Road Bed
Construction
Base Course
•is the materials laid on top
of the subgrade consisting
of crushed stoned or
gravel, sometimes mixed
with asphalt binders.
Two types of Base Course
•The granular Base Course or Untreated Base
Course
•Treated Base Course
The Granular Base Course is a road surface of
untreated soil mixture describe as gravel road.
Gravel Road consist largely pebbles or crushed rock
particles combined with either, clay, lime, iron oxide or
other fine materials sufficient enough to serve as binder of
the coarse particle.
Construction and Maintenance Requirement of Untreated
Gravel Road Surface
1. That the road must be stable to support the supper imposed loads
detrimental deformation.
2. It must shed the large portion of rain that falls on the surface because
water penetrating the sub grade might soften it and loosen the surface
stability.
3. It must be free from large rocks or stones over one inch in diameter
so that it could be regularly maintained by blading or dragging.
4. Gravel Road must possess capillarity properties sufficient enough to
replace the moisture lost through the surface evaporation
5. On dry weather, the moisture film on the clay particles should bind the entire
mass together, and in wet weather the first rain that fall on the surface, should
expand the clay and close the pores to prevent water from entering and
softening of the materials.
6. An excessive amount of highly expansive materials should be avoided
because clay swell and unseat the coarser materials when wet and ultimately
will weaken the stability of road.
7. Gravel Road must be low Cost. Funds for low traffic road is very limited that
most of the time overlooked in the list of appropriation priorities except on
election period.
8. Use local materials. Meaning those materials that could be found nearby the
project
Treated Base Course
•To stabilized the base coarse, it is sometimes treated with
either Asphalt, Lime, Portland Cement, or other materials
as binders mixed with the aggregate base course. Treated
Base course is adopted if in the study or analysis of the
highway agency, a better road can be produced at a
minimal over all cost, or when a politician order the
highway office to construct the road with or without study
because it was a commitment during the campaign period.
Sand and Asphalt Base Course
• The sand and asphalt base course is composed of either loose beach
sand, dune pit or river sand cemented with asphalt materials. In the
early road construction, sand and clay mixture is not only used as
road surfaces but also for base courses. But lately, the Cutback
asphalt, Emulsified asphalt or Tars have been introduced as
substitute for the clay binders to produce quality base courses for
roads and highways.
• Sand for mixing asphalt should be clean and strong should be clean
and strong, because the surface properties and grain shape must
have the quality to resist displacement under load.
Fine Grain
Asphalt Base
• An asphalt stabilized base and
sub-grade constructed with fine
grained has a controlled. Plastic
Index of 6 to 10 respectively.
Aggregates with plasticity Index
up to 30 are processed with
lime. Those with up to 50%
passing the No.200 sieve and
Plastic Index up to 18 can be
stabilized even without pre-
treatment.
Soil and Base Course Stabilized with
Cement
• The used of Portland cement in stabilizing soils and aggregates was initially
practiced after world war- 1 in 1914
1. Cement stabilization by mixing natural materials and Portland cement compacted at
optimum moisture content and cured to hydrate the cement is considerably strong and
stable base. It is less susceptible to deformation caused by moisture and temperature
changes.
2. Comparatively, this is less rigid than the Portland cement concrete because its
modulus of elasticity ranges from 100,000 for clay soils with little cement up to
1,000,000 for the strong mixture. Its compressive strength of about 300 psi to 600 psi
with flexural strength of about 20% of the compressive value.
3. Portland cement concrete modulus of elasticity ranges from 3 million to 6 million with
compressive strength of about 3,000 to 5,000 psi.
•
The stabilized cement mixture is called “ soil cement” produced by
using abundant native local materials subdivided into three parts:
1. Sandy, and gravelly soils containing less than 25% silt and clay.
2.Sand with lesser amount of fines like beach sand, glacial and
windblown sand.
3. Silty and Clayey Soils.
Grading and Maintenance of Untreated Surface
• The cross slope of untreated surface gravel road must be sufficient enough to
drain water to prevent potholes and softening of the roadway; thus:
1. If road materials are sufficiently stable and water tight, one inch per slope is
considered satisfactory although 3/8 to ½ per slope is preferred
2. If the road is steep grade, substantial cross slope is needed to direct the
water into the roadside.
• Untreated surface road is seldom constructed in less than 20 cm loose depth.
When compacted, will be compressed to about 15 cm thick. Road development
sometimes adopted the stage construction methods which means, step by step
improvement of the roadway, depending upon the availability of funds and
demand of increased traffic. The sequence of improvement could be as follows:
• First: it might be an earth road surface
• Second: untreated gravel road
• Third: Application of asphalt over the gravel
• Fourth: The use of stone type pavement with gravel as part of the base course
DWPH Standard Specification on Aggregate Sub-Base
Course
• The Department of Public Works and Highways
classified the aggregate sub-base course as Item
200 which consists of furnishing, placing and
compacting aggregate sub-base course on a
prepared sub-grade.
Item – 200 Material
Requirements
• That, aggregate for sub-base
shall consist of hard, durable
particles of fragments or crushed
stone, crushed slag or crushed or
natural gravel and filler or
natural crushed sand or other
firmly divided mineral matter.
Sieve Designation
Standard Alternate US Standard Mass
Percent
Passing
50 2”
25 1”
10 3/8”
0.75. No.200
100
55-85
40-75
0-12
GRADING REQUIREMENTS FOR ITEM 200
Item 201 Material Requirements
CONDITIONS:
1. That the fraction passing the 0.075 mm (No. 200) sieve shall have a mass
percent of wear or to exceed 50.
2. The fraction passing the 0.425mm (No. 40) sieve shall have a liquid limit not
greater than 25 and Plastic Index not greater than 6.
3. The coarse portion retained on a 2.0mm (No.40) sieve shall have a mass
percent of wear no to exceed 50.
4. The materials passing the 20mm (3/4”) sieve shall have a soaked CBR value
of not less than 80%
ITEM – 202 Material Requirements
• The portion passing the 0.075mm (No.200) sieve shall not be greater than
0.66 (2/3)of the portion passing the 0.425 mm (No.40) sieve.
• The portion passing the 0.425 mm(No.40) sieve shall have a liquid limit not
more than 25 and Plastic Index not more than 6.
• The coarse aggregate retained on 2.0 mm (No. 10) sieve shall have a mass
percent of wear not more than 45 by L.A. abrasion tests, and not less than 50
mass percent shall have at least one fractured face.
• The material passing the 20 mm (3/4”) sieve shall have a minimum soaked
CBR value of 80%
• ITEM 201 CRUSHED
AGGREGATE BASE
COURSES
Item- 203 Lime Stabilized Road
Mix Base Course
This item consists of foundation
for a surface course composed of
soil aggregate, lime and water
proportion mixed on site a
constructed on a prepared sub-
grade or sub-base.
Preparation of the Soil Aggregate
• Case – I For New Soil Aggregate
• The existing roadbed is scarified lightly and bladed to a uniform grade
according to the plan, then rolled, watered and rolled.
• All depressions appearing on the surface are filled, and the weak portion of
the roadbed is strengthened with new soil aggregate.
• Allow one day for measuring, sampling and testing of the sample for approval
of the quality and gradation before spreading the window for application of
the hydrated lime.
Case – 2 Salvage Soil Aggregate
• When materials in the site are to be used for mixing, the surface should be
scarified lightly and bladed to a uniform conforming to the cross section of
the plan.
• The reshaped surface is scarified again to depth required leaving a
foundation of undisturbed material parallel with the profile and cross
section.
• The loosened materials are bladed into a window at the side of the roadway.
The undisturbed materials are then rolled, watered and rolled.
Item 204 Portland Cement Stabilized Road Mix Base Course
• This item consist of a foundation for surface course
composed of soil aggregate, Portland cement and water,
proper proportions of road-mixed placed on a prepared sub-
grade or sub-base.
Item 205 Asphalt Stabilized Road Mixed Base Course
• Materials. Asphalt materials should be Anionic or Cationic
Emulsion asphalt of the slow setting type.
• Mixture Proportion. The amount of asphalt material to be
added to the aggregate should be from 4 to 7 mass percent of
the dry aggregate.
Item 206 Portland Cement Treated Plant Mix Base
Course
• Travel Plant Mixing Method: The salvage or new aggregate is pulverized until at
least 80 mass percent of all the materials other than stone or gravel passes a 4.75
(No.4) sieve. Any material retained on a 50 mm (2”) sieve and other unsuitable
materials are removed.
• Central Plant Mixing Method: The plant is equipped with feeding and meeting
devices that will introduce the cement aggregate and water into the mixer in
quantities specified. Mixing continue until after a uniform mixture is attained.
• Spreading, Compacting and Finishing: Nor more than 60 minutes should lapse
from the start of mixing to compaction of the laid mixture. After spreading, the
mixture is compacted and finished in accordance with the procedures as
enumerated for lime stabilized road mix base course Item 2-3.
Clearing
and
Grubbing
• Clearing and Grubbing is categorized under Item – 100 of the
DPWH standard specification. It consists of clearing, grubbing,
removing and disposing of all vegetables matter and debris except
this one objects that are designated to remain in place or are to
be removed in consonance with other provision of the
specifications. It also includes preservation from injury or
defacement of all objects designated to remain.
Specification for Clearing and Grabbing provides that:
All surface objects and all trees, stumps, roots and other protruding
obstructions, not designated to remain should be cleared and/or
grubbed including the moving required as follows:
• Removal of undistributed stumps and roots and non-perishable solid
objects with a minimum depth of 90 centimeters below sub-grade or
slope of embankments will not be required.
• Outside the grading limits of cut and embankment areas, stumps and
not perishable solid objects should be cut off not more than 15 cm
above the ground line or below low water level.
•In areas to be rounded at the top of cut slope, stumps
should be cut off flush with or below the surface of the final
slope line.
•Grubbing of pits, channel changes and ditches will be
required only to the depth necessary by the proposed
excavation with such areas.
•Burning should be under the surrounding vegetation,
adjacent property, or anything designated to remain on the
right of way will not be jeopardized.
Methods of Measurement
• Area Basis- by hectare and fractions thereof acceptably cleared
and grubbed.
• Lump Sum Basis- No measurement of areas will be made for this
item.
• Individual Unit Basis (selective clearing) – The diameter of trees
will be measured at a height of 1.4 meters above the ground.
Trees less than 15 cm diameter will not be measured for payment.
Excavation
Excavation is the process of loosening and removing earth or rock from its
original position in a cut and transporting it to a fill or to waste deposit.
Roadway excavation is classified int0:
• Unclassified excavation
• Rock excavation
• Common excavation
• Muck excavation
• Borrow excavation
• Unclassified Excavation is the excavation and disposal of all materials regardless of its
nature, or not classified and included in the Bill of Quantities under other pay items.
• Rock Excavation consists of igneous, sedimentary and metaphor if rocks that cannot be
excavated without blasting or the use of rippers and all boulders or other detached stones
each having a volume of 1 cubic meter.
• Common Excavation are those that are not included in the Bill of Quantities under rock
excavation or other pay items.
• Muck Excavation consist of the removal and disposal of deposits of saturated or
unsaturated mixture of soils and organic matter not suitable for foundation materials
regardless of moisture contents.
• Barrow Excavation in the excavation and utilization of approved materials for the
construction of a embankment or for other portion of the work obtained from approved
sources in accordance with the following requirements.
The Use of Excavated Materials
All suitable materials removed from the excavation area are used in the formation of:
Constructing the Roadbed
• Embankment
• Sub Grade
• Shoulders
• Slope
• Bedding
• Backfill for structures
All unsuitable materials that could not be properly compacted in embankment must must
be disposed of without d lay for it might be included in the work when the engineer turn
his back for a cup of coffee. Borrow materials should not be placed until after the fill
accessible roadway excavation has been placed in the fill.

More Related Content

Similar to Road-Bed-Construction PPT report- Construction materials and testing

Asphaltic concrete pavement.
Asphaltic concrete pavement. Asphaltic concrete pavement.
Asphaltic concrete pavement. adilahanuarr
 
moisture proofing of roads.pptx
moisture proofing of roads.pptxmoisture proofing of roads.pptx
moisture proofing of roads.pptxDESHANTAGGARWAL1
 
Roads in desert, swamp & black cotton
Roads in desert, swamp & black cottonRoads in desert, swamp & black cotton
Roads in desert, swamp & black cottonpradip dangar
 
SOIL STABILISATION (2).ppt
SOIL STABILISATION (2).pptSOIL STABILISATION (2).ppt
SOIL STABILISATION (2).pptDualAccount1
 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and PracticeSenthamizhan M
 
Weekly Report of AACRA Practice site visit.docx
Weekly Report of AACRA Practice site visit.docxWeekly Report of AACRA Practice site visit.docx
Weekly Report of AACRA Practice site visit.docxEthiopiaSelam2010
 
Typical road structure cross section details
Typical road structure cross section detailsTypical road structure cross section details
Typical road structure cross section detailsAglaia Connect
 
Foam Bitumen Presentation
Foam Bitumen PresentationFoam Bitumen Presentation
Foam Bitumen PresentationCraig Gordon
 
Soil stab use of-new.ppt dr msa edusat.ppt rev 1
Soil stab use of-new.ppt dr msa edusat.ppt rev 1Soil stab use of-new.ppt dr msa edusat.ppt rev 1
Soil stab use of-new.ppt dr msa edusat.ppt rev 1imtheking2088
 
crri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxcrri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxRipanJena
 
Tutor mortars ppt 1
Tutor mortars ppt 1Tutor mortars ppt 1
Tutor mortars ppt 1Luke D'Arcy
 
Cold mix bituminous plant
Cold mix bituminous plantCold mix bituminous plant
Cold mix bituminous plantpradip dangar
 
Types of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. ITypes of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. IGauri kadam
 
He unit iii 3d0f5751f8e65e10a1c08bba8255d4bc
He unit  iii 3d0f5751f8e65e10a1c08bba8255d4bcHe unit  iii 3d0f5751f8e65e10a1c08bba8255d4bc
He unit iii 3d0f5751f8e65e10a1c08bba8255d4bcsaibabu48
 
IRJET- The Study of Porous Asphalt Pavement with Emphasis in Road Constructio...
IRJET- The Study of Porous Asphalt Pavement with Emphasis in Road Constructio...IRJET- The Study of Porous Asphalt Pavement with Emphasis in Road Constructio...
IRJET- The Study of Porous Asphalt Pavement with Emphasis in Road Constructio...IRJET Journal
 

Similar to Road-Bed-Construction PPT report- Construction materials and testing (20)

Interlocking pavement
Interlocking pavementInterlocking pavement
Interlocking pavement
 
Asphaltic concrete pavement.
Asphaltic concrete pavement. Asphaltic concrete pavement.
Asphaltic concrete pavement.
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
moisture proofing of roads.pptx
moisture proofing of roads.pptxmoisture proofing of roads.pptx
moisture proofing of roads.pptx
 
Roads in desert, swamp & black cotton
Roads in desert, swamp & black cottonRoads in desert, swamp & black cotton
Roads in desert, swamp & black cotton
 
Presentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,deptPresentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,dept
 
SOIL STABILISATION (2).ppt
SOIL STABILISATION (2).pptSOIL STABILISATION (2).ppt
SOIL STABILISATION (2).ppt
 
Highway Construction Materials and Practice
Highway Construction Materials and PracticeHighway Construction Materials and Practice
Highway Construction Materials and Practice
 
Weekly Report of AACRA Practice site visit.docx
Weekly Report of AACRA Practice site visit.docxWeekly Report of AACRA Practice site visit.docx
Weekly Report of AACRA Practice site visit.docx
 
water proof roads.pptx
water proof roads.pptxwater proof roads.pptx
water proof roads.pptx
 
Typical road structure cross section details
Typical road structure cross section detailsTypical road structure cross section details
Typical road structure cross section details
 
Foam Bitumen Presentation
Foam Bitumen PresentationFoam Bitumen Presentation
Foam Bitumen Presentation
 
Soil stab use of-new.ppt dr msa edusat.ppt rev 1
Soil stab use of-new.ppt dr msa edusat.ppt rev 1Soil stab use of-new.ppt dr msa edusat.ppt rev 1
Soil stab use of-new.ppt dr msa edusat.ppt rev 1
 
crri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptxcrri_csir_odisha new tech JULY 2022.pptx
crri_csir_odisha new tech JULY 2022.pptx
 
Tutor mortars ppt 1
Tutor mortars ppt 1Tutor mortars ppt 1
Tutor mortars ppt 1
 
Cold mix bituminous plant
Cold mix bituminous plantCold mix bituminous plant
Cold mix bituminous plant
 
Types of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. ITypes of pavement- Transportation Engg. I
Types of pavement- Transportation Engg. I
 
He unit iii 3d0f5751f8e65e10a1c08bba8255d4bc
He unit  iii 3d0f5751f8e65e10a1c08bba8255d4bcHe unit  iii 3d0f5751f8e65e10a1c08bba8255d4bc
He unit iii 3d0f5751f8e65e10a1c08bba8255d4bc
 
IRJET- The Study of Porous Asphalt Pavement with Emphasis in Road Constructio...
IRJET- The Study of Porous Asphalt Pavement with Emphasis in Road Constructio...IRJET- The Study of Porous Asphalt Pavement with Emphasis in Road Constructio...
IRJET- The Study of Porous Asphalt Pavement with Emphasis in Road Constructio...
 
CONCRETE PPT SA JBP
CONCRETE PPT SA JBPCONCRETE PPT SA JBP
CONCRETE PPT SA JBP
 

Recently uploaded

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

Road-Bed-Construction PPT report- Construction materials and testing

  • 2. Base Course •is the materials laid on top of the subgrade consisting of crushed stoned or gravel, sometimes mixed with asphalt binders.
  • 3. Two types of Base Course •The granular Base Course or Untreated Base Course •Treated Base Course
  • 4. The Granular Base Course is a road surface of untreated soil mixture describe as gravel road. Gravel Road consist largely pebbles or crushed rock particles combined with either, clay, lime, iron oxide or other fine materials sufficient enough to serve as binder of the coarse particle.
  • 5. Construction and Maintenance Requirement of Untreated Gravel Road Surface 1. That the road must be stable to support the supper imposed loads detrimental deformation. 2. It must shed the large portion of rain that falls on the surface because water penetrating the sub grade might soften it and loosen the surface stability. 3. It must be free from large rocks or stones over one inch in diameter so that it could be regularly maintained by blading or dragging. 4. Gravel Road must possess capillarity properties sufficient enough to replace the moisture lost through the surface evaporation
  • 6. 5. On dry weather, the moisture film on the clay particles should bind the entire mass together, and in wet weather the first rain that fall on the surface, should expand the clay and close the pores to prevent water from entering and softening of the materials. 6. An excessive amount of highly expansive materials should be avoided because clay swell and unseat the coarser materials when wet and ultimately will weaken the stability of road. 7. Gravel Road must be low Cost. Funds for low traffic road is very limited that most of the time overlooked in the list of appropriation priorities except on election period. 8. Use local materials. Meaning those materials that could be found nearby the project
  • 7. Treated Base Course •To stabilized the base coarse, it is sometimes treated with either Asphalt, Lime, Portland Cement, or other materials as binders mixed with the aggregate base course. Treated Base course is adopted if in the study or analysis of the highway agency, a better road can be produced at a minimal over all cost, or when a politician order the highway office to construct the road with or without study because it was a commitment during the campaign period.
  • 8. Sand and Asphalt Base Course • The sand and asphalt base course is composed of either loose beach sand, dune pit or river sand cemented with asphalt materials. In the early road construction, sand and clay mixture is not only used as road surfaces but also for base courses. But lately, the Cutback asphalt, Emulsified asphalt or Tars have been introduced as substitute for the clay binders to produce quality base courses for roads and highways. • Sand for mixing asphalt should be clean and strong should be clean and strong, because the surface properties and grain shape must have the quality to resist displacement under load.
  • 9.
  • 10. Fine Grain Asphalt Base • An asphalt stabilized base and sub-grade constructed with fine grained has a controlled. Plastic Index of 6 to 10 respectively. Aggregates with plasticity Index up to 30 are processed with lime. Those with up to 50% passing the No.200 sieve and Plastic Index up to 18 can be stabilized even without pre- treatment.
  • 11. Soil and Base Course Stabilized with Cement • The used of Portland cement in stabilizing soils and aggregates was initially practiced after world war- 1 in 1914 1. Cement stabilization by mixing natural materials and Portland cement compacted at optimum moisture content and cured to hydrate the cement is considerably strong and stable base. It is less susceptible to deformation caused by moisture and temperature changes. 2. Comparatively, this is less rigid than the Portland cement concrete because its modulus of elasticity ranges from 100,000 for clay soils with little cement up to 1,000,000 for the strong mixture. Its compressive strength of about 300 psi to 600 psi with flexural strength of about 20% of the compressive value. 3. Portland cement concrete modulus of elasticity ranges from 3 million to 6 million with compressive strength of about 3,000 to 5,000 psi. •
  • 12. The stabilized cement mixture is called “ soil cement” produced by using abundant native local materials subdivided into three parts: 1. Sandy, and gravelly soils containing less than 25% silt and clay. 2.Sand with lesser amount of fines like beach sand, glacial and windblown sand. 3. Silty and Clayey Soils.
  • 13. Grading and Maintenance of Untreated Surface • The cross slope of untreated surface gravel road must be sufficient enough to drain water to prevent potholes and softening of the roadway; thus: 1. If road materials are sufficiently stable and water tight, one inch per slope is considered satisfactory although 3/8 to ½ per slope is preferred 2. If the road is steep grade, substantial cross slope is needed to direct the water into the roadside.
  • 14. • Untreated surface road is seldom constructed in less than 20 cm loose depth. When compacted, will be compressed to about 15 cm thick. Road development sometimes adopted the stage construction methods which means, step by step improvement of the roadway, depending upon the availability of funds and demand of increased traffic. The sequence of improvement could be as follows: • First: it might be an earth road surface • Second: untreated gravel road • Third: Application of asphalt over the gravel • Fourth: The use of stone type pavement with gravel as part of the base course
  • 15. DWPH Standard Specification on Aggregate Sub-Base Course • The Department of Public Works and Highways classified the aggregate sub-base course as Item 200 which consists of furnishing, placing and compacting aggregate sub-base course on a prepared sub-grade.
  • 16. Item – 200 Material Requirements • That, aggregate for sub-base shall consist of hard, durable particles of fragments or crushed stone, crushed slag or crushed or natural gravel and filler or natural crushed sand or other firmly divided mineral matter. Sieve Designation Standard Alternate US Standard Mass Percent Passing 50 2” 25 1” 10 3/8” 0.75. No.200 100 55-85 40-75 0-12 GRADING REQUIREMENTS FOR ITEM 200
  • 17. Item 201 Material Requirements CONDITIONS: 1. That the fraction passing the 0.075 mm (No. 200) sieve shall have a mass percent of wear or to exceed 50. 2. The fraction passing the 0.425mm (No. 40) sieve shall have a liquid limit not greater than 25 and Plastic Index not greater than 6. 3. The coarse portion retained on a 2.0mm (No.40) sieve shall have a mass percent of wear no to exceed 50. 4. The materials passing the 20mm (3/4”) sieve shall have a soaked CBR value of not less than 80%
  • 18. ITEM – 202 Material Requirements • The portion passing the 0.075mm (No.200) sieve shall not be greater than 0.66 (2/3)of the portion passing the 0.425 mm (No.40) sieve. • The portion passing the 0.425 mm(No.40) sieve shall have a liquid limit not more than 25 and Plastic Index not more than 6. • The coarse aggregate retained on 2.0 mm (No. 10) sieve shall have a mass percent of wear not more than 45 by L.A. abrasion tests, and not less than 50 mass percent shall have at least one fractured face. • The material passing the 20 mm (3/4”) sieve shall have a minimum soaked CBR value of 80%
  • 19. • ITEM 201 CRUSHED AGGREGATE BASE COURSES
  • 20. Item- 203 Lime Stabilized Road Mix Base Course This item consists of foundation for a surface course composed of soil aggregate, lime and water proportion mixed on site a constructed on a prepared sub- grade or sub-base.
  • 21.
  • 22. Preparation of the Soil Aggregate • Case – I For New Soil Aggregate • The existing roadbed is scarified lightly and bladed to a uniform grade according to the plan, then rolled, watered and rolled. • All depressions appearing on the surface are filled, and the weak portion of the roadbed is strengthened with new soil aggregate. • Allow one day for measuring, sampling and testing of the sample for approval of the quality and gradation before spreading the window for application of the hydrated lime.
  • 23. Case – 2 Salvage Soil Aggregate • When materials in the site are to be used for mixing, the surface should be scarified lightly and bladed to a uniform conforming to the cross section of the plan. • The reshaped surface is scarified again to depth required leaving a foundation of undisturbed material parallel with the profile and cross section. • The loosened materials are bladed into a window at the side of the roadway. The undisturbed materials are then rolled, watered and rolled.
  • 24. Item 204 Portland Cement Stabilized Road Mix Base Course • This item consist of a foundation for surface course composed of soil aggregate, Portland cement and water, proper proportions of road-mixed placed on a prepared sub- grade or sub-base. Item 205 Asphalt Stabilized Road Mixed Base Course • Materials. Asphalt materials should be Anionic or Cationic Emulsion asphalt of the slow setting type. • Mixture Proportion. The amount of asphalt material to be added to the aggregate should be from 4 to 7 mass percent of the dry aggregate.
  • 25. Item 206 Portland Cement Treated Plant Mix Base Course • Travel Plant Mixing Method: The salvage or new aggregate is pulverized until at least 80 mass percent of all the materials other than stone or gravel passes a 4.75 (No.4) sieve. Any material retained on a 50 mm (2”) sieve and other unsuitable materials are removed. • Central Plant Mixing Method: The plant is equipped with feeding and meeting devices that will introduce the cement aggregate and water into the mixer in quantities specified. Mixing continue until after a uniform mixture is attained. • Spreading, Compacting and Finishing: Nor more than 60 minutes should lapse from the start of mixing to compaction of the laid mixture. After spreading, the mixture is compacted and finished in accordance with the procedures as enumerated for lime stabilized road mix base course Item 2-3.
  • 27. • Clearing and Grubbing is categorized under Item – 100 of the DPWH standard specification. It consists of clearing, grubbing, removing and disposing of all vegetables matter and debris except this one objects that are designated to remain in place or are to be removed in consonance with other provision of the specifications. It also includes preservation from injury or defacement of all objects designated to remain.
  • 28. Specification for Clearing and Grabbing provides that: All surface objects and all trees, stumps, roots and other protruding obstructions, not designated to remain should be cleared and/or grubbed including the moving required as follows: • Removal of undistributed stumps and roots and non-perishable solid objects with a minimum depth of 90 centimeters below sub-grade or slope of embankments will not be required. • Outside the grading limits of cut and embankment areas, stumps and not perishable solid objects should be cut off not more than 15 cm above the ground line or below low water level.
  • 29. •In areas to be rounded at the top of cut slope, stumps should be cut off flush with or below the surface of the final slope line. •Grubbing of pits, channel changes and ditches will be required only to the depth necessary by the proposed excavation with such areas. •Burning should be under the surrounding vegetation, adjacent property, or anything designated to remain on the right of way will not be jeopardized.
  • 30. Methods of Measurement • Area Basis- by hectare and fractions thereof acceptably cleared and grubbed. • Lump Sum Basis- No measurement of areas will be made for this item. • Individual Unit Basis (selective clearing) – The diameter of trees will be measured at a height of 1.4 meters above the ground. Trees less than 15 cm diameter will not be measured for payment.
  • 32. Excavation is the process of loosening and removing earth or rock from its original position in a cut and transporting it to a fill or to waste deposit. Roadway excavation is classified int0: • Unclassified excavation • Rock excavation • Common excavation • Muck excavation • Borrow excavation
  • 33. • Unclassified Excavation is the excavation and disposal of all materials regardless of its nature, or not classified and included in the Bill of Quantities under other pay items. • Rock Excavation consists of igneous, sedimentary and metaphor if rocks that cannot be excavated without blasting or the use of rippers and all boulders or other detached stones each having a volume of 1 cubic meter. • Common Excavation are those that are not included in the Bill of Quantities under rock excavation or other pay items. • Muck Excavation consist of the removal and disposal of deposits of saturated or unsaturated mixture of soils and organic matter not suitable for foundation materials regardless of moisture contents. • Barrow Excavation in the excavation and utilization of approved materials for the construction of a embankment or for other portion of the work obtained from approved sources in accordance with the following requirements.
  • 34. The Use of Excavated Materials All suitable materials removed from the excavation area are used in the formation of: Constructing the Roadbed • Embankment • Sub Grade • Shoulders • Slope • Bedding • Backfill for structures All unsuitable materials that could not be properly compacted in embankment must must be disposed of without d lay for it might be included in the work when the engineer turn his back for a cup of coffee. Borrow materials should not be placed until after the fill accessible roadway excavation has been placed in the fill.