21 x lighting points
12 x double 10 A socket-outlets
1 x 15 A socket-outlet
1 x 230 V, 6.0 kW oven
1 x 230 V, 2.4 kW instantaneous water heater
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
Load       Description      Current       Calculation   Demand
Group       of load         allowance                   current
(column 1) (given list)     per unit                    (Amps)
                            (column 2)
            21 lighting     3A            3+2            5.0
   A (i)
            points
            12 double       10 A (1st 20) 10 + 5         15.0
            outlets         5 A (next 20)
   B (i)
            (equivalent 24
            sockets)
            15 single-phase 10 A          None           10.0
   B (ii)
            outlets
                            50%           (6000 / 240) x 12.5
    C       Oven rating
                            (or x 0.5)    0.5
     E      Instantaneous 33.3 %          (2400 / 240) x 3.33
            HWS             (or x 0.33) 0.33
                 Total demand current = 45.83 A
Electrical load calculation

More Related Content

Viewers also liked

Illumination - Method of calculation
Illumination - Method of calculationIllumination - Method of calculation
Illumination - Method of calculationVijay Raskar
 
Cellphone detector report
Cellphone detector reportCellphone detector report
Cellphone detector reportvenu13
 
Estimation of a residential building
Estimation of a residential buildingEstimation of a residential building
Estimation of a residential buildingVardhaman Sethia
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Ritesh Ambadkar
 
Building Services Electrical (MEP)
Building Services Electrical (MEP)Building Services Electrical (MEP)
Building Services Electrical (MEP)Manoj Mawle
 
Electrical Systems in a Building
Electrical Systems in a BuildingElectrical Systems in a Building
Electrical Systems in a BuildingGAURAV. H .TANDON
 

Viewers also liked (10)

Lighting
LightingLighting
Lighting
 
Illumination - Method of calculation
Illumination - Method of calculationIllumination - Method of calculation
Illumination - Method of calculation
 
Cellphone detector report
Cellphone detector reportCellphone detector report
Cellphone detector report
 
Estimation of a residential building
Estimation of a residential buildingEstimation of a residential building
Estimation of a residential building
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)
 
Building Services Electrical (MEP)
Building Services Electrical (MEP)Building Services Electrical (MEP)
Building Services Electrical (MEP)
 
Electrical Wiring Practices and Diagrams
Electrical Wiring Practices and DiagramsElectrical Wiring Practices and Diagrams
Electrical Wiring Practices and Diagrams
 
Building services
Building servicesBuilding services
Building services
 
ELECTRICAL WIRING
ELECTRICAL WIRINGELECTRICAL WIRING
ELECTRICAL WIRING
 
Electrical Systems in a Building
Electrical Systems in a BuildingElectrical Systems in a Building
Electrical Systems in a Building
 

Similar to Electrical load calculation

4.1.3 Example Solution Three
4.1.3 Example Solution Three4.1.3 Example Solution Three
4.1.3 Example Solution ThreeTalia Carbis
 
4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 Table4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 TableTalia Carbis
 
4.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part24.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part2Talia Carbis
 
Chapter 2 ( A) - Polyphase Circuits .ppt
Chapter 2 ( A) - Polyphase Circuits .pptChapter 2 ( A) - Polyphase Circuits .ppt
Chapter 2 ( A) - Polyphase Circuits .pptLiewChiaPing
 
Gate ee 2008 with solutions
Gate ee 2008 with solutionsGate ee 2008 with solutions
Gate ee 2008 with solutionskhemraj298
 

Similar to Electrical load calculation (7)

4.1.4 Step 2
4.1.4 Step 24.1.4 Step 2
4.1.4 Step 2
 
4.1.3 Example Solution Three
4.1.3 Example Solution Three4.1.3 Example Solution Three
4.1.3 Example Solution Three
 
4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 Table4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 Table
 
4.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part24.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part2
 
Chapter 2 ( A) - Polyphase Circuits .ppt
Chapter 2 ( A) - Polyphase Circuits .pptChapter 2 ( A) - Polyphase Circuits .ppt
Chapter 2 ( A) - Polyphase Circuits .ppt
 
Gate ee 2008 with solutions
Gate ee 2008 with solutionsGate ee 2008 with solutions
Gate ee 2008 with solutions
 
Unit4questions
Unit4questionsUnit4questions
Unit4questions
 

More from Talia Carbis

4.1.13 Light Demand 3
4.1.13 Light Demand 34.1.13 Light Demand 3
4.1.13 Light Demand 3Talia Carbis
 
4.1.10 Light Demand 2
4.1.10 Light Demand 24.1.10 Light Demand 2
4.1.10 Light Demand 2Talia Carbis
 
4.1.9 Light Demand 1
4.1.9 Light Demand 14.1.9 Light Demand 1
4.1.9 Light Demand 1Talia Carbis
 
4.1.8 Light Demand
4.1.8 Light Demand4.1.8 Light Demand
4.1.8 Light DemandTalia Carbis
 
4.1.7 Example Domestic 3
4.1.7 Example Domestic 34.1.7 Example Domestic 3
4.1.7 Example Domestic 3Talia Carbis
 
4.1.6 Example Domestic 2
4.1.6 Example Domestic 24.1.6 Example Domestic 2
4.1.6 Example Domestic 2Talia Carbis
 
4.1.5 Example Domestic 1
4.1.5 Example Domestic 14.1.5 Example Domestic 1
4.1.5 Example Domestic 1Talia Carbis
 
4.1.2 Example Three
4.1.2 Example Three4.1.2 Example Three
4.1.2 Example ThreeTalia Carbis
 
14.5.4 Example 1 Part 1
14.5.4 Example 1 Part 114.5.4 Example 1 Part 1
14.5.4 Example 1 Part 1Talia Carbis
 
14.5.8 Example 1 Part 5
14.5.8 Example 1 Part 514.5.8 Example 1 Part 5
14.5.8 Example 1 Part 5Talia Carbis
 
14.5.7 Example 1 Part 4
14.5.7 Example 1 Part 414.5.7 Example 1 Part 4
14.5.7 Example 1 Part 4Talia Carbis
 
14.5.6 Example 1 Part 3
14.5.6 Example 1 Part 314.5.6 Example 1 Part 3
14.5.6 Example 1 Part 3Talia Carbis
 
14.5.5 Example 1 Part 2
14.5.5 Example 1 Part 214.5.5 Example 1 Part 2
14.5.5 Example 1 Part 2Talia Carbis
 
14.5.1 Improvement
14.5.1 Improvement14.5.1 Improvement
14.5.1 ImprovementTalia Carbis
 

More from Talia Carbis (20)

7.4.6 slip
7.4.6 slip7.4.6 slip
7.4.6 slip
 
4.2.1 Better Load
4.2.1 Better Load4.2.1 Better Load
4.2.1 Better Load
 
4.1.13 Light Demand 3
4.1.13 Light Demand 34.1.13 Light Demand 3
4.1.13 Light Demand 3
 
4.1.10 Light Demand 2
4.1.10 Light Demand 24.1.10 Light Demand 2
4.1.10 Light Demand 2
 
4.1.9 Light Demand 1
4.1.9 Light Demand 14.1.9 Light Demand 1
4.1.9 Light Demand 1
 
4.1.8 Light Demand
4.1.8 Light Demand4.1.8 Light Demand
4.1.8 Light Demand
 
4.1.7 Example Domestic 3
4.1.7 Example Domestic 34.1.7 Example Domestic 3
4.1.7 Example Domestic 3
 
4.1.6 Example Domestic 2
4.1.6 Example Domestic 24.1.6 Example Domestic 2
4.1.6 Example Domestic 2
 
4.1.5 Example Domestic 1
4.1.5 Example Domestic 14.1.5 Example Domestic 1
4.1.5 Example Domestic 1
 
4.1.2 Example Three
4.1.2 Example Three4.1.2 Example Three
4.1.2 Example Three
 
5.4.4 LR Circuits
5.4.4 LR Circuits5.4.4 LR Circuits
5.4.4 LR Circuits
 
14.5.4 Example 1 Part 1
14.5.4 Example 1 Part 114.5.4 Example 1 Part 1
14.5.4 Example 1 Part 1
 
14.5.3 Improve
14.5.3 Improve14.5.3 Improve
14.5.3 Improve
 
14.1.2 TRA Power
14.1.2 TRA Power14.1.2 TRA Power
14.1.2 TRA Power
 
14.5.8 Example 1 Part 5
14.5.8 Example 1 Part 514.5.8 Example 1 Part 5
14.5.8 Example 1 Part 5
 
14.5.7 Example 1 Part 4
14.5.7 Example 1 Part 414.5.7 Example 1 Part 4
14.5.7 Example 1 Part 4
 
14.5.6 Example 1 Part 3
14.5.6 Example 1 Part 314.5.6 Example 1 Part 3
14.5.6 Example 1 Part 3
 
14.5.5 Example 1 Part 2
14.5.5 Example 1 Part 214.5.5 Example 1 Part 2
14.5.5 Example 1 Part 2
 
14.5.2 Correction
14.5.2 Correction14.5.2 Correction
14.5.2 Correction
 
14.5.1 Improvement
14.5.1 Improvement14.5.1 Improvement
14.5.1 Improvement
 

Recently uploaded

Paragliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir
 
Revolutionalizing Travel: A VacAI Update
Revolutionalizing Travel: A VacAI UpdateRevolutionalizing Travel: A VacAI Update
Revolutionalizing Travel: A VacAI Updatejoymorrison10
 
Inspirational Quotes About Italy and Food
Inspirational Quotes About Italy and FoodInspirational Quotes About Italy and Food
Inspirational Quotes About Italy and FoodKasia Chojecki
 
question 2: airplane vocabulary presentation
question 2: airplane vocabulary presentationquestion 2: airplane vocabulary presentation
question 2: airplane vocabulary presentationcaminantesdaauga
 
Where to Stay in Lagos, Portugal.pptxasd
Where to Stay in Lagos, Portugal.pptxasdWhere to Stay in Lagos, Portugal.pptxasd
Where to Stay in Lagos, Portugal.pptxasdusmanghaniwixpatriot
 
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's JewelSicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's JewelTime for Sicily
 
It’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldIt’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldParagliding Billing Bir
 
How Safe Is It To Witness Whales In Maui’s Waters
How Safe Is It To Witness Whales In Maui’s WatersHow Safe Is It To Witness Whales In Maui’s Waters
How Safe Is It To Witness Whales In Maui’s WatersMakena Coast Charters
 
Phil....National-Capital-Region-NCR.pptx
Phil....National-Capital-Region-NCR.pptxPhil....National-Capital-Region-NCR.pptx
Phil....National-Capital-Region-NCR.pptxDitasDelaCruz
 
a presentation for foreigners about how to travel in Germany.
a presentation for foreigners about how to travel in Germany.a presentation for foreigners about how to travel in Germany.
a presentation for foreigners about how to travel in Germany.moritzmieg
 
Authentic Travel Experience 2024 Greg DeShields.pptx
Authentic Travel Experience 2024 Greg DeShields.pptxAuthentic Travel Experience 2024 Greg DeShields.pptx
Authentic Travel Experience 2024 Greg DeShields.pptxGregory DeShields
 
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)Mazie Garcia
 
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)Escort Service
 

Recently uploaded (15)

Paragliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal Pardesh
 
Revolutionalizing Travel: A VacAI Update
Revolutionalizing Travel: A VacAI UpdateRevolutionalizing Travel: A VacAI Update
Revolutionalizing Travel: A VacAI Update
 
Enjoy ➥8448380779▻ Call Girls In Sector 74 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 74 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 74 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 74 Noida Escorts Delhi NCR
 
Inspirational Quotes About Italy and Food
Inspirational Quotes About Italy and FoodInspirational Quotes About Italy and Food
Inspirational Quotes About Italy and Food
 
question 2: airplane vocabulary presentation
question 2: airplane vocabulary presentationquestion 2: airplane vocabulary presentation
question 2: airplane vocabulary presentation
 
Where to Stay in Lagos, Portugal.pptxasd
Where to Stay in Lagos, Portugal.pptxasdWhere to Stay in Lagos, Portugal.pptxasd
Where to Stay in Lagos, Portugal.pptxasd
 
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's JewelSicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
Sicily Holidays Guide Book: Unveiling the Treasures of Italy's Jewel
 
It’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldIt’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The World
 
How Safe Is It To Witness Whales In Maui’s Waters
How Safe Is It To Witness Whales In Maui’s WatersHow Safe Is It To Witness Whales In Maui’s Waters
How Safe Is It To Witness Whales In Maui’s Waters
 
Phil....National-Capital-Region-NCR.pptx
Phil....National-Capital-Region-NCR.pptxPhil....National-Capital-Region-NCR.pptx
Phil....National-Capital-Region-NCR.pptx
 
a presentation for foreigners about how to travel in Germany.
a presentation for foreigners about how to travel in Germany.a presentation for foreigners about how to travel in Germany.
a presentation for foreigners about how to travel in Germany.
 
Authentic Travel Experience 2024 Greg DeShields.pptx
Authentic Travel Experience 2024 Greg DeShields.pptxAuthentic Travel Experience 2024 Greg DeShields.pptx
Authentic Travel Experience 2024 Greg DeShields.pptx
 
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
 
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
69 Girls ✠ 9599264170 ✠ Call Girls In East Of Kailash (VIP)
 
Enjoy ➥8448380779▻ Call Girls In Sector 62 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 62 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 62 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 62 Noida Escorts Delhi NCR
 

Electrical load calculation

  • 1.
  • 2.
  • 3.
  • 4.
  • 5. 21 x lighting points 12 x double 10 A socket-outlets 1 x 15 A socket-outlet 1 x 230 V, 6.0 kW oven 1 x 230 V, 2.4 kW instantaneous water heater
  • 6.
  • 7.
  • 8. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A
  • 9. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A
  • 10. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A
  • 11. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A
  • 12. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A
  • 13. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A
  • 14. Load Description Current Calculation Demand Group of load allowance current (column 1) (given list) per unit (Amps) (column 2) 21 lighting 3A 3+2 5.0 A (i) points 12 double 10 A (1st 20) 10 + 5 15.0 outlets 5 A (next 20) B (i) (equivalent 24 sockets) 15 single-phase 10 A None 10.0 B (ii) outlets 50% (6000 / 240) x 12.5 C Oven rating (or x 0.5) 0.5 E Instantaneous 33.3 % (2400 / 240) x 3.33 HWS (or x 0.33) 0.33 Total demand current = 45.83 A