What is CMMI? 
 CMMI (Capability Maturity Model Integration) is a proven 
industry framework to improve product quality and 
development efficiency for both hardware and software 
 Sponsored by US Department of Defence in cooperation 
with Carnegie Mellon University and the Software 
Engineering Institute (SEI) 
 Many companies have been involved in CMMI definition 
such as Motorola and Ericsson 
 CMMI has been established as a model to improve business 
results 
 CMMI, staged, uses 5 levels to describe the maturity of the 
organization, same as predecessor CMM 
 Vastly improved version of the CMM 
 Emphasis on business needs, integration and 
institutionalization
How can CMMI help? 
 CMMI provides a way to focus and manage hardware and 
software development from product inception through 
deployment and maintenance. 
 ISO/TL9000 are still required. CMMI interfaces well with 
them. CMMI and TL are complementary - both are needed 
since they address different aspects. 
 ISO/TL9000 is a process compliance standard 
 CMMI is a process improvement model 
 Behavioral changes are needed at both management and staff 
levels. Examples: 
 Increased personal accountability 
 Tighter links between Product Management, Development, 
SCN, etc. 
 Initially a lot of investment required – but, if properly 
managed, we will be more efficient and productive while 
turning out products with consistently higher quality.
CMMI Models within the Framework 
 Models: 
 Systems Engineering + Software Engineering (SE/SW) 
 Systems Engineering + Software Engineering + Integrated Product and 
Process Development (IPPD) 
 Systems Engineering + Software Engineering + Integrated Product and 
Process Development + Supplier Sourcing (SS) 
 Software Engineering only 
 Representation options: 
 Staged 
 Continuous 
 The CMMI definition of “Systems Engineering” - 
“The interdisciplinary approach governing the total technical and 
managerial effort required to transform a set of customer needs, expectations 
and constraints into a product solution and to support that solution 
throughout the product’s life.” This includes both hardware and 
software.
CMMI Staged Representation - 5 Maturity Levels 
Level 5 
Level 1 
Initial 
Level 3 
Level 4 
Processes are unpredictable, poorly controlled, reactive. 
Level 2 
Managed 
Processes are planned, documented, performed, 
monitored, and controlled at the project level. Often 
reactive. 
Defined 
Processes are well characterized and 
understood. Processes, standards, 
procedures, tools, etc. are defined at the 
organizational (Organization X ) level. 
Proactive. 
Quantitatively 
Managed 
Processes are controlled using 
statistical and other quantitative 
techniques. 
Optimizing 
Process performance 
continually improved through 
incremental and innovative 
technological improvements.
Maturity Level 1 
Initial 
 Maturity Level 1 deals with performed processes. 
 Processes are unpredictable, poorly controlled, reactive. 
 The process performance may not be stable and may not meet 
specific objectives such as quality, cost, and schedule, but 
useful work can be done.
Maturity Level 2 
Managed at the Project Level 
 Maturity Level 2 deals with managed processes. 
 A managed process is a performed process that is also: 
 Planned and executed in accordance with policy 
 Employs skilled people 
 Adequate resources are available 
 Controlled outputs are produced 
 Stakeholders are involved 
 The process is reviewed and evaluated for adherence to 
requirements 
 Processes are planned, documented, performed, monitored, 
and controlled at the project level. Often reactive. 
 The managed process comes closer to achieving the specific 
objectives such as quality, cost, and schedule.
Maturity Level 3 
Defined at the Organization Level 
 Maturity Level 3 deals with defined processes. 
 A defined process is a managed process that: 
 Well defined, understood, deployed and executed across the 
entire organization. Proactive. 
 Processes, standards, procedures, tools, etc. are defined at the 
organizational (Organization X ) level. Project or local 
tailoring is allowed, however it must be based on the 
organization’s set of standard processes and defined per the 
organization’s tailoring guidelines. 
 Major portions of the organization cannot “opt out.”
Behaviors at the Five Levels 
Maturity Level Process Characteristics Behaviors 
Optimizing 
Quantitatively 
Managed 
Defined 
Managed 
Initial 
Focus is on continuous 
quantitative improvement 
Process is measured 
and controlled 
Process is characterized 
for the organization and 
is proactive 
Process is characterized 
for projects and is often 
reactive 
Process is unpredictable, 
poorly controlled, and 
reactive 
Focus on "fire prevention"; 
improvement anticipated and 
desired, and impacts assessed. 
Greater sense of teamwork and inter-dependencies 
Reliance on defined process. 
People understand, support and 
follow the process. 
Over reliance on experience of good 
people – when they go, the process 
goes. “Heroics.” 
Focus on "fire fighting"; 
effectiveness low – frustration high.
CMMI Components 
 Within each of the 5 Maturity Levels, there are basic functions 
that need to be performed – these are called Process Areas (PAs). 
 For Maturity Level 2 there are 7 Process Areas that must be 
completely satisfied. 
 For Maturity Level 3 there are 11 Process Areas that must be 
completely satisfied. 
 Given the interactions and overlap, it becomes more efficient to 
work the Maturity Level 2 and 3 issues concurrently. 
 Within each PA there are Goals to be achieved and within each 
Goal there are Practices, work products, etc. to be followed that 
will support each of the Goals.
Maturity Level Project Managment Engineering Process Management Support 
5 
Optimizing 
Organizational Innovation & Deployment Causal Analysis & Resolution 
4 
Quantitatively 
Managed 
Quantitative Project Mngt Organizational Process Performance 
3 
Defined 
Integrated Project Mngt 
Risk Management 
Requirements Development 
Technical Solution 
Product Integration 
Verification 
Validation 
Organizational Process Focus 
Organizational Process Definition 
Organizational Training 
Decision Analysis & Resolution 
2 
Managed 
Project Planning 
Project Monitoring & 
Control 
Supplier Agreement Mngt 
Requirements Mngt Measurement & Analysis 
Process & Product Quality Assurance 
Configuration Mngt 
1 
Initial 
CMMI Process Areas
CMMI Terminology & Structure 
Maturity Levels (1 - 5) 
Process Area 1 Process Area 2 
Process Area n 
Generic 
Goals 
Common Features 
Generic 
Practices 
Verifying 
Implementation 
Specific 
Goals 
Specific 
Practices 
Ability 
to Perform 
Directing 
Implementation 
Commitment 
Required Required 
Sub practices, typical work products, 
discipline amplifications, generic 
practice elaborations, goal and 
practice titles, goal and practice notes, 
and references 
to Perform 
Sub practices, typical work products, 
discipline amplifications, generic 
practice elaborations, goal and 
practice titles, goal and practice notes, 
and references 
Required. Specific for 
each process area. 
Required. Common 
across all process areas.
Example 
For the Requirements Management Process Area: 
An example Goal (required): 
“Manage Requirements” 
An example Practice to support the Goal (required): 
“Maintain bi-directional traceability of requirements” 
Examples (suggested, but not required) of typical Work 
Products might be 
Requirements traceability matrix or 
Requirements tracking system

More Related Content

What's hot

Software Quality Challenge
Software Quality ChallengeSoftware Quality Challenge
Software Quality Challenge
Helmy Satria
 
Software quality
Software qualitySoftware quality
Software quality
jagadeesan
 
Ch 4 components of the sqa system
Ch 4 components of the sqa systemCh 4 components of the sqa system
Ch 4 components of the sqa system
Kittitouch Suteeca
 

What's hot (20)

CMMI an Overview
CMMI an OverviewCMMI an Overview
CMMI an Overview
 
Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)
 
CMMI
CMMICMMI
CMMI
 
CMM
CMMCMM
CMM
 
Capability Maturity Model Integartion
Capability Maturity Model IntegartionCapability Maturity Model Integartion
Capability Maturity Model Integartion
 
Capability Maturity Model Integration
Capability Maturity Model IntegrationCapability Maturity Model Integration
Capability Maturity Model Integration
 
CMMi
CMMiCMMi
CMMi
 
Software quality assurance
Software quality assuranceSoftware quality assurance
Software quality assurance
 
Spice
SpiceSpice
Spice
 
Software Testing Strategies ,Validation Testing and System Testing.
Software Testing Strategies ,Validation Testing and System Testing.Software Testing Strategies ,Validation Testing and System Testing.
Software Testing Strategies ,Validation Testing and System Testing.
 
Capability maturity model
Capability maturity modelCapability maturity model
Capability maturity model
 
Software Quality Analyst and Software Quality Management
Software Quality Analyst and Software Quality ManagementSoftware Quality Analyst and Software Quality Management
Software Quality Analyst and Software Quality Management
 
Unit I Software Testing and Quality Assurance
Unit I Software Testing and Quality AssuranceUnit I Software Testing and Quality Assurance
Unit I Software Testing and Quality Assurance
 
Software Quality Challenge
Software Quality ChallengeSoftware Quality Challenge
Software Quality Challenge
 
Istqb chapter 5
Istqb chapter 5Istqb chapter 5
Istqb chapter 5
 
Software quality
Software qualitySoftware quality
Software quality
 
Capability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptxCapability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptx
 
Ch 4 components of the sqa system
Ch 4 components of the sqa systemCh 4 components of the sqa system
Ch 4 components of the sqa system
 
Cmmi
CmmiCmmi
Cmmi
 
Ch 2 what is software quality
Ch 2 what is software qualityCh 2 what is software quality
Ch 2 what is software quality
 

Viewers also liked

Software Requirments
Software RequirmentsSoftware Requirments
Software Requirments
Dhunsyam Daji
 

Viewers also liked (10)

Cmmi process overview
Cmmi process overviewCmmi process overview
Cmmi process overview
 
Beit 381 se lec 14 - 35 - 12 mar21 - sqa - iso and cmm
Beit 381 se lec 14 - 35  - 12 mar21 - sqa - iso and cmmBeit 381 se lec 14 - 35  - 12 mar21 - sqa - iso and cmm
Beit 381 se lec 14 - 35 - 12 mar21 - sqa - iso and cmm
 
Cmmi - An overview
Cmmi - An overviewCmmi - An overview
Cmmi - An overview
 
NADRA pakistan
NADRA pakistanNADRA pakistan
NADRA pakistan
 
CMMi for Services lecture
CMMi for Services lectureCMMi for Services lecture
CMMi for Services lecture
 
Software Requirments
Software RequirmentsSoftware Requirments
Software Requirments
 
ITIL implementation and Service Management Best Practices – useful informatio...
ITIL implementation and Service Management Best Practices – useful informatio...ITIL implementation and Service Management Best Practices – useful informatio...
ITIL implementation and Service Management Best Practices – useful informatio...
 
Growing pains scaling agile in service delivery LAST Conf 2014
Growing pains  scaling agile in service delivery  LAST Conf 2014Growing pains  scaling agile in service delivery  LAST Conf 2014
Growing pains scaling agile in service delivery LAST Conf 2014
 
Capability Maturity Model
Capability Maturity ModelCapability Maturity Model
Capability Maturity Model
 
Role of IT in Retail Industry
Role of IT in Retail IndustryRole of IT in Retail Industry
Role of IT in Retail Industry
 

Similar to Capability Maturity Model Integration

QAI - Cmmi Overview - Induction ppt
QAI - Cmmi Overview - Induction pptQAI - Cmmi Overview - Induction ppt
QAI - Cmmi Overview - Induction ppt
QAIites
 
9.process improvement chapter 9
9.process improvement chapter 99.process improvement chapter 9
9.process improvement chapter 9
Warui Maina
 
Software process improvement.ppt
Software process improvement.pptSoftware process improvement.ppt
Software process improvement.ppt
ImXaib
 

Similar to Capability Maturity Model Integration (20)

Cmmi
CmmiCmmi
Cmmi
 
Cmmi (2)
Cmmi (2)Cmmi (2)
Cmmi (2)
 
CMMi level 3 presentation
CMMi level 3 presentationCMMi level 3 presentation
CMMi level 3 presentation
 
QAI - Cmmi Overview - Induction ppt
QAI - Cmmi Overview - Induction pptQAI - Cmmi Overview - Induction ppt
QAI - Cmmi Overview - Induction ppt
 
Ch28
Ch28Ch28
Ch28
 
Software quality system - Quality Engineering
Software quality system - Quality EngineeringSoftware quality system - Quality Engineering
Software quality system - Quality Engineering
 
Getting Started With CMMi level 3
Getting Started With CMMi level 3Getting Started With CMMi level 3
Getting Started With CMMi level 3
 
Achieve cmmi level 5 maturity
Achieve cmmi level 5 maturityAchieve cmmi level 5 maturity
Achieve cmmi level 5 maturity
 
9.process improvement chapter 9
9.process improvement chapter 99.process improvement chapter 9
9.process improvement chapter 9
 
Cmmi
CmmiCmmi
Cmmi
 
Software process improvement.ppt
Software process improvement.pptSoftware process improvement.ppt
Software process improvement.ppt
 
What is capability maturity model
What is capability maturity modelWhat is capability maturity model
What is capability maturity model
 
Making Smart Choices: Strategies for CMMI Adoption
Making Smart Choices: Strategies for CMMI AdoptionMaking Smart Choices: Strategies for CMMI Adoption
Making Smart Choices: Strategies for CMMI Adoption
 
Pharmaceutical Quality Management System
Pharmaceutical Quality Management SystemPharmaceutical Quality Management System
Pharmaceutical Quality Management System
 
Product Development Capability Maturity Model PowerPoint Presentation Slides
Product Development Capability Maturity Model PowerPoint Presentation SlidesProduct Development Capability Maturity Model PowerPoint Presentation Slides
Product Development Capability Maturity Model PowerPoint Presentation Slides
 
CMMI Certification (Level 1-5)
CMMI Certification (Level 1-5)CMMI Certification (Level 1-5)
CMMI Certification (Level 1-5)
 
CMMI.pdf
CMMI.pdfCMMI.pdf
CMMI.pdf
 
Introduction To Cmm1
Introduction To Cmm1Introduction To Cmm1
Introduction To Cmm1
 
Process improvement & service oriented software engineering
Process improvement & service oriented software engineeringProcess improvement & service oriented software engineering
Process improvement & service oriented software engineering
 
Building Quality Into Your Technical Communications Department
Building Quality Into Your Technical Communications DepartmentBuilding Quality Into Your Technical Communications Department
Building Quality Into Your Technical Communications Department
 

More from AAKASH S

A secure qos distributed routing protocol for hybrid wireless networks
A secure qos distributed routing protocol for hybrid wireless networksA secure qos distributed routing protocol for hybrid wireless networks
A secure qos distributed routing protocol for hybrid wireless networks
AAKASH S
 
Enhanced Adaptive ACKnowledgment (EAACK)
Enhanced Adaptive ACKnowledgment (EAACK)Enhanced Adaptive ACKnowledgment (EAACK)
Enhanced Adaptive ACKnowledgment (EAACK)
AAKASH S
 
CP7301 Software Process and Project Management notes
CP7301 Software Process and Project Management   notesCP7301 Software Process and Project Management   notes
CP7301 Software Process and Project Management notes
AAKASH S
 
Network simulator 2
Network simulator 2Network simulator 2
Network simulator 2
AAKASH S
 
A QoS oriented distributed routing protocol for Hybrid Wireless Network :Firs...
A QoS oriented distributed routing protocol for Hybrid Wireless Network :Firs...A QoS oriented distributed routing protocol for Hybrid Wireless Network :Firs...
A QoS oriented distributed routing protocol for Hybrid Wireless Network :Firs...
AAKASH S
 
AASR Authenticated Anonymous Secure Routing for MANETs in Adversarial Environ...
AASR Authenticated Anonymous Secure Routing for MANETs in Adversarial Environ...AASR Authenticated Anonymous Secure Routing for MANETs in Adversarial Environ...
AASR Authenticated Anonymous Secure Routing for MANETs in Adversarial Environ...
AAKASH S
 
Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...
Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...
Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...
AAKASH S
 

More from AAKASH S (17)

Detecting of routng misbehavion in hybrid wireless networks used and acknowle...
Detecting of routng misbehavion in hybrid wireless networks used and acknowle...Detecting of routng misbehavion in hybrid wireless networks used and acknowle...
Detecting of routng misbehavion in hybrid wireless networks used and acknowle...
 
A secure qos distributed routing protocol for hybrid wireless networks
A secure qos distributed routing protocol for hybrid wireless networksA secure qos distributed routing protocol for hybrid wireless networks
A secure qos distributed routing protocol for hybrid wireless networks
 
Enhanced Adaptive ACKnowledgment (EAACK)
Enhanced Adaptive ACKnowledgment (EAACK)Enhanced Adaptive ACKnowledgment (EAACK)
Enhanced Adaptive ACKnowledgment (EAACK)
 
A SECURE QOS ROUTING PROTCOL FOR HYBRID WIRELESS NETWORKS
A SECURE QOS ROUTING PROTCOL FOR HYBRID WIRELESS NETWORKSA SECURE QOS ROUTING PROTCOL FOR HYBRID WIRELESS NETWORKS
A SECURE QOS ROUTING PROTCOL FOR HYBRID WIRELESS NETWORKS
 
Intrusion detection system
Intrusion detection systemIntrusion detection system
Intrusion detection system
 
QOD PHASE-1 FINAL PPT
QOD PHASE-1 FINAL PPTQOD PHASE-1 FINAL PPT
QOD PHASE-1 FINAL PPT
 
QOD routing protocols : phase 1 ppt
QOD routing  protocols : phase 1 pptQOD routing  protocols : phase 1 ppt
QOD routing protocols : phase 1 ppt
 
Qo s oriented distributed routing protocols : anna university 2nd review ppt
Qo s   oriented  distributed routing  protocols : anna university 2nd review pptQo s   oriented  distributed routing  protocols : anna university 2nd review ppt
Qo s oriented distributed routing protocols : anna university 2nd review ppt
 
CP7301 Software Process and Project Management notes
CP7301 Software Process and Project Management   notesCP7301 Software Process and Project Management   notes
CP7301 Software Process and Project Management notes
 
Network simulator 2
Network simulator 2Network simulator 2
Network simulator 2
 
Network simulator 2
Network simulator 2Network simulator 2
Network simulator 2
 
Network simulator 2
Network simulator 2Network simulator 2
Network simulator 2
 
OSI model (7 LAYER )
OSI model (7 LAYER )OSI model (7 LAYER )
OSI model (7 LAYER )
 
A QoS oriented distributed routing protocol for Hybrid Wireless Network :Firs...
A QoS oriented distributed routing protocol for Hybrid Wireless Network :Firs...A QoS oriented distributed routing protocol for Hybrid Wireless Network :Firs...
A QoS oriented distributed routing protocol for Hybrid Wireless Network :Firs...
 
AASR Authenticated Anonymous Secure Routing for MANETs in Adversarial Environ...
AASR Authenticated Anonymous Secure Routing for MANETs in Adversarial Environ...AASR Authenticated Anonymous Secure Routing for MANETs in Adversarial Environ...
AASR Authenticated Anonymous Secure Routing for MANETs in Adversarial Environ...
 
Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...
Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...
Meeting Deadlines of Scientific Workflows in Public Clouds with Tasks Replica...
 
Hybrid wireless network -0th review
Hybrid wireless network -0th review Hybrid wireless network -0th review
Hybrid wireless network -0th review
 

Recently uploaded

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 

Recently uploaded (20)

Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 

Capability Maturity Model Integration

  • 1. Capability Maturity Model Integration Quality Frame works
  • 2. What is CMMI?  CMMI (Capability Maturity Model Integration) is a proven industry framework to improve product quality and development efficiency for both hardware and software  Sponsored by US Department of Defence in cooperation with Carnegie Mellon University and the Software Engineering Institute (SEI)  Many companies have been involved in CMMI definition such as Motorola and Ericsson  CMMI has been established as a model to improve business results  CMMI, staged, uses 5 levels to describe the maturity of the organization, same as predecessor CMM  Vastly improved version of the CMM  Emphasis on business needs, integration and institutionalization
  • 3. How can CMMI help?  CMMI provides a way to focus and manage hardware and software development from product inception through deployment and maintenance.  ISO/TL9000 are still required. CMMI interfaces well with them. CMMI and TL are complementary - both are needed since they address different aspects.  ISO/TL9000 is a process compliance standard  CMMI is a process improvement model  Behavioral changes are needed at both management and staff levels. Examples:  Increased personal accountability  Tighter links between Product Management, Development, SCN, etc.  Initially a lot of investment required – but, if properly managed, we will be more efficient and productive while turning out products with consistently higher quality.
  • 4. CMMI Models within the Framework  Models:  Systems Engineering + Software Engineering (SE/SW)  Systems Engineering + Software Engineering + Integrated Product and Process Development (IPPD)  Systems Engineering + Software Engineering + Integrated Product and Process Development + Supplier Sourcing (SS)  Software Engineering only  Representation options:  Staged  Continuous  The CMMI definition of “Systems Engineering” - “The interdisciplinary approach governing the total technical and managerial effort required to transform a set of customer needs, expectations and constraints into a product solution and to support that solution throughout the product’s life.” This includes both hardware and software.
  • 5. CMMI Staged Representation - 5 Maturity Levels Level 5 Level 1 Initial Level 3 Level 4 Processes are unpredictable, poorly controlled, reactive. Level 2 Managed Processes are planned, documented, performed, monitored, and controlled at the project level. Often reactive. Defined Processes are well characterized and understood. Processes, standards, procedures, tools, etc. are defined at the organizational (Organization X ) level. Proactive. Quantitatively Managed Processes are controlled using statistical and other quantitative techniques. Optimizing Process performance continually improved through incremental and innovative technological improvements.
  • 6. Maturity Level 1 Initial  Maturity Level 1 deals with performed processes.  Processes are unpredictable, poorly controlled, reactive.  The process performance may not be stable and may not meet specific objectives such as quality, cost, and schedule, but useful work can be done.
  • 7. Maturity Level 2 Managed at the Project Level  Maturity Level 2 deals with managed processes.  A managed process is a performed process that is also:  Planned and executed in accordance with policy  Employs skilled people  Adequate resources are available  Controlled outputs are produced  Stakeholders are involved  The process is reviewed and evaluated for adherence to requirements  Processes are planned, documented, performed, monitored, and controlled at the project level. Often reactive.  The managed process comes closer to achieving the specific objectives such as quality, cost, and schedule.
  • 8. Maturity Level 3 Defined at the Organization Level  Maturity Level 3 deals with defined processes.  A defined process is a managed process that:  Well defined, understood, deployed and executed across the entire organization. Proactive.  Processes, standards, procedures, tools, etc. are defined at the organizational (Organization X ) level. Project or local tailoring is allowed, however it must be based on the organization’s set of standard processes and defined per the organization’s tailoring guidelines.  Major portions of the organization cannot “opt out.”
  • 9. Behaviors at the Five Levels Maturity Level Process Characteristics Behaviors Optimizing Quantitatively Managed Defined Managed Initial Focus is on continuous quantitative improvement Process is measured and controlled Process is characterized for the organization and is proactive Process is characterized for projects and is often reactive Process is unpredictable, poorly controlled, and reactive Focus on "fire prevention"; improvement anticipated and desired, and impacts assessed. Greater sense of teamwork and inter-dependencies Reliance on defined process. People understand, support and follow the process. Over reliance on experience of good people – when they go, the process goes. “Heroics.” Focus on "fire fighting"; effectiveness low – frustration high.
  • 10. CMMI Components  Within each of the 5 Maturity Levels, there are basic functions that need to be performed – these are called Process Areas (PAs).  For Maturity Level 2 there are 7 Process Areas that must be completely satisfied.  For Maturity Level 3 there are 11 Process Areas that must be completely satisfied.  Given the interactions and overlap, it becomes more efficient to work the Maturity Level 2 and 3 issues concurrently.  Within each PA there are Goals to be achieved and within each Goal there are Practices, work products, etc. to be followed that will support each of the Goals.
  • 11. Maturity Level Project Managment Engineering Process Management Support 5 Optimizing Organizational Innovation & Deployment Causal Analysis & Resolution 4 Quantitatively Managed Quantitative Project Mngt Organizational Process Performance 3 Defined Integrated Project Mngt Risk Management Requirements Development Technical Solution Product Integration Verification Validation Organizational Process Focus Organizational Process Definition Organizational Training Decision Analysis & Resolution 2 Managed Project Planning Project Monitoring & Control Supplier Agreement Mngt Requirements Mngt Measurement & Analysis Process & Product Quality Assurance Configuration Mngt 1 Initial CMMI Process Areas
  • 12. CMMI Terminology & Structure Maturity Levels (1 - 5) Process Area 1 Process Area 2 Process Area n Generic Goals Common Features Generic Practices Verifying Implementation Specific Goals Specific Practices Ability to Perform Directing Implementation Commitment Required Required Sub practices, typical work products, discipline amplifications, generic practice elaborations, goal and practice titles, goal and practice notes, and references to Perform Sub practices, typical work products, discipline amplifications, generic practice elaborations, goal and practice titles, goal and practice notes, and references Required. Specific for each process area. Required. Common across all process areas.
  • 13. Example For the Requirements Management Process Area: An example Goal (required): “Manage Requirements” An example Practice to support the Goal (required): “Maintain bi-directional traceability of requirements” Examples (suggested, but not required) of typical Work Products might be Requirements traceability matrix or Requirements tracking system