18. Manufacturing Process Waste to Cotton FiberManufacturing Process Waste to Cotton Fiber
1.1. Opening of Pressed bale.Opening of Pressed bale.
2.2. Manual Cleaning Of Foreign Material.Manual Cleaning Of Foreign Material.
3.3. Air Blowing For Dust Removal.Air Blowing For Dust Removal.
4.4. Loaded in Pressure Kier For Scouring.Loaded in Pressure Kier For Scouring.
5.5. Bleaching Of all Waste to Ultra White.Bleaching Of all Waste to Ultra White.
6.6. Cutting Of Waste material to 1 Sq. Inch.Cutting Of Waste material to 1 Sq. Inch.
7.7. Opening To Semi Fiber Stage.Opening To Semi Fiber Stage.
8.8. Cleaning And Fiber making.Cleaning And Fiber making.
9.9. Pure White Cotton Fiber Bale PressingPure White Cotton Fiber Bale Pressing
38. Finished product : cottonFinished product : cotton
fiber in pressed balefiber in pressed bale
39. Power requirementPower requirement
FOR 1MT PER DAY PRODUCTION CAPACITY BASED PLANT
MACHINE NAME
NOS. OF MACHINE
REQUIRED
EACH MOTOR
HP
TOTAL MOTOR
HP.
Air Blowing Chamber 1 10 10
Pressure Kier 2 7.5 15
Preheater 2 0 0
Thermal Oil Heater 1 9 9
Bleaching Chamber 1 15 15
Hydroextractor 1 10 10
Conveyor Dryer 1 20 20
Hot Air Generator 1 7.5 7.5
Dryed Cotton Cutter 1 10 10
Cutted Cotton Opener 2 15 30
Fiber Making Machine 6 9.5 57
Bale Press Machine 1 10 10
TOTAL 193.5
40. Water requirementWater requirement
FOR 1MT PER DAY PRODUCTION CAPACITY BASED PLANT
MACHINE NAME TOTAL WATER REQUIREMENT PER DAY IN LTRS
Air Blowing Chamber 0
Pressure Kier 12000
Preheater 0
Thermal Oil Heater 1000
Bleaching Chamber 10000
Hydroextractor 0
Conveyor Dryer 0
Hot Air Generator 0
Dryed Cotton Cutter 0
Cutted Cotton Opener 0
Fiber Making Machine 0
Bale Press Machine 0
Misc. 3000
TOTAL 26000
41. Manpower requirementManpower requirement
FOR 1MT PER DAY PRODUCTION CAPACITY BASED PLANT
MACHINE NAME TOTAL number of manpower required per day
Air Blowing Chamber 0
Pressure Kier 4
Preheater 0
Thermal Oil Heater 0
Bleaching Chamber 4
Hydroextractor 2
Conveyor Dryer 2
Hot Air Generator 0
Dryed Cotton Cutter 1
Cutted Cotton Opener 1
Fiber Making Machine 2
Bale Press Machine 2
Misc. 4
TOTAL 22
42. Building area : working floorBuilding area : working floor
FOR 1MT PER DAY PRODUCTION CAPACITY BASED PLANT
MACHINE NAME area requirement including working space in sq. ft.
Air Blowing Chamber 100
Pressure Kier 1000
Preheater 100
Thermal Oil Heater 600
Bleaching Chamber 500
Hydroextractor 300
Conveyor Dryer 500
Hot Air Generator 100
Dryed Cotton Cutter 200
Cutted Cotton Opener 200
Fiber Making Machine 700
Bale Press Machine 300
Misc. 500
TOTAL 5100