Setting Up Resources
Objectives  Set up basic resource information for the people who work on projects. Enter basic resource information for the equipment that will be used in projects. Enter resource information for the materials that will be consumed as the project progresses. Enter cost resource information for financial tracking. Set up cost information for work resources. Change a resource’s availability for work. Record additional information about a resource in a note.
Resources include the people and equipment needed to complete the tasks in a project Microsoft Office Project 2007 focuses on two aspects of resources Availability Costs Availability determines when specific resources can work on tasks and how much work they can perform costs refer to how much money will be required to pay for those resources
Setting Up People Resources Project works with three types of resources: Work Material Cost  Work resources are the people and equipment that do the work of the project
Cont>> Some examples of work resources
Cont>> How to set up resource information for several people resources On the View menu, click Resource Sheet In the Resource Sheet view, click the cell directly below the Resource Name column heading Type Jonathan Mollerup, and press Enter On the next empty rows in the Resource Name column, enter the following names: Jon Ganio Garrett R.Vargas John Rodman
Cont>> In the Resource Name field below the last resource, type Electrician, and then press TAB In the Type field, make sure that Work is selected, and then press TABseveral times to move to the Max. Unitsfield The Max. Units field represents the maximum capacity of a resource to accomplish any task The Max. Units field represents the maximum capacity of a resource to accomplish any task ENTER Click the Max. Units field for Jon Ganio, type or select 50%, and then press
Setting Up Equipment Resources In Project, you set up people and equipment resources in exactly the same way because people and equipment are both examples of work resources However, you should be aware of important differences people resources might be flexible in the tasks they can perform, but equipment resources tend to be more specialized
Cont>> you might want to set up equipment resources when Multiple teams or people might need a piece of equipment to accomplish different tasks simultaneously, and the equipment might be overbooked. You want to plan and track costs associated with the equipment.
Enter information about equipment resources In the Resource Sheet, click the next empty cell in the Resource Namecolumn On the Standard toolbar, click the Resource Information button OR double-click a resource name Click the General tab if it is not already displayed In the Resource name field, type Mini-DV Camcorder In the Type field, click Work.  In the Max. Units field for the Mini-DV Camcorder, type or click the arrows until the value shown is 300% and press ENTER
Cont>> Enter the following information about equipment resources directly in the Resource Sheet or in the Resource Information dialog box, whichever you prefer. In either case, make sure Work is selected in the Type field.
Setting Up Material Resources Material resources are consumables that you use up as the project proceeds On a construction project, material resources might include nails, lumber, and concrete You work with material resources in Project mainly to track the rate of consumption and the associated cost
Cont>> How to enter information about a material resource In the Resource Sheet, click the next empty cell in the Resource Namecolumn Type Video Tape and press TAB In the Type field, click the down arrow, select Material, and press TAB In the Material Label field, type 30-min. cassette and press ENTER Note that you cannot enter a Max. Units value for a material resource. Since a material resource is a consumable item and not a person or piece of equipment that performs work, the Max. Units value doesn’t apply
Setting Up Cost Resources The third and final type of resource that you can use in Project is the cost resource You can use a cost resource to represent a financial cost associated with a task in a project Common types of cost resources might include categories of expenses you’d want to track on a project for accounting purposes such as travel, entertainment, or training Like material resources, cost resources do no work and have no effect on the scheduling of a task
Cont>> However, after you assign a cost resource to a task and specify the cost amount per task, you can then see the cumulative costs for that type of cost resource In the Resource Sheet, click the next empty cell in the Resource Name column. 2. Type Travel and press TAB. 3. In the Type field, click the down arrow, select Cost, and press ENTER.
Entering Resource Pay Rates Almost all projects have some financial aspect, and cost limits drive the scope of many projects. Tracking and managing cost information allows the project manager to answer such important questions as What is the expected total cost of the project based on our task duration and resource estimates? Are we using expensive resources to do work that less expensive resources could do? How much money will a specific type of resource or task cost over the life of the project? How have we allocated a particular type of expense, such as travel, in a project? Are we spending money at a rate that we can sustain for the planned duration of the project
Cont>> How to enter cost information for each work resource In the Resource Sheet, click the Std. Rate field for Jonathan Mollerup Type 10 and press  ENTER In the Std. Rate field for Jon Ganio, type 15.50 and press ENTER Enter the following standard pay rates for the given resources
Cont>>
Adjusting Working Time for Individual Resources Project uses different types of calendars for different purposes A resource calendar controls the working and nonworking times of a resource Project uses resource calendars to determine when work for a specific resource can be scheduled Resource calendars apply only to work resources (people and equipment) and not to material or cost resources
Cont>> When you initially create resources in a project plan, Project creates a resource calendar for each work resource. The initial working time settings for resource calendars exactly match those of the Standard base calendar, chances are that some of your resources will need exceptions to the working time in the Standard base calendar-such as A flex-time work schedule Vacation time Other times when a resource is not available to work on the project, such as time spent training or attending a conference
Cont>> How to specify the working and nonworking times for individual work resources On the Tools menu, click Change Working Time. The Change Working Time dialog box appears. In the For calendar box, click Garrett R.Vargas. Garrett R.Vargas’s resource calendar appears in the Change Working Time dialog box. Garrett has told you he will not be available to work on Thursday and Friday, January 10 and 11, because he plans to attend a film festival. On the Exceptions tab in the Change Working Time dialog box, click in the first row directly below the Name column heading and type Garrett attending West Coast Film Festival
Cont>> Click in the Start field and type or select 1/10/2008. Click in the Finish field, type or select 1/11/2008, and then press ENTER

More Related Content

Viewers also liked

Esc guidelines for guidelines update 2010
Esc guidelines for guidelines update 2010Esc guidelines for guidelines update 2010
Esc guidelines for guidelines update 2010Domènec Melgosa Arnau
 
Investments by institutions in primary agriculture in Russia, Ukraine and Kaz...
Investments by institutions in primary agriculture in Russia, Ukraine and Kaz...Investments by institutions in primary agriculture in Russia, Ukraine and Kaz...
Investments by institutions in primary agriculture in Russia, Ukraine and Kaz...NOVIROST Limited
 

Viewers also liked (6)

Azuron - Jean-Marc Barthe
Azuron - Jean-Marc Barthe Azuron - Jean-Marc Barthe
Azuron - Jean-Marc Barthe
 
The place where you live
The place where you liveThe place where you live
The place where you live
 
Esc guidelines for guidelines update 2010
Esc guidelines for guidelines update 2010Esc guidelines for guidelines update 2010
Esc guidelines for guidelines update 2010
 
Hul
HulHul
Hul
 
So esitys kort
So esitys kortSo esitys kort
So esitys kort
 
Investments by institutions in primary agriculture in Russia, Ukraine and Kaz...
Investments by institutions in primary agriculture in Russia, Ukraine and Kaz...Investments by institutions in primary agriculture in Russia, Ukraine and Kaz...
Investments by institutions in primary agriculture in Russia, Ukraine and Kaz...
 

Similar to Setting up resources

03 Setting-up resources
03  Setting-up resources  03  Setting-up resources
03 Setting-up resources Soe Naing Win
 
MS Project - Lesson #2 - Managing Project ResourcesObjectives - .docx
MS Project - Lesson #2 - Managing Project ResourcesObjectives - .docxMS Project - Lesson #2 - Managing Project ResourcesObjectives - .docx
MS Project - Lesson #2 - Managing Project ResourcesObjectives - .docxrosemarybdodson23141
 
Yom Institute Presentation project management course
Yom Institute Presentation project management courseYom Institute Presentation project management course
Yom Institute Presentation project management courseAbebaw31
 
08 Fine-Tuning Resource Details
08 Fine-Tuning Resource Details08 Fine-Tuning Resource Details
08 Fine-Tuning Resource DetailsSoe Naing Win
 
Project Management Quick Reference Guide For Microsoft Project 2007
Project Management Quick Reference Guide For Microsoft Project 2007Project Management Quick Reference Guide For Microsoft Project 2007
Project Management Quick Reference Guide For Microsoft Project 2007Toney Sisk
 
Project Management Quick Reference Guide for Microsoft Project 2007
Project Management Quick Reference Guide for Microsoft Project 2007Project Management Quick Reference Guide for Microsoft Project 2007
Project Management Quick Reference Guide for Microsoft Project 2007Toney Sisk
 
Ms project tutorial
Ms project tutorialMs project tutorial
Ms project tutorialRonald Oroya
 
sMs project tutorial_iit
sMs project tutorial_iitsMs project tutorial_iit
sMs project tutorial_iitKushal Patel
 
Project Web Access Quick Reference Guide For Team Members
Project Web Access Quick Reference Guide For Team MembersProject Web Access Quick Reference Guide For Team Members
Project Web Access Quick Reference Guide For Team MembersToney Sisk
 
Devry proj 586 week 3 project guidelines microsoft project new
Devry proj 586 week 3 project guidelines microsoft project newDevry proj 586 week 3 project guidelines microsoft project new
Devry proj 586 week 3 project guidelines microsoft project newuopassignment
 
Course ProjectObjective Guidelines Milestones De.docx
Course ProjectObjective  Guidelines  Milestones  De.docxCourse ProjectObjective  Guidelines  Milestones  De.docx
Course ProjectObjective Guidelines Milestones De.docxmarilucorr
 
How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013Ong-Art Sanpinit
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013Ong-Art Sanpinit
 
Create a new work order in Ibm Maximo
Create a new work order in Ibm MaximoCreate a new work order in Ibm Maximo
Create a new work order in Ibm MaximoTony Bertram
 
SAP HR: Training & event management
SAP HR: Training & event managementSAP HR: Training & event management
SAP HR: Training & event managementanisha gupta
 
Lesson 13 primavera.pptx..........................
Lesson 13 primavera.pptx..........................Lesson 13 primavera.pptx..........................
Lesson 13 primavera.pptx..........................EngrMuhammadJavidNaw
 
For this project you may choose one that is of interest to you or .docx
For this project you may choose one that is of interest to you or .docxFor this project you may choose one that is of interest to you or .docx
For this project you may choose one that is of interest to you or .docxbudbarber38650
 

Similar to Setting up resources (20)

03 Setting-up resources
03  Setting-up resources  03  Setting-up resources
03 Setting-up resources
 
MS Project - Lesson #2 - Managing Project ResourcesObjectives - .docx
MS Project - Lesson #2 - Managing Project ResourcesObjectives - .docxMS Project - Lesson #2 - Managing Project ResourcesObjectives - .docx
MS Project - Lesson #2 - Managing Project ResourcesObjectives - .docx
 
Yom Institute Presentation project management course
Yom Institute Presentation project management courseYom Institute Presentation project management course
Yom Institute Presentation project management course
 
08 Fine-Tuning Resource Details
08 Fine-Tuning Resource Details08 Fine-Tuning Resource Details
08 Fine-Tuning Resource Details
 
Ppsi pertemuan-3
Ppsi pertemuan-3Ppsi pertemuan-3
Ppsi pertemuan-3
 
Project Management Quick Reference Guide
Project Management Quick Reference GuideProject Management Quick Reference Guide
Project Management Quick Reference Guide
 
Project Management Quick Reference Guide For Microsoft Project 2007
Project Management Quick Reference Guide For Microsoft Project 2007Project Management Quick Reference Guide For Microsoft Project 2007
Project Management Quick Reference Guide For Microsoft Project 2007
 
Project Management Quick Reference Guide for Microsoft Project 2007
Project Management Quick Reference Guide for Microsoft Project 2007Project Management Quick Reference Guide for Microsoft Project 2007
Project Management Quick Reference Guide for Microsoft Project 2007
 
Project management software
Project management softwareProject management software
Project management software
 
Ms project tutorial
Ms project tutorialMs project tutorial
Ms project tutorial
 
sMs project tutorial_iit
sMs project tutorial_iitsMs project tutorial_iit
sMs project tutorial_iit
 
Project Web Access Quick Reference Guide For Team Members
Project Web Access Quick Reference Guide For Team MembersProject Web Access Quick Reference Guide For Team Members
Project Web Access Quick Reference Guide For Team Members
 
Devry proj 586 week 3 project guidelines microsoft project new
Devry proj 586 week 3 project guidelines microsoft project newDevry proj 586 week 3 project guidelines microsoft project new
Devry proj 586 week 3 project guidelines microsoft project new
 
Course ProjectObjective Guidelines Milestones De.docx
Course ProjectObjective  Guidelines  Milestones  De.docxCourse ProjectObjective  Guidelines  Milestones  De.docx
Course ProjectObjective Guidelines Milestones De.docx
 
How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013
 
Create a new work order in Ibm Maximo
Create a new work order in Ibm MaximoCreate a new work order in Ibm Maximo
Create a new work order in Ibm Maximo
 
SAP HR: Training & event management
SAP HR: Training & event managementSAP HR: Training & event management
SAP HR: Training & event management
 
Lesson 13 primavera.pptx..........................
Lesson 13 primavera.pptx..........................Lesson 13 primavera.pptx..........................
Lesson 13 primavera.pptx..........................
 
For this project you may choose one that is of interest to you or .docx
For this project you may choose one that is of interest to you or .docxFor this project you may choose one that is of interest to you or .docx
For this project you may choose one that is of interest to you or .docx
 

Recently uploaded

presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesBoston Institute of Analytics
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 

Recently uploaded (20)

presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Setting up resources

  • 2. Objectives Set up basic resource information for the people who work on projects. Enter basic resource information for the equipment that will be used in projects. Enter resource information for the materials that will be consumed as the project progresses. Enter cost resource information for financial tracking. Set up cost information for work resources. Change a resource’s availability for work. Record additional information about a resource in a note.
  • 3. Resources include the people and equipment needed to complete the tasks in a project Microsoft Office Project 2007 focuses on two aspects of resources Availability Costs Availability determines when specific resources can work on tasks and how much work they can perform costs refer to how much money will be required to pay for those resources
  • 4. Setting Up People Resources Project works with three types of resources: Work Material Cost Work resources are the people and equipment that do the work of the project
  • 5. Cont>> Some examples of work resources
  • 6. Cont>> How to set up resource information for several people resources On the View menu, click Resource Sheet In the Resource Sheet view, click the cell directly below the Resource Name column heading Type Jonathan Mollerup, and press Enter On the next empty rows in the Resource Name column, enter the following names: Jon Ganio Garrett R.Vargas John Rodman
  • 7. Cont>> In the Resource Name field below the last resource, type Electrician, and then press TAB In the Type field, make sure that Work is selected, and then press TABseveral times to move to the Max. Unitsfield The Max. Units field represents the maximum capacity of a resource to accomplish any task The Max. Units field represents the maximum capacity of a resource to accomplish any task ENTER Click the Max. Units field for Jon Ganio, type or select 50%, and then press
  • 8. Setting Up Equipment Resources In Project, you set up people and equipment resources in exactly the same way because people and equipment are both examples of work resources However, you should be aware of important differences people resources might be flexible in the tasks they can perform, but equipment resources tend to be more specialized
  • 9. Cont>> you might want to set up equipment resources when Multiple teams or people might need a piece of equipment to accomplish different tasks simultaneously, and the equipment might be overbooked. You want to plan and track costs associated with the equipment.
  • 10. Enter information about equipment resources In the Resource Sheet, click the next empty cell in the Resource Namecolumn On the Standard toolbar, click the Resource Information button OR double-click a resource name Click the General tab if it is not already displayed In the Resource name field, type Mini-DV Camcorder In the Type field, click Work. In the Max. Units field for the Mini-DV Camcorder, type or click the arrows until the value shown is 300% and press ENTER
  • 11. Cont>> Enter the following information about equipment resources directly in the Resource Sheet or in the Resource Information dialog box, whichever you prefer. In either case, make sure Work is selected in the Type field.
  • 12. Setting Up Material Resources Material resources are consumables that you use up as the project proceeds On a construction project, material resources might include nails, lumber, and concrete You work with material resources in Project mainly to track the rate of consumption and the associated cost
  • 13. Cont>> How to enter information about a material resource In the Resource Sheet, click the next empty cell in the Resource Namecolumn Type Video Tape and press TAB In the Type field, click the down arrow, select Material, and press TAB In the Material Label field, type 30-min. cassette and press ENTER Note that you cannot enter a Max. Units value for a material resource. Since a material resource is a consumable item and not a person or piece of equipment that performs work, the Max. Units value doesn’t apply
  • 14. Setting Up Cost Resources The third and final type of resource that you can use in Project is the cost resource You can use a cost resource to represent a financial cost associated with a task in a project Common types of cost resources might include categories of expenses you’d want to track on a project for accounting purposes such as travel, entertainment, or training Like material resources, cost resources do no work and have no effect on the scheduling of a task
  • 15. Cont>> However, after you assign a cost resource to a task and specify the cost amount per task, you can then see the cumulative costs for that type of cost resource In the Resource Sheet, click the next empty cell in the Resource Name column. 2. Type Travel and press TAB. 3. In the Type field, click the down arrow, select Cost, and press ENTER.
  • 16. Entering Resource Pay Rates Almost all projects have some financial aspect, and cost limits drive the scope of many projects. Tracking and managing cost information allows the project manager to answer such important questions as What is the expected total cost of the project based on our task duration and resource estimates? Are we using expensive resources to do work that less expensive resources could do? How much money will a specific type of resource or task cost over the life of the project? How have we allocated a particular type of expense, such as travel, in a project? Are we spending money at a rate that we can sustain for the planned duration of the project
  • 17. Cont>> How to enter cost information for each work resource In the Resource Sheet, click the Std. Rate field for Jonathan Mollerup Type 10 and press ENTER In the Std. Rate field for Jon Ganio, type 15.50 and press ENTER Enter the following standard pay rates for the given resources
  • 19. Adjusting Working Time for Individual Resources Project uses different types of calendars for different purposes A resource calendar controls the working and nonworking times of a resource Project uses resource calendars to determine when work for a specific resource can be scheduled Resource calendars apply only to work resources (people and equipment) and not to material or cost resources
  • 20. Cont>> When you initially create resources in a project plan, Project creates a resource calendar for each work resource. The initial working time settings for resource calendars exactly match those of the Standard base calendar, chances are that some of your resources will need exceptions to the working time in the Standard base calendar-such as A flex-time work schedule Vacation time Other times when a resource is not available to work on the project, such as time spent training or attending a conference
  • 21. Cont>> How to specify the working and nonworking times for individual work resources On the Tools menu, click Change Working Time. The Change Working Time dialog box appears. In the For calendar box, click Garrett R.Vargas. Garrett R.Vargas’s resource calendar appears in the Change Working Time dialog box. Garrett has told you he will not be available to work on Thursday and Friday, January 10 and 11, because he plans to attend a film festival. On the Exceptions tab in the Change Working Time dialog box, click in the first row directly below the Name column heading and type Garrett attending West Coast Film Festival
  • 22. Cont>> Click in the Start field and type or select 1/10/2008. Click in the Finish field, type or select 1/11/2008, and then press ENTER