SlideShare a Scribd company logo
1 of 3
Download to read offline
Demand
                             Description      Current allowance                      (Amps)
             Load Group
                                of load       per unit            Calculation
Circuit No   (column 1)
                              (given list)    (column 2)
                                                                                      L1    L2     L3
                                             3 A (1st 20)
    1           A (i)     13 Lighting points                      na                 3.0
                                             2 A (next 20)
    2           A (i)     14 Lighting points 3 A (1st 20)         na                        3.0
    3           A (i)     15 Lighting points 3 A (1st 20)         na                               3.0
                                                                  8 + (4 x 2) = 16
                          8 single +
                                                                   socket points +
    4           B (i)                        10 A (1st 20)                           10.0
                                                                  1 (pool filter
                          4 double outlets
                                                                  pump) = 17
                          7 single +
                                                                  7 + (5 x 2) =
    5           B (i)                        10 A (1st 20)                                  10.0
                                                                  17 socket points
                          5 double outlets
                          One 15 A         10 A
                B (ii)    single phase     (See note on group na                   10.0
    6
                          outlet           in Table C1, B (ii))
                                           50%
    7            C        Cook top                                4200/240 x 0.5         8.8
                                           (or x 0.5)
                                           50%
    8            C        Oven rating                             5200/240 x 0.5             10.8
                                           (or x 0.5)
                                           Pump rating = 4.3 A so socket outlet to
                                           be used for pump supply.
    9           B (i)     Pool filter pump                                           na
                                           Socket will be part of circuit L1 so
                                           Included with circuit 4 calculations
                          Air conditioner  75%
    10           D                                                23.6 x 0.75      17.7 17.7 17.7
                          (23.6 A)         (or x 0.75)
   11a                    OPHWS
                  F                        Full load current                                 15.0
                          bottom element                          3600/240
   11b                    OPHWS                                   Included
                  F                        Full load current                                  0.0
                          top element                             above
                                                  Total demand current per phase 40.7 39.5 46.5
4.1.4 Step 2
4.1.4 Step 2

More Related Content

Viewers also liked (16)

11.3.6 DC Motor Braking
11.3.6 DC Motor Braking11.3.6 DC Motor Braking
11.3.6 DC Motor Braking
 
13.8.3 Example 2
13.8.3 Example 213.8.3 Example 2
13.8.3 Example 2
 
4.1.6 RL Example 2
4.1.6 RL Example 24.1.6 RL Example 2
4.1.6 RL Example 2
 
11.3.1 Effect Emf Motor
11.3.1 Effect Emf Motor11.3.1 Effect Emf Motor
11.3.1 Effect Emf Motor
 
Less2.1
Less2.1Less2.1
Less2.1
 
4.1.3 Circuit Inductor
4.1.3 Circuit Inductor4.1.3 Circuit Inductor
4.1.3 Circuit Inductor
 
9.1.3safety
9.1.3safety9.1.3safety
9.1.3safety
 
14.4.1
14.4.114.4.1
14.4.1
 
1.1.3inputcurrent
1.1.3inputcurrent1.1.3inputcurrent
1.1.3inputcurrent
 
Topic6f
Topic6fTopic6f
Topic6f
 
Audit Training
Audit TrainingAudit Training
Audit Training
 
Intro3
Intro3Intro3
Intro3
 
Less1.5
Less1.5Less1.5
Less1.5
 
Good Elearning Practices
Good Elearning PracticesGood Elearning Practices
Good Elearning Practices
 
11.2.1 Types DC Motors
11.2.1 Types DC Motors11.2.1 Types DC Motors
11.2.1 Types DC Motors
 
192 Topic 2
192 Topic 2192 Topic 2
192 Topic 2
 

Similar to 4.1.4 Step 2

4.1.1 Example Single
4.1.1 Example Single4.1.1 Example Single
4.1.1 Example Single
Talia Carbis
 
4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 Table4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 Table
Talia Carbis
 
4.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part24.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part2
Talia Carbis
 
74 f85
74 f8574 f85
74 f85
neghy
 

Similar to 4.1.4 Step 2 (20)

4.1.1 Example Single
4.1.1 Example Single4.1.1 Example Single
4.1.1 Example Single
 
4.1.1 Example Single
4.1.1 Example Single4.1.1 Example Single
4.1.1 Example Single
 
4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 Table4.1.11 Light Demand 2 Table
4.1.11 Light Demand 2 Table
 
4.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part24.1.12 Light Demand 2 Table Part2
4.1.12 Light Demand 2 Table Part2
 
SPICE MODEL of LM7824 PSpice in SPICE PARK
SPICE MODEL of LM7824 PSpice in SPICE PARKSPICE MODEL of LM7824 PSpice in SPICE PARK
SPICE MODEL of LM7824 PSpice in SPICE PARK
 
74 f85
74 f8574 f85
74 f85
 
SPICE MODEL of LM7815 PSpice in SPICE PARK
SPICE MODEL of LM7815 PSpice in SPICE PARKSPICE MODEL of LM7815 PSpice in SPICE PARK
SPICE MODEL of LM7815 PSpice in SPICE PARK
 
SPICE MODEL of 2SB1020A in SPICE PARK
SPICE MODEL of 2SB1020A in SPICE PARKSPICE MODEL of 2SB1020A in SPICE PARK
SPICE MODEL of 2SB1020A in SPICE PARK
 
SPICE MODEL of TC7SET00F in SPICE PARK
SPICE MODEL of TC7SET00F in SPICE PARKSPICE MODEL of TC7SET00F in SPICE PARK
SPICE MODEL of TC7SET00F in SPICE PARK
 
SPICE MODEL of TC7SET00FU in SPICE PARK
SPICE MODEL of TC7SET00FU in SPICE PARKSPICE MODEL of TC7SET00FU in SPICE PARK
SPICE MODEL of TC7SET00FU in SPICE PARK
 
SPICE MODEL of IDH15S120 (Professional Model) in SPICE PARK
SPICE MODEL of IDH15S120 (Professional Model) in SPICE PARKSPICE MODEL of IDH15S120 (Professional Model) in SPICE PARK
SPICE MODEL of IDH15S120 (Professional Model) in SPICE PARK
 
SPICE MODEL of PC851 in SPICE PARK
SPICE MODEL of PC851 in SPICE PARKSPICE MODEL of PC851 in SPICE PARK
SPICE MODEL of PC851 in SPICE PARK
 
SPICE MODEL of IDH12S60C (Professional Model) in SPICE PARK
SPICE MODEL of IDH12S60C (Professional Model) in SPICE PARKSPICE MODEL of IDH12S60C (Professional Model) in SPICE PARK
SPICE MODEL of IDH12S60C (Professional Model) in SPICE PARK
 
PUTのスパイスモデル
PUTのスパイスモデルPUTのスパイスモデル
PUTのスパイスモデル
 
SPICE MODEL of 2SC3153 in SPICE PARK
SPICE MODEL of 2SC3153 in SPICE PARKSPICE MODEL of 2SC3153 in SPICE PARK
SPICE MODEL of 2SC3153 in SPICE PARK
 
SPICE MODEL of IRFB9N65A (Standard+BDS Model) in SPICE PARK
SPICE MODEL of IRFB9N65A (Standard+BDS Model) in SPICE PARKSPICE MODEL of IRFB9N65A (Standard+BDS Model) in SPICE PARK
SPICE MODEL of IRFB9N65A (Standard+BDS Model) in SPICE PARK
 
Diodo
DiodoDiodo
Diodo
 
SPICE MODEL of TC7SH02FS in SPICE PARK
SPICE MODEL of TC7SH02FS in SPICE PARKSPICE MODEL of TC7SH02FS in SPICE PARK
SPICE MODEL of TC7SH02FS in SPICE PARK
 
SPICE MODEL of 2SD986 in SPICE PARK
SPICE MODEL of 2SD986 in SPICE PARKSPICE MODEL of 2SD986 in SPICE PARK
SPICE MODEL of 2SD986 in SPICE PARK
 
SPICE MODEL of LM7815 SIMetrix in SPICE PARK
SPICE MODEL of LM7815 SIMetrix in SPICE PARKSPICE MODEL of LM7815 SIMetrix in SPICE PARK
SPICE MODEL of LM7815 SIMetrix in SPICE PARK
 

More from Talia Carbis

4.1.13 Light Demand 3
4.1.13 Light Demand 34.1.13 Light Demand 3
4.1.13 Light Demand 3
Talia Carbis
 
4.1.10 Light Demand 2
4.1.10 Light Demand 24.1.10 Light Demand 2
4.1.10 Light Demand 2
Talia Carbis
 
4.1.8 Light Demand
4.1.8 Light Demand4.1.8 Light Demand
4.1.8 Light Demand
Talia Carbis
 
4.1.7 Example Domestic 3
4.1.7 Example Domestic 34.1.7 Example Domestic 3
4.1.7 Example Domestic 3
Talia Carbis
 
4.1.6 Example Domestic 2
4.1.6 Example Domestic 24.1.6 Example Domestic 2
4.1.6 Example Domestic 2
Talia Carbis
 
4.1.5 Example Domestic 1
4.1.5 Example Domestic 14.1.5 Example Domestic 1
4.1.5 Example Domestic 1
Talia Carbis
 
4.1.2 Example Three
4.1.2 Example Three4.1.2 Example Three
4.1.2 Example Three
Talia Carbis
 
14.5.4 Example 1 Part 1
14.5.4 Example 1 Part 114.5.4 Example 1 Part 1
14.5.4 Example 1 Part 1
Talia Carbis
 
14.5.8 Example 1 Part 5
14.5.8 Example 1 Part 514.5.8 Example 1 Part 5
14.5.8 Example 1 Part 5
Talia Carbis
 
14.5.7 Example 1 Part 4
14.5.7 Example 1 Part 414.5.7 Example 1 Part 4
14.5.7 Example 1 Part 4
Talia Carbis
 
14.5.6 Example 1 Part 3
14.5.6 Example 1 Part 314.5.6 Example 1 Part 3
14.5.6 Example 1 Part 3
Talia Carbis
 
14.5.5 Example 1 Part 2
14.5.5 Example 1 Part 214.5.5 Example 1 Part 2
14.5.5 Example 1 Part 2
Talia Carbis
 
14.5.1 Improvement
14.5.1 Improvement14.5.1 Improvement
14.5.1 Improvement
Talia Carbis
 

More from Talia Carbis (20)

7.4.6 slip
7.4.6 slip7.4.6 slip
7.4.6 slip
 
4.2.1 Better Load
4.2.1 Better Load4.2.1 Better Load
4.2.1 Better Load
 
4.1.13 Light Demand 3
4.1.13 Light Demand 34.1.13 Light Demand 3
4.1.13 Light Demand 3
 
4.1.10 Light Demand 2
4.1.10 Light Demand 24.1.10 Light Demand 2
4.1.10 Light Demand 2
 
4.1.8 Light Demand
4.1.8 Light Demand4.1.8 Light Demand
4.1.8 Light Demand
 
4.1.7 Example Domestic 3
4.1.7 Example Domestic 34.1.7 Example Domestic 3
4.1.7 Example Domestic 3
 
4.1.6 Example Domestic 2
4.1.6 Example Domestic 24.1.6 Example Domestic 2
4.1.6 Example Domestic 2
 
4.1.5 Example Domestic 1
4.1.5 Example Domestic 14.1.5 Example Domestic 1
4.1.5 Example Domestic 1
 
4.1.2 Example Three
4.1.2 Example Three4.1.2 Example Three
4.1.2 Example Three
 
5.4.4 LR Circuits
5.4.4 LR Circuits5.4.4 LR Circuits
5.4.4 LR Circuits
 
14.5.4 Example 1 Part 1
14.5.4 Example 1 Part 114.5.4 Example 1 Part 1
14.5.4 Example 1 Part 1
 
14.5.3 Improve
14.5.3 Improve14.5.3 Improve
14.5.3 Improve
 
14.1.2 TRA Power
14.1.2 TRA Power14.1.2 TRA Power
14.1.2 TRA Power
 
14.5.8 Example 1 Part 5
14.5.8 Example 1 Part 514.5.8 Example 1 Part 5
14.5.8 Example 1 Part 5
 
14.5.7 Example 1 Part 4
14.5.7 Example 1 Part 414.5.7 Example 1 Part 4
14.5.7 Example 1 Part 4
 
14.5.6 Example 1 Part 3
14.5.6 Example 1 Part 314.5.6 Example 1 Part 3
14.5.6 Example 1 Part 3
 
14.5.5 Example 1 Part 2
14.5.5 Example 1 Part 214.5.5 Example 1 Part 2
14.5.5 Example 1 Part 2
 
14.5.2 Correction
14.5.2 Correction14.5.2 Correction
14.5.2 Correction
 
14.5.1 Improvement
14.5.1 Improvement14.5.1 Improvement
14.5.1 Improvement
 
14.4.5 Voltampere
14.4.5 Voltampere14.4.5 Voltampere
14.4.5 Voltampere
 

Recently uploaded

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 

Recently uploaded (20)

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 

4.1.4 Step 2

  • 1. Demand Description Current allowance (Amps) Load Group of load per unit Calculation Circuit No (column 1) (given list) (column 2) L1 L2 L3 3 A (1st 20) 1 A (i) 13 Lighting points na 3.0 2 A (next 20) 2 A (i) 14 Lighting points 3 A (1st 20) na 3.0 3 A (i) 15 Lighting points 3 A (1st 20) na 3.0 8 + (4 x 2) = 16 8 single + socket points + 4 B (i) 10 A (1st 20) 10.0 1 (pool filter 4 double outlets pump) = 17 7 single + 7 + (5 x 2) = 5 B (i) 10 A (1st 20) 10.0 17 socket points 5 double outlets One 15 A 10 A B (ii) single phase (See note on group na 10.0 6 outlet in Table C1, B (ii)) 50% 7 C Cook top 4200/240 x 0.5 8.8 (or x 0.5) 50% 8 C Oven rating 5200/240 x 0.5 10.8 (or x 0.5) Pump rating = 4.3 A so socket outlet to be used for pump supply. 9 B (i) Pool filter pump na Socket will be part of circuit L1 so Included with circuit 4 calculations Air conditioner 75% 10 D 23.6 x 0.75 17.7 17.7 17.7 (23.6 A) (or x 0.75) 11a OPHWS F Full load current 15.0 bottom element 3600/240 11b OPHWS Included F Full load current 0.0 top element above Total demand current per phase 40.7 39.5 46.5