PREFABRICATION AND MODULAR
COORDINATION
PRESENTED BY
SREE
1.1PREFABRICATION
Prefabricationis the practice of assembling components of a structure in
a factory or other manufacturing site, and transporting complete assemblies or sub-
assemblies to the construction site where the structure is to be located.
1.2METHODS OF CONSTRUCTION
CONVENTIONAL METHOD PREFABRICATION
CONSTRUCTION
The conventional method of building
is to transport bricks, timber ,cement,
sand ,steel and construction
aggregate, etc. to the site and to
constructthe house onsite from these
materials
Prefabrication is the practice of
assembling components of a structure
in a factory or other manufacturing site,
and transporting complete assemblies
or sub-assemblies to the construction
site where the structure is to be located.
The term is used to distinguish this
process from the more conventional
construction practice of transporting the
basic materials to the construction site
where all assembly is carried out.
1.3STAGES INVOLVED IN PREFABRICATION
1. The structure is divided into number of units.
2. The different units are precast in permanent factories(plant fabrication) or
temporary plants (site prefabrication).
3. Transported to the site.
4. Hoisted set into their final places and assembled to form a complete
structure.
1.4PLANS AND SPECIFICATIONS (IS15916)
• Drawings shall describe the elements and structures and assembly including
all required data of physical properties of componentmaterials (material
specification)
• Details of connection joints
• Site or shop location of services (installation of piping, wiring and other
accessories)
• Location of inserts (doors, windows and ventilators)
• Handling arrangements to avoid failure
1.5MODULAR COORDINATION
• Modular coordination is a conceptof coordination of dimension and space in
which buildings and components are dimensioned and positioned in terms of
basic unit or module.
• The basic module is known as 1M which is equivalent to 100mm.
• It is internationally accepted by the International Standard Organisation and
many other countries including Malaysia.
1.6BACKGROUND
• Modular coordination was first explored as an aid to design shortly after the
introduction of prefabrication in the construction industry in the
industrialization. It was conceived as a further step in the development of
systematic design and construction of the building.
• This subject has been discussed and attempted in an actual building
experiment in practically every developed country.
• Modular coordination was first studied in Singapore in the early seventies.
The housing and development board implemented the conceptin 1973 in the
new generation flats.
Prefabrication and standard components were subsequently introduced.
Modular blocks and bricks were introduced in 1983. There are merits to
extend the use of modular coordination in other components as well.
1.7AIMS AND OBJECTIVES OF MODULAR COORDINATION
 The principle objectives of modular system are to provide practical and
coherent solutions for coordination of the position and dimensions of
elements, components and space in building design.
 This process can contribute to increase design freedom and improved
balance between quality and cost in manufacture and construction.
1.8BASIC PRINCIPLE OF MODULAR COORDINATION
 The main purpose of Modular Coordination is to achieve the Dimensional
Compatibility between the Building Dimensions, Span or Spaces and the
Size of Components and Equipments by using related Modular Dimensions.
 Modular Coordination generally provides the easy grasped layout of the
positioning of the building components in relation to each other and to the
building and facilitates collaboration between planners, manufactures,
distributors and contractors.
1.9STANDARD RULES IN MODULAR COORDINATION
 Modular Coordination is essentially based on the use of modules (basic
module and multi-modules) and a reference system to define coordinating
spaces and zones for building elements and for the components which form
them.
There are standard rules to abide by
- Rules for locating building elements within the reference system;
- Rules for sizing building components in order to determine their work sizes;
- Rules for defining preferred sizes for building components and coordinating
dimensions for buildings.
• IS:7922-1987: Recommendations for Modular coordination in Building
Industry
1.10PURPOSE OF MODULAR COORDINATION:
• To reduce the component size produced;
• To allow the building designer of greater flexibility in the arrangement of
components
1.11MODULAR GRID
MODULARGRID
BASIC MODULAR
GRID
MULTI-MODULAR
GRID
SQUARE GRID RECTANGULAR GRID
TARTAN GRID
BASIC MODULAR GRID
The fundamental modular grid, is that in which the intervals between consecutive
parallel lines is equal to the basic module, smallest planning grid.
Fig 1.1BASIC MODULAR GRID
MULTI – MODULAR PLANNING GRID :
In addition to the basic modular grid, multi-modular grids in which the intervals
between consecutive lines are a multi-modular may be used.
TARTAN GRID
• Interrupted modular planning grid
• Intervals or bands of interruption are regularly spaced in both
directions
• Pattern may be used in very regular plans like those with columns
at constant intervals throughout the floor
Fig 1.2 SQUARE AND RECTANGULAR MULTI MODULAR GRID
Fig1.3 TARTAN GRID
1.12NOTATION AND SYMBOLS
Fig1.4TYPICAL WORKING DRAWING
Fig1.5MODULAR COORDINATION WORKING DRAWING
Module
Basic modules Multi modules Sub-modular module
1.13Module- It is a standard unit of size to coordinate the
dimensions of buildings and components.
a.) Basic module-
It is the fundamental unit of size ‘n’ modular coordination. The basic module is
represented by letter M while its international standard value is:
1M=100mm
b.) Multi-module-
They are standardized by selected whole multiples of the basic module. The
international standard values of multi-modules for horizontal coordinating
dimensions are:
3M, 6M, 12M, 30M and 60M
Multi-module of 15M is used for special applications.
Fig1.6 MULTI MODULE
The standardized dimension of horizontal coordination is
MH =3M (300mm)
VERTICAL COORDINATON
Mv =M (100mm)
- Floors are placed within a modular floor zone of nxM increments
- Floor to Floor heights are vertically placed nxM increments
Fig.1.7 VERTICAL COORDINATION
SUB –MODULAR INCREMENT
Sub-modular increment is an increment of size, the value of which is a selected
fraction of the basic module.
 The international standardized value of the sub-modular increment is M/2 =
50mm.
 It is to be used where there is a need for an increment smaller than the basic
module. Determining the displacements of different modular grids
 Modular coordination is the basis for a Standardization of a mass production
of component
Fig 1.8 COMPONETS OF WALL
1.14ADVANTAGES OF MC
 Facilitate collaboration between buildingdesigners, manufactures,
distributors and contractors
 Standard size- building components different types of buildings
 Speed of construction
 Minimize the wastage of materials, time and manpower in cutting and
trimming on site
 Balance between Quality and Cost
1.15DISADVANTAGES OF MODULAR COORDINATION
 Can lead to problems when modules are linked because link must thoroughly
test
 It is difficult to manufacture to producecomponents based on mm tolerance.

More Related Content

What's hot

Bc open pre fabricated construction system
Bc open pre fabricated construction systemBc open pre fabricated construction system
Bc open pre fabricated construction systemAnuj Singhal
 
Vierendeel truss bs5
Vierendeel truss bs5Vierendeel truss bs5
Vierendeel truss bs5Sandhya Singh
 
Precast construction
Precast constructionPrecast construction
Precast constructionDivya Vishnoi
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMSagar Shah
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure pptAbhishekM45
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionMadan Mohan Jana
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated StructuresBoopathi Raja
 
modular construction
modular construction modular construction
modular construction sandeeprao112
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structuresjamali husain
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explainedEyad Reda
 
Modular construction
Modular constructionModular construction
Modular constructionKiran Gill
 

What's hot (20)

Modular cordination
Modular cordinationModular cordination
Modular cordination
 
Bc open pre fabricated construction system
Bc open pre fabricated construction systemBc open pre fabricated construction system
Bc open pre fabricated construction system
 
Vierendeel truss bs5
Vierendeel truss bs5Vierendeel truss bs5
Vierendeel truss bs5
 
Precast construction
Precast constructionPrecast construction
Precast construction
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure ppt
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated Structures
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
modular construction
modular construction modular construction
modular construction
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structures
 
Building by laws
Building  by lawsBuilding  by laws
Building by laws
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Shoring
ShoringShoring
Shoring
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explained
 
Modular construction
Modular constructionModular construction
Modular construction
 
Modular construction ppt
Modular construction pptModular construction ppt
Modular construction ppt
 
Space frame
Space frameSpace frame
Space frame
 
Modular Construction
Modular ConstructionModular Construction
Modular Construction
 

Similar to PREFABRICATION AND MODULAR COORDINATION

FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...
FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...
FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...A Makwana
 
5 modular const.pptx
5 modular const.pptx5 modular const.pptx
5 modular const.pptxsonu515144
 
Design Principles
Design PrinciplesDesign Principles
Design PrinciplesNishma2
 
Modular coordination
Modular coordinationModular coordination
Modular coordinationShubham Jain
 
prefabrication structure report
prefabrication structure report prefabrication structure report
prefabrication structure report AbhishekM45
 
IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...IRJET Journal
 
July2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKJuly2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKSameer Malvankar
 
Analysis of Prefabricational Construction And Conventional Construction
Analysis of Prefabricational Construction And Conventional ConstructionAnalysis of Prefabricational Construction And Conventional Construction
Analysis of Prefabricational Construction And Conventional ConstructionIRJET Journal
 
Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02Gopinan
 
#6a modular construction (1)
#6a    modular construction (1)#6a    modular construction (1)
#6a modular construction (1)Eveana Crystle
 
B.Arch Dissertation Design in modules
B.Arch Dissertation Design in modulesB.Arch Dissertation Design in modules
B.Arch Dissertation Design in modules07206771966
 
Opportunities and Challenges of Modular Coordination: A Review
Opportunities and Challenges of Modular Coordination: A ReviewOpportunities and Challenges of Modular Coordination: A Review
Opportunities and Challenges of Modular Coordination: A ReviewIRJET Journal
 
Modular Construction In India : Opportunities and challenges pdf notes
Modular Construction  In India : Opportunities and challenges pdf notesModular Construction  In India : Opportunities and challenges pdf notes
Modular Construction In India : Opportunities and challenges pdf notesFluidconstructions
 
Off-site and on -site modern method of construction
Off-site and on -site modern method of constructionOff-site and on -site modern method of construction
Off-site and on -site modern method of constructionANNA REBECCA PRASAD
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Developmentijsrd.com
 
Mivan Formwork in Construction
Mivan Formwork in ConstructionMivan Formwork in Construction
Mivan Formwork in ConstructionIRJET Journal
 

Similar to PREFABRICATION AND MODULAR COORDINATION (20)

FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...
FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...
FACTORS CONTRIBUTING TO THE RISING IMPORTANCE OF MODULAR CONSTRUCTION ADOPTIO...
 
5 modular const.pptx
5 modular const.pptx5 modular const.pptx
5 modular const.pptx
 
Design Principles
Design PrinciplesDesign Principles
Design Principles
 
PEB 2-5.pptx
PEB 2-5.pptxPEB 2-5.pptx
PEB 2-5.pptx
 
Modular coordination
Modular coordinationModular coordination
Modular coordination
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
prefabrication structure report
prefabrication structure report prefabrication structure report
prefabrication structure report
 
IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...IRJET- Analysis of Modular Housing Technique Perception and Identification it...
IRJET- Analysis of Modular Housing Technique Perception and Identification it...
 
July2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORKJuly2013 MASTERBUILDERS- FORMWORK
July2013 MASTERBUILDERS- FORMWORK
 
Analysis of Prefabricational Construction And Conventional Construction
Analysis of Prefabricational Construction And Conventional ConstructionAnalysis of Prefabricational Construction And Conventional Construction
Analysis of Prefabricational Construction And Conventional Construction
 
Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02Mmcrevisionnotes 100523035236-phpapp02
Mmcrevisionnotes 100523035236-phpapp02
 
MMC Revision Notes
MMC Revision NotesMMC Revision Notes
MMC Revision Notes
 
#6a modular construction (1)
#6a    modular construction (1)#6a    modular construction (1)
#6a modular construction (1)
 
B.Arch Dissertation Design in modules
B.Arch Dissertation Design in modulesB.Arch Dissertation Design in modules
B.Arch Dissertation Design in modules
 
Opportunities and Challenges of Modular Coordination: A Review
Opportunities and Challenges of Modular Coordination: A ReviewOpportunities and Challenges of Modular Coordination: A Review
Opportunities and Challenges of Modular Coordination: A Review
 
Modular Construction In India : Opportunities and challenges pdf notes
Modular Construction  In India : Opportunities and challenges pdf notesModular Construction  In India : Opportunities and challenges pdf notes
Modular Construction In India : Opportunities and challenges pdf notes
 
Off-site and on -site modern method of construction
Off-site and on -site modern method of constructionOff-site and on -site modern method of construction
Off-site and on -site modern method of construction
 
module3.pptx
module3.pptxmodule3.pptx
module3.pptx
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Development
 
Mivan Formwork in Construction
Mivan Formwork in ConstructionMivan Formwork in Construction
Mivan Formwork in Construction
 

Recently uploaded

Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Industrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal CompressorsIndustrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal CompressorsAlirezaBagherian3
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsapna80328
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 

Recently uploaded (20)

Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Industrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal CompressorsIndustrial Applications of Centrifugal Compressors
Industrial Applications of Centrifugal Compressors
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
signals in triangulation .. ...Surveying
signals in triangulation .. ...Surveyingsignals in triangulation .. ...Surveying
signals in triangulation .. ...Surveying
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 

PREFABRICATION AND MODULAR COORDINATION

  • 2. 1.1PREFABRICATION Prefabricationis the practice of assembling components of a structure in a factory or other manufacturing site, and transporting complete assemblies or sub- assemblies to the construction site where the structure is to be located. 1.2METHODS OF CONSTRUCTION CONVENTIONAL METHOD PREFABRICATION CONSTRUCTION The conventional method of building is to transport bricks, timber ,cement, sand ,steel and construction aggregate, etc. to the site and to constructthe house onsite from these materials Prefabrication is the practice of assembling components of a structure in a factory or other manufacturing site, and transporting complete assemblies or sub-assemblies to the construction site where the structure is to be located. The term is used to distinguish this process from the more conventional construction practice of transporting the basic materials to the construction site where all assembly is carried out. 1.3STAGES INVOLVED IN PREFABRICATION 1. The structure is divided into number of units. 2. The different units are precast in permanent factories(plant fabrication) or temporary plants (site prefabrication). 3. Transported to the site. 4. Hoisted set into their final places and assembled to form a complete structure.
  • 3. 1.4PLANS AND SPECIFICATIONS (IS15916) • Drawings shall describe the elements and structures and assembly including all required data of physical properties of componentmaterials (material specification) • Details of connection joints • Site or shop location of services (installation of piping, wiring and other accessories) • Location of inserts (doors, windows and ventilators) • Handling arrangements to avoid failure 1.5MODULAR COORDINATION • Modular coordination is a conceptof coordination of dimension and space in which buildings and components are dimensioned and positioned in terms of basic unit or module. • The basic module is known as 1M which is equivalent to 100mm. • It is internationally accepted by the International Standard Organisation and many other countries including Malaysia. 1.6BACKGROUND • Modular coordination was first explored as an aid to design shortly after the introduction of prefabrication in the construction industry in the industrialization. It was conceived as a further step in the development of systematic design and construction of the building. • This subject has been discussed and attempted in an actual building experiment in practically every developed country.
  • 4. • Modular coordination was first studied in Singapore in the early seventies. The housing and development board implemented the conceptin 1973 in the new generation flats. Prefabrication and standard components were subsequently introduced. Modular blocks and bricks were introduced in 1983. There are merits to extend the use of modular coordination in other components as well. 1.7AIMS AND OBJECTIVES OF MODULAR COORDINATION  The principle objectives of modular system are to provide practical and coherent solutions for coordination of the position and dimensions of elements, components and space in building design.  This process can contribute to increase design freedom and improved balance between quality and cost in manufacture and construction. 1.8BASIC PRINCIPLE OF MODULAR COORDINATION  The main purpose of Modular Coordination is to achieve the Dimensional Compatibility between the Building Dimensions, Span or Spaces and the Size of Components and Equipments by using related Modular Dimensions.  Modular Coordination generally provides the easy grasped layout of the positioning of the building components in relation to each other and to the building and facilitates collaboration between planners, manufactures, distributors and contractors. 1.9STANDARD RULES IN MODULAR COORDINATION  Modular Coordination is essentially based on the use of modules (basic module and multi-modules) and a reference system to define coordinating spaces and zones for building elements and for the components which form them. There are standard rules to abide by - Rules for locating building elements within the reference system;
  • 5. - Rules for sizing building components in order to determine their work sizes; - Rules for defining preferred sizes for building components and coordinating dimensions for buildings. • IS:7922-1987: Recommendations for Modular coordination in Building Industry 1.10PURPOSE OF MODULAR COORDINATION: • To reduce the component size produced; • To allow the building designer of greater flexibility in the arrangement of components 1.11MODULAR GRID MODULARGRID BASIC MODULAR GRID MULTI-MODULAR GRID SQUARE GRID RECTANGULAR GRID TARTAN GRID
  • 6. BASIC MODULAR GRID The fundamental modular grid, is that in which the intervals between consecutive parallel lines is equal to the basic module, smallest planning grid. Fig 1.1BASIC MODULAR GRID MULTI – MODULAR PLANNING GRID : In addition to the basic modular grid, multi-modular grids in which the intervals between consecutive lines are a multi-modular may be used. TARTAN GRID • Interrupted modular planning grid • Intervals or bands of interruption are regularly spaced in both directions • Pattern may be used in very regular plans like those with columns at constant intervals throughout the floor
  • 7. Fig 1.2 SQUARE AND RECTANGULAR MULTI MODULAR GRID
  • 10.
  • 11. Fig1.4TYPICAL WORKING DRAWING Fig1.5MODULAR COORDINATION WORKING DRAWING
  • 12. Module Basic modules Multi modules Sub-modular module 1.13Module- It is a standard unit of size to coordinate the dimensions of buildings and components. a.) Basic module- It is the fundamental unit of size ‘n’ modular coordination. The basic module is represented by letter M while its international standard value is: 1M=100mm b.) Multi-module- They are standardized by selected whole multiples of the basic module. The international standard values of multi-modules for horizontal coordinating dimensions are: 3M, 6M, 12M, 30M and 60M Multi-module of 15M is used for special applications. Fig1.6 MULTI MODULE The standardized dimension of horizontal coordination is MH =3M (300mm)
  • 13. VERTICAL COORDINATON Mv =M (100mm) - Floors are placed within a modular floor zone of nxM increments - Floor to Floor heights are vertically placed nxM increments Fig.1.7 VERTICAL COORDINATION SUB –MODULAR INCREMENT Sub-modular increment is an increment of size, the value of which is a selected fraction of the basic module.  The international standardized value of the sub-modular increment is M/2 = 50mm.  It is to be used where there is a need for an increment smaller than the basic module. Determining the displacements of different modular grids  Modular coordination is the basis for a Standardization of a mass production of component
  • 14. Fig 1.8 COMPONETS OF WALL 1.14ADVANTAGES OF MC  Facilitate collaboration between buildingdesigners, manufactures, distributors and contractors  Standard size- building components different types of buildings  Speed of construction  Minimize the wastage of materials, time and manpower in cutting and trimming on site  Balance between Quality and Cost 1.15DISADVANTAGES OF MODULAR COORDINATION  Can lead to problems when modules are linked because link must thoroughly test  It is difficult to manufacture to producecomponents based on mm tolerance.