SlideShare a Scribd company logo
1 of 21
150w
90w
DEPARTMENT OF ELECTRICAL ENGG.
RTU KOTA
Under Guidance by :- presented by:-
Prof. ANNAPURNA BHARGAW Surendra Gurjar 13/690
Jeevan kumar 13/681
Prof. MAHENDRA LALWANI Mukesh kumar13/680
Hemant Kumar 13/680
 Introduction
 Solar Power in India
 Solar power in Rajasthan
 Project review
 Main component of the solar system
 Schematic diagram
 Working of this project
 Estimation and costing
 Calculations for parameter rating
 Installation money recovery
 Advantage of solar panels
 Recycling
 Solar panels are a great way of cutting our
electricity bills.
 Solar energy is the most widely and easily available
energy source which can be used to produce
pollution free and eco – friendly electricity.
 Government-funded solar electricity in India
was approximately 6.4 MW per year as of
2005
 25.1MW was added in 2010 and 468.3 MW in
2011
 As on 30 June 2015, the installed grid
connected solar power capacity is
4,060.65 MW
 India expects to install an additional
10,000 MW by 2017, and a total of
100,000 MW by 2022
 Rajasthan is one of the states of India in the field of solar energy.
The total photovoltaic capacity has passed 500 MW, reaching
510.25 MW at the end of the 2012-13.
 The district of Jodhpur leads with 42 projects totaling 293 MW,
followed by Jaisalmer and Bikaner. In total there were 84 projects
with installed capacity of 512.9.
 A 4,000MW Ultra Mega Green Solar Power Project (UMPP) is
being built near Sambhar Lake in Rajasthan. Upon Completion, it
would be world's largest Solar Power Plant. It is expected to be
built in 4 phases, with the first phase likely to be commissioned
by the end of 2016 with 1,000 MW capacity. The total cost of
each phase of the project is estimated to be R70 billion and the
entire project is expected to be completed in 7 years.
 The present Prime Minister Narendra Modi has put great
emphasis on solar projects and is inviting FDI in this sector
 This project has its major use in electricity savings in
the building blocks, room etc.
 The project is basically a solar power system, so it is
very useful in saving of electricity. Mainly in building
there is a problem of the electricity interruption so
use to solar system we solve this problem.
 By using this project we reduce the electricity bill of
the building block and save the money up to 10800
rupees in one year for load 600 watt Running for 8
hour.
 Installation cost of this we can recover in 5 years and
the age of solar panel is 25 year approximately. So
we have 20 year for free electricity use.
 Polycrystalline Solar panels
 Solar charge controller
 Inverter
 Battery
 Wire and other equipment
 Polycrystalline solar panel is a type of solar
panel which made of polycrystalline silicon.
 Many crystalline silicon module
manufactures offer a warranty that
guarantees electrical production for 10
years 90% of rated power output and after
that 80% .
 It is also recyclable.
 It is possible to recover more than 80% of
the incoming weight
SOLAR
CHARGE
CONTROLLER
The current we get from
solar panels will not
remain constant through
out the day, so many ups
and downs will be there
so that we can not
connect solar
photovoltaic
Modules directly to
charge or battery it will
spoil or battery overtime
So we need a device cold
solar charge controller to
control the current
INVERTER
The voltage
generate from solar
pv module is dc
voltage but the load
are ac equipment so
we have use an
inverter to convert
dc power to ac
power
BATTERY
Battery stored an
electrically power
coming from pv
system when grid
is off and also
store power
coming from ac
line.
 In this 600 watts solar setup, we will get 500
watts current for sure from solar panels in day
time this means 8 am to 5 pm.
 We can use the free current from PV modules
during this day time by manually switching off
the Input to Inverter (power supply from grid), so
that the inverter battery will be charged with
available solar power.
 While the battery is getting charge from solar
panels, concurrently we can use the battery
power to power up our home.
 So, with solar power, the battery will be get
charge and on the other side the battery will
deliver current to inverter for powering up our
gadgets, this happens simultaneously.
 As we have only 600 watts solar panel setup, we should not use
more than 500 watts power from inverter during day time.
 Lets see how many Fans, lights and TV can we use with this
500watts power during day time.
 1 fans – 80 watts
 1Cooler – 180
 One pc – 150 watts
 Total – 410 watts
 (As we don’t use lights during day time, i exclude it from this
list.)
 So, we use 410 watts power during day time, then what happens
to the excess 90 watts of current generated by solar panels
 The excess 90 watts will go directly in to your battery storage,
not only that 90 watts, if you switch off the pc for 1 hour in day
time, that 150 watts used by pc also goes to battery storage
directly.
Equipment Ratting Quant. Cost
 Polycrystalline
solar panel 300W ,12v 2 30000
 Pwm solar
charge controller 12v , 30amp 1 2000
 Microtech sine
wave inverter 1000va 1 4000
 Battery 12v , 150ah 1 14000
 Wire & other
Equipment as required as required 5000
Total amount = 55000
 Inverter rating
 The number of solar panel
 Rating of solar panel
 Rating of battery
 Back up time of battery
 Charging time for battery
 Calculation for Solar Panel Installation
new.docx
We have the total load = 600watts
Sun rays time duration in a day (9am to 5pm) = 8hr
So, Energy consume in this time duration by load = 600*8
= 4800wats
Daily unit for consume by total load = (4800/1000)
= 4.8unit (Approx 5 unit)
Monthly unit = 5*30=150
Cost of 1 unit = 6/-
Total monthly cost (bill) = 150*6=900
Annual cost = 12*900=10800/-
So in one year this project recover = 10800/-
Then required amount (55000) of installation recovers in 5
years approximately.
But a solar panel age is 25 year
So we have 20 year for free electricity use.
Now
Total amount of billing in 25yr for 600watt load = 25*10800
= 2, 70,000/-
So amount of bill save= 270000-55000
= 2,15,000/-
 No fuel requirement compare to conventional
power plant
 No wastes are produced
 Less maintenance cost
 Pollution free because hazard gases like CO2
SO2,CO,CFC NO2 are not reduces
 Recycling
 Most parts of a solar module can be recycled
including up to 97% of certain semiconductor
materials or the glass as well as large
amounts of ferrous and non-ferrous metals.
 Since 2010, there is an annual European
conference bringing together manufacturers,
recyclers and researchers to look at the future
of PV module recycling.
 recycling .docx
.

More Related Content

What's hot

Small residential stand alone roof top solar pv
Small residential stand alone roof top solar pvSmall residential stand alone roof top solar pv
Small residential stand alone roof top solar pvencon2014
 
A quick guide to off grid solar power systems design
A quick guide to off grid solar power systems designA quick guide to off grid solar power systems design
A quick guide to off grid solar power systems designMathy Mpassy Isinki
 
Solar PV design and installation
Solar PV design and installationSolar PV design and installation
Solar PV design and installationAYISHA NAZIBA
 
Solar photovoltaic system design
Solar photovoltaic system designSolar photovoltaic system design
Solar photovoltaic system designJay Ranvir
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantL'Obel Solar Power System
 
Mini grid design manual
Mini grid design manualMini grid design manual
Mini grid design manualSolarReference
 
Rooftop Solar Panel installation and cost analysis in INDIA
Rooftop Solar Panel installation and cost analysis in INDIARooftop Solar Panel installation and cost analysis in INDIA
Rooftop Solar Panel installation and cost analysis in INDIAVikrant Singh
 
HYBRID SOLAR INVERTER
HYBRID SOLAR INVERTERHYBRID SOLAR INVERTER
HYBRID SOLAR INVERTERprabhat kumar
 
Solar on grid application ppt
Solar on grid application pptSolar on grid application ppt
Solar on grid application pptswati malla
 
solar photovoltaic system
solar photovoltaic systemsolar photovoltaic system
solar photovoltaic systemPrachet Sokhiya
 
Mme solar off grid &on grid solar system -
Mme solar off grid &on grid solar system - Mme solar off grid &on grid solar system -
Mme solar off grid &on grid solar system - mme
 
Solar power invertor
Solar power invertorSolar power invertor
Solar power invertorManhar Singh
 
Proposal for Installation of Solar PV system and Steam Cooking System.
Proposal for Installation of Solar PV system and Steam Cooking System.Proposal for Installation of Solar PV system and Steam Cooking System.
Proposal for Installation of Solar PV system and Steam Cooking System.Sridhar Sibi
 

What's hot (20)

Small residential stand alone roof top solar pv
Small residential stand alone roof top solar pvSmall residential stand alone roof top solar pv
Small residential stand alone roof top solar pv
 
A quick guide to off grid solar power systems design
A quick guide to off grid solar power systems designA quick guide to off grid solar power systems design
A quick guide to off grid solar power systems design
 
Solar PV design and installation
Solar PV design and installationSolar PV design and installation
Solar PV design and installation
 
Designing Solar PV Systems (Rooftops)
Designing Solar PV Systems(Rooftops)Designing Solar PV Systems(Rooftops)
Designing Solar PV Systems (Rooftops)
 
Solar photovoltaic system design
Solar photovoltaic system designSolar photovoltaic system design
Solar photovoltaic system design
 
3 mwpv plant
3 mwpv plant3 mwpv plant
3 mwpv plant
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plant
 
Mini grid design manual
Mini grid design manualMini grid design manual
Mini grid design manual
 
mohan.final
mohan.finalmohan.final
mohan.final
 
Rooftop Solar Panel installation and cost analysis in INDIA
Rooftop Solar Panel installation and cost analysis in INDIARooftop Solar Panel installation and cost analysis in INDIA
Rooftop Solar Panel installation and cost analysis in INDIA
 
HYBRID SOLAR INVERTER
HYBRID SOLAR INVERTERHYBRID SOLAR INVERTER
HYBRID SOLAR INVERTER
 
Pv Solar Grid Connect Solar Design
Pv Solar Grid Connect Solar DesignPv Solar Grid Connect Solar Design
Pv Solar Grid Connect Solar Design
 
Solar on grid application ppt
Solar on grid application pptSolar on grid application ppt
Solar on grid application ppt
 
solar photovoltaic system
solar photovoltaic systemsolar photovoltaic system
solar photovoltaic system
 
Solar off grid
Solar off gridSolar off grid
Solar off grid
 
Mme solar off grid &on grid solar system -
Mme solar off grid &on grid solar system - Mme solar off grid &on grid solar system -
Mme solar off grid &on grid solar system -
 
Solar Development In India
Solar Development In IndiaSolar Development In India
Solar Development In India
 
Solar power invertor
Solar power invertorSolar power invertor
Solar power invertor
 
Benefits of Solar Energy - Sri Lanka
Benefits of Solar Energy - Sri LankaBenefits of Solar Energy - Sri Lanka
Benefits of Solar Energy - Sri Lanka
 
Proposal for Installation of Solar PV system and Steam Cooking System.
Proposal for Installation of Solar PV system and Steam Cooking System.Proposal for Installation of Solar PV system and Steam Cooking System.
Proposal for Installation of Solar PV system and Steam Cooking System.
 

Similar to installation of grid solar panel of electrical department

STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)sajidpk92
 
Indian National Solar Mission
Indian National Solar MissionIndian National Solar Mission
Indian National Solar MissionH Janardan Prabhu
 
technical paper
technical papertechnical paper
technical paperJ K Shree
 
Abhay Solar Catalogue 2023 Last Update.pdf
Abhay Solar Catalogue 2023 Last Update.pdfAbhay Solar Catalogue 2023 Last Update.pdf
Abhay Solar Catalogue 2023 Last Update.pdfvivekpaldiwal1
 
INDIAN SOLAR ENERGY [Bharat Surya Urja]
INDIAN SOLAR ENERGY [Bharat Surya Urja]INDIAN SOLAR ENERGY [Bharat Surya Urja]
INDIAN SOLAR ENERGY [Bharat Surya Urja]H Janardan Prabhu
 
Vertical axis wind turbine.pptx
Vertical axis wind turbine.pptxVertical axis wind turbine.pptx
Vertical axis wind turbine.pptxNagraj Tondchore
 
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWERTHE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWERDv Nareshkumar
 
Indian solar energy sector at a glance..
Indian solar energy sector at a glance..Indian solar energy sector at a glance..
Indian solar energy sector at a glance..Ankesh Singh
 
Real Time Monitoring and Simulation Analysis of 30WP off Grid Solar Rooftop P...
Real Time Monitoring and Simulation Analysis of 30WP off Grid Solar Rooftop P...Real Time Monitoring and Simulation Analysis of 30WP off Grid Solar Rooftop P...
Real Time Monitoring and Simulation Analysis of 30WP off Grid Solar Rooftop P...IRJET Journal
 
Solar energy two case studies
Solar energy   two case studiesSolar energy   two case studies
Solar energy two case studiesK Vivek Varkey
 
Harnessing solar in telangana
Harnessing solar in telanganaHarnessing solar in telangana
Harnessing solar in telanganaSatya Kumar DV
 
IRJET- Planning and Designing of Zero Energy Residential Building
IRJET-  	  Planning and Designing of  Zero Energy Residential BuildingIRJET-  	  Planning and Designing of  Zero Energy Residential Building
IRJET- Planning and Designing of Zero Energy Residential BuildingIRJET Journal
 
Proposal for 1kwp Roof-Top Solar PV Plant
Proposal for 1kwp Roof-Top Solar PV PlantProposal for 1kwp Roof-Top Solar PV Plant
Proposal for 1kwp Roof-Top Solar PV PlantIRJET Journal
 

Similar to installation of grid solar panel of electrical department (20)

STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)
 
JN National Solar-Mission
JN National Solar-MissionJN National Solar-Mission
JN National Solar-Mission
 
Indian National Solar Mission
Indian National Solar MissionIndian National Solar Mission
Indian National Solar Mission
 
Solar PPt.pptx
Solar PPt.pptxSolar PPt.pptx
Solar PPt.pptx
 
technical paper
technical papertechnical paper
technical paper
 
roof top solar
roof top solarroof top solar
roof top solar
 
Abhay Solar Catalogue 2023 Last Update.pdf
Abhay Solar Catalogue 2023 Last Update.pdfAbhay Solar Catalogue 2023 Last Update.pdf
Abhay Solar Catalogue 2023 Last Update.pdf
 
Research paper
Research paperResearch paper
Research paper
 
Bharat Surya Urja
Bharat Surya UrjaBharat Surya Urja
Bharat Surya Urja
 
SORALITE POWER
SORALITE POWERSORALITE POWER
SORALITE POWER
 
INDIAN SOLAR ENERGY [Bharat Surya Urja]
INDIAN SOLAR ENERGY [Bharat Surya Urja]INDIAN SOLAR ENERGY [Bharat Surya Urja]
INDIAN SOLAR ENERGY [Bharat Surya Urja]
 
Vertical axis wind turbine.pptx
Vertical axis wind turbine.pptxVertical axis wind turbine.pptx
Vertical axis wind turbine.pptx
 
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWERTHE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
THE ULTIMATE RENEWABLE RESOURCE - SOLAR POWER
 
Indian solar energy sector at a glance..
Indian solar energy sector at a glance..Indian solar energy sector at a glance..
Indian solar energy sector at a glance..
 
Why to go Solar?
Why to go Solar?Why to go Solar?
Why to go Solar?
 
Real Time Monitoring and Simulation Analysis of 30WP off Grid Solar Rooftop P...
Real Time Monitoring and Simulation Analysis of 30WP off Grid Solar Rooftop P...Real Time Monitoring and Simulation Analysis of 30WP off Grid Solar Rooftop P...
Real Time Monitoring and Simulation Analysis of 30WP off Grid Solar Rooftop P...
 
Solar energy two case studies
Solar energy   two case studiesSolar energy   two case studies
Solar energy two case studies
 
Harnessing solar in telangana
Harnessing solar in telanganaHarnessing solar in telangana
Harnessing solar in telangana
 
IRJET- Planning and Designing of Zero Energy Residential Building
IRJET-  	  Planning and Designing of  Zero Energy Residential BuildingIRJET-  	  Planning and Designing of  Zero Energy Residential Building
IRJET- Planning and Designing of Zero Energy Residential Building
 
Proposal for 1kwp Roof-Top Solar PV Plant
Proposal for 1kwp Roof-Top Solar PV PlantProposal for 1kwp Roof-Top Solar PV Plant
Proposal for 1kwp Roof-Top Solar PV Plant
 

Recently uploaded

Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxMuhammadAsimMuhammad6
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 

Recently uploaded (20)

Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 

installation of grid solar panel of electrical department

  • 2. DEPARTMENT OF ELECTRICAL ENGG. RTU KOTA Under Guidance by :- presented by:- Prof. ANNAPURNA BHARGAW Surendra Gurjar 13/690 Jeevan kumar 13/681 Prof. MAHENDRA LALWANI Mukesh kumar13/680 Hemant Kumar 13/680
  • 3.  Introduction  Solar Power in India  Solar power in Rajasthan  Project review  Main component of the solar system  Schematic diagram  Working of this project  Estimation and costing  Calculations for parameter rating  Installation money recovery  Advantage of solar panels  Recycling
  • 4.  Solar panels are a great way of cutting our electricity bills.  Solar energy is the most widely and easily available energy source which can be used to produce pollution free and eco – friendly electricity.
  • 5.  Government-funded solar electricity in India was approximately 6.4 MW per year as of 2005  25.1MW was added in 2010 and 468.3 MW in 2011  As on 30 June 2015, the installed grid connected solar power capacity is 4,060.65 MW  India expects to install an additional 10,000 MW by 2017, and a total of 100,000 MW by 2022
  • 6.  Rajasthan is one of the states of India in the field of solar energy. The total photovoltaic capacity has passed 500 MW, reaching 510.25 MW at the end of the 2012-13.  The district of Jodhpur leads with 42 projects totaling 293 MW, followed by Jaisalmer and Bikaner. In total there were 84 projects with installed capacity of 512.9.  A 4,000MW Ultra Mega Green Solar Power Project (UMPP) is being built near Sambhar Lake in Rajasthan. Upon Completion, it would be world's largest Solar Power Plant. It is expected to be built in 4 phases, with the first phase likely to be commissioned by the end of 2016 with 1,000 MW capacity. The total cost of each phase of the project is estimated to be R70 billion and the entire project is expected to be completed in 7 years.  The present Prime Minister Narendra Modi has put great emphasis on solar projects and is inviting FDI in this sector
  • 7.  This project has its major use in electricity savings in the building blocks, room etc.  The project is basically a solar power system, so it is very useful in saving of electricity. Mainly in building there is a problem of the electricity interruption so use to solar system we solve this problem.  By using this project we reduce the electricity bill of the building block and save the money up to 10800 rupees in one year for load 600 watt Running for 8 hour.  Installation cost of this we can recover in 5 years and the age of solar panel is 25 year approximately. So we have 20 year for free electricity use.
  • 8.  Polycrystalline Solar panels  Solar charge controller  Inverter  Battery  Wire and other equipment
  • 9.  Polycrystalline solar panel is a type of solar panel which made of polycrystalline silicon.  Many crystalline silicon module manufactures offer a warranty that guarantees electrical production for 10 years 90% of rated power output and after that 80% .  It is also recyclable.  It is possible to recover more than 80% of the incoming weight
  • 10.
  • 11. SOLAR CHARGE CONTROLLER The current we get from solar panels will not remain constant through out the day, so many ups and downs will be there so that we can not connect solar photovoltaic Modules directly to charge or battery it will spoil or battery overtime So we need a device cold solar charge controller to control the current INVERTER The voltage generate from solar pv module is dc voltage but the load are ac equipment so we have use an inverter to convert dc power to ac power BATTERY Battery stored an electrically power coming from pv system when grid is off and also store power coming from ac line.
  • 12.
  • 13.  In this 600 watts solar setup, we will get 500 watts current for sure from solar panels in day time this means 8 am to 5 pm.  We can use the free current from PV modules during this day time by manually switching off the Input to Inverter (power supply from grid), so that the inverter battery will be charged with available solar power.  While the battery is getting charge from solar panels, concurrently we can use the battery power to power up our home.  So, with solar power, the battery will be get charge and on the other side the battery will deliver current to inverter for powering up our gadgets, this happens simultaneously.
  • 14.  As we have only 600 watts solar panel setup, we should not use more than 500 watts power from inverter during day time.  Lets see how many Fans, lights and TV can we use with this 500watts power during day time.  1 fans – 80 watts  1Cooler – 180  One pc – 150 watts  Total – 410 watts  (As we don’t use lights during day time, i exclude it from this list.)  So, we use 410 watts power during day time, then what happens to the excess 90 watts of current generated by solar panels  The excess 90 watts will go directly in to your battery storage, not only that 90 watts, if you switch off the pc for 1 hour in day time, that 150 watts used by pc also goes to battery storage directly.
  • 15. Equipment Ratting Quant. Cost  Polycrystalline solar panel 300W ,12v 2 30000  Pwm solar charge controller 12v , 30amp 1 2000  Microtech sine wave inverter 1000va 1 4000  Battery 12v , 150ah 1 14000  Wire & other Equipment as required as required 5000 Total amount = 55000
  • 16.  Inverter rating  The number of solar panel  Rating of solar panel  Rating of battery  Back up time of battery  Charging time for battery  Calculation for Solar Panel Installation new.docx
  • 17. We have the total load = 600watts Sun rays time duration in a day (9am to 5pm) = 8hr So, Energy consume in this time duration by load = 600*8 = 4800wats Daily unit for consume by total load = (4800/1000) = 4.8unit (Approx 5 unit) Monthly unit = 5*30=150 Cost of 1 unit = 6/- Total monthly cost (bill) = 150*6=900 Annual cost = 12*900=10800/- So in one year this project recover = 10800/-
  • 18. Then required amount (55000) of installation recovers in 5 years approximately. But a solar panel age is 25 year So we have 20 year for free electricity use. Now Total amount of billing in 25yr for 600watt load = 25*10800 = 2, 70,000/- So amount of bill save= 270000-55000 = 2,15,000/-
  • 19.  No fuel requirement compare to conventional power plant  No wastes are produced  Less maintenance cost  Pollution free because hazard gases like CO2 SO2,CO,CFC NO2 are not reduces  Recycling
  • 20.  Most parts of a solar module can be recycled including up to 97% of certain semiconductor materials or the glass as well as large amounts of ferrous and non-ferrous metals.  Since 2010, there is an annual European conference bringing together manufacturers, recyclers and researchers to look at the future of PV module recycling.  recycling .docx
  • 21. .