Special Thanks To
Jeffrey K. Pinto, Dennis P. Slevin
 Ten empirically derived critical project implementation success factors.
 A diagnostic instrument-the Project Implementation Profile (PIP)
for measuring the ten factors.
 Measures of the key elements of project Strategy-and Tactics.
 The effect of Strategy and Tactics on project implementation success.
 The impact of the project life cycle on the relative importance of the
critical success factors.
We shall discuss about
A project is an organization of people dedicated to a specific purpose or objective.
A project involves:
large, expensive, unique, or high risk undertakings
A project should Completed:
by a certain date, for a certain amount of money,
within some expected level of performance.
At a minimum, all projects need to have well defined objectives and sufficient
resources to carry out all the required tasks.
What is Project
A project is generally considered to be successfully implemented if it
 Comes in on-schedule (time criterion).
 Comes in on-budget (monetary criterion).
 Achieves basically all the goals originally set for it (effectiveness)
 Is accepted and used by the clients (client satisfaction criterion).
What is Successful projects implementation
 Conceptualization
Preliminary goals and alternatives are specified and
possible means to accomplish those goals
 Planning
Scheduling, budgeting, and the allocation of
other specific tasks and resources.
 Execution
Materials and resources are procured, the project is produced,
and performance capabilities are verified.
 Termination
the release of resources and transfer of the project to the clients.
Project life cycle
Organizational effort in life cycle
 Project Mission
 Top Management Support
 Project Schedule Plan
 Client Consultation
 Personnel
 Technical Tasks
 Client Acceptance
 Monitoring and Feedback
 Communication
 Troubleshooting
Ten successful critical success factor
The Factor Model
 The factors appear to be both time sequenced and interdependent.
 The factors for a project implementation can be laid out on a critical
path.
 The model allows the manager to actively interact with and
systematically monitor his project.
Characteristics of the model
 Experimented on 400 project and the over 61% of the causes of project
implementation success can be explained by the ten critical success
factors.
 The importance value of critical
Factors has been measured by
regression beta weights showing the
combined relationships between
Critical Factors and project success
over the four project life-cycle stages
Results of applying 10 critical factors
Strategic Tactical
• Mission
• Top Management Support
• Schedule/Plans
• Client Consultation
• Personnel
• Technical Tasks
• Client Acceptance
• Monitoring and Feedback
• Communication
• Troubleshooting
Strategic and Tactical factors
Issues Strategic Tactical
1. Level of Conduct Top Management Mid to lower
Levels of management
2. Subjective/Objective
Assessment
Greater subjectivity used as
strategic level
Less use of subjective values
3. Nature of problems Unstructured, one at a time More structured and repetitive
4. Information Needs Larger amount of Information
needed
Need for internally generated,
specific information
5. Time Horizons Long Term Short Term
6. Completeness Covers the entire scope of
organization
Concerned only with the sub-
organizational unit involved
7. Reference The source of all planning is
original
Done in pursuit of strategic plans
Taxonomy of Strategic Vs Tactical
issues
Issues Strategic Tactical
8. Details Broad & general Narrow & problem specific
9. Ease of Evaluation Difficult Easier
10. Point of View Corporate Functional
Taxonomy of Strategic Vs Tactical
issues (Cont.)
Strategy/tactics effectiveness matrix
 Cell 1 : High Strategy-High Tactics
 High probability of implementation success
 Cell 2 : Low Strategy-High Tactics
 Error 2:
error would likely occur in a situation in which project strategy was ineffective, inaccurate, or
poorly done. However, in spite of initial planning inadequacies, goals and schedules were operationalized
during the tactical stage of the implementation.
 Error 3:
error has been defined as solving the wrong problem, or "effectively" taking the wrong action. In
this scenario, a problem has been identified, or a project is desired, but due to a badly performed strategic
sequence, the wrong problem has been isolated and the subsequently implemented project has little value
in that it does not address the intended target.
Strategy/tactics effectiveness matrix
 Cell 3 : Low Strategy-Low Tactics
 High probability of implementation failure
 Cell 4 : High Strategy-Low Tactics
 Error 1:
It occurs when an action should have been taken and was not. It will occur when little action is
subsequently taken and the tactical activities are inadequate to the degree that the project is not developed.
 Error 4:
error can be defined as taking an action which solves the right problem but the
solution is not used by the organization. one would expect projects classified in this quadrant to
exhibit a strong tendency toward "errors of inaction" such as low acceptance and low use by
organization members or clients for whom the project was intended.
Strategy/tactics effectiveness matrix(Cont.)
 A recent study of over 400
projects has demonstrated
that strategic issues become
less important and tactical
issues become more impor
-tant to project success over
the life of a project.
Strategic and Tactics Over Time
 Use a Multiple-Factor Model
 Think Strategically Early in the Project Life Cycle
 Think More Tactically as the Project Moves Forward in Time
 Make Strategy and Tactics Work for You and Your Project Team
 Consciously Plan for and Manage Your Project Team's Transition from
Strategy to Tactics
Implication for Managers
 Define the process of project implementation through exposing the
manager to a set of empirically derived factors found to be critical to
project success.
 These are some suggestions offered to project managers who are intent
on better understanding their project during its implementation
process, but are at a loss as to how to go about attempting to more
adequately ensure project success
Conclusion
Thank You All

More Related Content

What's hot

Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementMarkos Mulat G
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementKaustubh Gupta
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project ManagementAshish Mittal
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
Project Management - Basic Concepts
Project Management - Basic ConceptsProject Management - Basic Concepts
Project Management - Basic ConceptsImran Jamil
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycleAndrei Crăciun
 
Project Time Management
Project Time ManagementProject Time Management
Project Time ManagementSerdar Temiz
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-managementSavaş Şakar
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project ManagementMahesh Bendigeri
 

What's hot (20)

Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Project Management - Basic Concepts
Project Management - Basic ConceptsProject Management - Basic Concepts
Project Management - Basic Concepts
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
Roles of project managers in oe
Roles of project managers in oeRoles of project managers in oe
Roles of project managers in oe
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project risk analysis
Project risk analysisProject risk analysis
Project risk analysis
 
Project planning and control
Project planning and controlProject planning and control
Project planning and control
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-management
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
Project Risk Management and Uncertainty
Project Risk Management and UncertaintyProject Risk Management and Uncertainty
Project Risk Management and Uncertainty
 
Project selection
Project selection Project selection
Project selection
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project Management
 
The Process of Project Selection
The Process of Project SelectionThe Process of Project Selection
The Process of Project Selection
 
project management information system
project management information systemproject management information system
project management information system
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 

Similar to Critical success factors in effective project implementation

Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager PrimerTom Cremins
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementYamanta Raj Niroula, PMP
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]OyetadeTobi
 
Strategies for successful_engineering_management
Strategies for successful_engineering_managementStrategies for successful_engineering_management
Strategies for successful_engineering_managementSociety of Women Engineers
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMdAliMujawar1
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slidesdotesch
 
Week 02 - Portfolio Management
Week 02 - Portfolio ManagementWeek 02 - Portfolio Management
Week 02 - Portfolio ManagementAbid Khan
 
The Project Management Process - Week 2
The Project Management Process - Week 2The Project Management Process - Week 2
The Project Management Process - Week 2Craig Brown
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleKate Pynn
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overviewcford1973
 
Project management practices the criteria for success or failure
Project management practices the criteria for success or failureProject management practices the criteria for success or failure
Project management practices the criteria for success or failureTa Ngoc
 
Project project portfolio magament
Project project portfolio magamentProject project portfolio magament
Project project portfolio magamentDebotyamGhosh
 
Why projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfallsWhy projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfallsTa Ngoc
 
Top 10 project mgt. problems
Top 10 project mgt. problemsTop 10 project mgt. problems
Top 10 project mgt. problemsMaksudul Munna
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 
concept of evaluation "Character insight"
concept of evaluation "Character insight"concept of evaluation "Character insight"
concept of evaluation "Character insight"Shafiyazahoor327
 
2 a. project auditing
2 a. project auditing2 a. project auditing
2 a. project auditingDr.R. SELVAM
 

Similar to Critical success factors in effective project implementation (20)

Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager Primer
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project Management
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]
 
Strategies for successful_engineering_management
Strategies for successful_engineering_managementStrategies for successful_engineering_management
Strategies for successful_engineering_management
 
Chap 2 Organization Strategy
Chap 2 Organization StrategyChap 2 Organization Strategy
Chap 2 Organization Strategy
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptx
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slides
 
Week 02 - Portfolio Management
Week 02 - Portfolio ManagementWeek 02 - Portfolio Management
Week 02 - Portfolio Management
 
The Project Management Process - Week 2
The Project Management Process - Week 2The Project Management Process - Week 2
The Project Management Process - Week 2
 
Project Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training ExampleProject Plan Development - A FlackVentures Training Example
Project Plan Development - A FlackVentures Training Example
 
Pmbok
PmbokPmbok
Pmbok
 
Project Management Overview
Project Management OverviewProject Management Overview
Project Management Overview
 
Project management practices the criteria for success or failure
Project management practices the criteria for success or failureProject management practices the criteria for success or failure
Project management practices the criteria for success or failure
 
project management essentials
project management essentialsproject management essentials
project management essentials
 
Project project portfolio magament
Project project portfolio magamentProject project portfolio magament
Project project portfolio magament
 
Why projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfallsWhy projects fail avoiding the classic pitfalls
Why projects fail avoiding the classic pitfalls
 
Top 10 project mgt. problems
Top 10 project mgt. problemsTop 10 project mgt. problems
Top 10 project mgt. problems
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
concept of evaluation "Character insight"
concept of evaluation "Character insight"concept of evaluation "Character insight"
concept of evaluation "Character insight"
 
2 a. project auditing
2 a. project auditing2 a. project auditing
2 a. project auditing
 

Recently uploaded

Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysistanmayarora45
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxssuserf63bd7
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxAaron Stannard
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in DelhiIndependent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhiguptaswati8536
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Ram V Chary
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 

Recently uploaded (15)

Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in DelhiIndependent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 

Critical success factors in effective project implementation

  • 1. Special Thanks To Jeffrey K. Pinto, Dennis P. Slevin
  • 2.  Ten empirically derived critical project implementation success factors.  A diagnostic instrument-the Project Implementation Profile (PIP) for measuring the ten factors.  Measures of the key elements of project Strategy-and Tactics.  The effect of Strategy and Tactics on project implementation success.  The impact of the project life cycle on the relative importance of the critical success factors. We shall discuss about
  • 3. A project is an organization of people dedicated to a specific purpose or objective. A project involves: large, expensive, unique, or high risk undertakings A project should Completed: by a certain date, for a certain amount of money, within some expected level of performance. At a minimum, all projects need to have well defined objectives and sufficient resources to carry out all the required tasks. What is Project
  • 4. A project is generally considered to be successfully implemented if it  Comes in on-schedule (time criterion).  Comes in on-budget (monetary criterion).  Achieves basically all the goals originally set for it (effectiveness)  Is accepted and used by the clients (client satisfaction criterion). What is Successful projects implementation
  • 5.  Conceptualization Preliminary goals and alternatives are specified and possible means to accomplish those goals  Planning Scheduling, budgeting, and the allocation of other specific tasks and resources.  Execution Materials and resources are procured, the project is produced, and performance capabilities are verified.  Termination the release of resources and transfer of the project to the clients. Project life cycle
  • 7.  Project Mission  Top Management Support  Project Schedule Plan  Client Consultation  Personnel  Technical Tasks  Client Acceptance  Monitoring and Feedback  Communication  Troubleshooting Ten successful critical success factor
  • 9.  The factors appear to be both time sequenced and interdependent.  The factors for a project implementation can be laid out on a critical path.  The model allows the manager to actively interact with and systematically monitor his project. Characteristics of the model
  • 10.  Experimented on 400 project and the over 61% of the causes of project implementation success can be explained by the ten critical success factors.  The importance value of critical Factors has been measured by regression beta weights showing the combined relationships between Critical Factors and project success over the four project life-cycle stages Results of applying 10 critical factors
  • 11. Strategic Tactical • Mission • Top Management Support • Schedule/Plans • Client Consultation • Personnel • Technical Tasks • Client Acceptance • Monitoring and Feedback • Communication • Troubleshooting Strategic and Tactical factors
  • 12. Issues Strategic Tactical 1. Level of Conduct Top Management Mid to lower Levels of management 2. Subjective/Objective Assessment Greater subjectivity used as strategic level Less use of subjective values 3. Nature of problems Unstructured, one at a time More structured and repetitive 4. Information Needs Larger amount of Information needed Need for internally generated, specific information 5. Time Horizons Long Term Short Term 6. Completeness Covers the entire scope of organization Concerned only with the sub- organizational unit involved 7. Reference The source of all planning is original Done in pursuit of strategic plans Taxonomy of Strategic Vs Tactical issues
  • 13. Issues Strategic Tactical 8. Details Broad & general Narrow & problem specific 9. Ease of Evaluation Difficult Easier 10. Point of View Corporate Functional Taxonomy of Strategic Vs Tactical issues (Cont.)
  • 15.  Cell 1 : High Strategy-High Tactics  High probability of implementation success  Cell 2 : Low Strategy-High Tactics  Error 2: error would likely occur in a situation in which project strategy was ineffective, inaccurate, or poorly done. However, in spite of initial planning inadequacies, goals and schedules were operationalized during the tactical stage of the implementation.  Error 3: error has been defined as solving the wrong problem, or "effectively" taking the wrong action. In this scenario, a problem has been identified, or a project is desired, but due to a badly performed strategic sequence, the wrong problem has been isolated and the subsequently implemented project has little value in that it does not address the intended target. Strategy/tactics effectiveness matrix
  • 16.  Cell 3 : Low Strategy-Low Tactics  High probability of implementation failure  Cell 4 : High Strategy-Low Tactics  Error 1: It occurs when an action should have been taken and was not. It will occur when little action is subsequently taken and the tactical activities are inadequate to the degree that the project is not developed.  Error 4: error can be defined as taking an action which solves the right problem but the solution is not used by the organization. one would expect projects classified in this quadrant to exhibit a strong tendency toward "errors of inaction" such as low acceptance and low use by organization members or clients for whom the project was intended. Strategy/tactics effectiveness matrix(Cont.)
  • 17.  A recent study of over 400 projects has demonstrated that strategic issues become less important and tactical issues become more impor -tant to project success over the life of a project. Strategic and Tactics Over Time
  • 18.  Use a Multiple-Factor Model  Think Strategically Early in the Project Life Cycle  Think More Tactically as the Project Moves Forward in Time  Make Strategy and Tactics Work for You and Your Project Team  Consciously Plan for and Manage Your Project Team's Transition from Strategy to Tactics Implication for Managers
  • 19.  Define the process of project implementation through exposing the manager to a set of empirically derived factors found to be critical to project success.  These are some suggestions offered to project managers who are intent on better understanding their project during its implementation process, but are at a loss as to how to go about attempting to more adequately ensure project success Conclusion