1.1 Introduction
This coursework will consider the topics of stakeholder expectations, project constraints,
time, quality and cost, due diligence and the use of consultancy expertise in the wider
context of analyzing how a project manager approaches the “define and design stages”
of a major merger and acquisition process involving the sale of marketing assets.
1.1.2 Define and design stage
The define and design stage of project management will be where the project goals,
objectives and operational targets will be set out and agreed (Loosemore and Uher 2003
p. 136). These need to be integrated as every stage of the project's life cycle is
anticipated (Harrison and Lock 2004 p. 201). The define and design stage requires
discussion of factors that will determine key outcomes of the project's development.
Factors such as the role of the project manager, the duties, responsibilities and powers
of the project manager, the duties, responsibilities, and powers of key internal and
external stakeholders, budgetary matters, cost issues, and quality issues are all very
important to the define and design stage (Loosemore and Uher 2003 p. 136). As
Harrison and Lock (2004 p. 201) state, the define and design stage in the context of
contracts would, for example require the project manager to give a brief to an architect.
Harrison and Lock (2004 p. 201) contend that the definition stage can be evaluated
successfully through the use and application of the “go, no go” test which will determine
whether the project is on target at various stages of the define and design stage.
2.1 Stakeholder expectations in the define
and design phase
At the beginning of the define and design stage, the most important stakeholder, aside
from the project manager will be the client. As Loosemore and Uher (2003 p. 136) state,
it is essential for the project manager, and the client to communicate effectively during
this key initial stage. Later, more stakeholders will join the “mix” for example the design
leader, and or various sub-contractors (Harrison and Lock 2004 p. 201), so it is essential
that firm objectives, and expectations are set out as a result of the initial consultation
between project manager and client (Loosemore and Uher 2003 p. 136).
Strategies that will assist the successful development of the expectations of the client
and project manager during this key phase will include:
(a) devising a statement of key duties and responsibilities;
(b) agreeing the conditions of engagement of other stakeholders such as the design
leader, if applicable, and the engagement of any external consultation;
(c) devising and agreeing a planned, staged set of objectives;
(d) devising and agreeing a project management plan;
(e) agreement on an initial budget;
(f) planning cost control, expenditures and contingencies.
Initial communication between the project manager and the client will determine the
success of these factors (Loosemore and Uher 2003 p. 136). It would be advisable to
ensure that appropriate records are kept of communications, so for example email
records, and records of informal discussions. What will be key will be a comprehensive
record of what has been initially agreed in terms of what the expectations of the client
are, and it is advisable that this is formally recorded in a written document.
A key factor in the early stages of the design and define stage will be the role of the
project manager (Harrison and Lock 2004 p. 201), which will need to be discussed, and
set out clearly from the beginning of the define and design stages. As many
management experts would surmise, this is the area of the project that has the potential
to lead to expensive litigation, and project delay (Loosemore and Uher 2003 p. 130, p.
131, p. 132, p. 133, p. 134 and p.135), so it is essential that the role of the project
manager is clearly discussed, and agree from the beginning of the define and design
stage.
As the project develops, factors like change control, teamwork and evaluation are likely
to become important. Overall, the project manager will be expected to formulate an
appropriate change control strategy as the define and design stage unfolds.
Fundamental to the change control strategy are processes of organizational
communication, teamwork, evaluation and operation management, and these must be
aligned to the key strategic objectives of the company (Meredith and Mantel (2006) p8;
Newton, R. (2005) p 103-118; Wysocki (2009) p 39-47, 109-120).
It may be useful to consider what the key stakeholder expectations will be in a newly
formed corporate organization: employees will expect to be managed appropriately;
managers will expect to be trained and supported in their roles; stakeholders will expect
effective systems of communication and dissemination of information; investors may
expect performance targets to be met or exceeded; shareholders will expect
performance targets to be met or exceeded (Harold, K (2010) p 340 -346; Kelly, S. and
Nokes, S. (2007) p 20- 25) and this is not an exhaustive list since it would be nearly
impossible to extrapolate all of the stakeholder expectations that will emerge as the
organization begins to form.
Stakeholders will have to be identified as a first step in the define and design stage.
Stakeholders including employees (existing and new), investors (existing and new),
management and consumers all need to be communicated with appropriately during the
define and design stage (Berkun, S (2008) p. 42-46; Field, K. (1998) p 88-107, p163-
170; Hobbs, P (2009) p 18-28). It is suggested that the best means of managing such a
significant matrix of communication channels is to use some means of electronic
communication to support it. To this end, it is suggested that an internal intranet and an
external internet site, or sites are used to support the communication process between,
and with different stakeholder groups within, and external to the organization as a
merged entity. As Cox, D. notes (2010, p. 170) appropriate identification and
management of stakeholder expectations through effective communication increases the
probability of project success.
It is suggested that key processes such as procurement of contracts, recruitment, and
appraisal will be much changed within the new entity that is required to be project
managed. In light of these changes it is important to retain the efficacy of core functions
within these processes (Meredith and Mantel (2006) p8; Newton, R. (2005) p 103-118;
Wysocki (2009) p 39-47, 109-120). So, for example the procedure for conducting
procurements, recruitment, selection and appraisal may need to be re-negotiated and or
re-defined within different sectors of the newly formed business organization, so that it
can be implemented consistently.
2.2 Project constraints in the define and
design phase
Several project constraints are apparent in the early stages of this project.
Of key significance is the role of the team (Berkun, S (2008) p. 42-46; Field, K. (1998) p
88-107, p163-170; Hobbs, P (2009) p 18-28). In the aftermath of a merger, existing
teams may be changed considerably, and or require integration with other teams. This
can lead to performance, and leadership issues. Changes will need to be executed
smoothly, with appropriate planning and communication with key stakeholders in order
to ease these potential issues. Selection and recruitment strategies may need to be re-
formulated across the newly merged organization, and new managerial staff will require
extensive training in processes that may be new to them as this will be important to
reinforce any new managerial authority (Lock, D (2007); Maylor, H (2010) p 224).
In the define and design stage, it is suggested that the most important thing a project
manager can do initially is to consult with well-placed individuals, such as existing
teams, and managers in order to establish what the important issues are and how they
should be approached: “Taking a proactive approach means fighting the instinct to delay
consultation because it is still early days and you don't have all the answers yet or are
worried about raising expectations. The reality, most likely, is that people's expectations
are already raised in some form or other, and that speculation about the project and the
company is beginning to circulate. Early engagement provides a valuable opportunity to
influence public perception and set a positive tone with stakeholders early on. Be clear
upfront that there are still many uncertainties and unknowns, and use early interactions
with stakeholders as a predictor of potential issues and risks, and to help generate ideas
and alternative solutions on early design questions….…..(International Finance
Corporation (2007) pp. 5)”.
One of the major risks that the project manager will have to consider will be the risk that
a “them and us” culture might arise across the organization based on hostilities between
existing and new stakeholders who are required to work together in the newly formed
organization, causing disruption to the efficacy of the company as a whole (Harold, K
(2010) p 340 -346; Kelly, S. and Nokes, S. (2007) p 20- 25). Additionally, such negative
consequences of poorly managed change can impact on retention rates in the
organization as a whole (Lock, D (2007); Maylor, H (2010) p225), and this might add
additional problems to the transitional problems that might be anticipated already. Steps
such as improved communication between employees and management will mitigate the
risk of these types of employee motivation, and leadership problems (Lock, D (2007);
Maylor, H (2010) p 232). Using electronic systems like an intranet, which communicates
correct and up- to – date information will ensure that key messages are delivered
effectively to employees and other relevant stakeholders (Meredith and Mantel (2006)
p8; Newton, R. (2005) p 103-118; Wysocki (2009) p 39-47, 109-120).
Stakeholder engagement will also be key in the define and design stage: “Today, the
term “stakeholder engagement” is emerging as a means of describing a broader, more
inclusive, and continuous process between a company and those potentially impacted
that encompasses a range of activities and approaches, and spans the entire life of a
project. The change reflects broader changes in the business and financial worlds, which
increasingly recognize the business and reputational risks that come from poor
stakeholder relations, and place a growing emphasis on corporate social responsibility
and transparency and reporting. In this context, good stakeholder relations are a
prerequisite for good risk management…..(International Finance Corporation (2007) pp.
2)”.
Appropriate consultation strategies will ensure that problems are anticipated, rather than
dealt with when they crop up (Lock, D (2007); Maylor, H (2010) p 236). This delivers an
important “head- start” to the project manager, and indeed to the organization as a
whole. It is important to emphasize the importance therefore of early stakeholder
engagement, and the basis of this will be effective communication and consultation
strategies (Lock, D (2007) p 29 -39; Maylor, H (2010) p 219-225).
As the define and design stage unfolds, the channels of communication that are required
to be pursued are likely to become more and more complex as different stakeholders
engage in the process. Loosemore and Uher (2003 p. 137) states that formal reporting
strategies are helpful to control project constraints within the area of communication.
This means that communication follows a more regimented mode, which places
emphasis on formality, comprehensiveness and the importance of clarity as to the
outcome of the communication process.
2.3 Time, quality and cost in the define
and design phase
Factors, such as time, quality and cost are matters that will likely dominate the initial
stages of the define and design stage of the management of the project (Harrison and
Lock 2004 p. 201). What is important to recognize is the fact that these are often fluid
concepts, and they will be subject to change as to define and design stage of the project
develops, and contingency must be made for these changes to be managed
appropriately. The project manager will be responsible for the monitoring of the budget,
and the determination of whether any contingencies need to be implemented. As is
important in the early stages of the define and design stages of the project, expectations
relative to time, quality and cost issues will need to be clearly defined, and agreed as
they change, and so further formal discussions with the client are often advisable to
ensure the avoidance of delay and uncertainty as the project develops. Time, quality and
cost are important aspects of the merger and acquisition process (Loosemore and Uher
2003 p. 130, p. 131, p. 132, p. 133, p. 134 and p.135). In several ways, these factors will
underpin key objectives across the entire organization. As such it will be important to set
time, quality and cost goals, and ensure that these are realistic, agreed in advance and
based on consultation and consensus, where this is possible (Lock, D (2007) p 29;
Maylor, H (2010)).
Cox, D. (2010) suggests that cost control and schedule control are key factors in the
management of time, quality and cost. Realistic project budgets should be set in
advance, based on realistic information and projections. Additionally, the project budget
will need to be monitored as the stakeholders involved move out of the define and
design stage, and so the define and design stage should incorporate an appropriate
system to ensure that cost control, quality control and cost monitoring, and quality
monitoring are possible.
The management of time, quality and cost in the define and design stage may also
require a system of performance reporting to be devised. As Cox (2010, p. 171) notes
this involves periodically collecting data and comparing it with “baseline”, and “actual”
data, perhaps drawn from the wider industry, or notional data that original projections
were based upon. Performance reporting will allow for time, quality and cost issues to be
flagged up at an early stage to notify key stakeholders whether, and what type of
intervention may be required.
2.4 Due diligence in the define and design
phase
Due diligence is one of the most important issues facing management in the early stages
of a merger and acquisition. It is one of the key risks that organizations can be exposed
to during the process of merger and acquisition, since it exposes the new organization to
a heightened risk of expensive litigation. In terms of a downstream oil company
operation, one of the key challenges in this context will be communication with
employees in the disparate structure of an oil company operation. Of course these risks
can be mitigated by the project manager in the define and design stage. Accordingly, the
project manager will need to gather key information on all existing employees so that
risks can be evaluated in advance, and so that a plan of action can be set out, evaluated
and implemented as the project moves out of the define and design stage (Lock, D
(2007); Maylor, H (2010) p 219).
Managers will need to be trained, and key information about employees will need to be
gathered and managed electronically to ensure that appropriate, and thorough
processes of due diligence can be carried out effectively. This information may be
gathered by the project manager in the define and design stage, and the project
manager could assess what the best training, and communication strategies will be for
the newly merged organization.
2.5 The use of consultancy expertise in
the define and design phase
Consultancy expertise is expensive, particularly for an organization in transition as this
one is. Additionally, the usefulness of consultancy expertise can be a very variable factor
in terms of its contribution to the overall success of the company (Maylor, H (2010) p
222). In the define and design stage, the project manager can ensure that the use of
consultancy expertise is well-planned and assessed in terms of its value to the
organization as a whole. Consultancy input is something that is susceptible to
evaluation, and thus the project manager in the define and design stage can devise an
appropriate system of evaluation to ensure that cost expenditure on this type of external
expertise is monitored, and that costs are justified (Lock, D (2007); Maylor, H (2010) p
227).
3.0 Coursework conclusion
This coursework has considered the topics of stakeholder expectations, project
constraints, time, quality and cost control, due diligence and the use of consultancy
expertise from the point of view of the project manager in the define and design stage of
a major process of merger and acquisition.
The project manager, and the client are usually the key contenders at the beginning of
the define and design stage. This is the point where communication is likely to be most
critical, and clear, goals, boundaries, objectives, duties and responsibilities need to be
set out. This is particularly key in the process of merger and acquisition which requires
the management of numerous internal and external stakeholders engaged in the
process in complex ways.
It is advisable to ensure that early communication is approached in a comprehensive
and formal manner, since this is likely to minimize the risk of project delay as the define
and design stage develops and enters more critical execution phases. It has been
suggested that written communication is preferable in this phase, that formal reporting
strategies should govern communication to a large degree, and that comprehensive
records of discussions should be kept to ensure that what is agreed is explicit, and can
be identified retrospectively.
As the project develops into more advanced stages of the define and design stage the
project manager should adopt a consultative approach to ensure that problems are
identified in advance, and particularly in the case of a merger and acquisition process
consultation should engage internal and external stakeholders. Additionally, the project
manager will need to adopt strategies that will allow for appropriate progress, and
performance monitoring. Additionally, it has been suggested that the project manager
will need to devise and implement strategies to ensure appropriate leadership, training,
selection, recruitment, procurement, organizational communication and stakeholder
engagement. As such the project manager in the “define and design” stage will primarily
be concerned with planning effective strategy in these areas and the mitigation of risks
that are associated with change, and organizational transition.
Bibliography
Berkun, S. (2008) Making Things Happen: Mastering Project Management (Theory in
Practice. Great Britain. O Reilly Media.
Cox, D. (2010) Project Management for Instructional Designers. iUniverse. Bloomington,
USA.
Field, Keller, (1998) Project Management. Open University. London.
Harrison, F. and Lock, D. (2004) Advanced Project Management: A Structured
Approach. Aldershot and Burlington. Gower.
Hobbs, P (2009) Project Management (Essential Managers). London. Dorling Kindersley
Limited.
Harold, Kerzner (2010) Project Management. New Jersey. John Wiley and Sons
International Finance Corporation (2007) Stakeholder Engagement. Available at:
http://www.ifc.org/ifcext/enviro.nsf/attachmentsbytitle/p_stakeholderengagement_full/$fil
e/ifc_stakeholderengagement.pdf
Kelly,S. and Nokes,S (2007) The Definitive Guide to Project Management. Great Britain
and USA. Pearson Publishing.
Lock, D (2007) Project Management. Great Britain and USA. Gower Publishing
Loosemore, M. and Uher, T. (2003) Essentials of Construction Project Management.
NSW. UNSW.
Maylor, H (2010) Project Management. Great Britain. Prentice Hall
Meredith and Mantel. ( 2006) Project Management: A Managerial Approach: A
Managerial Approach. International Student Version. USA. John Wiley and Sons.
Newton, R. (2005) Project Manager: Mastering the Art of Delivery in Project
Management. London. Pearson Education.
Wysocki. (2009) Effective Project Management: Traditional, Agile, Extreme. USA and
Canada. Wiley Publishing

More Related Content

Similar to Essay on management (sample)

Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxRunning head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxcowinhelen
 
Critically evaluate the importance of Project Life Cycle to the.docx
Critically evaluate the importance of Project Life Cycle to the.docxCritically evaluate the importance of Project Life Cycle to the.docx
Critically evaluate the importance of Project Life Cycle to the.docxwrite4
 
Critically evaluate the importance of Project Life Cycle to the.docx
Critically evaluate the importance of Project Life Cycle to the.docxCritically evaluate the importance of Project Life Cycle to the.docx
Critically evaluate the importance of Project Life Cycle to the.docxwrite31
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changinghenry KKK
 
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docx
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docxRunning head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docx
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docxtodd581
 
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docx
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docxRunning head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docx
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docxglendar3
 
This module addresses your implementation plan through four perspe.docx
This module addresses your implementation plan through four perspe.docxThis module addresses your implementation plan through four perspe.docx
This module addresses your implementation plan through four perspe.docxjuliennehar
 
Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3Loren Schwappach
 
Assignment 1. Project Success And How It Is Defined
Assignment 1. Project Success And How It Is DefinedAssignment 1. Project Success And How It Is Defined
Assignment 1. Project Success And How It Is DefinedJeff Brooks
 
Understanding success for project organisations - APM Project Article
Understanding success for project organisations - APM Project ArticleUnderstanding success for project organisations - APM Project Article
Understanding success for project organisations - APM Project ArticleDonnie MacNicol
 
PROJECT MANAGEMENT prerequesites lect 1.pptx
PROJECT MANAGEMENT prerequesites lect 1.pptxPROJECT MANAGEMENT prerequesites lect 1.pptx
PROJECT MANAGEMENT prerequesites lect 1.pptxneeta12
 
Critical factors affecting trust in construction partnering in uk
Critical factors affecting trust in construction partnering in ukCritical factors affecting trust in construction partnering in uk
Critical factors affecting trust in construction partnering in ukAlexander Decker
 
Assignment 1 Organizing HR ProjectsIn order to effect a more ce.docx
Assignment 1 Organizing HR ProjectsIn order to effect a more ce.docxAssignment 1 Organizing HR ProjectsIn order to effect a more ce.docx
Assignment 1 Organizing HR ProjectsIn order to effect a more ce.docxfelicitytaft14745
 
Due Sunday 22518 by 10pm eastern timeYoutube video called EM.docx
Due Sunday 22518 by 10pm eastern timeYoutube video called EM.docxDue Sunday 22518 by 10pm eastern timeYoutube video called EM.docx
Due Sunday 22518 by 10pm eastern timeYoutube video called EM.docxsagarlesley
 
Green buildings and role of projects Manager in success of project
Green buildings and role of projects Manager in success of project Green buildings and role of projects Manager in success of project
Green buildings and role of projects Manager in success of project Tehmas Saeed
 
STRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDY
STRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDYSTRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDY
STRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDYcivejjour
 
STRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDY
STRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDYSTRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDY
STRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDYcivejjour
 
Running head Organizing HR Projects 1O.docx
Running head Organizing HR Projects          1O.docxRunning head Organizing HR Projects          1O.docx
Running head Organizing HR Projects 1O.docxjeanettehully
 

Similar to Essay on management (sample) (20)

Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxRunning head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docx
 
Finance 1.pdf
Finance 1.pdfFinance 1.pdf
Finance 1.pdf
 
Critically evaluate the importance of Project Life Cycle to the.docx
Critically evaluate the importance of Project Life Cycle to the.docxCritically evaluate the importance of Project Life Cycle to the.docx
Critically evaluate the importance of Project Life Cycle to the.docx
 
Critically evaluate the importance of Project Life Cycle to the.docx
Critically evaluate the importance of Project Life Cycle to the.docxCritically evaluate the importance of Project Life Cycle to the.docx
Critically evaluate the importance of Project Life Cycle to the.docx
 
Week02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changingWeek02 reading lechler_plan_and_changing
Week02 reading lechler_plan_and_changing
 
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docx
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docxRunning head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docx
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docx
 
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docx
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docxRunning head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docx
Running head PLANNING CONSIDERATIONS FOR THE HR PROJECT1PLANN.docx
 
This module addresses your implementation plan through four perspe.docx
This module addresses your implementation plan through four perspe.docxThis module addresses your implementation plan through four perspe.docx
This module addresses your implementation plan through four perspe.docx
 
The Vitality of Project Management
The Vitality of Project ManagementThe Vitality of Project Management
The Vitality of Project Management
 
Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3Pm600 1103 a-02-schwappach-loren-p1-t3
Pm600 1103 a-02-schwappach-loren-p1-t3
 
Assignment 1. Project Success And How It Is Defined
Assignment 1. Project Success And How It Is DefinedAssignment 1. Project Success And How It Is Defined
Assignment 1. Project Success And How It Is Defined
 
Understanding success for project organisations - APM Project Article
Understanding success for project organisations - APM Project ArticleUnderstanding success for project organisations - APM Project Article
Understanding success for project organisations - APM Project Article
 
PROJECT MANAGEMENT prerequesites lect 1.pptx
PROJECT MANAGEMENT prerequesites lect 1.pptxPROJECT MANAGEMENT prerequesites lect 1.pptx
PROJECT MANAGEMENT prerequesites lect 1.pptx
 
Critical factors affecting trust in construction partnering in uk
Critical factors affecting trust in construction partnering in ukCritical factors affecting trust in construction partnering in uk
Critical factors affecting trust in construction partnering in uk
 
Assignment 1 Organizing HR ProjectsIn order to effect a more ce.docx
Assignment 1 Organizing HR ProjectsIn order to effect a more ce.docxAssignment 1 Organizing HR ProjectsIn order to effect a more ce.docx
Assignment 1 Organizing HR ProjectsIn order to effect a more ce.docx
 
Due Sunday 22518 by 10pm eastern timeYoutube video called EM.docx
Due Sunday 22518 by 10pm eastern timeYoutube video called EM.docxDue Sunday 22518 by 10pm eastern timeYoutube video called EM.docx
Due Sunday 22518 by 10pm eastern timeYoutube video called EM.docx
 
Green buildings and role of projects Manager in success of project
Green buildings and role of projects Manager in success of project Green buildings and role of projects Manager in success of project
Green buildings and role of projects Manager in success of project
 
STRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDY
STRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDYSTRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDY
STRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDY
 
STRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDY
STRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDYSTRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDY
STRATEGIC COST MANAGEMENT FOR CONSTRUCTION PROJECT SUCCESS: A SYSTEMATIC STUDY
 
Running head Organizing HR Projects 1O.docx
Running head Organizing HR Projects          1O.docxRunning head Organizing HR Projects          1O.docx
Running head Organizing HR Projects 1O.docx
 

More from Влад Панасенко

Persuasive speech sample on cell phones importance
Persuasive speech sample on cell phones importancePersuasive speech sample on cell phones importance
Persuasive speech sample on cell phones importanceВлад Панасенко
 

More from Влад Панасенко (20)

Persuasive essay outline
Persuasive essay outlinePersuasive essay outline
Persuasive essay outline
 
Nursing essay on leadership (example)
Nursing essay on leadership (example)Nursing essay on leadership (example)
Nursing essay on leadership (example)
 
Persuasive speech sample on cell phones importance
Persuasive speech sample on cell phones importancePersuasive speech sample on cell phones importance
Persuasive speech sample on cell phones importance
 
Persuasive speech sample
Persuasive speech samplePersuasive speech sample
Persuasive speech sample
 
Article review sample
Article review sampleArticle review sample
Article review sample
 
Wings of fire book review
Wings of fire book reviewWings of fire book review
Wings of fire book review
 
Critical essay on porters 5 forces model
Critical essay on porters 5 forces modelCritical essay on porters 5 forces model
Critical essay on porters 5 forces model
 
Critical analysis why growth is good
Critical analysis why growth is goodCritical analysis why growth is good
Critical analysis why growth is good
 
Sonnet 116 critical essay
Sonnet 116 critical essaySonnet 116 critical essay
Sonnet 116 critical essay
 
Describe firewalls
Describe firewallsDescribe firewalls
Describe firewalls
 
My favorite car
My favorite carMy favorite car
My favorite car
 
Causes effects and solutions to global warming
Causes effects and solutions to global warmingCauses effects and solutions to global warming
Causes effects and solutions to global warming
 
Causes and effects of abortion
Causes and effects of abortionCauses and effects of abortion
Causes and effects of abortion
 
Causes and effects of climate change
Causes and effects of climate changeCauses and effects of climate change
Causes and effects of climate change
 
Why alcoholic advertisements should be banned
Why alcoholic advertisements should be bannedWhy alcoholic advertisements should be banned
Why alcoholic advertisements should be banned
 
Informative speech sample
Informative speech sampleInformative speech sample
Informative speech sample
 
Informative speech outline sample
Informative speech outline sampleInformative speech outline sample
Informative speech outline sample
 
The shawshank redemption review
The shawshank redemption reviewThe shawshank redemption review
The shawshank redemption review
 
Personal development essay on education
Personal development essay on educationPersonal development essay on education
Personal development essay on education
 
Personal development essay on leadership
Personal development essay on leadershipPersonal development essay on leadership
Personal development essay on leadership
 

Recently uploaded

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 

Recently uploaded (20)

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 

Essay on management (sample)

  • 1. 1.1 Introduction This coursework will consider the topics of stakeholder expectations, project constraints, time, quality and cost, due diligence and the use of consultancy expertise in the wider context of analyzing how a project manager approaches the “define and design stages” of a major merger and acquisition process involving the sale of marketing assets. 1.1.2 Define and design stage The define and design stage of project management will be where the project goals, objectives and operational targets will be set out and agreed (Loosemore and Uher 2003 p. 136). These need to be integrated as every stage of the project's life cycle is anticipated (Harrison and Lock 2004 p. 201). The define and design stage requires discussion of factors that will determine key outcomes of the project's development. Factors such as the role of the project manager, the duties, responsibilities and powers of the project manager, the duties, responsibilities, and powers of key internal and external stakeholders, budgetary matters, cost issues, and quality issues are all very important to the define and design stage (Loosemore and Uher 2003 p. 136). As Harrison and Lock (2004 p. 201) state, the define and design stage in the context of contracts would, for example require the project manager to give a brief to an architect. Harrison and Lock (2004 p. 201) contend that the definition stage can be evaluated successfully through the use and application of the “go, no go” test which will determine whether the project is on target at various stages of the define and design stage. 2.1 Stakeholder expectations in the define and design phase At the beginning of the define and design stage, the most important stakeholder, aside from the project manager will be the client. As Loosemore and Uher (2003 p. 136) state, it is essential for the project manager, and the client to communicate effectively during this key initial stage. Later, more stakeholders will join the “mix” for example the design leader, and or various sub-contractors (Harrison and Lock 2004 p. 201), so it is essential that firm objectives, and expectations are set out as a result of the initial consultation between project manager and client (Loosemore and Uher 2003 p. 136). Strategies that will assist the successful development of the expectations of the client and project manager during this key phase will include: (a) devising a statement of key duties and responsibilities; (b) agreeing the conditions of engagement of other stakeholders such as the design leader, if applicable, and the engagement of any external consultation; (c) devising and agreeing a planned, staged set of objectives;
  • 2. (d) devising and agreeing a project management plan; (e) agreement on an initial budget; (f) planning cost control, expenditures and contingencies. Initial communication between the project manager and the client will determine the success of these factors (Loosemore and Uher 2003 p. 136). It would be advisable to ensure that appropriate records are kept of communications, so for example email records, and records of informal discussions. What will be key will be a comprehensive record of what has been initially agreed in terms of what the expectations of the client are, and it is advisable that this is formally recorded in a written document. A key factor in the early stages of the design and define stage will be the role of the project manager (Harrison and Lock 2004 p. 201), which will need to be discussed, and set out clearly from the beginning of the define and design stages. As many management experts would surmise, this is the area of the project that has the potential to lead to expensive litigation, and project delay (Loosemore and Uher 2003 p. 130, p. 131, p. 132, p. 133, p. 134 and p.135), so it is essential that the role of the project manager is clearly discussed, and agree from the beginning of the define and design stage. As the project develops, factors like change control, teamwork and evaluation are likely to become important. Overall, the project manager will be expected to formulate an appropriate change control strategy as the define and design stage unfolds. Fundamental to the change control strategy are processes of organizational communication, teamwork, evaluation and operation management, and these must be aligned to the key strategic objectives of the company (Meredith and Mantel (2006) p8; Newton, R. (2005) p 103-118; Wysocki (2009) p 39-47, 109-120). It may be useful to consider what the key stakeholder expectations will be in a newly formed corporate organization: employees will expect to be managed appropriately; managers will expect to be trained and supported in their roles; stakeholders will expect effective systems of communication and dissemination of information; investors may expect performance targets to be met or exceeded; shareholders will expect performance targets to be met or exceeded (Harold, K (2010) p 340 -346; Kelly, S. and Nokes, S. (2007) p 20- 25) and this is not an exhaustive list since it would be nearly impossible to extrapolate all of the stakeholder expectations that will emerge as the organization begins to form. Stakeholders will have to be identified as a first step in the define and design stage. Stakeholders including employees (existing and new), investors (existing and new), management and consumers all need to be communicated with appropriately during the define and design stage (Berkun, S (2008) p. 42-46; Field, K. (1998) p 88-107, p163- 170; Hobbs, P (2009) p 18-28). It is suggested that the best means of managing such a significant matrix of communication channels is to use some means of electronic communication to support it. To this end, it is suggested that an internal intranet and an external internet site, or sites are used to support the communication process between, and with different stakeholder groups within, and external to the organization as a
  • 3. merged entity. As Cox, D. notes (2010, p. 170) appropriate identification and management of stakeholder expectations through effective communication increases the probability of project success. It is suggested that key processes such as procurement of contracts, recruitment, and appraisal will be much changed within the new entity that is required to be project managed. In light of these changes it is important to retain the efficacy of core functions within these processes (Meredith and Mantel (2006) p8; Newton, R. (2005) p 103-118; Wysocki (2009) p 39-47, 109-120). So, for example the procedure for conducting procurements, recruitment, selection and appraisal may need to be re-negotiated and or re-defined within different sectors of the newly formed business organization, so that it can be implemented consistently. 2.2 Project constraints in the define and design phase Several project constraints are apparent in the early stages of this project. Of key significance is the role of the team (Berkun, S (2008) p. 42-46; Field, K. (1998) p 88-107, p163-170; Hobbs, P (2009) p 18-28). In the aftermath of a merger, existing teams may be changed considerably, and or require integration with other teams. This can lead to performance, and leadership issues. Changes will need to be executed smoothly, with appropriate planning and communication with key stakeholders in order to ease these potential issues. Selection and recruitment strategies may need to be re- formulated across the newly merged organization, and new managerial staff will require extensive training in processes that may be new to them as this will be important to reinforce any new managerial authority (Lock, D (2007); Maylor, H (2010) p 224). In the define and design stage, it is suggested that the most important thing a project manager can do initially is to consult with well-placed individuals, such as existing teams, and managers in order to establish what the important issues are and how they should be approached: “Taking a proactive approach means fighting the instinct to delay consultation because it is still early days and you don't have all the answers yet or are worried about raising expectations. The reality, most likely, is that people's expectations are already raised in some form or other, and that speculation about the project and the company is beginning to circulate. Early engagement provides a valuable opportunity to influence public perception and set a positive tone with stakeholders early on. Be clear upfront that there are still many uncertainties and unknowns, and use early interactions with stakeholders as a predictor of potential issues and risks, and to help generate ideas and alternative solutions on early design questions….…..(International Finance Corporation (2007) pp. 5)”. One of the major risks that the project manager will have to consider will be the risk that a “them and us” culture might arise across the organization based on hostilities between existing and new stakeholders who are required to work together in the newly formed organization, causing disruption to the efficacy of the company as a whole (Harold, K
  • 4. (2010) p 340 -346; Kelly, S. and Nokes, S. (2007) p 20- 25). Additionally, such negative consequences of poorly managed change can impact on retention rates in the organization as a whole (Lock, D (2007); Maylor, H (2010) p225), and this might add additional problems to the transitional problems that might be anticipated already. Steps such as improved communication between employees and management will mitigate the risk of these types of employee motivation, and leadership problems (Lock, D (2007); Maylor, H (2010) p 232). Using electronic systems like an intranet, which communicates correct and up- to – date information will ensure that key messages are delivered effectively to employees and other relevant stakeholders (Meredith and Mantel (2006) p8; Newton, R. (2005) p 103-118; Wysocki (2009) p 39-47, 109-120). Stakeholder engagement will also be key in the define and design stage: “Today, the term “stakeholder engagement” is emerging as a means of describing a broader, more inclusive, and continuous process between a company and those potentially impacted that encompasses a range of activities and approaches, and spans the entire life of a project. The change reflects broader changes in the business and financial worlds, which increasingly recognize the business and reputational risks that come from poor stakeholder relations, and place a growing emphasis on corporate social responsibility and transparency and reporting. In this context, good stakeholder relations are a prerequisite for good risk management…..(International Finance Corporation (2007) pp. 2)”. Appropriate consultation strategies will ensure that problems are anticipated, rather than dealt with when they crop up (Lock, D (2007); Maylor, H (2010) p 236). This delivers an important “head- start” to the project manager, and indeed to the organization as a whole. It is important to emphasize the importance therefore of early stakeholder engagement, and the basis of this will be effective communication and consultation strategies (Lock, D (2007) p 29 -39; Maylor, H (2010) p 219-225). As the define and design stage unfolds, the channels of communication that are required to be pursued are likely to become more and more complex as different stakeholders engage in the process. Loosemore and Uher (2003 p. 137) states that formal reporting strategies are helpful to control project constraints within the area of communication. This means that communication follows a more regimented mode, which places emphasis on formality, comprehensiveness and the importance of clarity as to the outcome of the communication process. 2.3 Time, quality and cost in the define and design phase Factors, such as time, quality and cost are matters that will likely dominate the initial stages of the define and design stage of the management of the project (Harrison and Lock 2004 p. 201). What is important to recognize is the fact that these are often fluid concepts, and they will be subject to change as to define and design stage of the project develops, and contingency must be made for these changes to be managed appropriately. The project manager will be responsible for the monitoring of the budget,
  • 5. and the determination of whether any contingencies need to be implemented. As is important in the early stages of the define and design stages of the project, expectations relative to time, quality and cost issues will need to be clearly defined, and agreed as they change, and so further formal discussions with the client are often advisable to ensure the avoidance of delay and uncertainty as the project develops. Time, quality and cost are important aspects of the merger and acquisition process (Loosemore and Uher 2003 p. 130, p. 131, p. 132, p. 133, p. 134 and p.135). In several ways, these factors will underpin key objectives across the entire organization. As such it will be important to set time, quality and cost goals, and ensure that these are realistic, agreed in advance and based on consultation and consensus, where this is possible (Lock, D (2007) p 29; Maylor, H (2010)). Cox, D. (2010) suggests that cost control and schedule control are key factors in the management of time, quality and cost. Realistic project budgets should be set in advance, based on realistic information and projections. Additionally, the project budget will need to be monitored as the stakeholders involved move out of the define and design stage, and so the define and design stage should incorporate an appropriate system to ensure that cost control, quality control and cost monitoring, and quality monitoring are possible. The management of time, quality and cost in the define and design stage may also require a system of performance reporting to be devised. As Cox (2010, p. 171) notes this involves periodically collecting data and comparing it with “baseline”, and “actual” data, perhaps drawn from the wider industry, or notional data that original projections were based upon. Performance reporting will allow for time, quality and cost issues to be flagged up at an early stage to notify key stakeholders whether, and what type of intervention may be required. 2.4 Due diligence in the define and design phase Due diligence is one of the most important issues facing management in the early stages of a merger and acquisition. It is one of the key risks that organizations can be exposed to during the process of merger and acquisition, since it exposes the new organization to a heightened risk of expensive litigation. In terms of a downstream oil company operation, one of the key challenges in this context will be communication with employees in the disparate structure of an oil company operation. Of course these risks can be mitigated by the project manager in the define and design stage. Accordingly, the project manager will need to gather key information on all existing employees so that risks can be evaluated in advance, and so that a plan of action can be set out, evaluated and implemented as the project moves out of the define and design stage (Lock, D (2007); Maylor, H (2010) p 219). Managers will need to be trained, and key information about employees will need to be gathered and managed electronically to ensure that appropriate, and thorough processes of due diligence can be carried out effectively. This information may be
  • 6. gathered by the project manager in the define and design stage, and the project manager could assess what the best training, and communication strategies will be for the newly merged organization. 2.5 The use of consultancy expertise in the define and design phase Consultancy expertise is expensive, particularly for an organization in transition as this one is. Additionally, the usefulness of consultancy expertise can be a very variable factor in terms of its contribution to the overall success of the company (Maylor, H (2010) p 222). In the define and design stage, the project manager can ensure that the use of consultancy expertise is well-planned and assessed in terms of its value to the organization as a whole. Consultancy input is something that is susceptible to evaluation, and thus the project manager in the define and design stage can devise an appropriate system of evaluation to ensure that cost expenditure on this type of external expertise is monitored, and that costs are justified (Lock, D (2007); Maylor, H (2010) p 227). 3.0 Coursework conclusion This coursework has considered the topics of stakeholder expectations, project constraints, time, quality and cost control, due diligence and the use of consultancy expertise from the point of view of the project manager in the define and design stage of a major process of merger and acquisition. The project manager, and the client are usually the key contenders at the beginning of the define and design stage. This is the point where communication is likely to be most critical, and clear, goals, boundaries, objectives, duties and responsibilities need to be set out. This is particularly key in the process of merger and acquisition which requires the management of numerous internal and external stakeholders engaged in the process in complex ways. It is advisable to ensure that early communication is approached in a comprehensive and formal manner, since this is likely to minimize the risk of project delay as the define and design stage develops and enters more critical execution phases. It has been suggested that written communication is preferable in this phase, that formal reporting strategies should govern communication to a large degree, and that comprehensive records of discussions should be kept to ensure that what is agreed is explicit, and can be identified retrospectively. As the project develops into more advanced stages of the define and design stage the project manager should adopt a consultative approach to ensure that problems are identified in advance, and particularly in the case of a merger and acquisition process consultation should engage internal and external stakeholders. Additionally, the project manager will need to adopt strategies that will allow for appropriate progress, and
  • 7. performance monitoring. Additionally, it has been suggested that the project manager will need to devise and implement strategies to ensure appropriate leadership, training, selection, recruitment, procurement, organizational communication and stakeholder engagement. As such the project manager in the “define and design” stage will primarily be concerned with planning effective strategy in these areas and the mitigation of risks that are associated with change, and organizational transition. Bibliography Berkun, S. (2008) Making Things Happen: Mastering Project Management (Theory in Practice. Great Britain. O Reilly Media. Cox, D. (2010) Project Management for Instructional Designers. iUniverse. Bloomington, USA. Field, Keller, (1998) Project Management. Open University. London. Harrison, F. and Lock, D. (2004) Advanced Project Management: A Structured Approach. Aldershot and Burlington. Gower. Hobbs, P (2009) Project Management (Essential Managers). London. Dorling Kindersley Limited. Harold, Kerzner (2010) Project Management. New Jersey. John Wiley and Sons International Finance Corporation (2007) Stakeholder Engagement. Available at: http://www.ifc.org/ifcext/enviro.nsf/attachmentsbytitle/p_stakeholderengagement_full/$fil e/ifc_stakeholderengagement.pdf Kelly,S. and Nokes,S (2007) The Definitive Guide to Project Management. Great Britain and USA. Pearson Publishing. Lock, D (2007) Project Management. Great Britain and USA. Gower Publishing Loosemore, M. and Uher, T. (2003) Essentials of Construction Project Management. NSW. UNSW. Maylor, H (2010) Project Management. Great Britain. Prentice Hall Meredith and Mantel. ( 2006) Project Management: A Managerial Approach: A Managerial Approach. International Student Version. USA. John Wiley and Sons. Newton, R. (2005) Project Manager: Mastering the Art of Delivery in Project Management. London. Pearson Education. Wysocki. (2009) Effective Project Management: Traditional, Agile, Extreme. USA and Canada. Wiley Publishing