SlideShare a Scribd company logo
1 of 26
Download to read offline
1
INTRODUCTION
PAGE 2
CLIMATE DATA
PAGE 12
WIND ANALYSIS
PAGE 13
SUN ANALYSIS
PAGE 14
PASSIVE GREEN DESIGN
ANALYSIS
PAGE 15
REFERENCE LIST
PAGE 25
CONTENT PAGE
2
PROJECT: DIGI Technology Operations Centre
LOCATION: Malaysia
ARCHITECT: T. R. Hamzah & Yeang Sdn. Bhd.
Picture 1: A perspective view of DIGI’s Technology Operations Centre.
Designed by the T. R. Hamzah & Yeang Sdn. Bhd., it first started its
construction in April 2009 and was completed in July 2010. The DiGi
Technology Operation Centre is located in Subang High Tech Park, Shah
Alam, Selangor. It stands at 23.5 metres in height, or 4-storeys tall, covering a
total gross area of 12, 468 sq. m. The building is a data centre equipped with
necessary facilities such as an administration office, reception lobby, telco
tower and a service management centre.
In the project’s brief, they stated that they had sought for a data centre based
on ‘IT data centre uptime institute’ Tier 3 platform, with a possible increase to
a Tier 4 security that includes substantial ecological features. The response to
the brief was a design that optimizes the data centre footprint, providing
effective drainage and waterproofing to protect sensitive equipment, reduce
solar heat gain into the centre and allows for effective security measures.
INTRODUCTION
3
Picture 2: Satellite view of DIGI Technology Operations Center
Coordinates: 3.067780, 101.569256
Aim: The DIGI Technology Operations Centre aims to reduce
the company’s carbon footprint by more than 40% while
achieving operational efficiencies through the
construction of this green building.
Certification: DIGI Technology Operations Centre has ben certified
Gold in the Green Building Index in Malaysia
Green Features: The passive green features implemented in building
includes:
• Extensive vertical green walls that filters and improves
the ambient indoor air quality and reduces solar heat
gain
4
Picture 3: The vegetated green walls of the building
Source : Image Courtesy © T.R. Hamzah & Yeang Sdn Bhd
Picture 4: The vegetated vertical green wall of the building
Source : Image Courtesy © T.R. Hamzah & Yeang Sdn Bhd
5
• Full-height Low-E curtain walls to provide maximum
daylight penetration and enables energy efficient
lighting systems
Drawing 1: The low-e curtain walls enclosing the building
Source : Image Courtesy © T.R. Hamzah & Yeang Sdn Bhd
Diagram 1: Diagram showing the heat transfer through the low-e glass
Source: Lee, 2014
• Regular shuttle service is provided between the
building and the Batu Tiga KTM station
6
Picture 5: The nearest KTM station, Batu Tiga
Source : http://en.wikipedia.org/wiki/Batu_Tiga_Komuter_station
7
ORTHOGRAPHIC DRAWINGS
Drawing 2: Site Plan (nts)
Drawing 3: Level 2 floor plan of the DIGI Technology Operations Centre
8
Drawing 4: Roof Plan of Digi Technology Operations Centre
Drawing 5: North Western elevation of the building
9
Drawing 6: North Eastern elevation of the building
Drawing 7: Section cut of the building
Drawing 8: Section cut of the building
10
SITE PICTURES
( Copyright T.R. Hamzah & Yeang Sdn. Bhd. (2014) )
Picture 6: A perspective view of the DIGI Technology Operations Centre
11
Picture 7: Main entrance of the building
Picture 8: Reception area of the building
12
Figure 1: Average temperature of Kuala Lumpur, Malaysia
Diagram 2: Average Relative Humidity of Kuala Lumpur, Malaysia
Referring to Firgure 1, it can be seen that the temperatures vary throughout
the year. The first 6 months the temperature gradually decreases and
increases for the next 6 months. The average temperature for Malaysia is
28o
C. Referring to Diagram 2, the northwestern side of Kuala Lumpur has the
highest level of humidity as compared to the other areas.
CLIMATE DATA
13
Diagram 3: A wind rose diagram for Kuala Lumpur, Malaysia
Diagram 4: A diagram showing the direction of the prevailing winds
Referring to Diagram 3, the highest frequency of wind comes from the East
and Southeast of Kuala Lumpur. The highest wind speed for both directions is
10 km/h. It can be seen the orientation of the building is angled to maximize
ventilation around the building.
WIND ANALYSIS
14
Diagram 5: A sun path diagram for Kuala Lumpur, Malaysia
Diagram 6: Optimum orientation of a building in Kuala Lumpur, Malaysia
Referring to Diagram 6, the optimum orientation of a building to prevent
overheating should be where the longest façade faces the North East,
indicated by the blue arrow.
SUN ANALYSIS
15
1. VEGETATED GREEN WALL
a) Description
Diagram 9: Diagram showing the green wall surrounding the building
Picture 9: Picture showing the Southeastern façade with the green wall
PASSIVE GREEN DESIGN ANALYSIS
16
Drawing 10: A diagram showing the Northeastern façade with the green wall
Drawing 11: A diagram showing the Northwestern façade with the green wall
The green wall façade has a lot of biological advantages that it provides to the
building while functioning as a act living art installation. The northeast,
northwest and southeast façades, a large green wall is designed in a zigzag
manner across the building from the top to the bottom, creating a unique
attractive art installation, and at the same time protecting the entire building
with its biological advantages.
17
b) Thermal advantages
Diagram 7: A diagram showing the thermal and solar radiation pathways
Diagram 8: Temperature zoning within the building
The green wall surrounding the façades of the DIGI building causes thermal
reduction by trapping a layer of air within the plant mass. This reduces the
ambient temperature via evaporation shading. It also functions as a buffer
zone during hot weathers and cold weathers (e.g: rainy seasons). Not only is
the building protected from overheating, but also the surrounding air quality is
improved due to the green wall absorbing carbon dioxide and releasing
oxygen through photosynthesis. Referring to Diagram 8, heat has to be kept
18
away from the data centre to avoid damage to the equipment. This is done by
placing it in the centre of the building away from sources of heat.
c) Type of plant used
Picture 10: A close up of the green wall on the North Eastern façade
The DIGI Technology Operations Centre uses turf grass for the green wall
due to it having several advantages. Turf grass is larger, taller and they grow
in bulk making it easier to flourish. They also provide some sort of acoustic
insulation from the outside as well. The DIGI building is located in an industrial
area and due to it being an office building, acoustic insulation is necessary.
Evapotranspiration takes place thus reducing the heat entering the building,
regulating the interior temperatures and increasing the human comfort. The
turf grass also protects the building form ultraviolet rays as well (Bliss &
Everett, 2014).
19
d) Evapotranspiration
Diagram9: A diagram showing the effects of evapotranspiration
A wet object in this case turf grass will decrease in temperature due to
the effect of evaporation due to the molecular kinetics, where the faster
water molecules escape and become a part of the air. Since those that
escape has more energy than the average, the process decreases the
temperature of the water that escapes the object making the
environment cooler ( “How Does”, n.d.). The green wall is placed on
the north-east and north-west façade which, due to the building's
orientation, receives the most sunlight at 9am until 4pm, providing heat
to the turf grass, thus catalyzing the water molecules on the turf grass
to undergo evaporation, This in turn makes the environment around the
building cooler as the evaporated water molecules combine with the air
molecules. The designers take advantage of this process by placing
the ACMV’s, which take in fresh air close to the green walls. Not only
will the building ventilate cool air, it improves the indoor air quality as
well (Chua, et al., n.d.).
20
e) Acoustic Barrier
Diagram 10: A diagram stating the sources of noise in the area
Diagram 11: A diagram showing the reverberation of sound
Green walls also have an added benefit to the building occupants by
providing a form of acoustic insulation due to the plants ability to
absorb sound (“Green Wall Benefits”, 2010). The DiGi Technology
Operation Centre is located in an industrial area where large lorries
and trucks frequent. Therefore, sound insulation is needed. It can be
seen that the green walls have been placed strategically near the main
sources of noise, referring to Diagram 13.
21
2. BUILDING ORIENTATION
a) MS1525 Requirements
Diagram 12: Diagram showing the staircases and service rooms
In reference to the MS1525 (2007) requirements, the best orientation for
buildings in equatorial climates, have their long directional axis facing North-
South, minimizing the East-West orientation. It can be seen that the DIGI
Technology Operation Centre is angled in such a way that the longest façade
unfortunately have a East-West orientation. In order to reduce the solar heat
gain, service areas such as staircases and service ducts are located near the
external walls on the east-west façades. The rooftop also holds several
service rooms to further reduce the solar heat gain (Aun, 2009).
b) Induction of daylight
Diagram 13: North Eastern and North Western façade at 9am
22
Diagram 14: South Eastern and South Western façade at 4pm
Referring to the above diagrams, it can be seen that the Northeastern façade
receives the most sunlight at 9am until 4pm when it is shaded. The South
Eastern facade is shaded during the day until 4pm when it is fully exposed to
sunlight.
Picture 11: Natural daylight illuminates the reception area of the building
23
Picture 12: Natural daylight brightens up the office area
As seen in the above images, the interior spaces of the building are lit up with
natural daylighting especially the spaces in the Northeastern side during 9am
to 4pm, and the Southeastern spaces from 4pm onwards. The curtain wall at
Northeast façade allows sunlight to illuminate the main office areas during
working hours from 9am to 4pm, when the façade receives the maximum
daylight exposure.
c) Optimum Building Orientation
Diagram 15: Optimum building orientation for the DiGi Technology Operation Centre
The longer façade of the Digi Technology Operation Centre building is not
orientated towards the optimum direction, which is to the North East.
24
However, the building is perhaps to be orientated in such manner as the main
entrance as well as the main office area is situated there. This is as well to
avoid direct sunlight to penetrate in during morning and afternoon, which is
the time with the most sunlight.
As to compensate for the length of façade facing the optimum direction, the
North East side of the building has been installed with glazed glass with
curtain wall system which aid in the fully daylight penetration as well as an
efficient lighting scheme to the office area. Besides that, short overhang are
placed on this area for a better day lighting system.
Drawing 12: DiGi Technology Operations Centre façade with curtain walling
25
Aun, C. S. (Director) (2009). Green Building Index - MS1525. Applying
MS1525:2007 Code of Practice on Energy Efficiency and Use of Renewable
Energy for Non-Residential Buildings. Lecture conducted from Persatuan
Arkitek Malaysia, Kuala Lumpur.
Bliss, H., & Everett, W. (2014). What Is Turf Grass? Retrieved April 30, 2014, from
http://www.wisegeek.com/what-is-turf-grass.html
Chua, Z.Y., Chan, S.Q., Tan T., Ong, K., Hon, Y. M. Y., & Lim J. Z. ( n.d.)
[Presentation Board]. Digi technology operation centre.
Green Wall Benefits. (2010). Retrieved April 30, 2014, from
http://www.greenroofs.org/index.php/about/green-wall-benefits
Grondzik, W. T., Kowk, A. G., Stein, B., & Reynolds, J. S. (2010). Mechanical and
electrical equipment for buildings. Hoboken, N.J: Wiley.
Living Walls Improve Indoor Air Quality, Save Energy and Add Life to Your Home -
Green Home Gnome. (n.d.). Retrieved April 30, 2014, from
http://www.greenhomegnome.com/living-walls/
London's Famous Gherkin Building Goes Green - Literally | Inhabitat - Sustainable
Design Innovation, Eco Architecture, Green Building. (n.d.). Retrieved April 30,
2014, from http://inhabitat.com/gherkin-gets-a-green-roof/
REFERENCE LIST
26
Singal, S. (2014). AECCafe.com - ArchShowcase - DIGI Technology Operation
Centre in Shah Alam, Selangor, Malaysia by T.R. Hamzah & Yeang Sdn Bhd.
Retrieved April 28, 2014, from http://www10.aeccafe.com/blogs/arch-
showcase/2014/03/29/digi-technology-operation-centre-in-shah-alam-selangor-
malaysia-by-t-r-hamzah-yeang-sdn-bhd/?interstitial_displayed=Yes
TR Hamzah & Yeang Sdn. Bhd. (n.d.). Retrieved April 28, 2014, from
http://www.trhamzahyeang.com/project/large-buildings/Digi_01.html

More Related Content

What's hot

Cnh2 petaling jaya civic centre
Cnh2   petaling jaya civic centreCnh2   petaling jaya civic centre
Cnh2 petaling jaya civic centre杉 江紫
 
Menara mesiniaga kim yeang
Menara mesiniaga  kim yeangMenara mesiniaga  kim yeang
Menara mesiniaga kim yeangSudhi Agarwal
 
Project 2
Project 2Project 2
Project 2wzhen77
 
Nanyang Technological University - Singapore
Nanyang Technological University - SingaporeNanyang Technological University - Singapore
Nanyang Technological University - SingaporeTrevor Hoareau
 
Ct 1 report
Ct 1 reportCt 1 report
Ct 1 reportAh Lai
 
Building Science II KLPAC
Building Science II KLPAC Building Science II KLPAC
Building Science II KLPAC Natalie Yunxian
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case StudyBolin Loong
 
Asian Architecture Case Study Report
Asian Architecture Case Study Report Asian Architecture Case Study Report
Asian Architecture Case Study Report huiyuteoh
 
Theorizing Architecture : Putrajaya International Convention Centre
Theorizing Architecture : Putrajaya International Convention CentreTheorizing Architecture : Putrajaya International Convention Centre
Theorizing Architecture : Putrajaya International Convention CentreDexter Ng
 
Report of National Mosque, KL
Report of National Mosque, KLReport of National Mosque, KL
Report of National Mosque, KLLek Yuen
 
Solaris Singapore report
Solaris Singapore report Solaris Singapore report
Solaris Singapore report XingYue0907
 
BUILDING SCIENCE 1 PTM GEO 1
BUILDING SCIENCE 1 PTM GEO 1BUILDING SCIENCE 1 PTM GEO 1
BUILDING SCIENCE 1 PTM GEO 1Yaseen Syed
 
Walian house case study
Walian house case studyWalian house case study
Walian house case studyJoshua Lee
 
Culture History - Stadium Negara
Culture History - Stadium NegaraCulture History - Stadium Negara
Culture History - Stadium NegaraLee Yih
 
Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...Adila Zaas
 
Menara Dayabumi Analysis Report
Menara Dayabumi Analysis ReportMenara Dayabumi Analysis Report
Menara Dayabumi Analysis ReportjolynnTJL
 
Chapter 4 case studies characteristics
Chapter 4   case studies characteristicsChapter 4   case studies characteristics
Chapter 4 case studies characteristicsLokman Hakim Ismail
 
Menara Tabung Haji Case Study
Menara Tabung Haji Case StudyMenara Tabung Haji Case Study
Menara Tabung Haji Case StudyLovie Tey
 

What's hot (20)

C&H 2 Final Project
C&H 2 Final Project C&H 2 Final Project
C&H 2 Final Project
 
Cnh2 petaling jaya civic centre
Cnh2   petaling jaya civic centreCnh2   petaling jaya civic centre
Cnh2 petaling jaya civic centre
 
Menara mesiniaga kim yeang
Menara mesiniaga  kim yeangMenara mesiniaga  kim yeang
Menara mesiniaga kim yeang
 
Project 2
Project 2Project 2
Project 2
 
Nanyang Technological University - Singapore
Nanyang Technological University - SingaporeNanyang Technological University - Singapore
Nanyang Technological University - Singapore
 
Ct 1 report
Ct 1 reportCt 1 report
Ct 1 report
 
Building Science II KLPAC
Building Science II KLPAC Building Science II KLPAC
Building Science II KLPAC
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Asian Architecture Case Study Report
Asian Architecture Case Study Report Asian Architecture Case Study Report
Asian Architecture Case Study Report
 
Theorizing Architecture : Putrajaya International Convention Centre
Theorizing Architecture : Putrajaya International Convention CentreTheorizing Architecture : Putrajaya International Convention Centre
Theorizing Architecture : Putrajaya International Convention Centre
 
Report of National Mosque, KL
Report of National Mosque, KLReport of National Mosque, KL
Report of National Mosque, KL
 
Solaris Singapore report
Solaris Singapore report Solaris Singapore report
Solaris Singapore report
 
BUILDING SCIENCE 1 PTM GEO 1
BUILDING SCIENCE 1 PTM GEO 1BUILDING SCIENCE 1 PTM GEO 1
BUILDING SCIENCE 1 PTM GEO 1
 
Walian house case study
Walian house case studyWalian house case study
Walian house case study
 
Culture History - Stadium Negara
Culture History - Stadium NegaraCulture History - Stadium Negara
Culture History - Stadium Negara
 
Nanyang report
Nanyang reportNanyang report
Nanyang report
 
Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...
 
Menara Dayabumi Analysis Report
Menara Dayabumi Analysis ReportMenara Dayabumi Analysis Report
Menara Dayabumi Analysis Report
 
Chapter 4 case studies characteristics
Chapter 4   case studies characteristicsChapter 4   case studies characteristics
Chapter 4 case studies characteristics
 
Menara Tabung Haji Case Study
Menara Tabung Haji Case StudyMenara Tabung Haji Case Study
Menara Tabung Haji Case Study
 

Similar to Building science report [malaysia]

Building science report [malaysia] final
Building science report [malaysia] finalBuilding science report [malaysia] final
Building science report [malaysia] finalJannah Jailani
 
Parkroyal on Pickering Analysis Report
Parkroyal on Pickering Analysis ReportParkroyal on Pickering Analysis Report
Parkroyal on Pickering Analysis ReportCharlene Chan
 
Parkroyalfinalforsubmission 140717004033-phpapp02
Parkroyalfinalforsubmission 140717004033-phpapp02Parkroyalfinalforsubmission 140717004033-phpapp02
Parkroyalfinalforsubmission 140717004033-phpapp02phanngoc Tien
 
Lot 2C2 Building Science Report
Lot 2C2 Building Science ReportLot 2C2 Building Science Report
Lot 2C2 Building Science ReportXingYue0907
 
Report on Lot 2C2 - Malaysia [BSC]
Report on Lot 2C2 - Malaysia [BSC]Report on Lot 2C2 - Malaysia [BSC]
Report on Lot 2C2 - Malaysia [BSC]Esther Lau
 
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...AdnanSwat1
 
REPORT OF MESINIAGA, MALAYSIA
REPORT OF MESINIAGA, MALAYSIAREPORT OF MESINIAGA, MALAYSIA
REPORT OF MESINIAGA, MALAYSIATing Ting Kee
 
Building science report [singapore] final
Building science report [singapore] finalBuilding science report [singapore] final
Building science report [singapore] finalmiranazrin
 
Building science report [singapore] final
Building science report [singapore] finalBuilding science report [singapore] final
Building science report [singapore] finalJannah Jailani
 
Building science report [singapore]
Building science report [singapore] Building science report [singapore]
Building science report [singapore] Soh Shing
 
B.science report solaris
B.science report solarisB.science report solaris
B.science report solarisDaniel Yap
 
Park Royal Building Science Report
Park Royal Building Science ReportPark Royal Building Science Report
Park Royal Building Science ReportDexter Ng
 
The Pinnacle passive design strategies report
The Pinnacle passive design strategies reportThe Pinnacle passive design strategies report
The Pinnacle passive design strategies reportCarra Chin
 
B.science report pinnacle
B.science report pinnacleB.science report pinnacle
B.science report pinnacleDaniel Yap
 
IRJET- Green Technology Applications in Buildings
IRJET- Green Technology Applications in BuildingsIRJET- Green Technology Applications in Buildings
IRJET- Green Technology Applications in BuildingsIRJET Journal
 
Setia International Centre Analysis Report
Setia International Centre Analysis ReportSetia International Centre Analysis Report
Setia International Centre Analysis ReportCharlene Chan
 

Similar to Building science report [malaysia] (20)

Building science report [malaysia] final
Building science report [malaysia] finalBuilding science report [malaysia] final
Building science report [malaysia] final
 
Parkroyal on Pickering Analysis Report
Parkroyal on Pickering Analysis ReportParkroyal on Pickering Analysis Report
Parkroyal on Pickering Analysis Report
 
Parkroyalfinalforsubmission 140717004033-phpapp02
Parkroyalfinalforsubmission 140717004033-phpapp02Parkroyalfinalforsubmission 140717004033-phpapp02
Parkroyalfinalforsubmission 140717004033-phpapp02
 
Lot 2C2 Building Science Report
Lot 2C2 Building Science ReportLot 2C2 Building Science Report
Lot 2C2 Building Science Report
 
Report on Lot 2C2 - Malaysia [BSC]
Report on Lot 2C2 - Malaysia [BSC]Report on Lot 2C2 - Malaysia [BSC]
Report on Lot 2C2 - Malaysia [BSC]
 
Malaysia
MalaysiaMalaysia
Malaysia
 
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
:Design of principle Bioclimatic Technology Menara Mesiniaga Tower presentati...
 
REPORT OF MESINIAGA, MALAYSIA
REPORT OF MESINIAGA, MALAYSIAREPORT OF MESINIAGA, MALAYSIA
REPORT OF MESINIAGA, MALAYSIA
 
Building science report [singapore] final
Building science report [singapore] finalBuilding science report [singapore] final
Building science report [singapore] final
 
Building science report [singapore] final
Building science report [singapore] finalBuilding science report [singapore] final
Building science report [singapore] final
 
Building science report [singapore]
Building science report [singapore] Building science report [singapore]
Building science report [singapore]
 
B.science report solaris
B.science report solarisB.science report solaris
B.science report solaris
 
Park Royal Building Science Report
Park Royal Building Science ReportPark Royal Building Science Report
Park Royal Building Science Report
 
The Pinnacle passive design strategies report
The Pinnacle passive design strategies reportThe Pinnacle passive design strategies report
The Pinnacle passive design strategies report
 
B.science report pinnacle
B.science report pinnacleB.science report pinnacle
B.science report pinnacle
 
IRJET- Green Technology Applications in Buildings
IRJET- Green Technology Applications in BuildingsIRJET- Green Technology Applications in Buildings
IRJET- Green Technology Applications in Buildings
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
One city
One cityOne city
One city
 
Setia International Centre Analysis Report
Setia International Centre Analysis ReportSetia International Centre Analysis Report
Setia International Centre Analysis Report
 
A Facade Odyssey
A Facade OdysseyA Facade Odyssey
A Facade Odyssey
 

More from Soh Shing

Architecture Design Studio 5
Architecture Design Studio 5Architecture Design Studio 5
Architecture Design Studio 5Soh Shing
 
Building Science 2 (Project 2)
Building Science 2 (Project 2)Building Science 2 (Project 2)
Building Science 2 (Project 2)Soh Shing
 
Building Science 1 (Project 1)
Building Science 1 (Project 1)Building Science 1 (Project 1)
Building Science 1 (Project 1)Soh Shing
 
Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Soh Shing
 
Site Analysis & Precedent Studies
Site Analysis & Precedent StudiesSite Analysis & Precedent Studies
Site Analysis & Precedent StudiesSoh Shing
 
Project 1 part 2
Project 1  part 2Project 1  part 2
Project 1 part 2Soh Shing
 
Project1 part1stage2(sohyoushing)
Project1 part1stage2(sohyoushing)Project1 part1stage2(sohyoushing)
Project1 part1stage2(sohyoushing)Soh Shing
 
Theories of Architecture & Urbanism (Project 1part 1 stage 1)
Theories of Architecture & Urbanism (Project 1part 1 stage 1)Theories of Architecture & Urbanism (Project 1part 1 stage 1)
Theories of Architecture & Urbanism (Project 1part 1 stage 1)Soh Shing
 
B structure report project 2 (Individual)
B structure report project 2 (Individual)B structure report project 2 (Individual)
B structure report project 2 (Individual)Soh Shing
 
Building structure analysis report
Building structure analysis report Building structure analysis report
Building structure analysis report Soh Shing
 
Building structures report
Building structures report Building structures report
Building structures report Soh Shing
 
Building services report
Building services report Building services report
Building services report Soh Shing
 
Church of Seed Booklet
Church of Seed BookletChurch of Seed Booklet
Church of Seed BookletSoh Shing
 
Building construction report
Building construction reportBuilding construction report
Building construction reportSoh Shing
 
Precedent Studies
Precedent StudiesPrecedent Studies
Precedent StudiesSoh Shing
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]Soh Shing
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]Soh Shing
 
Sketch Journal
Sketch JournalSketch Journal
Sketch JournalSoh Shing
 

More from Soh Shing (20)

Architecture Design Studio 5
Architecture Design Studio 5Architecture Design Studio 5
Architecture Design Studio 5
 
Building Science 2 (Project 2)
Building Science 2 (Project 2)Building Science 2 (Project 2)
Building Science 2 (Project 2)
 
Building Science 1 (Project 1)
Building Science 1 (Project 1)Building Science 1 (Project 1)
Building Science 1 (Project 1)
 
Building Technology 1 (Project 1)
Building Technology 1 (Project 1)Building Technology 1 (Project 1)
Building Technology 1 (Project 1)
 
Site Analysis & Precedent Studies
Site Analysis & Precedent StudiesSite Analysis & Precedent Studies
Site Analysis & Precedent Studies
 
Project 1 part 2
Project 1  part 2Project 1  part 2
Project 1 part 2
 
Project1 part1stage2(sohyoushing)
Project1 part1stage2(sohyoushing)Project1 part1stage2(sohyoushing)
Project1 part1stage2(sohyoushing)
 
Theories of Architecture & Urbanism (Project 1part 1 stage 1)
Theories of Architecture & Urbanism (Project 1part 1 stage 1)Theories of Architecture & Urbanism (Project 1part 1 stage 1)
Theories of Architecture & Urbanism (Project 1part 1 stage 1)
 
B structure report project 2 (Individual)
B structure report project 2 (Individual)B structure report project 2 (Individual)
B structure report project 2 (Individual)
 
Case study
Case studyCase study
Case study
 
Building structure analysis report
Building structure analysis report Building structure analysis report
Building structure analysis report
 
Building structures report
Building structures report Building structures report
Building structures report
 
Building services report
Building services report Building services report
Building services report
 
Church of Seed Booklet
Church of Seed BookletChurch of Seed Booklet
Church of Seed Booklet
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 
Precedent Studies
Precedent StudiesPrecedent Studies
Precedent Studies
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]
 
History report final [pdf] [updated]
History report final [pdf] [updated]History report final [pdf] [updated]
History report final [pdf] [updated]
 
Sketch Journal
Sketch JournalSketch Journal
Sketch Journal
 

Recently uploaded

INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 

Recently uploaded (20)

INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 

Building science report [malaysia]

  • 1. 1 INTRODUCTION PAGE 2 CLIMATE DATA PAGE 12 WIND ANALYSIS PAGE 13 SUN ANALYSIS PAGE 14 PASSIVE GREEN DESIGN ANALYSIS PAGE 15 REFERENCE LIST PAGE 25 CONTENT PAGE
  • 2. 2 PROJECT: DIGI Technology Operations Centre LOCATION: Malaysia ARCHITECT: T. R. Hamzah & Yeang Sdn. Bhd. Picture 1: A perspective view of DIGI’s Technology Operations Centre. Designed by the T. R. Hamzah & Yeang Sdn. Bhd., it first started its construction in April 2009 and was completed in July 2010. The DiGi Technology Operation Centre is located in Subang High Tech Park, Shah Alam, Selangor. It stands at 23.5 metres in height, or 4-storeys tall, covering a total gross area of 12, 468 sq. m. The building is a data centre equipped with necessary facilities such as an administration office, reception lobby, telco tower and a service management centre. In the project’s brief, they stated that they had sought for a data centre based on ‘IT data centre uptime institute’ Tier 3 platform, with a possible increase to a Tier 4 security that includes substantial ecological features. The response to the brief was a design that optimizes the data centre footprint, providing effective drainage and waterproofing to protect sensitive equipment, reduce solar heat gain into the centre and allows for effective security measures. INTRODUCTION
  • 3. 3 Picture 2: Satellite view of DIGI Technology Operations Center Coordinates: 3.067780, 101.569256 Aim: The DIGI Technology Operations Centre aims to reduce the company’s carbon footprint by more than 40% while achieving operational efficiencies through the construction of this green building. Certification: DIGI Technology Operations Centre has ben certified Gold in the Green Building Index in Malaysia Green Features: The passive green features implemented in building includes: • Extensive vertical green walls that filters and improves the ambient indoor air quality and reduces solar heat gain
  • 4. 4 Picture 3: The vegetated green walls of the building Source : Image Courtesy © T.R. Hamzah & Yeang Sdn Bhd Picture 4: The vegetated vertical green wall of the building Source : Image Courtesy © T.R. Hamzah & Yeang Sdn Bhd
  • 5. 5 • Full-height Low-E curtain walls to provide maximum daylight penetration and enables energy efficient lighting systems Drawing 1: The low-e curtain walls enclosing the building Source : Image Courtesy © T.R. Hamzah & Yeang Sdn Bhd Diagram 1: Diagram showing the heat transfer through the low-e glass Source: Lee, 2014 • Regular shuttle service is provided between the building and the Batu Tiga KTM station
  • 6. 6 Picture 5: The nearest KTM station, Batu Tiga Source : http://en.wikipedia.org/wiki/Batu_Tiga_Komuter_station
  • 7. 7 ORTHOGRAPHIC DRAWINGS Drawing 2: Site Plan (nts) Drawing 3: Level 2 floor plan of the DIGI Technology Operations Centre
  • 8. 8 Drawing 4: Roof Plan of Digi Technology Operations Centre Drawing 5: North Western elevation of the building
  • 9. 9 Drawing 6: North Eastern elevation of the building Drawing 7: Section cut of the building Drawing 8: Section cut of the building
  • 10. 10 SITE PICTURES ( Copyright T.R. Hamzah & Yeang Sdn. Bhd. (2014) ) Picture 6: A perspective view of the DIGI Technology Operations Centre
  • 11. 11 Picture 7: Main entrance of the building Picture 8: Reception area of the building
  • 12. 12 Figure 1: Average temperature of Kuala Lumpur, Malaysia Diagram 2: Average Relative Humidity of Kuala Lumpur, Malaysia Referring to Firgure 1, it can be seen that the temperatures vary throughout the year. The first 6 months the temperature gradually decreases and increases for the next 6 months. The average temperature for Malaysia is 28o C. Referring to Diagram 2, the northwestern side of Kuala Lumpur has the highest level of humidity as compared to the other areas. CLIMATE DATA
  • 13. 13 Diagram 3: A wind rose diagram for Kuala Lumpur, Malaysia Diagram 4: A diagram showing the direction of the prevailing winds Referring to Diagram 3, the highest frequency of wind comes from the East and Southeast of Kuala Lumpur. The highest wind speed for both directions is 10 km/h. It can be seen the orientation of the building is angled to maximize ventilation around the building. WIND ANALYSIS
  • 14. 14 Diagram 5: A sun path diagram for Kuala Lumpur, Malaysia Diagram 6: Optimum orientation of a building in Kuala Lumpur, Malaysia Referring to Diagram 6, the optimum orientation of a building to prevent overheating should be where the longest façade faces the North East, indicated by the blue arrow. SUN ANALYSIS
  • 15. 15 1. VEGETATED GREEN WALL a) Description Diagram 9: Diagram showing the green wall surrounding the building Picture 9: Picture showing the Southeastern façade with the green wall PASSIVE GREEN DESIGN ANALYSIS
  • 16. 16 Drawing 10: A diagram showing the Northeastern façade with the green wall Drawing 11: A diagram showing the Northwestern façade with the green wall The green wall façade has a lot of biological advantages that it provides to the building while functioning as a act living art installation. The northeast, northwest and southeast façades, a large green wall is designed in a zigzag manner across the building from the top to the bottom, creating a unique attractive art installation, and at the same time protecting the entire building with its biological advantages.
  • 17. 17 b) Thermal advantages Diagram 7: A diagram showing the thermal and solar radiation pathways Diagram 8: Temperature zoning within the building The green wall surrounding the façades of the DIGI building causes thermal reduction by trapping a layer of air within the plant mass. This reduces the ambient temperature via evaporation shading. It also functions as a buffer zone during hot weathers and cold weathers (e.g: rainy seasons). Not only is the building protected from overheating, but also the surrounding air quality is improved due to the green wall absorbing carbon dioxide and releasing oxygen through photosynthesis. Referring to Diagram 8, heat has to be kept
  • 18. 18 away from the data centre to avoid damage to the equipment. This is done by placing it in the centre of the building away from sources of heat. c) Type of plant used Picture 10: A close up of the green wall on the North Eastern façade The DIGI Technology Operations Centre uses turf grass for the green wall due to it having several advantages. Turf grass is larger, taller and they grow in bulk making it easier to flourish. They also provide some sort of acoustic insulation from the outside as well. The DIGI building is located in an industrial area and due to it being an office building, acoustic insulation is necessary. Evapotranspiration takes place thus reducing the heat entering the building, regulating the interior temperatures and increasing the human comfort. The turf grass also protects the building form ultraviolet rays as well (Bliss & Everett, 2014).
  • 19. 19 d) Evapotranspiration Diagram9: A diagram showing the effects of evapotranspiration A wet object in this case turf grass will decrease in temperature due to the effect of evaporation due to the molecular kinetics, where the faster water molecules escape and become a part of the air. Since those that escape has more energy than the average, the process decreases the temperature of the water that escapes the object making the environment cooler ( “How Does”, n.d.). The green wall is placed on the north-east and north-west façade which, due to the building's orientation, receives the most sunlight at 9am until 4pm, providing heat to the turf grass, thus catalyzing the water molecules on the turf grass to undergo evaporation, This in turn makes the environment around the building cooler as the evaporated water molecules combine with the air molecules. The designers take advantage of this process by placing the ACMV’s, which take in fresh air close to the green walls. Not only will the building ventilate cool air, it improves the indoor air quality as well (Chua, et al., n.d.).
  • 20. 20 e) Acoustic Barrier Diagram 10: A diagram stating the sources of noise in the area Diagram 11: A diagram showing the reverberation of sound Green walls also have an added benefit to the building occupants by providing a form of acoustic insulation due to the plants ability to absorb sound (“Green Wall Benefits”, 2010). The DiGi Technology Operation Centre is located in an industrial area where large lorries and trucks frequent. Therefore, sound insulation is needed. It can be seen that the green walls have been placed strategically near the main sources of noise, referring to Diagram 13.
  • 21. 21 2. BUILDING ORIENTATION a) MS1525 Requirements Diagram 12: Diagram showing the staircases and service rooms In reference to the MS1525 (2007) requirements, the best orientation for buildings in equatorial climates, have their long directional axis facing North- South, minimizing the East-West orientation. It can be seen that the DIGI Technology Operation Centre is angled in such a way that the longest façade unfortunately have a East-West orientation. In order to reduce the solar heat gain, service areas such as staircases and service ducts are located near the external walls on the east-west façades. The rooftop also holds several service rooms to further reduce the solar heat gain (Aun, 2009). b) Induction of daylight Diagram 13: North Eastern and North Western façade at 9am
  • 22. 22 Diagram 14: South Eastern and South Western façade at 4pm Referring to the above diagrams, it can be seen that the Northeastern façade receives the most sunlight at 9am until 4pm when it is shaded. The South Eastern facade is shaded during the day until 4pm when it is fully exposed to sunlight. Picture 11: Natural daylight illuminates the reception area of the building
  • 23. 23 Picture 12: Natural daylight brightens up the office area As seen in the above images, the interior spaces of the building are lit up with natural daylighting especially the spaces in the Northeastern side during 9am to 4pm, and the Southeastern spaces from 4pm onwards. The curtain wall at Northeast façade allows sunlight to illuminate the main office areas during working hours from 9am to 4pm, when the façade receives the maximum daylight exposure. c) Optimum Building Orientation Diagram 15: Optimum building orientation for the DiGi Technology Operation Centre The longer façade of the Digi Technology Operation Centre building is not orientated towards the optimum direction, which is to the North East.
  • 24. 24 However, the building is perhaps to be orientated in such manner as the main entrance as well as the main office area is situated there. This is as well to avoid direct sunlight to penetrate in during morning and afternoon, which is the time with the most sunlight. As to compensate for the length of façade facing the optimum direction, the North East side of the building has been installed with glazed glass with curtain wall system which aid in the fully daylight penetration as well as an efficient lighting scheme to the office area. Besides that, short overhang are placed on this area for a better day lighting system. Drawing 12: DiGi Technology Operations Centre façade with curtain walling
  • 25. 25 Aun, C. S. (Director) (2009). Green Building Index - MS1525. Applying MS1525:2007 Code of Practice on Energy Efficiency and Use of Renewable Energy for Non-Residential Buildings. Lecture conducted from Persatuan Arkitek Malaysia, Kuala Lumpur. Bliss, H., & Everett, W. (2014). What Is Turf Grass? Retrieved April 30, 2014, from http://www.wisegeek.com/what-is-turf-grass.html Chua, Z.Y., Chan, S.Q., Tan T., Ong, K., Hon, Y. M. Y., & Lim J. Z. ( n.d.) [Presentation Board]. Digi technology operation centre. Green Wall Benefits. (2010). Retrieved April 30, 2014, from http://www.greenroofs.org/index.php/about/green-wall-benefits Grondzik, W. T., Kowk, A. G., Stein, B., & Reynolds, J. S. (2010). Mechanical and electrical equipment for buildings. Hoboken, N.J: Wiley. Living Walls Improve Indoor Air Quality, Save Energy and Add Life to Your Home - Green Home Gnome. (n.d.). Retrieved April 30, 2014, from http://www.greenhomegnome.com/living-walls/ London's Famous Gherkin Building Goes Green - Literally | Inhabitat - Sustainable Design Innovation, Eco Architecture, Green Building. (n.d.). Retrieved April 30, 2014, from http://inhabitat.com/gherkin-gets-a-green-roof/ REFERENCE LIST
  • 26. 26 Singal, S. (2014). AECCafe.com - ArchShowcase - DIGI Technology Operation Centre in Shah Alam, Selangor, Malaysia by T.R. Hamzah & Yeang Sdn Bhd. Retrieved April 28, 2014, from http://www10.aeccafe.com/blogs/arch- showcase/2014/03/29/digi-technology-operation-centre-in-shah-alam-selangor- malaysia-by-t-r-hamzah-yeang-sdn-bhd/?interstitial_displayed=Yes TR Hamzah & Yeang Sdn. Bhd. (n.d.). Retrieved April 28, 2014, from http://www.trhamzahyeang.com/project/large-buildings/Digi_01.html