practice for Architecture II
Professional Practice for Architecture IIProfessional Practice for Architecture II
Professional Practice for Architecture IIAr. Mukunda K.S
 
The Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction ContractThe Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction ContractTom Joseph Mukasa
 
Site visit report.
Site visit report.Site visit report.
Site visit report.Man Yee
 

What's hot (20)

Defects in buildings
Defects in buildingsDefects in buildings
Defects in buildings
 
Site organization and networking techniques
Site organization and networking techniquesSite organization and networking techniques
Site organization and networking techniques
 
high rise buildings case study
high rise buildings case studyhigh rise buildings case study
high rise buildings case study
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Earnest Money
Earnest MoneyEarnest Money
Earnest Money
 
THESIS GREEN BUILDING
THESIS GREEN BUILDINGTHESIS GREEN BUILDING
THESIS GREEN BUILDING
 
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban AreasCase Study: Sustainable Mixed-Use Development in Historic Urban Areas
Case Study: Sustainable Mixed-Use Development in Historic Urban Areas
 
Defects in buildings & remedies
Defects in buildings & remediesDefects in buildings & remedies
Defects in buildings & remedies
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Architecture Professional practice
Architecture Professional  practice Architecture Professional  practice
Architecture Professional practice
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildings
 
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIAHOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
HOW CONSERVATION WORKS TAKE PLACE IN MALAYSIA
 
Professional Practice for Architecture II
Professional Practice for Architecture IIProfessional Practice for Architecture II
Professional Practice for Architecture II
 
Dilip Deshmukh (1)
Dilip Deshmukh (1)Dilip Deshmukh (1)
Dilip Deshmukh (1)
 
Dilapidation report
Dilapidation reportDilapidation report
Dilapidation report
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
The Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction ContractThe Case for Standard Forms of Construction Contract
The Case for Standard Forms of Construction Contract
 
Site visit report.
Site visit report.Site visit report.
Site visit report.
 

Viewers also liked

Tender writing – point of difference – important in wining tenders?
Tender writing – point of difference – important in wining tenders?Tender writing – point of difference – important in wining tenders?
Tender writing – point of difference – important in wining tenders?Red Tape Busters
 
14102008 - Nordic Ppp Forum Presentation Pja Peekel Final
14102008 - Nordic Ppp Forum   Presentation Pja Peekel   Final14102008 - Nordic Ppp Forum   Presentation Pja Peekel   Final
14102008 - Nordic Ppp Forum Presentation Pja Peekel FinalPJAPeekel
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Constructionshillier38
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentationArchDuty
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedureayushida
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process
 

Viewers also liked (8)

Tender writing – point of difference – important in wining tenders?
Tender writing – point of difference – important in wining tenders?Tender writing – point of difference – important in wining tenders?
Tender writing – point of difference – important in wining tenders?
 
14102008 - Nordic Ppp Forum Presentation Pja Peekel Final
14102008 - Nordic Ppp Forum   Presentation Pja Peekel   Final14102008 - Nordic Ppp Forum   Presentation Pja Peekel   Final
14102008 - Nordic Ppp Forum Presentation Pja Peekel Final
 
Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
 
Lecture 2 tender process n documentation
Lecture 2 tender process n documentationLecture 2 tender process n documentation
Lecture 2 tender process n documentation
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
 
Tender procedure slide
Tender procedure slideTender procedure slide
Tender procedure slide
 
Tender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement GuideTender Process | A Complete Procurement Guide
Tender Process | A Complete Procurement Guide
 

Similar to RIBA plan of work

The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)Pinky Chan
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1JamesMoy7
 
Document 1
Document 1Document 1
Document 1Erik Ong
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020MTAF
 
construction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptxconstruction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptxBlackEagles1
 
Internship Report
Internship ReportInternship Report
Internship Reportdtan97
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentationemdad bhuiyan
 
Research development
Research developmentResearch development
Research developmentJ-Sern Phua
 
RESUME-MARIYA ZAVERI 05-07-2016
RESUME-MARIYA ZAVERI 05-07-2016RESUME-MARIYA ZAVERI 05-07-2016
RESUME-MARIYA ZAVERI 05-07-2016mariya zaveri
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Minn Lwin
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)JamesMoy7
 
architect Inigovenish cv
architect Inigovenish  cv architect Inigovenish  cv
architect Inigovenish cv inigo venish
 
Project management (1)
Project management (1)Project management (1)
Project management (1)aarenneoone
 

Similar to RIBA plan of work (20)

The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)
 
ICIP2G
ICIP2GICIP2G
ICIP2G
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1
 
Training Report 2014
Training Report 2014Training Report 2014
Training Report 2014
 
Magazine (ICI)
Magazine (ICI)Magazine (ICI)
Magazine (ICI)
 
MAGAZINE.ppt
MAGAZINE.pptMAGAZINE.ppt
MAGAZINE.ppt
 
Document 1
Document 1Document 1
Document 1
 
Project background
Project backgroundProject background
Project background
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
 
construction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptxconstruction-project-management-ppt-india-ppt.pptx
construction-project-management-ppt-india-ppt.pptx
 
Internship Report
Internship ReportInternship Report
Internship Report
 
Building project presentation
Building project presentationBuilding project presentation
Building project presentation
 
Research development
Research developmentResearch development
Research development
 
RESUME-MARIYA ZAVERI 05-07-2016
RESUME-MARIYA ZAVERI 05-07-2016RESUME-MARIYA ZAVERI 05-07-2016
RESUME-MARIYA ZAVERI 05-07-2016
 
Project management process
Project management processProject management process
Project management process
 
ConFire Engineering Pvt
ConFire Engineering PvtConFire Engineering Pvt
ConFire Engineering Pvt
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725
 
Project background (1)(1)
Project background (1)(1)Project background (1)(1)
Project background (1)(1)
 
architect Inigovenish cv
architect Inigovenish  cv architect Inigovenish  cv
architect Inigovenish cv
 
Project management (1)
Project management (1)Project management (1)
Project management (1)
 

Recently uploaded

Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesVijayaLaxmi84
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptxAneriPatwari
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvRicaMaeCastro1
 

Recently uploaded (20)

Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their uses
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptx
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 

RIBA plan of work

  • 1.
  • 2. Royal Institute of British Architecture
  • 3. Introduction Formed in 1834. Various plans are proposed by the charter Purpose of the charter is to promote and facilitate the knowledge related to construction sector.
  • 4. Used by internationally recognized contracting firms to coordinate and plan the project process. Recent past,2002 charter was in use. Later on2007 and currently revised 2013 is been used.
  • 5. Usage  Crucial for proper project management.  Taken place under several stages of 11. 1) Inception 2) Feasibility 3) Outline Proposals 4) Scheme Design 5) Detail Design 6) Production Information 7) Bill of Quantities 8) Tender Action 9) Project Planning 10)Operation On Site 11)Completion
  • 6. Our case study  Amawathura Asapuwa in malabe.  5 storey building with a pagoda on the roof top.
  • 7. Inception  Starting point of the entire project.  Client initiates the project having a rough idea in his mind.
  • 8.  Amawathura building was the idea of the board of the temple.  More space for people was a necessity.
  • 9. Feasibility  Done under mainly 04 categories.  Economic Financial  Technical Environmental
  • 10. Most of the client conducts the feasibility study. An economic review to know the value for money of the project is essential.
  • 11. For the selected building ,board took the support of a consultant to do the feasibility study. Decision between floor area vs cost was taken. Finally a viable project was chosen within the budget, to facilitate the required space.
  • 12. QS does the realistic first estimates of the entire project. Cube method, as the preliminary estimating method was used.
  • 13. Outline proposals Sketches for the project are provided. Architects play major role. Several designs are made.
  • 14. 5 storey building with a pagoda on roof top was designed. The pagoda is a cavity in which people can worship and do rituals. All the structural elements and other finishes are decided.
  • 15. Scheme design Brief is completed at this stage. Selected design is critically examined. Former sketches are drawn in a proper format.
  • 16. Detail design  Specific numbers are taken for the plan.  Final decision are taken.
  • 17.  For the site  number of steps per Flight  height, width of pillars and other structures  type of lift
  • 18. Production information  Final working drawings are prepared.  Use as document on site.  QS prepare specification.  Quotations are made.
  • 19. Bill of Quantities All the procurement details are included. For the Amawathura building, BOQ was prepared by ICC.
  • 20. Tender action  Suitable contractor was chosen.  Prominence was given to quality rather than lowest bid.
  • 21. Project planning  Sub contractors are chosen preferably.  Mclloid Was selected for the Amawathura site.
  • 22. A loop hole in planning was seen. Capacity was increased in the midway of the project.
  • 23. Operation on site Physical investigation is required. Quality must be checked. QS prepares payment details.
  • 24. Completion and feedback The building is get to be finished. So comments on this stage cannot be made.
  • 25. Conclusion  RIBA was not practiced well, due to the changes of plan in the midway.  However need to check the actual progress after the completion.
  • 26. Recommendation  Proper planning helps to get a quality work done.